Matthias Schäfer
Head of Application
Development
HR Group
Business Challenge
Without the ability to adapt quickly to
changing fashion trends, major shoe retailer
HR Group risked carrying unsold and
discounted stock. How could HR Group
spot – or even predict – shifting tastes?
Transformation
By migrating SAP HANA to the IBM Power
Systems platform, HR Group accelerated
key analytics processes, delivering
near-instant insight into market trends, at
lower operational costs.
HR Group
Delivering instant sales
and stock analytics
with SAP HANA on
IBM Power Systems
“SAP HANA on IBM
Power Systems reduced
complexity and increased
energy efficiency in our
data center.”
Matthias Schäfer, Head of Application
Development, HR Group
Business benefits:
Near-instant
insight into market
trends to respond fast to
shifting demand
Optimizes
SAP system landscape to
reduce costs
60%
faster business processes
with half the processor cores Major footwear retailer HR Group, headquartered in Osnabrück, Germany,
sells through 2,500 locations, including 750 of its own branches, in
20 countries. Employing 5,000 people, the company sells 49 million items a
year and achieves sales of EUR600 million.
Share this
Watch the HR Group video:
Challenge in detail
To protect their margins, fashion
retailers must react rapidly to an ever-
changing market. Allocating the optimal
assortment of products to each branch
is an effective way to maximize revenues
and avoid the cost of unsold stock—
but how could HR Group identify and
deliver the right mix to each store in a
timely manner?
Solution delivery
HR Group migrated to SAP HANA
on IBM® Power Systems™ for SAP
Business Warehouse, taking advantage
of the latest IBM POWER8® technology
and centralized IBM Storwize®
V5000 storage.
Quick insights needed
to keep up with fashion
trends
Trends in fashion change rapidly and it
is crucial for retailers to respond fast to
shifting market demands. As the industry
faces shrinking profit margins, it becomes
particularly important to be able to allocate
the right products in the right sizes to the
right branches at the right time, to help
cut costs, reduce unsold and discounted
stock, and maximize potential revenue.
Matthias Schäfer, Head of Application
Development at HR Group, says, “We
noticed that the business is getting faster
and faster in terms of customer response,
distribution and the whims of fashion.
To sell our stock across all our branches
at the best possible prices, we needed
instant insights into customer behavior.
Our regional sales managers can only
effectively plan campaigns when they have
access to up-to -the second sales figures.
Using reliable facts enables them to adapt
the product range in our branches to
match customers’ tastes.”
The company supplies some 2,500
locations with about 4,000 different
articles in various sizes. Previously, HR
Group based its distribution and sales
planning on product categories, not actual
sales of individual items at each branch.
This could lead to situations where one
branch had sold out while another had a
surplus of particular products.
Matthias Schäfer explains, “All fashion
retailers are under a lot of pressure right
now. Tight profit margins mean that even
small optimizations of our planning and
supply processes can make the difference
between profit and loss.”
Deploying SAP HANA
on IBM Power Systems
To react faster to sales patterns, HR
Group worked closely with IBM and IBM
Business Partner FRITZ & MACZIOL
to deploy SAP HANA for one of its SAP
Business Warehouse applications.
The company connected its existing
systems to SAP HANA using the SAP
Landscape Transformation Replication
Server software. HR Group also linked
point-of-sales devices in its 750 branches
to SAP HANA using SAP Point-of-Sale
Data Management.
Matthias Schäfer says, “By combining
SAP HANA with our points of sale, we can
instantly analyze sales information from
750 branches. On top of that, we use SAP
POS Loss Prevention Analytics for Retail to
monitor our transactions and flag up fraud
and other suspicious activity as quickly
as possible.”
After the initial implementation of SAP
HANA on x86 servers, HR Group decided
to move to SAP HANA on IBM® Power
Systems. With core SAP solutions already
running on the IBM Power Systems™
platform, the move would simplify its IT
environment and streamline operations
and management processes. Today,
the company operates a homogenous
SAP solution landscape based on IBM
POWER8® technology.
Manfred Gries, Team Leader Data Center
Operations at HR Group, elaborates,
“When SAP HANA became available
on IBM Power Systems, we immediately
discussed this with IBM and our trusted
partner FRITZ & MACZIOL, because
we were keen to migrate to the latest
POWER8 servers to streamline our
SAP application operations processes
and retire the isolated x86 systems in
our SAP environment that only increased
the management workload. Having all
of our SAP applications on a single,
highly reliable server platform helps us
standardize systems management and
increase productivity within the IT team.”
The company runs its mission-critical SAP
ERP applications on application servers
in fully virtualized environments with IBM
PowerVM® and IBM AIX® on three IBM
Power® System S824 servers.
HR Group, IBM and FRITZ & MACZIOL
set up one IBM Power System S822L with
SUSE Linux Enterprise Server to run the
production SAP HANA database. The test
and development instance of SAP HANA
runs with IBM PowerVM® virtualization on
an IBM Power System S824 server, also
with SUSE Linux Enterprise Server.
“Having all of our SAP
applications on the single,
highly reliable IBM Power
Systems server platform
helps us standardize
systems management and
increase productivity within
the IT team.
Manfred Gries
Team Leader Data Center Operations
HR Group
Benefits in detail
•	Ensures lightning-fast data analytics,
enabling near-instant insight into
market trends.
•	Reduces the risk of carrying
unfashionable lines.
•	Simplifies the SAP solution landscape
and cuts admin costs.
Key components
Industry: Retail
Applications: SAP® HANA®,
SAP for Retail, SAP Business Warehouse,
SAP BusinessObjects™ Mobile,
SAP Point-of-Sale Data Management,
SAP POS Loss Prevention Analytics for
Retail, SAP Landscape Transformation
Replication Server, SAPUI5
Hardware: IBM® Power® System S824,
IBM Power System S822L,
IBM Storwize® V5000,
IBM System Storage® DS3400
Software: IBM AIX®, IBM PowerVM®
Enterprise Edition,
IBM Spectrum Virtualize™,
IBM Spectrum Protect™ for SAP HANA,
IBM WebSphere® Commerce,
SUSE Linux Enterprise Server
Services: IBM Business Partner
FRITZ & MACZIOL
HR Group uses a central, fully redundant
storage solution based on two IBM
Storwize® V5000 systems, built with IBM
Spectrum Virtualize™ software, to provide
data storage for all SAP applications.
Using IBM Easy Tier® technology, the
company ensures that the most frequently
used data is automatically being moved to
ultra-fast flash storage.
For reliable back up of its SAP ERP
application data and the SAP HANA
database, HR Group relies on IBM
Spectrum Protect™ for Enterprise
Resource Planning Data Protection for
SAP HANA.
Direct cost savings
Running SAP HANA on IBM Power
Systems allowed HR Group to simplify and
streamline its IT environment. As a result,
the company currently saves EUR4,000
per month in hardware leasing costs.
Manfred Gries says, “The stability and
flexibility of IBM Power Systems ensures
that we can run our SAP applications,
including SAP HANA, reliably. The
advanced virtualization technology
gives us the opportunity to dynamically
optimize the resource utilization across
our SAP application landscape. In contrast
to dedicated SAP HANA appliances,
we expect SAP HANA on POWER to
seamlessly integrate into our virtualized
system environment, as we already
demonstrated with our test system.”
Furthermore, the virtualized storage
solution increases the performance of
the entire SAP system landscape by
seamlessly moving data to the most
appropriate storage system.
Faster, more detailed
planning
Using SAP HANA on IBM Power Systems
allowed HR Group to improve planning
and distribution substantially. Matthias
Schäfer says, “SAP HANA on IBM Power
Systems enables HR Group to run
complex planning analytics much faster
than before. Not only can we run existing
analytics more quickly, we are also able to
complete more-granular planning, so we
can now stock the right products at the
right branches more reliably than before.”
60% faster business processes
with half the processor cores
Giving staff an easy and quick way to
respond to these situations helps us to
keep our inventory figures up-to-date, so
that they match the actual inventories in
our branches. Access to real-time inventory
data is crucial for managing additional
deliveries throughout the day and ensuring
a smooth omni-channel experience. This
helps us optimize service to the branches
and, ultimately, customers.”
The company also introduced SAP
BusinessObjects Mobile to ensure its
sales staff can use the real-time figures
more efficiently without relying on a
desktop computer or laptop. Matthias
Schäfer adds, “With rapid access to
up-to-the-minute sales figures on mobile
devices like smartphones and tablets in
combination with the capability to analyze
this data flexibly without delays, our
regional sales managers can spot market
trends faster, helping them to redistribute
stock quicker and optimize our overall
sales performance.”
HR Group leverages the user interface
technology UI development toolkit
for HTML5 (SAPUI5) to create mobile
applications rapidly and easily.
Manfred Gries explains, “To accelerate
business processes and improve accuracy,
we wanted make more and more features
available on mobile devices. For example,
we used SAPUI5 to create an application
for iPads that staff in our branches can
use to quickly report when the warehouse
dispatches a shoe in the wrong size, for
example. In the past, small errors such as
this added up, and were only identified
when we checked our inventory.
© 2015 IBM Corp. IBM Deutschland GmbH D-71137 Ehningen ibm.com/solutions/sap IBM, the IBM logo,ibm.com, AIX, Easy Tier, IBM Spectrum, IBM Spectrum Protect, IBM Spectrum Virtualize, Power,
POWER8, PowerVM, Power Systems, Storwize, and System Storage are trademarks of International Business Machines Corporation, registered in many jurisdictions worldwide. A current list of other IBM
trademarks is available on the Web at “Copyright and trademark information” at http://www.ibm.com/legal/copytrade.shtml. Other company, product or service names may be trademarks, or service marks
of others. This case study illustrates how one IBM customer uses IBM and/or IBM Business Partner technologies/services. Many factors have contributed to the results and benefits described. IBM does
not guarantee comparable results. All information contained herein was provided by the featured customer and/or IBM Business Partner. IBM does not attest to its accuracy. All customer examples cited
represent how some customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics will vary depending on individual customer
configurations and conditions.This publication is for general guidance only. Photographs may show design models.
© 2015 SAP SE. All rights reserved. SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer, StreamWork, SAP HANA, and other SAP products and services mentioned
herein as well as their respective logos are trademarks or registered trademarks of SAP SE in Germany and other countries. These materials are provided by SAP SE or an SAP affiliate company for
informational purposes only, without representation or warranty of any kind, and SAP SE or its affiliated companies shall not be liable for errors or omissions with respect to the materials. This document, or
any related presentation, and SAP SE’s or its affiliated companies’ strategy and possible future developments, products, and/or platform directions and functionality are all subject to change and may be
changed by SAP SE or its affiliated companies at any time for any reason without notice.
Learn more, connect with IBM and SAP
Moving forward, HR Group plans to
connect its SAP HANA platform to its IBM
WebSphere Commerce online shop to show
users real-time stock information for all
items and branches.
Matthias Schäfer concludes, “Using SAP
HANA on IBM Power Systems reduced
the complexity of our IT environment and
boosts energy efficiency in our data center
– we achieve the same performance as
before with half the processor cores, thanks
to the powerful IBM POWER8 technology.
Some operations are even more than
60 percent faster on IBM POWER8.
“As next step, we will roll out SAP HANA
on IBM Power Systems to our wholesale
operation to achieve similar improvements
as we already realized for our own
branches.”
Scan the QR code with your
mobile to jump to the video

Spc03563 usen

  • 1.
    Matthias Schäfer Head ofApplication Development HR Group Business Challenge Without the ability to adapt quickly to changing fashion trends, major shoe retailer HR Group risked carrying unsold and discounted stock. How could HR Group spot – or even predict – shifting tastes? Transformation By migrating SAP HANA to the IBM Power Systems platform, HR Group accelerated key analytics processes, delivering near-instant insight into market trends, at lower operational costs. HR Group Delivering instant sales and stock analytics with SAP HANA on IBM Power Systems “SAP HANA on IBM Power Systems reduced complexity and increased energy efficiency in our data center.” Matthias Schäfer, Head of Application Development, HR Group Business benefits: Near-instant insight into market trends to respond fast to shifting demand Optimizes SAP system landscape to reduce costs 60% faster business processes with half the processor cores Major footwear retailer HR Group, headquartered in Osnabrück, Germany, sells through 2,500 locations, including 750 of its own branches, in 20 countries. Employing 5,000 people, the company sells 49 million items a year and achieves sales of EUR600 million. Share this Watch the HR Group video:
  • 2.
    Challenge in detail Toprotect their margins, fashion retailers must react rapidly to an ever- changing market. Allocating the optimal assortment of products to each branch is an effective way to maximize revenues and avoid the cost of unsold stock— but how could HR Group identify and deliver the right mix to each store in a timely manner? Solution delivery HR Group migrated to SAP HANA on IBM® Power Systems™ for SAP Business Warehouse, taking advantage of the latest IBM POWER8® technology and centralized IBM Storwize® V5000 storage. Quick insights needed to keep up with fashion trends Trends in fashion change rapidly and it is crucial for retailers to respond fast to shifting market demands. As the industry faces shrinking profit margins, it becomes particularly important to be able to allocate the right products in the right sizes to the right branches at the right time, to help cut costs, reduce unsold and discounted stock, and maximize potential revenue. Matthias Schäfer, Head of Application Development at HR Group, says, “We noticed that the business is getting faster and faster in terms of customer response, distribution and the whims of fashion. To sell our stock across all our branches at the best possible prices, we needed instant insights into customer behavior. Our regional sales managers can only effectively plan campaigns when they have access to up-to -the second sales figures. Using reliable facts enables them to adapt the product range in our branches to match customers’ tastes.” The company supplies some 2,500 locations with about 4,000 different articles in various sizes. Previously, HR Group based its distribution and sales planning on product categories, not actual sales of individual items at each branch. This could lead to situations where one branch had sold out while another had a surplus of particular products. Matthias Schäfer explains, “All fashion retailers are under a lot of pressure right now. Tight profit margins mean that even small optimizations of our planning and supply processes can make the difference between profit and loss.” Deploying SAP HANA on IBM Power Systems To react faster to sales patterns, HR Group worked closely with IBM and IBM Business Partner FRITZ & MACZIOL to deploy SAP HANA for one of its SAP Business Warehouse applications. The company connected its existing systems to SAP HANA using the SAP Landscape Transformation Replication Server software. HR Group also linked point-of-sales devices in its 750 branches to SAP HANA using SAP Point-of-Sale Data Management. Matthias Schäfer says, “By combining SAP HANA with our points of sale, we can instantly analyze sales information from 750 branches. On top of that, we use SAP POS Loss Prevention Analytics for Retail to monitor our transactions and flag up fraud and other suspicious activity as quickly as possible.” After the initial implementation of SAP HANA on x86 servers, HR Group decided to move to SAP HANA on IBM® Power Systems. With core SAP solutions already running on the IBM Power Systems™ platform, the move would simplify its IT environment and streamline operations and management processes. Today, the company operates a homogenous SAP solution landscape based on IBM POWER8® technology. Manfred Gries, Team Leader Data Center Operations at HR Group, elaborates, “When SAP HANA became available on IBM Power Systems, we immediately discussed this with IBM and our trusted partner FRITZ & MACZIOL, because we were keen to migrate to the latest POWER8 servers to streamline our SAP application operations processes and retire the isolated x86 systems in our SAP environment that only increased the management workload. Having all of our SAP applications on a single, highly reliable server platform helps us standardize systems management and increase productivity within the IT team.” The company runs its mission-critical SAP ERP applications on application servers in fully virtualized environments with IBM PowerVM® and IBM AIX® on three IBM Power® System S824 servers. HR Group, IBM and FRITZ & MACZIOL set up one IBM Power System S822L with SUSE Linux Enterprise Server to run the production SAP HANA database. The test and development instance of SAP HANA runs with IBM PowerVM® virtualization on an IBM Power System S824 server, also with SUSE Linux Enterprise Server. “Having all of our SAP applications on the single, highly reliable IBM Power Systems server platform helps us standardize systems management and increase productivity within the IT team. Manfred Gries Team Leader Data Center Operations HR Group
  • 3.
    Benefits in detail • Ensureslightning-fast data analytics, enabling near-instant insight into market trends. • Reduces the risk of carrying unfashionable lines. • Simplifies the SAP solution landscape and cuts admin costs. Key components Industry: Retail Applications: SAP® HANA®, SAP for Retail, SAP Business Warehouse, SAP BusinessObjects™ Mobile, SAP Point-of-Sale Data Management, SAP POS Loss Prevention Analytics for Retail, SAP Landscape Transformation Replication Server, SAPUI5 Hardware: IBM® Power® System S824, IBM Power System S822L, IBM Storwize® V5000, IBM System Storage® DS3400 Software: IBM AIX®, IBM PowerVM® Enterprise Edition, IBM Spectrum Virtualize™, IBM Spectrum Protect™ for SAP HANA, IBM WebSphere® Commerce, SUSE Linux Enterprise Server Services: IBM Business Partner FRITZ & MACZIOL HR Group uses a central, fully redundant storage solution based on two IBM Storwize® V5000 systems, built with IBM Spectrum Virtualize™ software, to provide data storage for all SAP applications. Using IBM Easy Tier® technology, the company ensures that the most frequently used data is automatically being moved to ultra-fast flash storage. For reliable back up of its SAP ERP application data and the SAP HANA database, HR Group relies on IBM Spectrum Protect™ for Enterprise Resource Planning Data Protection for SAP HANA. Direct cost savings Running SAP HANA on IBM Power Systems allowed HR Group to simplify and streamline its IT environment. As a result, the company currently saves EUR4,000 per month in hardware leasing costs. Manfred Gries says, “The stability and flexibility of IBM Power Systems ensures that we can run our SAP applications, including SAP HANA, reliably. The advanced virtualization technology gives us the opportunity to dynamically optimize the resource utilization across our SAP application landscape. In contrast to dedicated SAP HANA appliances, we expect SAP HANA on POWER to seamlessly integrate into our virtualized system environment, as we already demonstrated with our test system.” Furthermore, the virtualized storage solution increases the performance of the entire SAP system landscape by seamlessly moving data to the most appropriate storage system. Faster, more detailed planning Using SAP HANA on IBM Power Systems allowed HR Group to improve planning and distribution substantially. Matthias Schäfer says, “SAP HANA on IBM Power Systems enables HR Group to run complex planning analytics much faster than before. Not only can we run existing analytics more quickly, we are also able to complete more-granular planning, so we can now stock the right products at the right branches more reliably than before.” 60% faster business processes with half the processor cores
  • 4.
    Giving staff aneasy and quick way to respond to these situations helps us to keep our inventory figures up-to-date, so that they match the actual inventories in our branches. Access to real-time inventory data is crucial for managing additional deliveries throughout the day and ensuring a smooth omni-channel experience. This helps us optimize service to the branches and, ultimately, customers.” The company also introduced SAP BusinessObjects Mobile to ensure its sales staff can use the real-time figures more efficiently without relying on a desktop computer or laptop. Matthias Schäfer adds, “With rapid access to up-to-the-minute sales figures on mobile devices like smartphones and tablets in combination with the capability to analyze this data flexibly without delays, our regional sales managers can spot market trends faster, helping them to redistribute stock quicker and optimize our overall sales performance.” HR Group leverages the user interface technology UI development toolkit for HTML5 (SAPUI5) to create mobile applications rapidly and easily. Manfred Gries explains, “To accelerate business processes and improve accuracy, we wanted make more and more features available on mobile devices. For example, we used SAPUI5 to create an application for iPads that staff in our branches can use to quickly report when the warehouse dispatches a shoe in the wrong size, for example. In the past, small errors such as this added up, and were only identified when we checked our inventory. © 2015 IBM Corp. IBM Deutschland GmbH D-71137 Ehningen ibm.com/solutions/sap IBM, the IBM logo,ibm.com, AIX, Easy Tier, IBM Spectrum, IBM Spectrum Protect, IBM Spectrum Virtualize, Power, POWER8, PowerVM, Power Systems, Storwize, and System Storage are trademarks of International Business Machines Corporation, registered in many jurisdictions worldwide. A current list of other IBM trademarks is available on the Web at “Copyright and trademark information” at http://www.ibm.com/legal/copytrade.shtml. Other company, product or service names may be trademarks, or service marks of others. This case study illustrates how one IBM customer uses IBM and/or IBM Business Partner technologies/services. Many factors have contributed to the results and benefits described. IBM does not guarantee comparable results. All information contained herein was provided by the featured customer and/or IBM Business Partner. IBM does not attest to its accuracy. All customer examples cited represent how some customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics will vary depending on individual customer configurations and conditions.This publication is for general guidance only. Photographs may show design models. © 2015 SAP SE. All rights reserved. SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer, StreamWork, SAP HANA, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE in Germany and other countries. These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP SE or its affiliated companies shall not be liable for errors or omissions with respect to the materials. This document, or any related presentation, and SAP SE’s or its affiliated companies’ strategy and possible future developments, products, and/or platform directions and functionality are all subject to change and may be changed by SAP SE or its affiliated companies at any time for any reason without notice. Learn more, connect with IBM and SAP Moving forward, HR Group plans to connect its SAP HANA platform to its IBM WebSphere Commerce online shop to show users real-time stock information for all items and branches. Matthias Schäfer concludes, “Using SAP HANA on IBM Power Systems reduced the complexity of our IT environment and boosts energy efficiency in our data center – we achieve the same performance as before with half the processor cores, thanks to the powerful IBM POWER8 technology. Some operations are even more than 60 percent faster on IBM POWER8. “As next step, we will roll out SAP HANA on IBM Power Systems to our wholesale operation to achieve similar improvements as we already realized for our own branches.” Scan the QR code with your mobile to jump to the video