Bharat Electronics Ltd, Ghaziabad
Sub: Instructions and Terms & Conditions for Submitting Quotation against our RFQ
1. Quotation must be sent only through BEL SRM Portal in SRM.BEL.CO.IN .In case of any difficulty in sending the quotation, pl. contact
Corporate IS at e-mail ID srmadmin@bel.co.in or concerned purchase officer/sender.
2. Quotation must submitted latest by 23:59 Hours on the closing date. Quotation received after the closing date and to any other mail id/fax no.
/address will not be considered.
3. VALIDITY OF QUOTATION: The quotation must remain valid for a minimum period of 90 days from the closing date.
4. Item specification (s) must be as per our RFQ / BEL Drawing. Any alternate item offered must accompany with its data sheet. BEL reserves all
right to accept or reject the tender on the basis of deviation(s). Also attach all relevant document/ brochures. All items should conform to
Government/ statutory regulations with regard to Safety, handling & environment as applicable.
5. The Bidders required to indicate in their bids whether they are participating in the bid in the capacity of Manufactures/ Traders/
Service Providers in respect of the Tendered items. In case of MSME supplier, submit your latest MSME certificate/ requisite
documents, as stipulated in the statute along with the bid. For MSME supplier, Purchase Preference and Payment Terms will be as
per government guidelines in vogue. MSME Vendor participating in the capacity of “Traders” of the goods being tendered will not be
considered as eligible MSME vendors for this bid.
6. Preference to MAKE IN INDIA: Purchase preference to Makein India shall be extended to local suppliers as per Govt. Of India order 2017 (PPO-
2017) and BEL guidelines in vogue.For all the information on PPO-2017, its amendments, notifications and clauses, Public Procurement
(Preference to make in India) link on BEL website (under ‘Make in India initiatives) or the link as below shall be
referred:http://www.belindia.in/ContentPage.aspx?Mld=20&Cld=0&Lld=1&link=0.
7. Please submit your lowest quote and best delivery schedule. L1 will be decided on the basis of Cost to Company and sum of all service line item
basis. Cost to BEL and compliances to RFQ, conditions like delivery requirements, packing, etc. would be the basis while evaluating L1.
Payment terms including advances, if any, will be considered while working out cost to BEL.
8. Integrity pact: for offer value more than Rs 3 Cr, supplier must submit Integrity Pact along with bid. Format can be taken from Purchase
officer if applicable.
9. In case OEM is not bidding directly, the authorized distributor/ channel partner of OEM need to submit authorization letter from OEM
along with the bid.
10. Price shall be quoted with all applicable Taxes and duties and same shall be clearly & separately spelt out in the offer. No taxes will be payable
by BEL unless payment of same is specifically stipulated by the supplier in their quotation and the same is legally leviable
11. If the supplier/OEM is not interested to quote due to any reason against that published RFX, then it is required to submit a Regret mail with
reason on mail ID:- pursccs@bel.co.in.
12. Quotation Submitted may get disqualified/ Rejected on following Condition:-
 Advance Payment Terms.
 Alternate offered by general distributors or stockiest.
 Abnormal Delivery Schedule and non-Compliance to terms and conditions
 Any other term and condition quoted by vendor which is not in line with our business Ethics and procedures.
 Incomplete quotation.
13. The tendered rate against each item indicated in the RFQ should be indicated both in words and figures. In case of any clerical error between
the rates indicated in figures and word, the rates quoted in words would prevail. If there is any inconsistency between the rate and the value
extended (after multiplication with the tender quantity), the rate quoted shall be taken to prevail. Further, in case of any discrepancy between
price filled in SRM portal and quotation attached in the SRM, then the rates quoted in the attachment will be considered for further processing.
14. If vendor has not submitted the compliance to SOW/ Terms & conditions, then it will be assumed that said SOW/T&C is fully complied and
accepted by vendor.
15. The quotation and any other resulting from this RFX shall be governed by BEL’s Conditions of contract and the supplier quoting against this
enquiry shall be deemed to have read and understood the same.
16. Where counter terms and conditions of business have been offered by the supplier, we shall not be deemed to be governed by those unless
BEL’s specific written acceptance thereof has been given.
17. BEL reserves the right to accept or reject any quotation or part of the quotation without assigning any reasons. BEL reserves the right of
ordering part quantities without assigning reasons and the supplier shall supply the ordered quantity at accepted rates.
18. This RFX is being issued with no financial commitment and the Buyer reserves the right to change or vary any part thereof at any stage. Buyer
also reserves the right to withdraw the RFX, should it become necessary at any stage without assigning any reasons.
19. MENDATORY DOCUMENTS REQUIRED WITH BID
(i) Compliance to specifications/ Drawing
(ii)Point wise compliance to Terms and conditions enclosed at Annexure-A. If vendor doesn’t submit compliance with respect to
Annexure –I then full compliance shall be deemed to be considered.
Annexure-A
T&C and SOW of “ICNS: IN SITU IPEU REPAIRS 2023”
A. OBJECTIVE:
To carry out in situ repair of 120 nos. faulty IPEUs of ICNS project.
10. Repairs of 1st lot – 30 nos.
20. Repairs of 2nd lot – 30 nos.
30. Repairs of 3rd lot – 30 nos.
40. Repairs of 4th lot – 30 nos.
B. Period of repair Order
The repair of the faulty IPEUs shall be completed within 180 days from the date of release of PO.
C. Scope of Work:
1. PCB/LRU level fault rectification of the faulty IPEU at BEL GAD.
2. Scope of repair is to restore the basic functionality of the faulty units after ensuring normal booting up.
3. Repair/ replacement of faulty items shall cover all LRUs/ PCB/ modules, cables, connectors, display, sensors and other accessories. List of major
replaceable items at LRU/PCB level is placed at Appendix-1.
4. The repair activity is to be undertaken at repair bench at BEL GAD.
5. All tools, instruments and spares/modules at appendix-1 and any other items required for fault rectification is in the scope of work of the vendor/
firm.
6. A detailed report of rectification activities carried out on each unit must be documented and submitted.
7. Repaired items shall perform all basic functions and must pass the system run checks at the test bench at BEL GAD.
8. Any test failed item post repair shall be re-worked and repaired without any extra cost on BEL.
D. Payment Terms: The Payment for the subject order shall be made within 30 days after submission of satisfactory completion certificate signed
by BEL Rep at BEL, GAD on pro-rata basis of lots.
Prices mentioned in PO are without Taxes. Taxes are to be paid extra as applicable at the time of invoice. At present GST @ 18%.
E. Liquidated Damages (LD): In case of delayed supplies, where reasons for delay is directly attributable to seller, BEL shall be entitled at their
option :
a. To recover from the supplier a liquidated damages of sum of 0.5% of value of any stores/ services not supplied/ rendered in time for every
week or part of a week for which there have been delayed with a ceiling of 10%. Or
b. To purchase elsewhere, at the risk and cost of the supplier, the undelivered item/ services or to cancel the Purchase Order.
F. WARRANTY: The vendor shall extend a warranty for 06 months post repair wherein the vendor would be liable to repair the faulty unit without
any additional payment for the same.
G. REPEAT ORDER: Buyer at its option can order up to 120% quantity of the supplied items within 18 months from the date of original Purchase
Order on same cost, terms and conditions.
H. Option Clause: Purchase orders can be placed under option clause within 18 months from the date of Purchase Order for additional qty. upto a
max of 50% of the original quantity for the same price and terms & conditions.
I. PREVENTION OF COUNTERFEIT PART:
• In case of counterfeit parts supplied by vendor, no payment shall be made to vendor.
• In case of line-rejection due to counterfeit parts, payment will be recovered/deducted from the vendor.
• Counterfeit parts will not be returned back and shall be destroyed as per Standard Operating Procedure.
• Necessary action to debar the vendor from further RFQs shall be initiated.
J. Termination/Cancellation of Purchase order: BEL reserves the right to cancel the order (if placed) with 15 days notice without any financial
liability in the event of any of the following:
• Spurious supplies in service
• Time expired supplies
• Adulterated supplies
• Supplies inferior to the quality standards
• Repeated delays in deliveries
• Repeated rejections.
K. FORCE MAJEURE CLAUSE:
Force Majeure means an event beyond the control of the supplier and not involving the supplier’s fault or negligence and which is not foreseeable.
Such events may include, but are not restricted to, acts of the purchaser either in its sovereign or contractual capacity, wars or revolutions, hostility,
acts of public enemy, civil commotion, sabotage, fires, floods, explosions, epidemics, quarantine restrictions, strikes, lockouts, and freight
embargoes. If there is delay in performance or other failures by the supplier to perform its obligation under its contract due to event of a Force
Majeure, the supplier shall not be held responsible for such delays / failures. If a Force Majeure situation arises, the supplier shall promptly notify
the purchaser in writing of such conditions and the cause thereof within twenty-one days of occurrence of such event. Unless otherwise directed by
the purchaser
in writing, the supplier shall continue to perform its obligations under the contract as far as reasonably practical, and shall seek all reasonable
alternative means for performance not prevented by the Force Majeure event. If the performance in whole or in part or any obligation under this
contract is prevented or delayed by any Reason of Force Majeure for a period exceeding sixty days, either party may at its option terminate the
contract without any financial repercussion on either side. There may be a Force Majeure situation affecting the purchase organization only. In such
a situation the purchase organization is to take up with the supplier on similar lines as above for further necessary action.
L. Jurisdiction:
This order shall be governed by the Laws of Indian Union in force. Only competent courts shall have the jurisdiction as provided under the Indian
Arbitration and Conciliation Act 1996, or any statutory modifications thereof in force on any matter arising out of any Arbitration proceedings under
this contract.
Appendix-1: COMMONLY FAILED SPARES OF IPEU/CFG/MFG
Sl. Item Description BEL Part No.
1 RTC Battery 437444590171
2 Cable Assy Ethernet CAT 5E LFH HAL free 490712470165
3 iButton (64-bit ID) 437445170134
4 iButton touch probe with LED 437445180125
5 Ultra bright LED green HLMP-3950 446040510175
6 Ultra bright LED Red HLMP-3750 446040510272
7 Fuse time lag L5x20mm 250V, 0.0500A RoHS 456800801364
8 15W single output switching power supply 457944030172
9 Button Key ring mount 471642670193
10 Keypad with header (1x9) without cable 471642690272
11 Switch Toggle DP on none MIL-G 471301100310
12 LCD Assy IDU 142001238324
13 Battery CR-P2, 6V Li 457540610179
14 Battery CableAssy 142001194480
15 Keypad cable assy (IDU Filguns) 142001195353
16 AdhesiveCyanoacrylate 20g 560501400150
17 Fuse HLDR 10A250V for 5X20mm Fuse 475111000156
18 Resistor TFCH 75.0 ± 1% 0.125W 400505431187
19 Resistor TFCH 470 ± 5% 0.125W 400505240194
20 Resistor TFCH 121 ± 1% 0.125W 400505433418
21 Res 1.5 OHM SMD 1206 5% 400541720245
22 Diode SCHOT RECT 1A 40V 1N5819 RoHS 423204100196
23 Diode RECT 1N4007 RoHS 423200700540
24 Diode SI SW 1N4448 423772060125
25 ICLIN VREG LT1764AEQ 432841360111
26 IC RS232 TxRx 437814480368
27 LED Red 1.6V 60mA SMD 0805 446013160249
28 Ethernet Transceiver HX1188 437816570136
29 SRAM IC 437445140161
30 Wire PTFE 600V7/0.20 OD1 2W 485900200352

More Related Content

Similar to SOW T&C.pdf

Bid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal PradeshBid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal Pradesh
Headway Solar
 
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
Josh Kalov
 
Signed contract and purchase order
Signed contract and purchase orderSigned contract and purchase order
Signed contract and purchase order
jong drilon
 
Fwpq no 24 of 2021 2022 electricity meters
Fwpq no 24 of 2021 2022 electricity metersFwpq no 24 of 2021 2022 electricity meters
Fwpq no 24 of 2021 2022 electricity meters
SafetyOfficer14
 
!Rfq 9119 13-7035 final draft for approval (jan 30)
!Rfq 9119 13-7035 final draft for approval (jan 30)!Rfq 9119 13-7035 final draft for approval (jan 30)
!Rfq 9119 13-7035 final draft for approval (jan 30)
Bob Gaspirc
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Gensol Engineering Limited
 
Wb appendix 3 guidance to bidders
Wb appendix 3 guidance to biddersWb appendix 3 guidance to bidders
Wb appendix 3 guidance to biddersJoy Irman
 
Appendix 3 guidance to bidders
Appendix 3   guidance to biddersAppendix 3   guidance to bidders
Appendix 3 guidance to biddersJoy Irman
 
bChannels Terms & Conditions
bChannels Terms & ConditionsbChannels Terms & Conditions
bChannels Terms & ConditionsbChannels
 
Eoi indoor & outdoor venue branding
Eoi indoor & outdoor venue brandingEoi indoor & outdoor venue branding
Eoi indoor & outdoor venue branding
plastivision
 
Condition & Warranties on consumer durables
Condition & Warranties on consumer durablesCondition & Warranties on consumer durables
Condition & Warranties on consumer durables
Angshuman Mitra
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIA
Avinash Kumar Gupta
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdf
ChelDems
 
Keeping Track of Deadlines
Keeping Track of DeadlinesKeeping Track of Deadlines
Keeping Track of Deadlines
Tom Blefko
 
GrantWritertermsandconditions
GrantWritertermsandconditionsGrantWritertermsandconditions
GrantWritertermsandconditionsIrene Lemon
 
Eng iveco
Eng ivecoEng iveco
Eng iveco
Luis Jesus
 

Similar to SOW T&C.pdf (20)

Bid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal PradeshBid document for Solar in Himachal Pradesh
Bid document for Solar in Himachal Pradesh
 
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
 
Signed contract and purchase order
Signed contract and purchase orderSigned contract and purchase order
Signed contract and purchase order
 
serv_ter
serv_terserv_ter
serv_ter
 
Fwpq no 24 of 2021 2022 electricity meters
Fwpq no 24 of 2021 2022 electricity metersFwpq no 24 of 2021 2022 electricity meters
Fwpq no 24 of 2021 2022 electricity meters
 
!Rfq 9119 13-7035 final draft for approval (jan 30)
!Rfq 9119 13-7035 final draft for approval (jan 30)!Rfq 9119 13-7035 final draft for approval (jan 30)
!Rfq 9119 13-7035 final draft for approval (jan 30)
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
 
Wb appendix 3 guidance to bidders
Wb appendix 3 guidance to biddersWb appendix 3 guidance to bidders
Wb appendix 3 guidance to bidders
 
dgs&d
dgs&ddgs&d
dgs&d
 
Appendix 3 guidance to bidders
Appendix 3   guidance to biddersAppendix 3   guidance to bidders
Appendix 3 guidance to bidders
 
bChannels Terms & Conditions
bChannels Terms & ConditionsbChannels Terms & Conditions
bChannels Terms & Conditions
 
Eoi indoor & outdoor venue branding
Eoi indoor & outdoor venue brandingEoi indoor & outdoor venue branding
Eoi indoor & outdoor venue branding
 
Condition & Warranties on consumer durables
Condition & Warranties on consumer durablesCondition & Warranties on consumer durables
Condition & Warranties on consumer durables
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIA
 
2016 Product Catalog
2016 Product Catalog2016 Product Catalog
2016 Product Catalog
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdf
 
Keeping Track of Deadlines
Keeping Track of DeadlinesKeeping Track of Deadlines
Keeping Track of Deadlines
 
GrantWritertermsandconditions
GrantWritertermsandconditionsGrantWritertermsandconditions
GrantWritertermsandconditions
 
Eng iveco
Eng ivecoEng iveco
Eng iveco
 
1713865
17138651713865
1713865
 

Recently uploaded

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 

Recently uploaded (20)

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 

SOW T&C.pdf

  • 1. Bharat Electronics Ltd, Ghaziabad Sub: Instructions and Terms & Conditions for Submitting Quotation against our RFQ 1. Quotation must be sent only through BEL SRM Portal in SRM.BEL.CO.IN .In case of any difficulty in sending the quotation, pl. contact Corporate IS at e-mail ID srmadmin@bel.co.in or concerned purchase officer/sender. 2. Quotation must submitted latest by 23:59 Hours on the closing date. Quotation received after the closing date and to any other mail id/fax no. /address will not be considered. 3. VALIDITY OF QUOTATION: The quotation must remain valid for a minimum period of 90 days from the closing date. 4. Item specification (s) must be as per our RFQ / BEL Drawing. Any alternate item offered must accompany with its data sheet. BEL reserves all right to accept or reject the tender on the basis of deviation(s). Also attach all relevant document/ brochures. All items should conform to Government/ statutory regulations with regard to Safety, handling & environment as applicable. 5. The Bidders required to indicate in their bids whether they are participating in the bid in the capacity of Manufactures/ Traders/ Service Providers in respect of the Tendered items. In case of MSME supplier, submit your latest MSME certificate/ requisite documents, as stipulated in the statute along with the bid. For MSME supplier, Purchase Preference and Payment Terms will be as per government guidelines in vogue. MSME Vendor participating in the capacity of “Traders” of the goods being tendered will not be considered as eligible MSME vendors for this bid. 6. Preference to MAKE IN INDIA: Purchase preference to Makein India shall be extended to local suppliers as per Govt. Of India order 2017 (PPO- 2017) and BEL guidelines in vogue.For all the information on PPO-2017, its amendments, notifications and clauses, Public Procurement (Preference to make in India) link on BEL website (under ‘Make in India initiatives) or the link as below shall be referred:http://www.belindia.in/ContentPage.aspx?Mld=20&Cld=0&Lld=1&link=0. 7. Please submit your lowest quote and best delivery schedule. L1 will be decided on the basis of Cost to Company and sum of all service line item basis. Cost to BEL and compliances to RFQ, conditions like delivery requirements, packing, etc. would be the basis while evaluating L1. Payment terms including advances, if any, will be considered while working out cost to BEL. 8. Integrity pact: for offer value more than Rs 3 Cr, supplier must submit Integrity Pact along with bid. Format can be taken from Purchase officer if applicable. 9. In case OEM is not bidding directly, the authorized distributor/ channel partner of OEM need to submit authorization letter from OEM along with the bid. 10. Price shall be quoted with all applicable Taxes and duties and same shall be clearly & separately spelt out in the offer. No taxes will be payable by BEL unless payment of same is specifically stipulated by the supplier in their quotation and the same is legally leviable 11. If the supplier/OEM is not interested to quote due to any reason against that published RFX, then it is required to submit a Regret mail with reason on mail ID:- pursccs@bel.co.in.
  • 2. 12. Quotation Submitted may get disqualified/ Rejected on following Condition:-  Advance Payment Terms.  Alternate offered by general distributors or stockiest.  Abnormal Delivery Schedule and non-Compliance to terms and conditions  Any other term and condition quoted by vendor which is not in line with our business Ethics and procedures.  Incomplete quotation. 13. The tendered rate against each item indicated in the RFQ should be indicated both in words and figures. In case of any clerical error between the rates indicated in figures and word, the rates quoted in words would prevail. If there is any inconsistency between the rate and the value extended (after multiplication with the tender quantity), the rate quoted shall be taken to prevail. Further, in case of any discrepancy between price filled in SRM portal and quotation attached in the SRM, then the rates quoted in the attachment will be considered for further processing. 14. If vendor has not submitted the compliance to SOW/ Terms & conditions, then it will be assumed that said SOW/T&C is fully complied and accepted by vendor. 15. The quotation and any other resulting from this RFX shall be governed by BEL’s Conditions of contract and the supplier quoting against this enquiry shall be deemed to have read and understood the same. 16. Where counter terms and conditions of business have been offered by the supplier, we shall not be deemed to be governed by those unless BEL’s specific written acceptance thereof has been given. 17. BEL reserves the right to accept or reject any quotation or part of the quotation without assigning any reasons. BEL reserves the right of ordering part quantities without assigning reasons and the supplier shall supply the ordered quantity at accepted rates. 18. This RFX is being issued with no financial commitment and the Buyer reserves the right to change or vary any part thereof at any stage. Buyer also reserves the right to withdraw the RFX, should it become necessary at any stage without assigning any reasons. 19. MENDATORY DOCUMENTS REQUIRED WITH BID (i) Compliance to specifications/ Drawing (ii)Point wise compliance to Terms and conditions enclosed at Annexure-A. If vendor doesn’t submit compliance with respect to Annexure –I then full compliance shall be deemed to be considered.
  • 3. Annexure-A T&C and SOW of “ICNS: IN SITU IPEU REPAIRS 2023” A. OBJECTIVE: To carry out in situ repair of 120 nos. faulty IPEUs of ICNS project. 10. Repairs of 1st lot – 30 nos. 20. Repairs of 2nd lot – 30 nos. 30. Repairs of 3rd lot – 30 nos. 40. Repairs of 4th lot – 30 nos. B. Period of repair Order The repair of the faulty IPEUs shall be completed within 180 days from the date of release of PO. C. Scope of Work: 1. PCB/LRU level fault rectification of the faulty IPEU at BEL GAD. 2. Scope of repair is to restore the basic functionality of the faulty units after ensuring normal booting up. 3. Repair/ replacement of faulty items shall cover all LRUs/ PCB/ modules, cables, connectors, display, sensors and other accessories. List of major replaceable items at LRU/PCB level is placed at Appendix-1. 4. The repair activity is to be undertaken at repair bench at BEL GAD. 5. All tools, instruments and spares/modules at appendix-1 and any other items required for fault rectification is in the scope of work of the vendor/ firm. 6. A detailed report of rectification activities carried out on each unit must be documented and submitted. 7. Repaired items shall perform all basic functions and must pass the system run checks at the test bench at BEL GAD. 8. Any test failed item post repair shall be re-worked and repaired without any extra cost on BEL. D. Payment Terms: The Payment for the subject order shall be made within 30 days after submission of satisfactory completion certificate signed by BEL Rep at BEL, GAD on pro-rata basis of lots. Prices mentioned in PO are without Taxes. Taxes are to be paid extra as applicable at the time of invoice. At present GST @ 18%.
  • 4. E. Liquidated Damages (LD): In case of delayed supplies, where reasons for delay is directly attributable to seller, BEL shall be entitled at their option : a. To recover from the supplier a liquidated damages of sum of 0.5% of value of any stores/ services not supplied/ rendered in time for every week or part of a week for which there have been delayed with a ceiling of 10%. Or b. To purchase elsewhere, at the risk and cost of the supplier, the undelivered item/ services or to cancel the Purchase Order. F. WARRANTY: The vendor shall extend a warranty for 06 months post repair wherein the vendor would be liable to repair the faulty unit without any additional payment for the same. G. REPEAT ORDER: Buyer at its option can order up to 120% quantity of the supplied items within 18 months from the date of original Purchase Order on same cost, terms and conditions. H. Option Clause: Purchase orders can be placed under option clause within 18 months from the date of Purchase Order for additional qty. upto a max of 50% of the original quantity for the same price and terms & conditions. I. PREVENTION OF COUNTERFEIT PART: • In case of counterfeit parts supplied by vendor, no payment shall be made to vendor. • In case of line-rejection due to counterfeit parts, payment will be recovered/deducted from the vendor. • Counterfeit parts will not be returned back and shall be destroyed as per Standard Operating Procedure. • Necessary action to debar the vendor from further RFQs shall be initiated. J. Termination/Cancellation of Purchase order: BEL reserves the right to cancel the order (if placed) with 15 days notice without any financial liability in the event of any of the following: • Spurious supplies in service • Time expired supplies • Adulterated supplies • Supplies inferior to the quality standards • Repeated delays in deliveries • Repeated rejections. K. FORCE MAJEURE CLAUSE: Force Majeure means an event beyond the control of the supplier and not involving the supplier’s fault or negligence and which is not foreseeable. Such events may include, but are not restricted to, acts of the purchaser either in its sovereign or contractual capacity, wars or revolutions, hostility, acts of public enemy, civil commotion, sabotage, fires, floods, explosions, epidemics, quarantine restrictions, strikes, lockouts, and freight embargoes. If there is delay in performance or other failures by the supplier to perform its obligation under its contract due to event of a Force Majeure, the supplier shall not be held responsible for such delays / failures. If a Force Majeure situation arises, the supplier shall promptly notify the purchaser in writing of such conditions and the cause thereof within twenty-one days of occurrence of such event. Unless otherwise directed by the purchaser in writing, the supplier shall continue to perform its obligations under the contract as far as reasonably practical, and shall seek all reasonable alternative means for performance not prevented by the Force Majeure event. If the performance in whole or in part or any obligation under this contract is prevented or delayed by any Reason of Force Majeure for a period exceeding sixty days, either party may at its option terminate the contract without any financial repercussion on either side. There may be a Force Majeure situation affecting the purchase organization only. In such a situation the purchase organization is to take up with the supplier on similar lines as above for further necessary action.
  • 5. L. Jurisdiction: This order shall be governed by the Laws of Indian Union in force. Only competent courts shall have the jurisdiction as provided under the Indian Arbitration and Conciliation Act 1996, or any statutory modifications thereof in force on any matter arising out of any Arbitration proceedings under this contract. Appendix-1: COMMONLY FAILED SPARES OF IPEU/CFG/MFG Sl. Item Description BEL Part No. 1 RTC Battery 437444590171 2 Cable Assy Ethernet CAT 5E LFH HAL free 490712470165 3 iButton (64-bit ID) 437445170134 4 iButton touch probe with LED 437445180125 5 Ultra bright LED green HLMP-3950 446040510175 6 Ultra bright LED Red HLMP-3750 446040510272 7 Fuse time lag L5x20mm 250V, 0.0500A RoHS 456800801364 8 15W single output switching power supply 457944030172 9 Button Key ring mount 471642670193 10 Keypad with header (1x9) without cable 471642690272 11 Switch Toggle DP on none MIL-G 471301100310 12 LCD Assy IDU 142001238324 13 Battery CR-P2, 6V Li 457540610179 14 Battery CableAssy 142001194480 15 Keypad cable assy (IDU Filguns) 142001195353 16 AdhesiveCyanoacrylate 20g 560501400150 17 Fuse HLDR 10A250V for 5X20mm Fuse 475111000156 18 Resistor TFCH 75.0 ± 1% 0.125W 400505431187 19 Resistor TFCH 470 ± 5% 0.125W 400505240194 20 Resistor TFCH 121 ± 1% 0.125W 400505433418 21 Res 1.5 OHM SMD 1206 5% 400541720245 22 Diode SCHOT RECT 1A 40V 1N5819 RoHS 423204100196 23 Diode RECT 1N4007 RoHS 423200700540 24 Diode SI SW 1N4448 423772060125 25 ICLIN VREG LT1764AEQ 432841360111 26 IC RS232 TxRx 437814480368 27 LED Red 1.6V 60mA SMD 0805 446013160249 28 Ethernet Transceiver HX1188 437816570136 29 SRAM IC 437445140161 30 Wire PTFE 600V7/0.20 OD1 2W 485900200352