Introduction
• This report is a summary of the main
  indicators that show our organizational
  performance, created with graphs for an
  easier understanding of the data presented
• It consists of standard analysis (Points
  1 to 3) and a customized one foe every
  month (Point 4).
Summary
1. Exchange Status
2. Membership Status
3. Financial Status
4. Membership criteria for X
1. Exchange status - Performance vs last year
                                                            May 2010            May 2009

6
    5

                                                        4
4
                  3                           3 3

                                    2
2
            1 1                                                             1          1

        0             0   0 0   0       0 0         0       0 0   0 0   0        0 0       0
0
     BV     BU    CJ      CR    CT      GL    IS    OR       PI   PL    SB      TGM TM
1. Exchange status - Realized vs Planned for May
                                                                       Realized              Planned
             6               6
  6     5            5
  4                      3                             3
                                                   2       2               2
  2              1                   1                             1                     1         1 1
                                 0       0 0   0               0       0       0 0   0       0 0
  0
        BV       BU      CJ      CR      CT    GL      IS      OR      PI      PL    SB      TGM TM

                                                                           Realized Rate of X Obj
200%
        150%
                 100% 100% 100% 100% 83.33%
100%
                                                       50%
                                                               20%
                                                                       0%      0%    0%      0%    0%
 0%
            IS   CT      PL      TGM TM        BV      CJ      BU      CR      GL    OR       PI   SB
Conclusions
•   Total No of X Realizations for AIESEC RO: 13
    •   +2 | +18% vs. last year

    •   -13 | -50% vs. planned

•   7 OGX & 6 ICX
•   Total No of X Realizations for AIESEC RO: 4
    •   -2 | -33.3% vs. last year

•   LCs that exceed last years performance: BV, CJ, TM
    •   LCs that maintained their last year’s performance: BU, IS

•   LCs that overachieved what they planned: IS
    •   LCs that achieved what they planned: CT, PL, TGM, TM

•   X+L Contribution for this month: BU, CJ, CR, TM
MC’s thoughts
•   We have only achieved half of what we have planned for this
    month, which means that we will have to recover that gap in
    months to come
•   We have 5 LCs that have not had any achievement or did not
    plan any for this month - the question should be asked if they
    have worked on their pipeline for the next months?
•   There are 3 LCs that have 100% of achievement rate of their
    goals because they have not planned any X for this month
•   Only 4 X+L Re - this means that the former EBs are not
    going in X
2. Membership Status - No of Active Members
                                                     Active Memebrs
       109
110
             92
 88               83   80
                            76
                                 72
 66
                                      53   50
 44                                             41     40   39
                                                                 30   27
 22

  0
       IS    GL   TM   BU   BV   CJ   OR   CR TGM     SB    PI   CT   PL
2. Membership Status - Members efficiency
                                                                               Mb/X Ratio May 2010
                                                                               Mb/X Ratio May 2009
110

 88                                        80 77 83

 66                       57.66
                                  50
 44                     36.33
                                                                                                     30
               24
 22 15.2                                                      18.5
                                                                               7.5
           0        0                  0              0   0          0 0   0         0 0   0 0   0        0 0
  0
      BV        CJ        IS      CR       BU    TM       CT         GL    OR        PI    PL    SB       TGM
Conclusions
•   Total No of X Active Members in AIESEC RO: 792
    •   +26 | +3.39% vs. April

•   Members efficiency: 66 Mb work for 1 X
    •   86 was for May 2009

    •   23.9 was for April 2010

    •   Target for term: 2

•   Top 3 LCs with active Mb: IS, GL, TM
•   LC with most efficient members: BV (15.2)
MC’s thoughts
•   Our efficiency has decreased in May after the EB turnover
•   To achieve our goals for May, we should have had 29.3
    members working for one exchange
•   In the country 60 members are generating one exchange,
    but more important is that less than half of the LCs
    actually realized exchanges. This means 322 of our
    members are not contributing to exchange
•   Only 470 of our members are generating exchange
2. Financial situation - Revenue Diversification
€5000


€4000                                                                      Other sources
                                                                           2% & 3‰
                                                                           Grants
€3000                                                                      Alumni
                                                                           Exchange
                                                                           Corporate
€2000


€1000


  €0
         BU

              CJ

                   CR

                        IS

                             TGM

                                   CT

                                        PL

                                             TM

                                                  SB

                                                       BV




                                                                      PI
                                                            OR

                                                                 GL
2. Financial situation - Revenue Diversification for Country

                                        Corporate
                                        Exchange
                                        Grants
                                        Alumni & 2%
             19.5%                      Other sources
0.9%
                           36%


       13%




                     30%
2. Financial situation - Grant Applications
                                           Number of Grants applied for

5
    4
4
         3     3
3
                   2   2    2
2
                                 1    1      1     1
1
                                                        0     0    0
0
    CR   IS   TGM BV   CJ   BU   CT   PI     PL   TM    GL   OR    SB
2. Financial situation - Reserve Policy
                          Months of Operating Budget covered by Reserve Funds*

40
      34
32

24

16
            8.33   8.26   7.84
 8                               3.92   3.49   2.79
                                                      0.74   0.17   0.02   0   0    0
 0
     BU     CT     TM     BV     PI      IS    GL     CR     CJ     TGM OR     PL   SB

 *Calculated using the following formula:
 Reserve fund/Operational budget per month
Conclusions
Total value of incomes for LCs: €33.819
    •   Corporate - €9.461 | 36%

    •   Exchange - €7861.5 | 30%

    •   Grants - €3.516 (from CJ) | 13%

    •   Alumni + 2% & 3‰ - €242.10 | 0.9%

    •   Other sources - €5100 | 19.5%

•   LCs that had X as sources of revenue*: Bu, CJ, IS, CT, TM, SB, OR, PI

•   10 LCs applied for Grants: BV, BU, CJ, CR, IS, CT, PI, PL, TGM, TM
•   7 LCs can support their operating budget from reserves for more that 2
    months: BV, BU, CT, IS, GL, PI, TM


*≥ 20% out of Total Revenues
MC’s thoughts
•   We are not capitalizing on more sources of revenues like: Alumni, 3‰

•   Not enough LCs are generating revenues from X

•   There is only one LC that has revenues from Grants, even though a lot of Grants are
    written in the country. This means that either we do not have knowledge for writing the
    grants, either we are not targeting the wright investors

•   19.5% of our incomes are from Other Sources. This make it hard to forecast our
    incomes and base our expenses on something uncertain.

•   We are not selling X to companies, we have only signed TN partnerships for only €248

•   Not all LCs are not using or have not implemented a Reserve Fund which affect the
    financial sustainability of those LCs

•   We have a few number of sales meetings  323meetings/13 LCs – average number of 25
    meetings per LC/month;

•   323 meetings/135 ER members – average number of 2.4 meetings per member/month
4. Membership requirement on X for term 10-11
     LC       09-‘10 Re   08-‘09 Re   07-‘08 Re   Membership   Min OGX   Min ICX
Brasov            21          13           9         14            5        5
Bucharest         46          44          57          46         15        15
Cluj Napoca       33          47          31          33         11        11
Constanta         20          10          11          14          5         5
Craiova           22          19          16          19          6         6
Galati            18          21          20          18          6         6
Iasi              50          42          36          43         14        14
Oradea            18          14           1          11          4         4
Pitesti           19          13           6          13          4         4
Ploiesti          10           7           4           7          2         2
Sibiu             10          14           5          10          3         3
Targu Mures       23          21           7          17          6         6
Timisoara         29          11          18          19          6         6
                319         276         221          263         87        87
Final thoughts
•   Congratulations to the LCs for the effort of putting
    your L positions on the platform - in case you still need
    support on this, please ask for it

•   Good job with the 7 TN corporate signed - this means
    that we are starting to have focus on selling X again
    (119 meetings) or we are re-signing older TNs
Thank You

More Related Content

More from Michael Omescu

SONA Report for September 2010
SONA Report for September 2010SONA Report for September 2010
SONA Report for September 2010Michael Omescu
 
Sona report for september 2010
Sona report for september 2010Sona report for september 2010
Sona report for september 2010Michael Omescu
 
SONA report for september + Q3 2010
SONA report for september + Q3 2010SONA report for september + Q3 2010
SONA report for september + Q3 2010Michael Omescu
 
Sona report for july 2010
Sona report for july 2010Sona report for july 2010
Sona report for july 2010Michael Omescu
 
Sona report for august 2010
Sona report for august 2010Sona report for august 2010
Sona report for august 2010Michael Omescu
 
AIESEC Romania Monthly report August 2010
AIESEC Romania Monthly report August 2010AIESEC Romania Monthly report August 2010
AIESEC Romania Monthly report August 2010Michael Omescu
 
AIESEC Romania Monthly Report for July 2010
AIESEC Romania Monthly Report for July 2010AIESEC Romania Monthly Report for July 2010
AIESEC Romania Monthly Report for July 2010Michael Omescu
 
SONA report for june 2010 & Q2
SONA report for june 2010 & Q2SONA report for june 2010 & Q2
SONA report for june 2010 & Q2Michael Omescu
 

More from Michael Omescu (8)

SONA Report for September 2010
SONA Report for September 2010SONA Report for September 2010
SONA Report for September 2010
 
Sona report for september 2010
Sona report for september 2010Sona report for september 2010
Sona report for september 2010
 
SONA report for september + Q3 2010
SONA report for september + Q3 2010SONA report for september + Q3 2010
SONA report for september + Q3 2010
 
Sona report for july 2010
Sona report for july 2010Sona report for july 2010
Sona report for july 2010
 
Sona report for august 2010
Sona report for august 2010Sona report for august 2010
Sona report for august 2010
 
AIESEC Romania Monthly report August 2010
AIESEC Romania Monthly report August 2010AIESEC Romania Monthly report August 2010
AIESEC Romania Monthly report August 2010
 
AIESEC Romania Monthly Report for July 2010
AIESEC Romania Monthly Report for July 2010AIESEC Romania Monthly Report for July 2010
AIESEC Romania Monthly Report for July 2010
 
SONA report for june 2010 & Q2
SONA report for june 2010 & Q2SONA report for june 2010 & Q2
SONA report for june 2010 & Q2
 

Recently uploaded

SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 

Recently uploaded (20)

SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 

Sona report for may 2010

  • 2. Introduction • This report is a summary of the main indicators that show our organizational performance, created with graphs for an easier understanding of the data presented • It consists of standard analysis (Points 1 to 3) and a customized one foe every month (Point 4).
  • 3. Summary 1. Exchange Status 2. Membership Status 3. Financial Status 4. Membership criteria for X
  • 4. 1. Exchange status - Performance vs last year May 2010 May 2009 6 5 4 4 3 3 3 2 2 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 BV BU CJ CR CT GL IS OR PI PL SB TGM TM
  • 5. 1. Exchange status - Realized vs Planned for May Realized Planned 6 6 6 5 5 4 3 3 2 2 2 2 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 BV BU CJ CR CT GL IS OR PI PL SB TGM TM Realized Rate of X Obj 200% 150% 100% 100% 100% 100% 83.33% 100% 50% 20% 0% 0% 0% 0% 0% 0% IS CT PL TGM TM BV CJ BU CR GL OR PI SB
  • 6. Conclusions • Total No of X Realizations for AIESEC RO: 13 • +2 | +18% vs. last year • -13 | -50% vs. planned • 7 OGX & 6 ICX • Total No of X Realizations for AIESEC RO: 4 • -2 | -33.3% vs. last year • LCs that exceed last years performance: BV, CJ, TM • LCs that maintained their last year’s performance: BU, IS • LCs that overachieved what they planned: IS • LCs that achieved what they planned: CT, PL, TGM, TM • X+L Contribution for this month: BU, CJ, CR, TM
  • 7. MC’s thoughts • We have only achieved half of what we have planned for this month, which means that we will have to recover that gap in months to come • We have 5 LCs that have not had any achievement or did not plan any for this month - the question should be asked if they have worked on their pipeline for the next months? • There are 3 LCs that have 100% of achievement rate of their goals because they have not planned any X for this month • Only 4 X+L Re - this means that the former EBs are not going in X
  • 8. 2. Membership Status - No of Active Members Active Memebrs 109 110 92 88 83 80 76 72 66 53 50 44 41 40 39 30 27 22 0 IS GL TM BU BV CJ OR CR TGM SB PI CT PL
  • 9. 2. Membership Status - Members efficiency Mb/X Ratio May 2010 Mb/X Ratio May 2009 110 88 80 77 83 66 57.66 50 44 36.33 30 24 22 15.2 18.5 7.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 BV CJ IS CR BU TM CT GL OR PI PL SB TGM
  • 10. Conclusions • Total No of X Active Members in AIESEC RO: 792 • +26 | +3.39% vs. April • Members efficiency: 66 Mb work for 1 X • 86 was for May 2009 • 23.9 was for April 2010 • Target for term: 2 • Top 3 LCs with active Mb: IS, GL, TM • LC with most efficient members: BV (15.2)
  • 11. MC’s thoughts • Our efficiency has decreased in May after the EB turnover • To achieve our goals for May, we should have had 29.3 members working for one exchange • In the country 60 members are generating one exchange, but more important is that less than half of the LCs actually realized exchanges. This means 322 of our members are not contributing to exchange • Only 470 of our members are generating exchange
  • 12. 2. Financial situation - Revenue Diversification €5000 €4000 Other sources 2% & 3‰ Grants €3000 Alumni Exchange Corporate €2000 €1000 €0 BU CJ CR IS TGM CT PL TM SB BV PI OR GL
  • 13. 2. Financial situation - Revenue Diversification for Country Corporate Exchange Grants Alumni & 2% 19.5% Other sources 0.9% 36% 13% 30%
  • 14. 2. Financial situation - Grant Applications Number of Grants applied for 5 4 4 3 3 3 2 2 2 2 1 1 1 1 1 0 0 0 0 CR IS TGM BV CJ BU CT PI PL TM GL OR SB
  • 15. 2. Financial situation - Reserve Policy Months of Operating Budget covered by Reserve Funds* 40 34 32 24 16 8.33 8.26 7.84 8 3.92 3.49 2.79 0.74 0.17 0.02 0 0 0 0 BU CT TM BV PI IS GL CR CJ TGM OR PL SB *Calculated using the following formula: Reserve fund/Operational budget per month
  • 16. Conclusions Total value of incomes for LCs: €33.819 • Corporate - €9.461 | 36% • Exchange - €7861.5 | 30% • Grants - €3.516 (from CJ) | 13% • Alumni + 2% & 3‰ - €242.10 | 0.9% • Other sources - €5100 | 19.5% • LCs that had X as sources of revenue*: Bu, CJ, IS, CT, TM, SB, OR, PI • 10 LCs applied for Grants: BV, BU, CJ, CR, IS, CT, PI, PL, TGM, TM • 7 LCs can support their operating budget from reserves for more that 2 months: BV, BU, CT, IS, GL, PI, TM *≥ 20% out of Total Revenues
  • 17. MC’s thoughts • We are not capitalizing on more sources of revenues like: Alumni, 3‰ • Not enough LCs are generating revenues from X • There is only one LC that has revenues from Grants, even though a lot of Grants are written in the country. This means that either we do not have knowledge for writing the grants, either we are not targeting the wright investors • 19.5% of our incomes are from Other Sources. This make it hard to forecast our incomes and base our expenses on something uncertain. • We are not selling X to companies, we have only signed TN partnerships for only €248 • Not all LCs are not using or have not implemented a Reserve Fund which affect the financial sustainability of those LCs • We have a few number of sales meetings  323meetings/13 LCs – average number of 25 meetings per LC/month; • 323 meetings/135 ER members – average number of 2.4 meetings per member/month
  • 18. 4. Membership requirement on X for term 10-11 LC 09-‘10 Re 08-‘09 Re 07-‘08 Re Membership Min OGX Min ICX Brasov 21 13 9 14 5 5 Bucharest 46 44 57 46 15 15 Cluj Napoca 33 47 31 33 11 11 Constanta 20 10 11 14 5 5 Craiova 22 19 16 19 6 6 Galati 18 21 20 18 6 6 Iasi 50 42 36 43 14 14 Oradea 18 14 1 11 4 4 Pitesti 19 13 6 13 4 4 Ploiesti 10 7 4 7 2 2 Sibiu 10 14 5 10 3 3 Targu Mures 23 21 7 17 6 6 Timisoara 29 11 18 19 6 6 319 276 221 263 87 87
  • 19. Final thoughts • Congratulations to the LCs for the effort of putting your L positions on the platform - in case you still need support on this, please ask for it • Good job with the 7 TN corporate signed - this means that we are starting to have focus on selling X again (119 meetings) or we are re-signing older TNs

Editor's Notes