 NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, SHIKARPUR.
JOB DETAILS : FABRICATION, ERECTION & COMMISSIONING OF COMPLETE TERMINAL
WITH 02 TANKS55’ Ø X 45’ HEIGHT, KETTLES, PUMP MANIFOLD, FIRE
WATER/FOAM LINES & ITS CIVIL FOUNDATION.
 NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, W.W.L.B.P.
JOB DETAILS : FABRICATION & ERECTION OF SOFTNER PLANT.
 NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, W.W.L.B.P.
JOB DETAILS : INSTALLATION/COMMISSION OF FIRE WATER PUMP WITH ITS
ACCESSORIES
 NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, K.T.
JOB DETAILS : CONSTUCTION OF ROAD & RCC WORK IN FILLING AREA.
 NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, SHIKARPUR.
JOB DETAILS : FABRICATION & INSTALLATION OF 10000 HOBC TANKS INCLUDING ITS
CIVIL WORKS.
 NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, KT.
JOB DETAILS : REPLACEMENT OF UPPER 03 SHELL COURS OF TANK # 08, 90’ Ø X 45’ H,
WITHOUT REMOVING ROOF PLATE / STRUCTURE, REMOVING &
REINSTALLATION OF ITS INTERNAL FLOATING SCREEN.
 NAME OF COMPANY : AL-RAHIM TRADING COMPANY PVT LTD, KEAMARI.
JOB DETAILS : FABRICATION & ERECTION OF 03 NO’S TANKS 85’ Ø X 55’ H, INCLUDING
IT’S PIPPING, FILLINF GANTRIES & PUMP MANIFOLD WORKS
 NAME OF COMPANY : AL-RAHIM COMPANY, RASHEED ABAD.
JOB DETAILS : FABRICATION, LYING & ERECTION WORKS OF COMPLETE TERMINAL.
 NAME OF COMPANY : OVERSEAS TRADING CORPORATION, PORT BIN QASIM.
JOB DETAILS : FABRICATION & FIXING OF SWING LADDER, 36 NO’S.
 NAME OF COMPANY : COSMOPOLITAN DEVELOPMENT COMPANY LIMITED.
JOB DETAILS : FABRICATION & ERECTION WORKS OF TANK-01 & 02, 80’ Ø X 55’ HEIGHT.
 NAME OF COMPANY : GLOBAL CORPORATION.
JOB DETAILS : REPLACEMEMNT OF VERTICAL MULTI STAGE FIRE PUMP AT OP-I & ITS
RELATED WORKS FOR K.P.T.
 NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, W.W.L.B.P.
JOB DETAILS : FABRICATION, ERECTION & COMMISSIONING OF KETTLES, 20KL & 50 KL
INCLUDING ITS CIVIL FOUNDATION.
 NAME OF COMPANY : CHEVRON PAKISTAN LIMITED, K.T, KEAMARI.
JOB DETAILS : REHABILITATION OF FIRE WATER TANK-02, 12.2 M DIA.
 NAME OF COMPANY : AZARCON ENGINEERS & CONTRACTOR.
JOB DETAILS : MACHINING WORKS OF L-BOLTS FOR CHANAB BRIDGE.
 NAME OF COMPANY : CHEVRON PAKISTAN LIMITED, W.W.L.B.P.
JOB DETAILS : VACUM TESTING & REPAIRING OF BOTTOM OF ALL TANKS.
 NAME OF COMPANY : PAKISTAN STATE OIL LIMITED, LMT, KORANGI PLANT.
JOB DETAILS : PROVIDING & INSTALLATION OF MICRO FILTER UNIT.
 NAME OF COMPANY : CHEVRON PAKISTAN LIMITED, MACHIKE TERMINAL.
JOB DETAILS : FABRICATION, TESTING, COMMISSIONING & TESTING OF PIPING SYSTEM
AND ADDITITIVE STORAGE TANK.
 NAME OF COMPANY : PANAMA TRADING COMPANY PVT.LIMITED, KEAMARI.
JOB DETAILS : FABRICATION & ERECTION OF 85’ Ø X 55’ HEIGHT TANKS, 03 NO’S.
 NAME OF COMPANY : PANAMA TRADING COMPANY PVT.LIMITED, KEAMARI.
JOB DETAILS : FABRICATION & FIXING OF UNDERGROUNG SQUARE TANKS,
Size: 18ft X 10ft X 8.5ft, 05 PCS.
 NAME OF COMPANY : PANAMA TRADING COMPANY PVT.LIMITED, KEAMARI.
JOB DETAILS : FABRICATION & INSTALLATION OF 18” PIG LAUCHER.
 NAME OF COMPANY : CHEVRON PAKISTAN LIMITED, W.W.L.B.P.
JOB DETAILS : REPLACEMENT OF ROOF PLATES, CURB ANGLE, STAIRES & RAILING OF
ALL TANKS ONE BY ONE.
 NAME OF COMPANY : PAKISTAN STATE OIL LIMIED, LMT, KORANGI PLANT.
JOB DETAILS : INSTALLATION OF HEAT PRO CABINET.
 NAME OF COMPANY : PAKISTAN STATE OIL LIMITED, LMT, KORANGI PLANT.
JOB DETAILS : ANNUAL CERTIFICATION OF F.T BOILER CLEANING.
 NAME OF COMPANY : BULK MANAGEMENT (PAKISTAN) PVT.LTD. , KEAMARI.
JOB DETAILS : REPAIRING WORKS OF BOTTOM OF TANKS # 8, 9, 10 & 11.
 NAME OF COMPANY : PANAMA TRADING COMPANY PVT.LIMITED, KEAMARI.
JOB DETAILS : FABRICATION & FIXING OF 16” Ø & 14” Ø PIG RECEIVER & PIG LAUCHER
AT OP-II, INCLUDING VALVES FITTING.
 NAME OF COMPANY : PANAMA TRADING COMPANY (PVT) LIMITED, KEAMARI.
JOB DETAILS : FABRICATION, WELDING & FITTING WORKS OF 06” & 4” Ø FIRE WATER
AND FOAM PIPE LINE.
 NAME OF COMPANY : PANAMA TRADING COMPANY (PVT) LIMITED, KEAMARI.
JOB DETAILS : FABRICATION, ERECTION AND WELDING OF ALL SHED.
 NAME OF COMPANY : PAK GREASE MANUFACTURING COMPANY (PVT) LIMITED
JOB DETAILS : SUPPLY OF 6000 LITRE FURNACE HORIZONTAL TANK WITH MOBILE
TROLLEY.
 NAME OF COMPANY : PANAMA TRADING COMPANY (PVT) LIMITED, KEAMARI.
JOB DETAILS : CUTTING, DISMENTLING, REMOVING & SHIFTING OF TRAIN WAGON.
 NAME OF COMPANY : JAMIA LUBRICANT KARACHI.
JOB DETAILS : COMPLETE TERMINAL, TANKS, KETTLES, PIPING, PUMP MANIFOLD,
FILLING
GANTRY AND INSTALLATION & ALLIGNMENT OF EQUIPMENTS.
 NAME OF COMPANY : KARACHI PORT TRUST (KPT).
JOB DETAILS : REPAIRING & MAINTENANCE OF 16” Ø GATE VALVES.
 NAME OF COMPANY : AL-RAHIM TRADING COMPNAY (PVT) LIMITED.
JOB DETAILS : REPAIRING & OVERHAULING OF VALVES / STRAINERS.
 NAME OF COMPANY : AZLAK INTERPRISES PVT LIMITED, KEAMARI.
JOB DETAILS : REPLACEMENT OF BOTTOM, ROOF & UPPER 03 SHELLS COURS OF
TANK # 07, 70’ Ø X 55’ HEIGHT WITHOUT REMOVING ROOF TRUSSES
AND ITS RELATED CIVIL WORKS.
SAND BLASTING & PAINTING
 NAME OF COMPANY : PANAMA TRADING COMPANY PVT. LIMITED, KEAMARI.
JOB DETAILS : SAND BLASING & PAINTING OF TANKS, PIPE LINES & STRUTURE ETC.
AREA / SITE : 10,700 SQ FT. / KEAMARI TERMINAL.
INSPECTION : PANAMA COMPANY.
 NAME OF COMPANY : AL-RAHIM TRADING CO. PVT. LIMITED, KEAMARI.
JOB DETAILS : SAND BLASING & PAINTING OF PLATE FORM, STAIRS & PIPE LINES.
AREA / SITE : 4,481 SQ FT. / KEAMARI TERMINAL.
INSPECTION : AL-RAHIM TRADING COMPANY.
 NAME OF COMPANY : PAKISTAN CALBE LIMTED, SITE AREA.
JOB DETAILS : SAND BLASING & PAINTING OF CABLE DRUM.
AREA / SITE : 1,000 SQ FT. / KORANGI.
INSPECTION : PAKISTAN CALBE LIMITED.
 NAME OF COMPANY : OVERSEAS TRADING CONSTRUCTION, PORT BIN QASIM.
JOB DETAILS : SAND BLASING & PAINTING OF 06 TANKS.
AREA / SITE : 70,000 SQ FT. / PORT BIN QASIM.
INSPECTION : OVERSEAS TRADING CONSTRUCTION.
 NAME OF COMPANY : SUI GASS COMPANY, SUI BALOCHISTAN.
JOB DETAILS : SAND BLASING & PAINTING OF TANKS.
AREA / SITE : 9,800 SQ FT. / BALOCHSTAN.
INSPECTION : SUI GASS COMPANY.
 NAME OF COMPANY : BOSIQAR COMPANY, HUB SITE.
JOB DETAILS : SAND BLASING & PAINTING OF PIPE LINES.
AREA / SITE : 8,000 SQ FT. / HUBCO REFINERY.
INSPECTION : MOSIQAR COMPANY.
 NAME OF COMPANY : JAMIA LUBRICANT TERMINAL, RASHEED ABAD.
JOB DETAILS : SAND BLASTING & PAINTING OF COMPLETE LUBRICANT PLANT.
AREA / SITE : L/S SQ FT. / RASHEED ABAD.
INSPECTION : AL-RAHIM TRADING COMOPANY.
 NAME OF COMPANY : CHEVRON PAKISTAN LIMITED, K.T, KEAMARI.
JOB DETAILS : SCRAPING & PAINTING OF ALL PIPE LINES.
AREA / SITE : L/S SQ FT. / KEAMARI TERMINAL.
INSPECTION : CHEVRON PAKISTAN LIMITED
 NAME OF COMPANY : BULK MANAGEMENT PAKISTAN PVT. LTD., KEAMARI.
JOB DETAILS : SAND BLASTING & PAINTING OF TANK-07, 60’ D X 58’ H.
AREA / SITE : L/S SQ FT. / KEAMARI TERMINAL.
INSPECTION : BULK MANAGEMENT PAKISTAN LIMITED.
 NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, K.T, KEAMARI.
JOB DETAILS : SCRAPING & EPOXY PAINTING OF TTLR STRUCTURE.
AREA / SITE : L/S SQ FT. / KEAMARI.
INSPECTION : CALTEX OIL (PAKISTAN) LIMITED.
 NAME OF COMPANY : BULK MANAGEMENT PAKISTAN PVT.LTD. , KEAMARI.
JOB DETAILS : SAND BLASTING & PAINTING OF TANK-17, 56’ D X 58’ H.
AREA / SITE : L/S SQ FT. / KEAMARI TERMINAL.
INSPECTION : BULK MANAGEMENT PAKISTAN LIMITED.
 NAME OF COMPANY : BULK MANAGEMENT PAKISTAN PVT.LTD. , KEAMARI.
JOB DETAILS : SAND BLASTING & PAINTING OF TANK-05, 55’ D X 58’ H.
AREA / SITE : L/S SQ FT. / KEAMARI.
INSPECTION : BULK MANAGEMENT PAKISTAN LIMITED.
 NAME OF COMPANY : RAZZAK ASSOCIATES.
JOB DETAILS : SAND BLASTING & PAINTING OF TANKS PLATES & STRUCTURAL
MATERIAL FOR HABIB SUGAR MILL.
AREA / SITE : L/S SQ FT. / SHERSHAH.
INSPECTION : RAZZAK ASSOCIATES.

More Related Content

Viewers also liked

走出台灣的朝聖之路(郭兆偉)
走出台灣的朝聖之路(郭兆偉)走出台灣的朝聖之路(郭兆偉)
走出台灣的朝聖之路(郭兆偉)兆偉 郭
 
Khutbah aidilfitri
Khutbah aidilfitriKhutbah aidilfitri
Khutbah aidilfitripida8lama
 
7th Seven avenue work and Life Curitiba Rebouças centro Apartamento e slas lo...
7th Seven avenue work and Life Curitiba Rebouças centro Apartamento e slas lo...7th Seven avenue work and Life Curitiba Rebouças centro Apartamento e slas lo...
7th Seven avenue work and Life Curitiba Rebouças centro Apartamento e slas lo...Imóveis em Curitiba
 
El seguro sistema para financiar prdidas 1
El seguro sistema para financiar prdidas 1El seguro sistema para financiar prdidas 1
El seguro sistema para financiar prdidas 1eldeap10
 

Viewers also liked (7)

走出台灣的朝聖之路(郭兆偉)
走出台灣的朝聖之路(郭兆偉)走出台灣的朝聖之路(郭兆偉)
走出台灣的朝聖之路(郭兆偉)
 
RESUME FINAL
RESUME FINALRESUME FINAL
RESUME FINAL
 
Khutbah aidilfitri
Khutbah aidilfitriKhutbah aidilfitri
Khutbah aidilfitri
 
conor new CV
conor new CVconor new CV
conor new CV
 
7th Seven avenue work and Life Curitiba Rebouças centro Apartamento e slas lo...
7th Seven avenue work and Life Curitiba Rebouças centro Apartamento e slas lo...7th Seven avenue work and Life Curitiba Rebouças centro Apartamento e slas lo...
7th Seven avenue work and Life Curitiba Rebouças centro Apartamento e slas lo...
 
El seguro sistema para financiar prdidas 1
El seguro sistema para financiar prdidas 1El seguro sistema para financiar prdidas 1
El seguro sistema para financiar prdidas 1
 
slideshare
slideshareslideshare
slideshare
 

Similar to Some Project As Project Manager.

Sadikun lube oil blending plant 2013
Sadikun lube oil blending plant 2013Sadikun lube oil blending plant 2013
Sadikun lube oil blending plant 2013Eko Kiswanto
 
Piping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVPiping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVMuhammad Kashif
 
Ese oniovosa cv
Ese oniovosa cvEse oniovosa cv
Ese oniovosa cvoniovosa
 
IKL-Reference List_ Latest Des 11 for PDF
IKL-Reference List_ Latest Des 11 for PDFIKL-Reference List_ Latest Des 11 for PDF
IKL-Reference List_ Latest Des 11 for PDFStephane Sene
 
INDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.pptINDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.pptDeepakDayal11
 
HAJI LIAQAT ALI CV FABRICATOR
HAJI LIAQAT ALI CV FABRICATORHAJI LIAQAT ALI CV FABRICATOR
HAJI LIAQAT ALI CV FABRICATORliaqat ali
 
Etimaad Presentation (February 2015) - Project Info
Etimaad Presentation (February 2015) - Project InfoEtimaad Presentation (February 2015) - Project Info
Etimaad Presentation (February 2015) - Project InfoMazharuddin Ansari
 
Reliable sponge pvt ltd-hot-dip-galvanizing
Reliable sponge pvt ltd-hot-dip-galvanizingReliable sponge pvt ltd-hot-dip-galvanizing
Reliable sponge pvt ltd-hot-dip-galvanizingReliable India
 
Presentation P&P Dept edited (1).ppt
Presentation P&P Dept edited (1).pptPresentation P&P Dept edited (1).ppt
Presentation P&P Dept edited (1).pptshakeelabbas23
 
Corporate presentation 2
Corporate presentation 2Corporate presentation 2
Corporate presentation 2lvsamy
 
Newcast Die Casting
Newcast Die CastingNewcast Die Casting
Newcast Die Castingnr_blore
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)ABDUL QADIR
 
In the name of allah the most beneficient the most mercifull
In the name of allah the most beneficient the most mercifullIn the name of allah the most beneficient the most mercifull
In the name of allah the most beneficient the most mercifullABDULSATTAR KARACHI
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTmuhammad jamil
 

Similar to Some Project As Project Manager. (20)

Sadikun lube oil blending plant 2013
Sadikun lube oil blending plant 2013Sadikun lube oil blending plant 2013
Sadikun lube oil blending plant 2013
 
Rajesh CV 2016
Rajesh CV 2016Rajesh CV 2016
Rajesh CV 2016
 
Piping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVPiping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CV
 
JINTOMON WELDER .C.V.
JINTOMON WELDER .C.V.JINTOMON WELDER .C.V.
JINTOMON WELDER .C.V.
 
Ese oniovosa cv
Ese oniovosa cvEse oniovosa cv
Ese oniovosa cv
 
IKL-Reference List_ Latest Des 11 for PDF
IKL-Reference List_ Latest Des 11 for PDFIKL-Reference List_ Latest Des 11 for PDF
IKL-Reference List_ Latest Des 11 for PDF
 
INDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.pptINDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.ppt
 
HAJI LIAQAT ALI CV FABRICATOR
HAJI LIAQAT ALI CV FABRICATORHAJI LIAQAT ALI CV FABRICATOR
HAJI LIAQAT ALI CV FABRICATOR
 
Etimaad Presentation (February 2015) - Project Info
Etimaad Presentation (February 2015) - Project InfoEtimaad Presentation (February 2015) - Project Info
Etimaad Presentation (February 2015) - Project Info
 
Reliable sponge pvt ltd-hot-dip-galvanizing
Reliable sponge pvt ltd-hot-dip-galvanizingReliable sponge pvt ltd-hot-dip-galvanizing
Reliable sponge pvt ltd-hot-dip-galvanizing
 
Presentation P&P Dept edited (1).ppt
Presentation P&P Dept edited (1).pptPresentation P&P Dept edited (1).ppt
Presentation P&P Dept edited (1).ppt
 
Arsalan 1
Arsalan 1Arsalan 1
Arsalan 1
 
Corporate presentation 2
Corporate presentation 2Corporate presentation 2
Corporate presentation 2
 
Inspection CV Sasi
Inspection CV SasiInspection CV Sasi
Inspection CV Sasi
 
Newcast Die Casting
Newcast Die CastingNewcast Die Casting
Newcast Die Casting
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)
 
senior mechanic original cv
senior mechanic original cvsenior mechanic original cv
senior mechanic original cv
 
In the name of allah the most beneficient the most mercifull
In the name of allah the most beneficient the most mercifullIn the name of allah the most beneficient the most mercifull
In the name of allah the most beneficient the most mercifull
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
pipeline foreman
pipeline foremanpipeline foreman
pipeline foreman
 

Some Project As Project Manager.

  • 1. SOME PROJECT COMPLETED AS PROJECT MANAGER (IN PAKINSTAN)  NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, SHIKARPUR. JOB DETAILS : FABRICATION, ERECTION & COMMISSIONING OF COMPLETE TERMINAL WITH 02 TANKS55’ Ø X 45’ HEIGHT, KETTLES, PUMP MANIFOLD, FIRE WATER/FOAM LINES & ITS CIVIL FOUNDATION.  NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, W.W.L.B.P. JOB DETAILS : FABRICATION & ERECTION OF SOFTNER PLANT.  NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, W.W.L.B.P. JOB DETAILS : INSTALLATION/COMMISSION OF FIRE WATER PUMP WITH ITS ACCESSORIES  NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, K.T. JOB DETAILS : CONSTUCTION OF ROAD & RCC WORK IN FILLING AREA.  NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, SHIKARPUR. JOB DETAILS : FABRICATION & INSTALLATION OF 10000 HOBC TANKS INCLUDING ITS CIVIL WORKS.  NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, KT. JOB DETAILS : REPLACEMENT OF UPPER 03 SHELL COURS OF TANK # 08, 90’ Ø X 45’ H, WITHOUT REMOVING ROOF PLATE / STRUCTURE, REMOVING & REINSTALLATION OF ITS INTERNAL FLOATING SCREEN.  NAME OF COMPANY : AL-RAHIM TRADING COMPANY PVT LTD, KEAMARI. JOB DETAILS : FABRICATION & ERECTION OF 03 NO’S TANKS 85’ Ø X 55’ H, INCLUDING IT’S PIPPING, FILLINF GANTRIES & PUMP MANIFOLD WORKS  NAME OF COMPANY : AL-RAHIM COMPANY, RASHEED ABAD. JOB DETAILS : FABRICATION, LYING & ERECTION WORKS OF COMPLETE TERMINAL.  NAME OF COMPANY : OVERSEAS TRADING CORPORATION, PORT BIN QASIM. JOB DETAILS : FABRICATION & FIXING OF SWING LADDER, 36 NO’S.  NAME OF COMPANY : COSMOPOLITAN DEVELOPMENT COMPANY LIMITED. JOB DETAILS : FABRICATION & ERECTION WORKS OF TANK-01 & 02, 80’ Ø X 55’ HEIGHT.  NAME OF COMPANY : GLOBAL CORPORATION. JOB DETAILS : REPLACEMEMNT OF VERTICAL MULTI STAGE FIRE PUMP AT OP-I & ITS RELATED WORKS FOR K.P.T.  NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, W.W.L.B.P. JOB DETAILS : FABRICATION, ERECTION & COMMISSIONING OF KETTLES, 20KL & 50 KL INCLUDING ITS CIVIL FOUNDATION.  NAME OF COMPANY : CHEVRON PAKISTAN LIMITED, K.T, KEAMARI. JOB DETAILS : REHABILITATION OF FIRE WATER TANK-02, 12.2 M DIA.  NAME OF COMPANY : AZARCON ENGINEERS & CONTRACTOR. JOB DETAILS : MACHINING WORKS OF L-BOLTS FOR CHANAB BRIDGE.  NAME OF COMPANY : CHEVRON PAKISTAN LIMITED, W.W.L.B.P. JOB DETAILS : VACUM TESTING & REPAIRING OF BOTTOM OF ALL TANKS.  NAME OF COMPANY : PAKISTAN STATE OIL LIMITED, LMT, KORANGI PLANT. JOB DETAILS : PROVIDING & INSTALLATION OF MICRO FILTER UNIT.  NAME OF COMPANY : CHEVRON PAKISTAN LIMITED, MACHIKE TERMINAL. JOB DETAILS : FABRICATION, TESTING, COMMISSIONING & TESTING OF PIPING SYSTEM AND ADDITITIVE STORAGE TANK.
  • 2.  NAME OF COMPANY : PANAMA TRADING COMPANY PVT.LIMITED, KEAMARI. JOB DETAILS : FABRICATION & ERECTION OF 85’ Ø X 55’ HEIGHT TANKS, 03 NO’S.  NAME OF COMPANY : PANAMA TRADING COMPANY PVT.LIMITED, KEAMARI. JOB DETAILS : FABRICATION & FIXING OF UNDERGROUNG SQUARE TANKS, Size: 18ft X 10ft X 8.5ft, 05 PCS.  NAME OF COMPANY : PANAMA TRADING COMPANY PVT.LIMITED, KEAMARI. JOB DETAILS : FABRICATION & INSTALLATION OF 18” PIG LAUCHER.  NAME OF COMPANY : CHEVRON PAKISTAN LIMITED, W.W.L.B.P. JOB DETAILS : REPLACEMENT OF ROOF PLATES, CURB ANGLE, STAIRES & RAILING OF ALL TANKS ONE BY ONE.  NAME OF COMPANY : PAKISTAN STATE OIL LIMIED, LMT, KORANGI PLANT. JOB DETAILS : INSTALLATION OF HEAT PRO CABINET.  NAME OF COMPANY : PAKISTAN STATE OIL LIMITED, LMT, KORANGI PLANT. JOB DETAILS : ANNUAL CERTIFICATION OF F.T BOILER CLEANING.  NAME OF COMPANY : BULK MANAGEMENT (PAKISTAN) PVT.LTD. , KEAMARI. JOB DETAILS : REPAIRING WORKS OF BOTTOM OF TANKS # 8, 9, 10 & 11.  NAME OF COMPANY : PANAMA TRADING COMPANY PVT.LIMITED, KEAMARI. JOB DETAILS : FABRICATION & FIXING OF 16” Ø & 14” Ø PIG RECEIVER & PIG LAUCHER AT OP-II, INCLUDING VALVES FITTING.  NAME OF COMPANY : PANAMA TRADING COMPANY (PVT) LIMITED, KEAMARI. JOB DETAILS : FABRICATION, WELDING & FITTING WORKS OF 06” & 4” Ø FIRE WATER AND FOAM PIPE LINE.  NAME OF COMPANY : PANAMA TRADING COMPANY (PVT) LIMITED, KEAMARI. JOB DETAILS : FABRICATION, ERECTION AND WELDING OF ALL SHED.  NAME OF COMPANY : PAK GREASE MANUFACTURING COMPANY (PVT) LIMITED JOB DETAILS : SUPPLY OF 6000 LITRE FURNACE HORIZONTAL TANK WITH MOBILE TROLLEY.  NAME OF COMPANY : PANAMA TRADING COMPANY (PVT) LIMITED, KEAMARI. JOB DETAILS : CUTTING, DISMENTLING, REMOVING & SHIFTING OF TRAIN WAGON.  NAME OF COMPANY : JAMIA LUBRICANT KARACHI. JOB DETAILS : COMPLETE TERMINAL, TANKS, KETTLES, PIPING, PUMP MANIFOLD, FILLING GANTRY AND INSTALLATION & ALLIGNMENT OF EQUIPMENTS.  NAME OF COMPANY : KARACHI PORT TRUST (KPT). JOB DETAILS : REPAIRING & MAINTENANCE OF 16” Ø GATE VALVES.  NAME OF COMPANY : AL-RAHIM TRADING COMPNAY (PVT) LIMITED. JOB DETAILS : REPAIRING & OVERHAULING OF VALVES / STRAINERS.  NAME OF COMPANY : AZLAK INTERPRISES PVT LIMITED, KEAMARI. JOB DETAILS : REPLACEMENT OF BOTTOM, ROOF & UPPER 03 SHELLS COURS OF TANK # 07, 70’ Ø X 55’ HEIGHT WITHOUT REMOVING ROOF TRUSSES AND ITS RELATED CIVIL WORKS.
  • 3. SAND BLASTING & PAINTING  NAME OF COMPANY : PANAMA TRADING COMPANY PVT. LIMITED, KEAMARI. JOB DETAILS : SAND BLASING & PAINTING OF TANKS, PIPE LINES & STRUTURE ETC. AREA / SITE : 10,700 SQ FT. / KEAMARI TERMINAL. INSPECTION : PANAMA COMPANY.  NAME OF COMPANY : AL-RAHIM TRADING CO. PVT. LIMITED, KEAMARI. JOB DETAILS : SAND BLASING & PAINTING OF PLATE FORM, STAIRS & PIPE LINES. AREA / SITE : 4,481 SQ FT. / KEAMARI TERMINAL. INSPECTION : AL-RAHIM TRADING COMPANY.  NAME OF COMPANY : PAKISTAN CALBE LIMTED, SITE AREA. JOB DETAILS : SAND BLASING & PAINTING OF CABLE DRUM. AREA / SITE : 1,000 SQ FT. / KORANGI. INSPECTION : PAKISTAN CALBE LIMITED.  NAME OF COMPANY : OVERSEAS TRADING CONSTRUCTION, PORT BIN QASIM. JOB DETAILS : SAND BLASING & PAINTING OF 06 TANKS. AREA / SITE : 70,000 SQ FT. / PORT BIN QASIM. INSPECTION : OVERSEAS TRADING CONSTRUCTION.  NAME OF COMPANY : SUI GASS COMPANY, SUI BALOCHISTAN. JOB DETAILS : SAND BLASING & PAINTING OF TANKS. AREA / SITE : 9,800 SQ FT. / BALOCHSTAN. INSPECTION : SUI GASS COMPANY.  NAME OF COMPANY : BOSIQAR COMPANY, HUB SITE. JOB DETAILS : SAND BLASING & PAINTING OF PIPE LINES. AREA / SITE : 8,000 SQ FT. / HUBCO REFINERY. INSPECTION : MOSIQAR COMPANY.  NAME OF COMPANY : JAMIA LUBRICANT TERMINAL, RASHEED ABAD. JOB DETAILS : SAND BLASTING & PAINTING OF COMPLETE LUBRICANT PLANT. AREA / SITE : L/S SQ FT. / RASHEED ABAD. INSPECTION : AL-RAHIM TRADING COMOPANY.  NAME OF COMPANY : CHEVRON PAKISTAN LIMITED, K.T, KEAMARI. JOB DETAILS : SCRAPING & PAINTING OF ALL PIPE LINES. AREA / SITE : L/S SQ FT. / KEAMARI TERMINAL. INSPECTION : CHEVRON PAKISTAN LIMITED  NAME OF COMPANY : BULK MANAGEMENT PAKISTAN PVT. LTD., KEAMARI. JOB DETAILS : SAND BLASTING & PAINTING OF TANK-07, 60’ D X 58’ H. AREA / SITE : L/S SQ FT. / KEAMARI TERMINAL. INSPECTION : BULK MANAGEMENT PAKISTAN LIMITED.  NAME OF COMPANY : CALTEX OIL (PAKISTAN) LIMITED, K.T, KEAMARI. JOB DETAILS : SCRAPING & EPOXY PAINTING OF TTLR STRUCTURE. AREA / SITE : L/S SQ FT. / KEAMARI. INSPECTION : CALTEX OIL (PAKISTAN) LIMITED.  NAME OF COMPANY : BULK MANAGEMENT PAKISTAN PVT.LTD. , KEAMARI. JOB DETAILS : SAND BLASTING & PAINTING OF TANK-17, 56’ D X 58’ H. AREA / SITE : L/S SQ FT. / KEAMARI TERMINAL. INSPECTION : BULK MANAGEMENT PAKISTAN LIMITED.  NAME OF COMPANY : BULK MANAGEMENT PAKISTAN PVT.LTD. , KEAMARI. JOB DETAILS : SAND BLASTING & PAINTING OF TANK-05, 55’ D X 58’ H. AREA / SITE : L/S SQ FT. / KEAMARI. INSPECTION : BULK MANAGEMENT PAKISTAN LIMITED.
  • 4.  NAME OF COMPANY : RAZZAK ASSOCIATES. JOB DETAILS : SAND BLASTING & PAINTING OF TANKS PLATES & STRUCTURAL MATERIAL FOR HABIB SUGAR MILL. AREA / SITE : L/S SQ FT. / SHERSHAH. INSPECTION : RAZZAK ASSOCIATES.