YOUR SUCCESS, WE SUCCEED
Smart Asset and Tower Service
Management Solution
2022/8/11
2
Solution Architecture
AM performs as an unified platform for management and maintenance of various network assets for a complete
and precise view.
Capacity Management
Asset Management Asset Workflow Management Asset Report
Unified Platform
Asset Modeling
Manual Input
Asset Addition Financial Report
Statistic Report
Asset Transfer
Asset Replacement Asset Repair
Purchase
Management
Contract
Management
Visualization
Monitoring
PC Mobile APP Video Wall (3D view)
Northbound
Interface
Adapter
SAP
Mail
Forecast & Pre-warning
Purchase Support
Alarm Management
Alarm Export/Forward
Alarm Monitoring
Alarm Clearance
Automatic
Collection
Change Report
Asset Discard Routine Inspection
ERP
License
Management
Barcode
Management
Barcode Encode
Barcode Scan
Barcode Print …
Capacity Analysis
Spare Parts
Management
Issues/Receipts
Warehouse
Stock Check
Lifecycle
Management
Authority
Management
Batch Import
3
Flexible Modeling & Data Collection/Input
AM supports users with self-definition of various network asset types for convenient management, broadly and
rapidly adapting to multiple network techniques and network changes. The dynamic modeling can also support
asset automatic input, via EMS/NMS integration or NE direct connection.
Define Class
(SDH/DWDM)
Define Attributes
(Vendor/Location)
Define Constraints
(Mandatory/Optional)
Define Category
(Transmission)
Define Relations
(Device-Board-Port)
Auto Discovery and Manual Input
Parse & Standardization
Data Load
Asset DB
Data Process
Raw Data Collection
FTP Corba ·
·
·
·
SNMP
Auto
Task
NE/EMS/NMS
Manual entry
Flexible and agile to easily extend to support new types of
assets and adapt to network changes especially new network
technology application such as 5G
4
Scan with mobile phone
 Asset stock check
 Asset query
Besides automatic collection and manual entry, it also supports multiple batch input methods and operations
to support various asset management and data entry scenarios
Scan barcode for batch
input
Batch import with Excel
template
Excel Files Database
Multiple Asset Batch Input Methods
5
Central Monitoring and Management View
The video wall provides comprehensive monitoring for Intelligent Operation Center, using effective GIS, multiple
dashboard, visual 2D and 3D view for network asset presentation and key information display. It supports to
customize monitoring topics for different user groups and different use scenarios.
Transmission
Substation
6
Purchase
Planning Commissioning
Out of
Service
Addition
Replace
ment
Repair Transfer Discard
E2E Asset Workflow, through Barcode, to realize auto recognition and input
Scan barcode on terminal device
• Asset stock check
• Asset query
• Asset input
Maintenance
By using the standard asset workflow, AM supports entire lifecycle management of asset, update and record the
state change when network transformation & business expansion, to ensure the consistency and accuracy of
asset data.
Asset Lifecycle Management
7
Built-in Asset Naming Rule
(Asset Type + Vendor + Location + …)
Barcode Generation (Unified Coding Strategy for Multiple Vendor)
Barcode/RFID Label Printing & Pasting on Assets
Barcode/RFID Scanning & Read Asset Info
Asset Statistics & Report
AM provides Barcode Management for tracking and checking asset during whole life cycle. By use of marking asset
by barcode label, AM system is able to provide user with accurate and timely understanding on asset. Barcode/RFID
solution is composed of Barcode Generator, Printer (can write data to barcode label), Label (Transponder, located on
the object), and Data Processing Module.
Barcode QR code
RFID Label
Fast Query High Accuracy Unified Manage
Barcode Management
8
Asset Maintenance
Visible GIS Map manager view:
① Task information
② Engineer information
③ Vehicle information
Fast arrival to fault point and
trouble shooting:
① Vehicle navigation and
tracking
② Trouble shooting guidance
Efficient Complete
Intelligent Schedule Visible Management Rapid Field Work
Intelligent scheduling criteria:
① Asset with fault alarm
② Asset with capacity alarm
③ Asset nearly discard
④ Out of warranty period
Complete & Audit:
① Engineer taking
photos and upload
② NOC audit and close
WO
The solution supports automatic task scheduling and control/track for all the process. Preventive maintenance and
corrective maintenance are supported and maintenance cost will be recorded. Work task can also be forwarded by
integration with legacy system to start asset trouble shooting.
9
Asset Purchase Management Support
The solution supports asset purchase management scenario. It provides daily asset usage monitoring, pre-warning
notification when the expiry date is approaching and also purchase guidance with accurate information. Purchase
suggestion can be forwarded to ERP system for guidance.
Asset Usage Monitoring
• Network equipment
• IT infrastructure
• Office assets
Warning Method
• Pre-defined warning rule
• Email/SMS notification
(designated time/receipt)
• Periodic Report
Guidance Information
• Attach previous contract
• Asset model/configuration
• Quantity & Price reference
• Suggested purchase date
Asset Monitoring Expiry/Loss Pre-warning Purchase Guidance
10
Contract Management
As the original source of asset management, contract management is provided as multiple types as Common,
Without Interest, Only Depreciation, Discount and multiple down payment. It can bring a comprehensive
understanding and accurate calculation for asset value during the whole lifecycle of contract.
Contract
Assets
Licenses
Contract
Scan
Contract
Query
Contract
Archive
 Electronic, paperless management, with scan
 Intelligent, automatic management, for fast query
 Contract file/archive management
11
Receipts Stock Management Issues
 New receipt
 Repair return
 Lent-out return
 Damaged receipt
 Receipts list
 Stock Check
 Stock Threshold alarm
 Transfer Management
 Statistics Report
 Repair issue
 Lent-out issue
 Scrap issue
 Draw issue
 Issue list
In order to fulfill complete asset life cycle control, AM supports Warehouse Management, mainly including
asset receipts, issues and stock management. AM can help customer view and hold general status of asset to
control them in security.
Warehouse Management
12
Intelligent Stock Check
Daily Management
Query & Statistics
Asset Management
Report Generation
Stock Check Result
Stock Check Report
Handset / Mobile
Barcode Print Barcode
Check Stock
Verify Data
Handle Result
Finance System
Account Check Result
Import
Export
Account Check
QR code
The following chart shows the work flow for intelligent stock check.
13
System provides asset statistics reports and asset financial reports by multiple vendor, equipment type and value &
lifecycle, and the reports can be automatically generated by scheduled task and sent to pre-defined receivers
through Email, FTP.
Asset Statistics & Report
Various Report Styles
Line, Column, Rank, Pie, Area, Matrix,
Table
Auto Report Distribution
Email, FTP/SFTP
Easy Report Export
XLSX, CSV, XML, HTML, PDF, JPG
Summary Calculation
Summary: Contract->Site->Asset->Price
Support multiple currency USD, EUR, DHS
Flexible KPI Definition
Asset quantity, usage, NPV, Accumulated
Depreciation, Installment Interest
Scheduled Report Task
Periodic, One time
14
Audit: User check whether this
ticket is ok or not ok. The menu
approve or reject is the most
important choose on this ticket.
It make this ticket to move to
who do this ticket next step.
Approve
Query Report
Scan
Asset Mobile APP
Cost Management Solution
Based on resource data, to establish cost delicacy management of electricity, water, oil, O&M, repairment, spare
parts and other costs, realizes cross-domain connection of resource data and financial data. Realize multi-
dimensional cost analysis, benchmarking analysis and cost-benefit analysis.
Delicacy Management of Cost
Multi-dimensional benchmarking analysis
Achieve traceability for each cost
01
02
03
Grid Accounting
Cause Prediction
Performance
Assessment
01
02
03
Predictable
Optimizing
Controllable
Budget Control Cost Management Assessment
Support multi-dimensional cost
benchmarking and trend analysis
Risk Prevention and Control
Establish embedded audit rules and multi-dimensional cost benchmarking. Carry out audit early warning of
service details, such as whether the budget exceeds the standard, whether the contract unit price is correct,
and whether the expenses are abnormal, so as to achieve benchmarking of unit cost accounting and support
budget adjustment and execution decision-making.
Whether compliance
with contract requirements
Such as unit price,
payment period, execution
assessment and
compliance.
Whether exceed budget
Monitoring cost based
on budget
Whether exceed
management cost standard
Monitoring expenses on travel,
conference and business
entertainment based on standards
Whether associate
with minimum business unit
For example, network costs need
associating resources, and vehicle
operation costs need associating
vehicles, and expenses are
controlled based on business units.
Whether exceed
the unit benchmark
Whether the expense details exceed
the benchmark, such as electricity
bill exceeds 30%;
Compliance
Verification
Budget Control
17
Realize automatic budget prediction based on historical data, site size, market size and other data. Through
the annual budget implementation and predict data to provide reference for the compilation of next year's
budget.
 Budget prediction
Monitor budget progress
according to budget code,
subject, specialty, cost and
other dimensions;
 Budget progress monitoring
Automatically generate
budget data according to
grid benchmarking, service
unit benchmarking,
historical data, service
development scale, DC
cost planning, etc., to
assist budget decision-
making;
How much budget shall be allocated?
What is the basis of the budget?
Multi-dimensional Analysis
18
Based on service details, minimum service units and budget data, system supports comprehensive cost
structure analysis, benchmark analysis, correlation analysis, fluctuation analysis, and anomaly analysis. Identify
high cost items, and provide effective analysis data for management staff to assist decision-making.
Furthermore, it can relate income data to achieve benefit analysis.
Revenue
Traffic:12,321G
Voice:19.50 Erl
Expenses
Electricity: ¥272,100
Rental:¥612,300
Device Maintenance:¥62,400
Other:¥21,300
Assets
Initial assets value: ¥721,300
Assets depreciation:¥122,300
Site
Location:Langchao Road 1036
Site NO: JN23244325
Longitude:36.40321
Latitude:117.10202
Region:Noth 1
Statistical reports Analytical reports
Statistics of conventional data,
such as electricity payment of
specific period, rent payment and
electricity use statistics, etc.
Find out usage anomaly by
comparing theoretical power
consumption with actual power
consumption combined with year-
on-year, sequential analysis.
Aid decision making
Provide predictive data to
mgmt. staff through intelligent
analytics
Performance
Idle duration: 623min
Busy duration:523min
Cost Management Solution Architecture
IM
Electricity Data
Budget
System
Manual Import
Tower Data Asset Data Contract Data
P&E System
Budget Data Other Data
Site Rental Cost
Budget Mgmt.
Alert Mgmt.
System Mgmt.
Workflow Mgmt.
Performance
Mgmt.
Statistics
Basic
Information
Mgmt.
Tower Service
Cost
Electricity
Maintenance
Cost
Interface
Report
Portal Dashboard
ERP
Tower Service Cost Site Rental Cost
Control
Cost
Build measurement model with Tower
Company
Resource Mgmt.
Cost Calculate
Bill Audit
Statistics
Data Maintenance for site assets
Audit with monthly bill of shared
Operator before sending to ERP
Comprehensive analysis of assets
and cost
Resource
Correlation
Contract
Correlation
Bill Audit
Statistics
Correlate site rental information with assets
Correlate contract information to site
Audit the bill before sending to ERP
Comprehensive analysis of assets
and cost
Electricity Cost
Resource
Correlation
Meter Data
Summary
Bill Audit
Alert &
Analysis
Correlate site, contract, meter data
Collect meter reading data and summary
Comprehensive analysis of assets and cost
Audit the bill before sending to ERP
Maintenance Cost
Budget Mgmt.
Cost Item Mgmt.
Assessment
Alert & Rectify
Generate budget for maintenance cost
Assess cost for each project according to
audit rules
Risk alert and trigger rectify orders
Build measurement model by domain, project
Typical Scenarios
Pricing Agreement and Factors
Total
Cost
DG Service Cost
Battery Extra
Protection
Cost
Venue Cost,
Maintenance
Cost
Tower
Benchmark
Price Room & Asset
Benchmark Price
Electricity
Access Cost
Other Cost
Tower
Room
Asset
The price agreement should be signed between site owner and user. According to the product model and pricing formula
in the agreement, system can decompose total service cost into several single cost. The calculation algorithm is different
for existing site and new site.
Tower Service Cost
Tower & Room & Asset Benchmark
Maintenance Cost Management
The network maintenance cost category includes: wireless network, access network, core network, data network, transmission network, support
network, comprehensive supporting network, network information security
Budget Initiate Project Contract Implementation
Accounting
Assessment
• Connect with budget
management system, and then
subdivide budget of
maintenance costs for each
subject
• Project initiating
• Project approval
• Contract basic Information
• Amount
• Requirements
• Provision accounting
• Payment accounting
• Evaluate benefits
• Assess capability of implementer
• Workflow control
• Process control
• Results assessment
E2E
Control
Process
Cost category Description
Technical Support Services
For maintenance service Contract of main equipment, including: technical consultation, troubleshooting, on-site service , technical
support(excluding the upgrade fee of major version of main equipment, which shall be included in the project investment), resource survey, co-
maintenance, etc.
Network optimization
Refers to the optimization work for improving network quality, customer perception and network performance, as well as the system function
optimization work (non-investment) carried out by network administrators and equipment manufacturers according to our company's requirements .
Network monitoring test fee Daily monitoring, special testing, evaluation testing, optimization testing
Hardware maintenance cost
Hardware maintenance, daily equipment maintenance, spare parts maintenance and instrument maintenance (excluding instrument upgrade fee)
in the maintenance service contract of main equipment
Spare parts cost Spare parts service with maintenance and spare parts service without maintenance
O&M cost Basic package fee and per - time service fee, which have been implemented in the O&M system
Monitoring View
Rental Order Number Cumulative Tower Number Cumulative Electricity Cumulative Rental Cost
To-do order list
Indicator Summary
Tower Service Cost Process
Thank You for listening!

Smart Asset & Tower Service Management Solution updated.pdf

  • 1.
    YOUR SUCCESS, WESUCCEED Smart Asset and Tower Service Management Solution 2022/8/11
  • 2.
    2 Solution Architecture AM performsas an unified platform for management and maintenance of various network assets for a complete and precise view. Capacity Management Asset Management Asset Workflow Management Asset Report Unified Platform Asset Modeling Manual Input Asset Addition Financial Report Statistic Report Asset Transfer Asset Replacement Asset Repair Purchase Management Contract Management Visualization Monitoring PC Mobile APP Video Wall (3D view) Northbound Interface Adapter SAP Mail Forecast & Pre-warning Purchase Support Alarm Management Alarm Export/Forward Alarm Monitoring Alarm Clearance Automatic Collection Change Report Asset Discard Routine Inspection ERP License Management Barcode Management Barcode Encode Barcode Scan Barcode Print … Capacity Analysis Spare Parts Management Issues/Receipts Warehouse Stock Check Lifecycle Management Authority Management Batch Import
  • 3.
    3 Flexible Modeling &Data Collection/Input AM supports users with self-definition of various network asset types for convenient management, broadly and rapidly adapting to multiple network techniques and network changes. The dynamic modeling can also support asset automatic input, via EMS/NMS integration or NE direct connection. Define Class (SDH/DWDM) Define Attributes (Vendor/Location) Define Constraints (Mandatory/Optional) Define Category (Transmission) Define Relations (Device-Board-Port) Auto Discovery and Manual Input Parse & Standardization Data Load Asset DB Data Process Raw Data Collection FTP Corba · · · · SNMP Auto Task NE/EMS/NMS Manual entry Flexible and agile to easily extend to support new types of assets and adapt to network changes especially new network technology application such as 5G
  • 4.
    4 Scan with mobilephone  Asset stock check  Asset query Besides automatic collection and manual entry, it also supports multiple batch input methods and operations to support various asset management and data entry scenarios Scan barcode for batch input Batch import with Excel template Excel Files Database Multiple Asset Batch Input Methods
  • 5.
    5 Central Monitoring andManagement View The video wall provides comprehensive monitoring for Intelligent Operation Center, using effective GIS, multiple dashboard, visual 2D and 3D view for network asset presentation and key information display. It supports to customize monitoring topics for different user groups and different use scenarios. Transmission Substation
  • 6.
    6 Purchase Planning Commissioning Out of Service Addition Replace ment RepairTransfer Discard E2E Asset Workflow, through Barcode, to realize auto recognition and input Scan barcode on terminal device • Asset stock check • Asset query • Asset input Maintenance By using the standard asset workflow, AM supports entire lifecycle management of asset, update and record the state change when network transformation & business expansion, to ensure the consistency and accuracy of asset data. Asset Lifecycle Management
  • 7.
    7 Built-in Asset NamingRule (Asset Type + Vendor + Location + …) Barcode Generation (Unified Coding Strategy for Multiple Vendor) Barcode/RFID Label Printing & Pasting on Assets Barcode/RFID Scanning & Read Asset Info Asset Statistics & Report AM provides Barcode Management for tracking and checking asset during whole life cycle. By use of marking asset by barcode label, AM system is able to provide user with accurate and timely understanding on asset. Barcode/RFID solution is composed of Barcode Generator, Printer (can write data to barcode label), Label (Transponder, located on the object), and Data Processing Module. Barcode QR code RFID Label Fast Query High Accuracy Unified Manage Barcode Management
  • 8.
    8 Asset Maintenance Visible GISMap manager view: ① Task information ② Engineer information ③ Vehicle information Fast arrival to fault point and trouble shooting: ① Vehicle navigation and tracking ② Trouble shooting guidance Efficient Complete Intelligent Schedule Visible Management Rapid Field Work Intelligent scheduling criteria: ① Asset with fault alarm ② Asset with capacity alarm ③ Asset nearly discard ④ Out of warranty period Complete & Audit: ① Engineer taking photos and upload ② NOC audit and close WO The solution supports automatic task scheduling and control/track for all the process. Preventive maintenance and corrective maintenance are supported and maintenance cost will be recorded. Work task can also be forwarded by integration with legacy system to start asset trouble shooting.
  • 9.
    9 Asset Purchase ManagementSupport The solution supports asset purchase management scenario. It provides daily asset usage monitoring, pre-warning notification when the expiry date is approaching and also purchase guidance with accurate information. Purchase suggestion can be forwarded to ERP system for guidance. Asset Usage Monitoring • Network equipment • IT infrastructure • Office assets Warning Method • Pre-defined warning rule • Email/SMS notification (designated time/receipt) • Periodic Report Guidance Information • Attach previous contract • Asset model/configuration • Quantity & Price reference • Suggested purchase date Asset Monitoring Expiry/Loss Pre-warning Purchase Guidance
  • 10.
    10 Contract Management As theoriginal source of asset management, contract management is provided as multiple types as Common, Without Interest, Only Depreciation, Discount and multiple down payment. It can bring a comprehensive understanding and accurate calculation for asset value during the whole lifecycle of contract. Contract Assets Licenses Contract Scan Contract Query Contract Archive  Electronic, paperless management, with scan  Intelligent, automatic management, for fast query  Contract file/archive management
  • 11.
    11 Receipts Stock ManagementIssues  New receipt  Repair return  Lent-out return  Damaged receipt  Receipts list  Stock Check  Stock Threshold alarm  Transfer Management  Statistics Report  Repair issue  Lent-out issue  Scrap issue  Draw issue  Issue list In order to fulfill complete asset life cycle control, AM supports Warehouse Management, mainly including asset receipts, issues and stock management. AM can help customer view and hold general status of asset to control them in security. Warehouse Management
  • 12.
    12 Intelligent Stock Check DailyManagement Query & Statistics Asset Management Report Generation Stock Check Result Stock Check Report Handset / Mobile Barcode Print Barcode Check Stock Verify Data Handle Result Finance System Account Check Result Import Export Account Check QR code The following chart shows the work flow for intelligent stock check.
  • 13.
    13 System provides assetstatistics reports and asset financial reports by multiple vendor, equipment type and value & lifecycle, and the reports can be automatically generated by scheduled task and sent to pre-defined receivers through Email, FTP. Asset Statistics & Report Various Report Styles Line, Column, Rank, Pie, Area, Matrix, Table Auto Report Distribution Email, FTP/SFTP Easy Report Export XLSX, CSV, XML, HTML, PDF, JPG Summary Calculation Summary: Contract->Site->Asset->Price Support multiple currency USD, EUR, DHS Flexible KPI Definition Asset quantity, usage, NPV, Accumulated Depreciation, Installment Interest Scheduled Report Task Periodic, One time
  • 14.
    14 Audit: User checkwhether this ticket is ok or not ok. The menu approve or reject is the most important choose on this ticket. It make this ticket to move to who do this ticket next step. Approve Query Report Scan Asset Mobile APP
  • 15.
    Cost Management Solution Basedon resource data, to establish cost delicacy management of electricity, water, oil, O&M, repairment, spare parts and other costs, realizes cross-domain connection of resource data and financial data. Realize multi- dimensional cost analysis, benchmarking analysis and cost-benefit analysis. Delicacy Management of Cost Multi-dimensional benchmarking analysis Achieve traceability for each cost 01 02 03 Grid Accounting Cause Prediction Performance Assessment 01 02 03 Predictable Optimizing Controllable Budget Control Cost Management Assessment Support multi-dimensional cost benchmarking and trend analysis
  • 16.
    Risk Prevention andControl Establish embedded audit rules and multi-dimensional cost benchmarking. Carry out audit early warning of service details, such as whether the budget exceeds the standard, whether the contract unit price is correct, and whether the expenses are abnormal, so as to achieve benchmarking of unit cost accounting and support budget adjustment and execution decision-making. Whether compliance with contract requirements Such as unit price, payment period, execution assessment and compliance. Whether exceed budget Monitoring cost based on budget Whether exceed management cost standard Monitoring expenses on travel, conference and business entertainment based on standards Whether associate with minimum business unit For example, network costs need associating resources, and vehicle operation costs need associating vehicles, and expenses are controlled based on business units. Whether exceed the unit benchmark Whether the expense details exceed the benchmark, such as electricity bill exceeds 30%; Compliance Verification
  • 17.
    Budget Control 17 Realize automaticbudget prediction based on historical data, site size, market size and other data. Through the annual budget implementation and predict data to provide reference for the compilation of next year's budget.  Budget prediction Monitor budget progress according to budget code, subject, specialty, cost and other dimensions;  Budget progress monitoring Automatically generate budget data according to grid benchmarking, service unit benchmarking, historical data, service development scale, DC cost planning, etc., to assist budget decision- making; How much budget shall be allocated? What is the basis of the budget?
  • 18.
    Multi-dimensional Analysis 18 Based onservice details, minimum service units and budget data, system supports comprehensive cost structure analysis, benchmark analysis, correlation analysis, fluctuation analysis, and anomaly analysis. Identify high cost items, and provide effective analysis data for management staff to assist decision-making. Furthermore, it can relate income data to achieve benefit analysis. Revenue Traffic:12,321G Voice:19.50 Erl Expenses Electricity: ¥272,100 Rental:¥612,300 Device Maintenance:¥62,400 Other:¥21,300 Assets Initial assets value: ¥721,300 Assets depreciation:¥122,300 Site Location:Langchao Road 1036 Site NO: JN23244325 Longitude:36.40321 Latitude:117.10202 Region:Noth 1 Statistical reports Analytical reports Statistics of conventional data, such as electricity payment of specific period, rent payment and electricity use statistics, etc. Find out usage anomaly by comparing theoretical power consumption with actual power consumption combined with year- on-year, sequential analysis. Aid decision making Provide predictive data to mgmt. staff through intelligent analytics Performance Idle duration: 623min Busy duration:523min
  • 19.
    Cost Management SolutionArchitecture IM Electricity Data Budget System Manual Import Tower Data Asset Data Contract Data P&E System Budget Data Other Data Site Rental Cost Budget Mgmt. Alert Mgmt. System Mgmt. Workflow Mgmt. Performance Mgmt. Statistics Basic Information Mgmt. Tower Service Cost Electricity Maintenance Cost Interface Report Portal Dashboard ERP
  • 20.
    Tower Service CostSite Rental Cost Control Cost Build measurement model with Tower Company Resource Mgmt. Cost Calculate Bill Audit Statistics Data Maintenance for site assets Audit with monthly bill of shared Operator before sending to ERP Comprehensive analysis of assets and cost Resource Correlation Contract Correlation Bill Audit Statistics Correlate site rental information with assets Correlate contract information to site Audit the bill before sending to ERP Comprehensive analysis of assets and cost Electricity Cost Resource Correlation Meter Data Summary Bill Audit Alert & Analysis Correlate site, contract, meter data Collect meter reading data and summary Comprehensive analysis of assets and cost Audit the bill before sending to ERP Maintenance Cost Budget Mgmt. Cost Item Mgmt. Assessment Alert & Rectify Generate budget for maintenance cost Assess cost for each project according to audit rules Risk alert and trigger rectify orders Build measurement model by domain, project Typical Scenarios
  • 21.
    Pricing Agreement andFactors Total Cost DG Service Cost Battery Extra Protection Cost Venue Cost, Maintenance Cost Tower Benchmark Price Room & Asset Benchmark Price Electricity Access Cost Other Cost Tower Room Asset The price agreement should be signed between site owner and user. According to the product model and pricing formula in the agreement, system can decompose total service cost into several single cost. The calculation algorithm is different for existing site and new site. Tower Service Cost Tower & Room & Asset Benchmark
  • 22.
    Maintenance Cost Management Thenetwork maintenance cost category includes: wireless network, access network, core network, data network, transmission network, support network, comprehensive supporting network, network information security Budget Initiate Project Contract Implementation Accounting Assessment • Connect with budget management system, and then subdivide budget of maintenance costs for each subject • Project initiating • Project approval • Contract basic Information • Amount • Requirements • Provision accounting • Payment accounting • Evaluate benefits • Assess capability of implementer • Workflow control • Process control • Results assessment E2E Control Process Cost category Description Technical Support Services For maintenance service Contract of main equipment, including: technical consultation, troubleshooting, on-site service , technical support(excluding the upgrade fee of major version of main equipment, which shall be included in the project investment), resource survey, co- maintenance, etc. Network optimization Refers to the optimization work for improving network quality, customer perception and network performance, as well as the system function optimization work (non-investment) carried out by network administrators and equipment manufacturers according to our company's requirements . Network monitoring test fee Daily monitoring, special testing, evaluation testing, optimization testing Hardware maintenance cost Hardware maintenance, daily equipment maintenance, spare parts maintenance and instrument maintenance (excluding instrument upgrade fee) in the maintenance service contract of main equipment Spare parts cost Spare parts service with maintenance and spare parts service without maintenance O&M cost Basic package fee and per - time service fee, which have been implemented in the O&M system
  • 23.
    Monitoring View Rental OrderNumber Cumulative Tower Number Cumulative Electricity Cumulative Rental Cost To-do order list Indicator Summary Tower Service Cost Process
  • 24.
    Thank You forlistening!