SlideShare a Scribd company logo
1 of 20
Download to read offline
Page1
Sigve Hamilton Aspelund
Entrepreneur
sigve.aspelund@lyse.net
Summary
Norwegian senior petroleum engineer (29.01.76) with on-/offshore work experience in the oil and gas industry.
Having developed excellent consulting experience across Norway and International. My experience includes
geo modeling and simulation, special core analysis, sedimentology and supervision of well drilling, increased
oil production, enhanced oil production, water and gas injection, artificial lift (Gas lift), well completion/
workover operations, offshore production engineering operations (FPSO/IPF/WHP), artificial lift selection,
reservoir engineering, quality, health, safety and environment, resource coordinator and project risk advising.
It has been gained through working for major Oil & Gas companies including CNOOC, Cairn, Vanco, KPOC,
NNPC, BP, ENI, Total, Shell, Talisman, Norsk Hydro & Statoil. I have achieved management onshore,
offshore personnel and data, increased oil production in exploration and production industry, organized and
held courses and team buildings M.Sc. in petroleum technology with applied science programme from the
university college of Stavanger and the bachelor degree from NTNU, university of Bergen and the university
college of Stavanger M.Sc. thesis Edward Lorenz strange attractors, a course at M.Sc. level Personal profile:
Adaptation accomplished realist, outstanding organizational skills and business sense, desire to achieve
concrete results toward perfectionism, prefer hard work, ultimate realist, possess practical properties combined
with highly developed intelligence, sees quickly new opportunities and use this to his own benefit, hard
working, fair, very independent, convinced that morality is more important than anything else, resourceful,
action-oriented person, eager to expand own knowledge, expect to reach targets, responsible, industrious,
resolute and energetic, natural leader and has a natural talent as presenter
Specialties
Risk advising (Subsea) Production enhancement & optimization of surface and subsurface operations Quality,
Health, Safety & Environment engineering (Drilling) Integrated operations Marketing & business development
Exploration geoscience (Geology, geomodeling and drilling) Reservoir engineering: Increased Oil production
and petrophysics Alliance creator: Team building Technologist: Information Technology Oral presentations:
Teaching and presentation Realist: Mathematics, physics and technology
Experience
General Manager at Aspelund Consulting Energy Offshore Development International & National
October 2014 - Present (5 months)
Planning an Oil & Gas Management course Developed an Exploration & Production course for Iraq:
Delayed.
Page2
Petroleum engineering team leader at Oil Plus Ltd
July 2014 - September 2014 (3 months)
Business development proposal: Reservoir simulation: H2S analysis with CMG (Geochemistry/ HSE)
Petroleum engineer consultant at Aspelund Consulting Energy Offshore Development International &
National
August 2009 - June 2014 (4 years 11 months)
• Digital oilfield planning as a senior production engineer with BP, IPCOS, Emerson in Dubai Client:
NES Global Talent • Well Intervention Services (Advising) Client: Coleman research • Course director:
Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling. Client: Capital
Business Events • Analytics, sales management & revision at Aspelund Consulting & Energy Offshore
Development International National • Project risk engineer. Client: TOTAL via IDEA consultants • Course
director at a drilling, well control, HSE and risk course in Aberdeen. Client: CNOOC via Petromentor
• Project risk advisor. Client: FMC Technologies via IDEA • Chaired Doing more with drilling data.
Client: Finding petroleum • Course director at a production, geology, geomodeling, reservoir simulation,
drilling and HSE course in London. Client: NNPC via Petroconsult • Petroleum engineer advisor at
RCC • Course director at Introduction to oil & gas industry course in Kuala Lumpur, Malaysia. Client:
Kebabangan Petroleum Operating Company/ ARN • Offshore safety related to computer interfaces and
information presentation at the seminar People and the digital oilfield Client: Finding petroleum • Offhore
HSE-presentation at the seminar: Bringing businesses from east and west together Client: TransEuropean
Centre at Rica Forum Stavanger • Petroleum engineer advisor: Client: Gerson Lehrman Group • Lectured.
Clients: SOTS & Akademiet
13 recommendations available upon request
Project risk advisor at Aspelund Consulting & Energy Offshore Development International National
November 2012 - March 2013 (5 months)
Risk engineer in the pre-engineering FMC organization with projects outside Angola and Shetland Risk
advisor at the Subsea field developments CLOV: Cravo, Lirio, Orquidea and Violeta discoveries and GIRRI:
Rosa and Girassol fields operated by Total (Angola) The essential purpose of risk management in projects
and tenders are to improve project and tender performance via the systematic and iterative process designed
to identify, analyze, evaluate, and treat project related risk elements. Risk elements are compiled, recorded
and managed throughout the tender period and project life cycle. • Establishment of project risk management
plan in accordance to company project risk management process • Establishment and maintenance of a
risk register based on risk analysis done in tender phase (if available), lessons learned and project risk
assessment methodology • Ensuring that projects work according to company global risk management
process for projects • Facilitate risk meetings and co-ordinate risk responses • Monitor and control that
the risk strategies are implemented in a timely manner • Coordinate and participate in risk evaluation,
development of mitigation plans, monitor, summarize and report risk status • Compile record and follow up
risks out of tolerance level in the risk register • Create a project risk management close out report • Support
projects or tenders with risk analysis (quantification and /or bowtie) upon request • Report updates and
Page3
improvements for process, methodology and tools as a result of feedback from the organization and / or
changes in external conditions, to the local process owner • Provide input to internal and external monthly
reporting. Internal risk status reporting consisting of aggregated risk status from projects, project portfolio
and/ or tender work Via IDEA Consultants certified engineering consulting company which mainly provides
services within: Machine-, Mechanical and Process industry Electronic- IT and Software industry
Petroleum engineer consultant at Aspelund Consulting Energy Offshore Development International &
National
March 2012 - April 2012 (2 months)
Presentations: - Oil and gas industry & life cycle - Structural/ design - Piping/ layout - Procurement -
Materials/ corrosion Employee training: - Mechanical/ drilling - Process - Electronics & telecom/ HVAC
- Petroleum engineering; Drilling, production & reservoir - QHSE Resource coordinator: Nominating/
managing applicants & relevant candidates to available positions: Engineering & management: - Interface
coordinator - Petroleum engineering - Electro instrument & telecom/ HVAC - Technical safety, HSE/ HSEQ/
Quality/ QA/QC - Structural design - Process - Piping/ layout -- Subsea marine operations - Procurement
- Mechanical/ drilling - Materials/ Corrosion - Document/ LCI - Planning - Cost engineer Evaluating
candidates curriculum vitae Software: Itris Client: RC Consultants is a leading provider of engineering
consultancy services for the oil and gas industry on the Norwegian continental shelf.
Quality, Health, Safety & Environment engineer at Ocean Rig
June 2011 - November 2011 (6 months)
Procedures & Technical description review/revision Engineer at Corcovado (Drilling ship) Location:
Greenland Operator: Cairn Well: Attamik 2 - Risk assessment - Work permit system and Safe Job
Analysis - Care card system - Focusing on drilling safety: Bit type, drilling parameters, well control/volume
control, kick prevention, hole cleaning, mud data & DDR. - Software: STAR, Mintra & Empreda -
Care philosophy, procedures and procedure exam Investigated market for best available technology for
”dashboard” system solutions for HSE. Well control project for Petroleumstilsynet (PTIL) Technical
contact with customer relations management system (CRM) and Fast Track project implementation vendor
Data management & generel management Organized two care for safety seminars and held Care Card
presentations with offshore safety officers from Leiv Eiriksson, Eirik Raude, Olympia, Corcovado, Poseidon
and Mykonos and onshore QHSE department at Hummeren hotel in Tananger with team building (Gocart
racing at Stavanger carting) Safety officer at Olympia (Drilling ship) Location: Ghana Client: Vanco Well:
Dzata 2A Technical contact with information technology vendor and operational performance management
and reporting system vendor Project lead: Annual procedure revision/ review IADC data reporting KPI
reporting General QHSE engineering and risk management Software: Star Mintra administrator Empreda
Ocean Rig is an international offshore drilling contractor providing oilfield services for offshore oil and
gas exploration, development and production drilling. I can confirm that we worked well together when
Sigve was on board with us. We had some conversations, and he were more than willingly to help me out in
any questions related to HSEQ/QA, that i had. He appeard to be an professional in his profession, and had
Page4
much experience within the oil business, not only necessarly related to HSEQ/QA. Best regards Raymond
Øren Electrical section leader
Consultant at Aspelund Consulting Energy Offshore Development International & National
August 2010 - November 2010 (4 months)
Teaching: Mathematics, physics and chemistry Client: Akademiet Videregående skole The Academy
operates in three segments: We are both a private high school with state aid, one candidate school and a
nettstuide.
Petroleum engineer consultant at Aspelund Consulting Energy Offshore Development International &
National
August 2009 - December 2009 (5 months)
Management: Held courses for up to 100 students • Production technique 1 & 2 • Drilling technology •
Geology and formation evaluation • Health, Safety and Environment for the oil industry • Well control •
Drilling fluids • Operating and control systems • Mathematics • Chemistry prosess • Alternative energy
Consulting students at PetroChallenge Norway 2009 @ University of Stavanger Managing event expedition
to Weatherford oil field base in Forus Leading students expeditions at oil museum in Stavanger and Ullrigg
@ International Research Institute of Stavanger Client: Stavanger Offshore Technical College (SOTS) is
a publicly maintained leading educational facility in upper-secondary and technical college studies. The
College has an annual student body of about 500 students at further education level, employs a highly
qualified teaching staff, and has state-of-the-art equipment and modern facilities to meet the educational
needs of students. The main objective of the College is to be at the forefront in providing education in
offshore drilling.
Production Engineer consultant at Oilfield Technology Group
November 2008 - July 2009 (9 months)
Production engineer consultant at StatoilHydro (Grane) Responsible for: • Production engineering • Well
testing and analysis using SAP. Displaying results in Oil Field Manager. • Production analysis with Flow
Manager • P&I plan • Production optimizing with GORM Sub sea technology development team
work Hazid Project leader: Analyzing drilling waste management market for SWATH The OTG Group is
providing services, competence and products to the global petroleum industry. Our core services are Field
Operations, Drilling & Well Management, HSE & Offshore Safety Management, Emergency Preparedness,
Project and Risk Management, Engineering Support, Software Products and Software Development.
Reference: Johannes Waarseth-Junge CEO 3R Innovation
1 recommendation available upon request
Production Engineer at Talisman Energy
March 2007 - October 2008 (1 year 8 months)
Production engineering: Project leader: Responsible for improving oil production at Varg Sub project
leading: Subsurface within integrated operations (TENAS operation project) Production supervising with
PI process book designing and real time allocation programming with PI excel Responsible for: • Annual
Page5
and monthly reports • Well allocation including production analysis • Well testing and well test analysis •
Weekly production & injection planning and morning meetings with the communication tool GoToMeeting •
Real time production analysis with PI process book • Production optimizing with Prosper and GAP Planning
well operations: • Mechanical operations: Increased oil production from 600 Sm3/d to 1200Sm3/d in a well
by increase reservoir pressure by increasing water injection and changing the choke and reduce the pressure
drop, stabilized 2 slugging wells by changing gas lift valves (Stabilized total production) • PLT, Water
shut of and perforations (Increased oil production from 100 Sm3/d to 250 Sm3/d). • Production optimizing
including field visits offshore at Petrojarl Varg and Varg A • Event organizing: Organized presentations
and a seminar • Production forecasting • Technical contact with vendors Development Varg is an oil
field to the south of Sleipner Øst in the central part of the North Sea. The field has been developed with
the production vessel, “Petrojarl Varg”, which has integrated oil storage connected to the wellhead facility
Varg A. Reservoir The reservoir is in Upper Jurassic sandstones at a depth of approximately 2 700 metres.
The structure is segmented and includes several isolated compartments with varying reservoir properties.
Recovery strategy Recovery takes place by pressure maintenance using water and gas injection. The smaller
structures are produced by pressure depletion. All the wells are producing with gas lift.
3 recommendations available upon request
Consultant from IOR Chemco at Badger Explorer
January 2007 - February 2007 (2 months)
Consultant: Project within petrophysics and geology. Data collection and data base development. The
Badger Explorer is a revolutionary method to obtain subsurface data for oil&gas exploration, mapping of
hydrocarbon resources and long-term surveillance.The Badger Explorer drills and buries underground,
carrying a unique package of logging and monitoring sensors, at a substantially lower risk, cost and
complexity of utilising an expensive drilling rig. The tool penetrates the sea bed and the subsurface by
using a mechanical drill bit driven by an electrical motor to loosen and crush the formation ahead of the
tool. The crushed formation is transported through the device and deposited in the void behind the tool. The
tool carries an electrical cable, which is spooled up inside the unit, connected to the surface and powers the
electrical motors. The same cable is used for continous transfer of data back to the surface.
Reservoir engineer at IOR Chemco
January 2006 - February 2007 (1 year 2 months)
Analyzing of the world marked (High water cut reservoirs and sand producing reservoirs) Consultant at
Badger Explorer. Representation at ONS Reporting (Inteligel progress at IRIS) to Norwegian Research
Council, Total, Statoil and Norsk Hydro Screening of Espoir operated by Canadian Natural Recourses
05-11.06 Project research: at International Researh Institute of Stavanger • Field manager: mGel reservoir
stimulation for increased oil recovery at Gullfaks C including: Quality assurance of treatment, photographing
onsite and reporting • Application to ONS innovation award (Was nominated to the award) • Articles
published at OTC (Offshore & Energy) and ONS (Scandinavian oil and gas magazine) • Representation at
IOR 2006 in Tulsa Oklahoma (SPE) • PowerPoint designing for sales meetings and reporting • Presentation
for potential customers in Aberdeen • Contact developing (Gained 15 business meetings with oil companies
Page6
such as Maersk oil, Venture production, CNR international, Amerada Hess in Aberdeen and Talisman-
Energy in Stavanger over a short period) • Marked analyzing of the British shelf (High water cut sand
reservoirs) • Screening of projects including well log investigation and reservoir evaluation: Brage (Norsk
Hydro), Gullfaks (Statoil) Improved Oil Recovery Chemical Company - a new IOR Chemical Solution
Provider - a start up based on Best of Breed from The International Research Institute of Stavanger (IRIS -
former Rogaland Research, RF) extensive research history in the field - based in Stavanger - the oil capital
in Norway
1 recommendation available upon request
Consultant from IOR Chemco at International research institute of Stavanger
May 2006 - November 2006 (7 months)
Project research: Optimisation of IOR Chemco`s mSand technology (chemicals for sand consolidation):
Petrophystical measurements: PV, permeability, porosity and RRFw Article: Forskning: http://
www.forskning.no/artikler/2005/november/1132741898.83 IRIS - International Research Institute of
Stavanger - is a recognised research institute with high focus on applied research, equally owned by the
University of Stavanger and the regional foundation Rogalandsforskning. IRIS was established in 2006,
as a result of a technical re-structuring of the ownership of Rogaland Research. Rogaland Research was
established in 1973, and the continuation of its activities in IRIS provides IRIS with a long and proud
history right from the start. Research activities started in the area of social science, but quickly developed to
include petroleum. Today IRIS remains an independent research institute with research and research-related
activities in petroleum, new energy, marine environment, biotechnology and social science and business
development.
Mudlogger geologist at Geoservices
January 2003 - December 2005 (3 years)
• Functioning as Dataoperator/ Secure safe well drilling • Well monitoring: Pit volume control and
gas control • Maintaining sensors and repairing equipment • Reporting of geology • Geology: Catching
samples, lithology analyze, cuttings and cavings description and calcimetry analysis and core handling •
Logistics: Sending equipment and samples onshore When working for Geoservices I was working indirectly
for Lars Johan Skjold (Statoil) many times. When he was coming to our working area he asked me for the
answer to the geological interpretation. He also told me that the best geologists were engineers because
we described what we could see. The geologists were describing what they thought they could see. Arie
Romer wrote the following about me: Sigve has executed his work tasks to our full satisfaction and therefore
we give him the best recommendations. Geoservices is the industry leader in mud logging, focusing on
drilling support and formation evaluation. Decision-ready information about well status is helping to drill
better wells more efficiently. Timely and more accurate information on reservoir fluid composition and
lithology is detecting pay zones that would otherwise be missed, assisting well placement, revealing reservoir
connectivity and compartmentalization, and guiding critical decisions. Drilling Support Obtain improved
quality and higher level of analysis of surface data including drilling speed, vibrations, hole cleaning, and
early kick detection to enhance safety and optimize drilling operations. Formation Evaluation Services
Page7
Use analysis of rock cuttings and gas in the drilling mud for understanding formation geology, efficient
hydrocarbon detection under all conditions including in deepwater and harsh environments, downhole fluid
characterization, early information on reservoir fluid composition, lithology logs, and isotope logging.
Reference Kristina Merethe Rigland Discipline Leader Reservoir Geology and Petrophysics at Statoil
1 recommendation available upon request
ML geologist consultant from Geoservices at BP
2005 - November 2005 (less than a year)
Geology evaluation and supervision when drilling the wells: Ula (7/12-A-5 B & 7/12-A-05B-T2) Ula
(Norwegian: Ulafeltet) is an offshore oil field located in the southern Norwegian section of North Sea along
with Gyda, Tambar and Tambar East fields making up the UGT area, usually attributed to DONG Energy's
main areas of exploration and production activity. The Ula field was discovered in 1976 and came online in
October 1986. It contains confirmed 69.98 million m3 of oil and 2.5 million of NGL. Ownership BP is the
operator of the field with 80% of interest in the project. BP's partner DONG Energy holds 20% of interest.
DONG Energy increased its initial share of 5% to 20% by acquiring Svenska Petroleum's complete share of
15% for $130 million in 2008. Production Ula is located in approximately 70 m (230 ft) of water. The main
reservoir stands at 3,345 m (10,974 ft) in the Upper Jurassic Ula Formation. The field has three conventional
steel facilities with production, drilling, living quarters. It has 7 production and 2 water injection wells.
Current production at Ula field is 10,000 bbl/d. The existing gas process plant was recently extended with a
new module, turbin and compressor and has been operative since 2008. The gas from Blane field is injected
into the Ula reservoir for production. The gas produced at Ula field is re-injected into the field for increased
recovery as well. The field is expected to be abandoned in 2028. The produced oil is then transported by a
pipeline to Ekofisk oil field and on to Teesside for refining. In 2009, Aker Solutions was awarded a contract
to tieback Ula field to Oselvar field. The work is expected to commence in 2011. Once complete, the oil
from DONG-operated Oselvar field which is 24 kilometres (15 mi) from Ula will be pumped to facilities at
Ula for processing.
ML geologist consultant from Geoservices at BP
2005 - November 2005 (less than a year)
Geology evaluation and supervision when drilling the wells: Vallhall IP (2/8-G-10 T3 & 2/8-G-11-T4/
TS) Development Valhall is an oil field located in 70 metres of water. The field was originally developed
with three facilities, but has now 8 platforms. The Valhall complex consists today of six separate steel
platforms for quarters, drilling, wellheads, production, water injection, combined process- and hotel platform
respectively. These platforms are bridge-connected. In addition the field has two unmanned flank platforms,
one in the south and one in the north, both around 6 kilometers from the field center. The Drilling Platform
(DP) Situated between QP and PCP. It has 30 well slots, waste injection and a drilling rig. The platform
started its activity on 17 December 1981, at that time with the first covered derrick. The derrick and drilling
foundation were removed during summer 2009 and a separate program for plug and abandonment is under
development. The Production Platform (PCP) The final shut in of the platform took place late July 2012
and the production now takes place on the new process and hotel platform The original PCP platform was
Page8
built to process 168,000 barrels of oil and 350 million cubic feet of gas per day. The platform is 65 meters
high and weighs 21,000 tons. The oil production is piped to 2/4-J at the Ekofisk Center and goes to Teesside
in England. The gas is transported directly via Norpipe pipeline to Emden in Germany. The platform also
processes oil and gas that comes from Hod. The Wellhead Platform (WP) Installed in April 1996 and first
oil production started in June the same year. WP has 19 well slots. Total cost, including drilling of the wells,
is approx. 1,5 billion NOK.
ML Geologist consultant from Geoservices at Norsk Hydro
2005 - October 2005 (less than a year)
Wellbore history Well 6605/8-1 is an exploration well on a Late Cretaceous Lysing prospect situated on the
western flank of the Fles North rotated fault block structure in the Vøring Basin outside Mid Norway. The
primary objective was to test the presence of movable hydrocarbons in the Lysing prospect. A secondary
objective was to investigate the reservoir potential of the Nise Formation Operations and results Wildcat well
6605/8-1 was spudded in 838 m water depth with the semi-submersible installation Transocean Leader on
14 June 2005 and drilled to TD at 4513 m in Late Turonian sediments of the Lange Formation. Operations
went without significant technical problems. No shallow gas or shallow water flow was observed. The well
was drilled with spud mud down to 2500 m and with KCl/Polymer/Glydril mud from 2500 m to TD. The
well penetrated the main target at 4184 m, a 70 m thick Lysing Formation deep-water turbidite sand of Early
Coniacian age. Gas was recorded from 4180 m. There were two gas zones separated by a water zone. The
upper zone had gas down to a free water level inferred at 4221 m (4193 m TVD MSL). The lower gas zone,
at 4253 m, was very thin and was approximately 20 bar overpressured compared to the upper zone. Gas
shows were also encountered in Early Campanian Nise siltstone at 3064 m and a deeper Lysing sandstone
unit at 4354 m. One 9 m long core was taken in the interval 4190-4199 m in the upper Lysing reservoir. It
contained sandstones interbedded with thin mudstone layers. MDT fluid samples were taken at 4230.55 m
(water), 4231.4 m (water), 4209.4 m (gas), 4211.86m (gas), and at 4253.5 m (gas which gave a dark brown/
black liquid when flashed). An MDT run in cased hole after the DST and almost 3 weeks after the last mud
circulation gave a maximum temperature of 146 deg C at 4230 m. This was believed to be close to the true
formation temperature. The well was perm. abandoned 22 October as a gas discovery.
ML geologist consultant from Geoservices at Statoil
April 2003 - September 2005 (2 years 6 months)
Geology evaluation and supervision when drilling the wells: Deep Sea Trym (24/10-M-3BH) Stena Don
(6608/10-B-4BH) West Alpha (6506/11-P-3 H) Kristin field: Gas/condensate producer Kristin platform was
installed in the field in March 2005, and production from the field started on 3.11.2005. Today, 12 wells in
production. Full production was reached in 2007 with a daily production rate of approx. 18 million Sm3 gas
and condensate daily rate of approx. 17000 Sm3
ML geologist consultant from Geoservices at Statoil
April 2003 - September 2005 (2 years 6 months)
Page9
Geology evaluation and supervision when drilling the wells: Snorre B (34/4-I-1H cuttings injection
& 34/4-K-7 H water injector) Snorre is an oil platform in Block 34/4 on the Snorre field in the North
Sea. The platform was built by Aker Stord and started production in June 2001. Snorre B is an integral
semisubmersible drilling, production and accommodation platform, located about seven kilometers north of
Snorre A. The produced oil is transported by pipeline to Statfjord B for storage and export. Some of the gas
is reinjected into the reservoir, while the rest is piped to the Prime Pipe system via Snorre A. The platform
was originally operated by the Norwegian Hydro and now operated by Statoil.
ML geologist consultant from Geoservices at Statoil
April 2003 - September 2005 (2 years 6 months)
Geology evaluation and supervision when drilling the wells: Transocean Searcher (6506/12-Q-2H (Åsgard))
Åsgard is located in the Norwegian Sea, about 200 kilometers from the coast of Norway and 50 kilometers
south of Heidrun. Åsgard A vessel was in position 8 February 1999 and to start oil production 19 May.
Åsgard B is a semi-submersible facility that treats gas and condensate. It came on stream 1 October 2000.
Åsgard C is a storage vessel for condensate related to the field. Åsgard consists of Midgard, Smørbukk
and Smørrbukk South. In addition, gas fields Mikkel and Yttergryta linked to the infrastructure in Åsgard.
Midgard is located in blocks 6507/11 and 6407/2. Smørrbukk and Smørrbukk South is located in block
6506/11. Saga proven Midgard in 1981. Statoil found Smørrbukk in 1984 and Smørrbukk South in 1985. In
1995 the rights to the field coordinated in a new structure with Statoil as operator. The largest development
on the Norwegian Continental Shelf Overall Åsgard among the largest developments on the Norwegian
continental shelf with its 56 production and injection wells in 17 templates. The water depth in the area is
240-310 meters.
ML geologist consultant from Geoservices at Statoil
April 2003 - September 2005 (2 years 6 months)
Geology evaluation and supervision when drilling the well: West Navigator (6507-3-4) Wellbore history:
General Well 6507/3-4 is located on the Alve structure, which is a horst, located in the north central part
of block 6507/3 on the Dønna Terrace. The main objective of this appraisal well was to prove down flank
oil resources in the Middle Jurassic sandstones of the Garn and upper Not Formations. The secondary
objective was to prove oil in the Ile Formation. Operations and results Well was spudded with the vessel
West Navigator on 14 March 2004 and drilled to TD at 4092 m in the Early Jurassic Åre Formation. The
well was drilled with seawater and bentonite down to 1250 m, with KCl/polymer/glycol from 1250 m
to 2300 m, and with oil based mud (Paratherm) from 2300 m to TD. A shallow gas warning class 1 was
given for the interval between 950 to 1370 m, based on gas peaks observed in well 6507/3-1. A pilot hole
was drilled down to 1250 m. No shallow gas was observed. The well penetrated the reservoir below the
hydrocarbon-water contact in the Garn, Not and Ile Formations. Top Garn Formation was encountered
7 m below prognosis. Moveable hydrocarbons were not proven, only shows throughout the Garn and
Not Formations and discontinuous weak to moderate shows in the Ile, Ror, and Tilje Formations from
3805 m to 4000 m. Two cores were cut in the Garn, Not and Ile Formations and nine MDT water samples
Page10
were collected in Garn, Ile and Tilje Formations. The Garn sample from 3726 m contained approx 2 dl of
hydrocarbon fluid, which proved to be mud filtrate (base oil) with some dissolved residual oil from the
formation. The well was permanently abandoned on 30 April 2004 as a dry well with shows Testing No drill
stem test was performed
ML geologist consultant from Geoservices at Statoil
April 2003 - September 2005 (2 years 6 months)
Geology evaluation and supervision when drilling the well: 34/11-A-11 Kvitebjørn Development Kvitebjørn
is a gas condensate field located in the eastern part of the Tampen area, in the northern part of the North
Sea. Water depth in the area is about 190 metres. The field is developed with an integrated accommodation,
drilling and processing facility with a steel jacket. An amended PDO for Kvitebjørn was approved in
December 2006. Reservoir The main reservoir consists of Middle Jurassic sandstones of the Brent Group.
Discoveries have also been made in the Cook- and Statfjord Formations. The reservoir lies at a depth of
approximately 4 000 metres and initially had high temperature and high pressure. The reservoir quality is
good. Recovery strategy The field is recovered by pressure depletion. Transport Rich gas is transported
through a dedicated pipeline to Kollsnes, while condensate is transported in a pipeline tied to the Troll Oil
Pipeline II for onward transport to Mongstad. Status Drilling on Kvitebjørn is challenging due to depleted
reservoir pressure. A new infill well was drilled in 2012 and a second is being drilled in 2013. Development
of the east flank of the field is being considered. Gas pre-compression will be installed on the platform, with
start-up in December 2013. Modifications are being made to prepare for tie-in of the Valemon field in 2014.
ML geologist consultant at Statoil
April 2003 - September 2005 (2 years 6 months)
Transocean Searcher (15/9-E-3H, 15-9-E-1H, 15/9-E-4H (Sleipner)) Sleipner A (15/9-A-23 A, 15/9-A-19
& 15/9-A19T2) The Sleipner gas field is a natural gas field in the North Sea, about 250 kilometres (160 mi)
west of Stavanger, Norway. Two parts of the field are in production, Sleipner West (proven in 1974), and
Sleipner East (1981).The field produces natural gas and light oil condensates from sandstone structures about
2,500 metres (8,200 ft) below sea level. It is operated by Statoil. The field is named after the steed Sleipnir in
Norse mythology. Reference: Egil Kai Elde VP HSE Statoil
ML geologist consultant at Statoil
March 2003 - September 2005 (2 years 7 months)
Borgland Dolphin (34/10-F-2 Y1H (Gullfaks sør)): Oil producer Deep Sea Trym (34/10-4-2H (Gullfaks sør))
Gullfaks Sør is located just south of Gullfaks in the northern part of the North Sea. The field is developed
with a total of 12 subsea templates tied back to the Gullfaks A and Gullfaks C Gullfaks Sør is developed
in two phases. PDO for Phase 1 included the extraction of oil and condensate from the 34/10-2 Gullfaks
South, 34/10-17 and 34/10-37 Rimfaks Gullveig. PDO for Phase 2 was approved in June 1998 and included
production of gas from the Brent Group in the Gullfaks Sør deposit.
ML geologist consultant from Geoservices at Talisman Energy
Page11
2004 - 2004 (less than a year)
Geology evaluation and supervision when drilling the wells: Gyda oil and gas field (2/1-A16 AY1 & 2/1-A16
AY1/T2) Gyda is an offshore oil field located in the southern Norwegian section of North Sea along with
Ula, Tambar and Tambar East fields making up the UGT area, usually attributed to DONG Energy's main
areas of exploration and production activity. The Gyda field was discovered in 1980 and started producing
on June 21, 1990. The field contains confirmed 39.6 million m3 of oil and 6.6 billion cubic meter of natural
gas. Ownership: Talisman Energy is the operator of the field with 61% of interest in the project. The full
share was bought by Talisman Energy in 2003 from the previous operator, BP for $82 million.[3] Partners
of Talisman Energy, DONG Energy and Norske AEDC AS (NAEDC),owned by Arabian Oil Company
(AOC), hold 34% and 5% interest in the project, respectively. holds 34%. Capital spending on Gyda was
expected to be $131 million. Production: Gyda is located in approximately 66 m (217 ft) of water. The main
reservoir stands at 4,000 m (13,000 ft) in the Upper Jurassic Ula Formation. The field has one conventional
steel facility with production, drilling, living quarters. Gyda currently produces an average of 10,000 bbl/d
(1,600 m3/d). The field also produces excessive amount of water making the oil production stable. Due to the
difficulties, the production license was extended to 2018. Several new wells are currently being drilled. The
produced oil is transported by a pipeline to Ekofisk oil field and on to Teesside for refining.
ML geologist consultant from Geoservices at ENI
2004 - 2004 (less than a year)
Geology evaluation and supervision when drilling the well: Ocean Vanguard (6406/1-3 (Erlend)) The
drilling rig Ocean Vanguard had to spend almost the entire winter Vestbase. After of runs of an anchor
chain last December had the rig immediate needs for repairs. Mishap occurred during drilling for Eni well
6406/1-3 in Norwegian Sea. But never so bad that it is not good for anything. The immediate improvements
gave the local industry projects for 12 -NOK 15 million, according Vestbase. Ocean Vanguard went to the
field to pick up BOP and riser in end of February and returned for further improvements. The total turnover
on Vestbase for both sojourns estimated at 20 - NOK 25 million. The rig will shortly publish on behalf of
the group. Drilling HSE evaluation: The rig experienced a gain in the active pit. The mudlogger and data
engineer suspected a kick and warned drill floor.
ML geologist consultant from Geoservices at Total E&P
2003 - 2003 (less than a year)
Geology evaluation and supervision when drilling the wells: Scarabeo 6 (25/5-C-1H) Total S.A. is a French
multinational integrated oil and gas company and one of the six "Supermajor" oil companies in the world.
Its businesses cover the entire oil and gas chain, from crude oil and natural gas exploration and production
to power generation, transportation, refining, petroleum product marketing, and international crude oil and
product trading. Total is also a large-scale chemicals manufacturer. The company has its head office in the
Tour Total in the La Défense district in Courbevoie, West of Paris.
ML geologist consultant from Geoservices at Shell
2003 - 2003 (less than a year)
Page12
Geology evaluation and supervision when drilling the wells: Deep Sea Trym (6407/9-E-2H) Draugen
oil producer Draugen has the most produced approx. 225,000 barrels of oil a day. When the field was
developed, there was a planned average production of approx. 90,000 barrels a day, but the oil reservoir
and the platform proved to be able to produce more. Oil is produced from a total of 11 wells, of which 6
are platform wells and 5 subsea wells. The produced oil is stored in the seven storage cells in the bottom of
the concrete shaft. Crude oil is loaded via a floating loading buoy, about 3 kilometers east of the platform.
Facts: Location: West of Kristiansund Block Number: 6407/9 Operator: Norwegian Shell Licenses: Shell
(26.2%), Chevron Norway (7.56%), BP Norway (18.36%), Petoro (47.88%) Discovered date: 07/09/1984
Reservoir Depth 1650 Produsjonsstart: October 1993 Draugen gas exports The 10th October 2000 started
exports of gas from Draugenfield. Draugenfield exports about. 1.5 Sm3 gas per day via a dedicated 78
km pipeline of 16 "(inch) attached to Åsgard Transport pipeline. Ever since the start of oil production on
Draugen there have been efforts to increase and prolong the production. Yarn West is a site entirely west
of the Draugenfield containing approx. 7.5 million Sm3 of recoverable oil reserves. To map the area was
made extensive use of 4D seismic (4-dimensional). This has given very valuable information about the field
and how the oil moves in the field. At the same time 4D sesmikk information on where new wells should be
placed. A / S Norwegian Shell is continuously working to create the most value of the reserves in Draugen.
This benefits both the owners and the community. Therefore, considering one continuous drilling of new
wells to access the pockets of hydrocarbons that can be produced by the existing wells.
Laboratory Engineer at Reslab
2002 - 2002 (less than a year)
Special Core Analysis: Measurement of petrophysical data: Permeability, porosity and capillary pressure/
resistivity curves Reslab is a provider of fluid and core analysis to Oil & Gas-companies, sold to
Weatherford, Inc.
Geoscientist consultant at Roxar
September 2001 - 2002 (1 year)
Reservoir Modelling: System helpdesk (RMS 6.2) at Oslo office/ Technical contact with customers Software
error localization: Importing Eclipse grid files for inspection in RMS 7.0 and general bug hunting in new
applications in the software at Stavanger office Roxar ASA is an international technology company in the
oil and gas sector. The company's technology helps to improve the extraction of petroleum resources and
reduced field development expenses. Owner is currently Emerson Electric Company.
1 recommendation available upon request
Menig at Royal Norwegian Navy
July 1997 - June 1998 (1 year)
Security guard @ NATO base RSD Ulsnes, Hundvåg - My leader Roger Hesjedal wrote the following words
about me: The soldier is an particularly positive person, very cooperative, dutiful, and have performed his
tasks in a very satisfactory way, and I would strongly recommend Sigve Aspelund to future employers.
Page13
Naval diving school Håkonsvern @ Bergen - The best candidate @ admission and my leader told me that I
was one of the toughest of the divers. Menig at Harald Hårfagre navy base @ Stavanger
Courses
Project risk advisor
Aspelund Consulting & Energy Offshore Development
International National
Introduction to subsea technology: System overview in
production
Subsea technology: Production control systems
Subsea Technology: Processing Introduction
Introduction to subsea technology: Completion/
Workover
Standardization course
Subsea: Front End Engineering
Teamcenter: Review and approve
Subsea technology: Introduction to MPS
Introduction to subsea technology: Connection system
Introduction to subsea technology: Control systems
Document review: Introduction to NDT & MRB
Field development: Subsea technology production
systems
Introduction to Subsea technology: Foundations &
structures
Petroleum engineer consultant
Aspelund Consulting Energy Offshore Development
International & National
Sales and service & Business presentation strategy
Mudlogger geologist
Geoservices
Mud logging training course
Helicopter evacuation and Statoil internal course
Offshore work permit and safe job analysis course
Primary & secondary well control and kick sheet course
HSE training course and Basic safety and emergency
and evacuation course for Ula/Valhall
Data engineer
H2S course
Page14
Production Engineer
Talisman Energy
Mbal, Prosper & GAP & Gas lift course
PI process book & PI excel
Oil Field Manager
F.A.S.T. Fekete RTA
Geoscientist consultant
Roxar
RMS, reservoir modelling system, introduction
RMS, reservoir modelling system, streamlines
RMS, reservoir modelling system, simulation grid
RMS, reservoir modelling system, heterogeneity
Presentation Technique
Quality, Health, Safety & Environment engineer
Ocean Rig
Offshore safety course 2011 (Refresh from courses
taken in 2007 & 2003)
Reservoir engineer
IOR Chemco
Water shut off – Randy Seright, SPE IOR06 Tulsa
Oklahoma
Languages
English (Native or bilingual proficiency)
Norwegian (Native or bilingual proficiency)
German (Professional working proficiency)
Danish (Full professional proficiency)
Swedish (Full professional proficiency)
Skills & Expertise
Petroleum
Petroleum Engineering
Oil/Gas
Page15
Offshore Drilling
Drilling
Gas
Upstream
Energy
Onshore
Reservoir Engineering
Completion
Reservoir Management
Management
New Business Development
Pipelines
Geology
Business Development
Subsea Engineering
Field Development
Oil & Gas Industry
Geophysics
Engineering
Sales Management
Petroleum Geology
Reservoir Simulation
Leadership
Pressure
Well Testing
Teaching
Earth Science
Risk Management
Petrophysics
Inspection
Formation Evaluation
Natural Gas
Logging
Stimulation
Technical Presentations
HAZOP
Petrochemical
Eclipse
Prosper
Sedimentology
QHSE
Technical Project Leadership
FPSO
Production Engineering
Well Control
Page16
GAP
Oil & Gas
Education
Universitetet i Stavanger (UiS)
Post-qualifying education, Reservoir engineering, 2003 - 2003
Universitetet i Stavanger
M.Sc. Petroleum Engineering, Petroleum engineering with applied science programme. Master of science
(Lorenz strange attractors), 1998 - 2001
Falken
Sequrity guard, Sequrity, 2000 - 2000
University of Bergen (UiB)
Examen philosophicum (2.6) (Grades in paranthesis 1.0 is the best), 1998 - 1998
Håkonsvern dykker og froskemanskole
Naval diving, 1997 - 1997
Norges teknisk-naturvitenskapelige universitet (NTNU)
Candidatus Magisterii(B. Sc.), Mathematics Physics, 1995 - 1997
Bryne videregående skole
Allmennfag med fordypning i matematikk og fysikk, 1992 - 1995
Activities and Societies: Tillitsvalgt 1992-1995
Interests
Listening to music: Van der Graaf Generator, King Crimson, Pink Floyd, Led Zeppelin (top quartet). Sports:
Soccer (Bryne FK)
Page17
Sigve Hamilton Aspelund
Entrepreneur
sigve.aspelund@lyse.net
20 people have recommended Sigve Hamilton
"Sigve gave an excellent talk at our conference 'people and the digital oilfield' in Stavanger on October 20th
2011, about how systems can best be designed for safety. The talk is online at http://www.youtube.com/
watch?v=Ja3x2l94SpI"
— Karl Jeffery, Conference producer, Finding Petroleum, was with another company when working with
Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National
"I have had the pleasure of knowing Sigve Hamilton for the past 5 years Sigve Hamilton is not only a smart
and ambitious person but also an inspiring employee. Hard working, customer-service oriented, multi -skilled
and well educated expert. Wise, loyal, intelligent and open minded Quality, Health, Safety & Environment
engineer engineer always ready to put all his energy and stamina to get the job done. For Sigve Hamilton the
job is always the most important thing to do."
— Anantha Narayanan, was Sigve Hamilton's client
"Sigve is a detailed and incisive manager with great entrepreneurial talents. An engineer with extensive
experience in the petroleum industry it is always instructive to work with him."
— William Downey, MS JD, Founder & Director of Consulting, W J Downey & Associates, was
with another company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore
Development International National
"Sigve is a truly self motivated high performer who can bring a wide ranging skillset to virtually any
company in the oil and gas industry. I've relied multiple times on his knowledge and insights of the
Norwegian sector in particular. I've seen Sigve use his spare time to pass his knowledge along to up and
coming energy industry professionals. Sigve has the skills to make a fast transition into many positions, and
any learning curve will be minimized due to his experience and academic background. Regards, John Savage"
— John Savage, Account Manager, Halliburton, was with another company when working with Sigve
Hamilton at Aspelund Consulting & Energy Offshore Development International National
"I enjoyed very much to meet Sigve. I believe he will represent a great value to almost any business."
Page18
— Geir Ullenes, Bedriftsrådgiver Rekruttering & Omstilling, Proffice AS, was a consultant or contractor to
Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National
"Sigve is one of my favorite followers and friends in Lkdn. He understands that I try to supply valuable
information no matter that it is unsolicited from him. But, if we are connected and I can not send him some
selected by me content, and I do not get any information from him, then why we should be connected? He
acts on the contrary to others that never send anything, further refuse to say thanks for info signals and ask
not getting anything from me, but they do not want to break the connection with me at the same time.. hard to
understand! Undoubtelly, Sigve get the key to issues very fast and he will be a good partner to work!"
— Jorge C. Palma, CEO, Founder, Port Engineering Consulting Group, worked directly with Sigve
Hamilton at Aspelund Consulting & Energy Offshore Development International National
"Sigve is a visionary, a true patriarch of progress. In the time I've known him and worked with him, his
exemplary actions towards helping others is a testament to his person. I highly recommend him for any
endeavor, he is truly a one of a kind and an asset to any organization he represents. There is no can't in Sigve,
he always seems to find a way to make things happen. Cheers and kudos to you Sigve!"
— Junior Sanchez {LION}, CEO/President of New York Chapter, All Of Us Or None, was with another
company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development
International National
"SIGVE is having lots of contacts world wide and has very good Man- Management. skills.He is multi
talented person with fair knowledge of Oil industry, Software Industry & HR Recruitment industry.It is good
to know him. Venkatesh"
— Venkatesh Annadevara, BDM Domestic & International Business, SIRGRACE Technologies, was
with another company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore
Development International National
"Sigve is a person par excellence with a perfect blend of HIGH EQ AND IQ,with exceptional leadership
skills and great sensitivity.He has high business acumen and a meticulous approach,a combination which
enables a person to achieve good results in a short span of time with Accuracy and precision both.It was a
pleasure to know him personally and professionally-A Golden treasure for any company."
— Shankarnarayan Ramakrishnan, Management Consultant, I-Point Consulting Services Pvt Ltd, was
with another company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore
Development International National
"If I see linkedin benefits, sigve appears to be one of them. He is very vibrant & proactive ;always available.
I benefitted myself with his advising, consulting & teaching & he also helped me in uderstanding Linkedin &
its usage. He is very creative person & it seems to me that his brain machine is meant to generat ideas. what a
Page19
talented & knowledgeable person is he. When I met him I was working at NTSA Saudi Arabia as Consultant.
You name a thing & the next moment it is done...Thanks Sigve to be my partner & friend."
— Farasat Saeed, Regional Project Reporting Executive, Telenor Pakistan, was with another company
when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International
National
"Creative and intelligent with an excellent scientific bent, Sigve is also totally focused in his approach to
work and pleasant to deal with."
— Nirmal Sachdeva, was Sigve Hamilton's client
"Sigve is a multi experienced engineer with very solid experience in many aspects related to oil and gas
industry. He really likes to socialize with other people and also has eagerness to learn new things. I would
appreciate the chance to work with Sigve now and in the future."
— Agung Ertanto, Reservoir Engineer, StatoilHydro, was with another company when working with Sigve
Hamilton at Aspelund Petroleum Consulting
"Sigve has the capabilities of a 'business giant'. He is steadfast and dedicated to whatever he chooses to
do...he strives for excellence..."
— Nadira Haniff, Worldwide Independent Distributor, Xango LLC, worked with Sigve Hamilton at Xango
"I had the pleasure of having Sigve as one of my engineers in OTG. Sometimes simply endorsing people
gives not the full picture of their skills. As of beeing Sigves project manager, having a personallity like him
in the team is of incredible value. One of the projects where a new technological development from scratch,
and having Sigve`s analytical mindset, and systematically work in the team made a huge contribution to the
development. If i should do such a project again, Sigve would be one of the first i would take to the team to
make sure it is realized on time and quality."
— Johannes Waarseth-Junge, project manager/ consultant, Oilfield Technology Group, managed Sigve
Hamilton at Oilfield Technology Group
"Sigve Hamilton is a hard worker, proactive and eager to learn. He can solve the problem at under pressure"
— David Tobing, PE Team Leader, BP Indonesia, was with another company when working with Sigve
Hamilton at Talisman-Energy
"I worked with Sigve Hamilton in enhancing the production of oil wells through gas lift. He was very
acommendating and knowledgeable of this subject area. He is very focused and knows his reservoirs. His
friendly attitude made him really easy to work with. I would welcome the opportunity to work with him in the
future."
Page20
— Lloyd Ragnar Burnett, Sr. Sales and Operations Adv., Petroleum Technology Company, worked directly
with Sigve Hamilton at Talisman-Energy
"Sigve has a very aproachable personality and pays great attention to details in work. Always prompt to assist
colleagues and willing to put in the extra milel to get things done. I wish him well in his new undertakings."
— Lee Chih Chiang, Snr Completion / Integrity Engineer, Talisman Energy, worked with Sigve Hamilton at
Talisman-Energy
"I enjoyed interacting with Sigve when he had his office at IRIS while working for IOR Chemco."
— Sigmund Stokka, Research Director, IRIS, was with another company when working with Sigve
Hamilton at IOR Chemco
"Sigve Hamilton is very enthusiastic, and creative about how to improve work results."
— Lars Johan Skjold, Staff Geologist, Statoil, managed Sigve Hamilton indirectly at Geoservices
"Sigve and I worked together at Roxar within the Software Solutions Business Unit, where he formed part of
the Geoconsultancy Team that I was responsible for placing out on Consultancy Tasks with Clients. He was
always a hard worker, who was keen to learn. I wish him all the best for his future career development."
— Neil Quentin Smith (Ph.D), Software Sales Manager Scandinavia, Roxar, managed Sigve Hamilton
indirectly at Roxar
Contact Sigve Hamilton on LinkedIn

More Related Content

What's hot (20)

CV Sigve Hamilton Aspelund 042015
CV Sigve Hamilton Aspelund 042015CV Sigve Hamilton Aspelund 042015
CV Sigve Hamilton Aspelund 042015
 
CV Ole Dolven
CV Ole DolvenCV Ole Dolven
CV Ole Dolven
 
CV Sigve Hamilton Aspelund 032015
CV Sigve Hamilton Aspelund 032015CV Sigve Hamilton Aspelund 032015
CV Sigve Hamilton Aspelund 032015
 
CV Sigve Hamilton Aspelund 042015 b
CV Sigve Hamilton Aspelund 042015 bCV Sigve Hamilton Aspelund 042015 b
CV Sigve Hamilton Aspelund 042015 b
 
CV Sigve Hamilton Aspelund 052013
CV Sigve Hamilton Aspelund 052013CV Sigve Hamilton Aspelund 052013
CV Sigve Hamilton Aspelund 052013
 
Rakesh CV (4)
Rakesh CV (4)Rakesh CV (4)
Rakesh CV (4)
 
HaithaM Al-Arabi Resume
HaithaM Al-Arabi ResumeHaithaM Al-Arabi Resume
HaithaM Al-Arabi Resume
 
damir-resume
damir-resumedamir-resume
damir-resume
 
Personal Presentation
Personal PresentationPersonal Presentation
Personal Presentation
 
Hussein Resume DRFT9
Hussein Resume DRFT9Hussein Resume DRFT9
Hussein Resume DRFT9
 
Mhimdi Sameh Resume
Mhimdi Sameh ResumeMhimdi Sameh Resume
Mhimdi Sameh Resume
 
GC - CV June
GC - CV JuneGC - CV June
GC - CV June
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 
Amr Zaher
Amr ZaherAmr Zaher
Amr Zaher
 
Revamp of gas development project
Revamp of gas development projectRevamp of gas development project
Revamp of gas development project
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Air Energi - Gas Development Projects
Air Energi - Gas Development ProjectsAir Energi - Gas Development Projects
Air Energi - Gas Development Projects
 
Clough CH-IV Brochure
Clough CH-IV BrochureClough CH-IV Brochure
Clough CH-IV Brochure
 
Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016Ian Ahrens CV Jan2016
Ian Ahrens CV Jan2016
 
Resume-Wail
Resume-WailResume-Wail
Resume-Wail
 

Similar to Sigve Hamilton Aspelund CV Linkedin

Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Sigve Hamilton Aspelund
 
CV Sigve Hamilton Aspelund 092014 Production Engineer
CV Sigve Hamilton Aspelund 092014  Production EngineerCV Sigve Hamilton Aspelund 092014  Production Engineer
CV Sigve Hamilton Aspelund 092014 Production EngineerSigve Hamilton Aspelund
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionSigve Hamilton Aspelund
 
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leader
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leaderCV Sigve Hamilton Aspelund 122014, Petroleum engineering team leader
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leaderSigve Hamilton Aspelund
 
20210521 curriculum vitae sigve hamilton aspelund 1
20210521 curriculum vitae sigve hamilton aspelund 120210521 curriculum vitae sigve hamilton aspelund 1
20210521 curriculum vitae sigve hamilton aspelund 1Sigve Hamilton Aspelund
 

Similar to Sigve Hamilton Aspelund CV Linkedin (20)

CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013
 
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
 
CV Sigve Hamilton Aspelund 092014 Production Engineer
CV Sigve Hamilton Aspelund 092014  Production EngineerCV Sigve Hamilton Aspelund 092014  Production Engineer
CV Sigve Hamilton Aspelund 092014 Production Engineer
 
CV Sigve Hamilton Aspelund 092014
CV Sigve Hamilton Aspelund 092014 CV Sigve Hamilton Aspelund 092014
CV Sigve Hamilton Aspelund 092014
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short version
 
CV Sigve Hamilton Aspelund 052015 C
CV Sigve Hamilton Aspelund 052015 CCV Sigve Hamilton Aspelund 052015 C
CV Sigve Hamilton Aspelund 052015 C
 
CV Sigve Hamilton Aspelund 052015 B
CV Sigve Hamilton Aspelund 052015 BCV Sigve Hamilton Aspelund 052015 B
CV Sigve Hamilton Aspelund 052015 B
 
CV Sigve Hamilton Aspelund 042019
CV Sigve Hamilton Aspelund 042019 CV Sigve Hamilton Aspelund 042019
CV Sigve Hamilton Aspelund 042019
 
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leader
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leaderCV Sigve Hamilton Aspelund 122014, Petroleum engineering team leader
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leader
 
CV Sigve Hamilton Aspelund 022015
CV Sigve Hamilton Aspelund 022015CV Sigve Hamilton Aspelund 022015
CV Sigve Hamilton Aspelund 022015
 
CV Sigve Hamilton Aspelund 092015
CV Sigve Hamilton Aspelund 092015CV Sigve Hamilton Aspelund 092015
CV Sigve Hamilton Aspelund 092015
 
CV Sigve Hamilton Aspelund 012015
CV Sigve Hamilton Aspelund 012015CV Sigve Hamilton Aspelund 012015
CV Sigve Hamilton Aspelund 012015
 
CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013
 
062021 CV Sigve Hamilton Aspelund
062021 CV Sigve Hamilton Aspelund062021 CV Sigve Hamilton Aspelund
062021 CV Sigve Hamilton Aspelund
 
022021 cv sigve hamilton aspelund
022021 cv sigve hamilton aspelund022021 cv sigve hamilton aspelund
022021 cv sigve hamilton aspelund
 
20190403 cv sigve hamilton aspelund
20190403 cv sigve hamilton aspelund20190403 cv sigve hamilton aspelund
20190403 cv sigve hamilton aspelund
 
CV Sigve Hamilton Aspelund 052015
CV Sigve Hamilton Aspelund 052015CV Sigve Hamilton Aspelund 052015
CV Sigve Hamilton Aspelund 052015
 
Cv sigve hamilton aspelund 022013
Cv sigve hamilton aspelund 022013Cv sigve hamilton aspelund 022013
Cv sigve hamilton aspelund 022013
 
112020 cv sigve hamilton aspelund
112020 cv sigve hamilton aspelund112020 cv sigve hamilton aspelund
112020 cv sigve hamilton aspelund
 
20210521 curriculum vitae sigve hamilton aspelund 1
20210521 curriculum vitae sigve hamilton aspelund 120210521 curriculum vitae sigve hamilton aspelund 1
20210521 curriculum vitae sigve hamilton aspelund 1
 

More from Sigve Hamilton Aspelund

Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton Aspelund
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton AspelundOmregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton Aspelund
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton AspelundSigve Hamilton Aspelund
 
MOU your company or name and Aquinas & Sigve Hamilton Aspelund
MOU your company or name and Aquinas & Sigve Hamilton AspelundMOU your company or name and Aquinas & Sigve Hamilton Aspelund
MOU your company or name and Aquinas & Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Sigve Hamilton Aspelund: Eksamen i HMS-ledelse
Sigve Hamilton Aspelund: Eksamen i HMS-ledelseSigve Hamilton Aspelund: Eksamen i HMS-ledelse
Sigve Hamilton Aspelund: Eksamen i HMS-ledelseSigve Hamilton Aspelund
 
A training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton AspelundA training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Sedimentology Lecture 6. shelves & turbidites
Sedimentology Lecture 6. shelves & turbiditesSedimentology Lecture 6. shelves & turbidites
Sedimentology Lecture 6. shelves & turbiditesSigve Hamilton Aspelund
 
Sedimentology Lecture 5. techniques of sedimentary logging
Sedimentology Lecture 5. techniques of sedimentary loggingSedimentology Lecture 5. techniques of sedimentary logging
Sedimentology Lecture 5. techniques of sedimentary loggingSigve Hamilton Aspelund
 
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...Sedimentology Lecture 4. concept of sedimentary facies, association and proce...
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...Sigve Hamilton Aspelund
 
Sedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systemsSedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systemsSigve Hamilton Aspelund
 
Sedimentology Lecture 2. continental depositional systems
Sedimentology Lecture 2. continental depositional systemsSedimentology Lecture 2. continental depositional systems
Sedimentology Lecture 2. continental depositional systemsSigve Hamilton Aspelund
 
Sedimentology Lecture 1. introduction to the course
Sedimentology Lecture 1. introduction to the courseSedimentology Lecture 1. introduction to the course
Sedimentology Lecture 1. introduction to the courseSigve Hamilton Aspelund
 
11 projects on well top testing and remidiation of annular integrity loss (1)
11 projects on well top testing and remidiation of annular integrity loss (1)11 projects on well top testing and remidiation of annular integrity loss (1)
11 projects on well top testing and remidiation of annular integrity loss (1)Sigve Hamilton Aspelund
 
Application reservoir engineering specialist
Application reservoir engineering specialistApplication reservoir engineering specialist
Application reservoir engineering specialistSigve Hamilton Aspelund
 

More from Sigve Hamilton Aspelund (20)

Project_2_Group_C_5.pdf
Project_2_Group_C_5.pdfProject_2_Group_C_5.pdf
Project_2_Group_C_5.pdf
 
Legorapport 2217
Legorapport 2217Legorapport 2217
Legorapport 2217
 
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton Aspelund
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton AspelundOmregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton Aspelund
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton Aspelund
 
Conference summary and outcomes final
Conference summary and outcomes finalConference summary and outcomes final
Conference summary and outcomes final
 
MOU your company or name and Aquinas & Sigve Hamilton Aspelund
MOU your company or name and Aquinas & Sigve Hamilton AspelundMOU your company or name and Aquinas & Sigve Hamilton Aspelund
MOU your company or name and Aquinas & Sigve Hamilton Aspelund
 
Sigve Hamilton Aspelund: Eksamen i HMS-ledelse
Sigve Hamilton Aspelund: Eksamen i HMS-ledelseSigve Hamilton Aspelund: Eksamen i HMS-ledelse
Sigve Hamilton Aspelund: Eksamen i HMS-ledelse
 
122020 CV Sigve Hamilton Aspelund Norsk
122020 CV Sigve Hamilton Aspelund Norsk122020 CV Sigve Hamilton Aspelund Norsk
122020 CV Sigve Hamilton Aspelund Norsk
 
A training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton AspelundA training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
 
Sedimentology Lecture 6. shelves & turbidites
Sedimentology Lecture 6. shelves & turbiditesSedimentology Lecture 6. shelves & turbidites
Sedimentology Lecture 6. shelves & turbidites
 
Sedimentology Lecture 5. techniques of sedimentary logging
Sedimentology Lecture 5. techniques of sedimentary loggingSedimentology Lecture 5. techniques of sedimentary logging
Sedimentology Lecture 5. techniques of sedimentary logging
 
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...Sedimentology Lecture 4. concept of sedimentary facies, association and proce...
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...
 
Sedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systemsSedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systems
 
Sedimentology Lecture 2. continental depositional systems
Sedimentology Lecture 2. continental depositional systemsSedimentology Lecture 2. continental depositional systems
Sedimentology Lecture 2. continental depositional systems
 
Sedimentology Lecture 1. introduction to the course
Sedimentology Lecture 1. introduction to the courseSedimentology Lecture 1. introduction to the course
Sedimentology Lecture 1. introduction to the course
 
11 projects on well top testing and remidiation of annular integrity loss (1)
11 projects on well top testing and remidiation of annular integrity loss (1)11 projects on well top testing and remidiation of annular integrity loss (1)
11 projects on well top testing and remidiation of annular integrity loss (1)
 
Oseberg oppgave 1
Oseberg oppgave 1Oseberg oppgave 1
Oseberg oppgave 1
 
Skatt time kommune
Skatt time kommuneSkatt time kommune
Skatt time kommune
 
Application reservoir engineering specialist
Application reservoir engineering specialistApplication reservoir engineering specialist
Application reservoir engineering specialist
 
Norges energi attest
Norges energi attestNorges energi attest
Norges energi attest
 
Humanitære prosjekter
Humanitære prosjekterHumanitære prosjekter
Humanitære prosjekter
 

Recently uploaded

Experience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfExperience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfSoham Mondal
 
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call GirlsDelhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girlsshivangimorya083
 
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home MadeDubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Madekojalkojal131
 
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...Suhani Kapoor
 
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsSonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsNiya Khan
 
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...Suhani Kapoor
 
Neha +91-9537192988-Friendly Ahmedabad Call Girls has Complete Authority for ...
Neha +91-9537192988-Friendly Ahmedabad Call Girls has Complete Authority for ...Neha +91-9537192988-Friendly Ahmedabad Call Girls has Complete Authority for ...
Neha +91-9537192988-Friendly Ahmedabad Call Girls has Complete Authority for ...Niya Khan
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
Employee of the Month - Samsung Semiconductor India Research
Employee of the Month - Samsung Semiconductor India ResearchEmployee of the Month - Samsung Semiconductor India Research
Employee of the Month - Samsung Semiconductor India ResearchSoham Mondal
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxGry Tina Tinde
 
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证obuhobo
 
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士obuhobo
 
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service 🧳
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service  🧳CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service  🧳
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service 🧳anilsa9823
 
Production Day 1.pptxjvjbvbcbcb bj bvcbj
Production Day 1.pptxjvjbvbcbcb bj bvcbjProduction Day 1.pptxjvjbvbcbcb bj bvcbj
Production Day 1.pptxjvjbvbcbcb bj bvcbjLewisJB
 
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceSanjay Bokadia
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of JobRemote DBA Services
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfjtzach
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...Suhani Kapoor
 
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiVIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiSuhani Kapoor
 

Recently uploaded (20)

Experience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdfExperience Certificate - Marketing Analyst-Soham Mondal.pdf
Experience Certificate - Marketing Analyst-Soham Mondal.pdf
 
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call GirlsDelhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
Delhi Call Girls In Atta Market 9711199012 Book Your One night Stand Call Girls
 
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home MadeDubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
Dubai Call Girls Naija O525547819 Call Girls In Dubai Home Made
 
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
 
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsSonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
 
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
 
Neha +91-9537192988-Friendly Ahmedabad Call Girls has Complete Authority for ...
Neha +91-9537192988-Friendly Ahmedabad Call Girls has Complete Authority for ...Neha +91-9537192988-Friendly Ahmedabad Call Girls has Complete Authority for ...
Neha +91-9537192988-Friendly Ahmedabad Call Girls has Complete Authority for ...
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
 
Employee of the Month - Samsung Semiconductor India Research
Employee of the Month - Samsung Semiconductor India ResearchEmployee of the Month - Samsung Semiconductor India Research
Employee of the Month - Samsung Semiconductor India Research
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptx
 
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
女王大学硕士毕业证成绩单(加急办理)认证海外毕业证
 
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
内布拉斯加大学林肯分校毕业证录取书( 退学 )学位证书硕士
 
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service 🧳
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service  🧳CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service  🧳
CALL ON ➥8923113531 🔝Call Girls Husainganj Lucknow best Female service 🧳
 
Production Day 1.pptxjvjbvbcbcb bj bvcbj
Production Day 1.pptxjvjbvbcbcb bj bvcbjProduction Day 1.pptxjvjbvbcbcb bj bvcbj
Production Day 1.pptxjvjbvbcbcb bj bvcbj
 
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Cuttack Aishwarya 8250192130 Independent Escort Servic...
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector Experience
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Job
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdf
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
 
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiVIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
 

Sigve Hamilton Aspelund CV Linkedin

  • 1. Page1 Sigve Hamilton Aspelund Entrepreneur sigve.aspelund@lyse.net Summary Norwegian senior petroleum engineer (29.01.76) with on-/offshore work experience in the oil and gas industry. Having developed excellent consulting experience across Norway and International. My experience includes geo modeling and simulation, special core analysis, sedimentology and supervision of well drilling, increased oil production, enhanced oil production, water and gas injection, artificial lift (Gas lift), well completion/ workover operations, offshore production engineering operations (FPSO/IPF/WHP), artificial lift selection, reservoir engineering, quality, health, safety and environment, resource coordinator and project risk advising. It has been gained through working for major Oil & Gas companies including CNOOC, Cairn, Vanco, KPOC, NNPC, BP, ENI, Total, Shell, Talisman, Norsk Hydro & Statoil. I have achieved management onshore, offshore personnel and data, increased oil production in exploration and production industry, organized and held courses and team buildings M.Sc. in petroleum technology with applied science programme from the university college of Stavanger and the bachelor degree from NTNU, university of Bergen and the university college of Stavanger M.Sc. thesis Edward Lorenz strange attractors, a course at M.Sc. level Personal profile: Adaptation accomplished realist, outstanding organizational skills and business sense, desire to achieve concrete results toward perfectionism, prefer hard work, ultimate realist, possess practical properties combined with highly developed intelligence, sees quickly new opportunities and use this to his own benefit, hard working, fair, very independent, convinced that morality is more important than anything else, resourceful, action-oriented person, eager to expand own knowledge, expect to reach targets, responsible, industrious, resolute and energetic, natural leader and has a natural talent as presenter Specialties Risk advising (Subsea) Production enhancement & optimization of surface and subsurface operations Quality, Health, Safety & Environment engineering (Drilling) Integrated operations Marketing & business development Exploration geoscience (Geology, geomodeling and drilling) Reservoir engineering: Increased Oil production and petrophysics Alliance creator: Team building Technologist: Information Technology Oral presentations: Teaching and presentation Realist: Mathematics, physics and technology Experience General Manager at Aspelund Consulting Energy Offshore Development International & National October 2014 - Present (5 months) Planning an Oil & Gas Management course Developed an Exploration & Production course for Iraq: Delayed.
  • 2. Page2 Petroleum engineering team leader at Oil Plus Ltd July 2014 - September 2014 (3 months) Business development proposal: Reservoir simulation: H2S analysis with CMG (Geochemistry/ HSE) Petroleum engineer consultant at Aspelund Consulting Energy Offshore Development International & National August 2009 - June 2014 (4 years 11 months) • Digital oilfield planning as a senior production engineer with BP, IPCOS, Emerson in Dubai Client: NES Global Talent • Well Intervention Services (Advising) Client: Coleman research • Course director: Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling. Client: Capital Business Events • Analytics, sales management & revision at Aspelund Consulting & Energy Offshore Development International National • Project risk engineer. Client: TOTAL via IDEA consultants • Course director at a drilling, well control, HSE and risk course in Aberdeen. Client: CNOOC via Petromentor • Project risk advisor. Client: FMC Technologies via IDEA • Chaired Doing more with drilling data. Client: Finding petroleum • Course director at a production, geology, geomodeling, reservoir simulation, drilling and HSE course in London. Client: NNPC via Petroconsult • Petroleum engineer advisor at RCC • Course director at Introduction to oil & gas industry course in Kuala Lumpur, Malaysia. Client: Kebabangan Petroleum Operating Company/ ARN • Offshore safety related to computer interfaces and information presentation at the seminar People and the digital oilfield Client: Finding petroleum • Offhore HSE-presentation at the seminar: Bringing businesses from east and west together Client: TransEuropean Centre at Rica Forum Stavanger • Petroleum engineer advisor: Client: Gerson Lehrman Group • Lectured. Clients: SOTS & Akademiet 13 recommendations available upon request Project risk advisor at Aspelund Consulting & Energy Offshore Development International National November 2012 - March 2013 (5 months) Risk engineer in the pre-engineering FMC organization with projects outside Angola and Shetland Risk advisor at the Subsea field developments CLOV: Cravo, Lirio, Orquidea and Violeta discoveries and GIRRI: Rosa and Girassol fields operated by Total (Angola) The essential purpose of risk management in projects and tenders are to improve project and tender performance via the systematic and iterative process designed to identify, analyze, evaluate, and treat project related risk elements. Risk elements are compiled, recorded and managed throughout the tender period and project life cycle. • Establishment of project risk management plan in accordance to company project risk management process • Establishment and maintenance of a risk register based on risk analysis done in tender phase (if available), lessons learned and project risk assessment methodology • Ensuring that projects work according to company global risk management process for projects • Facilitate risk meetings and co-ordinate risk responses • Monitor and control that the risk strategies are implemented in a timely manner • Coordinate and participate in risk evaluation, development of mitigation plans, monitor, summarize and report risk status • Compile record and follow up risks out of tolerance level in the risk register • Create a project risk management close out report • Support projects or tenders with risk analysis (quantification and /or bowtie) upon request • Report updates and
  • 3. Page3 improvements for process, methodology and tools as a result of feedback from the organization and / or changes in external conditions, to the local process owner • Provide input to internal and external monthly reporting. Internal risk status reporting consisting of aggregated risk status from projects, project portfolio and/ or tender work Via IDEA Consultants certified engineering consulting company which mainly provides services within: Machine-, Mechanical and Process industry Electronic- IT and Software industry Petroleum engineer consultant at Aspelund Consulting Energy Offshore Development International & National March 2012 - April 2012 (2 months) Presentations: - Oil and gas industry & life cycle - Structural/ design - Piping/ layout - Procurement - Materials/ corrosion Employee training: - Mechanical/ drilling - Process - Electronics & telecom/ HVAC - Petroleum engineering; Drilling, production & reservoir - QHSE Resource coordinator: Nominating/ managing applicants & relevant candidates to available positions: Engineering & management: - Interface coordinator - Petroleum engineering - Electro instrument & telecom/ HVAC - Technical safety, HSE/ HSEQ/ Quality/ QA/QC - Structural design - Process - Piping/ layout -- Subsea marine operations - Procurement - Mechanical/ drilling - Materials/ Corrosion - Document/ LCI - Planning - Cost engineer Evaluating candidates curriculum vitae Software: Itris Client: RC Consultants is a leading provider of engineering consultancy services for the oil and gas industry on the Norwegian continental shelf. Quality, Health, Safety & Environment engineer at Ocean Rig June 2011 - November 2011 (6 months) Procedures & Technical description review/revision Engineer at Corcovado (Drilling ship) Location: Greenland Operator: Cairn Well: Attamik 2 - Risk assessment - Work permit system and Safe Job Analysis - Care card system - Focusing on drilling safety: Bit type, drilling parameters, well control/volume control, kick prevention, hole cleaning, mud data & DDR. - Software: STAR, Mintra & Empreda - Care philosophy, procedures and procedure exam Investigated market for best available technology for ”dashboard” system solutions for HSE. Well control project for Petroleumstilsynet (PTIL) Technical contact with customer relations management system (CRM) and Fast Track project implementation vendor Data management & generel management Organized two care for safety seminars and held Care Card presentations with offshore safety officers from Leiv Eiriksson, Eirik Raude, Olympia, Corcovado, Poseidon and Mykonos and onshore QHSE department at Hummeren hotel in Tananger with team building (Gocart racing at Stavanger carting) Safety officer at Olympia (Drilling ship) Location: Ghana Client: Vanco Well: Dzata 2A Technical contact with information technology vendor and operational performance management and reporting system vendor Project lead: Annual procedure revision/ review IADC data reporting KPI reporting General QHSE engineering and risk management Software: Star Mintra administrator Empreda Ocean Rig is an international offshore drilling contractor providing oilfield services for offshore oil and gas exploration, development and production drilling. I can confirm that we worked well together when Sigve was on board with us. We had some conversations, and he were more than willingly to help me out in any questions related to HSEQ/QA, that i had. He appeard to be an professional in his profession, and had
  • 4. Page4 much experience within the oil business, not only necessarly related to HSEQ/QA. Best regards Raymond Øren Electrical section leader Consultant at Aspelund Consulting Energy Offshore Development International & National August 2010 - November 2010 (4 months) Teaching: Mathematics, physics and chemistry Client: Akademiet Videregående skole The Academy operates in three segments: We are both a private high school with state aid, one candidate school and a nettstuide. Petroleum engineer consultant at Aspelund Consulting Energy Offshore Development International & National August 2009 - December 2009 (5 months) Management: Held courses for up to 100 students • Production technique 1 & 2 • Drilling technology • Geology and formation evaluation • Health, Safety and Environment for the oil industry • Well control • Drilling fluids • Operating and control systems • Mathematics • Chemistry prosess • Alternative energy Consulting students at PetroChallenge Norway 2009 @ University of Stavanger Managing event expedition to Weatherford oil field base in Forus Leading students expeditions at oil museum in Stavanger and Ullrigg @ International Research Institute of Stavanger Client: Stavanger Offshore Technical College (SOTS) is a publicly maintained leading educational facility in upper-secondary and technical college studies. The College has an annual student body of about 500 students at further education level, employs a highly qualified teaching staff, and has state-of-the-art equipment and modern facilities to meet the educational needs of students. The main objective of the College is to be at the forefront in providing education in offshore drilling. Production Engineer consultant at Oilfield Technology Group November 2008 - July 2009 (9 months) Production engineer consultant at StatoilHydro (Grane) Responsible for: • Production engineering • Well testing and analysis using SAP. Displaying results in Oil Field Manager. • Production analysis with Flow Manager • P&I plan • Production optimizing with GORM Sub sea technology development team work Hazid Project leader: Analyzing drilling waste management market for SWATH The OTG Group is providing services, competence and products to the global petroleum industry. Our core services are Field Operations, Drilling & Well Management, HSE & Offshore Safety Management, Emergency Preparedness, Project and Risk Management, Engineering Support, Software Products and Software Development. Reference: Johannes Waarseth-Junge CEO 3R Innovation 1 recommendation available upon request Production Engineer at Talisman Energy March 2007 - October 2008 (1 year 8 months) Production engineering: Project leader: Responsible for improving oil production at Varg Sub project leading: Subsurface within integrated operations (TENAS operation project) Production supervising with PI process book designing and real time allocation programming with PI excel Responsible for: • Annual
  • 5. Page5 and monthly reports • Well allocation including production analysis • Well testing and well test analysis • Weekly production & injection planning and morning meetings with the communication tool GoToMeeting • Real time production analysis with PI process book • Production optimizing with Prosper and GAP Planning well operations: • Mechanical operations: Increased oil production from 600 Sm3/d to 1200Sm3/d in a well by increase reservoir pressure by increasing water injection and changing the choke and reduce the pressure drop, stabilized 2 slugging wells by changing gas lift valves (Stabilized total production) • PLT, Water shut of and perforations (Increased oil production from 100 Sm3/d to 250 Sm3/d). • Production optimizing including field visits offshore at Petrojarl Varg and Varg A • Event organizing: Organized presentations and a seminar • Production forecasting • Technical contact with vendors Development Varg is an oil field to the south of Sleipner Øst in the central part of the North Sea. The field has been developed with the production vessel, “Petrojarl Varg”, which has integrated oil storage connected to the wellhead facility Varg A. Reservoir The reservoir is in Upper Jurassic sandstones at a depth of approximately 2 700 metres. The structure is segmented and includes several isolated compartments with varying reservoir properties. Recovery strategy Recovery takes place by pressure maintenance using water and gas injection. The smaller structures are produced by pressure depletion. All the wells are producing with gas lift. 3 recommendations available upon request Consultant from IOR Chemco at Badger Explorer January 2007 - February 2007 (2 months) Consultant: Project within petrophysics and geology. Data collection and data base development. The Badger Explorer is a revolutionary method to obtain subsurface data for oil&gas exploration, mapping of hydrocarbon resources and long-term surveillance.The Badger Explorer drills and buries underground, carrying a unique package of logging and monitoring sensors, at a substantially lower risk, cost and complexity of utilising an expensive drilling rig. The tool penetrates the sea bed and the subsurface by using a mechanical drill bit driven by an electrical motor to loosen and crush the formation ahead of the tool. The crushed formation is transported through the device and deposited in the void behind the tool. The tool carries an electrical cable, which is spooled up inside the unit, connected to the surface and powers the electrical motors. The same cable is used for continous transfer of data back to the surface. Reservoir engineer at IOR Chemco January 2006 - February 2007 (1 year 2 months) Analyzing of the world marked (High water cut reservoirs and sand producing reservoirs) Consultant at Badger Explorer. Representation at ONS Reporting (Inteligel progress at IRIS) to Norwegian Research Council, Total, Statoil and Norsk Hydro Screening of Espoir operated by Canadian Natural Recourses 05-11.06 Project research: at International Researh Institute of Stavanger • Field manager: mGel reservoir stimulation for increased oil recovery at Gullfaks C including: Quality assurance of treatment, photographing onsite and reporting • Application to ONS innovation award (Was nominated to the award) • Articles published at OTC (Offshore & Energy) and ONS (Scandinavian oil and gas magazine) • Representation at IOR 2006 in Tulsa Oklahoma (SPE) • PowerPoint designing for sales meetings and reporting • Presentation for potential customers in Aberdeen • Contact developing (Gained 15 business meetings with oil companies
  • 6. Page6 such as Maersk oil, Venture production, CNR international, Amerada Hess in Aberdeen and Talisman- Energy in Stavanger over a short period) • Marked analyzing of the British shelf (High water cut sand reservoirs) • Screening of projects including well log investigation and reservoir evaluation: Brage (Norsk Hydro), Gullfaks (Statoil) Improved Oil Recovery Chemical Company - a new IOR Chemical Solution Provider - a start up based on Best of Breed from The International Research Institute of Stavanger (IRIS - former Rogaland Research, RF) extensive research history in the field - based in Stavanger - the oil capital in Norway 1 recommendation available upon request Consultant from IOR Chemco at International research institute of Stavanger May 2006 - November 2006 (7 months) Project research: Optimisation of IOR Chemco`s mSand technology (chemicals for sand consolidation): Petrophystical measurements: PV, permeability, porosity and RRFw Article: Forskning: http:// www.forskning.no/artikler/2005/november/1132741898.83 IRIS - International Research Institute of Stavanger - is a recognised research institute with high focus on applied research, equally owned by the University of Stavanger and the regional foundation Rogalandsforskning. IRIS was established in 2006, as a result of a technical re-structuring of the ownership of Rogaland Research. Rogaland Research was established in 1973, and the continuation of its activities in IRIS provides IRIS with a long and proud history right from the start. Research activities started in the area of social science, but quickly developed to include petroleum. Today IRIS remains an independent research institute with research and research-related activities in petroleum, new energy, marine environment, biotechnology and social science and business development. Mudlogger geologist at Geoservices January 2003 - December 2005 (3 years) • Functioning as Dataoperator/ Secure safe well drilling • Well monitoring: Pit volume control and gas control • Maintaining sensors and repairing equipment • Reporting of geology • Geology: Catching samples, lithology analyze, cuttings and cavings description and calcimetry analysis and core handling • Logistics: Sending equipment and samples onshore When working for Geoservices I was working indirectly for Lars Johan Skjold (Statoil) many times. When he was coming to our working area he asked me for the answer to the geological interpretation. He also told me that the best geologists were engineers because we described what we could see. The geologists were describing what they thought they could see. Arie Romer wrote the following about me: Sigve has executed his work tasks to our full satisfaction and therefore we give him the best recommendations. Geoservices is the industry leader in mud logging, focusing on drilling support and formation evaluation. Decision-ready information about well status is helping to drill better wells more efficiently. Timely and more accurate information on reservoir fluid composition and lithology is detecting pay zones that would otherwise be missed, assisting well placement, revealing reservoir connectivity and compartmentalization, and guiding critical decisions. Drilling Support Obtain improved quality and higher level of analysis of surface data including drilling speed, vibrations, hole cleaning, and early kick detection to enhance safety and optimize drilling operations. Formation Evaluation Services
  • 7. Page7 Use analysis of rock cuttings and gas in the drilling mud for understanding formation geology, efficient hydrocarbon detection under all conditions including in deepwater and harsh environments, downhole fluid characterization, early information on reservoir fluid composition, lithology logs, and isotope logging. Reference Kristina Merethe Rigland Discipline Leader Reservoir Geology and Petrophysics at Statoil 1 recommendation available upon request ML geologist consultant from Geoservices at BP 2005 - November 2005 (less than a year) Geology evaluation and supervision when drilling the wells: Ula (7/12-A-5 B & 7/12-A-05B-T2) Ula (Norwegian: Ulafeltet) is an offshore oil field located in the southern Norwegian section of North Sea along with Gyda, Tambar and Tambar East fields making up the UGT area, usually attributed to DONG Energy's main areas of exploration and production activity. The Ula field was discovered in 1976 and came online in October 1986. It contains confirmed 69.98 million m3 of oil and 2.5 million of NGL. Ownership BP is the operator of the field with 80% of interest in the project. BP's partner DONG Energy holds 20% of interest. DONG Energy increased its initial share of 5% to 20% by acquiring Svenska Petroleum's complete share of 15% for $130 million in 2008. Production Ula is located in approximately 70 m (230 ft) of water. The main reservoir stands at 3,345 m (10,974 ft) in the Upper Jurassic Ula Formation. The field has three conventional steel facilities with production, drilling, living quarters. It has 7 production and 2 water injection wells. Current production at Ula field is 10,000 bbl/d. The existing gas process plant was recently extended with a new module, turbin and compressor and has been operative since 2008. The gas from Blane field is injected into the Ula reservoir for production. The gas produced at Ula field is re-injected into the field for increased recovery as well. The field is expected to be abandoned in 2028. The produced oil is then transported by a pipeline to Ekofisk oil field and on to Teesside for refining. In 2009, Aker Solutions was awarded a contract to tieback Ula field to Oselvar field. The work is expected to commence in 2011. Once complete, the oil from DONG-operated Oselvar field which is 24 kilometres (15 mi) from Ula will be pumped to facilities at Ula for processing. ML geologist consultant from Geoservices at BP 2005 - November 2005 (less than a year) Geology evaluation and supervision when drilling the wells: Vallhall IP (2/8-G-10 T3 & 2/8-G-11-T4/ TS) Development Valhall is an oil field located in 70 metres of water. The field was originally developed with three facilities, but has now 8 platforms. The Valhall complex consists today of six separate steel platforms for quarters, drilling, wellheads, production, water injection, combined process- and hotel platform respectively. These platforms are bridge-connected. In addition the field has two unmanned flank platforms, one in the south and one in the north, both around 6 kilometers from the field center. The Drilling Platform (DP) Situated between QP and PCP. It has 30 well slots, waste injection and a drilling rig. The platform started its activity on 17 December 1981, at that time with the first covered derrick. The derrick and drilling foundation were removed during summer 2009 and a separate program for plug and abandonment is under development. The Production Platform (PCP) The final shut in of the platform took place late July 2012 and the production now takes place on the new process and hotel platform The original PCP platform was
  • 8. Page8 built to process 168,000 barrels of oil and 350 million cubic feet of gas per day. The platform is 65 meters high and weighs 21,000 tons. The oil production is piped to 2/4-J at the Ekofisk Center and goes to Teesside in England. The gas is transported directly via Norpipe pipeline to Emden in Germany. The platform also processes oil and gas that comes from Hod. The Wellhead Platform (WP) Installed in April 1996 and first oil production started in June the same year. WP has 19 well slots. Total cost, including drilling of the wells, is approx. 1,5 billion NOK. ML Geologist consultant from Geoservices at Norsk Hydro 2005 - October 2005 (less than a year) Wellbore history Well 6605/8-1 is an exploration well on a Late Cretaceous Lysing prospect situated on the western flank of the Fles North rotated fault block structure in the Vøring Basin outside Mid Norway. The primary objective was to test the presence of movable hydrocarbons in the Lysing prospect. A secondary objective was to investigate the reservoir potential of the Nise Formation Operations and results Wildcat well 6605/8-1 was spudded in 838 m water depth with the semi-submersible installation Transocean Leader on 14 June 2005 and drilled to TD at 4513 m in Late Turonian sediments of the Lange Formation. Operations went without significant technical problems. No shallow gas or shallow water flow was observed. The well was drilled with spud mud down to 2500 m and with KCl/Polymer/Glydril mud from 2500 m to TD. The well penetrated the main target at 4184 m, a 70 m thick Lysing Formation deep-water turbidite sand of Early Coniacian age. Gas was recorded from 4180 m. There were two gas zones separated by a water zone. The upper zone had gas down to a free water level inferred at 4221 m (4193 m TVD MSL). The lower gas zone, at 4253 m, was very thin and was approximately 20 bar overpressured compared to the upper zone. Gas shows were also encountered in Early Campanian Nise siltstone at 3064 m and a deeper Lysing sandstone unit at 4354 m. One 9 m long core was taken in the interval 4190-4199 m in the upper Lysing reservoir. It contained sandstones interbedded with thin mudstone layers. MDT fluid samples were taken at 4230.55 m (water), 4231.4 m (water), 4209.4 m (gas), 4211.86m (gas), and at 4253.5 m (gas which gave a dark brown/ black liquid when flashed). An MDT run in cased hole after the DST and almost 3 weeks after the last mud circulation gave a maximum temperature of 146 deg C at 4230 m. This was believed to be close to the true formation temperature. The well was perm. abandoned 22 October as a gas discovery. ML geologist consultant from Geoservices at Statoil April 2003 - September 2005 (2 years 6 months) Geology evaluation and supervision when drilling the wells: Deep Sea Trym (24/10-M-3BH) Stena Don (6608/10-B-4BH) West Alpha (6506/11-P-3 H) Kristin field: Gas/condensate producer Kristin platform was installed in the field in March 2005, and production from the field started on 3.11.2005. Today, 12 wells in production. Full production was reached in 2007 with a daily production rate of approx. 18 million Sm3 gas and condensate daily rate of approx. 17000 Sm3 ML geologist consultant from Geoservices at Statoil April 2003 - September 2005 (2 years 6 months)
  • 9. Page9 Geology evaluation and supervision when drilling the wells: Snorre B (34/4-I-1H cuttings injection & 34/4-K-7 H water injector) Snorre is an oil platform in Block 34/4 on the Snorre field in the North Sea. The platform was built by Aker Stord and started production in June 2001. Snorre B is an integral semisubmersible drilling, production and accommodation platform, located about seven kilometers north of Snorre A. The produced oil is transported by pipeline to Statfjord B for storage and export. Some of the gas is reinjected into the reservoir, while the rest is piped to the Prime Pipe system via Snorre A. The platform was originally operated by the Norwegian Hydro and now operated by Statoil. ML geologist consultant from Geoservices at Statoil April 2003 - September 2005 (2 years 6 months) Geology evaluation and supervision when drilling the wells: Transocean Searcher (6506/12-Q-2H (Åsgard)) Åsgard is located in the Norwegian Sea, about 200 kilometers from the coast of Norway and 50 kilometers south of Heidrun. Åsgard A vessel was in position 8 February 1999 and to start oil production 19 May. Åsgard B is a semi-submersible facility that treats gas and condensate. It came on stream 1 October 2000. Åsgard C is a storage vessel for condensate related to the field. Åsgard consists of Midgard, Smørbukk and Smørrbukk South. In addition, gas fields Mikkel and Yttergryta linked to the infrastructure in Åsgard. Midgard is located in blocks 6507/11 and 6407/2. Smørrbukk and Smørrbukk South is located in block 6506/11. Saga proven Midgard in 1981. Statoil found Smørrbukk in 1984 and Smørrbukk South in 1985. In 1995 the rights to the field coordinated in a new structure with Statoil as operator. The largest development on the Norwegian Continental Shelf Overall Åsgard among the largest developments on the Norwegian continental shelf with its 56 production and injection wells in 17 templates. The water depth in the area is 240-310 meters. ML geologist consultant from Geoservices at Statoil April 2003 - September 2005 (2 years 6 months) Geology evaluation and supervision when drilling the well: West Navigator (6507-3-4) Wellbore history: General Well 6507/3-4 is located on the Alve structure, which is a horst, located in the north central part of block 6507/3 on the Dønna Terrace. The main objective of this appraisal well was to prove down flank oil resources in the Middle Jurassic sandstones of the Garn and upper Not Formations. The secondary objective was to prove oil in the Ile Formation. Operations and results Well was spudded with the vessel West Navigator on 14 March 2004 and drilled to TD at 4092 m in the Early Jurassic Åre Formation. The well was drilled with seawater and bentonite down to 1250 m, with KCl/polymer/glycol from 1250 m to 2300 m, and with oil based mud (Paratherm) from 2300 m to TD. A shallow gas warning class 1 was given for the interval between 950 to 1370 m, based on gas peaks observed in well 6507/3-1. A pilot hole was drilled down to 1250 m. No shallow gas was observed. The well penetrated the reservoir below the hydrocarbon-water contact in the Garn, Not and Ile Formations. Top Garn Formation was encountered 7 m below prognosis. Moveable hydrocarbons were not proven, only shows throughout the Garn and Not Formations and discontinuous weak to moderate shows in the Ile, Ror, and Tilje Formations from 3805 m to 4000 m. Two cores were cut in the Garn, Not and Ile Formations and nine MDT water samples
  • 10. Page10 were collected in Garn, Ile and Tilje Formations. The Garn sample from 3726 m contained approx 2 dl of hydrocarbon fluid, which proved to be mud filtrate (base oil) with some dissolved residual oil from the formation. The well was permanently abandoned on 30 April 2004 as a dry well with shows Testing No drill stem test was performed ML geologist consultant from Geoservices at Statoil April 2003 - September 2005 (2 years 6 months) Geology evaluation and supervision when drilling the well: 34/11-A-11 Kvitebjørn Development Kvitebjørn is a gas condensate field located in the eastern part of the Tampen area, in the northern part of the North Sea. Water depth in the area is about 190 metres. The field is developed with an integrated accommodation, drilling and processing facility with a steel jacket. An amended PDO for Kvitebjørn was approved in December 2006. Reservoir The main reservoir consists of Middle Jurassic sandstones of the Brent Group. Discoveries have also been made in the Cook- and Statfjord Formations. The reservoir lies at a depth of approximately 4 000 metres and initially had high temperature and high pressure. The reservoir quality is good. Recovery strategy The field is recovered by pressure depletion. Transport Rich gas is transported through a dedicated pipeline to Kollsnes, while condensate is transported in a pipeline tied to the Troll Oil Pipeline II for onward transport to Mongstad. Status Drilling on Kvitebjørn is challenging due to depleted reservoir pressure. A new infill well was drilled in 2012 and a second is being drilled in 2013. Development of the east flank of the field is being considered. Gas pre-compression will be installed on the platform, with start-up in December 2013. Modifications are being made to prepare for tie-in of the Valemon field in 2014. ML geologist consultant at Statoil April 2003 - September 2005 (2 years 6 months) Transocean Searcher (15/9-E-3H, 15-9-E-1H, 15/9-E-4H (Sleipner)) Sleipner A (15/9-A-23 A, 15/9-A-19 & 15/9-A19T2) The Sleipner gas field is a natural gas field in the North Sea, about 250 kilometres (160 mi) west of Stavanger, Norway. Two parts of the field are in production, Sleipner West (proven in 1974), and Sleipner East (1981).The field produces natural gas and light oil condensates from sandstone structures about 2,500 metres (8,200 ft) below sea level. It is operated by Statoil. The field is named after the steed Sleipnir in Norse mythology. Reference: Egil Kai Elde VP HSE Statoil ML geologist consultant at Statoil March 2003 - September 2005 (2 years 7 months) Borgland Dolphin (34/10-F-2 Y1H (Gullfaks sør)): Oil producer Deep Sea Trym (34/10-4-2H (Gullfaks sør)) Gullfaks Sør is located just south of Gullfaks in the northern part of the North Sea. The field is developed with a total of 12 subsea templates tied back to the Gullfaks A and Gullfaks C Gullfaks Sør is developed in two phases. PDO for Phase 1 included the extraction of oil and condensate from the 34/10-2 Gullfaks South, 34/10-17 and 34/10-37 Rimfaks Gullveig. PDO for Phase 2 was approved in June 1998 and included production of gas from the Brent Group in the Gullfaks Sør deposit. ML geologist consultant from Geoservices at Talisman Energy
  • 11. Page11 2004 - 2004 (less than a year) Geology evaluation and supervision when drilling the wells: Gyda oil and gas field (2/1-A16 AY1 & 2/1-A16 AY1/T2) Gyda is an offshore oil field located in the southern Norwegian section of North Sea along with Ula, Tambar and Tambar East fields making up the UGT area, usually attributed to DONG Energy's main areas of exploration and production activity. The Gyda field was discovered in 1980 and started producing on June 21, 1990. The field contains confirmed 39.6 million m3 of oil and 6.6 billion cubic meter of natural gas. Ownership: Talisman Energy is the operator of the field with 61% of interest in the project. The full share was bought by Talisman Energy in 2003 from the previous operator, BP for $82 million.[3] Partners of Talisman Energy, DONG Energy and Norske AEDC AS (NAEDC),owned by Arabian Oil Company (AOC), hold 34% and 5% interest in the project, respectively. holds 34%. Capital spending on Gyda was expected to be $131 million. Production: Gyda is located in approximately 66 m (217 ft) of water. The main reservoir stands at 4,000 m (13,000 ft) in the Upper Jurassic Ula Formation. The field has one conventional steel facility with production, drilling, living quarters. Gyda currently produces an average of 10,000 bbl/d (1,600 m3/d). The field also produces excessive amount of water making the oil production stable. Due to the difficulties, the production license was extended to 2018. Several new wells are currently being drilled. The produced oil is transported by a pipeline to Ekofisk oil field and on to Teesside for refining. ML geologist consultant from Geoservices at ENI 2004 - 2004 (less than a year) Geology evaluation and supervision when drilling the well: Ocean Vanguard (6406/1-3 (Erlend)) The drilling rig Ocean Vanguard had to spend almost the entire winter Vestbase. After of runs of an anchor chain last December had the rig immediate needs for repairs. Mishap occurred during drilling for Eni well 6406/1-3 in Norwegian Sea. But never so bad that it is not good for anything. The immediate improvements gave the local industry projects for 12 -NOK 15 million, according Vestbase. Ocean Vanguard went to the field to pick up BOP and riser in end of February and returned for further improvements. The total turnover on Vestbase for both sojourns estimated at 20 - NOK 25 million. The rig will shortly publish on behalf of the group. Drilling HSE evaluation: The rig experienced a gain in the active pit. The mudlogger and data engineer suspected a kick and warned drill floor. ML geologist consultant from Geoservices at Total E&P 2003 - 2003 (less than a year) Geology evaluation and supervision when drilling the wells: Scarabeo 6 (25/5-C-1H) Total S.A. is a French multinational integrated oil and gas company and one of the six "Supermajor" oil companies in the world. Its businesses cover the entire oil and gas chain, from crude oil and natural gas exploration and production to power generation, transportation, refining, petroleum product marketing, and international crude oil and product trading. Total is also a large-scale chemicals manufacturer. The company has its head office in the Tour Total in the La Défense district in Courbevoie, West of Paris. ML geologist consultant from Geoservices at Shell 2003 - 2003 (less than a year)
  • 12. Page12 Geology evaluation and supervision when drilling the wells: Deep Sea Trym (6407/9-E-2H) Draugen oil producer Draugen has the most produced approx. 225,000 barrels of oil a day. When the field was developed, there was a planned average production of approx. 90,000 barrels a day, but the oil reservoir and the platform proved to be able to produce more. Oil is produced from a total of 11 wells, of which 6 are platform wells and 5 subsea wells. The produced oil is stored in the seven storage cells in the bottom of the concrete shaft. Crude oil is loaded via a floating loading buoy, about 3 kilometers east of the platform. Facts: Location: West of Kristiansund Block Number: 6407/9 Operator: Norwegian Shell Licenses: Shell (26.2%), Chevron Norway (7.56%), BP Norway (18.36%), Petoro (47.88%) Discovered date: 07/09/1984 Reservoir Depth 1650 Produsjonsstart: October 1993 Draugen gas exports The 10th October 2000 started exports of gas from Draugenfield. Draugenfield exports about. 1.5 Sm3 gas per day via a dedicated 78 km pipeline of 16 "(inch) attached to Åsgard Transport pipeline. Ever since the start of oil production on Draugen there have been efforts to increase and prolong the production. Yarn West is a site entirely west of the Draugenfield containing approx. 7.5 million Sm3 of recoverable oil reserves. To map the area was made extensive use of 4D seismic (4-dimensional). This has given very valuable information about the field and how the oil moves in the field. At the same time 4D sesmikk information on where new wells should be placed. A / S Norwegian Shell is continuously working to create the most value of the reserves in Draugen. This benefits both the owners and the community. Therefore, considering one continuous drilling of new wells to access the pockets of hydrocarbons that can be produced by the existing wells. Laboratory Engineer at Reslab 2002 - 2002 (less than a year) Special Core Analysis: Measurement of petrophysical data: Permeability, porosity and capillary pressure/ resistivity curves Reslab is a provider of fluid and core analysis to Oil & Gas-companies, sold to Weatherford, Inc. Geoscientist consultant at Roxar September 2001 - 2002 (1 year) Reservoir Modelling: System helpdesk (RMS 6.2) at Oslo office/ Technical contact with customers Software error localization: Importing Eclipse grid files for inspection in RMS 7.0 and general bug hunting in new applications in the software at Stavanger office Roxar ASA is an international technology company in the oil and gas sector. The company's technology helps to improve the extraction of petroleum resources and reduced field development expenses. Owner is currently Emerson Electric Company. 1 recommendation available upon request Menig at Royal Norwegian Navy July 1997 - June 1998 (1 year) Security guard @ NATO base RSD Ulsnes, Hundvåg - My leader Roger Hesjedal wrote the following words about me: The soldier is an particularly positive person, very cooperative, dutiful, and have performed his tasks in a very satisfactory way, and I would strongly recommend Sigve Aspelund to future employers.
  • 13. Page13 Naval diving school Håkonsvern @ Bergen - The best candidate @ admission and my leader told me that I was one of the toughest of the divers. Menig at Harald Hårfagre navy base @ Stavanger Courses Project risk advisor Aspelund Consulting & Energy Offshore Development International National Introduction to subsea technology: System overview in production Subsea technology: Production control systems Subsea Technology: Processing Introduction Introduction to subsea technology: Completion/ Workover Standardization course Subsea: Front End Engineering Teamcenter: Review and approve Subsea technology: Introduction to MPS Introduction to subsea technology: Connection system Introduction to subsea technology: Control systems Document review: Introduction to NDT & MRB Field development: Subsea technology production systems Introduction to Subsea technology: Foundations & structures Petroleum engineer consultant Aspelund Consulting Energy Offshore Development International & National Sales and service & Business presentation strategy Mudlogger geologist Geoservices Mud logging training course Helicopter evacuation and Statoil internal course Offshore work permit and safe job analysis course Primary & secondary well control and kick sheet course HSE training course and Basic safety and emergency and evacuation course for Ula/Valhall Data engineer H2S course
  • 14. Page14 Production Engineer Talisman Energy Mbal, Prosper & GAP & Gas lift course PI process book & PI excel Oil Field Manager F.A.S.T. Fekete RTA Geoscientist consultant Roxar RMS, reservoir modelling system, introduction RMS, reservoir modelling system, streamlines RMS, reservoir modelling system, simulation grid RMS, reservoir modelling system, heterogeneity Presentation Technique Quality, Health, Safety & Environment engineer Ocean Rig Offshore safety course 2011 (Refresh from courses taken in 2007 & 2003) Reservoir engineer IOR Chemco Water shut off – Randy Seright, SPE IOR06 Tulsa Oklahoma Languages English (Native or bilingual proficiency) Norwegian (Native or bilingual proficiency) German (Professional working proficiency) Danish (Full professional proficiency) Swedish (Full professional proficiency) Skills & Expertise Petroleum Petroleum Engineering Oil/Gas
  • 15. Page15 Offshore Drilling Drilling Gas Upstream Energy Onshore Reservoir Engineering Completion Reservoir Management Management New Business Development Pipelines Geology Business Development Subsea Engineering Field Development Oil & Gas Industry Geophysics Engineering Sales Management Petroleum Geology Reservoir Simulation Leadership Pressure Well Testing Teaching Earth Science Risk Management Petrophysics Inspection Formation Evaluation Natural Gas Logging Stimulation Technical Presentations HAZOP Petrochemical Eclipse Prosper Sedimentology QHSE Technical Project Leadership FPSO Production Engineering Well Control
  • 16. Page16 GAP Oil & Gas Education Universitetet i Stavanger (UiS) Post-qualifying education, Reservoir engineering, 2003 - 2003 Universitetet i Stavanger M.Sc. Petroleum Engineering, Petroleum engineering with applied science programme. Master of science (Lorenz strange attractors), 1998 - 2001 Falken Sequrity guard, Sequrity, 2000 - 2000 University of Bergen (UiB) Examen philosophicum (2.6) (Grades in paranthesis 1.0 is the best), 1998 - 1998 Håkonsvern dykker og froskemanskole Naval diving, 1997 - 1997 Norges teknisk-naturvitenskapelige universitet (NTNU) Candidatus Magisterii(B. Sc.), Mathematics Physics, 1995 - 1997 Bryne videregående skole Allmennfag med fordypning i matematikk og fysikk, 1992 - 1995 Activities and Societies: Tillitsvalgt 1992-1995 Interests Listening to music: Van der Graaf Generator, King Crimson, Pink Floyd, Led Zeppelin (top quartet). Sports: Soccer (Bryne FK)
  • 17. Page17 Sigve Hamilton Aspelund Entrepreneur sigve.aspelund@lyse.net 20 people have recommended Sigve Hamilton "Sigve gave an excellent talk at our conference 'people and the digital oilfield' in Stavanger on October 20th 2011, about how systems can best be designed for safety. The talk is online at http://www.youtube.com/ watch?v=Ja3x2l94SpI" — Karl Jeffery, Conference producer, Finding Petroleum, was with another company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National "I have had the pleasure of knowing Sigve Hamilton for the past 5 years Sigve Hamilton is not only a smart and ambitious person but also an inspiring employee. Hard working, customer-service oriented, multi -skilled and well educated expert. Wise, loyal, intelligent and open minded Quality, Health, Safety & Environment engineer engineer always ready to put all his energy and stamina to get the job done. For Sigve Hamilton the job is always the most important thing to do." — Anantha Narayanan, was Sigve Hamilton's client "Sigve is a detailed and incisive manager with great entrepreneurial talents. An engineer with extensive experience in the petroleum industry it is always instructive to work with him." — William Downey, MS JD, Founder & Director of Consulting, W J Downey & Associates, was with another company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National "Sigve is a truly self motivated high performer who can bring a wide ranging skillset to virtually any company in the oil and gas industry. I've relied multiple times on his knowledge and insights of the Norwegian sector in particular. I've seen Sigve use his spare time to pass his knowledge along to up and coming energy industry professionals. Sigve has the skills to make a fast transition into many positions, and any learning curve will be minimized due to his experience and academic background. Regards, John Savage" — John Savage, Account Manager, Halliburton, was with another company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National "I enjoyed very much to meet Sigve. I believe he will represent a great value to almost any business."
  • 18. Page18 — Geir Ullenes, Bedriftsrådgiver Rekruttering & Omstilling, Proffice AS, was a consultant or contractor to Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National "Sigve is one of my favorite followers and friends in Lkdn. He understands that I try to supply valuable information no matter that it is unsolicited from him. But, if we are connected and I can not send him some selected by me content, and I do not get any information from him, then why we should be connected? He acts on the contrary to others that never send anything, further refuse to say thanks for info signals and ask not getting anything from me, but they do not want to break the connection with me at the same time.. hard to understand! Undoubtelly, Sigve get the key to issues very fast and he will be a good partner to work!" — Jorge C. Palma, CEO, Founder, Port Engineering Consulting Group, worked directly with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National "Sigve is a visionary, a true patriarch of progress. In the time I've known him and worked with him, his exemplary actions towards helping others is a testament to his person. I highly recommend him for any endeavor, he is truly a one of a kind and an asset to any organization he represents. There is no can't in Sigve, he always seems to find a way to make things happen. Cheers and kudos to you Sigve!" — Junior Sanchez {LION}, CEO/President of New York Chapter, All Of Us Or None, was with another company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National "SIGVE is having lots of contacts world wide and has very good Man- Management. skills.He is multi talented person with fair knowledge of Oil industry, Software Industry & HR Recruitment industry.It is good to know him. Venkatesh" — Venkatesh Annadevara, BDM Domestic & International Business, SIRGRACE Technologies, was with another company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National "Sigve is a person par excellence with a perfect blend of HIGH EQ AND IQ,with exceptional leadership skills and great sensitivity.He has high business acumen and a meticulous approach,a combination which enables a person to achieve good results in a short span of time with Accuracy and precision both.It was a pleasure to know him personally and professionally-A Golden treasure for any company." — Shankarnarayan Ramakrishnan, Management Consultant, I-Point Consulting Services Pvt Ltd, was with another company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National "If I see linkedin benefits, sigve appears to be one of them. He is very vibrant & proactive ;always available. I benefitted myself with his advising, consulting & teaching & he also helped me in uderstanding Linkedin & its usage. He is very creative person & it seems to me that his brain machine is meant to generat ideas. what a
  • 19. Page19 talented & knowledgeable person is he. When I met him I was working at NTSA Saudi Arabia as Consultant. You name a thing & the next moment it is done...Thanks Sigve to be my partner & friend." — Farasat Saeed, Regional Project Reporting Executive, Telenor Pakistan, was with another company when working with Sigve Hamilton at Aspelund Consulting & Energy Offshore Development International National "Creative and intelligent with an excellent scientific bent, Sigve is also totally focused in his approach to work and pleasant to deal with." — Nirmal Sachdeva, was Sigve Hamilton's client "Sigve is a multi experienced engineer with very solid experience in many aspects related to oil and gas industry. He really likes to socialize with other people and also has eagerness to learn new things. I would appreciate the chance to work with Sigve now and in the future." — Agung Ertanto, Reservoir Engineer, StatoilHydro, was with another company when working with Sigve Hamilton at Aspelund Petroleum Consulting "Sigve has the capabilities of a 'business giant'. He is steadfast and dedicated to whatever he chooses to do...he strives for excellence..." — Nadira Haniff, Worldwide Independent Distributor, Xango LLC, worked with Sigve Hamilton at Xango "I had the pleasure of having Sigve as one of my engineers in OTG. Sometimes simply endorsing people gives not the full picture of their skills. As of beeing Sigves project manager, having a personallity like him in the team is of incredible value. One of the projects where a new technological development from scratch, and having Sigve`s analytical mindset, and systematically work in the team made a huge contribution to the development. If i should do such a project again, Sigve would be one of the first i would take to the team to make sure it is realized on time and quality." — Johannes Waarseth-Junge, project manager/ consultant, Oilfield Technology Group, managed Sigve Hamilton at Oilfield Technology Group "Sigve Hamilton is a hard worker, proactive and eager to learn. He can solve the problem at under pressure" — David Tobing, PE Team Leader, BP Indonesia, was with another company when working with Sigve Hamilton at Talisman-Energy "I worked with Sigve Hamilton in enhancing the production of oil wells through gas lift. He was very acommendating and knowledgeable of this subject area. He is very focused and knows his reservoirs. His friendly attitude made him really easy to work with. I would welcome the opportunity to work with him in the future."
  • 20. Page20 — Lloyd Ragnar Burnett, Sr. Sales and Operations Adv., Petroleum Technology Company, worked directly with Sigve Hamilton at Talisman-Energy "Sigve has a very aproachable personality and pays great attention to details in work. Always prompt to assist colleagues and willing to put in the extra milel to get things done. I wish him well in his new undertakings." — Lee Chih Chiang, Snr Completion / Integrity Engineer, Talisman Energy, worked with Sigve Hamilton at Talisman-Energy "I enjoyed interacting with Sigve when he had his office at IRIS while working for IOR Chemco." — Sigmund Stokka, Research Director, IRIS, was with another company when working with Sigve Hamilton at IOR Chemco "Sigve Hamilton is very enthusiastic, and creative about how to improve work results." — Lars Johan Skjold, Staff Geologist, Statoil, managed Sigve Hamilton indirectly at Geoservices "Sigve and I worked together at Roxar within the Software Solutions Business Unit, where he formed part of the Geoconsultancy Team that I was responsible for placing out on Consultancy Tasks with Clients. He was always a hard worker, who was keen to learn. I wish him all the best for his future career development." — Neil Quentin Smith (Ph.D), Software Sales Manager Scandinavia, Roxar, managed Sigve Hamilton indirectly at Roxar Contact Sigve Hamilton on LinkedIn