This document provides a summary of an individual's qualifications and work experience in the petroleum engineering field. It includes details about their educational background such as a M.Sc. in petroleum technology from the University of Stavanger. Work experience spans over 15 years and includes various roles such as petroleum engineer consultant, production engineer, reservoir engineer, and teacher. The individual has worked on projects internationally for many oil and gas companies and developed expertise in areas like reservoir modelling, production optimization, and health and safety.