The document outlines a proposed shooting schedule and risk assessment for a photo shoot with the filmmaker's little sister. It provides 14 potential photo ideas with details on location, date, and shot type. It then evaluates each location for possible problems like weather, other people, uneven ground or poor lighting. For each location, it provides a risk assessment and mitigation strategies like scheduling shoots earlier or later to avoid crowds, wearing sensible shoes, and keeping shots away from hazards. The overall document plans shots, locations, dates and assesses safety risks to execute a safe yet creative photo shoot.
2. Idea 1: Shooting schedule
What? High angle shot of my little sister dress as a
modern pop artist Idea 9:
What? Medium shot of my little sister in a dance look
When? January
When? January
Where? Long Barn lane Park
Where? Long Barn Lane Park
Idea 2:
What? Mason sawyer holding his guitar Idea 10:
When? January What? Very long shot of my little sister in a field holding a flower
Where? Outside When? January
Idea 3: Where? Outside
What? High angle shot of a pile of colourful clothes Idea 11:
When? January What? Very long Shot of the field/grass
Where? In my house When? January
Idea 4: Where? Outside
What? Medium close up of my little sister in an edgy look
When? January Idea 12:
Where? Back garden What? Glitter falling towards to ground
Idea 5: When? January
What? Close up of a fashion statement shoes Where? Inside the play shed
When? January
Where? Town or Friends house Idea 13:
Idea 6: What? Close up of a flower
What? Extreme close up of my little sisters eye make-up When? January
When? January Where? Outside
Where? In my house
Idea 7: Idea 14:
What? Money just dropped on the floor What? Extreme close up of leaves
When? January
When? January
Where? Outside
Where? In my house
Idea 8:
Idea 15:
What? Long shot of my little sister in her perfect party outfit
What? Side angle of the yellow railing gate
When? January When? January
Where? Back garden Where? At Long Barn Lane Park
3. Location Possible problems Risk assessment
Long barn lane recreation -weather -check area before doing photo shoot.
-little hills -make sure park is more or less empty.
ground -other people in the park -Have the photo shoot around the hills
-finding sharp objects on the field. not on them
-choose a day will good weather
conditions.
My back garden -The pond -sensible shoes
-uneven ground -away from any danger by the pond.
-the different types of ground e.g. -making sure that I take the photo’s at an
gravel, grass and mud. earlier time to receive better lighting.
-lighting
The Oracle -very busy during the day -allowing myself to do the photo’s early
-lighting of shops when it’s less busy.
-escalators -making sure the place is well lit enough
-stairs so my photo’s turn out how I would like
them.
Play shed in my back garden -toys everywhere -making sure that the play shed is tidy or
-lighting could be dull set out in a way that no one is at risk of
-safety (child friendly) injury.
-the windows may be covered which will
restrict my light source for my photo’s.
Outside -lots of people around -take photo’s at a less busy time.
-weather -make sure the weather conditions aren’t
-little ditches terrible e.g. Raining or snow.
-lighting -keep an eye out in case of little ditches
to avoid injury.
-make sure trees don’t block out vital
light for my pictures.