Second Draft – Poster 1
The only major changes I have made in my second draft our improving on my use of conventions from real products. I have added an age rating and also a date line “COMING SOON”. I have also changed the font the font on my tag line “Not everyone can handle the truth” as I received feedback that the decorative, handwritten font I previously used cheapened the poster. I have chosen a simple sans serif font but am still not entirely happy with this font and I think I will change it on my next draft.

Second Draft - Poster

  • 1.
  • 2.
    The only majorchanges I have made in my second draft our improving on my use of conventions from real products. I have added an age rating and also a date line “COMING SOON”. I have also changed the font the font on my tag line “Not everyone can handle the truth” as I received feedback that the decorative, handwritten font I previously used cheapened the poster. I have chosen a simple sans serif font but am still not entirely happy with this font and I think I will change it on my next draft.