Standards-Based IEPs
Module 3: Present Levels of Academic
Achievement and Functional Performance
IEP Development Process
Desired
Outcomes/
Instructional
Results
Write
Measurable
Goals
Select Instructional
Services & Program
Supports
Implement &
Monitor Progress
General
Curriculum
Expectations
Current
Skills and
Knowledge
Area of
Instructional
Need
PLAAFP
Statements
on IEP Form
Developing PLAAFP
Statements
Process of Developing Standards-Based IEPs
Determine general
education
curriculum
expectations
Identify current
skills, knowledge
and area(s) of
instructional need
Conduct data/gap
analysis and
develop impact
statement
• NxGCSOs/Support for SB-IEPs (ELA, Math)
• NxGECEs/Community Readiness
• Unwrap the Standards
• What is the big picture?
• Which are most important?
• Which are critical needs?
• Develop student data profile
• Review student data profile
• Review Grade-Level CSOs
• Review Learning Progressions
• Determine Gap
• Where student is and where student needs to go
Develop student data profile which is an overview of student’s
functioning in all areas relevant to the IEP.
The profile should include general information regarding:
• Strengths
• Needs
• How the exceptionality affects involvement/progress in
the general education curriculum including Career and
Technical Education
• Assessment/Evaluation
• Status of prior IEP goals
• Teacher/Parent/Student input
• Transition needs (at least by age 16)
• Learning Style (UDL)
Step 2: Identify current skills, knowledge and
area (s) of instructional need
 Provide instructional accountability and
access to general curriculum
 Support instruction in least restrictive
environment
 Link the IEP to the general curriculum
Standards Drive IEPs
 Essential for closing the
achievement gap
 Promote a single system of
education and consistency across
schools and the district
 Are best for kids – assume more,
not less
Standards Drive IEPs
 Refer to standards to determine expectations
at grade-level
 Use the standards as a guide to determine
what is important for the student to learn or
be able to do
 Conduct an analysis to determine the gap
between grade expectations and the student’s
current skills/knowledge
What Does it Mean to
Connect IEPs to Standards?
• What is meant by the general education
curriculum?
 The full range of courses, activities, lessons, and
materials routinely used by the general
population
• What is meant by access?
 Participation in the knowledge and skills that
make up the general education curriculum
Accessing the General Education
Curriculum
Developing Present Level Statements
General
Curriculum
Expectations
Current
Skills and
Knowledge
Areas of
Instructional
Need
PLAAFP
Statements
on IEP
Form
• Academic
• Social emotional
• Communication
• Recreation/Leisure
• Health, Physical,
Medical
• Technology
• For secondary
consider:
 Jobs/job training
 Post-secondary
education
 Community
participation
 Home/independent
living
Collect Data Current Skills/Knowledge
Consider the Whole Child
• Academic
 Tests
 Work samples
 Curriculum based
assessments
 Statewide assessments
 Evaluation results
 Classroom observation
 Formative assessment
 IEP Progress Reports
 Social/emotional
behavior
 Classroom reports
 Observation
 Office referral data
 Family input
 Attendance
Collect Data Current Skills/Knowledge
 Communication
 Reports
 Observation
 Language evaluation
 Language skills (including
English Language
Learners ELLs with
exceptionalities)
 Health/Physical
 Family reports
 Comprehensive
evaluation
 In-school nurse reports
 Physical education
 Self-report
Collect Data Current Skills/Knowledge
• Recreation/Leisure
 Family reports
 Physical education
 Self-report
 Extracurricular
participation
• Jobs & Job training
 Vocational training
records
 Vocational/Transition
assessment results
 Student interview
Collect Data Current Skills/Knowledge
 Post-secondary
Education
 Counselor and student
interviews
 Transition assessments
• Community Participation
 Family report
 Student self-report
 Transition assessments
Collect Data Current Skills/Knowledge
• Home/Independent
Living
 Family report
 Student self-report
 In-school observations
 Transition assessments
• Other reports (use of
assistive technology,
accommodations,
modifications)
 Family
 Teacher
 Student
Collect Data Current Skills/Knowledge
• What:
 Can the student do in school; at home?
 Accommodations have helped in the past?
 Is the student’s performance level on state assessments
and in the classroom?
Present Performance or Current
Skills/Knowledge
Activity 3.1
Present Level Statements:
More than One Step
General
Curriculum
Expectations
Current
Skills and
Knowledge
Areas of
Instructional
Need
PLAAFP
Statements
on IEP
Form
Selecting the Standard
Discuss intent of standards:
 What are the knowledge and skills necessary for the
student to achieve to a level that is expected in the
standards?
 What are the prerequisite skills?
 Determine which standards are most important for each
student (based on progress in the general education
curriculum)
 Compare standard(s) with student’s areas of need and the
impact of the disability/giftedness
 Use data to determine the areas in which the student will
need additional supports
Selecting the Standard
Think about…Essential Knowledge
and Skills
 Leverage-standards in one subject that support
student’s success in other subjects
 Endurance-standards that help students across the
years rather than respond to the testing of a single
grade level
 Readiness-essential for the next grade/standards
that help students prepare for the next level of
learning
Which standards:
 Can be met with accommodations in the general
classroom?
 Require specialized instruction?
Impact Considerations
Which standards are most essential to:
 Accelerate the ability to progress in the general
curriculum?
 Result in educational benefit?
Impact Considerations
1. Consider the target grade level standards
 Identify critical knowledge and skills within the
standards
 Use a data analysis process to conduct a drill
down
Identifying Instructional Need
ELA.6.R.C1.5
determine a central idea of an informational text
and how it is conveyed through particular details;
provide a summary of the text distinct from
personal opinions or judgments.
2. Of these skills, where does the student
demonstrate proficiency? (These could
become descriptors in the Present Level
Statements)
 Formal assessment
 Informal assessment
Data Analysis, continued
3. Can the standard(s) be achieved with an
accommodation?
 For example, can the student:
 Demonstrate the central idea of a text if
given orally rather than being asked to read
the items independently?
 Summarize the text when it is read orally?
Data Analysis, continued
4. Given these responses:
 What skills need to be taught explicitly to
demonstrate proficiency on the targeted
standards?
 Which skills/knowledge can be acquired in the
general classroom with an
accommodation/assistive technology?
Data Analysis, continued
Consider other functional skill areas that may not be
directly connected to the academic standards, and
determine which areas need specialized instruction
through the IEP.
Data Analysis, continued
 Just as a review, we have already talked
about:
 Identifying critical standards
 Collecting/analyzing data relative to the
student’s current academic performance
 Collecting/analyzing data relative to the
student’s functional performance
 Identifying instructional need
 Present Level Statements
Let’s review…
Assignment:
1. Review the selected objective for English Language
Arts
2. Make notes of critical expectations
3. Document the student’s current skills and knowledge
specific to the objective
4. Conduct an analysis of data using the process we have
just been talking about and document results
Practice Data Analysis
Activity 3.2
Impact Statement
Answers the question of how the child's
exceptionality affects (impacts) his/her involvement
and progress in the general education curriculum.
• Discuss learner characteristics and examine how
the characteristics affect student learning.
• Do not use student’s exceptionality to explain
how the disability/giftedness affects involvement/
progress in the general curriculum.
33
Learner Characteristics
Consider the learner characteristics typical of
the student’s exceptionality and through
observation how these characteristics may affect
progress in learning the content state standard.
Activ
Learner Characteristics
Activity
Activity 3.3
Examples of Learner
Characteristics
• Easily distracted
• Difficulty processing information in specific ways
• Difficulty organizing materials/time
• Difficulty completing written tasks
• Difficulty with problem-solving
What is a Gap Analysis?
A gap analysis is used to measure the difference
between the student's current levels of
performance and grade-level content standard
expectations.
Karen’s Impact Statement
Karen’s deficit in reading fluency causes her to have
difficulties in summarizing and identifying the main idea of
a text. This adversely affects her in classes when she has
to read lengthy text materials, summarize them, and
provide central idea of a text.
What areas are affected due to the exceptionality?
How does the student’s exceptionality impact the
student’s involvement in the general education
curriculum?
What academic areas are impacted due to the
exceptionality?
38
Sample Impact Statements
Eli’s tendency to reverse numbers will impact his
ability to accurately write numbers and will also
impact computation/problem solving in
mathematics.
Samantha’s difficulties with reasoning skills affect
her ability to draw inferences from literary and
informational passages and impact all other
academic areas.
Sample Impact Statements
Ann’s disability in the areas of auditory processing
an auditory memory cause her to have difficulty
processing problems and remembering
information presented orally. This impacts her
ability to follow multi-step directions, to
comprehend and recall complex concepts. This
also impacts her academic success with oral
presentations in all instructional settings, reading,
written language, and math, and to a lesser
degree, science and social studies.
Jane’s exceptional intellectual ability and
achievement as shown in Part V Assessment
Data indicates that she may be under-
challenged in the grade-level content
instruction normally provided in the general
education classroom. This impacts her
educational progress in that she may need
grade-level curriculum enriched to include
more depth and complexity.
Sample Impact Statements
Unacceptable Impact Statements
What is missing?
• Lisa has difficulty organizing her materials and
beginning assignments because she has an
attention deficit disorder.
• Ethan’s learning disability impacts his phonemic
awareness.
Activity 3.4 Karen Shaw
Develop Present
Levels of Academic
Achievement and
Functional
Performance
Choose content
standard and
objective(s)
Write measurable
goals and
objectives
• Collect Data
• Identify Strengths
• Identify Needs
• Develop Impact Statement
• What standard(s) and objective(s) best address the
gap?
• What standard(s) and objective(s) are critical for
accelerating student learning?
• Develop 4-Point Goal
• In what length of time (Timeframe)
• Under what context (Conditions)
• The student (Who) - Will do what (Behavior)
• Through what assessment (Evaluation) - To what
degree/level (Criterion)
• Accommodations/Modifications/Specially Designed
Instruction
Step 4:Develop Present Levels of Academic
Achievement and Functional Performance
The present level provides a summary of baseline information that indicates the
student’s academic achievement on specific standards or skills. The present level
must be data-based.
Components of Present Levels:
• Grade-level expectations
• Strengths
• Needs
• How the student’s exceptionality affects involvement/progress in the general
education curriculum (for preschool children, how the disability affects the
child’s participation in age- appropriate activities).
• Impact Statement
DO NOT use the student’s eligibility to explain how the exceptionality affects
involvement/progress in the general education curriculum!
Remember: the present levels of academic achievement and functional
performance set the stage for developing IEP goals!
Present Levels of Academic
Achievement and Functional
Performance (PLAAFP)
(1) “. . .a statement of the child’s present levels of
academic and functional performance,
including—
(i) how the child’s disability affects the child’s
involvement and progress in the general
education curriculum (i.e., the same curriculum
as for nondisabled children);…..”
§300.320(a)(1)
 Part I
 Description of what the student can do; strengths,
based on general curriculum expectations
 Part II
 Conversation to identify the gaps in skills/knowledge
associated with the exceptionality
Present Level & the IEP:
A Two-Step Process
Present Levels of Academic Achievement
and Functional Performance
Present levels must be:
• Measurable—use terms that are observable,
specific, and based on evidence
• Understandable—use clear language that can
be understood by all members of the IEP Team
Subjective Statements Objective Statements
Richie talks too much. Richie interrupts the teacher during
classroom discussions with verbal outbursts
Stephanie did not turn in her homework
assignments.
Stephanie did not turn in her homework
assignments 17 out of 20 times this grading
period resulting in a grade of “Incomplete”
in Math I.
Tom has difficulty writing a summary. On 50% of his assignments related to
summarizing a passage, Tom will list the
main idea instead of providing a summary.
Objective vs. Subjective Statements
Activity 3.5
Components of Present Levels of
Academic Achievement and Functional
Performance
1. Strengths
2. Needs
3. Impact statement
PLAAFP: Component 1
Strengths must be specific to the knowledge/skills
that are needed to learn grade level standards.
Strengths may include:
• Skills related to the state standard(s)
• Student’s response to learning strategies
• Successful Core, Targeted and Intensive Instruction
interventions or accommodations
PLAAFP: Component 2
Needs should focus on the skill sets the student
requires to access and make progress in general
education curriculum.
The student’s needs will inform the IEP Team which
measurable annual goals to develop.
PLAAFP: Component 3
Impact Statement: Answers the question of how the
child's exceptionality affects (impacts) his/her
involvement and progress in the general education
curriculum.
• Discuss learner characteristics and examine how
the characteristics affect student learning.
• Do not use student’s exceptionality to explain
how the exceptionality affects involvement/
progress in the general curriculum.
54
On the IEP:
 The Present Level Statements must include:
 Academic and functional performance:
strengths, needs and data sources
 Affect of the exceptionality in the general
education curriculum - The Impact Statement
for preschool children, the affect on
participation in age appropriate activities
Putting it All Together, continued…
 Strengths:
Student’s response to:
 Learning strategies
 Accommodations
 Interventions
 Standards instruction
Ask…What have we learned about this student’s
academic skills and knowledge?
Putting it All Together, continued…
 Needs:
Focus on needs that affect progress in the general education
curriculum
 progress in learning grade-level standards
Ask…What prerequisite skills/knowledge does
the student need to close the gap between
his/her Present Level and the grade-level
content standards?
Putting it All Together, continued…
• Use up-to-date descriptive data:
Cory reads 24 wpm, while the benchmark for 2nd
graders in the regular curriculum is 60-80 wpm. Cory
can say 5 out of 10 short and long vowel sounds. He
cannot read multi-syllabic words.
Academic Performance Example
 Student’s:
 social/emotional (behavioral) performance
 communication skills
 performance in areas of recreation/leisure, self-
management, independent living, etc.
Ask…“ What have we learned about this student’s ability to
function independently and appropriately with peers
and adults?”
Functional Performance
 Use up-to-date descriptive data:
In a classroom observation, Cory sat quietly in his seat for 10
minutes. At the 10-minute mark, he began to look around the
room, followed by twirling his pencil and playing with his
paper. When placed with a partner to complete his work, he
was able to remain on task and complete the assignment…
Functional Performance Example
 How does the disability affect performance?
 Consider how it affects progress in learning the
grade-level content standards – the Impact
Statement.
Performance in the General Education
Curriculum
 Do not use the student’s exceptionality to explain how the
disability/advanced learning affects involvement/progress in
the general education curriculum when developing the
Impact Statement.
 What not to write:
Marley’s learning disability affects his progress in the
general curriculum.
 What to write:
Marley’s weakness in applying strategies, such as making
inferences and complex predictions, affect his progress in
comprehending sixth-grade literary materials.
Caution
Activity 3.6 Karen Shaw
Rosie has trouble controlling her behavior.
She gets easily upset when interacting with
peers and does not take direction from
authority. Once off task it is really hard to
reengage her.
Can you improve this Present Level
statement?
Activity 3.7
Rosie enjoys socializing with peers, and will play
cooperatively with them some of the time. Her
teacher reports that more often, Rosie is off task
and interacts inappropriately with her peers.
Observations of Rosie indicated that when
interacting with peers, Rosie became upset
(cried, threw material, left the group) 55% of the
time within the first five minutes of a group
activity. Once off task, it took up to 20 minutes
for her to reengage in the activity.
One way…
 Rosie has improved in mathematics since
last year. She can add and subtract and
do some multiplication. She has difficulties
solving word problems. Rosie currently
has a grade of 71% in math.
Putting it all together
Activity 3.7 (Continued)
Curriculum Based Assessments indicate Rosie can add and subtract
within 100 to solve one-step words problems, involving “adding to”,
“taking from”, etc. She has memorized the multiplication facts for 0 –
5 and 10. She is able to use a multiplication table for facts she does
not have memorized. Classroom assessments demonstrate that Rosie
can apply the correct operation when presented with the terms or
symbols for “multiply”, and “divide”. Rosie cannot describe a context
in which a total number of objects can be expressed as a
multiplication problem, such 35 = 5 groups of 7 objects. She is not
able to interpret a multiplication equation as a comparison when
given word problem, such as: “A pack of pencils costs 9 times as much
as a single pencil, which costs 5 cents. How much is a pack?” Rosie’s
disability impacts her ability to use multiplication equations to solve
real world problems.
One way…
Review of Present Level Statements
1. Are they related to the vision (desired outcome) for this
student?
2. Do they reflect what the student knows in relation to the
general curriculum or standards expectations?
3. Are they stated in measurable terms?
4. Do they include strengths, needs, and exceptionality
affect on access to the general curriculum?
5. Are they self-explanatory?
Review of Steps to Develop
PLAAFP
1. Review NxGCSOs for student’s grade level
2. Review various data sources to determine the
student’s strengths and needs
3. Determine what the priorities are for the
student in relation to the grade-level standards
4. After the strengths and priority needs have
been identified, now write the Present Levels
statement for each relevant area
PLAAFP Reading Example-Grade 4
Strengths
Sally can identify 1-2 details from text read. She can identify the main
idea when reading content area passages. She can verbally explain
events in chronological order. She can compare and contrast events
from text using a Venn diagram.
Needs
However, Sally is unable to write a complete summary and will often
add her opinion. She has difficulty identifying author’s evidence or
purpose in text read, she only states why she likes the text. In addition,
Sally can not determine the cause or effect of a situation.
Impact Statement
Sally’s inability to understand key components of reading literature
affects her progress in the 4th grade general education curriculum.
PLAAFP Phrase Examples
Vague Verb Phrases Specific Verb Phrases
Received a math score of 90 Can count to 25
Knows his letters Can verbally identify 23/26 letters
Can add Using a calculator, solves double-digit
addition problems
Expressive language is at 27 Communicates wants and needs in 2-
3 word sentences
Can read Can locate 2 -3 details in a reading
selection
Knows fractions Can reduce equivalent fractions
Can measure Can accurately use various types of
measurement tools such as rulers,
weights, and volume (liters)
Present Levels: Instructional and
Grade Levels
It is critical that the PLAAFP and annual
goals include both the instructional AND
grade levels. Why?
1. Instructional level alone does not meet the criteria
of the general education curriculum.
2. Grade level alone does not meet the criteria of an
IEP based on identified skill deficits.
Present Levels: Instructional and
Grade Level
• The two levels together (instructional and grade)
allow the student to make progress in the
general education curriculum, while also
addressing skill deficits (needs).
Present Levels: The End Result
Instructional Level and Grade Level
The information then translates into content for
goals and specially designed instruction in order
for the student to work toward mastery in the
general education curriculum.
74
Present Level
Remember…
The Present Levels of Academic Achievement
and Functional Performance set the stage
for developing IEP goals!
Let’s Review
PLAAFP Reminders
Activity 3.9

Sb iep module-3

  • 1.
    Standards-Based IEPs Module 3:Present Levels of Academic Achievement and Functional Performance
  • 2.
    IEP Development Process Desired Outcomes/ Instructional Results Write Measurable Goals SelectInstructional Services & Program Supports Implement & Monitor Progress General Curriculum Expectations Current Skills and Knowledge Area of Instructional Need PLAAFP Statements on IEP Form Developing PLAAFP Statements
  • 3.
    Process of DevelopingStandards-Based IEPs Determine general education curriculum expectations Identify current skills, knowledge and area(s) of instructional need Conduct data/gap analysis and develop impact statement • NxGCSOs/Support for SB-IEPs (ELA, Math) • NxGECEs/Community Readiness • Unwrap the Standards • What is the big picture? • Which are most important? • Which are critical needs? • Develop student data profile • Review student data profile • Review Grade-Level CSOs • Review Learning Progressions • Determine Gap • Where student is and where student needs to go
  • 4.
    Develop student dataprofile which is an overview of student’s functioning in all areas relevant to the IEP. The profile should include general information regarding: • Strengths • Needs • How the exceptionality affects involvement/progress in the general education curriculum including Career and Technical Education • Assessment/Evaluation • Status of prior IEP goals • Teacher/Parent/Student input • Transition needs (at least by age 16) • Learning Style (UDL) Step 2: Identify current skills, knowledge and area (s) of instructional need
  • 5.
     Provide instructionalaccountability and access to general curriculum  Support instruction in least restrictive environment  Link the IEP to the general curriculum Standards Drive IEPs
  • 6.
     Essential forclosing the achievement gap  Promote a single system of education and consistency across schools and the district  Are best for kids – assume more, not less Standards Drive IEPs
  • 7.
     Refer tostandards to determine expectations at grade-level  Use the standards as a guide to determine what is important for the student to learn or be able to do  Conduct an analysis to determine the gap between grade expectations and the student’s current skills/knowledge What Does it Mean to Connect IEPs to Standards?
  • 8.
    • What ismeant by the general education curriculum?  The full range of courses, activities, lessons, and materials routinely used by the general population • What is meant by access?  Participation in the knowledge and skills that make up the general education curriculum Accessing the General Education Curriculum
  • 9.
    Developing Present LevelStatements General Curriculum Expectations Current Skills and Knowledge Areas of Instructional Need PLAAFP Statements on IEP Form
  • 10.
    • Academic • Socialemotional • Communication • Recreation/Leisure • Health, Physical, Medical • Technology • For secondary consider:  Jobs/job training  Post-secondary education  Community participation  Home/independent living Collect Data Current Skills/Knowledge Consider the Whole Child
  • 11.
    • Academic  Tests Work samples  Curriculum based assessments  Statewide assessments  Evaluation results  Classroom observation  Formative assessment  IEP Progress Reports  Social/emotional behavior  Classroom reports  Observation  Office referral data  Family input  Attendance Collect Data Current Skills/Knowledge
  • 12.
     Communication  Reports Observation  Language evaluation  Language skills (including English Language Learners ELLs with exceptionalities)  Health/Physical  Family reports  Comprehensive evaluation  In-school nurse reports  Physical education  Self-report Collect Data Current Skills/Knowledge
  • 13.
    • Recreation/Leisure  Familyreports  Physical education  Self-report  Extracurricular participation • Jobs & Job training  Vocational training records  Vocational/Transition assessment results  Student interview Collect Data Current Skills/Knowledge
  • 14.
     Post-secondary Education  Counselorand student interviews  Transition assessments • Community Participation  Family report  Student self-report  Transition assessments Collect Data Current Skills/Knowledge
  • 15.
    • Home/Independent Living  Familyreport  Student self-report  In-school observations  Transition assessments • Other reports (use of assistive technology, accommodations, modifications)  Family  Teacher  Student Collect Data Current Skills/Knowledge
  • 16.
    • What:  Canthe student do in school; at home?  Accommodations have helped in the past?  Is the student’s performance level on state assessments and in the classroom? Present Performance or Current Skills/Knowledge
  • 17.
  • 18.
    Present Level Statements: Morethan One Step General Curriculum Expectations Current Skills and Knowledge Areas of Instructional Need PLAAFP Statements on IEP Form
  • 19.
    Selecting the Standard Discussintent of standards:  What are the knowledge and skills necessary for the student to achieve to a level that is expected in the standards?  What are the prerequisite skills?
  • 20.
     Determine whichstandards are most important for each student (based on progress in the general education curriculum)  Compare standard(s) with student’s areas of need and the impact of the disability/giftedness  Use data to determine the areas in which the student will need additional supports Selecting the Standard
  • 21.
    Think about…Essential Knowledge andSkills  Leverage-standards in one subject that support student’s success in other subjects  Endurance-standards that help students across the years rather than respond to the testing of a single grade level  Readiness-essential for the next grade/standards that help students prepare for the next level of learning
  • 22.
    Which standards:  Canbe met with accommodations in the general classroom?  Require specialized instruction? Impact Considerations
  • 23.
    Which standards aremost essential to:  Accelerate the ability to progress in the general curriculum?  Result in educational benefit? Impact Considerations
  • 24.
    1. Consider thetarget grade level standards  Identify critical knowledge and skills within the standards  Use a data analysis process to conduct a drill down Identifying Instructional Need
  • 25.
    ELA.6.R.C1.5 determine a centralidea of an informational text and how it is conveyed through particular details; provide a summary of the text distinct from personal opinions or judgments.
  • 27.
    2. Of theseskills, where does the student demonstrate proficiency? (These could become descriptors in the Present Level Statements)  Formal assessment  Informal assessment Data Analysis, continued
  • 28.
    3. Can thestandard(s) be achieved with an accommodation?  For example, can the student:  Demonstrate the central idea of a text if given orally rather than being asked to read the items independently?  Summarize the text when it is read orally? Data Analysis, continued
  • 29.
    4. Given theseresponses:  What skills need to be taught explicitly to demonstrate proficiency on the targeted standards?  Which skills/knowledge can be acquired in the general classroom with an accommodation/assistive technology? Data Analysis, continued
  • 30.
    Consider other functionalskill areas that may not be directly connected to the academic standards, and determine which areas need specialized instruction through the IEP. Data Analysis, continued
  • 31.
     Just asa review, we have already talked about:  Identifying critical standards  Collecting/analyzing data relative to the student’s current academic performance  Collecting/analyzing data relative to the student’s functional performance  Identifying instructional need  Present Level Statements Let’s review…
  • 32.
    Assignment: 1. Review theselected objective for English Language Arts 2. Make notes of critical expectations 3. Document the student’s current skills and knowledge specific to the objective 4. Conduct an analysis of data using the process we have just been talking about and document results Practice Data Analysis Activity 3.2
  • 33.
    Impact Statement Answers thequestion of how the child's exceptionality affects (impacts) his/her involvement and progress in the general education curriculum. • Discuss learner characteristics and examine how the characteristics affect student learning. • Do not use student’s exceptionality to explain how the disability/giftedness affects involvement/ progress in the general curriculum. 33
  • 34.
    Learner Characteristics Consider thelearner characteristics typical of the student’s exceptionality and through observation how these characteristics may affect progress in learning the content state standard.
  • 35.
  • 36.
    Examples of Learner Characteristics •Easily distracted • Difficulty processing information in specific ways • Difficulty organizing materials/time • Difficulty completing written tasks • Difficulty with problem-solving
  • 37.
    What is aGap Analysis? A gap analysis is used to measure the difference between the student's current levels of performance and grade-level content standard expectations.
  • 38.
    Karen’s Impact Statement Karen’sdeficit in reading fluency causes her to have difficulties in summarizing and identifying the main idea of a text. This adversely affects her in classes when she has to read lengthy text materials, summarize them, and provide central idea of a text. What areas are affected due to the exceptionality? How does the student’s exceptionality impact the student’s involvement in the general education curriculum? What academic areas are impacted due to the exceptionality? 38
  • 39.
    Sample Impact Statements Eli’stendency to reverse numbers will impact his ability to accurately write numbers and will also impact computation/problem solving in mathematics. Samantha’s difficulties with reasoning skills affect her ability to draw inferences from literary and informational passages and impact all other academic areas.
  • 40.
    Sample Impact Statements Ann’sdisability in the areas of auditory processing an auditory memory cause her to have difficulty processing problems and remembering information presented orally. This impacts her ability to follow multi-step directions, to comprehend and recall complex concepts. This also impacts her academic success with oral presentations in all instructional settings, reading, written language, and math, and to a lesser degree, science and social studies.
  • 41.
    Jane’s exceptional intellectualability and achievement as shown in Part V Assessment Data indicates that she may be under- challenged in the grade-level content instruction normally provided in the general education classroom. This impacts her educational progress in that she may need grade-level curriculum enriched to include more depth and complexity. Sample Impact Statements
  • 42.
    Unacceptable Impact Statements Whatis missing? • Lisa has difficulty organizing her materials and beginning assignments because she has an attention deficit disorder. • Ethan’s learning disability impacts his phonemic awareness.
  • 43.
  • 44.
    Develop Present Levels ofAcademic Achievement and Functional Performance Choose content standard and objective(s) Write measurable goals and objectives • Collect Data • Identify Strengths • Identify Needs • Develop Impact Statement • What standard(s) and objective(s) best address the gap? • What standard(s) and objective(s) are critical for accelerating student learning? • Develop 4-Point Goal • In what length of time (Timeframe) • Under what context (Conditions) • The student (Who) - Will do what (Behavior) • Through what assessment (Evaluation) - To what degree/level (Criterion) • Accommodations/Modifications/Specially Designed Instruction
  • 45.
    Step 4:Develop PresentLevels of Academic Achievement and Functional Performance The present level provides a summary of baseline information that indicates the student’s academic achievement on specific standards or skills. The present level must be data-based. Components of Present Levels: • Grade-level expectations • Strengths • Needs • How the student’s exceptionality affects involvement/progress in the general education curriculum (for preschool children, how the disability affects the child’s participation in age- appropriate activities). • Impact Statement DO NOT use the student’s eligibility to explain how the exceptionality affects involvement/progress in the general education curriculum! Remember: the present levels of academic achievement and functional performance set the stage for developing IEP goals!
  • 46.
    Present Levels ofAcademic Achievement and Functional Performance (PLAAFP) (1) “. . .a statement of the child’s present levels of academic and functional performance, including— (i) how the child’s disability affects the child’s involvement and progress in the general education curriculum (i.e., the same curriculum as for nondisabled children);…..” §300.320(a)(1)
  • 47.
     Part I Description of what the student can do; strengths, based on general curriculum expectations  Part II  Conversation to identify the gaps in skills/knowledge associated with the exceptionality Present Level & the IEP: A Two-Step Process
  • 48.
    Present Levels ofAcademic Achievement and Functional Performance Present levels must be: • Measurable—use terms that are observable, specific, and based on evidence • Understandable—use clear language that can be understood by all members of the IEP Team
  • 49.
    Subjective Statements ObjectiveStatements Richie talks too much. Richie interrupts the teacher during classroom discussions with verbal outbursts Stephanie did not turn in her homework assignments. Stephanie did not turn in her homework assignments 17 out of 20 times this grading period resulting in a grade of “Incomplete” in Math I. Tom has difficulty writing a summary. On 50% of his assignments related to summarizing a passage, Tom will list the main idea instead of providing a summary. Objective vs. Subjective Statements Activity 3.5
  • 50.
    Components of PresentLevels of Academic Achievement and Functional Performance 1. Strengths 2. Needs 3. Impact statement
  • 51.
    PLAAFP: Component 1 Strengthsmust be specific to the knowledge/skills that are needed to learn grade level standards. Strengths may include: • Skills related to the state standard(s) • Student’s response to learning strategies • Successful Core, Targeted and Intensive Instruction interventions or accommodations
  • 52.
    PLAAFP: Component 2 Needsshould focus on the skill sets the student requires to access and make progress in general education curriculum. The student’s needs will inform the IEP Team which measurable annual goals to develop.
  • 53.
    PLAAFP: Component 3 ImpactStatement: Answers the question of how the child's exceptionality affects (impacts) his/her involvement and progress in the general education curriculum. • Discuss learner characteristics and examine how the characteristics affect student learning. • Do not use student’s exceptionality to explain how the exceptionality affects involvement/ progress in the general curriculum. 54
  • 54.
    On the IEP: The Present Level Statements must include:  Academic and functional performance: strengths, needs and data sources  Affect of the exceptionality in the general education curriculum - The Impact Statement for preschool children, the affect on participation in age appropriate activities Putting it All Together, continued…
  • 55.
     Strengths: Student’s responseto:  Learning strategies  Accommodations  Interventions  Standards instruction Ask…What have we learned about this student’s academic skills and knowledge? Putting it All Together, continued…
  • 56.
     Needs: Focus onneeds that affect progress in the general education curriculum  progress in learning grade-level standards Ask…What prerequisite skills/knowledge does the student need to close the gap between his/her Present Level and the grade-level content standards? Putting it All Together, continued…
  • 57.
    • Use up-to-datedescriptive data: Cory reads 24 wpm, while the benchmark for 2nd graders in the regular curriculum is 60-80 wpm. Cory can say 5 out of 10 short and long vowel sounds. He cannot read multi-syllabic words. Academic Performance Example
  • 58.
     Student’s:  social/emotional(behavioral) performance  communication skills  performance in areas of recreation/leisure, self- management, independent living, etc. Ask…“ What have we learned about this student’s ability to function independently and appropriately with peers and adults?” Functional Performance
  • 59.
     Use up-to-datedescriptive data: In a classroom observation, Cory sat quietly in his seat for 10 minutes. At the 10-minute mark, he began to look around the room, followed by twirling his pencil and playing with his paper. When placed with a partner to complete his work, he was able to remain on task and complete the assignment… Functional Performance Example
  • 60.
     How doesthe disability affect performance?  Consider how it affects progress in learning the grade-level content standards – the Impact Statement. Performance in the General Education Curriculum
  • 61.
     Do notuse the student’s exceptionality to explain how the disability/advanced learning affects involvement/progress in the general education curriculum when developing the Impact Statement.  What not to write: Marley’s learning disability affects his progress in the general curriculum.  What to write: Marley’s weakness in applying strategies, such as making inferences and complex predictions, affect his progress in comprehending sixth-grade literary materials. Caution
  • 62.
  • 63.
    Rosie has troublecontrolling her behavior. She gets easily upset when interacting with peers and does not take direction from authority. Once off task it is really hard to reengage her. Can you improve this Present Level statement? Activity 3.7
  • 64.
    Rosie enjoys socializingwith peers, and will play cooperatively with them some of the time. Her teacher reports that more often, Rosie is off task and interacts inappropriately with her peers. Observations of Rosie indicated that when interacting with peers, Rosie became upset (cried, threw material, left the group) 55% of the time within the first five minutes of a group activity. Once off task, it took up to 20 minutes for her to reengage in the activity. One way…
  • 65.
     Rosie hasimproved in mathematics since last year. She can add and subtract and do some multiplication. She has difficulties solving word problems. Rosie currently has a grade of 71% in math. Putting it all together Activity 3.7 (Continued)
  • 66.
    Curriculum Based Assessmentsindicate Rosie can add and subtract within 100 to solve one-step words problems, involving “adding to”, “taking from”, etc. She has memorized the multiplication facts for 0 – 5 and 10. She is able to use a multiplication table for facts she does not have memorized. Classroom assessments demonstrate that Rosie can apply the correct operation when presented with the terms or symbols for “multiply”, and “divide”. Rosie cannot describe a context in which a total number of objects can be expressed as a multiplication problem, such 35 = 5 groups of 7 objects. She is not able to interpret a multiplication equation as a comparison when given word problem, such as: “A pack of pencils costs 9 times as much as a single pencil, which costs 5 cents. How much is a pack?” Rosie’s disability impacts her ability to use multiplication equations to solve real world problems. One way…
  • 67.
    Review of PresentLevel Statements 1. Are they related to the vision (desired outcome) for this student? 2. Do they reflect what the student knows in relation to the general curriculum or standards expectations? 3. Are they stated in measurable terms? 4. Do they include strengths, needs, and exceptionality affect on access to the general curriculum? 5. Are they self-explanatory?
  • 68.
    Review of Stepsto Develop PLAAFP 1. Review NxGCSOs for student’s grade level 2. Review various data sources to determine the student’s strengths and needs 3. Determine what the priorities are for the student in relation to the grade-level standards 4. After the strengths and priority needs have been identified, now write the Present Levels statement for each relevant area
  • 69.
    PLAAFP Reading Example-Grade4 Strengths Sally can identify 1-2 details from text read. She can identify the main idea when reading content area passages. She can verbally explain events in chronological order. She can compare and contrast events from text using a Venn diagram. Needs However, Sally is unable to write a complete summary and will often add her opinion. She has difficulty identifying author’s evidence or purpose in text read, she only states why she likes the text. In addition, Sally can not determine the cause or effect of a situation. Impact Statement Sally’s inability to understand key components of reading literature affects her progress in the 4th grade general education curriculum.
  • 70.
    PLAAFP Phrase Examples VagueVerb Phrases Specific Verb Phrases Received a math score of 90 Can count to 25 Knows his letters Can verbally identify 23/26 letters Can add Using a calculator, solves double-digit addition problems Expressive language is at 27 Communicates wants and needs in 2- 3 word sentences Can read Can locate 2 -3 details in a reading selection Knows fractions Can reduce equivalent fractions Can measure Can accurately use various types of measurement tools such as rulers, weights, and volume (liters)
  • 71.
    Present Levels: Instructionaland Grade Levels It is critical that the PLAAFP and annual goals include both the instructional AND grade levels. Why? 1. Instructional level alone does not meet the criteria of the general education curriculum. 2. Grade level alone does not meet the criteria of an IEP based on identified skill deficits.
  • 72.
    Present Levels: Instructionaland Grade Level • The two levels together (instructional and grade) allow the student to make progress in the general education curriculum, while also addressing skill deficits (needs).
  • 73.
    Present Levels: TheEnd Result Instructional Level and Grade Level The information then translates into content for goals and specially designed instruction in order for the student to work toward mastery in the general education curriculum. 74
  • 74.
    Present Level Remember… The PresentLevels of Academic Achievement and Functional Performance set the stage for developing IEP goals!
  • 76.