Serving customized success in Information Technology since 1994
220 Davidson Avenue.
3rd Floor, Suite 318
Somerset, New Jersey
08873
 info@satnam.com
 +1-732-961-8383
Fax- +1-732-783-0414
2
“…This relationship is beyond business…. many companies promise to deliver the same as SDS does but none
of them have the demonstrated ability of commitment and capability to truly partner with our business plans
for success.”
Scott Bauer
(Resource Director IT Services pioneer)
PARTNERSHIP FOR A
BETTER TOMORROW
Satnam Data Systems, Inc. (SDS) is an IT company with an impeccable
record of deliveries spanning various verticals. We provide a broad range of
Technology Consulting, Professional and Outsourcing services with a client
base consisting of Fortune500 and mid-size companies and government
installations that are diversified in size, geography and industry.
SDS shares over two decades of expertise in successful deployment of IT
projects and meeting the talent needs for companies for high quality IT
resources through staff augmentation, contractual staffing and managed
services program.
And…SDS is a Minority Woman owned Small Business Enterprise
(MBE/WBE/SBE)
3
TAKE A LEAD WITH
OUR STAFFING
SERVICES
SDS considers itself a leader in providing IT services through “Project
Staffing Division” by hiring and staffing its organization with experienced
and accomplished employees and consultants.
Project Staffing Services involves the provision of SDS’s skilled IT
professionals that are integrated with the clients’ in-house team for short
or long term projects. Under this arrangement, the client is responsible for
the management of our consultants to ensure the success of the project.
SDS will ensure the work performed meets and exceeds the client’s
needs. We offer a broad range of computer consulting services
nationwide. SDS brings a world of resources to the full range of our
clients’ information systems challenges. Whether it is an upgrade of
existing system with new capabilities, reconfiguration of a system to
perform additional tasks, or implementation of an entirely new system, we
will provide the client with the very latest technological skills and solutions.
SDS provides consultation and development services for a wide range of
technical environments and functional business areas.
4
GET AN EDGE WITH
OUR PROJECT
SOLUTIONS SERVICES
At SDS, we have had great success with staffing supplementation,
while at the same time keeping up with industry trends and clients’
demand, our “Project Solution Division” offers perfect collaborative
and full project outsourcing solution. Our goal is to leverage our
employees to provide quality staffing and cost-effective outsourcing. We
have invested in experience proven leadership, process development
and facilities to support our initiative. As a result SDS has the
capabilities to provide “world class” IT Project Development services
with Risk Control either On-site, Offsite or Offshore through various
strategic alliance partners.
Our service offerings include:
Offsite Development:
Solutions Delivery Services provides complete turnkey solutions to
client’s problems including, undertaking feasibility studies, requirement
assessment and analysis, selection hardware platform, software design
and development, installation, implementation, maintenance and
support.
Offshore Development:
This model best suits projects with a well-defined 'Project Plan'. Onsite
PMs from SDS interact on a regular basis with the client to manage the
requirements for outsourcing. In certain cases, the PM is located
offshore and establishes regular communications through fax,
telephone and email. Maintenance projects, porting requirements and
application development to well defined specifications are some of the
engagements that are typically delivered in an offshore mode.
5
OFFERINGS FROM
OUR PROJECT
SOLUTIONS DIVISION
Big Data and Analytics Solutions
“Big Data is a moving target; what is considered to be “Big” today will not be so years ahead.”
The boon of e-commerce is an ocean of opportunities for many ideas to take
a form. An idea became a business, a business became an organization, an
organization become a community and a community made up a world of its
own. At every crucial moment, one attribute played a key factor in making
executive decisions. An attribute called Data. Until 2001, data scientists were
constantly encountering limitations in methodologies to analyze, evaluate
and determine a concise result from the unique set of algorithms applied to
the vast data.
An opportunity in disguise, Big Data has now become a substantial part of
organizational strategy and in years to come, it will continue to foster the
demands of many. SDS has been around for two decades and has adopted
to offer the IT industry with solutions to help organizations unleash the
potential of the current market trends.
SDS offers organizations a mix of experienced insights and in-depth
strategies to create a bridge for organizations to tap on the potential of Big
Data to create a more robust and dynamic environment of change and
realization.
Cloud services
Cloud Computing represents the biggest disruptive trend in computing this
decade. SDS is well poised to become a transformation partner for large
enterprises who are envisaging their journey in the cloud computing space by
virtue of unparalleled competencies and capabilities with rich customer
experience in Cloud engagements.
Key services offered by SDS: Cloud Strategy & Consulting, Cloud
6
Business Intelligence
Data overload is a common problem most companies face, especially due
to the Internet revolution and wireless innovations. Today, companies are
finding themselves being inundated with terabytes of new customer
information every year. SDS can help you translate data streams into smart
management tools. SDS builds and maintains large data warehouses,
infrastructure, and business intelligence platforms utilizing our experience in
finance, customer risk management, billing, marketing, customer support,
and operations. Through our affiliate, Knowledge Solutions, we deliver
enterprise-wide information management solutions that enable executives
and decision makers to make timely and informed business and strategy
decisions by integrating technology with business processes and policies.
OFFERINGS FROM
OUR PROJECT
SOLUTIONS DIVISION
7
Database Services
SDS provides our clients with first-class database support, design and
administration. We boast extensive experience in relational database
management systems (DBMS) such as Oracle, DB2, SQL Server and
Informix on UNIX, VAX VMS, zOS and Microsoft platforms. SDS's
database consulting services include database design, re-design,
enterprise & departmental database modeling, consolidation,
performance tuning, corporate repository implementation and data
warehouse implementation. We also provide software package
evaluation and transition for clients that rely heavily on packaged
solutions. Architecting and supporting a database can be both
complicated and time consuming. Fortune 1000 companies turn to SDS
for our database expertise we provide professional quality results that are
timely and cost effective. We welcome the opportunity to discuss your
company's specific needs, and how we can make the data work more
effectively.
OFFERINGS FROM
OUR PROJECT
SOLUTIONS DIVISION
8
OFFERINGS FROM
OUR PROJECT
SOLUTIONS DIVISION
JAVA Solutions
Effectively combines tools, services, and expertise into a practical
solution for implementing Automated Error Prevention throughout your
entire Java development cycle. SDS solutions for Java seamlessly
incorporate error prevention tools, methodologies, and services into the
Java development process, ensuring that the software you produce
works. They fit into any development process with a minimum of
disruption. They improve how organizations build software by placing a
transparent layer on top of key development processes, allowing error
prevention and monitoring techniques to be integrated into the full
production lifecycle of any software development project. Every role
and task in the Java software development lifecycle is identified and
brought under an automated process that uses source control and build
systems in conjunction with proven techniques, which include coding
standards, unit testing, and regression testing to prevent development
and testing errors. SDS enhances these proven techniques by
implementing a fully automated solution organized around the main
roles in Java software development. Each of these roles Developers,
Architects, and Project Managers is equipped with the tools and
procedures that enable active participation in the prevention of errors
throughout the entire software development lifecycle.
9
OFFERINGS FROM
OUR PROJECT
SOLUTIONS DIVISION
Microsoft .Net Solutions
We offer expertise in every stage of SDLC incorporating an array of
technologies under .NET umbrella. We develop application in most
common flavors of .NET which are VB.NET and C#.NET in conjunction
with ASP.NET and ADO.NET right from .NET 1.0 to the most current
.NET 3.0 versions. We have executed turnkey development projects
using .NET framework employing various custom methodologies as well
as Microsoft provided patterns n practices. More than half of .NET
skilled personnel are Microsoft Certified at various levels, from lowest
MCP to the top of the line MCSD. We offer expertise in the latest trends
in .NET employing Windows Communication Foundation and Windows
Presentation Foundation technologies. Our consultants have done
projects on latest Microsoft Platform FOR Microsoft in Seattle work site,
they have expertise is in web based solutions as well as console based
solutions, they have also executed projects that involved creating web
services which are consumed by other third party applications. We have
successfully executed projects that employ Service Oriented
Architecture at its core. We are experts in authoring accessibility
applications in .NET environment for users which fall in legally disabled
category.
10
OFFERINGS FROM
OUR PROJECT
SOLUTIONS DIVISION
Web-based Solutions
We offer our clients a clear and insightful look at the web as a business
tool. SDS works intimately with the clients to determine their objectives and
to develop strategic plans, which further evolve to their business
advantages. We help companies plan, develop, and deploy all the elements
of an e-Business - from commerce and community sites, intranets and
extranets, to web enable applications, and the security infrastructure
required to support them. Our web-based service offerings include:
Strategic Consulting:
There are so many ways in which Internet Technology can help an
organization save or make money, improve the flow of information, and
build stronger relationships. The first step in developing a site or application
is to work with a client to determine their business objectives and decide
which initiatives will provide the maximum value for their investment. Our
visionary tech experts have been serving as guideposts for many
organizations in providing excellent consulting to take their business
forward
11
OFFERINGS FROM
OUR PROJECT
SOLUTIONS DIVISION
Internet Application Development:
SDS’s e-Business Division delivers Leading Edge applications. We
develop public and private Internet applications that enable companies to
simplify, streamline, and automate the flow of information, thus saving
paper, time, and money. We help organizations to successfully leverage
and integrate their existing business critical application/systems so that
they work together to bring a complete, seamless transaction to the
costumer, supplier, or the business partner. SDS e-Business groups works
closely with the client to develop sophisticated user interfaces and designs,
and adds the innovation to turn big ideals into functional realities.
Web Enabled Legacy Systems:
SDS provides consulting services, which help companies to leverage their
investment in legacy systems. We can help you plan, design, and engineer
any Internet based system or solution regardless of your current platform or
configuration. Whether your legacy applications run on an IBM mainframe,
AS/400, VAX or UNIX host, our expert team will help you to seamlessly
integrate your legacy system into a dynamic web or Client/Server
application using your preferred development environment and legacy
integration tools.
12
OFFERINGS FROM
OUR PROJECT
SOLUTIONS DIVISION
Web Site Development:
SDS has experienced developing websites that help companies extend their
reach and meet their business goals. We build successful commerce sites
for business-to-business and/or business-to-costumer transactions. We
develop websites that give an organization a competitive advantage in
critical areas such as marketing, Internet commerce, and costumer
relationship building.
Internet Security:
As we move toward a paperless society, security remains a major concern.
SDS addresses the security concerns of our clients, in terms of both security
issues related to public or private Internet Servers and private LAN/WAN
Internet connectivity. We deliver security solutions, which insure that our
customer’s information stores remain private.
13
OFFERINGS FROM
OUR PROJECT
SOLUTIONS DIVISION
Business Applications
SDS is dedicated to helping organizations successfully develop,
implement and maintain cutting-edge applications. We develop and
maintain applications that deliver desired functions and, above all,
reliability. SDS offers a complete menu of technical capabilities and
end-to-end project management, which ensures that our clients’
application needs are always met, on time and within budget. Our
focus and scalable, flexible, multi- tiered systems in client/server, web,
and legacy systems, provides our clients with the robust application
needed to support their complex business environments. SDS’s
specialized staff has the demonstrated ability to design and deliver
solutions with meaningful business impact. Our expert personnel bring
a spirit of innovation to every assignment and a dedication to
developing cost-effective solutions that help keep our clients at the
forefront of their respective industries. Each of our developers has a
solid technical foundation complimented by strong analytical,
communication and interpersonal skills. Our development and
implementation teams offer practical, efficient, and cost-effective best
practices that enable business change. Balancing technical and
functional business experience, our consultants work side-by-side with
the client team, ensuring that the application solution most clearly
meets the client’s exact requirements for continued business process
improvements.
14
For more information, visit us at:
www.satnam.com

Satnam Data Systems Inc.

  • 1.
    Serving customized successin Information Technology since 1994 220 Davidson Avenue. 3rd Floor, Suite 318 Somerset, New Jersey 08873  info@satnam.com  +1-732-961-8383 Fax- +1-732-783-0414
  • 2.
    2 “…This relationship isbeyond business…. many companies promise to deliver the same as SDS does but none of them have the demonstrated ability of commitment and capability to truly partner with our business plans for success.” Scott Bauer (Resource Director IT Services pioneer) PARTNERSHIP FOR A BETTER TOMORROW Satnam Data Systems, Inc. (SDS) is an IT company with an impeccable record of deliveries spanning various verticals. We provide a broad range of Technology Consulting, Professional and Outsourcing services with a client base consisting of Fortune500 and mid-size companies and government installations that are diversified in size, geography and industry. SDS shares over two decades of expertise in successful deployment of IT projects and meeting the talent needs for companies for high quality IT resources through staff augmentation, contractual staffing and managed services program. And…SDS is a Minority Woman owned Small Business Enterprise (MBE/WBE/SBE)
  • 3.
    3 TAKE A LEADWITH OUR STAFFING SERVICES SDS considers itself a leader in providing IT services through “Project Staffing Division” by hiring and staffing its organization with experienced and accomplished employees and consultants. Project Staffing Services involves the provision of SDS’s skilled IT professionals that are integrated with the clients’ in-house team for short or long term projects. Under this arrangement, the client is responsible for the management of our consultants to ensure the success of the project. SDS will ensure the work performed meets and exceeds the client’s needs. We offer a broad range of computer consulting services nationwide. SDS brings a world of resources to the full range of our clients’ information systems challenges. Whether it is an upgrade of existing system with new capabilities, reconfiguration of a system to perform additional tasks, or implementation of an entirely new system, we will provide the client with the very latest technological skills and solutions. SDS provides consultation and development services for a wide range of technical environments and functional business areas.
  • 4.
    4 GET AN EDGEWITH OUR PROJECT SOLUTIONS SERVICES At SDS, we have had great success with staffing supplementation, while at the same time keeping up with industry trends and clients’ demand, our “Project Solution Division” offers perfect collaborative and full project outsourcing solution. Our goal is to leverage our employees to provide quality staffing and cost-effective outsourcing. We have invested in experience proven leadership, process development and facilities to support our initiative. As a result SDS has the capabilities to provide “world class” IT Project Development services with Risk Control either On-site, Offsite or Offshore through various strategic alliance partners. Our service offerings include: Offsite Development: Solutions Delivery Services provides complete turnkey solutions to client’s problems including, undertaking feasibility studies, requirement assessment and analysis, selection hardware platform, software design and development, installation, implementation, maintenance and support. Offshore Development: This model best suits projects with a well-defined 'Project Plan'. Onsite PMs from SDS interact on a regular basis with the client to manage the requirements for outsourcing. In certain cases, the PM is located offshore and establishes regular communications through fax, telephone and email. Maintenance projects, porting requirements and application development to well defined specifications are some of the engagements that are typically delivered in an offshore mode.
  • 5.
    5 OFFERINGS FROM OUR PROJECT SOLUTIONSDIVISION Big Data and Analytics Solutions “Big Data is a moving target; what is considered to be “Big” today will not be so years ahead.” The boon of e-commerce is an ocean of opportunities for many ideas to take a form. An idea became a business, a business became an organization, an organization become a community and a community made up a world of its own. At every crucial moment, one attribute played a key factor in making executive decisions. An attribute called Data. Until 2001, data scientists were constantly encountering limitations in methodologies to analyze, evaluate and determine a concise result from the unique set of algorithms applied to the vast data. An opportunity in disguise, Big Data has now become a substantial part of organizational strategy and in years to come, it will continue to foster the demands of many. SDS has been around for two decades and has adopted to offer the IT industry with solutions to help organizations unleash the potential of the current market trends. SDS offers organizations a mix of experienced insights and in-depth strategies to create a bridge for organizations to tap on the potential of Big Data to create a more robust and dynamic environment of change and realization. Cloud services Cloud Computing represents the biggest disruptive trend in computing this decade. SDS is well poised to become a transformation partner for large enterprises who are envisaging their journey in the cloud computing space by virtue of unparalleled competencies and capabilities with rich customer experience in Cloud engagements. Key services offered by SDS: Cloud Strategy & Consulting, Cloud
  • 6.
    6 Business Intelligence Data overloadis a common problem most companies face, especially due to the Internet revolution and wireless innovations. Today, companies are finding themselves being inundated with terabytes of new customer information every year. SDS can help you translate data streams into smart management tools. SDS builds and maintains large data warehouses, infrastructure, and business intelligence platforms utilizing our experience in finance, customer risk management, billing, marketing, customer support, and operations. Through our affiliate, Knowledge Solutions, we deliver enterprise-wide information management solutions that enable executives and decision makers to make timely and informed business and strategy decisions by integrating technology with business processes and policies. OFFERINGS FROM OUR PROJECT SOLUTIONS DIVISION
  • 7.
    7 Database Services SDS providesour clients with first-class database support, design and administration. We boast extensive experience in relational database management systems (DBMS) such as Oracle, DB2, SQL Server and Informix on UNIX, VAX VMS, zOS and Microsoft platforms. SDS's database consulting services include database design, re-design, enterprise & departmental database modeling, consolidation, performance tuning, corporate repository implementation and data warehouse implementation. We also provide software package evaluation and transition for clients that rely heavily on packaged solutions. Architecting and supporting a database can be both complicated and time consuming. Fortune 1000 companies turn to SDS for our database expertise we provide professional quality results that are timely and cost effective. We welcome the opportunity to discuss your company's specific needs, and how we can make the data work more effectively. OFFERINGS FROM OUR PROJECT SOLUTIONS DIVISION
  • 8.
    8 OFFERINGS FROM OUR PROJECT SOLUTIONSDIVISION JAVA Solutions Effectively combines tools, services, and expertise into a practical solution for implementing Automated Error Prevention throughout your entire Java development cycle. SDS solutions for Java seamlessly incorporate error prevention tools, methodologies, and services into the Java development process, ensuring that the software you produce works. They fit into any development process with a minimum of disruption. They improve how organizations build software by placing a transparent layer on top of key development processes, allowing error prevention and monitoring techniques to be integrated into the full production lifecycle of any software development project. Every role and task in the Java software development lifecycle is identified and brought under an automated process that uses source control and build systems in conjunction with proven techniques, which include coding standards, unit testing, and regression testing to prevent development and testing errors. SDS enhances these proven techniques by implementing a fully automated solution organized around the main roles in Java software development. Each of these roles Developers, Architects, and Project Managers is equipped with the tools and procedures that enable active participation in the prevention of errors throughout the entire software development lifecycle.
  • 9.
    9 OFFERINGS FROM OUR PROJECT SOLUTIONSDIVISION Microsoft .Net Solutions We offer expertise in every stage of SDLC incorporating an array of technologies under .NET umbrella. We develop application in most common flavors of .NET which are VB.NET and C#.NET in conjunction with ASP.NET and ADO.NET right from .NET 1.0 to the most current .NET 3.0 versions. We have executed turnkey development projects using .NET framework employing various custom methodologies as well as Microsoft provided patterns n practices. More than half of .NET skilled personnel are Microsoft Certified at various levels, from lowest MCP to the top of the line MCSD. We offer expertise in the latest trends in .NET employing Windows Communication Foundation and Windows Presentation Foundation technologies. Our consultants have done projects on latest Microsoft Platform FOR Microsoft in Seattle work site, they have expertise is in web based solutions as well as console based solutions, they have also executed projects that involved creating web services which are consumed by other third party applications. We have successfully executed projects that employ Service Oriented Architecture at its core. We are experts in authoring accessibility applications in .NET environment for users which fall in legally disabled category.
  • 10.
    10 OFFERINGS FROM OUR PROJECT SOLUTIONSDIVISION Web-based Solutions We offer our clients a clear and insightful look at the web as a business tool. SDS works intimately with the clients to determine their objectives and to develop strategic plans, which further evolve to their business advantages. We help companies plan, develop, and deploy all the elements of an e-Business - from commerce and community sites, intranets and extranets, to web enable applications, and the security infrastructure required to support them. Our web-based service offerings include: Strategic Consulting: There are so many ways in which Internet Technology can help an organization save or make money, improve the flow of information, and build stronger relationships. The first step in developing a site or application is to work with a client to determine their business objectives and decide which initiatives will provide the maximum value for their investment. Our visionary tech experts have been serving as guideposts for many organizations in providing excellent consulting to take their business forward
  • 11.
    11 OFFERINGS FROM OUR PROJECT SOLUTIONSDIVISION Internet Application Development: SDS’s e-Business Division delivers Leading Edge applications. We develop public and private Internet applications that enable companies to simplify, streamline, and automate the flow of information, thus saving paper, time, and money. We help organizations to successfully leverage and integrate their existing business critical application/systems so that they work together to bring a complete, seamless transaction to the costumer, supplier, or the business partner. SDS e-Business groups works closely with the client to develop sophisticated user interfaces and designs, and adds the innovation to turn big ideals into functional realities. Web Enabled Legacy Systems: SDS provides consulting services, which help companies to leverage their investment in legacy systems. We can help you plan, design, and engineer any Internet based system or solution regardless of your current platform or configuration. Whether your legacy applications run on an IBM mainframe, AS/400, VAX or UNIX host, our expert team will help you to seamlessly integrate your legacy system into a dynamic web or Client/Server application using your preferred development environment and legacy integration tools.
  • 12.
    12 OFFERINGS FROM OUR PROJECT SOLUTIONSDIVISION Web Site Development: SDS has experienced developing websites that help companies extend their reach and meet their business goals. We build successful commerce sites for business-to-business and/or business-to-costumer transactions. We develop websites that give an organization a competitive advantage in critical areas such as marketing, Internet commerce, and costumer relationship building. Internet Security: As we move toward a paperless society, security remains a major concern. SDS addresses the security concerns of our clients, in terms of both security issues related to public or private Internet Servers and private LAN/WAN Internet connectivity. We deliver security solutions, which insure that our customer’s information stores remain private.
  • 13.
    13 OFFERINGS FROM OUR PROJECT SOLUTIONSDIVISION Business Applications SDS is dedicated to helping organizations successfully develop, implement and maintain cutting-edge applications. We develop and maintain applications that deliver desired functions and, above all, reliability. SDS offers a complete menu of technical capabilities and end-to-end project management, which ensures that our clients’ application needs are always met, on time and within budget. Our focus and scalable, flexible, multi- tiered systems in client/server, web, and legacy systems, provides our clients with the robust application needed to support their complex business environments. SDS’s specialized staff has the demonstrated ability to design and deliver solutions with meaningful business impact. Our expert personnel bring a spirit of innovation to every assignment and a dedication to developing cost-effective solutions that help keep our clients at the forefront of their respective industries. Each of our developers has a solid technical foundation complimented by strong analytical, communication and interpersonal skills. Our development and implementation teams offer practical, efficient, and cost-effective best practices that enable business change. Balancing technical and functional business experience, our consultants work side-by-side with the client team, ensuring that the application solution most clearly meets the client’s exact requirements for continued business process improvements.
  • 14.
    14 For more information,visit us at: www.satnam.com