RESUME
JAIPRAKASH U. GUPTA
Address: S/O UPENDRAPRASAD GUPTA Email Id: j.p.gupta@hotmail.com
Rajur colliery, Q.No:- 36, D-5, Contact No.: +91-7620792238 (P)
Tah: - Wani, Dist: - Yavatmal. +91-7096029508 (W)
Maharashtra, Pin code: - 445303. PASSPORT No.: K 8 1 9 1 3 8 3
CARIEER OBJECTIVES:
Seeking full time career with an organization, which will permit me to use and contribute my abilities and Skill in any
field to contribute towards its growth by knowledge, committed and high quality work.
KEY ROLE / SKILL:
Jr. Electrical Engineer, Signal and Telecom Engineer, MEP Engineer, Service Engineer, Project Engineer,
Site Incharge, Site Engineer, Supervisor, Planning, Design, Engineering, Supply, Government liaisoning,
Operation & Maintenance, Services, Installation & Commissioning, Load Calculation, Wiring & Cable
Laying, Lighting, Transformers, CT,PT, D.G. Operation, Earthing, Distribution, Estimation, Costing, HVAC.
WORK EXPERIENCE:
TOTAl EXPERIENCE: 4 Years
Name of Organization Kalindee Rail Nirman Engineers Limited
Duration April – 2015 till Present.
Designation Junior Engineer ( Electrical )
Location Palanpur , Gujarat
Job Profile 1) Planning for designing, site execution for smooth project management.
2) Prepare Estimation and requirement list to execute the work.
3) Evaluation of Drawings, Cable root plans, Track bonding plan, SIP, Cable
corage plan, Track crossing plan upto 11 KV.
4) Getting Sub-Contractors to carry execution work at site.
5) Filling of Measurement books for payment from client and payment to
contractors. Also Prepare bill of quantities of executed work.
6) Managing a team of 15 – 20 consisting of engineers, supervisors,
technicians & Workers.
7) Correspondence with clients and contractors to solve day to day issues.
Project G – BPQ Signaling (Gondia) and General Electrical ( Sarotra Rd – Palanpur)
Name of Organization Bhate and Raje Construction Company Pvt. Ltd.
Duration March – 2014 to April – 2015
Designation Jr. Electrical Engineer ( Project )
Location Pune.
1
Job Profile 1) Uses various equipment and tools to manage the design, construction
and maintenance of various electrical systems and components, including
power distribution and telecommunications, in buildings and structures.
2) Use computer-assisted engineering and design software and equipment
to perform assignments.
3) Applies certain creativity, latitude, principles, experience, judgment to plan
and techniques of electrical engineering to accomplish goals.
4) Performs the evaluation and inspection of electrical engineering projects
to ensure that standards and requirements are met.
5) Prepares, maintains and reviews technical documentation, such as
drawings and specifications, for electrical engineering projects.
6) Follows applicable building codes and safety regulations.
7) Advise and trains others to detect issues & problems and take proper
action to eliminate them.
8) Maintain proper records for material, fault and other technical details, so
that can be review and preplanning could be done.
9) Perform periodical test to ensure that the system is stable and safe.
10) Create maintenance schedule for routine maintenance.
Project
Cummins India Limited
Name of Organization Nissar Transformers Pvt. Ltd.
Duration October – 2013 to March – 2014
Designation Service Engineer ( Maintenance Department )
Location Pune.
Job Profile 1) Provides on-site assistance and performs the installation & start-up
2) Testing servicing of transformer, OLTC and other equipments on site.
3) OLTC to RTCC connection, Oil filtration, testing and leakage attend.
4) Identifies faults and takes inspection to determine source of problem, and
recommends repair, replacement, or other corrective action.
5) Attends service call and provide through services, participates in job site
final walk-through on assigned jobs and completes all job closeout
documentation, maintain records of performance reports
6) Analyzes reports of technical problems to determine trends affecting
future design, production, service, and maintenance processes
7) Report generation, Quotation Preparation, Cold callings for service,
maintaining & arrangement of tools, vehicles, manpower, material etc.
8) Support other team members to achieve the common goal.
Name of Organization PINNACLE ENGINEERING SOLUTION (INDIA) PVT. LTD.
Duration June 2012 to September 2013.
2
Designation Project Engineer (Electrical)
Location Pune
Job Profile 1) Planning, Design, Engineering, Estimation, Costing, Supply, Government
liaisoning, Operation, Maintenance, Services, Installation & Commissioning.
2) Delibrations, Supervision, Report generation, Feedback to staffs /
superior about particular type of work.
3) Contractor Management, PO generation, Dealing with MSEB, Distribution
and Transmission Staff.
4) Creating and maintaining client relation, Marketing, Activities related to
growth and development of company.
5) Purchasing of material, Bill preparation and submission.
6) Maintaining daily work records and General support to other employees.
Project Open Access, Modification of existing switchyard to add ABT main & check
meter and CT/PT units of 22KV, 33KV.
INDUSTRIAL TRAINING AND VISIT:
 Training for 15 days in the Super Thermal Power Station, Chandrapur.
 Visited the HVDC terminal, Chandrapur.
TECHNICAL SKILLS:
Programming language PLC (Allen Bradley, Siemens), C Language
Operating System Windows 98, XP, Vista, Win 7, Win 8, Win 10
Software Knowledge MS Project, AutoCAD, ERP, SCADA, RSLogix 500, SIMATIC 300, MS-Office
ACADMIC QUALIFICATION:
Bachelor Degree in “ELECTRICAL ENGINEERING “ with 56.07% in 2012.
COLLEGE: Government College of Engineering, Chandrapur.
UNIVERSITY: Rashtrasant Tukadoji Maharaj Nagpur University.
Aggregate marks for all semesters 55.51%.
II. SECONDARY AND HIGHER SECONDARY EDUCATION:
Qualification
College /
School
Board/
University
Max
Marks
Marks
Obtained
Percentage
XII
A. N. C. warora,
Chandrapur.
MSBSHSE,
Pune.
600 370
61.67 %
X
K.V. WCL New majri,
Chandrapur.
C.B.S.E. 500 332 66.4 %
PERSIONAL DETAIL:
Personal Profile:
3
Name Jaiprakash U. Gupta
Father’s Name Upendraprasad A. Gupta
Date of Birth 01/ JULY /1989
Gender Male
Marital Status Unmarried
Languages Known English, Hindi & Marathi.
Nationality Indian
Hobbies Watching movies, Tracking & Travelling, Making friends etc.
SKILLS AND STRENGTH:
 Quick learning, Problem solving ability, Positive thinking
 Good grasping capability and understanding the concepts clearly.
 Ability to adjust to the situation, Sense of Responsibility and a very hard worker.
 A Self motivated team player, with excellent confidence & commitment.
 I’m interested in learning as much as I can in whatever I do.
ACHIEVEMENTS & CO-CURRICULAR ACTIVITES:
 Coordinator in PURSUIT 2011 (NATIONAL LEVEL TECHNICAL FESTIVAL).
 Secretary of Electrical Engineering Student Association (EESA) 2008-09.
 Adventure camp in Manali (Himachal Pradesh).
 Participated in National Social Service organised by HELPAGE INDIA.
DECLARATION:
I hereby declare that the above furnished details are true and correct to the best of my knowledge.
Place:
Date:
Jaiprakash U. Gupta
4

Jaiprakash Gupta - Resume

  • 1.
    RESUME JAIPRAKASH U. GUPTA Address:S/O UPENDRAPRASAD GUPTA Email Id: j.p.gupta@hotmail.com Rajur colliery, Q.No:- 36, D-5, Contact No.: +91-7620792238 (P) Tah: - Wani, Dist: - Yavatmal. +91-7096029508 (W) Maharashtra, Pin code: - 445303. PASSPORT No.: K 8 1 9 1 3 8 3 CARIEER OBJECTIVES: Seeking full time career with an organization, which will permit me to use and contribute my abilities and Skill in any field to contribute towards its growth by knowledge, committed and high quality work. KEY ROLE / SKILL: Jr. Electrical Engineer, Signal and Telecom Engineer, MEP Engineer, Service Engineer, Project Engineer, Site Incharge, Site Engineer, Supervisor, Planning, Design, Engineering, Supply, Government liaisoning, Operation & Maintenance, Services, Installation & Commissioning, Load Calculation, Wiring & Cable Laying, Lighting, Transformers, CT,PT, D.G. Operation, Earthing, Distribution, Estimation, Costing, HVAC. WORK EXPERIENCE: TOTAl EXPERIENCE: 4 Years Name of Organization Kalindee Rail Nirman Engineers Limited Duration April – 2015 till Present. Designation Junior Engineer ( Electrical ) Location Palanpur , Gujarat Job Profile 1) Planning for designing, site execution for smooth project management. 2) Prepare Estimation and requirement list to execute the work. 3) Evaluation of Drawings, Cable root plans, Track bonding plan, SIP, Cable corage plan, Track crossing plan upto 11 KV. 4) Getting Sub-Contractors to carry execution work at site. 5) Filling of Measurement books for payment from client and payment to contractors. Also Prepare bill of quantities of executed work. 6) Managing a team of 15 – 20 consisting of engineers, supervisors, technicians & Workers. 7) Correspondence with clients and contractors to solve day to day issues. Project G – BPQ Signaling (Gondia) and General Electrical ( Sarotra Rd – Palanpur) Name of Organization Bhate and Raje Construction Company Pvt. Ltd. Duration March – 2014 to April – 2015 Designation Jr. Electrical Engineer ( Project ) Location Pune. 1
  • 2.
    Job Profile 1)Uses various equipment and tools to manage the design, construction and maintenance of various electrical systems and components, including power distribution and telecommunications, in buildings and structures. 2) Use computer-assisted engineering and design software and equipment to perform assignments. 3) Applies certain creativity, latitude, principles, experience, judgment to plan and techniques of electrical engineering to accomplish goals. 4) Performs the evaluation and inspection of electrical engineering projects to ensure that standards and requirements are met. 5) Prepares, maintains and reviews technical documentation, such as drawings and specifications, for electrical engineering projects. 6) Follows applicable building codes and safety regulations. 7) Advise and trains others to detect issues & problems and take proper action to eliminate them. 8) Maintain proper records for material, fault and other technical details, so that can be review and preplanning could be done. 9) Perform periodical test to ensure that the system is stable and safe. 10) Create maintenance schedule for routine maintenance. Project Cummins India Limited Name of Organization Nissar Transformers Pvt. Ltd. Duration October – 2013 to March – 2014 Designation Service Engineer ( Maintenance Department ) Location Pune. Job Profile 1) Provides on-site assistance and performs the installation & start-up 2) Testing servicing of transformer, OLTC and other equipments on site. 3) OLTC to RTCC connection, Oil filtration, testing and leakage attend. 4) Identifies faults and takes inspection to determine source of problem, and recommends repair, replacement, or other corrective action. 5) Attends service call and provide through services, participates in job site final walk-through on assigned jobs and completes all job closeout documentation, maintain records of performance reports 6) Analyzes reports of technical problems to determine trends affecting future design, production, service, and maintenance processes 7) Report generation, Quotation Preparation, Cold callings for service, maintaining & arrangement of tools, vehicles, manpower, material etc. 8) Support other team members to achieve the common goal. Name of Organization PINNACLE ENGINEERING SOLUTION (INDIA) PVT. LTD. Duration June 2012 to September 2013. 2
  • 3.
    Designation Project Engineer(Electrical) Location Pune Job Profile 1) Planning, Design, Engineering, Estimation, Costing, Supply, Government liaisoning, Operation, Maintenance, Services, Installation & Commissioning. 2) Delibrations, Supervision, Report generation, Feedback to staffs / superior about particular type of work. 3) Contractor Management, PO generation, Dealing with MSEB, Distribution and Transmission Staff. 4) Creating and maintaining client relation, Marketing, Activities related to growth and development of company. 5) Purchasing of material, Bill preparation and submission. 6) Maintaining daily work records and General support to other employees. Project Open Access, Modification of existing switchyard to add ABT main & check meter and CT/PT units of 22KV, 33KV. INDUSTRIAL TRAINING AND VISIT:  Training for 15 days in the Super Thermal Power Station, Chandrapur.  Visited the HVDC terminal, Chandrapur. TECHNICAL SKILLS: Programming language PLC (Allen Bradley, Siemens), C Language Operating System Windows 98, XP, Vista, Win 7, Win 8, Win 10 Software Knowledge MS Project, AutoCAD, ERP, SCADA, RSLogix 500, SIMATIC 300, MS-Office ACADMIC QUALIFICATION: Bachelor Degree in “ELECTRICAL ENGINEERING “ with 56.07% in 2012. COLLEGE: Government College of Engineering, Chandrapur. UNIVERSITY: Rashtrasant Tukadoji Maharaj Nagpur University. Aggregate marks for all semesters 55.51%. II. SECONDARY AND HIGHER SECONDARY EDUCATION: Qualification College / School Board/ University Max Marks Marks Obtained Percentage XII A. N. C. warora, Chandrapur. MSBSHSE, Pune. 600 370 61.67 % X K.V. WCL New majri, Chandrapur. C.B.S.E. 500 332 66.4 % PERSIONAL DETAIL: Personal Profile: 3
  • 4.
    Name Jaiprakash U.Gupta Father’s Name Upendraprasad A. Gupta Date of Birth 01/ JULY /1989 Gender Male Marital Status Unmarried Languages Known English, Hindi & Marathi. Nationality Indian Hobbies Watching movies, Tracking & Travelling, Making friends etc. SKILLS AND STRENGTH:  Quick learning, Problem solving ability, Positive thinking  Good grasping capability and understanding the concepts clearly.  Ability to adjust to the situation, Sense of Responsibility and a very hard worker.  A Self motivated team player, with excellent confidence & commitment.  I’m interested in learning as much as I can in whatever I do. ACHIEVEMENTS & CO-CURRICULAR ACTIVITES:  Coordinator in PURSUIT 2011 (NATIONAL LEVEL TECHNICAL FESTIVAL).  Secretary of Electrical Engineering Student Association (EESA) 2008-09.  Adventure camp in Manali (Himachal Pradesh).  Participated in National Social Service organised by HELPAGE INDIA. DECLARATION: I hereby declare that the above furnished details are true and correct to the best of my knowledge. Place: Date: Jaiprakash U. Gupta 4