Right School Right Place
A Guide to Victorian Government Schools
Enrolling International Students
2015–16
2 Right School Right Place 2014/2015
For information including how to apply
visit our website, www.study.vic.gov.au,
or contact an education agent in
your country.
Department of Education and
Early Childhood Development
International Education Division
Tel:	 +61 3 9637 2990
Fax:	 +61 3 9637 2184
Email:	international@edumail.vic.gov.au
Web:	 www.study.vic.gov.au
Published by the International Education Division
Department of Education and
Early Childhood Development
Melbourne
September 2014
© State of Victoria (Department of Education
and Early Childhood Development) 2014
The copyright in this document is owned by the State of
Victoria (Department of Education and Early Childhood
Development), or in the case of some materials, by
third parties (third party materials). No part may be
reproduced by any process except in accordance with
the provisions of the Copyright Act 1968, the National
Education Access Licence for Schools (NEALS) or
with permission.
An educational institution situated in
Australia which is not conducted for profit,
or a body responsible for administering such
an institution, may copy and communicate
the materials, other than third party materials, for the
educational purposes of the institution.
Authorised by the Department of Education
and Early Childhood Development,
2 Treasury Place, East Melbourne, Victoria, 3002.
ISBN 978-0-7594-0700-8
Accessibility
If you would like to receive this publication in an
accessible format, please telephone 1800 809 834,
or email edline@vic.gov.au
This document is also available on the internet at
www.study.vic.gov.au
1www.study.vic.gov.au
Choosing the right school and right place
opens windows of opportunity for life.
This guide gives education agents, students
and their families information about Victorian
government schools. It includes the educational
advantages all schools offer and unique
features of individual schools. Inside you will
find the key detail needed to help international
students choose the right school and the right
place to achieve their education goals.
Where our stud
shapes our future
2
General information
General information	
–– Welcome	 3
–– About this guide	 4
–– Important information	 6
–– Comparing schools	 8
–– Taking the next step	 10
Location
–– Location of Victorian Government Schools	 12
Profiles
–– Melbourne A-Z	 14
–– Victorian cities (excluding Melbourne)	 106
Subjects
–– VCE subjects by school	 119
–– VET subjects by school	 123
2
3
Through this guide you’ll discover Victorian government schools are exciting,
multicultural places where culture, learning and global friendships are embraced.
No matter which school you decide on, a supportive and diverse education
community awaits.
Victoria has successfully hosted international students over many years. By
enrolling in a Victorian government school, you’ll join students from around 85
countries. Through shared experiences, new ideas and interests, every global
learner makes a special and valued contribution.
The windows of opportunity opened by a quality education are almost endless. In
Victoria, you will benefit from a distinct blend of education, outside school activity,
welfare and support. Some of the advantages that make international students’ time
with us fulfilling and enjoyable include:
	Academic excellence 	English language skill 	University pathways
	Student welfare focus 	Multicultural community 	Great lifestyle choices
Victorian government schools are respected around the world for high education
standards and individual student care. Everyone working in the Victorian education
system is dedicated to creating a positive and enriching environment where
students can achieve their education goals. In Victoria you will be challenged,
encouraged and nurtured along the path to global citizenship.
We wish you every success.
Welcome
We are delighted you are considering study in Victoria.
Right School Right Place is a resource
guide for education agents and
international students planning to
study in Victoria. It contains
information about Victorian
government schools and provides 102
individual school profiles.
About
this guide
4
5www.study.vic.gov.au
Using this Guide
In this publication you will find profiles of accredited Victorian government high
schools, containing information about their location, number of students, special
programs offered, contact details and a brief overview of the school environment.
Using this information, a list of schools can be created that meet a student’s
educational needs, and further research undertaken by visiting school websites.
Finding information
Right School Right Place is divided into four easy-to-follow sections:
Page 2-11 General information
Information about the guide and its use, including contents,
welcome, about this guide, important information,
comparing schools and taking the next step.
Page 12-13 Location
A colour coded map to help quickly find a school in Melbourne or
another Victorian city, complete with cross-reference index to the
map location and school profile page.
Page 14-118 Profiles
Alphabetically ordered, separate summaries for each accredited
school offer a snapshot of what sets the school apart and its
distinctive, nurturing education community.
Page 119-125 Subjects
Each school develops an original curriculum using course units from the
Victorian Certificate of Education and Vocational Education and Training subjects
showcased in these pages. Ask an education agent if a subject area is omitted.
Victoria is Australia’s education state,
recognised worldwide for its high
standards. All Victorian government
schools are committed to providing
international students with an
outstanding education experience and
high levels of personalised support.
Important
information
6
7www.study.vic.gov.au
Access to resources
All international students studying in
Victorian government schools enjoy a
range of advanced education resources.
The Victorian school system offers:
	VCE (Victorian Certificate
of Education) consisting of
subject units that provide
a tertiary pathway
	Victorian School of Languages,
offering tuition in over
40 languages
	English language tuition,
for language proficiency and
VCE studies
	Support services, for student
welfare and personal growth
	Career Resources, offering
students vocational guidance
	Academic, sporting and extra-
curricular learning activities
	VET (Vocational Education
and Training) career oriented
subject units
	AusVELS (Australian curriculum
in Victoria) prep to Year 10
Accreditation
In every Victorian government school,
students gain advantage through unique
learning environments and high
education standards. Accredited schools
participate in a rigorous quality program
to ensure exemplary education, student
support and best education practice.
To achieve and maintain accreditation,
schools demonstrate their quality
education approach through:
•	 Broad school community support for
international students
•	 Record of student achievement from
early school to Year 12
•	 Desire for continued improvement
across all services provided
•	 High levels of student engagement
and teacher satisfaction
•	 Quality academic, accommodation,
welfare and language support
•	 Students successfully transitioning to
preferred tertiary study
Once accredited, schools are involved
in a formal quality assurance system
that revisits accreditation every four
years. A system of measuring outcomes
keeps student performance levels high
and maintains supportive and engaging
learning environments.
All schools published in Right School
Right Place are accredited. Schools are
constantly achieving and renewing their
accreditation, so if your school of
interest is not listed, please contact the
International Education Division.
Study expenses
At some schools, additional costs may
be encountered for optional activities
like camps or private music lessons.
However, in general, international
students should expect to pay for:
•	 Tuition and subject levies
•	 Homestay accommodation
•	 Overseas student health cover
•	 Textbooks and stationery
•	 School uniforms (if applicable)
Tertiary pathways
Most international students plan
to continue their study at university.
Victoria has Australia’s highest school to
university transition rates. So, Victorian
educators are skilled and experienced in
propelling students to this goal.
VCE gives students the choice of
progression to a Victorian university
or tertiary study overseas.
Many features (educators and staff,
location, student numbers, special
programs, community) contribute to the
individual personality of a school.
Victorian government schools provide
consistently high academic standards,
but their nurturing environments are
what actually yield student success.
omparing
schools
8
9www.study.vic.gov.au
Location
Victoria is a diverse state.
Accredited schools support international
students right across the state. Of the
schools profiled in this guide, 90 are
located in Melbourne. The remaining 12
schools are sited in other Victorian cities.
Melbourne
Large city with a
population over
4 million
Other Victorian cities
Small to mid-sized
metropolitan
centres
Every school location has something
different to offer. So when comparing
schools, consider the benefits students
stand to gain from a particular
learning environment.
For easy reference, the location map on
page 12-13 is divided into coloured areas.
To help identify school locations, a
corresponding symbol appears in the map
index and on each school profile page.
Curriculum
A summary of VCE (Victorian Certificate
of Education) and VET (Vocational
Education and Training) subjects
appears towards the end of the guide.
From this array of course offerings,
each Victorian government school
develops its own distinctive curriculum.
This method of independent course
development allows schools to be
responsive to the needs and interests
of its community.
The dynamic study landscape created
by this approach has allowed many
schools to develop specialities within
their curriculum.
Some schools are sought after for these
specialities, that may offer students an
integrated study approach to their
preferred university course.
In making school comparisons,
consider each unique curriculum
and its alignment with the student’s
learning aspirations.
Unique features
The characteristics of each
school contribute to its positive
learning environment.
Victorian government schools are
renowned for their culture of growth
and encouragement. A range of activities
from music productions to camps,
representative opportunities or student
community service are considered vital
to student personal growth and local
community engagement.
Some schools also feature exclusive
academic opportunities. Many accredited
schools support accelerated learning
programs for high achieving students.
Other schools offer tertiary subjects
within a university extension program.
These units assist students to gain prior
learning recognition towards degree
study at a participating university.
Profiles published in this guide provide
some information to help make school
feature comparisons. Refer to individual
school websites for full details.
10
Department of Education and
Early Childhood Development
International Education Division
GPO Box 4367
Melbourne Victoria 3001
Australia
Tel: +61 3 9637 2990
Fax: +61 3 9637 2184
Email: international@edumail.vic.gov.au
Web: www.study.vic.gov.au
CRICOS Provider Code: 00861K
Make an application
Students may make an application to
study in Victoria at their school of
choice. Accredited education agents and
students and their families can apply
online at www.study.vic.gov.au
Information about study in Victorian
government schools is also available
from these online resources:
Study Victoria
www.study.vic.gov.au
Victorian School of Languages
www.vsl.vic.edu.au
Victorian Certificate of Education
www.vcaa.vic.edu.au/vce/studies/index.html
Select Entry Accelerated Learning
www.education.vic.gov.au
Join us
Connect with our online community
of current and future international
students on Facebook at www.facebook.
com/InternationalSchoolStudentsVictoria
and on WeChat at StudyMelbourne.
Taking the next step
More information about education services provided to
international students is available from the International
Division of the Department of Education and Early
Childhood Development.
11
12
Street addresses appear in the school profile pages following. Enter this address at www.maps.google.com.au
for an accurate geographic location.
School Name	 Map Reference Page
School Name	 Map Reference PageSchool Name	 Map Reference Page
Alkira Secondary College K10 15
Ashwood Secondary College H5 16
Auburn High School G5 17
Balwyn High School G4 18
Bayside P–12 College D5 19
Bentleigh Secondary College G6 20
Blackburn High School I4 21
Box Hill High School H4 22
Box Hill Senior Secondary College H4 23
Braybrook College D3 24
Brentwood Secondary College I6 25
Brighton Secondary College F6 26
Brunswick Secondary College E3 27
Buckley Park College D3 28
Camberwell High School G4 29
Canterbury Girls’Secondary College G4 30
Carwatha College P–12 I7 31
Charles La Trobe P–12 College G2 32
Cheltenham Secondary College G7 33
Collingwood College F4 34
Copperfield College B2 35
Dandenong High School J8 36
Doncaster Secondary College H3 37
Dromana Secondary College H12 38
East Doncaster Secondary College I3 39
Elwood College F5 40
Essendon Keilor College E3 41
Fairhills High School J5 42
Footscray City College D4 43
Forest Hill College I5 44
Fountain Gate Secondary College K9 45
Frankston High School H11 46
Gilmore College for Girls D4 47
Gleneagles Secondary College k7 48
Glen Eira College G6 49
Glen Waverley Secondary College I5 50
Highvale Secondary College I5 51
Hoppers Crossing Secondary College A5 52
Hume Central Secondary College E1 53
John Fawkner Secondary College F2 54
Kambrya College K9 55
Keilor Downs College C2 56
Kew High School G4 57
Keysborough Secondary College I7 / I8 58
Koonung Secondary College H4 59
Lalor North Secondary College G1 60
Lilydale Heights College K3 61
Lyndale Secondary College I7 62
Macleod College G2 63
Maribyrnong College D3 64
McClelland College H11 65
McKinnon Secondary College G6 66
Melbourne Girls’College F4 67
Mentone Girls’Secondary College G7 68
Mill Park Secondary College G1 69
Mordialloc College H8 70
Mornington Secondary College G12 71
Mount Alexander College E4 72
Mount Eliza Secondary College H12 73
Mount Erin College I12 74
Mount Waverley Secondary College H5 75
Mullauna Secondary College I4 76
Noble Park Secondary College I7 77
Northcote High School F3 78
Parkdale Secondary College H8 79
Point Cook Senior Secondary College B6 80
Princes Hill Secondary College F3 81
Reservoir High School G2 82
Ringwood Secondary College J4 83
Rosehill Secondary College D3 84
Sandringham College G7 85
South Oakleigh College H6 86
St Albans Secondary College C3 87
Strathmore Secondary College E3 88
Sunbury Downs College A1 89
Sunshine College C4 90
Templestowe College H3 91
Thornbury High School G3 92
Upper Yarra Secondary College K4 93
Vermont Secondary College I5 94
Victoria University Secondary College C2/B3 95
Victorian College of the Arts E4 96
Viewbank College H3 97
Wantirna College J5 98
Warrandyte High School I3 99
Wellington Secondary College I7 100
Werribee Secondary College A6 101
Westall Secondary College H7 102
Wheelers Hill Secondary College I6 103
Williamstown High School D5 104
Location of Victorian
Government Schools
Location
English Language Schools
Blackburn	
Brunswick
Collingwood
Hume
Noble Park
Western
A DH5
F3
F4
E1
i7
D4
B E
C F
School Name	 Map Reference Page
Victorian cities (excluding Melbourne)
Belmont High School C11 107
Bendigo Senior Secondary College C11 108
Bright P–12 College D11 109
Charlton College B10 110
Kurnai College D12 111
Kyenton Secondary College C11 112
Mildura Senior College B9 113
Mount Clear College C11 114
Red Cliffs Secondary College B9 115
Stawell Secondary College B11 116
Warrnambool College B12 117
Wycheproof P-12 College B10 118
Melbourne A-Z
A B
A B
1
2
3
4
5
6
7
8
9
10
11
12
15kms
20kms
25kms
Werribee
Deer Park
Delahey
St Alb
Ke
Point Cook
Hoppers
Crossing
CITY WEST
Melbourne
VICTORIA
AU
State of Victoria
35
80
52
95
95
101
107
108
110
113
114
118
116
117
89
115
112
13
Page 2
C D E F G H i J K
C D E F G H i J K
1
2
3
4
5
6
7
8
9
10
11
12
5kms
5 kms
10
kms
10kms
15 kms
20 kms
25 kms
30 kms
35 kms
45 kms
50 kms
Hawthorn East
McKinnon
Caulfield
South
Williamstown
Sandringham
Brighton
Elwood
BraybrookSunshine
Footscray
Maidstone
Richmond
Southbank
Brunswick
Flemington
Collingwood
Northcote
Essendon
bans
eilor Downs
Keilor
East
Reservoir
Broadmeadows
Strathmore
Thornbury
Mt Eliza
Frankston
Keysborough
Mordialloc
Parkdale
Dandenong
Mulgrave
Springvale
Oakleigh
South
Bentleigh
East
Cheltenham
Clayton
South
Springvale
South
Mt Waverley
Noble
Park
Rowville
Wheelers
Hill
Glen
Waverley
Knoxfield
Doncaster
East
Ashwood
Canterbury
Burwood
East
BlackburnKew
Box Hill
North
Templestowe
Lower
Doncaster
Wantirna
RingwoodMitcham
Croydon
Viewbank
Heidelberg
Macleod
Montmorency
Mill Park
Box Hill
Blackburn
South
Balwyn
Epping
Dandenong
North
Mooroolbark
Mont
Albert
North
Cranbourne
Narre
Warren
Endeavour
Hills
Fawkner
Warrandyte
English language schools
Melbourne International Airport
(Tullamarine)
Melbourne city centre
Major road
Public transport rail line
Legend
Secondary school
School with on-site English
language facilities
Off map location
CITY NORTH
CITY EAST
CITY SOUTH
Port Philip Bay
USTRALIA AUSTRALIA
Victoria,
Melbourne
16
18
19
20
21
22
23
24
25
26
28
29
31
32
34
36
37 39
40
41
53
54
42
43
44
46
47
49
50
17
51
56
57
48
59
60
62
63
64
66
67
68
69
72
73
75
76
77
78
79
81
82
38
84
85
86
87
88
90
91
92
93
94
96
97
100
102
103
104
109
111
A
B
D
F
E
C
55
61
99
45
30
15
27
58
58
33
70
71
74
83
98
2
65
Profiles
Melbourne
A-Z
Accredited schools located within the city
of Melbourne are listed in these pages.
Search for schools that teach specific
subjects at http://schlprv.vcaa.vic.
edu.au/schoolsstudiessearch
14
15For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Alkira
Secondary College
Alkira provides excellent opportunities for students to gain a truly international
experience. We are a new school boasting modern and innovative facilities. Our
curriculum is student centered and allows students to choose individual pathways
through VCE, VCALand VET programs. Our International centre will help students with
transition and offer support in literacy and English language. The school has established
partnerships with both Monash and Melbourne Universities.
Features of the local area
•	 Multicultural community, active sports and
cultural programs
•	 Close to public transport, large shopping
center and Monash University
•	 Close to tourism areas: The Dandenongs,
Phillip Island and the Gippsland Lakes
Languages taught
	 Chinese
	 Other languages available through
alternative provision
Special programs
•	 Experienced international teachers
•	 Access to a T40 High Achievers mentoring
program
•	 Access to senior programs at local university
•	 Access to a specialist Sports Academy
program
Intensive English Language classes
Provided at English Language Centre located
within 10kms of school
Student support services and programs
•	 Specialist international teachers
•	 Full time Student Welfare officer
•	 Part-time psychologist and access to
counselling
•	 Careers resource centre
•	 Peer support program
•	 Embedded literacy and Numeracy program
Extracurricular activities
•	 International student camp and tour program:
China and India
•	 World Challenge Asia
•	 Full sports program
•	 Performing Arts: Music Dance Drama
programs
Sports offered
Athletics, Australian Rules Football, Baseball,
Basketball, Cricket, Hockey, Netball, Soccer,
Softball, Swimming, Tennis, Table Tennis,
Volleyball
Awards
•	 International Confucius school group of the
year, 2014
•	 Regional Champions Boys Basketball, Cross
Country and Swimming, 2014
•	 State Champions Year 8 Cricket, 2013 •	 International Design Award, 2012
•	 Regional Champions Athletics, 2013
•	 Best School Award Berwick, Dandenong and
City of Casey Art Shows, 2013-14
Reasons to choose our school
	Small school offering personalised experience
	Spirit of cooperation and belonging among staff and students
	Attractive school grounds including full sports fields and environmental science wetlands area
Visit our school online at www.alkirasecondarycollege.com.au
Address:	 15 Nurture Avenue,
Cranbourne North VIC 3977
Distance from	
Melbourne city centre:	
40 km (Map Reference:
Pg 12-13, K10, No. 15 )
Principal:	 Ian McKenzie
International	
Student Coordinator:	
Simone McKenzie
Telephone:	 +61 3 5991 3500
Fax:	 +61 35991 3599
Email:	 alkira.sc@edumail.vic.gov.au
Web:	 www.alkirasecondarycollege.com.au
Number of students:	 1000 Number of international students:	 2
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $250
16 Right School Right Place 2014/2015 – Melbourne A-Z
Ashwood
Secondary College
Located in Melbourne’s leafy eastern suburbs, Ashwood College nurtures
academic achievement and personal growth. The school offers a broad and
engaging curriculum spanning the academic, technology and creative interests
that support individual learning goals. Personal care and attention are Ashwood
College hallmarks. The school expects to contain its size so students continue to
gain this advantage. International students benefit from a range of programs
designed to make living and studying in Australia a success.
Features of the local area
•	 Train, tram and bus public transport offer
easy access to multicultural Melbourne
•	 Natural local features include parks and
reserves, wetland and golf courses
•	 Close to Chadstone Shopping Centre, the
Southern Hemisphere’s largest mall
Languages taught
	 French
	 Chinese
Special programs
•	 Experienced Chinese/Korean program
assistants and multicultural aides
•	 Accelerated English, mathematics, science
and language studies available
•	 International student leadership program
•	 1:1 learning program (iPads and NetBooks)
•	 Expansive visual and performing arts program
•	 Years 7-10 flexible curriculum tailored to
individual student abilities and interests
Intensive English Language classes
Provided at English Language Centre located
within 5 kilometres of school
Student support services and programs
•	 International student tutors, homework groups
and in-class multicultural teacher’s aide
•	 Careers resource centre, student common
room and dedicated Victorian Certificate of
Education study centre
•	 Complete wellbeing support program with
student welfare coordinator, adolescent
health nurse and part-time psychologist
•	 Peer support program
Extracurricular activities
•	 International student camp and tour
•	 International student sports participation
•	 International student social events –
Barbeques, dine-out and birthday parties
•	 Special interest clubs and interschool
competitions such as chess, computer club,
science, mathematics, debating, and sports
•	 Choir, musical ensembles, drama productions
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Hockey, Netball,
Soccer, Softball, Squash, Surfing, Swimming,
Table Tennis, Tennis, Volleyball
Success story
‘I had a great experience here at Ashwood
Secondary College. It’s like my second
home. The students and teachers are so
friendly. They offered me lots of help both
academically and on a personal level so
that I can become what I am now.’
–	 Xinhang Xu (China). Scholarship in
engineering at Monash University
Awards
•	 Kwong Lee Dow Scholarships, 2013-14 •	 Gateway LLen VCAL Achievement, 2013
•	 Royal Australia Chemical Institute
Competition Gold and Silver Medals, 2013
•	 RACV Grand Final Championship, 2013-14
•	 Long Tan Scholarships, 2013
•	 State Championship Representatives in Track,
Field and Cross Country, 2013-14
Reasons to choose our school
	All international students enjoy outstanding levels of personal care and attention
	School curriculum allows for accelerated study in English, mathematics, science and language
	Facilities include purpose designed state-of-the-art science centre
Visit our school online at www.ashwood.vic.edu.au
Address:	 Vannam Drive
Ashwood, VIC 3147
Distance from	
Melbourne city centre:	
10km (Map Reference:
Pg 12-13, H5, No. 16 )
Principal:	 Kerrie Croft
International	
Student Coordinator:	
Kim Elliston
Telephone:	 +61 3 9807 1333
Fax:	 +61 3 9888 1441
Email:	 ashwood.sc@edumail.vic.gov.au
Web:	 www.ashwood.vic.edu.au
Number of students:	 500 Number of international students:	 50
Dress:	 Uniform
Cost of uniform (approx.):	 $350
Cost of homestay per week:	 $250 – $280
17For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Auburn
High School
Auburn High school is a new 7-12 school located on the site of the former Hawthorn
Secondary College. The school offers a strong academic programme for all students
with a particular focus on science, technology, engineering and mathematics for
year 10 -12. The outstanding facilities include well-equipped classrooms, a new
science discovery centre, an English language centre, a VCE study centre, a lecture
theatre, art and design centre and extensive playing fields.
Features of the local area
•	 Prestigious inner Melbourne location only a
short distance from Melbourne CBD.
•	 Well serviced by train-line, tram and bus
routes
•	 Well established native gardens surrounding
the school.
Languages taught
	 Chinese
	 French
	 Other languages at VCE level organized at
Victorian School of Languages as required
Special programs
•	 Onsite English Language Centre
•	 Extensive careers counselling for
international students
•	 University enhancement programme
•	 Year 12 study camp
•	 International student leadership positions
Intensive English Language classes
Provided at our onsite English Language Centre
for years 10 - 11
Student support services and programs
•	 Ongoing English support from Language
Centre staff
•	 After school mathematics and science tuition
from bilingual tertiary students
•	 Targeted ongoing English language and
academic support for VCE students and
Homework Club for junior students
•	 Ongoing welfare support and access to
Chinese speaking counsellors as required
•	 Career resource centre
•	 Part time psychologist
Extracurricular activities
•	 A large choice of student clubs including
chess, Chinese craft and basketball
•	 Student leadership opportunities
•	 Excursion programme linked to curriculum
•	 Study and adventure camps
Sports offered
Athletics, Swimming, Cross Country, Australian
Rules Football, Basketball, Hockey, Soccer,
Table Tennis, Volleyball, Netball
Success story
My experience studying at Hawthorn
Secondary College (now Auburn High
School) was warm and unforgettable. I had
so much help from teachers to do well.
Some teachers were like parents to me.
The school is so beautiful and I made many
friends. I will remember this time always.
–	 Michelle Nguyen – Monash University
Engineering Scholarship winner 2012
Awards
•	 Three Monash University Engineering scholarships, 2012
•	 Swinburne University of Technology, Vice Chancellor’s Student Scholarship, 2010
•	 TOP VCE student in Persian, 2010
Reasons to choose our school
	
Outstanding facilities refurbished and updated over the last 5 years in beautiful garden
surroundings
	
A small to medium sized school offering an academic programme, personalised learning and
tailored support to international students
	A large variety of extra-curricular clubs and activities
Visit our school online at www.auburnhs.vic.edu.au
Address:	 Burgess Street
Hawthorn East, VIC 3123
Distance from	
Melbourne city centre:	
10 km (Map Reference:
Pg 12-13, G5, No. 17 )
Principal:	 Maria Karvouni
International	
Student Coordinator:	
Bernadette Caruana
Telephone:	 +61 3 9804 6344
Fax:	 +61 3 9822 6837
Email:	 auburn.hs@edumail.vic.gov.au
Web:	 www.auburnhs.vic.edu.au
Number of students:	 450 Number of international students:	 65
Dress:	 Uniform
Cost of uniform (approx.):	 $300 – $450
Cost of homestay per week:	 $270 – $300
18 Right School Right Place 2014/2015 – Melbourne A-Z
Balwyn
High School
Established in 1954, today Balwyn High School is a renowned multicultural co-
educational school. Located in Melbourne’s eastern suburbs, the school supports a
large population of local Year 7-12 students. International students are selected on
merit. Skilled and experienced staff deliver a diverse and challenging curriculum
that supports consistently high Victorian Certificate of Education results. The school
community encourages international students to engage with a range of activities
including sport, music, student leadership and public speaking.
w
Features of the local area
•	 Regular tram and bus public transport services
•	 Surrounded by leafy parklands
•	 Easy access to popular shopping centres
Languages taught
	 French
	 Classical Greek
	 Modern Greek
	 Chinese as a first and second language
	 Chinese as a second language advanced
Special programs
•	 Accelerated learning Program for high
performing students
•	 Exemplary music program
•	 Learning enrichment activities
•	 Chinese club where international students
tutor Australian students in Chinese
•	 Student leadership programs
•	 Year 9 Xplore learning program
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Full-time International Program Coordinator
•	 Large, air-conditioned international student
centre with recreational and cooking facilities
•	 Cross-age tutoring program
•	 Full-time social welfare worker
Extracurricular activities
•	 Co-curricular programs such as debating,
chess club, drama, sports
•	 International buddy system
•	 Mid-autumn festival celebration
Sports offered
Aerobics, Athletics, Australian Rules Football,
Badminton, Baseball, Basketball, Cricket, Cross
Country, Cycling/Mountain Biking, Golf,
Gymnastics, Hockey, Netball, Rowing, Soccer,
Softball, Squash, Surfing, Swimming, Table
Tennis, Tennis, Volleyball
Success story
‘I was awarded bachelor with honours and
masters at the University of Melbourne. I
am now involved in a key project in an
Australian organisation. Balwyn High
School’s constant supports were
impressive. I was very honoured to be
selected to Balwyn High School, which has
made my dreams come true.’
–	 Nick Yu – China
Awards
•	 ICAS Maths Competition Top Winner of
Year 12, 2014
•	 Monash University Scholarships - Four
awarded in 2013
•	 Australian National University Full
Scholarship, 2013
•	 Victorian International Student of the Year &
Academic Excellence Awards, 2013
•	 Monash University Scholarships - Five
awarded in 2014
•	 Monash University Year 11 EAL Excellence
Award, 2013
Reasons to choose our school
	Graduating students consistently achieve outstanding university entrance scores
	Effective international student administration and school vision for academic success
	Homestay student accommodation includes heated lunch provided daily
Visit our school online at www.balwynhs.vic.edu.au
Address:	 Buchanan Avenue
Balwyn North, VIC 3104
Distance from	
Melbourne city centre:	
8 km (Map Reference:
Pg 12-13, G4, No. 18 )
Principal:	 Deborah Harman
International	
Student Coordinator:	
Grace Yin
Telephone:	 +61 3 9819 7911
Fax:	 +61 3 9819 7395
Email:	 balwynhs@balwynhs.vic.edu.au
Web:	 www.balwynhs.vic.edu.au
Number of students:	 2000 Number of international students:	 80
Dress:	 Uniform
Cost of uniform (approx.):	 $400 – $500
Cost of homestay per week:	 $290 – $320
19For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Bayside
P-12 College
Located only 8km from Melbourne’s central business district Bayside P-12 College
offers excellence in teaching and state of the art learning facilities. The college
provides students with an outstanding opportunity to gain global perspective across
its three superbly located multi-cultural campuses. The Victorian Certificate of
Education academic stream is complemented by a comprehensive range of
vocational pathways and support programs to assist students in achieving their
academic dreams.
Features of the local area
•	 Train and bus public transport offer quick,
easy access to multicultural Melbourne
•	 Attractive grounds close to native flora and
fauna, Williamstown and Altona Beaches
•	 New state of the art buildings close to local
and CBD shopping
Languages taught
	 Japanese
	 Italian
Special programs
•	 Academic acceleration program
•	 Student Representative Council
•	 Innovative tennis program (incorporating
both curriculum and tennis component)
•	 Advanced photography
•	 Young Ambassadors for Industry Program in
partnership with Mobil Oil and Transfield
Intensive English Language classes
Provided at English Language Centre located
within 5 kilometres of school
Student support services and programs
•	 Careers resource centre with two
pathways counsellors
•	 English as an Additional Language homework
club
•	 Peer support program
•	 Experienced International Student Coordinator
•	 Three welfare coordinators
•	 Part-time psychologist
Extracurricular activities
•	 College theatre productions and
performances
•	 International Newsletter providing student
opportunities for reporting and editing
•	 Annual visits with our Japanese sister school
•	 Public speaking and debating club
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Bike Education, Fitness, Golf,
Gymnastics, Hockey, Lacrosse, Minor Games,
Soccer, Softball, Swimming, Table Tennis,
Tennis, Volleyball
Success story
‘My entire experience in Australia has been
spectacular. Bayside has just been icing on
the cake. I have loved my time at Bayside
and I can’t see myself being anywhere
else. Everyone in Australia, especially at
Bayside, has been so friendly.’
–	 Zane Shirley, Currently studying at
Trinity College, Dublin
Awards
•	 VCAA Plain English Speaking Award for
Public Speaking - Regional Winner, 2014
•	 Melbourne University - Kwong Lee Dow
Scholarship - Two awarded, 2014
•	 State Intermediate Girls Tennis Silver Medalist, 2014
•	 Hobsons Bay City Council Inspirational Young Persons Award, 2014
Reasons to choose our school
	Modern learning facilities with an emphasis on science, technology and the arts
	Welcoming and supportive learning environment with strong links to local universities
	100% of international students received university offers over the past two years
Visit our school online at www.bayside.vic.edu.au
Address:	 Kororoit Creek Road
Williamstown, VIC 3016
Distance from	
Melbourne city centre:	
8 km (Map Reference:
Pg 12-13, D5, No. 19 )
Principal:	 Andrew Harnett
International	
Student Coordinator:	
Tracy James
Telephone:	 +61 3 9393 5800
Fax:	 +61 3 9393 5892
Email:	 international@bayside.vic.edu.au
Web:	 www.bayside.vic.edu.au
Number of students:	 1160 Number of international students:	 17
Dress:	 Uniform
Cost of uniform (approx.):	 Firstbasicfree
Cost of homestay per week:	 $230-$240
20 Right School Right Place 2014/2015 – Melbourne A-Z
Bentleigh
Secondary College
Bentleigh Secondary College is a Year 7 – 12 medium-sized college, located in
Melbourne about 14 Km from the city. The college is close to bus stops, shopping
centres, swimming pools and other facilities. Dedicated and highly motivated staff
provide strong support and leadership for all students. Students benefit from
ongoing career guidance and constant feedback and strategies to improve their
academic performance.
Features of the local area
•	 Wetlands, Urban Forest, Harvest Garden and
Japanese Garden
•	 Close to shopping centre, banks, post offices,
medical centre and hospital
•	 Well-serviced by train-lines and bus routes
Languages taught
	 Japanese
	 Indonesian
Special programs
•	 Performing Arts, Instrumental Music Program,
Sports and Camps.
•	 Student Leadership
•	 Sustainability
Intensive English Language classes
Provided at English Language School located
within 13 km or 10 mins by car
Student support services and programs
•	 Specialist international student tutors
•	 Careers resource centre
•	 Peer support program
•	 Wellbeing support program
•	 Year 10 – 12 English support program
•	 Experienced international Chinese program
assistants
Extracurricular activities
•	 Central Australia Trip
•	 Weekend Snow trip
•	 Mooncake Festival at Dandenong
•	 Open Uni-day
Sports offered
Athletics, Badminton, Baseball, Basketball,
Cricket, Netball, Soccer, Softball, Swimming,
Table Tennis, Tennis, Volleyball
Success story
‘I go to University of Melbourne doing
Bachelor of Science and will major in
Electrical and Electronic Engineering. I
wouldn’t have such an amazing University
life without the experience at Bentleigh
Secondary College. I really appreciate
everything I had during the past 2 years
and I will remember the College motto
‘being the best you can be’ forever.’
–	 William Gao (China). Dux of 2013 at
Bentleigh Secondary College
Awards
•	 Secondary Principal of the Year, Victorian
Education Excellence Awards, 2014
•	 Finalist, Outstanding Curriculum Innovative
for Mindfulness Meditation, 2014
•	 United Nations of Australia Environmental
School Award, 2014
•	 Golf Victoria Junior Champion of Champions
held in Spring Valley 2013
•	 Finalist, Victorian Education Excellence
Awards, 2014
•	 Pierre de Coubertin Award for excellence in
sport 2013
Reasons to choose our school
	Spirit of cooperation and belonging among staff and students
	An award winning school
	Caring International Student Coordinators
Visit our school online at www.bentleighsc.vic.edu.au
Address:	 Vivien Street
Bentleigh East, VIC 3165
Distance from	
Melbourne city centre:	
14 km (Map Reference:
Pg 12-13, G6, No. 20 )
Principal:	 Karen Wade
International	
Student Coordinator:	
Chen Lee
Telephone:	 +61 3 9579 1044
Fax:	 +61 3 9579 2720
Email:	 bentleigh.sc@edumail.vic.gov.au
Web:	 www.bentleighsc.vic.edu.au
Number of students:	 896 Number of international students:	 25
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $270
21For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Blackburn
High School
Blackburn High School is a culturally aware learning community. Students are
nurtured to academic success in an inclusive environment where the broad
curriculum offers all students the possibility of high level success. Experienced
teachers carefully trace student progress, always remaining sensitive to individual
learning needs. Regular family contact offers international students further personal
and academic support. Blackburn High School students are encouraged to
participate in activities that help them become well-rounded, global citizens.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Nearby shopping centre, parks, sporting
facilities and community hubs
•	 20 minutes to Melbourne by public transport
Languages taught
	 German
	 French
Special programs
•	 Experienced Chinese and Korean assistants
•	 On-site Victorian School of Languages
•	 Additional English classes for students in
Years 11-12
•	 Intensive music program including solo,
ensemble and symphony orchestra
•	 Individual instruction for piano, strings, wind
and percussion instruments
Intensive English Language classes
Provided at English Language Centre located
within 3 kilometres of school
Student support services and programs
•	 Multicultural education aides
•	 Careers resource centre
•	 House program with student support
mentor groups
•	 Student welfare coordinator
•	 Part-time psychologist
Extracurricular activities
•	 Lunchtime mathematics club
•	 Nationally recognised music program
•	 Inclusive sports program
•	 Student leadership program
Sports offered
A wide variety of sports are available for
students to choose from as well as many
inter-school sporting competitions.
Success story
‘Blackburn gave me every opportunity
to grow in experience and confidence.
Surrounded by totally supportive teachers
and students, I immersed myself in school
life and I was voted school captain.
These experiences have set me up for
university and life.’
–	 Nhat Nguyen – graduated from the
University of Melbourne (Commerce).
He is currently an Australian resident
and has successfully started his career
as an accountant.
Awards
•	 World Education Program Scholarship –
only successful Victorian student, 2011
•	 Pierre de Coubertin Award – academic and
sporting excellence, 2011
•	 Nhat Nguyen Community Service Award –
Richard Do, 2013
•	 VCE Top Acts – brass quintet, 2010
Top Class Concert – student composer, 2010
•	 Australian and New Zealand Student
Exchange Scholarship, 2011
•	 Jamie Oliver Home Cooking Skills Secondary
Schools Program – selected school, 2011
Reasons to choose our school
	Caring staff provide student-centred academic and personal mentoring
	An award-winning musical school
	
Wide selection of new education facilities including Music Centre, Gymnasium and Auditorium,
Food Technology Centre, Global Learning Centre and multi-space educational centres
Visit our school online at www.blackburnhs.vic.edu.au
Address:	 60 Springfield Road
Blackburn, VIC 3130
Distance from	
Melbourne city centre:	
10 km (Map Reference:
Pg 12-13, I4, No. 21 )
Principal:	 Dr Sandra Woodman
International	
Student Coordinator:	
Isabel Zhou
Telephone:	 +61 3 8804 6464
Fax:	 +61 3 8804 6499
Email:	 blackburn.hs@edumail.vic.gov.au
Web:	 www.blackburnhs.vic.edu.au
Number of students:	 870 Number of international students:	 66
Dress:	 Uniform
Cost of uniform (approx.):	 $700
Cost of homestay per week:	 $260 – $280
22 Right School Right Place 2014/2015 – Melbourne A-Z
Box Hill
High School
Established in 1930, Box Hill High School enjoys an excellent location and long,
proud education history. The school is renowned for its high academic standards,
achieved through a blend of welcoming atmosphere, firm discipline and active
student encouragement. Every Box Hill High School student is supported in striving
for their full learning potential. Our International Student Coordinator is fluent in
several Asian languages and ensures international students are well supported in
both study and life.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Exciting and culturally diverse location
•	 Close to major shopping and business centre
Languages taught
	 Chinese
	 German
Special programs
•	 Accelerated learning Program for high
performing students
•	 Experienced international Chinese coordinator
•	 Science and Technology Education Resource
Network (SATERN)
•	 Model solar car design program
•	 School theatre production and performance
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Careers resource centre
•	 Part-time multicultural aide
•	 Year level coordinators
•	 Peer support program
•	 Student counsellor
Extracurricular activities
•	 VCE student camp
•	 International students school trip
•	 Basketball matches
Sports offered
Athletics, Basketball, Netball, Soccer,
Swimming Sports
Success story
Box Hill High School graduate, Lydia Xiao
(China), is now working as an accountant
while studying for her Certified Practicing
Accountant qualification. She graduated
from the University of Melbourne with a
Bachelor of Commerce, proceeded to
Monash University and graduated with
a Master of Applied Finance.
Awards
•	 Premier’s VCE Award – Health and Human
Development, 2010
•	 German Film Competition, 2010
•	 Premier’s VCE Award – Chinese First
Language, 2010
•	 Science School of the Year, 2010
•	 Monash University Dean’s Award, 2010
Reasons to choose our school
	A community with strong spirit of cooperation and belonging among both staff and students
	The large, multicultural school campus is conveniently located to all facilities
	On-site Intensive English School for English language development
Visit our school online at www.boxhillhs.vic.edu.au
Address:	 1180 Whitehorse Road
Box Hill, VIC 3128
Distance from	
Melbourne city centre:	
15 km (Map Reference:
Pg 12-13, H4, No. 22 )
Principal:	 Kate Mitchell
International	
Student Coordinator:	
Darren Wen Yap
Telephone:	 +61 3 9877 1177
Fax:	 +61 3 9894 1347
Email:	 box.hill.hs@edumail.vic.gov.au
Web:	 www.boxhillhs.vic.edu.au
Number of students:	 1000 Number of international students:	 45
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $270-$290
23For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Box Hill Senior
Secondary College
Box Hill Senior Secondary College students are encouraged to pursue their passions
and achieve their best. Over 700 Year 10, 11 and 12 students are enrolled in the
vibrant senior high school community. Broad curriculum options and dedicated staff
support students to achieve their education goals. The school enrols a small
number of international students that a dedicated team helps settle quickly into
study. Homestay families are carefully selected with students’ interests in mind.
Features of the local area
•	 Major transport hub with easy access to
trains, trams and buses
•	 Positioned in a quiet, leafy neighbourhoods
surrounded by parks and gardens
•	 Box Hill is Melbourne’s multicultural heart,
with an abundance of shops and cafes
Special programs
•	 Elite sports development programs with
United States college system pathways
•	 Dedicated business, science, technology and
creative arts programs
•	 Comprehensive mentoring to monitor student
progress and cater for individual needs
•	 Contemporary music, fashion and
dance programs
•	 Laptop computer program
Intensive English Language classes
Provided at English Language Centre located
within 5 kilometres of school
Student support services and programs
•	 Small English as an Additional Language
(EAL) classes
•	 Language Support Program
•	 Chinese and Japanese-speaking
program assistants
•	 Careers resource centre
•	 Dedicated International Student Coordinator
•	 Student mentoring program
•	 Social worker and wellbeing coordinator
•	 Buddy system
Extracurricular activities
•	 India trip
•	 USA basketball tour
•	 Array of camps and excursions
•	 Student events including formal, celebration
dinners and debutante ball
Sports offered
Students may enrol to receive intensive training
in the three college sport specialties: Tennis,
Basketball and Australian Rules Football.
Programs include weight and fitness training
with access to physiotherapist, Outdoor
Education camps and other sports offered
include surfing, bushwalking, mountain bike
riding, snowboarding and canoeing
Success story
‘I have found the staff and students here
very friendly and helpful. I love the adult
learning environment and being able to
study dance as part of my schooling. I
study English, Maths, Psychology, Studio
Arts (Fashion) and belong to the
cheerleading team.’
–	 Yun (Serena) Lu – Taiwan; studying
VCE Dance, 2012
Awards
•	 Top Arts – Fashion Design and
Art award, 2011
•	 Australian Schools Basketball –
champions, 2010
•	 The Australian Institute for Performing Arts
– Singer Songwriter Project Award, 2011
•	 Australian Open and Davis Cup – junior
tennis competition representatives
•	 University of Melbourne Young Scholars
Program, 2009
Reasons to choose our school
	A small number of international students receive genuinely personal attention
	Broad range of subjects choices and learning programs to select from
	Outstanding modern learning facilities and convenient location
Visit our school online at www.bhssc.vic.edu.au
Address:	 Dunloe Avenue
Mont Albert North, VIC 3129
Distance from	
Melbourne city centre:	
14 km (Map Reference:
Pg 12-13, H4, No. 23 )
Principal:	 Steve Cook
International	
Student Coordinator:	
Belverlyn Jian
Telephone:	 +61 3 9890 0571
Fax:	 +61 3 9899 4093
Email:	 box.hill.senior.sc@edumail.vic.gov.au
Web:	 www.bhssc.vic.edu.au
Number of students:	 720 (Years 10-12) Number of international students:	 25
Dress:	 Non-uniform Cost of homestay per week:	 $260 – $280
24 Right School Right Place 2014/2015 – Melbourne A-Z
Braybrook
College
Multicultural Braybrook College is a school focused on academic achievement and
committed to traditional values. Students in Years 7-12 flourish within the safe,
caring environment that places special emphasis on individual help and support.
Facilities include extensive grounds with attractive gardens, modern learning
centres and excellent sporting facilities. The co-educational college serves areas
west of Melbourne including Footscray, Braybrook and Sunshine. Braybrook
College is easily accessed via regular public transport services.
Features of the local area
•	 Serviced by regular train and bus transport
•	 Nearby local Buddhist temple
•	 Close to several modern shopping centres
Languages taught
	 Vietnamese
Special programs
•	 Established and highly regarded English as
an Additional Language program
•	 Advanced Years 7-10 classes for academically
talented students
•	 Accelerated programs
•	 Co-curriculum program, including debating,
music, camps, excursions and sport
•	 Student leadership programs
•	 1:1 laptop program (all year levels)
Intensive English Language classes
Provided at English Language Centre located
within 2 kilometres of school
Student support services and programs
•	 Three specialist International Student staff
(including an International Student Welfare
Coordinator)
•	 Three Vietnamese Multicultural Teacher Aides
•	 After school Homework Clubs for all year
levels
•	 Home Group/Pastoral Care Program
•	 International Student Tutoring Program
•	 Careers Resource Centre
Extracurricular activities
•	 Engaging camps and outdoor activities
•	 Debating club and events
•	 Instrumental music and band program
•	 Lunchtime learning activities
•	 Year 10 work experience program
•	 Peer support program
Sports offered
Athletics, Badminton, Baseball,
Basketball, Cricket, Football, Netball,
Soccer, Softball, Surfing, Swimming,
Table Tennis, Tennis, Volleyball
Success story
‘I’m in Year 11 and this is my second
year at the college. I’ve had a great time
here. The teachers are very friendly and
enthusiastically help me in all my subjects
and to improve my English skills. I’m aiming
to get a high university entrance score and
undertake a bio-engineering course.’
–	 Thao Dinh – Vietnam
Awards
•	 Premier’s VCE Awards in several subjects,
2013-14
•	 Mary Jane Lewis Scholarship, 2014
•	 Pierre De Courbetin Award, 2013-14 •	 Skyline VCE Bursary Scholarships, 2013-14
•	 Dafydd Lewis Trust Scholarship, 2013-14 •	 Braybrook College Year 11 Scholarship, 2014
Reasons to choose our school
	Large modern campus and dynamic multicultural learning community
	Recently completed purpose built science facilities
	Spirit of cooperation and belonging among staff and students
Visit our school online at www.braybrooksc.vic.edu.au
Address:	 352 Ballarat Road
Braybrook, VIC 3019
Distance from	
Melbourne city centre:	
10 km (Map Reference:
Pg 12-13, D3, No. 24 )
Principal:	 Kelly Panousieris
International	
Student Coordinator:	
Arlene Bailey
Telephone:	 +61 3 9312 2900
Fax:	 +61 3 9311 7668
Email:	 braybrook.sc@edumail.vic.gov.au
Web:	 www.braybrooksc.vic.edu.au
Number of students:	 1179 Number of international students:	 31
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $220 – $250
25For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Brentwood
Secondary College
Brentwood Secondary College is a high-performing academic school. The college
reflects its vibrant multicultural community in Melbourne’s east through a culture
that values and respects student diversity. The safe and caring learning environment
caters for students in Years 7-12 with a uniquely challenging curriculum including
over 30 Victorian Certificate of Education subjects and an intensive English as an
Additional Language program. Brentwood Secondary College gives every student
the opportunity to pursue excellence and achieve success.
Features of the local area
•	 Easy public transport access by train and bus
•	 Multicultural neighbourhood and
local amenities
•	 Close to shopping centres, entertainment and
recreational venues
Languages taught
	 German
	 Japanese
Special programs
•	 Monash University extension program
•	 International student extended study program
•	 Accelerated learning and education
enrichment at all year levels
•	 Participation in national English,
Mathematics and Science competitions
•	 Highly specialised Year 10 electives
(eg. Aviation)
•	 Year 9 extension and research projects,
including the Duke of Edinburgh’s Award
Intensive English Language classes
Provided at several English Language Centres
located within 10 kilometres of school
Student support services and programs
•	 Chinese, Japanese, German and Vietnamese
speaking teachers/education support staff
•	 Personalised course counselling program
•	 Weekly international student tutorials
•	 Careers resource centre
•	 Student wellbeing centre with social workers,
psychologist and chaplain
•	 Peer support program
Extracurricular activities
•	 Year level camps across Australia
•	 Sister school exchanges to German, Japan
•	 Inter-school sport and debating programs
•	 Instrumental music program, theatre
productions and dance competitions
•	 Student representative council, Green Team
school environment/sustainability projects
•	 G’day USA and World Challenge expeditions
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Golf, Hockey, Netball, Soccer, Softball,
Swimming, Table Tennis, Tennis, Volleyball
Success story
‘The positive atmosphere at Brentwood
made me more outgoing and confident. All
the teachers are friendly and passionate.
Studying at Brentwood is an unforgettable
experience and one for which I will always
be grateful.’
–	 Yang Yang Xie. Recipient of BSC’s
International Student of the Year Award
2012; studying Civil Engineering at
RMIT
Awards
•	 Monash University – Engineering
Scholarships
•	 Top Design Award
•	 University of Melbourne Young Scholars
Program
•	 Top Arts Award
•	 Pierre de Coubertin Awards
Reasons to choose our school
	Rigorous academic programs built on student preferences and differentiated instruction
	Expert pastoral care program and staff to supports student wellbeing and engagement
	Advanced learning facilities including computers, multimedia labs, science labs and gym
Visit our school online at www.brentwood.vic.edu.au
Address:	 65-71 Watsons Road
Glen Waverley, VIC 3150
Distance from	
Melbourne city centre:	
25 km (Map Reference:
Pg 12-13, i6, No. 25 )
Principal:	 Vicki Forbes
International	
Student Coordinator:	
Melissa Antoniuk
Telephone:	 +61 3 8545 0300
Fax:	 +61 3 8545 0355
Email:	 brentwood.sc@edumail.vic.gov.au
Web:	 www.brentwood.vic.edu.au
Number of students:	 1445 Number of international students:	 35
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $260
26 Right School Right Place 2014/2015 – Melbourne A-Z
Brighton
Secondary College
Located in a family-oriented suburb close to the beach, Brighton Secondary College
has a tradition of excellence. The school offers students an outstanding education,
delivered through its structured, supportive and caring learning environment. The
curriculum features academic studies, creative and performing arts, technology
subjects and sporting program. At senior levels the school provides a wide range of
Victorian Certificate of Education and vocational studies, as well as University
pathway connections.
Features of the local area
•	 Close to the beach, shopping centers,
eateries, malls, and public transport
•	 Wide choice of local sporting clubs, including
sailing, golf, football, and tennis
Languages taught
	 Japanese
	 French
	 Chinese as a first language
Special programs
•	 Experienced international Chinese
program assistants
•	 University of Melbourne and Monash
University study enhancement access
•	 Education enrichment, including Accelerated
learning Program for high performing students
•	 Annual school choral competition
•	 Instrumental music program
•	 Local and state level sporting program
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Specialist international student tutoring
•	 Broad ranging English as an Additional
Language student support
•	 Careers resource centre and counsellors
•	 Student welfare team
•	 International student committee providing
peer support
Extracurricular activities
•	 Local and international camps
•	 Array of student leadership programs
•	 Music program and performance, including
solo, bands and vocal
•	 Chess and science clubs
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Hockey, Netball,
Rugby, Soccer, Softball, Squash, Swimming,
Table Tennis, Tennis, Volleyball
Success story
‘I appreciate the kindness and hard work of
all of my teachers and say “thanks” to all
the local students who became my friends.’
–	 Jing Ying Tong – China; studying
accounting at the University
of Melbourne
Awards
•	 National Gold Medalist in Taekwondo, 2013
•	 State representatives in tennis and
gymnastics, 2014
•	 Year 8 Girls Junior Hockey and Softball
State Champion teams, 2013
•	 Victorian International School Student
Awards – Commendation Award, 2013
Reasons to choose our school
	Supportive College community, teachers, and caring Homestay family environment
	New Science, Arts and Technology facilities
	School renowned for academic excellence and appealing curriculum choices
Visit our school online at www.brightonsc.vic.gov.au
Address:	 120 Marriage Road
East Brighton, VIC 3187
Distance from	
Melbourne city centre:	
12 km (Map Reference:
Pg 12-13, F6, No. 26 )
Principal:	 Julie Podbury
International	
Student Coordinator:	
Gary Agg
Telephone:	 +61 3 9592 7488
Fax:	 +61 3 9592 5724
Email:	 brighton.sc@edumail.vic.gov.au
Web:	 www.brightonsc.vic.edu.au
Number of students:	 1200 Number of international students:	 100
Dress:	 Uniform
Cost of uniform (approx.):	 $350
Cost of homestay per week:	 $290
27For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Brunswick
Secondary College
Brunswick Secondary College has a reputation for successfully supporting students
in their endeavor for academic excellence. There are over 50 nationalities at the
school and an on-site English Language Centre. Brunswick Secondary delivers a
wide selection of academic and specialist courses, preparing students to enter
tertiary education confident and ready for academic success. The school has highly
skilled staff, trained in English as an Additional Language catering for the needs of
International Students.
Features of the local area
•	 Close to regular train, bus and tram routes
•	 Near Melbourne CBD, the city’s
cultural centre
•	 Close to established learning institutions,
University of Melbourne, State Library of
Victoria
Languages taught
	 Chinese
	 Italian
Special programs
•	 VCE study skills program including after-
hours Maths and EAL support groups
•	 Extra academic support at International
Student Homework Club
•	 Accelerated Learning Program for high
performing students
•	 Leadership programs and opportunities for
International Students
•	 On-site Victorian School of Languages
•	 Chinese specialisation
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Fortnightly support sessions with
International Students Coordinator
•	 Individual help with subject selection and
careers counseling
•	 Peer support program for all new students
includes induction and mentoring
•	 International student school captain
•	 Student wellbeing support and counseling
Extracurricular activities
•	 International student excursions and guest
speakers
•	 Study tours to Italy and China
•	 Varied range of competitions, extension and
enrichment opportunities
•	 Vibrant performing arts program including
annual whole school production
•	 Extensive co-curricular program with over 50
clubs including chess, debating and anime
•	 Extensive music performance opportunities
Sports offered
Athletics, Australian Rules Football, Basketball,
Hockey, Soccer, Table Tennis, Volleyball
Success story
‘School life is pleasing because of patient
teachers and friendly students from
different countries. We have useful English
classes at the Language Centre and
Brunswick Secondary. There are many
interesting subjects, enthusiastic teachers
and students at Brunswick Secondary
College. I love my homestay - they make
me feel confident and relaxed.’
–	 Shukun Yang – Year 10
Awards
•	 Winner, Latrobe University High School
Legal Studies Mooting Comp’n, 2013/14
•	 High Distinction ICAS English Competition,
2013
•	 Victorian International School Student
Global Citizenship Award, 2014
•	 Hon. Mention, National History Challenge,
2013
•	 Winners, Year 7-9 Boys Victorian Table
Tennis Championship, 2012-13
•	 Kwong Lee Dow Scholarships, 2013
Reasons to choose our school
	
Dedicated teachers with expertise in the teaching of English as an Additional Language at all
levels
	Graduating students consistently achieve excellent Victorian Certificate of Education results
	Motivating and aspiring student culture
Visit our school online at www.brunswick.vic.edu.au
Address:	 47 Dawson Street,
Brunswick, VIC 3056
Distance from	
Melbourne city centre:	
4 km (Map Reference:
Pg 12-13, E3, No. 27 )
Principal:	 Vivienne Tellefson
International	
Student Coordinator:	
Anne Siciliano
Telephone:	 +61 3 9387 6133
Fax:	 +61 3 9387 0061
Email:	 brunswick.sc@edumail.vic.gov.au
Web:	 www.brunswick.vic.edu.au
Number of students:	 950 Number of international students:	 21
Dress:	 Uniform
Cost of uniform (approx.):	 $370
Cost of homestay per week:	 $285
28 Right School Right Place 2014/2015 – Melbourne A-Z
Buckley Park
College
The learning foundations at Buckley Park College are its broad curriculum and safe,
caring environment. The school is committed to nurturing both academic and
personal development. Experienced teachers inspire and motivate students to
achieve excellent Victorian Certificate of Education results. Individual progress is
carefully observed as students are prepared to enter the world of university, training
or employment. International students are welcomed into every aspect of school
life, forming lasting relationships with teachers and peers.
Features of the local area
•	 Easy access via public transport by train,
tram and bus
•	 Multicultural neighbourhood offering a
variety of sporting, cultural and
community facilities
•	 Close to both Melbourne city centre and
Melbourne International Airport
Languages taught
	 Japanese
	 German
Special programs
•	 Education enhancement programs for
Victorian Certificate of Education in
mathematics, sciences, English and history
•	 Local university student mentoring
•	 Year 11 study camp
Intensive English Language classes
Provided at English Language Centre, located
within 2 kilometres of school
Student support services and programs
•	 Experienced English as an Additional
Language support staff
•	 Careers resource centre
•	 Peer support program
•	 Dedicated year level coordinators
and form teachers
•	 Welfare support including psychologist,
chaplain and social worker
Extracurricular activities
•	 Germany and Japan overseas tours
•	 Mathematics and science competitions
•	 Instrumental music and band program
•	 Annual school theatre production
•	 Making a Difference Program for
community action
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Cricket, Cross Country, Golf, Hockey,
Netball, Soccer, Swimming, Table Tennis, Tennis,
Volleyball
Success story
‘I was at Buckley Park College for two years
for VCE. This has been my “greatest” time.
The school has many services to support
students. I had many chances to make new
friends and the staff and students are a
great help.’
–	 Phuoc Nguyen – Vietnam; studying
accounting at RMIT University
Awards
•	 Rio Tinto Big Science Competition – student
national distinction, 2013
•	 Students selected to participate in study tour
to Japan, 2014
•	 Premier’s VCE Award – Further
Mathematics ICT, 2013
•	 Pierre de Coubertin Award, 2014
•	 National Schools Constitution Convention
– Victorian student delegate, 2014
•	 Former student awarded RMIT University
Prize for Spatial Information Systems
Reasons to choose our school
	Positive school culture embracing and cooperation teamwork between staff and students
	A commitment to academic learning and focus on preparing students for university study
	Attractive school grounds where student-centred learning occurs in a safe, nurturing environment
Visit our school online at www.buckleyparkco.vic.edu.au
Address:	 Cooper Street
Essendon, VIC 3040
Distance from	
Melbourne city centre:	
14 km (Map Reference:
Pg 12-13, D3, No. 28 )
Principal:	 Nathan Chisholm
International	
Student Coordinator:	
Justin Garrett
Telephone:	 +61 3 9331 9999
Fax:	 +61 3 9331 9977
Email:	 buckley.park.co@edumail.vic.gov.au
Web:	 www.buckleyparkco.vic.edu.au
Number of students:	 950 Number of international students:	 15
Dress:	 Uniform
Cost of uniform (approx.):	 $350
Cost of homestay per week:	 $270 – $280
29For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Camberwell
High School
Camberwell High School was established in 1941 and is one of Melbourne’s
oldest and most highly regarded schools. Having operated a successful
international student program since 1996, our staff are familiar with the unique
needs of these students. Indeed, all teachers strive to meet individual student
needs, across the broad subject range and challenging curriculum. An on-site
English Language Centre offers skilled instructors who help international
students meet English education requirements.
Features of the local area
•	 Convenient to train, tram and bus routes
for short trips to Melbourne city and
other centres
•	 Appealing location and safe, secure suburb
with sports grounds, cycling tracks and parks
•	 Near to Camberwell shopping and business
hub with library, medical and banking facilities
Languages taught
	 Chinese (Mandarin) as a first and second
language
	 French
Special programs
•	 Acceleration and extension programs,
including participation in mathematics and
science competitions
•	 Opportunity to take part in overseas trips
•	 Extensive student leadership program
including international student captains
Intensive English Language classes
Provided from July to December at on-site
English Language Centre
Student support services and programs
•	 Careers guidance provided by experienced
teachers and two careers counsellors
•	 Dedicated International Student Coordinator
and Homestay Coordinator
•	 Welfare support provided by student welfare
coordinator; psychologist referral if needed
•	 After-school study sessions include guest
speakers and specialist subject teachers
•	 Excursions and social activities
Extracurricular activities
•	 Year level camps, study tours, overseas trips
•	 Music instruction and performance groups
•	 Drama festivals and biennial production
•	 Sporting activities and competitions
•	 Regular activities including a student
organised annual Asian Moon Festival
Sports offered
Australian Rules Football, Badminton, Baseball,
Basketball, Cricket, Golf, Hockey, Netball,
Rowing, Soccer, Softball, Swimming, Table
Tennis, Tennis, Volleyball
Success story
‘I loved school so much that I wanted to go
even during school holidays. Everything
was different – the education system was
better, the people nice and the school
facilities were better. I was amazed when I
first stepped into the school.’
–	 Crystal Seah – Malaysia; Year 12
Dux, 2010; studying medicine at
Monash University (achieved
distinctions and high distinctions
in 2010 state and national maths/
science competitions)
Awards
•	 Melbourne Schools Music Festival – gold
and silver medals, 2012-13
•	 Premiers VCE Awards –Classics, 2013
•	 Melbourne School Band – Saxophone
Quartet, 2012-13 and Soloist, 2014
•	 Distinctions and High-distinctions in state
and national maths competitions
•	 State Champions – lawn bowls, netball,
hockey, 2013 and baseball, 2014
•	 43% of international students achieved an
ATAR score over 90%, 2013
Reasons to choose our school
	High performing academic program and curriculum designed to ready students for university
	Experienced staff provide the quality teaching and support that ensures student success
	Comprehensive modern facilities that promote innovative teaching and learning
Visit our school online at www.camhigh.vic.edu.au
Address:	 Prospect Hill Road
Canterbury, VIC 3126
Distance from	
Melbourne city centre:	
10 km (Map Reference:
Pg 12-13, G4, No. 29 )
Principal:	 Jill Laughlin
International	
Student Coordinator:	
Isabelle McKenzie - AP
A. Beilby and P. Low - ISCs
Telephone:	 +61 3 9836 0555
Fax:	 +61 3 9836 0194
Email:	 isc@camhigh.vic.edu.au
Web:	 www.camhigh.vic.edu.au
Number of students:	 1200 Number of international students:	 80
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $290 + $10 internet
30 Right School Right Place 2014/2015 – Melbourne A-Z
Canterbury Girls’
Secondary College
Canterbury Girls’ Secondary College is a highly performing academic school for
girls. The College provides a quality educational environment, tailored to meet the
needs of girls, with a focus on success in a range of academic, creative and sporting
endeavours and the development of self-esteem and dignity.
Features of the local area
•	 Excellent public transport access that provide
links across Melbourne
•	 Close to shopping centers with all amenities
•	 Quiet residential area with nearby parks and
recreational facilities
Languages taught
	 French
	 Japanese
Special programs
•	 Student leadership opportunities
•	 Outstanding and extensive music and sport
programs
•	 University enhancement programs
•	 1:1 netbook program
•	 Only accredited De Bono thinking school in
Australia
•	 Extensive student exchange program
Intensive English Language classes
Provided at English Language Centre located
8kms from the school
Student support services and programs
•	 Careers advisor and centre
•	 Full time educational psychologist and
welfare support
•	 Peer support program
•	 Big Sister Little Sister support program
Extracurricular activities
•	 Clubs including chess, SRC, Sustainability,
Community Liaison, Social Service
•	 Student leadership program
•	 Extensive camp and tour program, domestic
and international
•	 Variety of local and national competitions in
academia, sport and music
•	 Annual drama and/or musical production
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Cricket, Cross Country, Dance,
Diving, Golf, Gymnastics, Hockey, Lacrosse,
Netball, Rowing, Soccer, Softball, Swimming,
Table tennis, Tennis, Volleyball
Success story
‘I had six fabulous years at Canterbury
Girls’ Secondary College. I had so many
amazing opportunities as a House Captain
to learn leadership skills and form
friendships with girls of all ages. I was
taught by passionate and dedicated
teachers who helped me endlessly to
exceed my goals. I cannot speak highly
enough of my time at Canterbury, I loved
every second of it..’
–	 Olivia Cartledge (Class of 2013), Studying a
Bachelor of Health Science and Master of Clinical
Prosthetics and Orthotics, La Trobe University
Awards
•	 Victorian Outstanding Teacher contribution
to School Sport, 2013
•	 Victorian Schools Music Festival winners of
Bronze, Silver and Gold Shields, 2010-14
•	 VCE Top Arts and Top Design Awards,
2011-13
•	 Pierre de Coubertin Award, 2014
•	 Student recipients of scholarships, Faculty
of Engineering Monash University, 2012-14
•	 State Finals: 9 Swimming Gold Medals, 3 Athletics
Gold Medals. State Champions Senior Hockey
Reasons to choose our school
	High academic achievements
	Medium sized school allowing for individualised education
	Student-led House program enabling interaction with all students
Visit our school online at www.cgsc.vic.gov.au
Address:	 Mangarra Rd,
Canterbury, VIC 3126
Distance from	
Melbourne city centre:	
10 km (Map Reference:
Pg 12-13, G4, No. 30 )
Principal:	 Mary Cannon
International	
Student Coordinator:	
Helene Hiotis
Telephone:	 +61 3 9830 5099
Fax:	 +61 3 986 8958
Email:	 info@cgsc.vic.edu.au
Web:	 www.cgsc.vic.gov.au
Number of students:	 1100 Number of international students:	 0
Dress:	 Uniform
Cost of uniform (approx.):	 $600
Cost of homestay per week:	 $300
31For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Carwatha
College P-12
A multicultural community, Carwatha College P-12 welcomes students from over 55
nationalities. Drawing enrolments from a wide geographic area, the school provides
a caring, nurturing environment that empowers students to achievement and
success. Carwatha College P-12 encourages both primary and secondary students
to strive for academic excellence. Three-year Victorian Certificate of Education
offered for all Year 10, 11 and 12 students to maximise opportunities for success.
Features of the local area
•	 Well-serviced by public transport bus routes
•	 Quiet residential area, close to shopping,
bank, sporting and recreational facilities
•	 Just 20 minutes to Melbourne city via Monash
Freeway and EastLink
Languages taught
	 French
Special programs
•	 Three-year VCE program
•	 Mathematics extension program
•	 Extra English and mathematics support
•	 Instrumental music instruction
and performance
•	 Music and theatre productions
•	 Annual Victorian Certificate of Education
presentation ball and valedictory dinner
Intensive English Language classes
Provided at English Language Centre located
within 3 kilometres of school
Student support services and programs
•	 Careers resource centre
•	 Victorian Certificate of Education
motivational sessions
•	 Success coaching for Years 9-11
•	 Individual learning pathways from Years 9-12
•	 Wellbeing team including adolescent health
nurse and psychologist
•	 Peer support program
•	 Leadership programs at all year levels
Extracurricular activities
•	 College wide mentoring including primary
and secondary school mentors
•	 Clubs including chess club; debating club
•	 Annual theatre production and concerts
•	 Array of sporting facilities and activities,
including ski trip and surf safety training
•	 School camps
Sports offered
Athletics, Australian Rules Football, Baseball,
Basketball, Cricket, Cross Country, Hockey,
Netball, Soccer, Swimming, Table Tennis,
Tennis, Volleyball
Success story
‘My Year 12 at Carwatha was the most
wonderful and memorable experience in
my life. The special care for international
students made me feel safe and welcome.
One of the best things is the diversity of
the students’ background cultures; as a
result everyone is friendly.’
–	 Richard Zhang – China; studying
biomedical science advanced with
honours at Monash University
Awards
•	 Victorian Education Excellence Award –
Winner, 2014
•	 Ongoing success in state and regional chess
competitions
•	 Monash University Dean’s Scholar’s Award
(international student), 2009
•	 Second place, regional Battle of the Bands,
2011
Reasons to choose our school
	Three-year VCE program
	Limited international student enrolment offers a truly personal education experience
	Dynamic multicultural campus with Victorian School of Languages on-site
Visit our school online at www.carwatha.vic.edu.au
Address:	 43-81 Browns Road
Noble Park North, VIC 3174
Distance from	
Melbourne city centre:	
25 km (Map Reference:
Pg <OV>-<OV>, I7, No. )
Principal:	 Bronwyn Hamilton
International	
Student Coordinator:	
Lynne Ramsay
Telephone:	 +61 3 9795 5848
Fax:	 +61 3 9790 1712
Email:	 carwatha.p12@edumail.vic.gov.au
Web:	 www.carwatha.vic.edu.au
Number of students:	 900 Number of international students: 	 7
Dress:	 Uniform
Cost of uniform (approx.):	 $200
Cost of homestay per week:	 $200 - $250
31
32 Right School Right Place 2014/2015 – Melbourne A-Z
Charles La Trobe
P-12 College
One of Melbourne’s newest schools, Charles La Trobe College is set amongst
appealing landscaped gardens. Just 12 kilometres from Melbourne city centre,
the recently opened college boasts a range of cutting edge education facilities. The
school provides a strong academic pathway to tertiary study. Unique student
benefits include Quantum Victoria a Specialist Mathematics and Science Centre and
a flourishing partnership with La Trobe University.
Features of the local area
•	 Well-serviced by train, tram and bus routes
•	 Close to Northland Shopping Centre with
banking, entertainment and business facilities
•	 Nearby the Austin Hospital medical precinct
Languages taught
	 Auslan
	 Chinese (Mandarin)
Special programs
•	 English as an Additional Language Program
offered at all year levels
•	 Strong partnership with La Trobe University
•	 Year 7-12 Careers program
•	 P-12 Student Leadership opportunities
•	 Access to Quantum Victoria a Specialist
Mathematics and Science Centre
•	 Year 8-9 Specialist Mathematics and Science
Program
Intensive English Language classes
Provided at English Language Centre located
within 12 kilometres of school
Student support services and programs
•	 Experienced International Student Manager
•	 Chinese and Vietnamese Staff
•	 Wellbeing Team – Student Welfare
Coordinator, Nurse, Psychologist, College
Chaplain
•	 Careers Resource Centre
•	 Homework club
•	 Free tutoring provided by La Trobe University
students
Extracurricular activities
•	 Year 10 World at Work Program to assist in
development of skills for career planning
•	 High Resolves student leadership program
•	 Sister school study tour program
•	 School camps including VCE study camp
•	 Inter-school sports competitions
•	 House Debating, Art show and Talent quest
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Soccer, Softball, Table
Tennis, Volleyball
Success story
‘I have enjoyed my time at Charles La Trobe
College because of my teachers. It is easy to
engage with them as many are from my
generation. They have challenged me beyond
the text book and study design to give me a
deeper knowledge of the subjects I am
studying.’
–	 Ben Dinh – (Vietnam) studying Year 12
(Rosanna Rotary Club Scholarship holder)
Awards
•	 University of Melbourne Young Scholars Program- Kwong Lee Dow Award
•	 Australian Defence Award
•	 Rotary Club Scholarships Years 8-11
Reasons to choose our school
	
Multi-cultural school with a welcoming school community that supports students from diverse
backgrounds
	A strong technology focus across all areas of learning
	New modern classroom spaces and facilities
Visit our school online at www.charleslatrobecollege.vic.edu.au
Address:	 235 Kingsbury Drive
Macleod West, VIC 3085
Distance from	
Melbourne city centre:	
12 km (Map Reference:
Pg 12-13, G2, No. 32 )
Principal:	 Jason Bek
International	
Student Coordinator:	
Bernadette Smith
Telephone:	 +61 3 9223 1400
Fax:	 +61 3 9223 1499
Email: 	 charles.la.trobe.p12@edumail.vic.gov.au
Web:	 www.charleslatrobecollege.vic.edu.au
Number of students:	 470 Number of international students:	 24
Dress:	 Uniform
Cost of uniform (approx.):	 $350
Cost of homestay per week:	 $270
33For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Cheltenham
Secondary College
Cheltenham Secondary College is renowned for its caring and supportive learning
environment. The school fosters a culture of courtesy, self-discipline and respect
amongst its welcoming students and staff. A strong discipline and welfare structure
are cornerstones of the college community. The school’s Victorian Certificate of
Education program is characterised by course counselling and personal learning
pathways. The support of a skilled and experienced teaching team has rewarded
many graduating Year 12 students with outstanding results.
Features of the local area
•	 Close to regular public transport services
•	 Warm, safe and friendly neighbourhood
•	 Nearby major shopping centres and other
lifestyle amenities
Languages taught
	 Italian
Special programs
•	 International student additional English
support for two hours each week
•	 University of Melbourne sponsored
mathematics program
•	 Daily after-school tutoring program
•	 All senior students receive personal
laptop computers
•	 Instrumental music program
•	 Sports coaching
Intensive English Language classes
Provided at English Language School on-site or
located within 10 kilometres of school
Student support services and programs
•	 Careers resource centre
•	 Peer support program
•	 Part-time psychologist
Extracurricular activities
•	 International student camp and tour program
•	 Regular international student events and
social activities
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Golf, Hockey, Netball,
Soccer, Swimming, Table Tennis
Success story
‘I met lots of Cheltenham classmates
at the University of Melbourne. Teachers
at Cheltenham are very friendly to us.
Cheltenham has a nice education, nice
friendship and most important thing is
Cheltenham can provide a very comfortable
environment for students to improve
English skills.’
–	 Jack Hou – China; studying architecture
at the University of Melbourne
Awards
•	 Australian Schools mathematics
competitions – top performer
•	 Caltex All-Rounder Award
•	 Australian Schools science competitions
– top performer
•	 University of Melbourne Young Scholars
program recipients
Reasons to choose our school
	High local student to international student ratio offers genuine integration
	
Graduating students achieve consistently outstanding Victorian Certificate of Education
results
	Tertiary level mathematics program in conjunction with the University of Melbourne
Visit our school online at www.cheltsec.vic.edu.au
Address:	 Bernard Street
Cheltenham, VIC 3192
Distance from	
Melbourne city centre:	
18 km (Map Reference:
Pg 12-13, G7, No. 33 )
Principal:	 Keith Muller
International	
Student Coordinator:	
Judy Ponton
Telephone:	 +61 3 9555 5955
Fax:	 +61 3 9555 8617
Email:	 cheltenham.sc@edumail.vic.gov.au
Web:	 www.cheltsec.vic.edu.au
Number of students:	 1100 Number of international students:	 35
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $270
34 Right School Right Place 2014/2015 – Melbourne A-Z
Collingwood
College
Established in 1882, Collingwood College is one of Melbourne’s oldest and finest
inner city schools. Located a short distance of the city centre, the college supports
P-12 students over two modern campuses. The school fosters a friendly and
supportive learning atmosphere that motivates students to accomplish personal
learning goals. Every student is passionately encouraged to be their best and
strive for academic excellence. Collingwood College students consistently gain
100% completion of Victorian Certificate of Education studies.
Features of the local area
•	 Well-serviced by trains, trams and a variety
of bus routes
•	 Multicultural environment within a vibrant
inner city locale, close to Melbourne CBD
•	 Near to Melbourne, RMIT, La Trobe and
Victoria universities as well as other further
education facilities
Languages taught
	 Chinese (Mandarin)
	 Spanish
	 Vietnamese
Special programs
•	 Intensive English as an Additional
Language classes
•	 Mathematics and science streams to cater for
a variety of student abilities
•	 La Trobe University advocacy program
•	 Vocational Education and Training subjects
•	 After-school homework club
Intensive English Language classes
Provided at English Language Centre, located
within 10 minutes’ walk of school
Student support services and programs
•	 Early morning student tutorials
•	 After-school specialist tutors
•	 Career guidance with local organisations
•	 Peer support program
•	 Part-time welfare worker, psychologist
and paediatrician
•	 Speech pathologist and youth worker
available by appointment
Extracurricular activities
•	 International student overnight camp
•	 Clubs (Chess, Drama, Tai Chi, Soccer, Art)
•	 Cultural Festival Celebrations (Spring Festival,
Mid-Autumn Festival)
•	 	Other Social activities (Welcome Picnic,
Birthday Parties, Snow Playing)
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Cycling, Hockey, Netball, Soccer, Softball,
Swimming, Table Tennis, Tennis, Volleyball
Success story
Duc Truong, from Vietnam, received a
Premier’s Award for outstanding academic
achievement in his Victorian Certificate of
Education year at Collingwood College.
Duc recently graduated from the University
of Melbourne with a double degree. Duc
encouraged his cousin Khanh to enrol at
Collingwood College when she had several
options owing to her excellent academic
achievement and her IELTS 6.5.
Awards
•	 State Top Design — Design Exhibits in
National Gallery of Victoria, 2013
•	 Kwong Lee Dow Young Scholar, 2014
•	 Top VCE student in Vietnamese, 2013
•	 Three Skyline Scholarships, 2014
Reasons to choose our school
	Emphasis on academic achievement with around 100 VCE units offered on two campuses
	
Friendly, supportive and competitive learning environment with strong links to local
universities
	Modern learning facilities including a state-of-the-art design and technology centre
Visit our school online at www.collingwood.vic.edu.au
Address:	 Cnr. Cromwell St & McCutcheon Way
Collingwood, VIC 3066
Distance from	
Melbourne city centre:	
Principal:	 Dale Perichon
International	
Student Coordinator:	
Lucy Wang
Telephone:	 +61 3 9417 6681
Fax:	 +61 3 9416 1279
Email:	 collingwood.co@edumail.vic.gov.au
Web:	 www.collingwood.vic.edu.au
Number of students:	 680 Number of international students:	 25
Dress:	 Non-uniform Cost of homestay per week:	 $260 – $280
1.6 km (Map Reference:
Pg <OV>-<OV>, F4, No. 34 )
35For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Copperfield
College
Copperfield College is a culturally diverse school. Its modern facilities span two
Years 7-10 campuses and one Years 11-12 campus where students may access
all Victorian Certificate of Education studies. The stimulating senior campus
environment helps students achieve high results and gain university entry.
Accelerated learning opportunities and the extra support of English as an
Additional Language classes encourage students to excel. A leadership program
gives all students the chance to develop personal leadership skills.
Features of the local area
•	 Well serviced by public transport including
train-lines and bus routes
•	 Convenient location near to shopping centre
Languages taught
	 Japanese
	 Italian
Special programs
•	 English as an Additional Language
•	 Year 12 holiday VCE exam preparation
•	 Homework club
•	 Student leadership and environmental
leadership programs
•	 Student literacy program
•	 Challenge Day participation
•	 Production and instrumental music
•	 Access to a broad range of Vocational
Education and Training in school courses
•	 Camps/activity program for all year levels
Intensive English Language classes
Provided at English Language Centre located
within 5 kilometres of school. Small English as
an Additional Language classes provide focused
individual tuition at school.
Student support services and programs
•	 Victorian Certificate of Education centre
•	 Libraries with extensive resources and
internet access on each campus
•	 Mentor/home group program
•	 Careers resource centre and counsellors
•	 Trade training centre
•	 Full-time psychologist at each campus
Extracurricular activities
•	 Student leadership opportunities
•	 Debating club
•	 School theatre production and
instrumental classes
•	 Sports (full-size gymnasium, artificial turf
sports ground, basketball/netball courts)
•	 Environmental program
Sports offered
Athletics, Australian Rules Football, Soccer,
Rugby, Softball, Badminton
Success story
‘The best things about my time at
Copperfield were the great learning
environment, new friends, the teachers
and the new experiences for life and study.’
–	 Yitong Lin – China; Dux of College,
2011; member of the Leadership Team
to support other international students
and contribute to school programs
Awards
•	 School received state leadership Award –
Numeracy, 2011
•	 VCE Curriculum Excellence Award
•	 Kool Skools music and video – winner,
2013
•	 Waka Kiri performance award, 2013
•	 Science and Mathematics Education
Excellence Award, 2011
Reasons to choose our school
	Multi-campus and multicultural school fostering a spirit of cooperation and belonging
	Broad choice of subjects and pathways at VCE level with various acceleration opportunities
	Extra English tutoring offered above regular English as an Additional Language classes
Visit our school online at www.copperfieldcollege.vic.edu.au
Address:	 Goldsmith Avenue
Delahey, VIC 3037 (senior campus)
Distance from	
Melbourne city centre:	
18 km (Map Reference:
Pg<OV>-<OV>,B2,No. 35 )
Principal:	 Tony Simpson
International	
Student Coordinator:	
Sue Wettenhall
Telephone:	 +61 3 9307 5555
Fax:	 +61 3 9307 5444
Email:	 copperfield.co@edumail.vic.gov.au
Web:	 www.copperfieldcollege.vic.edu.au
Number of students:	 1850 Number of international students:	 25
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $230 – $250
36 Right School Right Place 2014/2015 – Melbourne A-Z
Dandenong
High School
Established in 1919, Dandenong High School is one of the oldest, largest and most
culturally-diverse secondary schools in Victoria. Experienced and caring teachers
ensure students develop a deep sense of connectedness to the school and excel in
their academic studies. The school has an innovative curriculum based on the
principles of inquiry and deep learning and offers a broad range of opportunities for
all students. We offer a comprehensive EAL Program and a strong Sports and
Performing Arts program.
Features of the local area
•	 Serviced by regular train and bus public
transport routes
•	 Multicultural community, close to vibrant
shopping preincints
•	 Close to Tertiary institutions - Deakin and
Monash Universities and Chisholm TAFE
Languages taught
	 Japanese
	 French
	 Latin
Special programs
•	 EAL including experienced multicultural
education assistance
•	 Laptop 1:1 program with Multimedia/IT focus
•	 Instrumental music program with private
tuition
•	 Select Entry Accelerated Learning Program
•	 Drama and dance, debating and public
speaking
•	 Literacy and numeracy support programs
Intensive English Language classes
Provided at English Language Centre located
within 4 kilometres of school
Student support services and programs
•	 Victorian School of Languages located onsite
•	 Well-supported International Student
program
•	 Full-time wellbeing staff including
psychologist, speech therapist, school nurse
•	 Careers resource centre
•	 Well-equipped Learning Resource Centre
•	 Partnerships with Monash and Deakin
Universities
Extracurricular activities
•	 Harmony Ambassadors/International Week
•	 House competitions including chorals,
athletics and swimming
•	 Surf, ski, and outdoor education camps
•	 Performing Arts Gala, Dance Showcase and
School Production
•	 Homework Club
Sports offered
Athletics, Australian Rules Football,
Badminton, Baseball, Basketball, Cricket,
Cross Country, Futsal, Golf, Hockey, Netball,
Rugby, Soccer, Softball, Squash, Swimming,
Table Tennis, Tennis, Touch Rugby, Volleyball
Success story
‘It has been a privilege to be part of
Dandenong High School. The coordinated
learning environment offered both a
personal and social zone where I made
many friends who inspired and helped me
through my unforgettable journey across
high school.’
–	 Chamnap Phok – International Student
from Cambodia
Awards
•	 VCE Top Schools awards in Media and
Design, 2010-14
•	 CEFPI Education Facilities Awards Australian
Region-Winner Major Facility, 2009-10
•	 University of Melbourne’s Kwong Lee Dow
Young Scholarships Program, 2013
•	 DEECD School Design Awards - Best Overall
School
•	 Garth Boomer Curriculum Leadership Award,
2011
•	 DEECD School Design Awards - Best
Secondary School, 2009
Reasons to choose our school
	Well-established, highly-innovative and internationally-renowned educational precinct
	Large multicultural school with architecturally-designed, state of the art facilities
	
An environment that fosters curiosity, inclusion, empathy, respect, excellence and tolerance for
diversity
Visit our school online at www.dandenong-hs.vic.edu.au
Address:	 92-106 Princes Highway
Dandenong, VIC 3175
Distance from	
Melbourne city centre:	
30 km (Map Reference:
Pg 12-13, J8, No. 36 )
Principal:	 Susan Ogden
International	
Student Coordinator:	
Carol Collins
Telephone:	 +61 3 9792 0561
Fax:	 +61 3 9706 8028
Email:	 dandenong.hs@edumail.vic.gov.au
Web:	 www.dandenong-hs.vic.edu.au
Number of students:	 1900 Number of international students:	 20
Dress:	 Uniform
Cost of uniform (approx.):	 $250 – $300
Cost of homestay per week:	 $230 – $250
37For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Doncaster
Secondary College
Doncaster Secondary College is noted for the strong academic performance of its
international students. Close attention is paid to the learning needs and welfare of
this unique student group. An experienced team of dedicated staff support our
international students to achieve success and progress to tertiary education. New
students joining the on-site Intensive English Language Program have the optional
advantage of participating in mainstream elective and mathematics extension
classes to rapidly consolidate their English language skills.
Features of the local area
•	 Well serviced by regular bus routes that also
link to Melbourne city centre
•	 An array of nearby recreational and
sporting amenities
•	 Positioned close to major shopping and
entertainment centre
Languages taught
	 Chinese
	 French
	 Italian
Special programs
•	 University of Melbourne and Monash
University extension programs
•	 Mathematics acceleration program
•	 Learning enhancement and enrichment
•	 Academic competition program in English,
mathematics and science
•	 Student leadership opportunities
•	 House drama, orchestra and school choir
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Specialist classroom support
•	 Careers adviser and resource centre
•	 Homegroup support and social
development program
•	 After-school homework club and mathematics
tuition program
•	 Welfare coordinator and school chaplain
•	 Health centre including on-site school nurse
Extracurricular activities
•	 International students excursions
around Victoria
•	 International students basketball club
•	 Debating and public speaking clubs
•	 Vocal ensemble and performances
•	 Chess club
•	 Badminton and tennis
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Dance, Hockey, Netball, Soccer, Softball,
Swimming, Table Tennis, Tennis, Volleyball
Success story
‘Coming to Australia and being an
international student is one of the best
experiences of my life. I enjoyed my school
life in DSC and made lots of friends
through joining many interesting school
activities. Teachers in DSC helped me to
achieve my best possible academic results
(University entrance score of 98.15). I
learned to be assertive and independent
and now I am also a part-time manager
of a small company.’
–	 Chen (Anna) Liu – China; studying
commerce at the University of Melbourne
Awards
•	 Multiple Premiers Awards for top VCE
students including Chinese language, 2013
•	 Melbourne University Kwong Lee Dow Youth
Scholars Program, 2013
•	 Monash University Engineering Scholarships
awarded to international students, 2011-13
•	 Statewide Top Design Exhibiters Award for
Visual Communication and Design, 2013
•	 International and National Mathematics
Olympiad awards, 2010, 2012
•	 Swinburne University Deans Scholarship for
Design , 2012
Reasons to choose our school
	Highly individualised welfare and academic support
	A very well regarded and long standing international student program
	A caring supportive teaching staff with a focus on academic achievement and leadership
Visit our school online at www.doncastersc.vic.edu.au
Address:	 123 Church Road
Doncaster, VIC 3108
Distance from	
Melbourne city centre:	
15 km (Map Reference:
Pg 12-13, H3, No. 37 )
Principal:	 Eva McMaster
International	
Student Coordinator:	
Susan Qu
Telephone:	 +61 3 9848 4677
Fax:	 +61 3 9840 1390
Email:	 doncaster.sc@edumail.vic.gov.au
Web:	 www.doncastersc.vic.edu.au
Number of students:	 1300 Number of international students:	 110
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $280
38 Right School Right Place 2014/2015 – Melbourne A-Z
Dromana
Secondary College
Dromana College is located on 40 Hectares in a rural setting overlooking Port Philip
Bay. The College provides a broad curriculum and flexible learning environment
tailoring individual need with academic excellence. Our highly skilled and
passionate staff ensure students become independent learners with the knowledge,
skills and values necessary to experience successful, rewarding and fulfilling lives.
The College is proud of its VCE results which gives students access to a range of
University and other tertiary courses.
Features of the local area
•	 Close to native Australian flora and fauna
•	 Spectacular beaches
•	 Bush walking opportunities
Languages taught
	 Japanese
	 Indonesian
Special programs
•	 St John Ambulance Cadets
•	 Partnership with Monash University
•	 Dance	
•	 Notebook laptop program
•	 Annual readers and writers festival
•	 Musical productions
•	 Debating and public speaking
•	 Camps and tours
•	 Comprehensive sports program
•	 Human powered vehicle
Intensive English Language classes
Provided at nearby English Language Centre
Student support services and programs
•	 Part-time psychologist
•	 Careers resource center
•	 Peer support program
•	 College Chaplain
•	 College Nurse
•	 St John Ambulance officer on duty school
hours
Extracurricular activities
•	 Mountain bike program
•	 Human powered vehicle
•	 Junior & senior drama productions
Sports offered
Athletics, Australian Rules Football, Basketball,
Netball, Soccer, Surfing, Swimming
Success story
‘Dromana gave me the opportunity to
explore the subjects I wanted to do, as well
as assisting me and always concerned with
my wellbeing. The whole school body was
happy to have me. Therefore I could really
enjoy every moment of this fantastic
semester abroad. My six months here were
full of new, interesting and sometimes
strange experiences, but I am most
thankful for the friendly people who
surrounded me. The host family was a
stroke of luck, but also my school Dromana
College.’
–	 Juliana Svoboda – Austria
Awards
•	 Pierre De Coubertin Award •	 Young Adventurers Award
•	 Top Arts
•	 State Swimming Championship – Gold medalist
Reasons to choose our school
	Spirit of cooperation and belonging among staff and students
	Small school offering personalised experience
	Attractive school grounds close to native flora and fauna
Visit our school online at www.dsc.vic.edu.au
Address:	 110 Harrison Road
Dromana, VIC 3936
Distance from	
Melbourne city centre:	
80 km (Map Reference:
Pg 12-13, H12, No. 38 )
Principal:	 Alan Marr
International	
Student Coordinator:	
Simon Jones
Theresa Stelling
Telephone:	 +61 3 5987 2805
Fax:	 +61 3 5981 4345
Email:	 dromana.sc@edumail.vic.gov.au
Web:	 www.dsc.vic.edu.au
Number of students:	 1000 Number of international students:	 2
Dress:	 Uniform
Cost of uniform (approx.):	 $500
Cost of homestay per week:	 $200 – $300
39For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
East Doncaster
Secondary College
Situated 16 kilometres from Melbourne CBD, East Doncaster Secondary College
offers modern facilities set amongst substantial grounds and playing fields. The
multicultural environment provides students with abundant subject choice. A broad
curriculum includes languages, sciences, mathematics, humanities, technology and
the arts. Skilled teachers and staff nurture a culture of curiosity to develop students’
academic and social skills. Almost 100% of graduating Victorian Certificate of
Education students gain university and tertiary college entry.
Features of the local area
•	 Easy public transport access to school,
universities, Technical and Further Education
colleges and city
•	 Peaceful, safe residential area with abundant
parks and sporting facilities
•	 Close to shopping centres, libraries,
restaurants, banks
•	 Chinese and western medical
practitioners nearby
Languages taught
	 Chinese (Mandarin)
	 Italian
Special programs
•	 Victorian Certificate of Education student
university orientation program
•	 Years 10-12 study skills program
•	 Regular excursions and cultural activities
•	 Intensive student orientation program
Intensive English Language classes
Provided at two English Language Centres
located within 8 kilometres of school
Student support services and programs
•	 Two specialist international
student assistants
•	 Careers resource centre and personalised
course counselling
•	 English conversation club
•	 Homework program
•	 Orientation program
Extracurricular activities
•	 Academic competitions and extension work
•	 Student leadership opportunities
•	 Instrumental music with multiple choirs,
ensembles and performance opportunities
•	 Drama and musical productions
•	 Participation in a wide range sports
•	 Debating
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Golf, Hockey, Netball, Soccer, Softball,
Swimming, Table Tennis, Tennis, Volleyball
Success story
‘The teachers at my school were very
friendly and patient. The ESL teachers
and the language assistants helped me
to improve my English and to be more
confident in speaking to my classmates.
This has been a big help to me
at university.’
–	 Jia Gu – China; awarded Masters of
Finance, Monash University, 2011
Awards
•	 Top VCE students – Physical Education,
Visual Communication and Design, 2010
•	 State soccer and athletics – champions,
2010; cross country – champions, 2011
•	 Melbourne School Strings Festival –
medalists, 2010-14
•	 Premier’s Award - Top 1% VCE in IT, 2011 -12
EAL, 2013, Business Management, 2014
•	 State Sport Diving Award, 2014
•	 Australian Intermediate Mathematics
Olympiad – students selected, 2011
Reasons to choose our school
	Large multicultural campus with a friendly and cohesive learning atmosphere
	
Exemplary record of academic success and forging tertiary pathways with wide subject
choices
	Extensive co-curricular program giving students the chance to extend particular talents
Visit our school online at www.edsc.vic.edu.au
Address:	 20 George Street
East Doncaster, VIC 3109
Distance from	
Melbourne city centre:	
16 km (Map Reference:
Pg 12-13, I3, No. 39 )
Principal:	 John Handley
International	
Student Coordinator:	
Simon Veerhuis
Telephone:	 +61 3 9842 2244
Fax:	 +61 3 9841 8010
Email:	 east.doncaster.sc@edumail.vic.gov.au
Web:	 www.edsc.vic.edu.au
Number of students:	 1500 Number of international students:	 60
Dress:	 Uniform
Cost of uniform (approx.):	 $350
Cost of homestay per week:	 $280
40 Right School Right Place 2014/2015 – Melbourne A-Z
Elwood
College
Set in a charming beachside suburb, Elwood College is just 15 minutes from
Melbourne CBD. The popular international program is run by dedicated staff,
committed to providing a quality education program. Students settle into study
and life, supported by excellent Homestay care and dedicated student welfare.
Exciting sports and other activities complete the positive learning experience.
Elwood College is known for its high level of Year 12 success and the number
of students progressing to tertiary education.
Features of the local area
•	 Excellent public transport connections to all
parts of the city
•	 Beautiful local area with beaches, parks,
restaurants and shops
•	 Within easy reach of Melbourne CBD
Languages taught
	 Japanese as a first and second language
	 Chinese as a first and second language
	 French
Special programs
•	 Experienced international Chinese, Korean,
Japanese, Vietnamese program assistants
•	 Intensive English Language program
•	 Outstanding science/mathematics programs
•	 Business, accounting and information
technology courses
•	 Specialist art, design and
photography instruction
•	 Student orientation program
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Dedicated international program staff
•	 Language assistants to help new students
•	 Tutorial program for extra learning support
•	 Homework classes for international students
•	 Translation services in Japanese, Chinese,
Korean, Vietnamese, Russian, French,
Spanish and German
•	 Part-time psychologist and dedicated student
wellbeing team
Extracurricular activities
•	 International student camp and tours,
including interstate and local excursions
•	 Extensive music and theatre program
including yearly musical production
•	 Annual school art show
•	 Ski and snowboarding camp
•	 Sports teams
•	 Outdoor education and adventure camps
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Futsal, Handball,
Hockey, Lacrosse, Netball, Snow Skiing, Soccer,
Swimming, Table Tennis, Tennis, Volleyball
Success story
‘I loved my time at Elwood College. I made
so many friends and we all supported each
other during the hard work for the VCE. I
had so much assistance from the teachers
and the aides at the college. I am really
happy with my results.’
–	 Jiang Yishan – China; studying
Engineering at RMIT University
Awards
•	 Monash University Vice Chancellor’s Award
– Mathematics, 2013
•	 Australian Defence Force Academy
Scholarship, 2012
•	 University of Melbourne Kwong Lee Dow
Scholarship, 2013
•	 Swinburne University Vice Chancellor’s
Scholarship – Design, 2013
Reasons to choose our school
	
All Year 12 students successfully graduate and around 90% progress to university or Technical
and Further Education
	Superbly appointed new science, language and senior study facilities opened recently
	Diverse, multicultural student population from Australia, Asia, Europe, North and South America
Visit our school online at www.elwood.vic.edu.au
Address:	 101 Glenhuntly Road,
Elwood, Vic 3184
Distance from	
Melbourne city centre:	
6 km (Map Reference:
Pg 12-13, F5, No. 40 )
Principal:	 Rhonda Holt
International	
Student Coordinator:	
Greg Pritchard
Stella Turchina
Telephone:	 +61 3 9531 9566
Fax:	 +61 3 9525 6213
Email:	 elwood.co@edumail.vic.gov.au
Web:	 www.elwood.vic.edu.au
Number of students:	 600 Number of international students:	 65
Dress:	 Uniform
Cost of uniform (approx.):	 $230
Cost of homestay per week:	 $275
41For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Essendon Keilor
College
A co-educational school, Essendon Keilor College is close to Melbourne CBD. The
college spans two Years 7-9 (East Keilor and Niddrie) and one senior campus
(Essendon). Year 10-12 students enjoy a comprehensive choice of Victorian
Certificate of Education and Vocational Education and Training subjects and courses.
Students flourish within the caring environment with its personal achievement
focus. International students are actively encouraged to participate in the academic,
extracurricular and social sides of school life.
Features of the local area
•	 Excellent public transport services including
tram, train and bus routes
•	 Very close to the vibrant centre of Melbourne
•	 Nearby major shopping, business and
entertainment areas
Languages taught
	 Chinese for first language speakers
(Years 11-12)
	 Japanese (Years 7-12)
	 Italian (Years 7-12)
Special programs
•	 Experienced Chinese and Vietnamese
international program staff assist students
and communicate with families
•	 Intensive university entrance counselling for
Victorian Certificate of Education students
•	 International student excursions
and activities
•	 International family visits by school staff
•	 Study seminars
Intensive English Language classes
•	 On-site English Language Centre at
Essendon Campus
•	 Extra English language enrichment tuition
sessions for Years 10-12 international
students
•	 Junior campuses English assistance
Student support services and programs
•	 Specialist international support staff
•	 Careers resource centre
•	 Well managed Homestay program
•	 Personal computer provided for Years 10-12
students
•	 Comprehensive welfare service
Extracurricular activities
•	 Engaging excursions and activities
•	 Interstate and overseas tours
•	 Annual college musical production
•	 Debutante ball and college formal
•	 	Interschool sport
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Netball, Soccer, Softball, Swimming, Table
Tennis, Tennis, Volleyball
Success story
Pham Truong Thinh Le came to us from
Vietnam and commenced in Year 10. He
gained a university entrance score of 99.5
and accepted a full scholarship to study
commerce at the University of Melbourne.
Thinh also received a Premier’s Award as
one of the best three international
students of his year. He has since won the
first year mathematics prize and the final
year commerce prize at the University of
Melbourne.
Awards
•	 Premier’s Prize – one of top three international students
•	 Victorian Education Excellence awards, finalist
•	 Pierre de Coubertin Award
Reasons to choose our school
	Spirit of cooperation and belonging among staff and students
	Small school offering personalised experience
	Large multicultural campus
Visit our school online at www.ekc.vic.edu.au
Address:	 286 Buckley Street
Essendon, VIC 3040
Distance from	
Melbourne city centre:	
8 km (Map Reference:
Pg 12-13, E3, No. 41 )
Principal:	 David Adamson
International	
Student Coordinator:	
Alistair McCrum
Telephone:	 +61 3 9319 1300
Fax:	 +61 3 9319 1343
Email: essendon.keilor.co@edumail.vic.gov.au
Web:	 www.ekc.vic.edu.au
Number of students:	 950 Number of international students:	 60
Dress:	 Uniform
Cost of uniform (approx.):	 Provided by school
Cost of homestay per week:	 $290
42 Right School Right Place 2014/2015 – Melbourne A-Z
Fairhills
High School
Located east of Melbourne city, Fairhills High School is a medium size, co-
educational school. International students are welcomed into a nurturing school
environment that values cultural diversity. Annual exchanges with Germany and
Japan extend students’ global perspective. Diverse curriculum choices offer distinct
academic and vocational learning pathways. Students live with friendly local
families while undertaking the Victorian Certificate of Education or Vocational
Education and Training/Victorian Certificate of Applied Learning program
Features of the local area
•	 Nearby the scenic Dandenong Ranges National
Park with abundant flora and fauna
•	 Close to a major shopping and cinema
complex, sporting and leisure amenities
•	 Well-serviced by train-lines and bus routes
Languages taught
	 Japanese
	 German
Special programs
•	 Experienced international program assistants
•	 Accelerated learning program for high
performing students
•	 Monash University science and language
enhancement at Victorian Certificate of
Education level.
•	 Links to Swinburne University and a high-tech
science learning centre (KIOSC)
•	 Deakin University Annual Study Skills
Conference with access to teaching facilities
•	 Basketball Academy and Performing Arts
Centre
Intensive English Language classes
•	 Students commence studies at a nearby
English Language Centre
•	 Qualified staff lead small groups for Intensive
English as an Additional Language support
Student support services and programs
•	 Free intensive personal tutoring for
international students
•	 Individual vocation guidance counselling at
careers resource centre
•	 Peer support program
•	 School leadership program
•	 Part-time social worker, psychologist
and chaplain
Extracurricular activities
•	 International student tour and camp program
•	 Musical and inter-school dance competitions
•	 Inter-school debating
•	 Sports including basketball and martial arts
clubs
•	 Chess club
Sports offered
Athletics, Australian Rules Football,
Badminton, Baseball, Basketball, Bike
Education, Cricket, Cross Country, Indoor
Soccer, Golf, Hockey, Netball, Snow Skiing,
Soccer, Softball, Swimming, Table Tennis,
Tennis, Touch Rugby, Volleyball
Success story
‘Fairhills High School is undoubtedly an
excellent school and we have experienced
a great school life. All of the teachers have
supported us with kindness and they are
extremely reliable. Also local students
have been very helpful and friendly,
helping us in class as “mates” and inviting
us to enjoy socialising with them even
outside school.’
–	 Masa Hatoyama – Japan; studying law
at Ritsumeikan University in Japan
Awards
•	 State Super 8 Cricket – champions, 2010
•	 Rock Eisteddfod Challenge state
finals – winners
•	 State golf – champion (international
student), 2010
•	 National Volleyball Championship Under-17
Girls – bronze medal
Reasons to choose our school
	Personalised education provided by qualified, dedicated staff in a safe and caring environment
	Award-winning performing arts high school
	A top regional sporting school with state-of-the-art stadium facilities
Visit our school online at www.fairhillshs.vic.edu.au
Address:	 330 Scoresby Road
Knoxfield, VIC 3180
Distance from	
Melbourne city centre:	
27 km (Map Reference:
Pg 12-13, J5, No. 42 )
Principal:	 Harvey Wood
International	
Student Coordinator:	
Sally Newnham
Telephone:	 +61 3 9758 5022
Fax:	 +61 3 9752 2597
Email:	 fairhills.hs@edumail.vic.gov.au
Web:	 www.fairhillshs.vic.edu.au
Number of students:	 792 Number of international students:	 11
Dress:	 Uniform
Cost of uniform (approx.):	 $320
Cost of homestay per week:	 $260
43For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Footscray
City College
International focus is a feature at Footscray City College. Students are drawn from
diverse backgrounds, including Germany, Vietnam, Malaysia, Indonesia, China,
Japan, Denmark and Hong Kong. The academic curriculum is complemented by
multimedia, music, dance and sporting programs. Academic and personal progress
is closely observed. International students benefit from the guidance of a welfare
coordinator, careers advisor an experienced English as an Additional Language staff.
The school is close to Melbourne city and adjacent to Victoria University.
Features of the local area
•	 Easy public transport access with regular
tram, train and bus services
•	 Appealing landscaped gardens with
spectacular views of Melbourne city centre
•	 Nearby a bustling Asian market and close to
major shopping centre
Languages taught
	 Japanese
	 Italian
Special programs
•	 Experienced international Chinese and
Vietnamese program assistants
•	 Local university student mentoring
•	 Access to Victoria University teaching facilities
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Two specialist international student tutors
•	 Careers resource centre
•	 Specialist bilingual mathematics tutors
•	 Homework program four afternoons a week
•	 Student welfare coordinator
•	 Part-time psychologist
Extracurricular activities
•	 International student orientation camp and
tour program
•	 Annual welcome dinner for Homestay families
and education agents
•	 Year 12 celebratory end-of-year function
•	 International student social activities
including regular morning teas and luncheons
•	 Strong music program
•	 Arts and multimedia program
•	 Outdoor education program
•	 Interstate and overseas trips available
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Cricket, Dance, Fitness, Golf, Soccer,
Gymnastics, Hockey, Indoor Cricket, Lawn
Bowls, Martial Arts, Netball, Rollerblading,
Softball, Swimming, Table Tennis, Volleyball
Success story
Hilda Liu, from China, attended
Footscray City College from Year 10.
Since graduating in accountancy at RMIT
University (including studies in London)
Hilda returned to Melbourne. She is now
working at a Brighton accountancy firm
while undertaking further studies to
become a Chartered Accountant. On
reflection Hilda was delighted to find the
school staff and students friendly and
helpful. Also of great importance to Hilda’s
remarkable success were her supportive
Homestay families.
Awards
•	 University of Melbourne Science
Award, 2011
•	 Victorian School Garden Award, 2009
•	 Australian Mathematics Competition
Award, 2011
•	 Top VCE student – Vietnamese, 2010
Reasons to choose our school
	Strong focus on academic performance, with a wide range of subject choices
	Attractive school grounds and modern facilities close to Melbourne’s city centre
	English Language Centre on-site
Visit our school online at www.footscray.vic.edu.au
Address:	 Kinnear Street
Footscray, VIC 3011
Distance from	
Melbourne city centre:	
7 km (Map Reference:
Pg 12-13, D4, No. 43 )
Principal:	 Maria Bawden
International	
Student Coordinator:	
Maureen O’Flaherty
Telephone:	 +61 3 8387 1500
Fax:	 +61 3 8387 1599
Email:	 info@footscray.vic.edu.au
Web:	 www.footscray.vic.edu.au
Number of students:	 900 Number of international students:	 40
Dress:	 Uniform in Years 7-12 only
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $235
44 Right School Right Place 2014/2015 – Melbourne A-Z
Forest Hill
College
Forest Hill College, in Melbourne’s eastern suburbs, is supported by a wonderful
community. Students enjoy the beautiful school gardens, benefit from excellent
facilities and access state-of-the-art technology. An established international
program offers a dynamic learning experience, supported by regular overseas family
contact and visits. The on-site Language Centre helps students achieve secondary
education English requirements and transition smoothly into mainstream classes.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 10 minutes bus to Melbourne’s second
‘Chinatown’ – Box Hill
•	 Healthy, clean local environment featuring
parkland, gardens and low hills
•	 Close to shopping centre, sporting
facilities, theatre
Languages taught
	 Chinese as a first language in Year 12 and
as a Language other than English in other
year levels
	 French
	 Auslan
Special programs
•	 Elite Soccer Program
•	 Special Tennis Program
•	 Instrumental Music
•	 Student leadership Courses
•	 Outdoor Education
•	 Flexible Learning Programs
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Experienced ISP Language Assistants
•	 VCE Study Centre
•	 Careers Resource Centre
•	 Homework Club
•	 Breakfast Club
•	 	Annual overseas parent/teacher interview
Extracurricular activities
•	 Study skills camp
•	 Excursions to familiarise student with locale
and see Australian animals
•	 Instrumental music program including
ensembles, orchestras and stage bands
•	 Annual school musical performance
•	 Elite fitness squad
•	 Chess club
•	 Debating club
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball (24-Hour Basketball
Marathon), Soccer (Elite Soccer Program), Table
Tennis, Volleyball
Success story
In 2014, four Year 12 International
Students are already studying at
Melbourne University as they are in the
Extension Maths Program. This will assist
their ATAR and be recognised by their
University in 2015.
Awards
•	 Premier’s Award – LOTE, 2012
•	 Monash University Scholarships –
Engineering and Science
•	 Teacher of the Year Award, 2013
•	 World Challenge Borneo – Student
Leadership Award, 2012
Reasons to choose our school
	Wonderful level of care for international students in a medium/small school setting
	
International student transition is aided by local students learning Chinese as second
language
	Newly completed school resources include a dedicated science facility and modern classrooms
Visit our school online at www.fhc.vic.edu.au
Address:	 178-180 Mahoneys Road
East Burwood, VIC 3151
Distance from	
Melbourne city centre:	
16 km (Map Reference:
Pg 12-13, I5, No. 44 )
Principal:	 David Rogers
International	
Student Coordinator:	
Jacki Hood
Telephone:	 +61 3 9814 9444
Fax:	 +61 3 9887 8126
Email:	 forest.hill.co@edumail.vic.gov.au
Web:	 www.fhc.vic.edu.au
Number of students:	 570 Number of international students:	 70
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $260
45For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Visit our school online at www.fountaingatesc.vic.edu.au
Address:	 41 Josephine Avenue
Narre Warren, VIC 3805
Distance from	
Melbourne city centre:	
40 km (Map Reference:
Pg 12-13, K9, No. 45 )
Principal:	 Vicki Walters
International	
Student Coordinator:	
James Orange
Telephone:	 +61 3 8762 6839
Fax:	 +61 3 9796 7401
Email:	 fountain.gate.sc@edumail.vic.gov.au
Web:	 www.fountaingatesc.vic.edu.au
Number of students:	 1053 Number of international students:	 4
Dress:	 Uniform
Cost of uniform (approx.):	 $500
Cost of homestay per week:	 $250
Fountain Gate
Secondary College
Fountain Gate Secondary College, located 40 minutes from Melbourne CBD, is close to
wide a range of facilities including a shopping precinct, medical centres, sport and
recreational venues. The area is well-serviced by public transport. Through an alliance
with two local secondary colleges, we have able to offer senior students the widest
selection of VCE and VETiS in Victoria. We are committed to a providing our international
students an excellent comprehensive education in a secure, supportive and educationally
challenging environment.
Features of the local area
•	 Well serviced by train lines and bus routes
•	 Close to second largest shopping centre
precinct in Victoria
•	 Two local Primary Schools within 1km
•	 Close to quality sporting and recreational
facilities
Languages taught
	 German
	 Indonesian
Special programs
•	 Instrumental Music Program
•	 High Achievers Program for gifted students
•	 Intensive English as an Additional Language
classes
•	 Weekly Homework Support club
•	 I Learn 24/7 program IT Program
•	 Wide range of elective subjects at Year 9 and
10
Intensive English Language classes
Provided at English Language Centre located
within 13kms of school
Student support services and programs
•	 Student Wellbeing Centre
•	 Counseling and support services
•	 International Student Mentor
•	 	Careers Resource Centre
•	 Full-time nurse
Extracurricular activities
•	 Student Leadership Program
•	 School camps, field trips and excursion
program
•	 Interschool sports
•	 Future Problem Solving and other national
competitions
•	 Performing arts program e.g. school
production
•	 Instrumental Music
Sports offered
Aerobics, Athletics, Australian Rules Football,
Badminton, Basketball, Baseball, Hockey,
Rugby League, Rugby Union, Soccer, Softball,
Swimming, Volleyball
Success story
‘Since I arrived at FGSC three years ago I
have found the teachers to be very friendly
and always willing to give extra time and
support to me. This year in Year 12, I am
currently studying Specialist Maths, Maths
Methods, EAL and Physics. I have made
lots of great friends who also support with
my studies.’
–	 Dung (Arthur) Bui – Year 12, Vietnam
Awards
•	 Second Place International Future Problem
Solving Competition USA, 2014
•	 Spirit of ANZAC state award, 2014
•	 State Champions Rugby Union, 2011-13 •	 State Champions Aerobics Team, 2014
•	 Premier’s VCE Award – Further
Mathematics, 2013
•	 South-Eastern Junior AFL Champions, 2013
Reasons to choose our school
	Large multicultural campus
	Friendly students and staff
	Strong wellbeing support for students
46 Right School Right Place 2014/2015 – Melbourne A-Z
Frankston
High School
A long tradition of academic excellence makes Frankston High School a popular
choice for international students. Located near pristine Port Phillip Bay, the school
enjoys a tranquil, appealing garden setting. Enrolments are drawn from various
countries to form a vibrant, multicultural student body. Friendly Homestay families
provide a comfortable, safe and happy ‘home away from home’. A settled home
assists caring, professional teachers to support international students in their
development and inspire them to succeed.
Features of the local area
•	 Well-serviced by train lines and buses
•	 Nearby scenic and clean swimming beaches
•	 Excellent local shopping malls and cinema
complexes
Languages taught
	 Japeanese
	 French
	 Chinese (First language)
Special programs
•	 Accelerated program for high achievers
•	 Established close links with local university
•	 Site-wide computer access over secure
wireless connections
•	 Highly regarded music program
•	 Extensive range of sporting teams
•	 Exemplary student leadership programs
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Specialist language assistants
•	 Dedicated international student tutors
•	 Highly skilled English language teachers
•	 Well-established careers resource centre
•	 Active international committee
•	 Lunchtime tutorials in many subjects
Extracurricular activities
•	 International student camps and tours
•	 Elite sports training program
•	 Concert bands, jazz bands and choir
•	 Art and design clubs and annual drama
production with performance opportunities
•	 Surf lifesaving program
•	 Choice of many sports
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Diving, Golf, Gymnastics, Hockey, Lawn Bowls,
Netball, Rowing, Soccer, Softball, Squash,
Swimming, Table Tennis, Tennis, Volleyball
Success story
‘I loved my time at Frankston High School.
The students are so friendly and the
teachers are patient and kind. My host
family was very supportive and lots of fun.
I set high goals and am proud that I
achieved them.’
–	 Xiang Zhao – China; graduate,
computer engineering at the University
of Melbourne
Awards
•	 State Music Awards •	 Environmental awards
•	 State/National Sports Championships
•	 Student Leadership Awards
Reasons to choose our school
	Varied international program with students drawn from many different countries and cultures
	Recent completion and launch of purpose designed high-tech science wing
	Indoor heated swimming pool and well equipped fitness centre on-site
Visit our school online at www.fhs.vic.edu.au
Address:	 Foot Street
Frankston, VIC 3199
Distance from	
Melbourne city centre:	
40 km (Map Reference:
Pg 12-13, H11, No. 46 )
Principal:	 John Albiston
International	
Student Coordinator:	
Cathy Hogg
Sharon Koning
Telephone:	 +61 3 9783 7955
Fax:	 +61 3 9783 7689
Email:	 frankston.hs@edumail.vic.gov.au
Web:	 www.fhs.vic.edu.au
Number of students:	 1700 Number of international students:	 50
Dress:	 Uniform
Cost of uniform (approx.):	 $200
Cost of homestay per week:	 $240
47For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Gilmore College
for Girls
Gilmore College for Girls enables young women to achieve their potential in an
all-girls’ environment of educational excellence. We develop inquiring,
knowledgeable and caring young women who help to create a better and more
peaceful world through inter-cultural understanding and respect. Our programs
encourage students to become active, compassionate and lifelong learners with a
global perspective. We are a candidate school for the International Baccalaureate
Middle Years Program (IBMYP).
Features of the local area
•	 Easy access to Universities, Melbourne CBD
and international airport
•	 Close to shops, accommodation, markets and
restaurants
•	 Well-serviced by train-lines and bus routes
Languages taught
	 Italian
	 Other languages through VSL
Special programs
•	 Melbourne University enhancement program
with student mentoring and other activities
•	 Woman’s Leadership program in partnership
with PricewaterhouseCoopers
•	 Kwong Lee Dow Young Scholars Program
•	 Student netbook program and Instrumental
music program
•	 Duke of Edinburgh Award
•	 4-period days – fewer teachers assists
students to better engage in study
Intensive English Language classes
Provided at English Language Centre located
within 2 kilometres of school
Student support services and programs
•	 Afterschool homework club with tutors
•	 Student welfare officer and school nurse
•	 Careers Resource Centre
•	 Online Mathematics tutoring and support.
•	 Wireless Internet and Intranet
Extracurricular activities
•	 Interschool debating and public speaking
•	 	Science club and academic competitions.
•	 Drama productions and School’s Spectacular
•	 University enhancement program.
•	 Recreation and leadership camps
•	 Interschool Sports Competition
Sports offered
Athletics, Badminton, Basketball, Cricket,
Gymnastics, Hockey, Netball, Physical
Education, Soccer, Softball, Swimming, Table
Tennis, Tennis, Volleyball
Success story
‘My first impression of Gilmore College was
the small size of the classes. That means
you are able to ask questions when you are
not sure about something. You will get
good care from specialist teachers and
gain opportunities to express yourself. The
teacher are very helpful.’
–	 Misa Tran-Nguyen – Vietnam; VCE at
Gilmore College, Bachelor of
Commerce, University of Melbourne
Awards
•	 Pierre de Coubertin Award Winner, 2014
•	 Trinity College International Summer School
Scholarships, 2013
•	 Badminton Zone Finalists , 2014
•	 University of Melbourne International
Summer School Scholarships , 2013
•	 WYNSPEAK Public Speaking Competition
Finalists , 2013
Reasons to choose our school
	Candidate school for the International Baccalaureate Middle Years Program (IBMYP)
	Afterschool support with English and other subjects. Our students are friendly and welcoming
	New science facilities with modern laboratories and equipment
Visit our school online at www.gilmoregirls.vic.edu.au
Address:	 298 Barkly Street
Footscray, VIC 3011
Distance from	
Melbourne city centre:	
8 km (Map Reference:
Pg 12-13, D4, No. 47 )
Principal:	 Bette Prange
International	
Student Coordinator:	
Peter Walker
Telephone:	 +61 3 9689 4788
Fax:	 +61 3 9687 3867
Email:	 gilmoregirls.co@edumail.vic.gov.au
Web:	 www.gilmoregirls.vic.edu.au
Number of students:	 280 Number of international students:	 8
Dress:	 Uniform
Cost of uniform (approx.):	 $350
Cost of homestay per week:	 $250
48 Right School Right Place 2014/2015 – Melbourne A-Z
Gleneagles Secondary
College
Gleneagles provides excellent opportunities for students to explore their individual
talents and aspirations in a supportive, harmonious and well-resourced school
environment. An extensive and well-regarded VCE program, and access to VCAL, VET and
the Trade Training Centre, provides various study options for our senior students,
supported by our skilled staff who deliver a solid grounding in the basics of English along
with a dedicated EAL/D Centre to ensure each learner is challenged to reach their
potential. The school has strong ties to Monash and Deakin Universities.
Features of the local area
•	 Natural features including Lysterfield Lake
Park
•	 Close to shopping centre
•	 Well-serviced by bus routes from Dandenong
•	 Close to a range of primary schools
Languages taught
	 German
	 Indonesian
	 Chinese (2015)
Special programs
•	 Experienced multicultural aides/program
assistants
•	 Experienced EAL/D teachers
•	 Mentoring with local university
•	 Access to teaching facilities at network
schools
•	 SEAL program for high achievers
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Specialist international student tutor
•	 Part-time psychologist/speech pathologist/
mental health professional and social worker
•	 Careers resource centre
•	 Peer support program
•	 After hours homework club with university
tutors and dedicated teachers
•	 Breakfast club
Extracurricular activities
•	 VCE student study camp
•	 Year 7 Phillip Island camp
•	 Year 8 Lorne Camp/CPR Lifesaving training
•	 Year 9 CBD excursion
•	 Year 10 Sports’ coaching program
•	 Chess club, book club, art club
•	 Orchestra, choir, school production
•	 Kick boxing and yoga
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Hockey, Lacrosse, Netball, Soccer,
Swimming, Table Tennis, Volleyball
Awards
•	 Australian Schools Maths Competition •	 State Soccer/Football Champions
•	 Short Story Competition
•	 Top VCE student Arts Award
Reasons to choose our school
	Large multicultural campus
	Attractive school grounds close to native flora and fauna
	
Access to VCAL, VET and the Trade Training Centre provides various study options for our senior
students
Visit our school online at www.gleneagles.vic.edu.au
Address:	 Reema Boulevard
Endeavour Hills, VIC 3802
Distance from	
Melbourne city centre:	
38 km (Map Reference:
Pg 12-13, K7, No. 48 )
Principal:	 Sue Peddlesden
International	
Student Coordinator:	
Penelope Andrews
Telephone:	 +61 3 9708 1319
Fax:	 +61 3 9708 1324
Email:	 gleneagles.sc@edumail.vic.gov.au
Web:	 www.gleneagles.vic.edu.au
Number of students:	 1370 Number of international students:	 2
Dress:	 Uniform
Cost of uniform (approx.):	 $1,000
Cost of homestay per week:	 N/A
49For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Glen Eira
College
Students at Glen Eira College access learning programs and education facilities
that meet today’s global challenges. A new learning facility houses one of five
government-accredited English Language Centres within metropolitan Melbourne.
The College provides high levels of individual care and attention to create a learning
atmosphere where students achieve personal and education goals. Curriculum
breadth, choice of co and extracurricular programs and staff committed to
professional growth support student success.
Features of the local area
•	 Easy public transport access to school
•	 Safe, attractive suburb nearby parks,
swimming beach and shopping centres
•	 Adjacent to Monash University (Caulfield)
Languages taught
	 Chinese
	 CNED (French Government Distance
Education) French Program
	 Hebrew
Special programs
•	 Experienced international student program
team including language teacher assistants
•	 Accelerated learning program for
advanced students
•	 Academic extension and transition programs
•	 University of Melbourne and Monash
University career pathways program
•	 Student leadership programs including
international student captain
•	 Camps, excursions, optional overseas trips
Intensive English Language classes
•	 Provided at on-site English Language Centre
•	 One of five metropolitan government-
accredited English Language Centres
Student support services and programs
•	 English as an Additional Language support
•	 Careers resource centre and careers adviser
•	 Airport reception and orientation program
•	 Homestay monitoring/ongoing welfare support
•	 Wellbeing centre for student counselling,
health and study plans
•	 Extra after-school/lunchtime homework tuition
Extracurricular activities
•	 Maths/science national and state competitions
•	 University enhancement studies and activities
•	 High Achievers’ Club
•	 Student representative council and
leadership program participation
•	 Performing arts centre – music tuition, drama
and dance with performance opportunities
•	 Lunchtime activities; sports, robotics, chess
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Diving, Futsal, Hockey, Netball, Soccer, Softball,
Swimming, Table Tennis, Tennis, Volleyball
Success story
‘Glen Eira College is a global community
where I can follow my dreams. Teachers
understand the challenges we have as ESL
students and are always there to help us. I
was proud to receive the Award for
Academic Excellence for 2011.’
–	 Huang Yanbing – International Student
Captain, 2011
Awards
•	 Australian Defence Force Leadership Award,
2013
•	 Year 8 National History Competition winner,
2013
•	 Glen Eira City Leadership Awards, 2013
•	 Rotary Club of Glen Eira scholarship winner,
2014
•	 Pierre de Coubertin Award, 2012
•	 Berthe Mouchette Poetry recitation finalists,
2014
Reasons to choose our school
	Students are provided with a high level of individual care and attention
	Government-accredited English Language Centre located on-site housed in newly built facility
	Transition program to next level and ongoing English as an Additional Language classes
Visit our school online at www.gec.vic.edu.au
Address:	 76 Booran Road
Caulfield East, VIC 3145
Distance from	
Melbourne city centre:	
8 km (Map Reference:
Pg 12-13, G6, No. 49 )
Principal:	 Sheereen Kindler
International	
Student Coordinator:	
Matthew Polwarth
Telephone:	 +61 3 9571 7838
Fax:	 +61 3 9571 0079
Email:	 glen.eira.co@edumail.vic.gov.au
Web:	 www.gec.vic.edu.au
Number of students:	 620 Number of international students:	 30
Dress:	 Uniform
Cost of uniform (approx.):	 $250
Cost of homestay per week:	 $280
50 Right School Right Place 2014/2015 – Melbourne A-Z
Glen Waverley
Secondary College
Glen Waverley Secondary College is an international learning community. College
enrolments are drawn from over 40 nationalities and more than 50 languages are
represented. Renowned for its student success, the college learning program is
designed to support individuals and develop the whole person. Every student is
encouraged to grow their global awareness and develop an international
perspective. The school promotes an atmosphere where students discover the
importance of acquiring skills to function successfully as global citizens.
Features of the local area
•	 Close to regular public transport services
•	 Appealing urban treed setting
•	 Nearby major shopping centre
•	 Multicultural local community
Languages taught
	 Italian
	 French
	 Chinese
	 Chinese as a second language
Special programs
•	 Inquiry Learning Program
(sustainability focus)
•	 Literacy and numeracy
•	 Head start program to prepare students for
Years 11-12
•	 Living and learning
•	 Music
•	 Sport
Intensive English Language classes
Provided at English Language Centre located
within 5 kilometres of school
Student support services and programs
•	 Dedicated study hall area
•	 Peer support program
•	 Wellbeing coordinator and chaplain
Extracurricular activities
•	 Camps and cultural exchanges
•	 Chess club
•	 Debating
•	 Book club
•	 Community service
Sports offered
Athletics, Badminton, Basketball, Swimming,
Table Tennis
Success story
‘I have to admit now that I regard Glen
Waverley Secondary College as my second
home – the people here are fantastic and
have really made me feel at home! Thanks
to Glen Waverley Secondary College for
giving me such a wonderful experience.’
–	 Joshua Lee – International student; Dux
of the Class of 2010
Awards
•	 NAB Schools First Award in Sustainability,
2013
•	 Premier’s VCE Award – Japanese Second
Language, 2012
•	 Premier’s VCE Awards – Chinese First
Language and Hindi, 2013
•	 Premier’s VCE Award – Accounting and VET
Technical Production, 2012
•	 Premier’s VCE Award – Physics and Maths
Methods, 2013
•	 National Chess champions and runners up
(Open & Junior divisions), 2012-13
Reasons to choose our school
	Large multicultural campus populated by a dynamic and welcoming student group
	An award-winning music program offering instruction and performance opportunities
	Reputation for supporting students to achieve outstanding academic outcomes
Visit our school online at www.gwsc.vic.edu.au
Address:	 O’Sullivan Road
Glen Waverley, VIC 3150
Distance from	
Melbourne city centre:	
27 km (Map Reference:
Pg 12-13, I5, No. 50 )
Principal:	 Gerard Schiller
International	
Student Coordinator:	
Lena Tan
Telephone:	 +61 3 8805 6700
Fax:	 +61 3 8805 6701
Email:	 enquiries@gwsc.vic.edu.au
Web:	 www.gwsc.vic.edu.au
Number of students:	 2000 Number of international students:	 59
Dress:	 Uniform
Cost of uniform (approx.):	 $270
Cost of homestay per week:	 $290
51For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Highvale
Secondary College
Students attending Highvale Secondary College enjoy excellent learning opportunities.
Set amongst spacious grounds 20 kilometres from Melbourne city centre, the school
offers an international education experience. A broad curriculum and two learning
pathways are supported by personal course counselling and careers guidance. Strong
ties with Monash and Deakin Universities strengthen student achievement in studies of
science, mathematics, commerce, technology and the arts. Students may also pursue
vocational courses or Technical and Further Education pathways.
Features of the local area
•	 Major public transport links with train and
bus terminals
•	 Nearby tennis courts, sporting tracks and the
large native reserve, Jells Park
•	 Established, medium density residential area
•	 Close to The Glen and Kingsway multicultural
mall and strip shopping
Languages taught
	 German
	 French
	 Chinese (weekend classes)
Special programs
•	 Experienced international Chinese
program assistants
•	 Monash University acceleration program
•	 Local university student mentoring
•	 Flourishing music program with Victorian
Certificate of Education Music studies
Intensive English Language classes
Provided at Blackburn English Language School
or other private providers located within 10
kilometres of school
Student support services and programs
•	 Pupil Welfare Manager
•	 Two specialist international student tutors
•	 Part-time psychologist
•	 Careers Resource Centre
Extracurricular activities
•	 International student morning teas and social
activities
•	 Inter-school and local community music
performances
•	 Chess Club
•	 Debating
•	 Sporting events
•	 Debutante Ball and formal school social
occasions
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Fencing, Netball, Soccer,
Swimming, Table Tennis, Tennis
Success story
‘Highvale has given me the most wonderful
study experience. Only when I stayed here I
realized the sky is really the limit. There were no
boundaries stopping me from achieving my
goals. We all know this was the place where we
were all given a momentous opportunity to
explore our potential, enjoy every moment of
our study life and grow as a person.’
–	 Giang To – Victorian International School
Student - Arts Achievment Award winner,
2013
Awards
•	 High distinctions and distinctions in
Australian schools competitions
•	 Westpac Maths Award winner, 2013
•	 University of Melbourne Scholars Program
recipients, 2013
•	 Victorian International School Student - Arts
Achievement Award, 2013
•	 Young Scholars Award, 2013 •	 Forest Hill Endeavour Award
Reasons to choose our school
	Medium-sized school with a collaborative, welcoming community offering personalised learning
	Senior study centre offering VCE students regular extra tutoring, included in tuition fee
	Closely ties with Monash University and appealing Melbourne location central to all amenities
Visit our school online at www.highvalesc.vic.edu.au
Address:	 Capital Avenue
Glen Waverley, VIC 3150
Distance from	
Melbourne city centre:	
20 km (Map Reference:
Pg 12-13, I5, No. 51 )
Principal:	 Ian Watkins
International	
Student Coordinator:	
Kate Grennan
Telephone:	 +61 3 9803 5144
Fax:	 +61 3 9803 4310
Email:	 highvale.sc@edumail.vic.gov.au
Web:	 www.highvalesc.vic.edu.au
Number of students:	 950 Number of international students:	 52
Dress:	 Uniform
Cost of uniform (approx.):	 $600
Cost of homestay per week:	 $260 + $20 per
month internet
52 Right School Right Place 2014/2015 – Melbourne A-Z
Hoppers Crossing
Secondary College
Located in the western metropolitan area, approximately 30 minutes from
Melbourne’s CBD, the College offers a whole school enrichment program so that
students are challenged and encouraged to reach their full potential. The College
offers a 1:1 Netbook Program, a wide subject choice and is renowned for its student
leadership programs designed to create global citizens. The recent addition of the
$2 million Science complex has seen the College take on a leading role in the
education of students in the area.
Features of the local area
•	 Approx. 30 minutes from Melbourne’s CBD
•	 Located in the City of Wyndham
•	 Close to a major shopping centre
•	 Well-serviced by train-lines and bus routes
Languages taught
	 Italian
Special programs
•	 International Sister Schools in Costa Mesa,
California, USA and Forli, Italy
•	 Annual Overseas Learning Experience to
China – Utahloy International School
•	1:1 Netbook Program
•	 University Enhancement Programs offered at
Year 12
•	 Year 7-12 Enrichment Program
•	 Hoppers TV and Hoppers FM (TV and Radio
Productions)
•	 Structured Student Leadership Program (Year
7-10)
Intensive English Language classes
Provided at English Language Centre located
within 10 kilometres of school
Student support services and programs
•	 Careers Resource Centre
•	 Peer Support Program
•	 Student Wellbeing Team
•	 Part Time Speech Pathologist and School
Nurse
Extracurricular activities
•	 Wakakirri Dance Spectacular
•	 Whole School Swimming and Athletics
Carnival
•	 Interschool Sports Program
•	 High Achievers Preparation Program (HAPP)
•	 Debutante Ball
•	 Student Leadership Program
Sports offered
Athletics, Australian Rules Football, Basketball,
Netball, Soccer, Table Tennis, Tennis, Volleyball
Success story
‘From the start I felt included completely.
Lots of people helped me to integrate
myself at the College. I got involved in
different programs and everyone was
friendly. I’m a big fan of your Course
Selection.’
–	 Marie-Luise Schlesinger, Germany
Awards
•	 Deakin University Scholarship, 2013
•	 Wakakirri Dance Spectacular – Best
Blockbuster
•	 Rotary Citizenship Award, 2012-13
•	 Wynspeak Public Speaking Competition
Winner, 2008, 2010, 2012
•	 Wakakirri Dance Spectacular – Best
Choreography
•	 Australian Toastmasters Public Speaking
Competition Winner, 2008
Reasons to choose our school
	Large multicultural campus
	Attractive school grounds
	New $2 million science facility
Visit our school online at www.hopcross.vic.edu.au
Address:	 2 Fraser Street
Hoppers Crossing, VIC 3029
Distance from	
Melbourne city centre:	
30 km (Map Reference:
Pg 12-13, A5, No. 52 )
Principal:	 Wayne Terrill
International	
Student Coordinator:	
Keith Halge
Telephone:	 +61 3 9974 7777
Fax:	 +61 3 9748 6645
Email:	 hoppers.crossing.sc@edumail.vic.gov.au
Web:	 www.hopcross.vic.edu.au
Number of students:	 1400 Number of international students:	 3
Dress:	 Uniform
Cost of uniform (approx.):	 $250
Cost of homestay per week:	 N/A
53For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Hume Central
Secondary College
A culturally rich learning community giving young people the knowledge and skills
they need to thrive in school and life. The College has three campuses and an
on-site English Language Centre where international students are supported to
develop their English language skills. New facilities and a broad curriculum ensure
students are engaged and excited by learning with 96% of our Year 12 students
gaining a University or TAFE position.
Features of the local area
•	 Well-serviced train and bus routes.
•	 Vibrant multicultural community with
extensive community services
•	 Sporting and leisure facilities close-by
Languages taught
	 Turkish
	 Other languages through the Victorian
School of Languages
Special programs
•	 VCE tutorials and workshops to optimize year
12 results
•	 Special Entry Accelerated Leaning program
•	 College offers a 1:1 Netbook
•	 Performing Arts Program
•	 Mentoring with local university
•	 Sister school in Spain
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Afterschool support and enrichment tutorials for
Year 12 students
•	 Collaboration with Universities and high
performing colleges to enhance VCE student
performance
•	 Student wellbeing co-coordinators, youth
workers, nurses and psychologists
•	 Careers support
•	 Mentoring Program
•	 Student leadership programs
•	 Homework club
Extracurricular activities
•	 International student support and tour program
•	 Well-established Performing Arts (music, drama
and dance) program with an annual production
•	 School camps, e.g. outdoor education camps
and program
•	 City school experience programs	
•	 Extensive sports program
•	 Specialised soccer training
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Netball, Rugby, Soccer, Table Tennis,
Volleyball
Success story
‘When I first arrived at Hume Central
Secondary College I had a lot of support
from teachers which enabled me to grow in
confidence and take on opportunities the
college offered me. Now in VCE, initially I
was nervous, but my hard work and
support from my teachers I am on my way
to achieving my goals.’
–	 Reshani – Year 11 student from Sri
Lanka
Awards
•	 Australian Mathematics Champion Awards
– Distinction
•	 Smith Family Scholarships
•	 State Rugby Champions •	 Australian Defence Award
•	 Hume City Council Performing Arts
Scholarships, 2013
Reasons to choose our school
	The College offers a diverse range of subject and experiences with close links with Universities
	Large multicultural campus offering extensive support to students
	New attractive school grounds close transports and leisure facilities
Visit our school online at www.humecentralsc.vic.edu.au
Address:	 60-78 Tanderrum Way,
Broadmeadows VIC 3047
Distance from	
Melbourne city centre:	
17 km (Map Reference:
Pg 12-13, E1, No. 53 )
Principal:	 Glenn Proctor
International	
Student Coordinator:	
Snezana Veljanovski
Telephone:	 +61 3 9066 3600
Fax:	 +61 3 9066 3636
Email:	 hume.central.sc@edumail.vic.gov.au
Web:	 www.humecentralsc.vic.edu.au
Number of students:	 1120 Number of international students:	 3
Dress:	 Uniform
Cost of uniform (approx.):	 $300 – $500
Cost of homestay per week:	 $250
54 Right School Right Place 2014/2015 – Melbourne A-Z
John Fawkner
Secondary College
John Fawkner College is located on spacious grounds 17kms from the CBD.
The College prepares students for tertiary and career pathways through a broad
curriculum of VCE and VET subjects. Skilled staff at our on-site English language
centre help students meet the English requirements of secondary education.
The College also partners wih Latrobe University to offer a unique Sports Industry
Pathway Program for students wishing to pursue a vocation in the sports industry.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Close to a number of large and small
shopping centres
•	 Close to the Merri Creek natural parkland
Languages taught
	 Italian
	 Vietnamese, Syriac and Arabic offered
through the Victorian School of Languages
Special programs
•	 Comprehensive Language Support program
•	 Extensive Leadership Development program
•	 Senior Sports Specialist Pathway program
•	 Facilitators of the Melbourne City College of
Football
•	 Selection of VET subjects
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 English language support staff
•	 Part-time psychologist
•	 Careers resource centre
•	 Peer support program
Extracurricular activities
•	 Student camp
•	 Sports program
•	 Student Leadership program
•	 Work Placement program
Sports offered
Athletics, Australian Rules Football, Basketball,
Cricket, Netball, Rugby, Soccer, Swimming,
Volleyball
Success story
‘International students at John Fawkner
College have often commented on how the
schools made them feel welcomed. One of
the reasons is because we are a small
secondary school and as a result students
and staff are able to really get to know
each other well.’
Awards
•	 State Junior Futsal Champions, 2011
•	 Top VCE student in in VET Multimedia, 2011
•	 State Intermediate Soccer
Championships, 2007
Reasons to choose our school
	New Language Centre opened in 2012
	New Sports/Learning Complex in 2014
	An award winning sports school
Visit our school online at www.jfc.vic.edu.au
Address:	 51 Jukes Road
Fawkner VIC 3060
Distance from	
Melbourne city centre:	
17 km (Map Reference:
Pg 12-13, F2, No. )
Principal:	 Gus Napoli
International	
Student Coordinator:	
Suzie Spirova
Telephone:	 +61 3 9359 1166
Fax:	 +61 3 9357 1783
Email:	 john.fawkner.co@edumail.vic.gov.au
Web:	 www.jfc.vic.edu.au
Number of students:	 380 Number of international students:	 5
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 N/A
54
55For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Kambrya
College
With its strong focus on academic excellence, Kambrya College is highly
regarded as an outstanding international school. The broad school curriculum
offers students excellent learning opportunities and a truly international
experience. Our on-site Intensive English Language Program assists students
meet the English requirements of secondary and higher education. Almost
100% of graduating Victorian Certificate of Education students gain university
and tertiary college entry.
Features of the local area
•	 Close to major shopping centre, cinema
complex, restaurants, banks, quality medical
facilities
•	 Peaceful, safe family area with many local
parks and sporting facilities
•	 Well serviced by train lines and bus routes
•	 Located in education precinct close to
primary schools, Monash University,
Chisholm TAFE
Languages taught
	 Japanese
	 German
	 Chinese
Special programs
•	 Select Entry Accelerated Learning program
(SEAL) for high achievers
•	 Extensive range of sporting teams
•	 Established Later Years Careers Program
•	 Commencement program to prepare students
for Years 11 and 12
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Highly skilled English language teachers
•	 Lunchtime tutorials in many subjects
•	 Dedicated study hall area
•	 Careers Resource Centre and personalised
course counseling
•	 Strong student welfare focus
•	 Full time nurse
Extracurricular activities
•	 Large range of sporting programs
•	 Lunchtime activities program offering a broad
range of activities
•	 Local and international student camp and
tour program
•	 Community service
•	 Student leadership opportunities
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Hockey, Netball, Touch Rugby, Softball, Soccer,
Swimming, Table Tennis, Tennis, Volleyball
Success story
‘I enjoy the atmosphere at Kambrya
College and was very welcomed on the first
day. I have made lots of friends and the
teachers are great.’
–	 Seong Kim – South Korea; Year 10;
hopes to study medicine at the
University of Melbourne
Awards
•	 Top VCE student – Chinese, 2010 •	 VCE Premiers Award, 2012
•	 Prime Minister’s Award for Excellence
•	 Intermediate Girls State Softball champions,
2014
•	 State Touch Rugby champions, 2014 •	 Australian Clay Target champion, 2013
Reasons to choose our school
	Excellent VCE results – top 20% of government schools
	Council of International Schools accreditation as a school of very high quality
	Well-appointed school gymnasium complex recently completed and opened
Visit our school online at www.kambryacollege.com
Address:	 68 Bemersyde Drive
Berwick, VIC 3806
Distance from	
Melbourne city centre:	
45 km (Map Reference:
Pg 12-13, K9, No. )
Principal:	 Michael Muscat
International	
Student Coordinator:	
Sue Kirkham
Chrissie Chen
Telephone:	 +61 3 9707 7600
Fax:	 +61 3 9702 6277
Email:	 kambrya.co@edumail.vic.gov.au
Web:	 www.kambryacollege.com
Number of students:	 1000 Number of international students:	 11
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $250
55
56 Right School Right Place 2014/2015 – Melbourne A-Z
Keilor Downs
College
Keilor Downs College is located on the north-western edge of metropolitan
Melbourne. The College has a strong history of academic achievement providing
students with an engaging curriculum, including a wide choice of Victorian
Certificate of Education studies. Great value is attached to the diversity of our
community with staff and students representing over 30 different language
backgrounds. The College also offers individual course and career pathway
counselling to assist students to reach their personal and academic goals.
Features of the local area
•	 Well-serviced by local bus routes and
train services
•	 Quiet leafy suburban area near attractive
open air parklands
•	 Within easy access of Melbourne
International Airport
•	 Close to several large shopping centres
Languages taught
	 Italian
	 Japanese
Special programs
•	 Victorian School Of Languages on-site
Saturday school
•	 Accelerated learning Program for high
performing students
•	 Student leadership program and Students
Making a Difference (SMAD) community
action program
•	 Sporting and PE programs with championship
winning success
Intensive English Language classes
Provided at English Language Centre located
within 10 kilometres of school
Student support services and programs
•	 Dedicated international student program and
facility
•	 International student committee providing
peer support
•	 English language support for new students
•	 Specialised in-class student support
•	 Extensive student leadership programs
•	 Individual course and careers counselling
Extracurricular activities
•	 Maths and Science competitions
•	 University enhancement studies
•	 Curriculum and Year-level based camps
•	 Music program and performance, including
band, solo groups and vocals
•	 Debating teams, book club and chess club
•	 Team sports, fitness club and specialised
soccer training
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Hockey, Netball, Soccer, Softball, Swimming,
Table Tennis, Tennis, Volleyball
Success story
‘I really enjoyed my time at KDC. The
things I liked best were the environment of
the school and the flexibility of the
timetable for studying. I also liked my
teachers, they were good and really helped
me with my work.’
–	 Dat Cao – Business Management, RMIT
Awards
•	 Premier’s Award for Excellence in Food
Technology, 2013
•	 Third Place in Senior Boys Baseball State
Finals, 2013
•	 Perfect score of 50 in VCE Chemistry, 2013
•	 First Place National Running Championships
in 400m, 2013
•	 Gold and Silver Medals at The Royal Australian Chemical Institute Titration Competition, 2013
Reasons to choose our school
	Inclusive ethos and culture of acceptance across the school community
	Students who strive for their best and reach high standards of academic achievement
	Targeted support and tuition for international students
Visit our school online at www.kdc.vic.edu.au
Address:	 100-110 Odessa Avenue
Keilor Downs, VIC 3038
Distance from	
Melbourne city centre:	
20 km (Map Reference:
Pg 12-13, C2, No. 56 )
Principal:	 Stuart Andrews
International	
Student Coordinator:	
Katherine Judge
Anh Tsibouriaris
Telephone:	 +61 3 9365 8000
Fax:	 +61 3 9367 6490
Email:	 keilor.downs.sc@edumail.vic.gov.au
Web:	 www.kdc.vic.edu.au
Number of students:	 1200 Number of international students:	 26
Dress:	 Uniform
Cost of uniform (approx.):	 $170 – $370
Cost of homestay per week:	 $260 – $270
57For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Kew
High School
Within easy access of Melbourne city, Kew High School is a performance oriented
secondary school. Renowned for helping students reach their full potential, the
school offers a secure environment and outstanding facilities. The high quality
learning experience supports all students in their personal and academic growth.
A strong support network encourages international students to participate fully
in school life. This also assists with the study and social development needed
to help achieve their dreams in Australia.
Features of the local area
•	 Public transport access by regular tram and
bus services
•	 Attractive locale within 10 kilometres of
Melbourne city centre
•	 Nearby several strip shopping venues and
close to major shopping mall
Languages taught
	 Chinese First Language
	 French
Japanese Second Language
	 Vietnamese
Special programs
•	 Timetabled foundation English classes to give
students extra English language support
•	 Math homework club
•	 Year 12 study camp
•	 International student leadership
•	 Participation in state, national and
international academic competitions
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Dedicated and experienced support staff
including International Student Coordinator
(fluent in English and Chinese), Homestay
Coordinator and English Language Center
Coordinator
•	 Reporting trips to parents in home countries
•	 Careers counseling service
•	 After-school homework club
Extracurricular activities
•	 Melbourne and Monash Universities Campus
Day
•	 Year 11 Biology camp at Queenscliff Marine
Study Centre, and Year 12 study camp
•	 Excursions and incursions in the Arts,
Chemistry, EAL, Legal Studies, Media,
Physics, and Theatre Studies
•	 Swimming Carnival, House Athletics, and
Music Festivals
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Golf, Hockey,
Netball, Soccer, Softball, Squash, Swimming,
Table Tennis, Volleyball
Success story
‘We have the best school support here.
All the teachers are enthusiastic and
willing to give us extra help at any time.
Making ourselves part of school life is the
most important thing. So, let’s enjoy the
sports, band music and interactions with
local students. Having faith in ourselves
and others can help put everything just in
the right order.’
–	 Xiaoyu Li – China; studying commerce
at the University of Melbourne
Awards
•	 The University of Melbourne – Academic
Excellence Award winner, 2013
•	 Australian Math Competition – Prudence Award
winner, 2010
•	 Premier’s VCE Awards – Chinese First
Language, 2012
•	 International Student – School Dux winner, 2009
•	 Monash University – Engineering
Scholarship winner, 2011
Reasons to choose our school
	Outstanding student outcomes in both academic results and personal development
	On-site English Language School facilitates a smooth transition into mainstream classes
	
Strong wellbeing support, broad and challenging curriculum and extra-curricular activities
provide students with a rewarding and memorable experience
Visit our school online at www.kew.vic.edu.au
Address:	 1393 Burke Road
East Kew, VIC 3102
Distance from	
Melbourne city centre:	
10 km (Map Reference:
Pg 12-13, G4, No. 57 )
Principal:	 Clare Entwisle
International	
Student Coordinator:	
Junling Yang
Telephone:	 +61 3 9859 8652
Fax:	 +61 3 9819 7880
Email:	 kew.hs@edumail.vic.gov.au
Web:	 www.kew.vic.edu.au
Number of students:	 1100 Number of international students:	 80
Dress:	 Uniform
Cost of uniform (approx.):	 $300 – $400
Cost of homestay per week:	 $290 – $310
58 Right School Right Place 2014/2015 – Melbourne A-Z
Keysborough
Secondary College
Students of Keysborough Secondary College enjoy a range of education choices.
The school operates over two modern campuses offering a broad subject curriculum
supporting both academic and vocational study pathways. Studies of science,
mathematics, commerce, technology and the arts provide university pathways.
Other courses guide students towards Technical and Further Education.
International students are welcomed into a safe, caring education environment
and supported to achieve success. An English Language Centre is located on-site.
Features of the local area
•	 Easy public transport access by regular train
and bus services
•	 Urban features, including parks, playing
fields and modern lifestyle amenities
•	 Conveniently located to shopping centre and
other services
Languages taught
	 Chinese
	 French
Special programs
•	 Experienced international Chinese, Khmer
and Vietnamese program assistants
•	 Local university student mentoring
•	 Leadership training program for students
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Highly experienced international student
program staff team
•	 Additional after school tuition for
international students provided free
•	 Careers resource centre
•	 Junior and senior resource centres
•	 School nurse
Extracurricular activities
•	 Student camp and interesting excursions
•	 Homework club after school
•	 Sports program offering a choice of activities
Sports offered
Athletics, Badminton, Basketball, Cricket, Cross
Country, Futsal, Netball, Soccer, Swimming,
Table Tennis, Tennis, Volleyball
Success story
‘Keysborough College helped me a lot
during my high school years and I was able
to achieve the results required to get into
my ideal course. Teachers at school were
very dedicated and enthusiastic in
teaching and supporting us. I am always
proud of being a student of Keysborough
Secondary College.’
–	 Vien Huynh – Vietnam; studying electrical
engineering and computer systems on
scholarship at Monash University
Awards
•	 Monash University Dean’s Scholars Award,
2013
•	 Australian Defence Force University –
scholarship, 2013
•	 Caltex Best All-Rounder Award, 2013
•	 Debating Association of Victoria – finalists,
2012
•	 Distinctions in Australian Mathematics
Competition, 2013
Reasons to choose our school
	Accepting school community with a strong sense of teamwork among staff and students
	A range of purpose built education facilities includes brand-new smart classrooms for all year levels
	Pioneering education programs resourced with high level, best of breed ICT equipment
Visit our school online at www.keysboroughsc.vic.edu.au
Address:	 AcaciaCampus: Isaac Road
Keysborough, VIC 3173
BanksiaCampus: Janine Road
Springvale South, VIC 3172
Distance from
Melbourne city centre:
	
25 km (Map Reference:
Pg 12-13, I7/I8, No. 58 )
Principal:	 Heather Lindsay
International	
Student Coordinator:	
Mitze Ho
Telephone:
Fax:
AcaciaCampus:
+61 3 9798 1877
+61 3 9798 5196
BanksiaCampus:
+61 3 9546 4144
+61 3 9558 5761
Email:	 keysborough.sc@edumail.vic.gov.au
Web:	 www.keysboroughsc.vic.edu.au
Number of students:	 1600 Number of international students:	 70
Dress:	 Uniform
Cost of uniform (approx.):	 $350 – $450
Cost of homestay per week:	 $250
59For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Koonung
Secondary College
Bordering cosmopolitan Box Hill, Koonung Secondary College in Mont Albert North
is a co-educational Years 7-12 school. Staffed by a team of qualified and committed
professionals, the college nurtures a stimulating learning environment. Students
access a challenging, wide-ranging curriculum and study within a secure,
disciplined environment. Both academic and personal development is actively
encouraged. The college promotes a culture of excellence that endorses respect
for others and generates student leadership interest and opportunities.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Central location within easy access of Deakin,
Monash, Melbourne and RMIT universities
•	 Close proximity to the popular multicultural
Box Hill shopping district
Languages taught
	 Chinese to Year 12
	 French to Year 12
	 Japanese to Year 12
Special programs
•	 Years 7-12 English as an Additional
Language classes
•	 Innovative, state-of-the-art teacher program
with University of Melbourne student
teachers assisting in classrooms
•	 Notebook computers as student study aids
•	 Year 10 pathways program focusing on
careers and tertiary study transition
•	 Year 9 Live Life Program aimed at
engaging students
Intensive English Language classes
Provided at two English Language Centres
located within 5 kilometres of school
Student support services and programs
•	 Experienced international Chinese and
Vietnamese program assistants
•	 Careers resource centre
•	 International student captains
•	 Peer support program
•	 School counsellor
•	 School nurse
Extracurricular activities
•	 Chinese, French and Japanese study tours
•	 Homework club to assist with student
progress and development
•	 World Challenge overseas
educational expeditions
•	 Annual school musical production
•	 Instrumental music instruction
•	 Sport for all year levels
•	 Lunchtime clubs and activities
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Fitness Testing, Golf, Hockey, Minor Games,
Netball, Soccer, Softball, Swimming, Table
Tennis, Tennis, Volleyball
Success story
In 2013, all international students achieved
very pleasing VCE results with the top two
ATAR’s of 97.2 and 96.9. In addition, Lingya
Zhang’s sporting contribution to Victoria
was recognised through a Victorian
International School Student Award.
Hye Yeon Baek (International Student
Captain) achieved an exceptional
university entrance score of 99.55 in 2011
and is currently studying commerce at
Melbourne University.
Awards
•	 Premier’s VCE Award – Maths Methods,
2013
•	 Victorian International School Student –
Sports Achievement Award, 2013
•	 ICAS Writing Award Top Medal, 2013
•	 State Hockey Champtions, 2013
Reasons to choose our school
	Student leadership opportunities enhanced by a positive and well-bonded school community
	Year 12 students overwhelmingly achieve successful completion of VCE
	Language and senior study centres located close to international student coordinators
Visit our school online at www.koonung.vic.edu.au
Address:	 615 Elgar Road
Mont Albert North, VIC 3129
Distance from	
Melbourne city centre:	
14 km (Map Reference:
Pg 12-13, H4, No. 59 )
Principal:	 Peter Wright
International	
Student Coordinator:	
Tracey Song
Telephone:	 +61 3 9890 9662
Fax:	 +61 3 9899 0228
Email:	 koonung.sc@edumail.vic.gov.au
Web:	 www.koonung.vic.edu.au
Number of students:	 1080 Number of international students:	 50
Dress:	 Uniform
Cost of uniform (approx.):	 $500
Cost of homestay per week:	 $270
60 Right School Right Place 2014/2015 – Melbourne A-Z
Lalor North
Secondary College
A co-educational school in Melbourne’s northern suburbs, a convenient location
well-served by public transport, close to shops and sporting facilities. We have
students from over 40 countries and multiculturalism is celebrated. We have
international students who are integrated fully with mainstream English-speaking
students in all programs. We offer a balanced and varied program which includes
academic, practical, vocational and physical options. There is strong welfare
support and the Coordinator works closely with parents and host families.
Features of the local area
•	 Serviced by regular public transport train and
bus routes
•	 Located at the urban fringe with parks,
waterways, walking and bicycle tracks
•	 Close to shopping centres, cosmopolitan
markets and the Preston dining precinct
•	 Easy commute to the city
Languages taught
	 Italian
Special programs
•	 Music Futures Program VET certificate in
Music; singing, instrumental, performances
•	 Student leadership program
•	 A focus on academic success with extensive
literacy and numeracy programs
•	 Multi-ethnic aides to assist in classes and
with community issues.
•	 La Trobe University partnership provides
student mentoring and tutoring
•	 1:1 Student laptop program
Intensive English Language classes
Provided at English Language Centre located
within 4 kilometres of school
Student support services and programs
•	 Team-based teachers and coordinators
•	 After-school homework club
•	 Careers resource centre
•	 University student tutors program
•	 School leaders program
•	 Peer support program
•	 Part-time psychologist, welfare support
Extracurricular activities
•	 Year level student camps and tours including
snow trips, surf days, bush walking
•	 Dancing
•	 Student led excursions such as city tours,
football matches, restaurant visits, beach days
Sports offered
Athletics, Australian Rules Football, Baseball,
Basketball, Cricket, Netball, Soccer, Softball,
Table Tennis, Tennis, Volleyball
Success story
‘School and teaching is very different in
Australia, but there is help. I had to learn
to ask more questions and work in teams.
I did not enjoy oral presentations until I
knew the other students – this was good in
a mixed class. Uni life is different – you
have to get the information before you
make your choice.’
–	 Thi Thuy Tram Pham – Vietnam;
studying mathematics/statistics at
RMIT University
Awards
•	 Italian Poetry Competition Finalists, 2013
•	 Australian National Chemistry Quiz –
Distinction, 2013
•	 The University of Melbourne – Kwong Lee
Dow Scholarship Winner, 2013
•	 Australian Mathematics Trust – Distinction,
2013
•	 University of New South Wales – Science
Competition High achievers, 2013
Reasons to choose our school
	Small school offering students a personal learning experience and life within a close community
	Multicultural campus with comprehensive team-based student welfare support
	Good range of curriculum study choices including music, sport and elective options
Visit our school online at www.lalornthsc.vic.edu.au
Address:	 114 Childs Road
Epping, VIC 3078
Distance from	
Melbourne city centre:	
20 km (Map Reference:
Pg 12-13, G1, No. 60 )
Principal:	 Denise Veltre
International	
Student Coordinator:	
Margaret Badham
Telephone:	 +61 3 9401 3888
Fax:	 +61 3 9408 6983
Email:	 lalor.north.sc@edumail.vic.gov.au
Web:	 www.lalornthsc.vic.edu.au
Number of students:	 450 Number of international students:	 16
Dress:	 Uniform
Cost of uniform (approx.):	 $300 – $390
Cost of homestay per week:	 $280 – $350
61For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Lilydale Heights
College
Lilydale Heights College provides excellent opportunities for students in a positive
and safe environment. We enjoy spacious and attractively treed grounds near the
Yarra Valley. Our broad curriculum caters for all students with specialist programs in
Health/PE, Music, Arts and Technology. Students focus on independent learning
with the opportunity to select studies to develop their talents. Our dedicated
mentors, academic tutors and wellbeing staff will support students during their time
at the College.
Features of the local area
•	 Gateway to the Yarra Valley
•	 Close to shopping centres and sporting
facilities
•	 Well-serviced by train-lines and bus routes
Languages taught
	 Japanese
	 Indonesian
Special programs
•	 Sister Schools in Japan and China
•	 Music enrichment program
•	 Sports programs
•	 Education enhancement programs
•	 Accelerated VCE program
•	 Year 12 Study Camp
•	 Year 10 Work Experience
Intensive English Language classes
Provided at English Language Centre located
within 15kms from the school
Student support services and programs
•	 One specialist international student tutor
•	 Part-time psychologist
•	 Part-time Adolescent Health Nurse
•	 Part-time Mental Health Nurse
•	 Careers resource centre
•	 Peer Support Program
•	 Supportive Friends Program
•	 Mentoring Program
Extracurricular activities
•	 School camps and tours including annual
Japan Tour, Central Australia Tour, Ski Trips
•	 College Production
•	 Music performances, bands and camps
•	 Art exhibition and film festival
•	 Variety of clubs including Robotics, Art,
Games, Book Club, Homework, Maths
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Cricket, Hockey, Netball, Soccer,
Swimming, Table Tennis, Volleyball
Success story
‘I have made so many friends and will
never forget my time at the College. I have
learnt so much about the culture and
school life in Australia. The support I
received from the staff and students has
made my time memorable.’
–	 Charlotte, Year 9 student France
Awards
•	 Gold, Silver and Bronze Shield winners at
the Melbourne Bands Festivals
•	 TAC Cup Players
•	 Kwong Lee Dow recipients •	 Representative of cricket overseas
•	 State Rugby Players •	 State Cricket Players
Reasons to choose our school
	Dedicated learning space and team of teachers at each year level
	Small school offering personalised experience
	An award winning musical school
Visit our school online at www.lilydaleheights.vic.edu.au
Address:	 17-19 Nelson Rd
Lilydale VIC 3140
Distance from	
Melbourne city centre:	
40 km (Map Reference:
Pg 12-13, K3, No. 61 )
Principal:	 Greg Hancock
International	
Student Coordinator:	
Isabella Phillips
Telephone:	 +61 3 9735 1133
Fax:	 +61 3 9739 5463
Email:	 lilydale.heights.co@edumail.vic.gov.au
Web:	 www.lilydaleheights.vic.edu.au
Number of students:	 600 Number of international students:	 0
Dress:	 Uniform
Cost of uniform (approx.):	 $200
Cost of homestay per week:	 $220
62 Right School Right Place 2014/2015 – Melbourne A-Z
Lyndale
Secondary College
The positive learning community of Lyndale Secondary College takes pride in
helping students fulfil their education ambition. Success is constant cause for
celebration as the comprehensive curriculum invests in students a diverse range of
skills and knowledge. A dedicated studies wing prepares senior students for further
study in an adult learning environment. Year 12 students may even enhance their
learning by incorporating Monash University or University of Melbourne degree
studies within the Victorian Certificate of Education.
Features of the local area
•	 Serviced by regular train and bus routes
•	 Within close proximity of the picturesque
Dandenong Ranges and national park
•	 A short distance from Monash University
•	 Easily access to Melbourne city centre
Languages taught
	 Japanese
	 French
Special programs
•	 Enrichment and accelerated learning
including Accelerated learning Program for
high performing students
•	 Monash University and University of
Melbourne enhancement studies
•	 Modern science facilities
•	 New language centre
•	 Instrumental music program
•	 Sporting program at local and state level
Intensive English Language classes
Provided at English Language Centre located
within 5 kilometres of school
Student support services and programs
•	 International student committee to support
new students
•	 Access to extensive English as an Additional
Language support
•	 Careers resource centre and counsellors
•	 Student welfare team
•	 Full-time psychologist
Extracurricular activities
•	 Local and international camps
•	 Choice of student leadership activities
and programs
•	 Instrumental music, including individual,
bands, vocal instruction and performance
•	 Chess and science clubs
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Hockey, Netball,
Soccer, Softball, Swimming, Table Tennis,
Tennis, Volleyball
Success story
‘I would like to thank all of my teachers at
Lyndale Secondary College for helping me
achieve very good results and also to the
many friends I have made at the school.’
–	 Tracy Nguyen – Vietnam
Awards
•	 Boys Baseball State Champions, 2008-09, 2011, 2013
•	 Boys Table Tennis Champions, 2012
•	 Three students awarded sport scholarships to College in Canada and USA, 2014
Reasons to choose our school
	Family-like school community and a supportive, caring environment
	A reputation for academic excellence and range of curriculum subject choice
	Various opportunities for students to participate in leadership and personal development
Visit our school online at www.lyndale.vic.edu.au
Address:	 Gladstone Road
Dandenong North, VIC 3175
Distance from	
Melbourne city centre:	
24 km (Map Reference:
Pg 12-13, I7, No. 62 )
Principal:	 Mark Moir
International	
Student Coordinator:	
Pam Robinson
Telephone:	 +61 3 9795 2366
Fax:	 +61 3 9790 1466
Email:	 lyndale.sc@edumail.vic.gov.au
Web:	 www.lyndale.vic.edu.au
Number of students:	 1200 Number of international students:	 12
Dress:	 Uniform
Cost of uniform (approx.):	 $250 – $300
Cost of homestay per week:	 $250 – $300
63For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Macleod
College
Macleod College enjoys a reputation for academic success and excellent
Victorian Certificate of Education results. Student achievement in physics, biology,
psychology and music is of particular note. The college educates Years Prep-12 and
offers an exceptional range of subject choice. Extracurricular programs are a special
strength and include the Macleod College Music Academy, student leadership and
resilience and wellbeing programs. The school enjoys close ties with La Trobe
University, located just two kilometres away.
Features of the local area
•	 Very well-serviced by train lines and bus routes
•	 Native parklands within walking distance
from school (Gresswell Forest and kangaroos)
•	 Close to shopping centre
•	 20 minutes by train to Melbourne city centre
Languages taught
	 German
Special programs
•	 International students pastoral care and extra
study support
•	 School partnerships in China and Germany
•	 Student leadership program, including
international student captaincy
•	 School camps and interstate trips
•	 Vocational Education and Training/Victorian
Certificate of Applied Learning programs
•	 Years 7-10 High Achievers Program
•	 Before and after-school care
Intensive English Language classes
Provided at English Language Centre located
within 12 kilometres of school
Student support services and programs
•	 Health and wellbeing team (School nurse,
chaplain, youth worker)
•	 Careers resource centre including full-time
careers and further education teacher
•	 Multiple subject teachers instruct the same
class to provide learning stability
•	 Peer support program
•	 Student welfare coordinator
•	 School psychologist
Extracurricular activities
•	 Range of student leadership opportunities
•	 Homework Club, (English, Mathematics,
Science)
•	 School Radio Station
•	 Music Program
•	 Sport Program
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Cricket, Cross Country, Fencing,
Fitness, Handball, Hockey (Field and Indoor),
Netball, Recreational Sports, Soccer, Softball,
Swimming, Table Tennis, Tennis, Volleyball
Success story
‘Macleod College is a wonderful school
as there are many friendly people here
from lots of different countries. The
teachers in all of my subjects are helpful
and my English has improved. I am
enjoying the subjects that I have chosen
and am learning a lot. I hope that I will be
able to get into a university course to
study engineering.’
–	 Macleod College student
Awards
•	 Annual ADF Long Tan Leadership and
Teamwork Award
•	 String Orchestra – Highly Commended at
South Street Festival, 2013
•	 University of Melbourne Kwong Lee Dow
Award
•	 Gold Medal Winners – National Schools
Basketball Tournament, 2011
•	 State Finalists – Senior Table Tennis, 2013
•	 Jazz Bands – Silver and Bronze Shields –
Victorian School Bands Festival, 2013
Reasons to choose our school
	Individually focused learning experience in a friendly, cooperative and respectful environment
	Experienced specialist teachers providing English as an Additional Language classes
	International Student Coordinator liaises regularly with students, parents and Homestay families
Visit our school online at www.macleod.vic.edu.au
Address:	 Carwarp Street
Macleod, VIC 3085
Distance from	
Melbourne city centre:	
12 km (Map Reference:
Pg 12-13, G2, No. 63 )
Principal:	 Mario Panaccio
International	
Student Coordinator:	
Colleen Cochrane
Telephone:	 +61 3 9459 0222
Fax:	 +61 3 9458 1878
Email:	 macleod.co@edumail.vic.gov.au
Web:	 www.macleod.vic.edu.au
Number of students:	 620 Number of international students:	 24
Dress:	 Uniform
Cost of uniform (approx.):	 $250 – $300
Cost of homestay per week:	 $250 – $280
64 Right School Right Place 2014/2015 – Melbourne A-Z
Maribyrnong
College
Bordering an outdoor reserve and nearby river parklands, Maribyrnong College is
just 8km from Melbourne’s heart. Students enjoy excellent new and refurbished
facilities and the school is rapidly establishing a reputation for academic excellence
and high standards of student behaviour. Teachers from diverse backgrounds are
skilled in supporting non-English speaking students both in class and after school.
Maribyrnong College is well serviced by public transport and close to both Victoria
University and Highpoint shopping centre.
Features of the local area
•	 Regular tram and bus public transport services
•	 Adjacent to parkland and Peaceful river
precinct
•	 Adjacent to Highpoint Shopping Centre and
Maribyrnong Aquatic Centre; close to
Melbourne city
Languages taught
	 Italian
	 Vietnamese at the nearby Victorian School
of Languages
Special programs
•	 Experienced Vietnamese international
program assistants
•	 Tertiary style learning and student mentoring
at nearby Victoria University
•	 Extra tuition in Victorian Certificate of
Education subjects after school
•	 Sports academy program – outstanding
sports school
Intensive English Language classes
•	 Provided at English Language Centre located
within 5 kilometres of school
•	 Small class sizes in English as an Additional
Language and foundation English
Student support services and programs
•	 Two specialist international student
program facilitators
•	 Careers resource centre with experience
helping students plan tertiary pathways
•	 Peer support program
Extracurricular activities
•	 Year 12 High Achievers’ Club
•	 Year 12 Leadership Camp
•	 Year 11 Study Camp
•	 Sports including after-school
badminton
•	 Chess club
•	 International Student event each term
Sports offered
The college offers many sports and
opportunities to participate in representative
school teams. Sporting strengths include
Athletics, Badminton, Basketball, Swimming
and Soccer.
Success story
‘Maribyrnong offered me the best
opportunities to develop both in my study
and in my life. It provided modern facilities,
after-school classes and professional
teachers who were willing to help me
whenever I needed. Maribyrnong was like
my second home.’
–	 Huy Le was our first International Student
leader at the College. He is now in his
third year of a Teaching Degree at Victoria
University.
Awards
•	 Dux of the School – International Student
Huy Vu, 2013
•	 State Champions in intermediate boys
tennis and baseball, 2014
•	 Victorian International School Student –
Sports Achievement Award, 2012
•	 Top VCE student in Vietnamese, 2011
•	 State Champions in senior girls cricket,
2013
•	 State Champions in many sports, 2011-13
Reasons to choose our school
	Superb new sports facilities including badminton, basketball and soccer stadiums
	
Recent school works including classroom renovations, new science facilities and grounds
landscaping
	A diverse student population and a positive, multicultural school community
Visit our school online at www.maribsc.vic.edu.au
Address:	 2 River Street
Maribyrnong, VIC 3032
Distance from	
Melbourne city centre:	
8 km (Map Reference:
Pg 12-13, D3, No. 64 )
Principal:	 Nick Scott
International	
Student Coordinator:	
Judy Cameron
Telephone:	 +61 3 9091 8100
Fax:	 +61 3 9318 4251
Email:	 maribyrnong.sc@edumail.vic.gov.au
Web:	 www.maribsc.vic.edu.au
Number of students:	 1180 Number of international students:	 30
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $230 – $250
65For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
McClelland
College
McClelland College is located in spacious, leafy grounds minutes from pristine
beaches, beautiful parks and shopping centres, with good transport links to the
CBD. Our caring and experienced teachers coupled with our personalised learning
approach guarantees each student has an individual learning program and career
plan to suit their needs. Students enjoy the unique Academy Program where they
follow their passion and perfect their skills. The school has strong ties to Monash
and Melbourne Universities.
Features of the local area
•	 Very close to public transport; well-serviced
by train-lines (to the CBD) and bus routes
•	 Close to beautiful beaches, shopping centre
and cinemas
•	 Close to Monash University Peninsula
Campus
Languages taught
	 Japanese (first language and second
language)
Special programs
•	 Accelerated learning programs
•	 Experienced English Language teachers
•	 Specialised academy programs including
Soccer, Maths, Science, Basketball and
Music.
•	 Student leadership programs
•	 Established close links with Monash and
Melbourne University
•	 School-owned camp in the foothills of the
Victorian ski slopes
Intensive English Language classes
•	 Provided at nearby English Language Centre
•	 Extra English language enrichment tuition for
international students by qualified EAL teacher
Student support services and programs
•	 Part-time psychologist and full-time access to
a personal counselor
•	 Careers Resource Centre and personalised
Career Pathway Advisor
•	 Access to state-of-the-art gymnasium and
indoor heated swimming pool
•	 International Student Centre with computer
access and kitchen facilities
•	 After school study club
Extracurricular activities
•	 Camps and Excursions; Central Australia,
Snow and Surf Camps
•	 International student orientation tour program
•	 State Emergency Service Rescue Training
•	 Maths and Science Competitions and Tutoring
•	 International Exchange to USA, Fiji, Japan
Sports offered
Athletics, Australian Rules Football, Baseball,
Basketball, Cricket, European Handball, Hockey,
Netball, Rugby, Soccer, Softball, Table Tennis,
Tennis, Volleyball
Success story
‘I thoroughly enjoyed my time studying at
McClelland College. The teaching staff
were very caring and supportive, which
helped me to achieve entry into my dream
course at the University of Melbourne.’
– Josh Hughes, former McClelland College
School Captain and current Bachelor of
Science student at Melbourne University,
majoring in Physics
Awards
•	 Monash University Extension Studies
DUX, 2013
•	 Early Entry into University awarded to
McClelland students, 2014
•	 VCE Top Achiever Business Management
– Perfect VCE Study Score of 50, 2013
•	 Environmental Sustainability Awards,
2011-14
•	 Best Secondary School Leadership Team in
Victoria, 2013
•	 National Excellence in Teaching Award, 2012
Reasons to choose our school
	
We know every student and care about the whole student: their education, personal
development, career and tertiary pathways
	Excellent academic programs tailored to suit individual student learning needs
	McClelland Academy Program – every student follows their passion!
Visit our school online at www.mcclellandcollege.vic.edu.au
Address:	 Belar Avenue,
Frankston VIC 3199
Distance from	
Melbourne city centre:	
40 km (Map Reference:
Pg 12-13, H11, No. )
Principal:	 Amadeo Ferra
International	
Student Coordinator:	
Kathryn Henderson
Telephone:	 +61 3 9789 4544
Fax:	 +61 3 9776 5211
Email:	 mcclelland.sc@edumail.vic.gov.au
Web:	 www.mcclellandcollege.vic.edu.au
Number of students:	 900 Number of international students:	 0
Dress:	 Uniform
Cost of uniform (approx.):	 $250
Cost of homestay per week:	 $240 - $260
65
66 Right School Right Place 2014/2015 – Melbourne A-Z
McKinnon
Secondary College
Most McKinnon Secondary College students aspire to and achieve university entry.
A large co-educational school, the college has a long and proud tradition of
academic excellence. Abundant student choice is a feature of the broad curriculum,
offering over 30 Victorian Certificate of Education subjects. Learning is based on
traditional subject disciplines that maximise the alternatives available to students
in later years. The south-eastern location is easily accessed by public transport
and close to Monash University.
Features of the local area
•	 Serviced by regular train and bus routes
•	 Busy and vibrant suburb with a pleasing,
leafy aspect close to the city and
beach reserves
•	 Nearby major shopping centre
Languages taught
	 French
	 German
Special programs
•	 Experienced Chinese aide
•	 Close links with local university
•	 Extensive instrumental music program
•	 Wide choice of sporting activities
Intensive English Language classes
Provided at English Language Centre located
within 4 kilometres of school
Student support services and programs
•	 Student manager support at all year levels
•	 Careers resource centre
•	 Peer support program
•	 Student welfare program
Extracurricular activities
•	 Camps and excursions at all year levels
•	 Junior and senior leadership roles
•	 Debating and drama opportunities
Sports offered
Alternative Sport Gala Day, Athletics, Australian
Rules Football, Badminton, Baseball,
Basketball, Cricket, Cross Country, Netball,
Rugby, Soccer, Softball, Swimming, Table
Tennis, Tennis
Success story
‘My greatest achievement during these two
years of study at MSC was making friends,
taking part in fun and meaningful activities
and sharing precious moments with my
classmates and teachers’
– Shirley Cao – China. Dux of school 2013.
ATAR 99.85 studying Science, Melbourne
University
Overall, our international students are
consistently successful with 40% placing
in the top 10% of the State
Awards
•	 Two Premier’s VCE Awards, 2013
•	 Numerous winners in national mathematics,
English and geography competitions
•	 Top VCE student awards, 2010 •	 State winners in debating competitions
•	 State champions in football, soccer, hockey,
netball and cross country in recent years
Reasons to choose our school
	Renowned as one of the top performing Victorian Certificate of Education schools in Victoria
	Numerous music instruction and performance as well as sporting opportunities
	Newly built facilities for Year 7, administration and staff recently opened
Visit our school online at www.mckinnonsc.vic.edu.au
Address:	 McKinnon Road
McKinnon, VIC 3204
Distance from	
Melbourne city centre:	
12 km (Map Reference:
Pg 12-13, G6, No. 66 )
Principal:	 Pitsa Binnion
International	
Student Coordinator:	
Stuart Baker
Telephone:	 +61 3 8520 9000
Fax:	 +61 3 9578 9253
Email:	 mckinnon.sc@edumail.vic.gov.au
Web:	 www.mckinnonsc.vic.edu.au
Number of students:	 1850 Number of international students:	 48
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $280
67For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Melbourne Girls’
College
Melbourne Girls’ College, “Where Girls Lead and Achieve”, provides a quality
educational experience incorporating intellectual challenge as well as opportunities
for personal and social development. Our students learn in a safe and caring
environment. We encourage high standards of achievement, leadership, discipline
and responsibility. MGC values the diversity of our student population and
encourages a harmonious community that embraces opportunities to foster global
citizenship.
Features of the local area
•	 Set in gardens opposite parklands
overlooking the Yarra River
•	 Accessed from CBD by 3 trams, a train line
and by suburban bus
•	 15 minutes from Melbourne CBD and close to
Victoria Gardens Shopping Centre
Languages taught
	 French
	 Chinese
	 Other languages arranged through VSL
Special programs
•	 Competitions in public speaking,
mathematics, writing, science and art
•	 Acceleration: Gifted & Talented, access to
University Enhancement Programs
•	 VET: hospitality, community service, sport
•	 Selected as a Confucius School
•	 Careers Program including mock job
interviews, work experience and tertiary
information sessions
Intensive English Language classes
Provided at nearby English Language Centre.
Transition to MGC Program including liaison to
develop EAL students’ language competency
Student support services and programs
•	 Full-time International Student Manager and
a Chinese/Vietnamese-speaking assistant
•	 Psychologist/counselor, careers advisor
•	 Academic support by email contact with
teachers at any time
•	 Designated study areas and resources
•	 Peer Support and Supportive Friends
•	 After school Homework Help Program
Extracurricular activities
•	 Instrumental music studios
•	 Performing Arts Centre (music, drama, dance)
•	 Aerobics and personal training fitness centre
•	 Rowing from our own pontoon
•	 Tennis on school’s own courts
•	 Year Level camps, class excursions and
student clubs
Sports offered
Badminton, Basketball, Cricket, Cross Country,
Cycling, Diving, Hockey, Netball, Rowing, Soccer,
Surf Lifesaving, Table Tennis, Tennis, Volleyball
Success story
‘Attending MGC was the best decision I
have ever made because MGC is such an
outstanding school. Through my years at
MGC, I did not only learn to excel
academically; but most of all, I made
friends and learned about myself, my
capabilities and my passions. I am very
grateful for my teachers’ and friends’
support for bringing me to where I am
today.’
–	 Hannah Nguyen – ATAR 98.2 – currently
studying Bachelor of Science (Honours)
at the University of Melbourne
Awards
•	 Top VCE Scorers Award from the Victorian
School of Languages for Chinese
•	 State Schools Sports Awards
•	 Premier’s Award for LOTE and VET
Hospitality
•	 Outstanding Achievement Award from World
Vision 40 Hour Famine
•	 Rotary International Public Speaking
Award and Writing Award
•	 Sustainability Victoria Resource Smart
Schools Awards
Reasons to choose our school
	Impressive academic results with VCE scores in top 10% of government schools
	An exciting student leadership program: SRC, peer support, junior ambassadors, captains
	New include contemporary cafeteria, mezzanine performance studio
Visit our school online at www.mgc.vic.edu.au
Address:	 Yarra Boulevard
Richmond, VIC 3121
Distance from	
Melbourne city centre:	
4 km (Map Reference:
Pg 12-13, F4, No. 67 )
Principal:	 Karen Money
International	
Student Coordinator:	
Bronwyn McGarry
Telephone:	 +61 3 9428 8955
Fax:	 +61 3 9428 2737
Email: melbourne.girls.co@edumail.vic.gov.au
Web:	 www.mgc.vic.edu.au
Number of students:	 1200 Number of international students:	 65
Dress:	 Uniform
Cost of uniform (approx.):	 $500
Cost of homestay per week:	 $285 – $300
68 Right School Right Place 2014/2015 – Melbourne A-Z
Mentone Girls’
Secondary College
Mentone Girls’ College students gain outstanding learning and student leadership
opportunities with a unique girls-only education. Catering for both academic and
vocational study streams, the curriculum offers a wide subject choice of Science,
Maths, Commerce, Technology and Art creating university pathways. Other subjects
may lead to Technical and Further Education. Located beside the bay, 23 kilometers
from Melbourne CBD. The College has strong links with Melbourne, Monash and
Deakin Universities.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Three minutes from swimming beach
•	 Close to large Southland Shopping Centre
Languages taught
	 Japanese
	 French
Special programs
•	 Year 12 Victorian Certificate of Education
study conference
•	 Student leadership program
•	 School sponsors a student from Soweto to
study in Australia
•	 Student environment committee
Intensive English Language classes
Provided at English Language Centre located
within 8kms of school (English Language School
onsite from 2015)
Student support services and programs
•	 Full-time student wellbeing coordinator
•	 Careers resource centre
•	 Peer support program
•	 Supportive friends program
•	 Safe Schools Coalition member
•	 Part-time psychologist
Extracurricular activities
•	 Camps program
•	 Sister schools in France, Japan, South Africa
and China
•	 World Challenge overseas educational
expeditions
•	 Co-curricular activities in debating,
performing arts, sport, leadership
•	 Music program
Sports offered
Aerobics, Archery, Athletics, Australian Rules
Football, Badminton, Baseball, Basketball, Beach
Activities, Circus Skills, Cross Country, European
Handball, Golf, Gymnastics, Hip Hop, Hockey, Indoor
Hockey, Korfball, Lacrosse, Netball, Orienteering,
Soccer, Swimming,TableTennis,Tchoukball,Tennis,
Volleyball,Weights/Fitness, Zumba
Success story
‘I benefited a lot from this experience. My
English has improved in leaps and bounds.
School offers a wide range of subjects. You
can choose the subjects that you enjoy. I live
in a home-stay. It’s just like my second home.’
–	 Tear, Year 12 – Hohhot, China
Awards
•	 National History Challenge finalists, 2013 •	 Top Designs – multiple selections, 2012
•	 State sporting competitions – multiple
finalists
•	 Australian Brain Bee competition – multiple
finalists
•	 Pierre de Coubertin Award, 2014
•	 Maths Challenge for Young Australians –
multiple distinctions
Reasons to choose our school
	Excellent facilities including purpose designed music centre and newly built media centre
	Outstanding VCE results with the vast majority of student progressing to tertiary study
	School teams in a wide range of sports competing at state level and beyond
Visit our school online at www.mgsc.vic.edu.au
Address:	 Cnr Balcombe and Charman Roads
Mentone, VIC 3194
Distance from	
Melbourne city centre:	
23 km (Map Reference:
Pg 12-13, G7, No. 68 )
Principal:	 Deborah Lehner
International	
Student Coordinator:	
Doanvy Roberts
Ekaterina Xanthopoulos
Telephone:	 +61 3 9581 5200
Fax:	 +61 3 9585 1012
Email:	 mentone.girls.sc@edumail.vic.gov.au
Web:	 www.mgsc.vic.edu.au
Number of students:	 1100 Number of international students: 	 11
Dress:	 Uniform
Cost of uniform (approx.):	 $600
Cost of homestay per week:	 $280 – $300
69For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Mill Park
Secondary College
Located north of Melbourne’s city centre, Mill Park Secondary College is a dual-
campus co-education school. Its generous school population allows the college to
offer a wide-ranging choice of Victorian Certificate of Education subjects.
International students enjoy the use of a dedicated centre and are further supported
by an on-site English Language Centre. The school enjoys an outstanding record of
academic success. Many graduates achieve high Victorian Certificate of Education
results and gain admission to world-class universities.
Features of the local area
•	 Close to train-line and bus routes
•	 Close to major shopping centers
•	 Enjoyable lifestyle amenities including public
libraries, parks, sporting and entertainment
facilities
Languages taught
	 Italian
Special programs
•	 Uni Bridges Science themed program that has
direct entry into selected LaTrobe University
Degree courses
•	 Student leadership possibilities
•	 Select Accelerated Learning Programs for
high performing students
•	 Extensive Visual and Performing Arts
Programs
•	 Wide choice of Vocational Educational and
Training subjects
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Dedicated International Student Coordinator
•	 Careers centre with dedicated
careers counsellors
•	 Caring and experienced student welfare team
•	 Years 7-12 pastoral care program
•	 Homework club
Extracurricular activities
•	 Instrumental music tuition and performance
•	 Debating and public speaking teams
•	 Annual college production
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Netball, Soccer,
Softball, Swimming, Tennis, Volleyball
Success story
‘I came to Mill Park Secondary College
two years ago from Vietnam and soon
learnt that the teachers in this college are
very happy to spend extra time helping
students. This has prepared me well for
my final year of VCE. Thank you to all
my teachers.’
–	 Thien Tin Pham – Vietnam; Year 11
Awards
•	 Scholarship – University of Melbourne and
Trinity College Young Leaders Program
•	 Winner of the Living Spirit Fellowship Award
•	 Runners-Up in the La Trobe University
Mooting Competition
•	 Runners-Up in the Middle Years Division
Chess Competition
•	 Bronze – Under-16 200m at Australian Junior
Track and Field National Championships
Reasons to choose our school
	Dedicated International Student Centre
	Large multicultural campus offering a smaller, more personalised program
	Excellent science facilities including specialist rooms for chemistry and physics studies
Visit our school online at www.millparksc.vic.edu.au
Address:	 Moorhead Drive
Mill Park, VIC 3082
Distance from	
Melbourne city centre:	
22 km (Map Reference:
Pg 12-13, G1, No. 69 )
Principal:	 Tricia Horner
International	
Student Coordinator:	
Marilyn Pridmore
Telephone:	 +61 3 9409 8222
Fax:	 +61 3 9401 5966
Email:	 mill.park.sc@edumail.vic.gov.au
Web:	 www.millparksc.vic.edu.au
Number of students:	 1600 Number of international students:	 24
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $260 – $280
70 Right School Right Place 2014/2015 – Melbourne A-Z
Mordialloc
College
Mordialloc College is at the gateway to Victoria’s beautiful Mornington Peninsula.
A co-educational school, the college serves south-eastern suburbs and is only a
train ride from Melbourne CBD. A tradition of academic excellence showcases high
teaching standards and celebration of student success. The school also enjoys a
reputation for nurturing personal development and motivating students to achieve.
Staff take great pride in fostering the development of future global citizens.
Features of the local area
•	 Public transport access by regular train and
bus services
•	 Beautiful natural setting with generous school
grounds and close to swimming beaches
•	 Nearby local shopping centre
Languages taught
	 French
Special programs
•	 Accelerated learning program for high
performing students
•	 Music and performing arts programs
•	 Art and studio arts courses
•	 ‘Advance’ outdoor education program
•	 Camps and excursions
•	 Year 9 ‘Mordialloc Experience’ community-
based learning
•	 Years 7-8 enquiry learning programs
•	 Life saving club partnership
Intensive English Language classes
Provided at English Language Centre located
within 15 kilometres of school
Student support services and programs
•	 English as an Additional Language support
•	 Excellent careers centre advising on a range
of study and careers pathways
•	 Teacher supervised Years 7-12 after school
study clubs
•	 Study skills program running all year at all
year levels
•	 Full-time wellbeing counsellor, part-time
psychologist, school nurse
•	 Victorian Certificate of Education one-to-one
student NetBook program
Extracurricular activities
•	 Year level camps
•	 Performing arts program including annual
production or Rock Eisteddfod Challenge
•	 Participation in inter-school
sporting competitions
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Hockey, Netball, Surf Life Saving, Swimming,
Table Tennis
Success story
‘Studying in Mordialloc College has been
a memorable and precious time in my life.
Its friendly, rich Aussie atmosphere helped
me to embrace a different culture and mix
into mainstream society easily. The friends
I made in Mordialloc are my treasure
forever. Advice from the teachers will
guide me through on my way to success.’
–	 Luya (Joyce) Wang – China; studying
actuarial studies at the University
of Melbourne
Awards
•	 Only Victorian secondary school invited to present at the Future Schools Conference, Sydney,
2014
•	 City of Kingston Citizen of the Year Award, 2013
•	 Finalist in many sporting competitions, 2013-14
Reasons to choose our school
	Harmonious learning community of staff and students working towards common goals
	Delivery of inspired junior programs and commitment to academic focus in senior years
	Recently opened science centre and brand new multimedia resource hub
Visit our school online at www.mcsc.vic.edu.au
Address:	 1 Station Street
Mordialloc, VIC 3195
Distance from	
Melbourne city centre:	
20 km (Map Reference:
Pg 12-13, H8, No. 70 )
Principal:	 Michelle Roberts
International	
Student Coordinator:	
Di Douglas
Telephone:	 +61 3 9580 1184
Fax:	 +61 3 9587 5443
Email:	 mordialloc.co@edumail.vic.gov.au
Web:	 www.mcsc.vic.edu.au
Number of students:	 600 Number of international students:	 5
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $270
(Plus contribution to internet cost)
71For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Mornington
Secondary College
Mornington Secondary College provides an inspirational learning environment.
Located on Mornington Peninsula’s picturesque natural coastline, the college offers
outstanding facilities and resources. Expansive grounds provide a setting for sports,
performing arts and recreational facilities. Specialist classrooms and up-to-date
computer equipment also feature. The school promotes a strong work ethic in
supporting students to reach study goals. Blending academic rigour, initiative and
self discipline is integral to the culture that supports each student’s path to success.
Features of the local area
•	 Within a short distance of beautiful bay and
ocean surf beaches
•	 Close to famous Mornington Peninsula
gourmet food and wine growing region
Languages taught
	 Japanese
	 Indonesian
Special programs
•	 Osaka, Japan sister city relationship
•	 Denpasar, Bali, Indonesia senior high sister
school
•	 School Access Monash – Preparing students
of University
•	 Instrumental music and choir ensembles and
performances
•	 Sports Specialism School – Basketball,
Netball, Swimming, Athletics
•	 Student Ambassadors – Student Leadership
Intensive English Language classes
Provided at English Language Centre onsite
Student support services and programs
•	 International Student Coordinator
•	 International student Homestay coordinator
•	 Careers/pathways resource centre
•	 Student welfare program
•	 School chaplain
Extracurricular activities
•	 World Challenge overseas student camp
•	 Theatre production camp
•	 Music camp
•	 Outdoor education ski camps
•	 Human powered vehicle program and events
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Futsal, Golf, Hockey, Netball, Rugby, Soccer,
Softball, Swimming, Table Tennis, Tennis
Success story
‘Studying at MSC is fun! Teachers are very
knowledgeable and are able to simplify
teaching to help me understand the lesson
well. They give so much effort to take a
personal interest in helping me with my
school work. I loved the atmosphere in the
school and the way the school offered a lot
of activities which made learning fun.’
–	 Anne Orbon – Philippines
Awards
•	 Boys Cross Country State Champions, 2014
•	 Junior girls gymnastics state champions,
2013
•	 Aerobics Year 7 State Champions, 2014 •	 Girls diving state finalists, 2013
•	 Junior boys soccer state finalists, 2013
•	 Individual girl gymnastics state champion,
2013
Reasons to choose our school
	Positive school spirit among staff and students inspiring a strong sense of community
	Extensive program of academic subject choices and individual or team sporting activities
	Well resourced school set in attractive grounds close to beautiful bay beaches
Visit our school online at www.mornsc.vic.edu.au
Address:	 1051 Nepean Highway
Mornington, VIC 3931
Distance from	
Melbourne city centre:	
60 km (Map Reference:
Pg 12-13, G12, No. 71 )
Principal:	 Sarah Burns
International	
Student Coordinator:	
Jim Papas
Telephone:	 +61 3 5970 0200
Fax:	 +61 3 5970 0299
Email:	 mornington.sc.@edumail.vic.gov.au
Web:	 www.mornsc.vic.edu.au
Number of students:	 1400 Number of international students:	 3
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $230 – $250
72 Right School Right Place 2014/2015 – Melbourne A-Z
Mount Alexander
College
Senior secondary students at Mount Alexander College enjoy small class sizes and
excellent learning opportunities. The school boasts a new science centre plus
purpose designed Information and Communications Technology and multimedia
facilities. The Middle Years education program takes an individual wellbeing and
learning style focus. Experienced staff and advanced resources support student
learning right across the curriculum. Situated close to Melbourne city, RMIT and
Victoria Universities, the college is easily accessed by public transport.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Exciting inner city urban environment
•	 Close to major shopping centre
Languages taught
	 Italian
	 Chinese
Special programs
•	 Melbourne University student mentoring
•	 Access to nearby university teaching facilities
•	 	Drama and art
•	 Student leadership and girls leadership
programs
•	 SEAL program
•	 The Duke of Edinburgh’s Award
Intensive English Language classes
Provided at English Language Centre located
within 4 kilometres of school
Student support services and programs
•	 International Student Coordinator
•	 Careers resource centre
•	 Student welfare coordinator
•	 School nurse
•	 Speech therapist
•	 Special education consultant
Extracurricular activities
•	 Year level camps
•	 School band and performance opportunities
•	 Arts, film festival and music participation
•	 Chess, computer and soccer clubs
•	 Breakfast club
Sports offered
Athletics, Basketball, Australian Rules Football,
Netball, Soccer, Swimming, Volleyball
Success story
‘Teachers are dedicated. Class sizes are
small, so we get lots of help from teachers.
I quickly improve my English through the
ESL class and get one-to-one tutoring from
a university student in the Ormond College
tutoring program.’
–	 Xuan Loc Le – Vietnam
Awards
•	 VCE Top Achiever – Arabic, 2011,
Vietnamese, 2012
•	 High Distinctions Australian Mathematics
Competition, 2013
•	 LOTE Film Festival Award
•	 High Distinctions Australian National
Chemistry Awards, 2013
•	 Bayside Film Festival Award
Reasons to choose our school
	Unified and welcoming school community offering students a personal learning experience
	Vibrant multicultural school community with students from diverse backgrounds
	Outstanding musical program and science facilities
Visit our school online at www.mountalexandercollege.vic.edu.au
Address:	 169-175 Mt Alexander Road
Flemington, VIC 3031
Distance from	
Melbourne city centre:	
4 km (Map Reference:
Pg 12-13, E4, No. 72 )
Principal:	 Alan Davis
International	
Student Coordinator:	
David Hanna
Telephone:	 +61 3 9376 1622
Fax:	 +61 3 9376 5232
Email:	 mount.alexander.712@edumail.vic.gov.au
Web:	 www.mountalexandercollege.vic.edu.au
Number of students:	 310 Number of international students:	 6
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $270 – $300
73For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Mount Eliza
Secondary College
A successful international program has been a long-standing feature at Mount Eliza
Secondary College. Many participating students have excelled in Victorian
Certificate of Education Studies and gained entry to top Melbourne universities.
International students thrive personally and academically within the healthy,
nurturing environment provided at school and by Homestay families. The college is
situated within a scenic natural coastal environment. Public transport is easily
accessed as are spectacular beaches and Monash University Peninsula Campus.
Features of the local area
•	 Close to public transport and shopping centre
•	 An short distance to numerous clean, safe
swimming beaches
•	 Nearby Monash University Peninsula Campus
Languages taught
	 Chinese as a first language
	 Indonesian
	 German
Special programs
•	 International student tutorial program
•	 International study tours
•	 Acceleration studies offered in all subjects
•	 University enhancement for
high-performing students
•	 Innovative student leadership program
incorporating international student captain
•	 Mentor program
•	 Homework club
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 International student secretary and homestay
coordinator; Assistant Principal as
International Student Coordinator
•	 Chinese teacher fostering close contact and
communication with families and students
•	 Careers resource centre with full time
counsellor
•	 Peer support program
•	 Instrumental music program
•	 Victorian Police Youth Corp Program
Extracurricular activities
•	 Camps including Central Australian tour
•	 International student excursions/study tours
•	 Cultural Diversity programs
•	 Functions including Year 10 Formal,
Debutante Ball, Valedictory Dinner
•	 Interschool sport
•	 Lunchtime activities
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Hockey, Netball, Soccer, Softball, Swimming,
Table Tennis, Tennis, Volleyball
Success story
‘The best thing about Mount Eliza
Secondary College is the wonderful
teachers. All the teachers have lots of
patience with the International students
and try many different ways to help us
understand. And we are lucky, too, because
the homestay families are very good
hearted and make us feel like part of their
family.’
– Ouyang Ying, China, studying a Bachelor
of Business / Commerce degree, 2013
Awards
•	 National Skating Champion, 2013
•	 National Junior Badminton Champion,
2011-13
•	 Archibald Prize -Young Artist awards, 2013 •	 State Debate Champions, 2012
•	 Multiple awards regional and state-level
sports, 2011-13
Reasons to choose our school
	Specialised international program facilities incorporating English Language Centre on-site
	Outstanding Homestay program with established, caring Homestay families in large homes
	Excellent academic program which provides students with a school netbook free of charge
Visit our school online at www.mesc.vic.edu.au
Address:	 Canadian Bay Road
Mt Eliza, VIC 3930
Distance from	
Melbourne city centre:	
55 km (Map Reference:
Pg 12-13, H12, No. 73 )
Principal:	 Angela Pollard
International	
Student Coordinator:	
Andrew Musgrave
Telephone:	 +61 3 9787 6288
Fax:	 +61 3 9787 9888
Email:	 mount.eliza.sc@edumail.vic.gov.au
Web:	 www.mesc.vic.edu.au
Number of students:	 750 Number of international students:	 30
Dress:	 Uniform
Cost of uniform (approx.):	 $250
Cost of homestay per week:	 $230 – $240
74 Right School Right Place 2014/2015 – Melbourne A-Z
Mount Erin
College
Positioned on the border of beautiful Mornington Peninsula, Mount Erin College
offers a rich academic curriculum and harmonious learning environment. Year 12
academic results place Mount Erin among the best-performing government colleges
within the south-eastern region. The school enjoys strong ties with nearby Monash
University, where many graduating Year 12 students continue on to world class
tertiary education. Mount Erin College is located just one hour from Melbourne.
Features of the local area
•	 Well serviced by train and bus
•	 Only 4 kilometers to swimming beaches
•	 Provincial school campus
•	 Nearby shopping centres
Languages taught
	 Auslan
	 Indonesian
	 Chinese can be studied by arrangement
(off-site)
Special programs
•	 Experienced international Chinese and
Indonesian program assistants
•	 Accelerated learning Program for high
performing students
•	 Monash University student mentoring
•	 Sports academy
•	 Arts academy
•	 Management committee for students to plan
events such as fund-raisers
Intensive English Language classes
Provided at English Language centre located
within 3km
Student support services and programs
•	 Tutorial system to support VCE students
•	 Careers Counsellor and resource Centre
•	 Order of Australia Peer Support Program
Extracurricular activities
•	 New Zealand excursion
•	 Indonesian excursion
•	 Pre-driver education
•	 School theatre production night
•	 School band performances
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Golf, Hockey,
Netball, Soccer, Softball, Swimming, Table
Tennis, Tennis, Volleyball
Success story
Mount Erin College’s first international
student, Li Jun Yan, rapidly developed her
English in our Accelerated English classes,
and assimilated quickly with the local
students here. She rapidly became very
confident and capable in class, and
relished the cultural experiences the
College gave her the opportunity to
experience. Li Jun Yan trod the path first
that many will follow!
Awards
•	 Order of Australia Award for Supportive
Friends Program
•	 Monash and Deakin University High Achievers
Awards for Academic Excellence
•	 Young Leaders Award – Frankston Shire
•	 Kwong Lee Dow Melbourne University
Scholarships, 2010-14
•	 Long Tan Leadership and Teamwork Awards,
2009-14
•	 Regional, State and National sports
representatives
Reasons to choose our school
	Monash University alliance offering student tuition and tertiary pathways
	$9 million building program for expanded science facility and senior annex
	Multilingual teachers including Chinese and Indonesian
Visit our school online at www.mounterin.vic.edu.au
Address:	 Robinsons Road
Frankston South, VIC 3199
Distance from	
Melbourne city centre:	
53 km (Map Reference:
Pg 12-13, I12, No. 74 )
Principal:	 Karen Lee
International	
Student Coordinator:	
Karen Lee
Telephone:	 +61 3 5971 6000
Fax:	 +61 3 5971 1421
Email:	 mount.erin.sc@edumail.vic.gov.au
Web: www.mounterin.vic.edu.au
Number of students:	 896 Number of international students:	 0
Dress:	 Uniform
Cost of uniform (approx.):	 $380
Cost of homestay per week:	 $240
75For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Mount Waverley
Secondary College
Mount Waverley Secondary College is a co-educational school in Melbourne’s
east. One the largest government schools in Victoria, the college is noted for its
students’ consistent academic success. Set over two campuses, the school offers
modern junior facilities for Years 7-8, designed to meet the specific learning and
developmental needs of adolescents. A separate senior site supports Years 9-12
with advanced resources and stimulating environments. A majority of graduates
receive university offers and progress to tertiary study.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Peaceful, leafy suburb in easy proximity to city
•	 Shopping centres, churches, public
library, hospitals
Languages taught
	 German
	 Japanese
	 Chinese as a first language
Special programs
•	 Monash University enhancement program for
high achieving students
•	 Year 12 university residential program
prepare students for Victorian Certificate of
Education challenges
•	 Enrichment programs including poetry,
debating, mathematics competitions, Science
Talent Search, World Skill Competition
•	 Engaging programs at all year levels
including camps and ‘City Experience’
Intensive English Language classes
Provided at English Language Centre located
within 4 kilometres of school
Student support services and programs
•	 English as an Additional Language support
•	 Careers resource centre
•	 Mentor groups for senior students
•	 Peer support program
•	 Nurses and counsellors
•	 After-school homework club
Extracurricular activities
•	 Study tours to Japan and Germany
•	 Victorian Certificate of Education team-
building programs
•	 Exam preparation and revision program for
Victorian Certificate of Education students
•	 Debutante ball, fancy dress ball,
valedictory dinner
•	 Swimming, gymnastics, lunchtime activities
and active sports programs
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Hockey, Netball, Soccer,
Swimming, Table Tennis, Tennis
Success story
Won-Ki Noh came to study in Australia as
an international student and graduated in
2007 achieving a university entrance score
of 99.55. He is now studying a Bachelor of
Dental Science at the University of
Melbourne, which is his dream come true.
After graduating Year 12 in 2011, Chunkai
Qiu has won a coveted scholarship to
Monash University, Engineering Faculty
in 2012.
Awards
•	 VCE Premier’s Award for Further Maths
– Minh Wayne Tat, 2013
•	 World Vision Victorian Youth Ambassador,
2014
•	 Australian Maths Competition – 17 High
Distinctions and 118 Distinctions, 2013
•	 Norman A Smith Memorial Scholarship,
2013
•	 Pierre de Coubertin Award, 2013 •	 Oaktree Ambassador, 2014
Reasons to choose our school
	
Renowned for Victorian Certificate of Education student pass rate and high level of first-round
university offers
	Years 7-9 education enrichment classes and university subjects available at Year 12
	Dedicated learning centres for music, art, design, media and drama plus a separate VCE area
Visit our school online at www.mwsc.vic.edu.au
Address:	 Lechte Road
Mount Waverley, VIC 3149
Distance from	
Melbourne city centre:	
18 km (Map Reference:
Pg 12-13, H5, No. 75 )
Principal:	 Mark Kosach
International	
Student Coordinator:	
Linda Smith
Telephone:	 +61 3 9803 6811
Fax:	 +61 3 9887 9308
Email:	 oss@mwsc.vic.edu.au
Web:	 www.mwsc.vic.edu.au
Number of students:	 1850 Number of international students:	 35
Dress:	 Uniform
Cost of uniform (approx.):	 $400 – $500
Cost of homestay per week:	 $270
76 Right School Right Place 2014/2015 – Melbourne A-Z
Mullauna
Secondary College
Positioned in Mitcham, an eastern suburb of Melbourne, Mullauna College is an
academic, co-educational secondary school for Years 7 – 12 students. Mullauna has a
strong tradition of academic excellence, active student leadership and outstanding
music, visual arts and sporting programs. The College staff delivers a comprehensive
curriculum, and employs targeted teaching strategies to maximise individual student
potential. Personalised course counseling supports students’individual pathways to
university.
Features of the local area
•	 Convenient and regular public transport by
train and bus; 20 minutes to the city
•	 Close to multi-cultural Box Hill and Doncaster,
and shops, entertainment and recreational
venues
•	 Easy access to universities and TAFE colleges
Languages taught
	 German
	 Indonesian
Special programs
•	 Accelerated learning and education
enrichment at all year levels
•	 International student extended study
program
•	 English as an Additional Language classes
and support
•	 Participation in national English,
Mathematics and Science competitions
•	 Student Leadership, debating, visual arts,
music and sport programs
Intensive English Language classes
Provided at English Language Centre located
within 5 kilometres of school
Student support services and programs
•	 Experienced International Chinese
Coordinator
•	 Chinese, Vietnamese and German speaking
teachers/Education Support staff
•	 Pastoral Care program
•	 Specialist international student tutors
•	 Student Wellbeing Coordinator and part-time
psychologist
•	 Career counselling tailored to individual
pathways
Extracurricular activities
•	 VCE Study Camp at Melbourne University and
camps at all year levels
•	 World Challenge Expedition
•	 Instrumental music tuition and annual School
Production
•	 Debating and inter-school sport
Sports offered
Aerobics/Dance, Athletics, Australian Rules
Football, Badminton, Baseball, Basketball,
Cricket, Cross Country, Fitness, Football Codes,
Hockey, Netball, Outdoor Education, Soccer,
Softball, Sport Games, Swimming,
Table Tennis, Volleyball
Success story
‘I loved this school. The teachers were
passionate and willing to help. This made
me feel important and special. I have kept
friends I made here to this day. I enjoyed the
sporting activities. Accepting leadership
roles of Connect Leader and College Captain
was a rewarding experience and allowed me
to make a difference for other new arrivals’.
–	 Meng Sam – Cambodia; studying
commerce (honours) at the University
of Melbourne
Awards
•	 Premier’s Commendation for Academic
Excellence – International Student, 2013
•	 Australian Maths Competition – High
Distinctions and Distinctions
•	 The Victoria Shield for Excellence in
Debating, 2011-13
•	 Monash University Dean’s Scholars 2011-12,
Ancor Imparo Leadership Program, 2013
•	 Pierre de Coubertin Award – academic and
sporting excellence, 2013-14
•	 Melbourne University Kwong Lee Dow Scholar
Program
Reasons to choose our school
	Rigorous academic programs built on student preferences and differentiated instruction
	Strong sense of community between staff, parents and students
	
Extensive, modern facilities including computers, laboratories, double court stadium and a new
air conditioned VCE Learning Centre opened in 2014
Visit our school online at www.mullauna.vic.edu.au
Address:	 456 Springfield Road
Mitcham, VIC 3132
Distance from	
Melbourne city centre:	
16 km (Map Reference:
Pg 12-13, I4, No. 76 )
Principal:	 Barbara Laidlaw
International	
Student Coordinator:	
Chiu Kwan Tong
Telephone:	 +61 3 9874 3422
Fax:	 +61 3 9873 2943
Email:	 mullauna.sc@edumail.vic.gov.au
Web:	 www.mullauna.vic.edu.au
Number of students:	 550 Number of international students:	 15
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $260
77For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Noble Park
Secondary College
A vibrant multicultural school, Noble Park Secondary College offers diverse learning
opportunities. Mathematics, Science and Technology subjects carry strong
curriculum emphasis and students access a large number of other academic
subjects. Intermingled with a caring and supportive environment, Noble Park
Secondary College prioritises the use of technology as a tool to develop 21st
Century learning. All students have their own individual netbook/laptop to enable
learning ‘anywhere anytime’
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Close to other multiculturally diverse suburbs
•	 Nearby a number of shopping centres
•	 Close to Monash University
Languages taught
	 Japanese
Special programs
•	 Student-centered English as an Additional
•	 Language
•	 VCE, VCAL and VET learning pathways
•	 Homework support club
•	 One-to-one Net Book program
•	 Student-focused Year 7 program
•	 Personalised learning program for all
students
Intensive English Language classes
Provided at English Language Centre located
within 1 kilometre of school
Student support services and programs
•	 International student services and lounge
•	 University Tutors for senior students
•	 Careers resource centre
•	 Peer support and mentor programs
•	 College Psychologists
•	 Speech therapist
•	 Literacy / Numeracy support
•	 Junior and Senior Year Level Coordinator’s
•	 Student Leadership
•	 School bus for student pick up and drop off
Extracurricular activities
•	 Local and interstate camps
•	 Japanese exchange program
•	 International student events and excursions
•	 Music bands, instrumental music, private
tuition, annual productions
•	 Public speaking and debating
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Cricket, Futsal, Golf, Hockey,
Lunchtime Sports Activities, Netball, Rugby
Union, Soccer, Swimming, Table Tennis, Tennis
Success story
Noble Park Secondary College has had
many success stories. In 2012/2013, 100%
of our students received their desired
pathways. Mi Do was Dux of Noble Park
Secondary College. Mi Do had only been in
Australia for three years when she scored a
University entrance score of 99 in the
Victorian Certificate of Education. Her
subjects included Specialist Maths,
Chemistry, Maths Methods and Physics.
Awards
•	 Academic excellence and Endeavour Award •	 Arthur William Junior Citizenship Award
•	 Caltex award for outstanding effort and
contribution in work experience
•	 Debaters Association of Victoria – multiple
best speaker awards
•	 Commonwealth Bank Math Award •	 Eye to Eye Award (Art)
Reasons to choose our school
	Right size to personalise learning for every student
	New state of the art technology and facilities
	Comprehensive senior education program including VCE/VCAL/VET and student mentoring
Visit our school online at www.nobleparksc.vic.edu.au
Address:	 3 Callaghan Street
Noble Park, VIC 3174
Distance from	
Melbourne city centre:	
35 km (Map Reference:
Pg 12-13, I7, No. 77 )
Principal:	 Pam Dyson
International	
Student Coordinator:	
Elizabeth Roshiah
Telephone:	 +61 3 9546 9066
Fax:	 +61 3 9562 4757
Email:	 noble.park.sc@edumail.vic.gov.au
Web:	 www.nobleparksc.vic.edu.au
Number of students:	 473 Number of international students:	 25
Dress:	 Uniform
Cost of uniform (approx.):	 $230
Cost of homestay per week:	 $230 – $250
78 Right School Right Place 2014/2015 – Melbourne A-Z
Northcote
High School
Northcote High School is set in generous grounds, 2 kilometres north of Melbourne
CBD. The school was established 85 years ago and supports students to achieve
outstanding academic results. Highly qualified and experienced staff teach a wide
subject curriculum. Sciences, mathematics, commerce, humanities, technology and
the arts studies are all offered. The international program is a valued part of the
co-educational school’s culturally diverse learning community. Northcote High
School is nearby universities and tertiary institutions.
Features of the local area
•	 Excellent public transport including tram,
train and bus services
•	 Adjacent to parkland surrounds of Merri
Creek
•	 Convenient to the busy High Street Northcote
Strip Shopping Precinct and within easy
access of Northland shopping centre
Languages taught
	 Chinese as a first and second language
	 French
	 Italian
	 Modern Greek
Special programs
•	 Acclaimed music program
•	 Outstanding sports program
•	 Strong sister school program in China, Italy
and France
•	 Over 40 Victorian Certificate of Education
study choices
•	 Mentoring by local university students
Intensive English Language classes
Provided at English Language Centres located
within 2-4 kilometres of school
Student support services and programs
•	 Strong English as an Additional Language
program
•	 Additional English, Maths and Science tuition
for international students
•	 Strong, supportive group of inspirational and
committed teachers
•	 Well-established international program with
a very able support team
•	 Experienced international program assistants
•	 After-school support
Extracurricular activities
•	 International student camp outside
Melbourne
•	 Trips and excursions to experience the beauty
of Australia’s coastline and rural retreats
•	 Staff and student discos, dinners and
celebratory events
Sports offered
Athletics, Basketball, Cricket, Football, Hockey,
Netball, Soccer, Table Tennis
Success story
‘I fell in love with the dark red colour of the
school buildings on my first school day.
Red colour makes me feel warm. I then
quickly found out that all the teachers and
classmates have warm hearts too. This is a
very happy and exciting school and I enjoy
every minute here.’
–	 Year 11 student from China
Awards
•	 Australian Mathematics Competition award,
2013
•	 State girls intermediate soccer –
champions, 2013
•	 Premier’s VCE Awards – 50-Perfect VCE
Study Scores students
•	 Victorian International School Student – Arts
Achievement Award, 2012
•	 State athletics championship – gold
medallist, 2013
•	 National Girls Volleyball Team and National
Girls Aerobic Team, 2013
Reasons to choose our school
	A learning community with a strong academic work ethic among both students and staff
	Large school with capacity to offer a broad subject choice and varied education experiences
	
Strong partnership links with the top universities – The University of Melbourne, RMIT
University, Latrobe University and Monash University
Visit our school online at www.nhs.vic.edu.au
Address:	 St. George’s Road
Northcote, VIC 3070
Distance from	
Melbourne city centre:	
2 km (Map Reference:
Pg 12-13, F3, No. 78 )
Principal:	 Kate Morris
International	
Student Coordinator:	
Lixia Wang
Telephone:	 +61 3 9488 2334
Fax:	 +61 3 9488 2399
Email:	 info@nhs.vic.edu.au
Web:	 www.nhs.vic.edu.au
Number of students:	 1700 Number of international students:	 85
Dress:	 Uniform
Cost of uniform (approx.):	 $300 – $350
Cost of homestay per week:	 $285
79For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Parkdale
Secondary College
Located within Melbourne’s bayside suburbs, Parkdale Secondary College stands
proud as a progressive and student-focused government school. A body of over
1100 students attend the co-educational college that promotes a safe, supportive
and welcoming learning environment. Success is embraced for every student as the
school’s quality teaching guides individuals on a dynamic, stimulating and engaging
learning journey. Each student is challenged to reach their potential, becoming
life-long learners and effective, caring community members.
Features of the local area
•	 Serviced by easy to access public transport
– buses and trains
•	 Close distance to bayside swimming beaches
Languages taught
	 Japanese
	 French
Special programs
•	 Elite Sports Program
•	 Art Enhancement Program – Dance
•	 Science, Technology, Engineering Program
•	 Links with local Universities
•	 Leadership pathways
•	 Experienced international assistants
supporting students with transition to
Victorian government school
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Specialist international student tutors
•	 Careers resource centre
•	 International student program centre
•	 International student buddy program
•	 Full-time psychologist
Extracurricular activities
•	 Various excursions around Victoria
•	 Regular city excursions
•	 Surf safety training
•	 School music ensembles and theatre
productions
•	 Lunchtime activities
•	 Games club
•	 High performance programs with national
level coaching support
Sports offered
Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Futsal, Golf,
Hockey, Netball, Soccer, Softball, Squash, Table
Tennis, Tennis, Volleyball,
Success story
‘Parkdale Secondary College is a great
place to come to study as an international
student. The facilities are of high quality
and there are many more to come. The
environment is a very positive one where
all students and staff work together well.
There is plenty of support available for
students should any need arise. Students
are given many opportunities to develop
leadership, academics, sports and arts.’
–	 Keit Loi – Malaysia; Year 12 student
and school captain
Awards
•	 Premier’s VCE Awards – Chinese First Language; Dance, 2009
•	 University of Melbourne Young Scholars program, 2010
•	 Pierre De Coubertin Annual Award – Spirit of Sportsmanship
Reasons to choose our school
	Strong network of support for students extending both inside and outside school
	Excellent academic programs tailored to suit individual student learning needs
	Sports, science and performing arts programs that showcase student strengths and talents
Visit our school online at www.parkdalesc.vic.edu.au
Address:	 Warren Road
Mordialloc, VIC 3195
Distance from	
Melbourne city centre:	
22 km (Map Reference:
Pg 12-13, H8, No. 79 )
Principal:	 Gregory McMahon
International	
Student Coordinator:	
Debby Chaves
Telephone:	 +61 3 9580 6311
Fax:	 +61 3 9587 3142
Email:	 parkdale.sc@edumail.vic.gov.au
Web:	 www.parkdalesc.vic.edu.au
Number of students:	 1350 Number of international students:	 35
Dress:	 Uniform
Cost of uniform (approx.):	 $400 – $600
Cost of homestay per week:	 $260 – $280
80 Right School Right Place 2014/2015 – Melbourne A-Z
Point Cook Senior
Secondary College
Point Cook Senior Secondary College students benefit from a full range of education
pathway options. A program of Individual Learning and Pathways Plans helps
students develop their study, career and tertiary education focus. Years 11-12
students access a subject range spanning academic and vocational courses. Study
units are offered alongside school based apprenticeships and vocational subject
choices. In partnership with local universities, the school also offers accelerated
tertiary study in areas like mathematics and information technology.
Features of the local area
•	 Public transport access by frequent train and
bus services
•	 Within easy distance of Melbourne city centre
•	 Full local shopping facilities within 1
kilometre of school
Special programs
•	 Select Tertiary Admission Masters
Program (STAMP)
•	 Access to local university teaching facilities
•	 Vocational Education and Training Aero Skills
subject available
•	 English as an Additional Language program
available, years 10-12
Intensive English Language classes
Provided at English Language Centre located
within 10 kilometres of school
Student support services and programs
•	 Well-resourced careers centre with
experienced careers counsellor
•	 Student advisory program at all year levels
•	 Student wellbeing leader
•	 Community outreach services
Extracurricular activities
•	 Year 12 study camp
•	 Year 12 valedictory function
•	 Year 11 careers evening
•	 Year 10 Queensland tour
•	 Year 10 work experience
•	 Year 10 formal
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Cricket, Netball, Soccer, Swimming,
Table Tennis, Tennis
Success story
‘Every student at this school is supported to
achieve success in their chosen pathway.’
–	 Jane Iwunze; College student leader, 2011
Awards
•	 University of Melbourne Young Scholare Program
•	 Architectural Design Award, 2009
•	 Telecome Advertising Design Competition – winner, 2010
Reasons to choose our school
	Individual student planning to create personal learning, career and tertiary pathways
	A young adult learning environment supported by advisory program at all year levels
	Full range of education pathway options including VCE, VCAL and VET studies
Visit our school online at www.pointcooksenior.vic.edu.au
Address:	 Cnr Boardwalk Boulevard and
Bergamot Drive, Point Cook, VIC 3030
Distance from	
Melbourne city centre:	
25 km (Map Reference:
Pg 12-13, B6, No. 80 )
Principal:	 Greg Sperling
International	
Student Coordinator:	
Chris Mooney
Telephone:	 +61 3 9395 9271
Fax:	 +61 3 9395 4964
Email:	 point.cook.senior.sc@edumail.vic.gov.au
Web:	 www.pointcooksenior.vic.edu.au
Number of students:	 760 Number of international students:	 10
Dress:	 Uniform
Cost of uniform (approx.):	 $400 – $500
Cost of homestay per week:	 $250 – $270
81For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Princes Hill
Secondary College
Princes Hill Secondary College supports the development of the whole person.
The college program encourages students to always seek excellence and respect the
rights of others. Limited international student numbers provide a good opportunity
to improve and consolidate English quickly. Students are actively encouraged to
communicate with their local peers and contribute in class. The school fosters an
environment where students grow confident, gaining internationally valued skills
and knowledge to support their university study or employment.
Features of the local area
•	 Well-serviced by trams, trains and bus routes
•	 Walking distance to University of Melbourne,
Melbourne Museum, Lygon Street shops and
cinema in Carlton
•	 Close to the Melbourne city centre
Languages taught
	 Italian
	 French
Special programs
•	 Intensive English as an Additional
Language lasses
•	 Access to University of Melbourne
teaching facilities
•	 Large music/drama program with 400-seat
theatre and 20 instrumental music teachers
•	 Inclusive sports and health program catering
for all interests and abilities
•	 Technical and Further Education subjects
available in Year 11-12
•	 Victorian Certificate of Applied Learning
Intensive English Language classes
Provided at two English Language Centres
located within 4 kilometres of school
Student support services and programs
•	 Experienced Chinese multicultural aide
•	 Supportive team of English as an Additional
Language teachers
•	 Intensive career advice from a team of
pathways teachers
•	 Peer support program
•	 Full-time student welfare coordinator
•	 Part-time psychologist
Extracurricular activities
•	 Camps for skiing, boot camp, Year 7
orientation, art at Mirimbah campsite
•	 International study tours program: Italy,
China, New York, Russia, France, Vietnam
•	 University of Melbourne science activities
•	 Large debating, drama and music programs
•	 Active interschool sports program
•	 Student leadership forum
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Futsal, Hockey,
Netball, Snow Sports, Soccer, Softball,
Swimming, Table Tennis, Tennis, Volleyball
Success story
‘I made a lot of friends throughout my time
at Princes Hill. The teachers were very nice
and they were willing to help me achieve
my best results. The subjects were very
interesting and I really enjoyed school.’
–	 Fei – China; studying commerce at the
University of Melbourne
Awards
•	 State Athletics Finalists, 2014
•	 LaTrobe University Vice Chancellor’s
Scholarship, 2013
•	 Science Talent Search Finalist, 2014 •	 VCE Top Arts - selected multiple years
•	 French Alliance Francais - Year 12 First
Place, 2014
Reasons to choose our school
	
Excellent Victorian Certificate of Education results and record; 100% of international students
gain university entrance
	Collegiate community spirit and strong sense of belonging among staff and students
	Broad study choices across a range of core subjects with VCE, VET, VCAL all offered
Visit our school online at www.phsc.vic.edu.au
Address:	 Arnold Street
Princes Hill, VIC 3054
Distance from	
Melbourne city centre:	
2 km (Map Reference:
Pg 12-13, F3, No. 81 )
Principal:	 Trevor Smith
International	
Student Coordinator:	
Debra Icely
Telephone:	 +61 3 9389 0600
Fax:	 +61 3 9387 0108
Email:	 princes.hill.sc@edumail.vic.gov.au
Web:	 www.phsc.vic.edu.au
Number of students:	 850 Number of international students: 	 9
Dress:	 Non-uniform Cost of homestay per week:	 $280 – $300
82 Right School Right Place 2014/2015 – Melbourne A-Z
Reservoir
High School
The modern facilities at Reservoir High School are set within spacious grounds.
A full complement of academic and vocational studies is offered so students
may develop personal learning pathways to university, employment and further
education. The school supports a student body drawn from many different
backgrounds with dedicated, caring staff and English as an Additional Language
classes at each year level. A short distance from Melbourne city centre, the
school is easily accessed by public transport services.
Features of the local area
•	 Well-serviced by trams, train lines and
bus routes
•	 Very close to a variety of restaurants,
shopping centres and markets
•	 Melbourne, La Trobe and RMIT universities
are all within close proximity of school
Languages taught
	 Italian
Special programs
•	 Experienced international Chinese,
Vietnamese and Arabic program assistants
•	 Extra tutoring for international students in all
subject areas
•	 University of Melbourne and LaTrobe
University extension programs
•	 Accelerated learning Program for high
performing students
•	 Interschool sports competitions
•	 Leadership programs and extension activities
Intensive English Language classes
Provided at English Language Centre located
within 10 kilometres of school
Student support services and programs
•	 Specialist international student tutors
•	 Sister schools in China and Italy
•	 Dedicated centre for Victorian Certificate of
Education students
•	 Careers resource centre
•	 Homework programs
Extracurricular activities
•	 International student camp and tour program
•	 Musical and theatrical
performance opportunities
•	 Popular sports activities and competitions
•	 Debating team
Sports offered
Australian Rules Football, Badminton, Baseball,
Basketball, Cricket, Hockey, Netball, Soccer,
Softball, Table Tennis, Tennis, Volleyball
Success story
‘I experienced a wonderful and memorable
life at Reservoir High School. From day one
teachers and classmates warmly welcomed
me and during the past two years I’ve made
lots of supportive friends. Nothing has given
me more happiness than the feeling of being
part of a big, warm and caring family. I would
like to express my appreciation towards the
school that provided such a caring
environment for me, so that I could adapt
into a new culture and pursue my dream.’
–	 Wenxin Cai – China; studying Bachelor of
Medicine, Surgery and Science at the
University of Queensland
Awards
•	 VCE Premier’s Award and VCE Top Arts
Awards
•	 Australian Schools Mathematics Competition
- Distinctions
•	 University of Melbourne Kwong Lee Dow
Scholarship
•	 Pierre De Coubertin Athletics Award
•	 Wakakirri Dance Performance Awards and
State Finalists, 2014
•	 Victorian Brain Bee National Science
Challenge Award
Reasons to choose our school
	Culture of nurturing individuals and supporting students to achieve academic excellence
	Multicultural school offering intensive English as an Additional Language class support
	Wide variety of exciting extracurricular activities including science, music and performance
Visit our school online at www.reservoirhs.vic.edu.au
Address:	 855 Plenty Road
Reservoir, VIC 3073
Distance from	
Melbourne city centre:	
10 km (Map Reference:
Pg 12-13, G2, No. 82 )
Principal:	 Mark Jessup
International	
Student Coordinator:	
Christine Farrugia
Telephone:	 +61 3 9466 0900
Fax:	 +61 3 9471 0252
Email:	 reservoir.hs@edumail.vic.gov.au
Web:	 www.reservoirhs.vic.edu.au
Number of students:	 600 Number of international students:	 35
Dress:	 Uniform
Cost of uniform (approx.):	 $350
Cost of homestay per week:	 $270
Other fees:	 Optional school camps
83For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Ringwood
Secondary College
Located east of Melbourne, Ringwood Secondary College offers a rich education
opportunity. Students are challenged to extend themselves across both academic
and vocational studies. Technical, creative, scientific and business pathways are
balanced by a breadth of practical training programs. Talented staff ensure
wellbeing and inclusion while personal study and career guidance is also provided.
English as an Additional Language support is accessed on-site. The college is
renowned for academic success, sporting prowess and a proud historical heritage.
Features of the local area
•	 Easy school access by rail and bus
•	 Positioned at the gateway to the beautiful
Dandenong Ranges and national park
•	 Walking distance to Eastland shopping
complex and business precinct
Languages taught
	 French
	 Indonesian
Special programs
•	 International and provincial school tours
•	 Range of education extension activities
•	 Instrumental music program
•	 Individual student mentoring
•	 Year 9 challenge program
Intensive English Language classes
Provided at English Language School onsite/or
located within 6 km
Student support services and programs
•	 Dedicated international student tutors
•	 Tight-knit international student group led by
an international student prefect
•	 Careers resource centre
•	 Proactive student counselling programs
•	 Peer support program
•	 Overseas visits/guests
•	 School chaplain
Extracurricular activities
•	 Regular camps and social events
•	 Common period events
•	 Concerts and performances
•	 Aerobics and all sports
•	 Debutante ball
•	 Student and staff recognition events for
science, sport, art and heritage
Sports offered
Aerobics, Athletics, Australian Rules Football,
Badminton, Baseball, Basketball, Cricket,
Equestrian, Golf, Hockey, Netball, Skiing, Soccer,
Squash, Swimming, Table Tennis, Tennis, Volleyball
Success story
The Truong family have sent four of their
children to the College. Naomi, their youngest,
comments “I am here to explore every
opportunity given to me by Ringwood
Secondary College. I make the most of
everything which comes my way and have fun
at the same time.” She still resides with the
same home stay as her siblings. The
friendship, family interaction and rapport that
emanates is pure joy and typifies the nature of
the international experience.
Awards
•	 State Plain English Speaking
Award – finalist
•	 Victorian Premier’s Award – Textiles
•	 Winner, jazz ensemble, national
performing arts eisteddfod
•	 VCE Top Arts and media awards
Reasons to choose our school
	High levels of participation in sport, performing arts and a strong student voice
	Excellent academic outcomes with students successfully achieving education goals
	Learning community with a definite spirit of engagement between staff and students
Visit our school online at www.ringwoodsc.vic.edu.au
Address:	 Bedford Road
Ringwood VIC 3134
Distance from	
Melbourne city centre:	
27 km (Map Reference:
Pg 12-13, J4, No. 83 )
Principal:	 Michael Phillips
International	
Student Coordinator:	
Leah Pritchard
Telephone:	 +61 3 9870 2002
Fax:	 +61 3 9879 5414
Email:	 ringwood.sc@edumail.vic.gov.au
Web:	 www.ringwoodsc.vic.edu.au
Number of students:	 1450 Number of international students:	 19
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $260–$280
84 Right School Right Place 2014/2015 – Melbourne A-Z
Rosehill
Secondary College
A single campus, co-educational school, Rosehill Secondary College motivates
students to academic excellence. Set within appealing grounds, the school provides
a safe and stimulating environment where students are encouraged to reach their
full potential. Students may select from a wide array of Victorian Certificate of
Education subjects. Acceleration options like the University of Melbourne
Mathematics Extension Program are also offered. International students are quickly
immersed into the student body with the benefit of a dedicated support network.
Features of the local area
•	 Well-serviced by train lines, tram and
bus routes
•	 Excellent range of nearby sporting facilities
and clubs
•	 Close to shopping centre
Languages taught
	 Japanese
	 Italian
Special programs
•	 University of Melbourne Mathematics
Extension Program
•	 One to One senior mathematics and science
tuition
•	 Accelerated studies in most learning areas
•	 Years 7-10 Selective Talent Enrichment
Program
•	 Instrumental music program
•	 Kogakkan High School, Japan sister school
exchange program
Intensive English Language classes
Provided at English Language Centre located
within 10 kilometres of school
Student support services and programs
•	 Three specialist international student tutors
•	 Part-time psychologist
•	 Careers resource centre
•	 Peer support program
Extracurricular activities
•	 Student leadership programs and
competitions
•	 Overseas trips to Italy and Japan
•	 Musical, cabaret and theatre productions
•	 Year 11 Debutante Ball
•	 School camp program, including ski and
outdoor activities
•	 Instrumental music performance and
concerts
Sports offered
Athletics, Australian Rules Football, Baseball,
Basketball, Cricket, Futsal, Golf, Hockey, Lawn
Bowls, Netball, Rugby, Soccer, Softball,
Swimming, Table Tennis, Tennis, Volleyball
Success story
‘I feel very happy to be studying at Rosehill.
My friends are kind and helpful; they are from
all over the world including Finland, Vietnam,
Greece, Italy and China. My Teachers are very
supportive, it’s a great school. I am studying
double mathematics, physics, chemistry and
EAL. When I finish Year 12 I plan to study Civil
Engineering at RMIT University.’
–	 Zhi Hong Chen – China, Year 12 Student
Awards
•	 Outstanding School Leadership for
Sustained Numeracy Improvement, 2011
•	 VCE DUX Annual Award
•	 Kwong Lee Dow Young Scholars •	 State swimming – finalist, 2011
•	 Victoria University Science Award •	 State senior boys basketball – finalist, 2011
Reasons to choose our school
	A strong sense of community, and spirit of cooperation between staff and students
	
Academic rigor and an individualised tailored curriculum providing a comprehensive range of
subjects
	New state of the art science facilities opening in 2015
Visit our school online at www.rosehillsc.vic.edu.au
Address:	 Sapphire Street
Niddrie, VIC 3042
Distance from	
Melbourne city centre:	
8 km (Map Reference:
Pg 12-13, D3, No. 84 )
Principal:	 Peter Rouse
International	
Student Coordinator:	
Arthur Soumalias
Telephone:	 +61 3 9337 2488
Fax:	 +61 3 9331 0525
Email:	 rosehill.sc@edumail.vic.gov.au
Web:	 www.rosehillsc.vic.edu.au
Number of students:	 1160 Number of international students:	 5
Dress:	 Uniform
Cost of uniform (approx.):	 $250
Cost of homestay per week:	 $270
85For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Sandringham
College
A beautiful bayside environment is the setting for Sandringham College. The school
welcomes students from Europe, South America and Asia to enjoy its tradition of
excellence and opportunity. One of the largest VCE providers in Melbourne,
Sandringham College offers over 70 VCE subject choices. Specialist teachers and an
experienced international team ensure excellent teaching and smooth integration
with local students. The supportive community helps international students to enjoy
Victoria and achieve both learning and personal goals.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Safe and established residential area with
easy access to beautiful swimming beaches
•	 Close to shopping centres and essential
lifestyle amenities
Languages taught
	 Indonesian
	 French
Special programs
•	 English as an Additional Language classes
•	 Free after school tutoring program three
nights a week
•	 Golf Academy
•	 Student Leadership Program
•	 Pre-VCE support and orientation program
•	 Well-established music, arts, dance, science
humanities and vocational learning programs
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Chinese and Japanese multicultural aides
•	 International student Homestay coordinator
and international program leader
•	 Careers resource centre with careers
counsellor providing study and career advice
•	 Peer support program
•	 Full-time welfare counsellor
•	 Part-time psychologist on site
Extracurricular activities
•	 Golf Academy
•	 Ski and outback camps program
•	 International student recreation lounge
•	 Whole school music and dance productions
•	 Round robin sporting program
•	 Europe/USA Dramatic Arts Tour
Sports offered
Athletics, Australian Rules Football, Basketball,
Cycling, Golf, Kayaking, Netball, Orienteering,
Rock Climbing, Sailing, Soccer, Snorkelling,
Snow Skiing, Surfing, Swimming, Tennis,
Wind Surfing
Success story
‘I originally enrolled for a 6 month
program, but loved the school and
environment so much that I extended to
complete my VCE. With my Food
Technology and Hospitality qualifications
from Sandringham, I won a scholarship to
the International College of Hotel
Management, Adelaide, the great Sandy
staff helped me find this career path!’
–	 Barnaby Rautenberg, 2013
Awards
•	 Prime Minister’s Award for Excellence in
Music and Global Politics, 2013
•	 Vocational Education and Training Provider
Award, 2013
•	 Two VCE Top Design Awards for Fashion,
2013
•	 Six Applied Learning Awards, 2013
Reasons to choose our school
	School population drawn from many nations offering a diverse learning experience
	Safe, clean beachside setting
	An award winning college with strong links to Monash, Melbourne and RMIT universities
Visit our school online at www.sandringhamsc.vic.edu.au
Address:	 Holloway Road
Sandringham, VIC 3191
Distance from	
Melbourne city centre:	
15 km (Map Reference:
Pg 12-13, G7, No. 85 )
Principal:	 Allen McAuliffe
International	
Student Coordinator:	
Denise Cornish
Telephone:	 +61 3 8599 0548
Fax:	 +61 3 8599 0504
Email:	 sandringham.co@edumail.vic.gov.au
Web:	 www.sandringhamsc.vic.edu.au
Number of students:	 1200 Number of international students:	 63
Dress:	 Uniform in Years 7-10 only
Cost of uniform (approx.):	 No charge
Cost of homestay per week:	 $280
86 Right School Right Place 2014/2015 – Melbourne A-Z
South Oakleigh
College
South Oakleigh College counts over 55 nationalities amongst its student population.
A co-educational campus, the school is located to the south-east of Melbourne city
centre. The dedicated and professional staff cultivates a secure, stimulating
atmosphere that nurtures all students to achieve their personal best. Indeed, its
‘Respect Responsibility Resilience’ motto exemplifies the mutual commitment of
both college and students. Pursuit of academic excellence, personal growth and
development of global citizens are natural outcomes.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Attractive school grounds close to native
parkland reserve and golf courses
•	 Close to Monash University Clayton Campus
Languages taught
	 Japanese
	 Greek
Special programs
•	 Enhanced learning opportunities at
all year levels
•	 School holiday senior study classes
•	 Writing workshops featuring guest speakers,
authors and writers-in-residence
•	 Instrumental music program
•	 Student leadership training, including
student representative council, peer support
program, peer mediation program, college
and year level captains, house captains
•	 TV studio, Media Communication Centre
linked to whole curriculum
Intensive English Language classes
Provided at English Language Centre located
within 3 kilometres of school
Student support services and programs
•	 Experienced professional international
student program assistant
•	 Careers advice and expert course counselling
•	 After-school homework club
•	 Dedicated welfare team including student
welfare coordinator, chaplain, school nurse
Extracurricular activities
•	 Local and interstate camps, international
study tours
•	 English, mathematics, science and
art competitions
•	 Music performances, talent quest and a major
annual theatre production
•	 College inter-school sports participation,
athletics and swimming carnivals
•	 Beach safety training
•	 Year 9 alternative sports program
Sports offered
•	 Athletics, Australian Rules Football,
Badminton, Baseball, Basketball, Cross
Country, Netball, Rugby, Soccer, Softball,
Swimming, Table Tennis
Success story
‘I’m currently studying Business at Monash
University. I found the Enrichment
Programs in the areas of English,
Mathematics and Science challenging and
exciting. The teachers and students
supported me in every way.’
–	 Jingham Zhang, currently studying a
Bachelor of Business at Monash
Universuty – Graduatated 2013
Awards
•	 UNSW ICAS Year 8 Mathematics
Competition – gold medal, 2013
•	 Youth For Human Rights Art Award – paid
New York trip
•	 UNSW ICAS Year 12 English Competition
– two gold medals, 2012
•	 Greek Essay Writing Competition – paid
Athens trip, 2012-14
•	 Gold Medal in Javelin, 2012
•	 Teacher awards – nuclear research CERN in
Geneva and Google Teacher Academy
Reasons to choose our school
	Secure education environment where students are safe to pursue their individual best
	Respect, responsibility and resilience commitment among both staff and students
	Caring and devoted staff who provide all students with high quality learning experiences
Visit our school online at www.sosc.vic.edu.au
Address:	 Bakers Road
Oakleigh South, VIC 3167
Distance from	
Melbourne city centre:	
20 km (Map Reference:
Pg 12-13, H6, No. 86 )
Principal:	 Helen Koziaris
International	
Student Coordinator:	
Helen Koziaris
Telephone:	 +61 3 9579 2322
Fax:	 +61 3 9579 2946
Email:	 south.oakleigh.sc@edumail.vic.gov.au
Web:	 www.sosc.vic.edu.au
Number of students:	 430 Number of international students:	 7
Dress:	 Uniform
Cost of uniform (approx.):	 $350 – $400
Cost of homestay per week:	 $240 – $270
87For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
St Albans
Secondary College
The multicultural learning community of St Albans Secondary College embraces
international students. The college fosters a positive sense of self and academic
success across its co-educational, Years 7-12 campus. All students are challenged and
encouraged to fulfil their academic potential and confidently pursue chosen pathways.
International students gain the specialist support of a dedicated Chinese and
Vietnamese-speaking coordinator. Staff resolutely support individual development
and ensure students leave the school as young adults with qualifications that count.
Features of the local area
•	 Regular public transport access by train and
bus services
•	 Renowned multicultural area offering a range
of international experiences
•	 Close to local markets and shopping centres
Languages taught
	 Vietnamese
	 French
	 Italian
	 Japanese
Special programs
•	 English as an Additional Language offered at
all year levels
•	 Established international student program
•	 Select Entry Accelerated Learning program for
high achievers
•	 Enrichment learning opportunities
•	 Business and community partnerships
•	 Arts, performance, student leadership, sports,
camps and outdoor education programs
Intensive English Language classes
Provided at English Language Centre located
within 8 kilometres of school
Student support services and programs
•	 Careers counselling and pathway planning
•	 Study skills programs
•	 After school tutoring
•	 Peer support programs
•	 Health promotion programs
•	 Wellbeing department with counsellors,
psychologists and school nurse
Extracurricular activities
•	 Enrichment program for high
achieving students
•	 Instrumental music instruction and
performance opportunities
•	 Annual drama production
•	 Individual and team inter-school sports
•	 Lunchtime clubs and activities
•	 Inter-school debating
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Cricket, Futsal, Soccer, Swimming,
Table Tennis, Volleyball
Success story
‘Thank you, St Albans Secondary College,
for the special care through the
international students program. I was
encouraged and assisted by teachers to
improve my English skills as well as
integrate me into the Australian
multicultural society. My family is very
proud of my university entrance score of
99.55.’
–	 Khuu Chau Ngan Ha – Vietnam
Awards
•	 Premier’s VCE Awards, 2010-11 •	 Australian Fashion Awards, 2005-13
•	 Australian Defence Force Scholarships,
2010-13
•	 University of Melbourne Young Scholars
Program recipients
•	 Regional and State sporting championships •	 University scholarships
Reasons to choose our school
	Intensive English as an Additional Language program
	
Consistently high Victorian Certificate of Education scores ensure students transition to
further study at University and technical education
	Student reports in native language and overseas progress visits with parents and family
Visit our school online at www.stalbanssc.vic.edu.au
Address:	 289 Main Road East
St Albans, VIC 3021
Distance from	
Melbourne city centre:	
18 km (Map Reference:
Pg 12-13, C3, No. 87 )
Principal:	 Kerrie Dowsley
International	
Student Coordinator:	
Maranda Truong
Telephone:	 +61 3 9366 2555
Fax:	 +61 3 9367 9361
Email:	 st.albans.sc@edumail.vic.gov.au
Web:	 www.stalbanssc.vic.edu.au
Number of students:	 1170 Number of international students:	 50
Dress:	 Uniform
Cost of uniform (approx.):	 $350 – $400
Cost of homestay per week:	 $220 – $240
88 Right School Right Place 2014/2015 – Melbourne A-Z
Strathmore
Secondary College
Strathmore Secondary College is set in a safe suburban location between
Melbourne city centre and international airport. The Years 7-12 campus is just
20 minutes by train from the city and set within beautifully landscaped gardens.
International students enjoy a friendly environment where both staff and fellow
students support their personal development and academic success. Individual
learning programs are planned with care and attention to ensure all students
achieve their best and gain excellent academic results.
Features of the local area
•	 Well-serviced by trains, buses and trams
•	 Lovely urban environment with well-
maintained homes in safe suburb
•	 20 minutes by train to Melbourne city and 15
minutes by car to international airport
Languages taught
	 Chinese as a first language (Year 11-12)
	 Japanese as a second language (Years 7-12)
	 Italian (Years 7-12)
	 Greek (Years 7-12)
Special programs
•	 Advanced mathematics
•	 New VCE subject Algorithmics (credit towards
first year at Melbourne/Monash Universities)
•	 ipad program for all students in Year 10
•	 Victorian Space Science Education Centre
•	 Instrumental music program and wide range
of drama and visual arts activities
•	 Extensive sport programs and facilities
including a swimming pool on site
Intensive English Language classes
Provided at two English Language Centres
located within 5 kilometres of school
Student support services and programs
•	 Very experienced International Student
Coordinator and assistant
•	 Two native speaking international
student tutors
•	 Specialist advice on university applications
•	 Knowledgeable careers coordinator
•	 Student wellbeing officers
Extracurricular activities
•	 International student camp and tour program
•	 Option to go on ‘Mission to Mars’ at Space
Centre
•	 After-school homework support
•	 Musical ensembles and orchestras
•	 Annual school theatre production
•	 International students’ basketball and
badminton club
Sports offered
Aquatics, Athletics, Badminton, Baseball,
Basketball, European Handball, Fitness, Futsal,
Golf, Hockey, International Rules/Touch
Football, Lacrosse, Netball, Soccer, Softball,
Swimming, Tennis, Ultimate Games, Volleyball,
Water Polo
Success story
‘Strathmore is green and beautiful, with really
good equipment and facilities. My classmates
are very friendly to me and help me to
understand the classwork. I have been really
well looked after by my Homestay and
International Student Coordinator and I feel
really comfortable and safe in Melbourne.’
–	 Mike Yu – Year 12 student; applying for
Bachelor of Environments at University of
Melbourne
Awards
•	 Victorian International School Student – Academic Excellence Award and International School
Student of the Year Award, 2012
•	 Premier’s VCE Award – Outstanding
Performance Software Development, 2013
•	 Two International Space Settlement Design
Competition nominations, 2013
•	 Australian Space Settlement Design
Competition Entry Awards, 2009-13
•	 Two State Top Designs Season of Excellence
entrants for Visual Communication, 2013
Reasons to choose our school
	Highly respected school with a strong record of student academic achievement
	University level science equipment in renowned Victorian Space Science Education Centre
	Individual support for all international students and development of personal learning pathways
Visit our school online at www.strathmore.vic.edu.au
Address:	 Pascoe Vale Road
Strathmore, VIC 3041
Distance from	
Melbourne city centre:	
10 km (Map Reference:
Pg 12-13, E3, No. 88 )
Principal (acting):	 Jillian English
International	
Student Coordinator:	
Lois Kruger
Telephone:	 +61 3 9379 7999
Fax:	 +61 3 9379 2812
Email:	 strathmore.sc@edumail.vic.gov.au
Web:	 www.strathmore.vic.edu.au
Number of students:	 1500 Number of international students:	 70
Dress:	 Uniform in Years 7-11 only
Cost of uniform (approx.):	 $350
Cost of homestay per week:	 $270 – $280
89For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Sunbury Downs
College
Sunbury Downs College is an academic school offering a wide range of VCE subjects
and is the only secondary school in the area that offers an Accelerated Curriculum 
Enrichment (ACE) program which includes early commencement of VCE and Tertiary
studies. Students also benefit from a vibrant inter-school sports program and
co-curricular activities including an overseas Italian Study Tour, Outdoor Education,
Instrumental Music, Annual Musical Production and student leadership programs.
The College creates students who are confident and independent learners for life.
Features of the local area
•	 Close to native Australian flora and fauna
•	 Serviced by train line and buses
•	 Friendly local community
Languages taught
	 Italian
Special programs
•	 English extension program for Year 12
Students.
•	 Rigour Writing program for students requiring
tutorials on writing that runs after school
•	 Homework Program (Magnus Opus) runs
every Wednesday to support VCE students
with their studies
Intensive English Language classes
Provided at nearby English Language Centre
Student support services and programs
•	 Highly-qualified health, wellbeing and
guidance officers
•	 Careers counsellors
•	 School Nurse
•	 College Chaplain
Extracurricular activities
•	 Outdoor Education Program
•	 Camps and Excursions including an overseas
Italian Study Tour
•	 Outdoor Education Program
•	 Instrumental Music Program including Annual
Musical Production
•	 Debating Program
•	 Student Leadership Programs
Sports offered
Athletics Carnival, Australian Rules Football,
Badminton, Basketball, Cross Country Running,
Netball, Soccer, Surfing, Swimming Carnival
Reasons to choose our school
	Attractive school grounds with well-maintained facilities
	Accelerated Curriculum Enrichment program
	Comprehensive instrumental music and extensive camps programs
Visit our school online at www.sunburydowns.vic.edu.au
Address:	 148-174 Mitchells Lane
Sunbury, VIC 3429
Distance from	
Melbourne city centre:	
38 km (Map Reference:
Pg 12-13, A1, No. 89 )
Principal:	 Brett Moore
International	
Student Coordinator:	
Rhona Quon
Telephone:	 +61 3 9744 7366
Fax:	 +61 3 9744 1604
Email:	 sunbury.downs.sc@edumail.vic.gov.au
Web:	 www.sunburydowns.vic.edu.au
Number of students:	 750 Number of international students:	 0
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $270 plus
internet
90 Right School Right Place 2014/2015 – Melbourne A-Z
Sunshine
College
Set within a vibrant multicultural community, Sunshine College helps students
build a positive and purposeful future. An engaging curriculum is offered across
vocational and academic subjects, including mathematics, science, technology,
commerce and the arts. Strong ties to Melbourne, RMIT and Victoria universities
help students gain confidence in their further education choices and school to
university transition. Sunshine College is located just 10km from Melbourne
city centre and students enjoy excellent access by public transport.
Features of the local area
•	 Public transport hub with easy access to
Melbourne centre and surrounding suburbs
•	 Dynamic local Asian communities
•	 Close to local markets and a range of
different shopping venues
Languages taught
	 Vietnamese
	 Italian
Special programs
•	 Experienced Vietnamese international
program teacher and assistant
•	 Language support programs for new arrivals
to Australia
•	 Special access to RMIT University and
other universities
•	 Award-winning school to university
transition programs
•	 Literacy program for all junior students
Intensive English Language classes
Provided at English Language Centre located
within 4 kilometres of school
Student support services and programs
•	 Teachers skilled and experienced in
supporting international students
•	 Well developed career support with four
annual student interviews
•	 Structured after hours homework support
•	 Established facilities with learning centres
led by dedicated subject teachers
•	 Student focused pastoral care and support
Extracurricular activities
•	 School theatre production
•	 Dinner twice yearly for international students
and families
•	 Excursions, trips and social events
Sports offered
Australian Rules Football, Basketball, Indoor
Soccer, Netball, Rugby, Soccer, Volleyball
Success story
‘The thing that all international students
will say is that the teachers at Sunshine
College are dedicated and really care for
their students. You are made to feel
welcome by the students and everyone is
focussed on doing their best. I have
improved my English so much since Year
10 that I feel really confident about going
to University.’
–	 (Sandy) Phu Quyen Tran – Vietnam;
studying commerce at the University
of Melbourne
Awards
•	 Victorian Premier’s Awards – academic achievement
•	 State sports teams – champions
•	 Best practice – school to university transition program
Reasons to choose our school
	
Proven success transitioning high numbers of student graduates to university, including
international students who consistently achieve high university entrance scores
	International Student Coordinators who travel to Vietnam and China for family meetings
	Curriculum and learning environment with a strong literacy emphasis
Visit our school online at www.sunshine.vic.edu.au
Address:	 Graham Street
Sunshine, VIC 3020
Distance from	
Melbourne city centre:	
10 km (Map Reference:
Pg 12-13, C4, No. 90 )
Principal:	 Tim Blunt
International	
Student Coordinator:	
Graeme Newman
Telephone:	 +61 3 8311 5200
Fax:	 +61 3 8311 5209
Email:	 sunshine.co@edumail.vic.gov.au
Web:	 www.sunshine.vic.edu.au
Number of students:	 1021 Number of international students:	 32
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $250
91For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Templestowe
College
Located east of Melbourne city, Templestowe College is a safe and caring school.
Students flourish in a positive learning environment sustained by the whole college
community. The school fosters development of student leadership skills and
encourages success in both personal and academic pursuits. A strong pastoral care
program ensures the welfare needs of international students are met. The on-site
English Language Centre program assists students with initial English skill
development and supports their transition into mainstream classes.
Features of the local area
•	 Excellent public transport to city and suburbs
•	 Attractive natural school grounds set in a
pleasant residential area
•	 Close to major shopping centre
Languages taught
	 Chinese as a first language
Special programs
•	 Experienced international Chinese and
Vietnamese program assistants
•	 Victorian Certificate of Education studies
available from Year 10
•	 Two year Language Centre/Victorian
Certificate of Education option for highly-able
students
•	 Bring Your Own Device laptop program for all
students
•	 Full fitness gym free for international
students
•	 Full student kitchen facility
•	 Newly renovated buildings
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Well equipped careers resource centre
•	 Student learning mentors
•	 Homework club until 5.30pm
•	 After school tutoring available
Extracurricular activities
•	 Extensive camps program
•	 Instrumental music program
•	 Annual school theatre production
•	 Public speaking
Sports offered
Athletics, Australian Rules Football, Badminton,
Cricket, Cross Country Running, Table Tennis,
Fitness, Netball, Soccer, Swimming, Volleyball.
Elite Basketball and Squash Programs
Success story
‘The Templestowe College community
supported me to achieve my dreams and
aspirations. I participated in every aspect
of College life – excursions, camps, sports,
music and was very proud of my Global
Citizenship Award. I am now a cultural
ambassador for Templestowe College.’
–	 Yena Lee – recipient of Victorian
International School Student - Global
Citizenship, International Leader and
Long Tan Leadership Awards; studying
Bachelor of Nursing at Australian
Catholic University
Awards
•	 VCEExcellenceAward,VCALExcellenceAward,
2013
•	 Australian National Rock Climbing
Champion, 2014
•	 Top VCE Student for Persian, 2013 •	 Battle of the Bands Winners, 2014
•	 Long Tan Youth Leadership  Teamwork
Awards, 2013
•	 3 on 3 Basketball Competition Winners, 2014
Reasons to choose our school
	16 years experience with international students
	Teachers and other staff highly experienced in assisting international students
	Regular cultural activities and structured conversation classes with local students
Visit our school online at www.templestowec.vic.edu.au
Address:	 Cypress Avenue
Lower Templestowe, VIC 3107
Distance from	
Melbourne city centre:	
15 km (Map Reference:
Pg 12-13, H3, No. 91 )
Principal:	 Peter Hutton
International	
Student Coordinator:	
Angela Hoptroff
Jin Kim
Telephone:	 +61 3 9850 6333
Fax:	 +61 3 9852 0728
Email:	 templestowe.co@edumail.vic.gov.au
Web:	 www.templestowec.vic.edu.au
Number of students:	 520 Number of international students:	 50
Dress:	 Uniform
Cost of uniform (approx.):	 $300 – $400
Cost of homestay per week:	 $280
92 Right School Right Place 2014/2015 – Melbourne A-Z
Thornbury
High School
Located 8 kilometres from Melbourne, Thornbury High School is set amid lovely
spacious grounds. The school provides a commitment to academic excellence and
successful education outcomes. Victorian Certificate of Education studies span broad
and invigorating subject choices that result in excellent student achievements. A
blend of professional, dedicated staff, well resourced learning facilities and close ties
with several universities creates a uniquely positive learning experience. The safe
suburban neighbourhood is easily accessed by public transport.
Features of the local area
•	 Close to all public transport services
•	 Safe neighbourhood near Melbourne centre
•	 Near to major shopping centres
Languages taught
	 Chinese (Mandarin)
	 Indonesian
	 Greek
	 Italian
Special programs
•	 Accelerated and enrichment programs
•	 Pathways to enable students to directly
access Melbourne, RMIT and
La Trobe universities
•	 Established English as an Additional
Language programs
•	 Supervised homework program
•	 Extensive co-curricular program, including
music, sport, leadership, camp, debating
•	 Classroom assistance provided by student
teachers from University of Melbourne
Intensive English Language classes
Provided at English Language Centre located
within 5 kilometres of school
Student support services and programs
•	 Chinese and Vietnamese international
student program assistants
•	 International Student Program Coordinator
•	 Careers and learning pathways guidance
•	 Peer support program
•	 Pastoral care program
•	 Part-time psychologist and nurse and
full-time youth worker
•	 Supervised homework program
Extracurricular activities
•	 International student camp and tour program
•	 Award-winning music program with bands
and instrumental tuition and performance
•	 Annual school musical production
•	 Class TV student television program
•	 Extensive individual and team sport program
•	 Chess and science clubs
Sports offered
Athletics, Australian Rules Football, Basketball,
Cricket, Cross Country, Futsal, Golf, Gymnastics,
Indoor Hockey, Indoor Soccer, Minor Games,
Netball, Rugby, Soccer, Softball, Swimming,
Table Tennis, Tennis, Volleyball
Success story
‘I have made many new friends at Thornbury.
The year level coordinators, international
student staff and the teaching staff have
been very supportive and have helped my
transition into an Australian school.’
–	 Ashkan Mehrnejad – Iran; Year 12 student
Awards
•	 Rio Tinto Big Science Competition
– winner, 2011
•	 Melbourne School Bands Festival – gold
award, 2010
•	 State cross country championship
– winner, 2011
•	 School district athletics – winners, 2009-11
•	 Silver award, national performing
arts eisteddfod
Reasons to choose our school
	Multicultural school where diversity is embraced
	Well resourced modern facilities, including comfortable air-conditioned class rooms
	Vibrant and welcoming school community with a maximum of 25 students per class
Visit our school online at www.thornburyhs.vic.edu.au
Address:	 238 Collins Street
Thornbury, VIC 3071
Distance from	
Melbourne city centre:	
8 km (Map Reference:
Pg 12-13, G3, No. 92 )
Principal:	 Peter Egeberg
International	
Student Coordinator:	
Paul Mameghan
Telephone:	 +61 3 9480 4066
Fax:	 +61 3 9480 1314
Email:	 thornbury.hs@edumail.vic.gov.au
Web:	 www.thornburyhs.vic.edu.au
Number of students:	 1100 Number of international students:	 15
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $260
93For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Upper Yarra
Secondary College
Upper Yarra Secondary College is nestled within the charming Yarra Valley, 65
kilometres east of Melbourne. The local area is renowned for its natural beauty and
allows international students to experience a semi-rural lifestyle. The college offers
senior students both academic studies and vocational courses. Exhilarating outdoor
education (including rock climbing, kayaking and skiing) promotes self-discipline,
challenge and leadership. Students may also enjoy hands-on hospitality and cabinet
making training at the school’s polytechnic campus.
Features of the local area
•	 Mount Donna Buang alpine area is popular
for snow sports
•	 Area abounding with natural caves and rock
climbing locations
•	 Nearby picturesque Yarra River parkland
Languages taught
	 German
	 Japanese
Special programs
•	 Established German and Japanese exchange
programs as well as a new Chinese sister
school agreement
•	 Senior students academic excellence program
•	 School bands
Intensive English Language classes
Provided through on-site language classes
Student support services and programs
•	 Well equipped careers resource centre
•	 Strong student wellbeing program
•	 Part-time psychologist
Extracurricular activities
•	 School camps at all year levels
•	 Outdoor education camps
Sports offered
Athletics, Australian Rules Football, Basketball,
Hockey, Soccer, Table Tennis, Volleyball
Success story
Upper Yarra Secondary College has
educated a number of distinguished alumni.
The school counts a weather forecaster,
football and basketball champions, medical
research scientist, television journalist and
actors amongst its graduates. Other former
students have become successful business
owners.
Awards
•	 VCE Top Arts, 2011
•	 Scholarships to various Universities have recently been awarded for Law and Medical degrees
with one student already receiving a scholarship for 2015
Reasons to choose our school
	Small school on 11 acres of attractive grounds with magnificent Yarra Valley views
	Within easy access of alpine snowfields and natural landscapes with rivers and caves
	
Dedicated hospitality and cabinetmaking facilities in new polytechnic training campus and
newly-appointed fitness centre
Visit our school online at www.uysc.vic.edu.au
Address:	 Little Yarra Road
Yarra Junction, VIC 3799
Distance from	
Melbourne city centre:	
	 65 km (Map Reference:
Pg 12-13, K4, No. 93 )
Principal:	 Robert Miller
International	
Student Coordinator:	
Deborah Morrish
Telephone:	 +61 3 5967 1877
Fax:	 +61 3 5967 2109
Email:	 upper.yarra.sc@edumail.vic.gov.au
Web:	 www.uysc.vic.edu.au
Number of students:	 500 Number of international students:	 0
Dress:	 Uniform
Cost of uniform (approx.):	 $350
Cost of homestay per week:	 $280
including internet
94 Right School Right Place 2014/2015 – Melbourne A-Z
Vermont
Secondary College
Vermont Secondary College is a coeducational school set in spacious grounds and
first class facilities located 19km from the CBD. It has a strong focus on academic
rigour, extensive co-curricular opportunities and excellent student leadership
programs in an IT-rich environment. We offer VCE and VET subjects that include:
English, Mathematics, Science, Commerce, Arts, Technology, PE/Health, History,
Music, Geography, Languages (French and German).
Features of the local area
•	 Attractive natural parks and bush land
•	 Close to shopping centre
•	 Well-serviced by train-lines and bus routes
Languages taught
	 German
	 French
Special programs
•	 Gifted student program LEEP for highly-able
students
•	 Close links with Melbourne, Monash,
Swinburne and Deakin Universities and access
to University studies
•	 Excellent music and performing arts programs
•	 Outstanding camps and excursions program
•	 Extensive sport and outdoor education
programs including Duke of Edinburgh
•	 Excellent German and French programs
Intensive English Language classes
Provided on-site or at English Language Centre
located 6 kilometres from school
Student support services and programs
•	 Two specialist Student Welfare Coordinators
•	 Part-time psychologist
•	 Specialist Pathways and Transition
Coordinator and Careers Resource Centre
•	 Full time First Aid Officer
•	 Excellent House System that fosters
connectedness
Extracurricular activities
•	 School Tours to Germany and France
•	 Extensive Camps program that includes: Surf,
Central Australia, Ski, Year 12 Study, City
Experience and Orientation camps, and Duke
of Edinburgh program
•	 Outstanding Sport and Outdoor Education
program
•	 Annual School Production
•	 A range of musical and choral ensembles
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cross Country, Hockey,
Netball, Soccer, Swimming, Tennis, Volleyball
Success story
Yen Wei Chang is a Year 10 student who
arrived at Vermont Secondary College in
2010 from Taiwan. He has made many new
friends and highlights include the Year 9
surf camp and the Year 10 camp to Central
Australia. He has attended English as an
Additional Language classes that provided
extra assistance with his English and he
intends on going to university to study
architecture.
Awards
•	 Nearly 50% of Year 12 VCE students achieve
a score of 80 or more towards Uni entrance
•	 State football team champions
•	 Students obtained a perfect score of 99.95
in Year 12 VCE
•	 Australian Schools Chemistry and
Mathematics Competitions
•	 World class cyclists and swimming
champions
Reasons to choose our school
	
Positive school environment that nurtures a spirit of cooperation and belonging among staff
and students
	An award winning academic, sporting and musical school
	
New library facilities, Senior Study Centre, Year 7 Centre, Auditorium and extensive computer
facilities
Visit our school online at www.vermontsc.vic.edu.au
Address:	 Morack Road
Vermont, VIC 3133
Distance from	
Melbourne city centre:	
19 km (Map Reference:
Pg 12-13, I5, No. 94 )
Principal:	 Tony Jacobs
International	
Student Coordinator:	
Joanna Alexander
Telephone:	 +61 3 9873 1077
Fax:	 +61 3 9874 4368
Email:	 vermont.sc@edumail.vic.gov.au
Web:	 www.vermontsc.vic.edu.au
Number of students:	 1300 Number of international students:	 12
Dress:	 Uniform
Cost of uniform (approx.):	 $800
Cost of homestay per week:	 N/A
95For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Victoria University
Secondary College
Victoria University Secondary College sets ambitious standards for itself and its
students. The college community fosters a warm and welcoming environment that
caters for the needs of every individual student. A best practice education approach
is used to develop the challenging and purposeful curriculum. An innovative and
exciting range of enrichment programs helps personalise each students’ learning
pathways. Intensive literacy and numeracy programs encourage students to achieve
learning goals in all their studies.
Features of the local area
•	 Ready access to both public and school-run
bus services
•	 Just 30 minutes by train to Melbourne city
•	 Close to numerous shopping outlets,
banking, medical and recreation facilities
Languages taught
	 Italian
	 Chinese
Special programs
•	 Programs to prepare students for University
•	 Vibrant music and performing arts programs
•	 Sports Academy including rugby league,
rugby union and soccer development
•	 Student Leadership programs
•	 Mentoring and tutoring by University
students and business professionals
Intensive English Language classes
Provided on-site or at English Language Centre
located within 5 kilometres of school
Student support services and programs
•	 Careers and education pathways services
•	 Dedicated student welfare co-ordinators
•	 Onsite psychologist
•	 Onsite speech therapist
•	 Onsite youth worker
Extracurricular activities
•	 Music and theatre performances
•	 Interschool sporting teams
•	 Debating teams
Sports offered
A successful sporting school with strong
partnerships with the Melbourne Storm Rugby
League Club, Melbourne Rebels Rugby Union
Club and the Melbourne Victory Football Club to
develop our students’ skills and athletic ability.
Success story
Many of our students have progressed to
exciting education and career pathways.
Current students represent Victoria in
rugby league and union. Past students
have successfully forged careers in the
workforce, including a mathematician,
professor of genetics, builder, landscaping
business owner, statistician and ICT
professional.
Awards
•	 VCE Season of Excellence – Top Acts
(Music), 2014
•	 Joint Winners of Melbourne Storm Cup, 2013
•	 Gorton Young Leaders Awards, 2014 •	 Gorton Young Leaders Awards, 2013
•	 Victorian School and Community
Partnerships Sports Award, 2013
•	 Debating – fourth-ranked in the Sunshine
debating network, 2011
Reasons to choose our school
	Supportive and caring staff
	Unique blend of open learning and specialist teaching spaces caters for all learning styles
	Rich program of learning with engaging and comprehensive curriculum
Visit our school online at www.vusc.vic.edu.au
Address:	 Senior Campus: 5A Jamieson Street
St Albans VIC 3021
JuniorCampus: 88 Billingham Road
Deer Park VIC 3023
Distance from
Melbourne city centre:
20 km (Map Reference:
Pg 12-13, C2/B3, No. 95 )
Principal:	 Genevieve Simson
International	
Student Coordinator:	
Sue Atzarakis
Telephone:
Fax:
SeniorCampus:
+61 3 8312 0200
+61 3 8312 0211
JuniorCampus:
+61 3 9363 1155
+61 3 9363 8681
Email:	 victoria.university.sc@edumail.vic.gov.au
Web:	 www.vusc.vic.edu.au
Number of students:	 1050 Number of international students:	 3
Dress:	 Uniform
Cost of uniform (approx.):	 $300 – $500
Cost of homestay per week:	 $150
96 Right School Right Place 2014/2015 – Melbourne A-Z
Victorian College of the
Arts Secondary School
The Victorian College of the Arts Secondary School is Victoria’s premier school for
the education and training of talented young dancers, musicians and visual artists.
The VCA Secondary School provides a training program supported by a high-quality
education to prepare talented young people for professional careers in music, dance
and the visual arts. Entry to the school is by competitive audition or interview, held
every August. Overseas students are able to audition by video. Students perform in
professional venues throughout the year and have access to master classes.
Features of the local area
•	 City experience
•	 Located in arts precinct
•	 Easy access to all public transport
Languages taught
	 French
	 Bi-lingual students may study at the
Victorian School of Languages or Distance
Education
Special programs
•	 Music, dance and visual arts teachers with
industry experience
•	 Close association with professional
performing arts companies
•	 Close association with University of
Melbourne and Tertiary Specialist Education
Institutions
Intensive English Language classes
Provided at nearby English Language Centres,
located within the Melbourne metropolitan area
Student support services and programs
•	 International student tutors available
•	 School Wellbeing program
•	 Access to students with like interests
•	 Multicultural community
Extracurricular activities
•	 All activities form key parts of the distinctive
performing arts education program, eg;
•	 Junior camp activity
•	 Dance performance season at Melbourne’s
Malthouse Theatre
•	 Music performance at Melbourne
Recital Centre
Success story
Our international students are successful
in achieving places in the finest
Universities and tertiary training
institutions in Australia and overseas
Awards
•	 Premier’s VCE Awards – multiple awards each year
•	 Ranked as one of the highest quality performing arts schools in Victoria
Reasons to choose our school
	Spirit of cooperation and belonging among staff and students
	Small school offering personalised experience
	Purpose built and award winning school facilities
Visit our school online at www.vcass.vic.edu.au
Address:	 57 Miles Street
Southbank, VIC 3006
Distance from	
Melbourne city centre:	
2 km (Map Reference:
Pg 12-13, E4, No. 96 )
Principal:	 Colin Simpson
International	
Student Coordinator:	
Ludi Servadei
Telephone:	 +61 3 8644 8644
Fax:	 +61 3 8644 8699
Email:	 victorianarts.ss@edumail.vic.gov.au
Web:	 www.vcass.vic.edu.au
Number of students:	 340 Number of international students:	 3
Dress:	 Uniform in specialist activities
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $250
97For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Viewbank
College
Positioned within generous grounds, Viewbank College offers an excellent variety of
learning opportunities. Students experience a broad academic curriculum, covering
43 Victorian Certificate of Education study areas. Subjects offered include science,
mathematics, commerce, technology, humanities and the arts. International students
also enjoy the intensive support of English as an Additional Language classes. The
learning atmosphere promoted across the Viewbank College community encourages
students to fulfil their potential and progress to tertiary study or work.
Features of the local area
•	 Serviced by regular train lines and bus
routes, with easy access to the Melbourne
city centre
•	 Attractive school grounds close to a range of
native flora and fauna reserves
•	 Close to shopping centres, banking, medical
and entertainment amenities
Languages taught
	 Japanese
	 German
Special programs
•	 Advanced mathematics and science
opportunities
•	 Extensive instrumental music program
•	 ICT and media studies
•	 Access to external Vocational Educational
Studies
Intensive English Language classes
English language instruction provided at
suitable external sites
Student support services and programs
•	 Strong English as an Additional Language
support program
•	 Homework clubs in mathematics/science and
English/humanities
•	 Student leadership program
•	 Pastoral care and student counselling
support
•	 College nurse
Extracurricular activities
•	 Work experience program
•	 Musical instrument tuition and performance
•	 College production and drama performances
•	 Sporting program
•	 Debating and public speaking
•	 Lunchtime activities program
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Hockey, Netball, Soccer, Softball, Swimming,
Table Tennis, Tennis, Volleyball
Success story
‘Viewbank College is where I felt supported
and accepted by all the encouraging staff
and friendly schoolmates. It’s a place to
call home and it’s where excellence starts.’
–	 Yiming Guo – China, graduated in 2013,
currently studying Engineering at
Monash University
Awards
•	 VCE Drama award – Top Class solo performance, 2013
•	 Victorian Sporting Blue award – women’s football, 2013
•	 15 sporting teams to State finals, 2013
Reasons to choose our school
	Learning community with a strong spirit of unity where staff and students work together
	Well maintained facilities that support student choices and future directions
	Student academic achievement and results firmly supported by caring, professional staff
Visit our school online at www.viewbank.vic.edu.au
Address:	 Warren Road
Rosanna, VIC 3084
Distance from	
Melbourne city centre:	
17 km (Map Reference:
Pg 12-13, H3, No. 97 )
Principal:	 Judith Craze
International	
Student Coordinator:	
Kaye Mackenzie
Telephone:	 +61 3 9458 2811
Fax:	 +61 3 9459 0512
Email:	 viewbank.co@edumail.vic.gov.au
Web:	 www.viewbank.vic.edu.au
Number of students:	 1200 Number of international students:	 25
Dress:	 Uniform
Cost of uniform (approx.):	 $600
Cost of homestay per week:	 $280
98 Right School Right Place 2014/2015 – Melbourne A-Z
Wantirna
College
Wantirna College enjoys a reputation for its academic focus. The school curriculum
extends across a broad range of study areas to include academic subjects and
vocational courses. The multicultural school community comprises well-trained
bi-lingual staff that supports Years 10-12 English as an Additional Language
studies. Wantirna College is within close proximity of a large shopping and
entertainment district. International students are welcomed into carefully chosen
Homestay families and most often live within walking distance of school.
Features of the local area
•	 Major shopping centre and bus terminus
nearby
•	 Picturesque location, green and spacious
•	 Safe, friendly residential area
Languages taught
	 Chinese
	 Spanish
Special programs
•	 Weekly Study Support for international
students
•	 Weekly tutoring in most subjects by honour
roll graduates
•	 Student leadership, including International
Student Captain
•	 Highly regarded Music and Performing Arts
program
•	 Full range of VCE Science subjects
Intensive English Language classes
Provided at English Language Centre located
within 6 kilometres of school
Student support services and programs
•	 Three bilingual International Student
Program staff
•	 Careers resource centre and university entry
counseling
•	 Peer support program
•	 Health centre with full-time nurse
•	 Part-time psychologist
•	 Full-time social worker
Extracurricular activities
•	 A wide range of camps and excursions
•	 Individual instrumental music classes
•	 Annual school musical production
•	 Sporting team competitions up to state level
•	 Year 11 Central Australia trip
•	 Year 11 Presentation ball
Sports offered
Australian Rules Football, Badminton, Baseball,
Basketball, Cricket, Cross Country Running,
Dodge Ball, Soccer, Golf, Hockey, Netball,
Soccer, Softball, Swimming  Diving, Tennis,
Table Tennis, Track  Field (Athletics), Volleyball
Success story
Dongqi Yang is an active student leader in
his role as the International Student
Captain at Wantirna College. Since arriving
at the school he has excelled in English
and Maths and made many friends
amongst local and international students.
Dongqi’s contribution to Victoria was
recently recognised through two Victorian
International School Student Awards.
Dongqi has set a high standard for all
student leaders at the school.
–	 Dongqi Yang - China
Awards
•	 Ruth Chapman Award for Service to the
Careers Industry, 2014
•	 Victorian International School Student -
Community Engagement Award, 2013
•	 Royal South Street Competitions – College
Choir  Senior Percussion Ensemble, 2013
•	 Victorian International School Student -
Student Leadership Award, 2013
•	 Intermediate Cricket Victorian State
Champions, 2013, and Finalists, 2014
•	 Premier’s VCE Award – Health, 2011 and 2013
Reasons to choose our school
	A rich co-curricular program including sports, music and the performing arts
	Experienced teachers of English as an Additional Language and Multicultural Aides
	Strong academic curriculum delivered in recently constructed facilities
Visit our school online at www.wantirnacollege.vic.edu.au
Address:	 Harold Street
Wantirna, VIC 3152
Distance from	
Melbourne city centre:	
25 km (Map Reference:
Pg 12-13, J5, No. 98 )
Principal:	 Sue Bell
International	
Student Coordinator:	
Kenn Stollery-Jones
Telephone:	 +61 3 9801 9700
Fax:	 +61 3 9800 2590
Email:	 international@wantirnacollege.vic.edu.au
Web:	 www.wantirnacollege.vic.edu.au
Number of students:	 1250 Number of international students:	 28
Dress:	 Uniform
Cost of uniform (approx.):	 $200 – $300
Cost of homestay per week:	 $250 + internet
99For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Warrandyte
High School	
Warrandyte High School is a medium-sized co-educational school for years 7-12.
The school has a strong reputation for consistent academic and creative achievement
in a holistic learning environment, where every student is valued and supported to
achieve their personal best. Warrandyte’s size allows for broad subject choices and
extra-curricular activities. The school also enjoys rich partnerships with local
community groups, businesses and individuals.
Features of the local area
•	 Direct bus links to the CBD and close to a
major shopping centre
•	 Superb natural surroundings adjacent to
Warrandyte State Park
•	 Sought after eastern suburbs location
Languages taught
	 Italian
Special programs
•	 1:1 laptop computer program (all year levels)
•	 Annual school musical theatre performance
•	 VCE acceleration program
•	 Lunchtime mathematics help
•	 Extensive 1:1 pathways counseling for all
students at Years 9-12
•	 Year 9 Taking the Challenge Program
Intensive English Language classes
Provided at several English Language centres
located within 15km of the school
Student support services and programs
•	 School psychologist
•	 Dedicated wellbeing leader
•	 Careers advisory centre onsite
•	 Peer support program
•	 School leaders program
•	 Online learning materials and teacher email
contact for extracurricular support
Extracurricular activities
•	 Duke of Edinburgh Awards Scheme
•	 Year level student camps including Year 11
Central Australia trip
•	 Extensive excursion and incursion program
•	 Yearly school musical
•	 Instrumental Music and School Band program
•	 VCE Art show
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Cricket, Cross Country, Fitness,
Hockey, Mountain Biking, Netball Soccer, Rugby,
Softball, Swimming, Table Tennis, Tennis,
Triathlon, Volleyball
Success story
‘Warrandyte High has many things that I
love. The students and teachers are very
friendly and help me a lot. Everyone greets
me in the yard. The school’s environment
also attracted me. The school is big and
beautiful, its classrooms are big and bright
and I like them very much.’
–	 Haoyuan Song, Beijing China,
Current Year 8 Student
Awards
•	 Two exhibitors in the ‘Top Arts’ award
exhibition, 2014
•	 Bendigo Community Bank Scholarship
winners, 2012-14
•	 Two exhibitors in the ‘Top Design’ award
exhibition, 2013
•	 Finalists in the Eureka Science Awards, 2012
•	 Pierre de Coubertin Award Finalist –
academic and sporting excellence, 2012-13
Reasons to choose our school
	Small number of international students which allows for English immersion
	Medium sized school allows for individualised education
	Award winning art and design program
Visit our school online at www.warrandytehigh.vic.edu.au
Address:	 241-247 Heidelberg Warrandyte
Road, Warrandyte, VIC 3113
Distance from	
Melbourne city centre:	
24 km (Map Reference:
Pg 12-13, I3, No. 99 )
Principal:	 Stephen Parkin
International	
Student Coordinator:	
Pamela Dunstall
Telephone:	 +61 3 9844 2749
Fax:	 +61 3 9844 1813
Email:	 warrandyte.hs@edumail.vic.gov.au
Web:	 www.warrandytehigh.vic.edu.au
Number of students:	 515 Number of international students:	 4
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $270-$280
100 Right School Right Place 2014/2015 – Melbourne A-Z
Wellington
Secondary College
The motto ‘Caring, Striving, Learning’ underpins Wellington Secondary College
traditional values. Good behaviour, leadership and academic excellence are qualities
nurtured in all students. An experienced international program provider, the school
retains a dedicated, experienced staff. Specific international student support includes
carefully chosen Homestay families, intensive English as an Additional Language
classes and regular first language academic and social progress reports for parents.
Located close to Monash University, the college offers personal care to each student.
Features of the local area
•	 Serviced by frequent public bus routes and
college charter bus service
•	 Close to Monash University Clayton Campus
•	 Nearby Waverley Gardens Shopping Centre,
business and entertainment precinct
Languages taught
	 French (to Year 10)
	 Mandarin
Special programs
•	 Strong lunchtime/after school engagement
program/homework clubs
•	 Experienced international Chinese and
Vietnamese program assistants
•	 Cambodian Multicultural Aide
•	 Annual Multicultural Concert
•	 Teachers with international teaching
experience
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Annual in-country visits to parents
•	 Multilingual Staff
•	 Careers Resource Centre (experienced team)
•	 Wellbeing Centre (services of professional
health workers including doctor on site
weekly)
Extracurricular activities
•	 Regular school camps and excursions
•	 Exciting lunchtime engagement program
Sports offered
Athletics, Badminton, Basketball, Cross Country,
Soccer, Swimming, Table Tennis, Volleyball
Success story
‘Since the first day I started I knew I was
lucky to be at Wellington Secondary
College. The students worked hard; the
environment for learning new skills and
knowledge was inspiring; classmates were
friendly in and out of the classroom. I was
made to feel accepted in this totally new
environment.’
–	 Mengdi Mandy Li – China – Bachelor of
Commerce, University of Melbourne;
currently studying her Masters at
Oxford University, London
Awards
•	 Australian Mathematics Competition – high distinctions annually
•	 Monash University Scholarships awarded each year to Year 12 students
•	 Wheelers Hill Rotary Club Scholarships awarded each year
Reasons to choose our school
	New International Centre on-site with excellent facilities and equipment
	Very caring International Programs Team providing ongoing support in and out of school
	Strong EAL department with highly experienced teachers
Visit our school online at www.wellingtonsc.vic.edu.au
Address:	 91 Police Road
Mulgrave, VIC 3170
Distance from	
Melbourne city centre:	
25 km (Map Reference:
Pg 12-13, I7, No. 100 )
Principal:	 Edward Hugh Blaikie
International	
Student Coordinator:	
Connie Tzelepis
Telephone:	 +61 3 9547 6822
Fax:	 +61 3 9548 4483
Email:	 wellington.sc@edumail.vic.gov.au
Web:	 www.wellingtonsc.vic.edu.au
Number of students:	 1400 Number of international students:	 80
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $2
101For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Werribee
Secondary College
Werribee Secondary College is a fully accredited international school. The college
is renowned for its level of student academic achievement and the high standard
of curriculum programs. The motto ‘Live Worthily’ encapsulates the school vision
and goals. Students are empowered with resilience and skills that enhance their
post-secondary education options, within Australia and overseas. The contemporary
education facilities at Werribee Secondary College are centrally located and within
an easy walk of train or bus services.
Features of the local area
•	 Convenient access to Melbourne city centre
via train network and other public transport
•	 Expansive parklands and recreation facilities
•	 Diverse multicultural community
•	 Easily accessible local shopping area
Languages taught
	 Chinese as a first language
	 Chinese as a second language
	 Japanese
	 Italian
	 Spanish
Special programs
•	 International Baccalaureate Diploma offered
•	 Outstanding music program with ensembles
•	 Accelerated learning Program for high
performing students
•	 Extensive extracurricular program
Intensive English Language classes
Provided at English Language Centre located
within 3 kilometres of school
Student support services and programs
•	 Team of professionals providing academic
and welfare support to international students
•	 Personal careers counselling to aid students
with course choices and university placement
•	 Careers office with careers counselling team
•	 After-school study program
•	 Full-time college welfare coordinator
Extracurricular activities
•	 International student excursions
•	 Multicultural celebration days
•	 Instrumental music recitals and performances
•	 School theatre productions
•	 School musicals
•	 Debating
•	 Public speaking
•	 Chess
Sports offered
Athletics, Australian Rules Football, Basketball,
Cricket, Netball, Soccer, Swimming, Tennis
Success story
‘Although I am an international student, I
feel the college is my “home”. I’ve made
lots of friends at school who are
international students from all over the
world, and also many local students. The
teachers in my school are excellent and
patient too. Werribee Secondary College
not only creates a great environment for
my studies, but also teaches me how to
“live worthily”.’
–	 Connie Xu – China; Year 12 in 2011
Awards
•	 Premier’s VCE Awards – multiple recipients,
2009-10
•	 State swimming championships – gold
medal, 2011
•	 Australian Defence Force Academy –
scholarship, 2009
•	 Sporting Blue award for high achievement in
athletics and sport, 2010
•	 University of Melbourne – Dean’s Awards,
2009-2011
•	 University of Melbourne – Dafydd Lewis
Scholarship, 2011
Reasons to choose our school
	School offering the Accelerated learning Program for high performing students
	Facilities include well equipped science, mathematics, language and technology centres
	Strong pastoral care focus, including extra international student support and after-school tuition
Visit our school online at www.werribeesc.vic.edu.au
Address:	 Duncans Road
Werribee, VIC 3030
Distance from	
Melbourne city centre:	
30 km (Map Reference:
Pg 12-13, A6, No. 101 )
Principal:	 Steve Butyn
International	
Student Coordinator:	
Angela Callea
Telephone:	 +61 3 9741 1822
Fax:	 +61 3 9742 3164
Email:	 werribee.sc@edumail.vic.gov.au
Web:	 www.werribeesc.vic.edu.au
Number of students:	 1380 Number of international students:	 35
Dress:	 Uniform
Cost of uniform (approx.):	 $650
Cost of homestay per week:	 $240
102 Right School Right Place 2014/2015 – Melbourne A-Z
Westall
Secondary College
At Westall Secondary College, students gain a genuine international learning experience.
First-rate education opportunities are provided across a broad curriculum and the
exemplary Victorian Certificate of Education academic program. Students study across
a breadth of subjects including biology, physics, chemistry, psychology, accounting,
business management and mathematics streams. Experienced staff help international
students gain English competence at the English Language Centre provided on-site.
The school enjoys firm links to Monash University and easy public transport access.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Close to shopping centre and Asian
food markets
•	 Located in pleasant, modern, residential area,
close to Monash University
Languages taught
	 Chinese
Special programs
•	 Extra English as an Additional Language
classes and support for international students
•	 Weekly after-school homework program
•	 Instrumental music program
•	 Junior school iPad program
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Chinese and Vietnamese international
student aides
•	 Careers resource centre
•	 Full-time student counsellor
•	 Part-time school nurse
•	 Breakfast club
Extracurricular activities
•	 Frequent international student excursions
•	 Participation in academic subject
competitions
•	 Numerous sporting clubs
•	 Camp program
•	 College formal dinner
•	 Lunch time activities such as Cambodian club
Sports offered
Athletics, Australian Rules Football, Cricket,
Netball, Rugby, Soccer, Table Tennis, Volleyball
Success story
‘My time at Westall Secondary College has
provided me with not only a concrete
preparation for my further studies but also
exposure to a diverse cultural exchange.
Both the students and teachers have
become my extended family and I am
extremely grateful for the experience of
being an international student.’
–	 Nhi Vuong – graduated in 2012 with an
ATAR of 98.95; studying a Bachelor of
Science at the University of Melbourne
Awards
•	 Victorain International School Student –
Student Leadership Award, 2013
•	 Top VCE ATAR 99.55 (student accepted into
medicine at Monash University), 2013
•	 University of NSW Mathematics Competition-ICAS, Top Year 10 Student in the State of Victoria
•	 University of Melbourne Mathematics Competition, 2nd Place Winner, 2014
Reasons to choose our school
	An international house for the exclusive study and social use of international students
	Small secondary school with ability to offer personal learning support to all students
	Attractive school grounds with abundance of modern facilities, including a new science building
Visit our school online at www.westallsc.vic.edu.au
Address:	 88 Rosebank Avenue
Clayton South, VIC 3169
Distance from	
Melbourne city centre:	
22 km (Map Reference:
Pg 12-13, H7, No. 102 )
Principal:	 David Tyson
International	
Student Coordinator:	
Po Sim Ngian
Telephone:	 +61 3 9546 3233
Fax:	 +61 3 9547 5785
Email:	 info@westallsc.vic.edu.au
Web:	 www.westallsc.vic.edu.au
Number of students:	 420 Number of international students:	 55
Dress:	 Uniform
Cost of uniform (approx.):	 $300–$350
Cost of homestay per week:	 $250 – $280
103For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Wheelers Hill
Secondary College
Established in 1980 the College is located in spacious grounds, boasts superb
modern facilities with more than 40 nationalities and 25 languages represented. An
established international program enables the school to provide excellent learning
opportunities where students gain a global perspective. Experienced, caring staff
help students achieve secondary education English requirements. A comprehensive
curriculum bridges academic and vocational pathways, supporting student progress
to university and Vocation Education and Training programs.
Features of the local area
•	 Close to Monash University, Clayton Campus
and Holmesglen TAFE
•	 Well-serviced by train-lines and bus routes
•	 Within easy proximity of Melbourne city
centre and popular shopping complexes
Languages taught
	 French
	 Indonesian
Special programs
•	 Extension and enrichment program
•	 Extensive student leadership program
including international student captains
•	 Instrumental music and performing arts
instruction and performance
•	 Inter- and intra-school school sports
competitions
•	 Extensive camp program, including Central
Australian trip and Urban City experience
•	 VCE valedictory dinner and formal
Intensive English Language classes
Provided at English Language Centre located
within 10 kilometres of school
Student support services and programs
•	 Experienced full-time International Student
Coordinator
•	 Experienced Chinese and other language
assistants
•	 Well-equipped Careers Resource Centre
•	 Peer Support program
•	 English as Additional Language classes and
support to VCE level
•	 Student Wellbeing Coordinator
Extracurricular activities
•	 English, Maths, Science, Chess and Debating
Competitions
•	 Extensive camp program including outdoor
education, G’Day USA trip, World Challenge
expedition
•	 School theatrical production
•	 Year 12 study skills camp
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Diving, Hockey, Netball, Soccer, Softball, Table
Tennis, Tennis, Volleyball, Swimming
Success story
‘I was impressed with the friendly
atmosphere of students and found
teachers to be helpful, kind and always
happy to help students. The teachers teach
with enthusiasm, which makes the
atmosphere in classrooms most
interesting.’
–	 Xuân Pham – Vietnam; studying
marketing/management at
Monash University)
Awards
•	 Westpac Australian Mathematics Competition, High Distinctions, 2013
•	 University of New South Wales Mathematics Competition, Distinctions, 2013
•	 Monash University Science scholarship, 2013
Reasons to choose our school
	Supportive and caring school community
	Modern learning facilities including science labs, drama centre and multi-media facilities
	Opportunities for student leadership including college, drama and sports captains
Visit our school online at www.whsc.vic.edu.au
Address:	 Raphael Drive
Wheelers Hill, VIC 3150
Distance from	
Melbourne city centre:	
21 km (Map Reference:
Pg 12-13, I6, No. 103 )
Principal:	 Marie Ghirardello
International	
Student Coordinator:	
Ms Terry Ashton
Telephone:	 +61 3 9561 5811
Fax:	 +61 3 9561 8227
Email:	 whsc@whsc.vic.edu.au
Web:	 www.whsc.vic.edu.au
Number of students:	 550 Number of international students:	 12
Dress:	 Uniform
Cost of uniform (approx.):	 $300
Cost of homestay per week:	 $250 – $260
104 Right School Right Place 2014/2015 – Melbourne A-Z
Williamstown
High School
Established in 1914, Williamstown High School is one of Melbourne’s oldest and
most distinguished schools. Today’s learning community reflects proudly on its past
but looks firmly to the future. Senior students are well supported and achieve
consistently high Victorian Certificate of Education results. Active participation in an
array of engaging extra-curricular activities is also encouraged. International
students are welcomed in Years 10-12. They join local students preparing for
academic achievement and productive, responsible adult lives.
Features of the local area
•	 Outstanding location 50 metres from the
Williamstown Beach railway station
•	 Only 500 metres to Williamstown Beach
and scenic parkland surrounds
•	 Close to Williamstown shopping centre
and restaurant district
Languages taught
	 Indonesian
	 French
Special programs
•	 Advanced best practice science program
•	 Extensive art and technology program
•	 Lively theatre and music departments
•	 Active sport, recreation and camp program
•	 Year 10 work experience program
•	 Year 10 cadet sailing program
Intensive English Language classes
Provided at English Language Centre located
within 10 kilometres of school
Student support services and programs
•	 International student program support centre
•	 Teacher support through homegroup and
year level coordinators
•	 Well equipped careers resource centre
•	 Active student representative council
•	 Full-time student welfare counsellor teacher
Extracurricular activities
•	 Instrumental music tuition and
performance program
•	 Annual school drama and music production
•	 Debating and public speaking
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Golf, Hockey, Lacrosse, Netball, Soccer, Softball,
Squash, Swimming, Table Tennis, Tennis, Touch
Rugby, Volleyball
Success story
Zheng Jie Zhong is currently studying
engineering at Monash University. After an
outstanding 2010 Victorian Certificate of
Education result he was offered a partial
scholarship toward his enrolment fees.
Awards
•	 Premier’s VCE Award – Academic Excellence,
2011, 2013
•	 Kwong Le Dow Scholarship, 2011-14
•	 Victorian School Sport’s Award, 2011-14 •	 Pierre De Coubertin Award, 2011-14
•	 Monash University Engineering –
scholarship, 2012
Reasons to choose our school
	
Graduating Year 12 students consistently achieve outstanding Victorian Certificate of Education
results, including perfect scores obtained each year in a range of individual subjects
	International international program offering truly individual support to each student
	Highly committed, experienced staff help maximise student achievements
Visit our school online at www.willihigh.vic.edu.au
Address:	 Pasco Street
Williamstown, VIC 3016
Distance from	
Melbourne city centre:	
9 km (Map Reference:
Pg 12-13, D5, No. 104 )
W I L L I A M S TO W N
H I G H S C H O O L
1914 - 2014
H O L D FAST
Principal:	 Gino Catalano
International	
Student Coordinator:	
Lucie Compton
Telephone:	 +61 3 9397 1899
Fax:	 +61 3 9397 6899
Email:	 williamstown.hs@edumail.vic.gov.au
Web:	 www.willihigh.vic.edu.au
Number of students:	 1480 Number of international students:	 30
Dress:	 Uniform
Cost of uniform (approx.):	 $350 – $400
Cost of homestay per week:	 $250 + internet
105
Victorian cities
(excluding Melbourne)
Accredited schools located in cities
across Victoria are listed in these pages.
Search for schools that teach specific
subjects at http://schlprv.vcaa.vic.
edu.au/schoolsstudiessearch
106
107For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Belmont
High School
Students are encouraged to achieve excellence at Belmont High School. The
school is committed to global education and offers a diverse academic experience,
supported by international exchange and extensive extracurricular programs. An
on-site English Language Centre provides international students with intensive
language support. Victoria’s second largest city offers students a safe living and
learning environment nearby Deakin University Geelong campus. The school’s
location offers easy access to city amenities, including Melbourne universities.
Features of the local area
•	 Safe city location close to universities
•	 Near Port Phillip Bay and scenic Surf Coast
•	 Easy access to local sporting clubs
Languages taught
	 Italian
	 Indonesian
Special programs
•	 University extension studies for senior
students
•	 Accelerated learning Program for high
performing students
•	 On-site bioLAB (mathematics/science centre)
program access linked to Deakin University
•	 Opportunities to participate in a wide range
of academic competitions
•	 Outstanding music program
•	 Extensive student welfare support
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 English as an Additional Language tutors
•	 Careers and pathways resource centre
•	 Peer support programs
•	 Health centre with full-time nurse
•	 Part-time psychologist
•	 Full-time student wellbeing counsellor
Extracurricular activities
•	 International student camp
•	 Various international student excursions
•	 Extensive sporting program
•	 Co-curricular activities: debating, drama, Rock
Eisteddfod Challenge, university competitions
•	 Exemplary music program with a range of
school band participation opportunities
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Cricket, Cross Country,
Golf, Hockey, Lawn Bowls, Netball, Soccer,
Softball, Surfing, Swimming, Table Tennis,
Tennis, Volleyball
Success story
‘Studying at Belmont High School was one
of the greatest and unique experiences I
have ever had in my life. The understanding
teachers helped my quickly improve my
English. During my time at the school I
formed friendships with local students
who helped me adjust to my new lifestyle
and I met many students from diverse
backgrounds and cultures.’
–	 Wee Chaimanowong – Thailand;
studying science at Monash University
Awards
•	 National Youth Science Forum, 2013 •	 Pierre De Coubertin Olympic Award, 2013
•	 Premier’s VCE Award – History Revolutions,
Further Mathematics and English, 2013
•	 State Champions in junior boys netball,
2013
•	 University of Melbourne Young Scholars
Program, 2013
•	 State Finalists in swimming, athletics  cross
country, 2013
Reasons to choose our school
	bioLAB specialist mathematics/science centre on-site with links state-wide
	
Extensive curriculum offers broad Victorian Certificate of Education subject choice and extra
English as an Additional Language tutoring support
	Integrated pastoral care programs and small class sizes
Visit our school online at www.bhs.vic.edu.au
Address:	 Rotherham Street
Belmont, VIC 3216
Distance from	
Melbourne city centre:	
80 km (Map Reference:
Pg 12-13, C11, No. 107 )
Principal:	 Garry Schultz
International	
Student Coordinator:	
Michael Caccamo
Telephone:	 +61 3 5243 5355
Fax:	 +61 3 5243 2420
Email:	 belmont.hs@edumail.vic.gov.au
Web:	 www.bhs.vic.edu.au
Number of students:	 1204 Number of international students:	 15
Dress:	 Uniform
Cost of uniform (approx.):	 $400 – $600
Cost of homestay per week:	 $260
108 Right School Right Place 2014/2015 – Victorian cities (excluding Melbourne)
Bendigo Senior
Secondary College
Bendigo Senior Secondary College enjoys a leafy location in Rosalind Park, at the
heart of Bendigo city. Its robust population makes the school Victoria’s largest
Victorian Certificate of Education provider. Wide curriculum choices allow individual
students to personalise education pathways and relationships with major Australian
universities assist in preparing for further education. The first government school
accredited by the Council for International Schools, Bendigo Secondary College
boasts a Confucius Classroom and modern English Language Centre on-site.
Features of the local area
•	 Access to modern transport, shops
and amenities
•	 Easy living within 90 minutes from Melbourne
•	 Outdoor lifestyle featuring gardens, sports,
recreation, festivals and events
•	 Strong historical Chinese connections
Languages taught
	 Chinese
	 Indonesian
	 French
	 German
	 Auslan
Special programs
•	 Confucius Classroom; visiting Chinese
teachers promote language and culture
•	 Microsoft Worldwide Pathfinder Schools
program (one of 52 schools worldwide)
•	 Local mentoring/vocational opportunities
•	 Exchanges/tours to global sister schools
•	 Personal computers for all students
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Award-winning career program and school
to university transition pathway advisors
•	 Health and wellbeing support: counsellors,
nurse, visiting doctor
•	 Experienced team dedicated to international
student support
•	 Regular contact and overseas family visits to
report on progress and welfare
Extracurricular activities
•	 Student council, international student
forums, leadership programs and camps
•	 Entry support for Science, mathematics,
Young Inventors and other competitions
•	 Cultural celebrations including school tours,
festivals and Homestay families events
Sports offered
Athletics, Australian Rules Football, Badminton,
Baseball, Basketball, Beach Volleyball, Clay
Shooting, Cricket, Cycling, Diving, Golf, Hockey,
Lacrosse, Lawn Bowls, Mountain Biking,
Netball, Orienteering, Rowing, Soccer, Softball,
Swimming, Table Tennis, Tennis, Touch Football
Success story
‘Bendigo is the ideal place for teenagers to
study because it is very peaceful. Teachers
are very helpful and friendly and treat
students very nicely.’
–	 Zhou Yimei – China; 99.9 University
Entrance Score; three Premier’s Awards,
Dux of college and regional top Victorian
Certificate of Education student
Awards
•	 Victorian Education Excellence Awards –
student support excellence, 2009-11
•	 International student VCCA VCE Season of
Excellence Award, 2010
•	 Microsoft Worldwide Pathfinder School
Program, 2010
•	 Victorian Student Representative Councils
Award, 2010
•	 Premier’s VCE Awards (multiple) –
outstanding student performance, 2009-11
•	 Bendigo Young Inventor of the Year – carbon
fibre wheel, 2011
Reasons to choose our school
	Innovative, multi award-winning college that creates and supports individual student programs
	Established international student program with advanced resources and modern facilities
	Lovely garden setting and safe, clean environment with experienced Homestay families
Visit our school online at www.bssc.edu.au
Address:	 Rosalind Park
Bendigo, VIC 3552
Distance from	
Melbourne city centre:	
145 km (Map Reference:
Pg 12-13, C11, No. 108 )
Principal:	 Dale Pearce
International	
Student Coordinator:	
Juncai Lin
Telephone:	 +61 3 5443 1222
Fax:	 +61 3 5441 4548
Email:	 bendigo.senior.sc@edumail.vic.gov.au
Web:	 www.bssc.edu.au
Number of students:	 1700 Number of international students:	 24
Dress:	 Non-uniform Cost of homestay per week:	 $238
109For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Bright
P-12 College
Nestled within the picturesque Ovens Valley, the setting for Bright P-12 College
is 10 hectares of landscaped grounds. The town of Bright is located 310 kilometres
north-east of Melbourne amongst magnificent alpine country. River valleys and
mountains offer year-round activities and a wide range of sports including skiing,
bushwalking and bike riding. College facilities encompass appealing recreational
environments and extensive outdoor sporting amenities. During the winter ski
season a school annexe operates at Dinner Plain.
Features of the local area
•	 Alpine environment nearby ski resorts, hiking
and hang gliding facilities
•	 Popular tourist town serviced by all typical
visitor amenities
•	 Rural community with some associated small
towns on a major highway
Languages taught
	 German
	 Japanese
	 Indigenous languages: Murrinh-patha 
Dhudhuroa
Special programs
•	 Participation in Australian mathematics,
computer, English and science competitions
•	 Firmly established exchange programs with
sister schools in Japan and Germany
•	 Music (including instrumental and choir)
•	 Indigenous studies with opportunity for
travel to Australia’s Northern Territory
•	 Visual arts, wood, metal and food technology
Intensive English Language classes
On-site language support provided
Student support services and programs
•	 Careers resource centre and coordinator
•	 Peer support program
•	 Active student representative council
•	 Student leadership
•	 Year level camps
•	 Student Welfare Support Staff
•	 SunSmart school promoting sun protection
for students
Extracurricular activities
•	 Ski program
•	 Unique camps including Wadeye indigenous
camp in the Northern Territory, Apollo Bay,
Bogong Outdoor Education Centre
•	 Language speaking competitions
•	 Local Youth of the Year participation
•	 Local Lions Club speaking competition
•	 School for Student Leadership (Alpine, Marlo,
Gnurad Gundidj)
Sports offered
Athletics, Australian Rules Football, Baseball,
Basketball, Cricket, Cross Country Running,
Gymnastics, Mountain Biking, Netball, Soccer,
Skiing, Swimming, Volleyball, Tennis
Success story
I loved participating in classes, which are
not available in my school in Germany, like
Outdoor Recreation and Australian
Indigenous Languages. I learned and
experienced a lot, for example, Rock
climbing, Bushwalking, Kayaking and
Caving. It was always great fun and it
increased my knowledge about the
outdoors a lot. Out of school, I played
Australian Rules Football and I really
enjoyed it. It is also, in my opinion, way
better than soccer.
– Severin – Germany, 2014
Awards
•	 Australian Olympic Committee Pierre de
Coubertin Award, 2014
•	 State swimming championship bronze medal,
2014
•	 Newsboys Foundation Leadership Award,
2013
•	 Victorian Multicultural Commission Harmony
Day grant, 2014
•	 AGTV Year 10 German Award, 2013
Reasons to choose our school
	Small school offering personalised learning in small classes with mentoring opportunities
	Welcoming community that is experienced with hosting exchange students
	Fabulous grounds close to native Australian flora and fauna
Visit our school online at www.brightp12.vic.edu.au
Address:	 Park Street
Bright, VIC 3741
Distance from	
Melbourne city centre:	
310 km (Map Reference:
Pg 12-13, D11, No. 109 )
Principal:	 Ms Jean Olley
International	
Student Coordinator:	
Katrina Ciolli
Telephone:	 +61 3 5755 1166
Fax:	 +61 3 5755 1770
Email:	 bright.p12@edumail.vic.gov.au
Web:	 www.brightp12.vic.edu.au
Number of students:	 420 Number of international students:	 2
Dress:	 Uniform
Cost of uniform (approx.):	 $250
Cost of homestay per week:	 $240–$260
Other fees:	 $250
110 Right School Right Place 2014/2015 – Victorian cities (excluding Melbourne)
Charlton
College
Charlton College is a Preparatory to Year 12 school in the rural town of Charlton, 255
km north-west of Melbourne and 110 km west of Bendigo in Victoria. Charlton
College has a professional team of staff and well-equipped with technology
facilities. Our students have high expectations of the school and over the years
students have achieved excellent results in both Victorian Certificate of Education
(VCE) and Victorian Certificate of Applied Learning (VCAL). A Trade Training Centre is
in the process of being completed which enables 11 VET courses to be delivered.
Features of the local area
•	 Natural features – Avoca River, river red
gums, Buckrabanyule and Yawong Hills
•	 Small country town environment
•	 All facilities are close by
Languages taught
	 Indonesian
	 Chinese
Special programs
•	 Video conferencing to provide breadth of VCE
and VET Curriculum
•	 CSOAR mentoring program with community
members
•	 Music and sports program
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Chinese speaking staff member
•	 Part-time psychologist
•	 Careers advisor
•	 Teacher Advisory Program
Extracurricular activities
•	 Pre-driver Education
•	 Music
•	 	Sport
Sports offered
Athletics, Australian Rules Football, Basketball,
Hockey, Netball, Soccer
Awards
•	 Regular finalists in badminton state competitions
Reasons to choose our school
	New Science  Language Centre opened in 2013
	New Primary facilities opened in 2013
	Trade Training Centre to open in 2014
Visit our school online at www.charlton.vic.edu.au
Address:	 Davies Street
Charlton, VIC 3525
Distance from	
Melbourne city centre:	
255 km (Map Reference:
Pg 12-13, B12, No. 110 )
Principal:	 Kelvin Baird
International	
Student Coordinator:	
Kelvin Baird
Telephone:	 +61 3 5491 1280
Fax:	 +61 3 5491 1703
Email:	 charlton.co@edumail.vic.gov.au
Web:	 www.charlton.vic.edu.au
Number of students:	 150 Number of international students: 1
Dress:	 Uniform
Cost of uniform (approx.):	 $200
Cost of homestay per week:	 N/A
111For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Kurnai
College
Kurnai College is part of an exciting education development – positioned within the
beautiful grounds of Federation University, students enjoy access to stunning
facilities, like the $1.5m Information Communications Technology hub. This
partnership allows the College use of Federation University facilities, including the
University library. Students have access to tutoring from Federation University
students to support their study in a full range of Victorian Certificate of Education
subjects.
Features of the local area
•	 Close to both the ocean and mountains, yet
within 90 minutes of Melbourne
•	 Provincial city of Latrobe provides excellent
modern lifestyle facilities
•	 Easy transition for international students to
study at Federation University Gippsland
Languages taught
	 Chinese (Mandarin)
	 German
Special programs
•	 Experienced Chinese/Japanese/German
international program assistants and aides
•	 Access to all Federation University facilities
and free tutoring from Federation students
•	 1:1 Learning program with free netbook
computer for all international students
•	 Free camps and excursions for international
students, including interstate trips
•	 Confucius Classrooms run in collaboration
with Hanban of Chinese government
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Four specialist international student tutors,
homework clubs and multicultural aide
•	 Advanced language and culture centre with
technology-rich learning environment
•	 Selective homestay program with local
families. Generally only one student in a
homestay but never two from the same
language background
•	 Careers resource centre, student common
room and state-of-the-art library provide a
quiet study environment
•	 Strong student welfare support team
Extracurricular activities
•	 Principal’s farm trip to experience local culture
•	 Music tuition and calendar of concert events
•	 Sporting teams where international students
participate in local competitions
•	 School holiday excursion and trips
Sports offered
Athletics, Badminton, Basketball, Netball,
Soccer, Table Tennis, Volleyball
Success story
‘I feel very lucky to have attended Kurnai
College. The school created a safe and quiet
environment without the distractions and
noise of the big city. I experienced authentic
Australian culture, improved my English and
achieved a high score in my VCE exams. I was
very well looked after and supported by the
school, from the principals, teachers to the
International Program staff. All these have
led to my success. Now that I am doing my
medical degree at the University of Melbourne,
I still miss the days I spent at Kurnai College
and will definitely go back and visit the school
and my teachers. Thank you Kurnai College!’
–	 Zhenwei Zhang – China; Biomedicine,
University of Melbourne, 2012
Awards
•	 Deakin University Merit Scholarship, 2014 •	 Constitution Convention – Australian finalist,
2011
•	 Three full scholarships to the University of
Melbourne 2009-2011
•	 State champions, girls soccer, 2011
•	 Eight full and partial Monash University
Scholarships 2009-2011
•	 Fulbright Scholar – Molecular Biology, 2009
Reasons to choose our school
	
A friendly, safe community for students to experience authentic Australian culture and quickly
improve their English
	Located within Federation University campus, accessing its facilities and study
	Strong personalised care and support for international students and their families
Visit our school online at www.kurnaicollege.vic.edu.au
Address:	 Northways Road
Churchill, VIC 3842
Distance from	
Melbourne city centre:	
140 km (Map Reference:
Pg 12-13, D12, No. 111 )
Principal:	 Anthony Rodaughan
International	
Student Coordinator:	
Danny Johnston
James Yao
Telephone:	 +61 3 5132 3800
Fax:	 +61 3 5132 3828
Email:	 kurnai.co@edumail.vic.gov.au
Web:	 www.kurnaicollege.vic.edu.au
Number of students:	 1200 Number of international students:	 19
Dress:	 No Uniform
Cost of uniform (approx.):	 No charge
Cost of homestay per week:	 $220
112 Right School Right Place 2014/2015 – Victorian cities (excluding Melbourne)
Kyenton
Secondary College
A caring school dedicated to providing our students with the best possible
education in a safe and engaging environment. We have a proud history of student
achievement and community involvement. Throughout our 100 years, virtually all
students completing Year 12 at Kyneton Secondary College have gained entry to
their preferred tertiary courses, traineeships, apprenticeships and employment
choices. We enjoy an envious record of achievement in the performing arts and
provide a wide range of extracurricular activities for all students.
Features of the local area
•	 Rural environment
•	 Close to Melbourne  airport
•	 Good public transport
Languages taught
	 Indonesian
	 French
Special programs
•	 Intensive literacy support program for Years
7-9
•	 Friendly, small school with supportive staff
•	 Comprehensive VCE, VCAL  VET programs
•	 Offers Virtual Learning Network for some
subjects
•	 Access to certificate training in several areas
Intensive English Language classes
Provided at English Language School located in
Melbourne. Some language assistance may be
provided.
Student support services and programs
•	 Part-time psychologist
•	 Careers resource centre
•	 School counsellor and nurse
•	 Links to Cobaw Community Health Services
•	 Teen mental health training provided at Year
11
Extracurricular activities
•	 Camps at most year levels
•	 Debutante Ball at Year 11
•	 School production
•	 School bands and choir
•	 Driver education programs
•	 Outdoor Education programs
Sports offered
Athletics, Australian Rules Football, Basketball,
Diving, Netball, Rugby, Soccer, Swimming
Awards
•	 Premier’s Award for Systems Engineering, 2013
•	 Premier’s Award for Engineering, 2014
Reasons to choose our school
	Spirit of cooperation and belonging among staff and students
	Small school offering personalised experience
	New science facilities opened in 2014
Visit our school online at www.kynsec.vic.edu.au
Address:	 Epping Street
Kyneton, VIC 3444
Distance from	
Melbourne city centre:	
88 km (Map Reference:
Pg 12-13, C11, No. 112 )
O
NWAR
D
A
WARDP
U
K Y N E T O N
N D
Principal:	 Mark Ridgeway
International	
Student Coordinator:	
Annette Brown
Telephone:	 +61 3 5421 1100
Fax:	 +61 3 5422 3505
Email:	 kyneton.sc@edumail.vic.gov.au
Web:	 www.kynsec.vic.edu.au
Number of students:	 536 Number of international students: 0
Dress:	 Uniform
Cost of uniform (approx.):	 $130
Cost of homestay per week:	 $100
113For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Mildura
Senior College
Mildura Senior College is a Year 11- and 12-only College that provides an extensive
list of subject offerings across VCE, VETis and VCAL and has an English Language
Centre on Campus. Mildura Senior College is committed to providing a stimulating
learning environment for all students. The College has a positive culture to engage
and support student learning so that students reach their full educational potential
in a happy, healthy and safe environment.
Features of the local area
•	 Close to shopping centre
•	 Natural features
Languages taught
	 Italian
	 VSL access available
Special programs
•	 Partnerships with local university
•	 English Language Centre on site
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Youth Worker
•	 Careers resource centre
•	 Chaplin
•	 School Nurse
•	 GP access on site
Extracurricular activities
•	 Tertiary Trips
•	 Debutant Balls
•	 Extensive Sport Team Opportunities
Sports offered
Athletics, Australian Rules Football, Basketball,
Hockey, Soccer, Softball, Swimming, Table
Tennis, Tennis, Volleyball
Awards
•	 Australian School Based Apprentice of the Year, 2013
•	 Top VET Engineering Student, 2012
Reasons to choose our school
	Spirit of cooperation and belonging among staff and students
	Large multicultural campus
	Attractive school grounds
Visit our school online at www.milsen.vic.edu.au
Address:	 Deakin Avenue
Mildura, VIC 3500
Distance from	
Melbourne city centre:	
550 km (Map Reference:
Pg 12-13, B9, No. 113 )
Principal:	 Andrew Ough
International	
Student Coordinator:	
Belinda Hudak
Telephone:	 +61 3 5021 2911
Fax:	 +61 3 5023 2440
Email:	 mildura.senior.co@edumail.vic.gov.au
Web:	 www.milsen.vic.edu.au
Number of students:	 900 Number of international students:	 3
Dress:	 No Uniform
Cost of uniform (approx.):	
Cost of homestay per week:	 N/A
114 Right School Right Place 2014/2015 – Victorian cities (excluding Melbourne)
Mount Clear
College
Excellence is the goal of all programs offered at Mount Clear College. Located
within the city of Ballarat, the college nurtures a safe, caring and inclusive learning
environment. Highly qualified and experienced staff inspire students to achieve
the highest academic outcomes. International students enjoy access to a diverse
curriculum and challenging educational program. Parents receive regular reports of
student progress under the careful watch provided by a supportive college community.
Features of the local area
•	 Excellent local public transport and only
one-hour by train from Ballarat to Melbourne
•	 Safe and encouraging learning environment
supported by welcoming local community
•	 Large provincial city with outstanding
educational facilities and two universities
Languages taught
	 Chinese
	 Japanese
Special programs
•	 Accelerated learning Program for high
performing students
•	 Experienced international Chinese
program assistants
•	 Local university mentoring and access to
university teaching facilities
•	 Special mathematics and science programs in
resources and alternative energy areas
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Complete range of wellbeing services to
ensure the all students’ health and happiness
•	 Careers resource centre and adviser to guide
students on subject choices and university
•	 Native speaking Chinese and Japanese
International Student Coordinators
•	 Mentoring program for all
international students
•	 On-site doctor and psychologist
Extracurricular activities
•	 International student camp and tour program
•	 Broad range of sporting, music, performing
arts and academic programs
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Cricket, Cross Country, Martial Arts,
Netball, Soccer, Swimming, Tennis
Success story
‘Mount Clear College is a very friendly
school. It has wonderful facilities and very
modern equipment. We are excited about
the range of subjects available to study.
The environment of the school is very
beautiful. Our homestay family looks after
us and makes us feel very welcome.’
–	 Dong Wang
Awards
•	 Prime Minister’s Award for Excellence •	 Premier’s VCE Awards
•	 Australian Mathematics Competition –
excellence awards
•	 Vocational Educational Training Excellence
Awards – Year 6 student
Reasons to choose our school
	A good place to learn English language
	High-quality homestay environments
	Magnificent Language Centre for international students
Visit our school online at www.mtclearsc.vic.edu.au
Address:	 Olympic Avenue
Mount Clear, VIC 3350
Distance from	
Melbourne city centre:	
100 km (Map Reference:
Pg 12-13, C11, No. 114 )
Principal:	 Lynita Taylor
International	
Student Coordinator:	
Andrew Lang
Hongxia Wei
Telephone:	 +61 3 5330 1500
Fax:	 +61 3 5330 2670
Email:	 mount.clear.sc@edumail.vic.gov.au
Web:	 www.mtclearsc.vic.edu.au
Number of students:	 1200 Number of international students: 	 24
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $240
115For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Red Cliffs
Secondary College
Red Cliffs Secondary College is located in spacious grounds in a rural community
600 kilometers from the city of Melbourne. The school provides excellent
opportunities for students to gain a truly international experience. Our broad
curriculum offers students across years 7-12 allows students to be a skilled global
citizen as they move on to tertiary study and or their career. Our skilled teaching and
non-teaching staff aim to care and support the whole student.
Features of the local area
•	 Well serviced by bus routes
•	 Traditional values in regard to manners,
behaviour and community expectations
•	 Well serviced by train lines and bus routes
Languages taught
	 Chinese
	 Indonesian
	 Other languages through the Victorian
School of Languages
Special programs
•	 Flexible learning program for students in
Years 8 and 9
•	 Students in Year 10, 11 and 12 can accelerate
their studies
•	 Instrumental music program
•	 Comprehensive sport program
•	 Student leadership program
•	 Student Representative Council
•	 	Supportive friends training
•	 Peer Leadership training
Intensive English Language classes
Provided at English Language School located
15kms from school
Student support services and programs
•	 Teacher aides to assist students
•	 Fully staffed library / resource Centre
•	 Full time social worker
•	 Part time Chaplin – both male and female
•	 School nurse
•	 Careers resource centre with a dedicated
careers person
•	 Peer support program
•	 Tutoring program for students before school
Extracurricular activities
•	 School camps and all year levels
•	 Range of lunchtime programs and clubs
•	 Live theatre performances
Sports offered
Athletics, Australian Rules Football, Badminton,
Basketball, Cross Country Running, Hockey,
Netball, Shooting, Soccer, Table Tennis,
Volleyball
Awards
•	 University of Melbourne – Kwong Lee Dow
Young Scholars Program
•	 Eisteddfod Awards in the performing arts
•	 Long Tan Leadership Awards
•	 Premier’s VCE Awards
Reasons to choose our school
	New science facilities and wellbeing centre opened in 2013
	Small school offering personalised experience
	Purpose built young adult playground
Visit our school online at www.red-cliffs-sc.vic.edu.au
Address:	 Fitzroy Avenue
Red Cliffs, VIC 3496
Distance from	
Melbourne city centre:	
600 km (Map Reference:
Pg 12-13, B9, No.115 )
Principal:	 David Browne
International	
Student Coordinator:	
Helen Popovski
Telephone:	 +61 3 5024 1522
Fax:	 +61 3 5024 2982
Email:	 red.cliffs.sc@edumail.vic.gov.au
Web:	 www.red-cliffs-sc.vic.edu.au
Number of students:	 680 Number of international students: 0
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $200
116 Right School Right Place 2014/2015 – Victorian cities (excluding Melbourne)
Stawell
Secondary College
Stawell Secondary College offers all students exceptional education opportunities.
International students are embraced by the school community and well supported
in meeting secondary education English requirements. A new on-site Language
Centre provides a motivational venue for intensive English tuition by skilled staff.
The broader college curriculum offers a variety of study choices and possible
university pathways. Graduate international students have progressed to further
study at Melbourne, La Trobe, Deakin, Canberra and Sydney universities.
Features of the local area
•	 Well-serviced by train lines and bus routes
•	 Safe location free of big city distractions
•	 Near to Stawell shopping centre and
sporting facilities
Languages taught
	 Chinese
	 German
Special programs
•	 Experienced teachers for Chinese and
German international student programs
•	 Chinese and German teachers/interpreters
assist with parent communications
•	 Notebook computers for every student
•	 Dedicated Year 12 VCE study centre
•	 Hair and beauty teaching salon
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Advice with subject selections, careers and
University selection
•	 Full time counsellor
•	 Careers resource centre
•	 Support programs via a vertical house system
to ensure social and emotional learning best
practice
•	 Football and soccer fields, basketball courts
and gymnasium
Extracurricular activities
•	 Year 12 study camp
•	 Surfing training
•	 Outdoor education camps including rock
climbing, canoeing and bush cooking
•	 School and local sports competitions
•	 Day trips and excursions to places of interest
Sports offered
Australian Rules Football, Basketball, Cricket,
Netball, Racquetball, Shooting, Soccer,
Swimming, Table Tennis, Tennis
Success story
Relationships with Sister Schools in China
have enabled International students and
local students to learn and travel together
in both countries.
Awards
•	 100% of students satisfactorily completed the VCE, 2013
•	 Kwong Lee Dow Young Scholars Program, 2014
Reasons to choose our school
	New purpose built on-site English Language Centre
	New technology access with laptop computers issued to every student in the school
	Attractive school grounds close to Grampians National Park
Visit our school online at www.stawellsc.vic.edu.au
Address:	 79-97 Patrick Street
Stawell, VIC 3380
Distance from	
Melbourne city centre:	
230 km (Map Reference:
Pg 12-13, B11, No. 116 )
Principal:	 Colin Axup
International	
Student Coordinator:	
Cindy Bibby
Telephone:	 +61 3 5358 1700
Fax:	 +61 3 5358 3096
Email:	 stawell.sc@edumail.vic.gov.au
Web:	 www.stawellsc.vic.edu.au
Number of students:	 420 Number of international students:	 0
Dress:	 Uniform
Cost of uniform (approx.):	 $320
Cost of homestay per week:	 N/A
117For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Warrnambool
College
Positioned within a key Victorian coastal centre, Warrnambool College offers an
outstanding academic program. Supported by highly capable teachers, students are
encouraged to prepare for University. Advanced science and language facilities and
easy technology access support student achievement. Skilled staff from our
language centre assist students to meet the English requirements of secondary
education. The school has strong ties to the Warrnambool campus of Deakin
University and also the Warrnnambool TAFE
Features of the local area
•	 Inspirational rural landscapes
•	 Key Victorian coastal centre, well serviced by
retail, medical, sporting and lifestyle amenities
•	 Close to swimming and surfing beaches
Languages taught
	 Indonesian
	 French
Special programs
•	 Accelerated learning Program for high
performing students
•	 Student international study tours
•	 Vocational Education and Training course in
sustainable and emerging technology
•	 Award-winning music program
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Careers resource centre
•	 House system promotes close partnerships
between students, families and school
•	 Homestay accommodation
•	 Camps programs
•	 School counsellors and chaplain
Extracurricular activities
•	 Duke of Edinburgh’s Award
•	 World Challenge overseas
educational expeditions
•	 Rock Eisteddfod Challenge
•	 Student Representative Council and student
leadership opportunities
•	 College bands and music performance
•	 Drama and dance school productions
•	 Environmental action groups
Sports offered
Athletics, Australian Rules Football Academy,
Badminton, Basketball Academy, Hockey
Academy, Lawn Bowls, Soccer Academy, Table
Tennis Academy, Volleyball, Swimming Club and
Ocean Swimming
Success story
Many of our international students
continue to tertiary education, both in
Australia and their home country. One
student is completing a Bachelor of Arts as
a participant in the Dean’s Scholars
Program at Monash University, majoring in
Indonesian and also studying Spanish,
Asian studies and history. She was College
Dux in 2009 with a high score of 99.55.
Awards
•	 Top VCE results in region
•	 Best Art House Production – Victorian State
Winner
•	 Victorian Education Excellence Award
•	 State and national finalists – Basketball,
Football, Hockey, Swimming
•	 Duke of Edinburgh – Gold Award
Presentations
•	 Award winning music ensembles – Senior,
Junior and Jazz Bands, Drum, Flute and Brass
Reasons to choose our school
	Select international program offering students personal attention from experienced staff
	Recently opened purpose-built science centre and language facilities
	An award-winning music program available to all students
Visit our school online at www.wblcoll.vic.edu.au
Address:	 Grafton Road
Warrnambool, VIC 3280
Distance from	
Melbourne city centre:	
270 km (Map Reference:
Pg 12-13, B12, No. 117 )
Principal:	 Michael Fitzgerald
International	
Student Coordinator:	
Emma Miller
Telephone:	 +61 3 5564 4444
Fax:	 +61 3 5561 2356
Email:	 warrnambool.co@edumail.vic.gov.au
Web:	 www.wblcoll.vic.edu.au
Number of students:	 1180 Number of international students: 2
Dress:	 Uniform
Cost of uniform (approx.):	 $400
Cost of homestay per week:	 $230
118For a listing of studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch
Wycheproof
P-12 College	
Wycheproof P-12 College provides an engaging and diverse education from Prep to
Year 12. The school aims to meet the educational, social and cultural needs of the
students through promoting a caring, supportive and educationally challenging
environment. There is a culture of high expectations in terms of student learning
and behaviour. Students are encouraged to ‘be their best’ in all that they undertake.
The College community takes great pride in celebrating exemplary achievements.
Features of the local area
•	 Safe location supported by a welcoming
community
•	 Unique country lifestyle experience that
enhances character development
•	 Well-serviced public transport routes
Languages taught
	 Chinese
	 Italian
	 Japanese
	 French
Special programs
•	 Laptops for all students
•	 Safe, high-quality English-speaking homestay
experiences
•	 Regular international student excursions
to Melbourne universities
•	 Student leadership opportunities
Intensive English Language classes
Provided at on-site English Language Centre
Student support services and programs
•	 Individual support for all international
students
•	 Academic enrichment programs for high-
achieving students
•	 Student welfare program
•	 School Nurse and School Chaplain
•	 After school study program
•	 Chinese-speaking teacher
Extracurricular activities
•	 International student camp and tour program
•	 Public speaking
•	 Extensive camps program
•	 Instrumental music program
•	 Lunchtime activities
Sports offered
Athletics, Australian Rules Football, Cricket,
Cross Country, Golf, Hockey, Netball, Table
Tennis, Tennis, Soccer, Swimming
Success story
The school provided a very happy study
experience. Beautiful school with few
people and the students from Year 5
onwards can have their own computers -
which is an advantage.” – Jiaqi Chen - 2013
“I particularly enjoyed the hospitality and
good manners of students, classes are very
interesting.” – Leyan Zeng – 2013
Awards
•	 Kwong Lee Dow Young Scholars Program –
University of Melbourne, 2014
•	 Sustainably Active School - Tidy Towns
Sustainable Communities Award, 2012
•	 Australian Mathematics Competition –
High Distinction student awards, 2014
•	 Regional and state level sports – multiple
awards
•	 15.6% of students obtained a study score of
40 or higher (above the state average), 2012
•	 Long Tan Leadership Awards, 2014
Reasons to choose our school
	Highly-respected school with a strong record of academic excellence
	Unique cultural experience where staff are genuinely involved in each child’s progress
	An environment in which the school is as ambitious for your child as you are
Visit our school online at www.wychep12.vic.edu.au
Address:	 McKenzie Cres,
Wycheproof VIC 3527
Distance from	
Melbourne city centre:	
320 km (Map Reference:
Pg 12-13, B10, No. 118 )
Principal:	 Christine McKersie
International	
Student Coordinator:	
Qin Zhang
Telephone:	 +61 3 5493 7409
Fax:	 61 3 5493 7506
Email:	 wycheproof.p12@edumail.vic.gov.au
Web:	 www.wychep12.vic.edu.au
Number of students:	 130 Number of international students: 0
Dress:	 Uniform
Cost of uniform (approx.):	 $150
Cost of homestay per week:	 $220
119 Right School Right Place 2014/2015 – Subject Matrix
Regional Victoria
Belmont High School • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Bendigo Senior Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Bright P-12 College • • • • • • • • • • • • • • • • • •
Charlton College • • • • • • • • • • • • • • • • • • • • • • •
Dromana Secondary College • • • • • • • • • • • • • • • • • • • • • • • • •
Kurnai College • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Kyneton Secondary College • • • • • • • • • • • • • • • • • • • • • • • •
Mildura Senior College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Mount Clear College • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Red Cliffs Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Stawell Secondary College • • • • • • • • • • • • • • • • • •
Warrnambool College • • • • • • • • • • • • • • • • • • • • • • • •
Wycheproof P-12 College • • • • • • • • • • • • • • • • • • • • •
Metropolitan Melbourne
Alkira College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Ashwood Secondary College • • • • • • • • • • • • • • • • • • • •
Auburn High School • • • • • • • • • • • • • • • • • • • • •
Balwyn High School • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Bayside P-12 College • • • • • • • • • • • • • • • • • • • • • • • • •
Bentleigh Secondary College • • • • • • • • • • • • • • • • • • • • • • •
Blackburn High School • • • • • • • • • • • • • • • • • • • • • • • • • • •
Box Hill High School • • • • • • • • • • • • • • • • • • • • • • •
Box Hill Senior Secondary College • • • • • • • • • • • • • • • • • • • • • • • • •
Braybrook College • • • • • • • • • • • • • • • • • • • • • •
Brentwood Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Brighton Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Brunswick Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • •
Buckley Park College • • • • • • • • • • • • • • • • • • • • • • • •
Camberwell High School • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Canterbury Girls’ Secondary College • • • • • • • • • • • • • • • • • • • • • • •
Carwatha College • • • • • • • • • • • • • • • • • • • • • • •
Charles La Trobe P-12 College • • • • • • • • • • • • • • • • • •
Cheltenham Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • •
Collingwood College • • • • • • • • • • • • • • • • • • • • • • • • • •
Copperfield College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Dandenong High School • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Doncaster Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • •
East Doncaster Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • •
Elwood College • • • • • • • • • • • • • • • • • • • • •
Essendon Keilor College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Fairhills High School • • • • • • • • • • • • • • • • • • • • • • • • •
VCE subjects by school
Subjects are offered based on student enrolments at each school and may change from year to year. If your study preference is not listed, please contact your education
agent or department staff.
Subjects
VCE Subjects Accounting
AgriculturalAndHorticulturalStudies
Art
AustralianAndGlobalPolitics
Biology
BusinessManagement
Chemistry
ClassicalStudies
Dance
Drama
Economics
English
EnglishLanguage
EnvironmentalScience
FoodAndTechnology
Geography
HealthAndHumanDevelopment
History
IndustryAndEnterprise
InformationTechnology
Languages(OtherThanEnglish)
LegalStudies
Literature
Mathematics
Media
Music
MusicStylesandComposition
OutdoorAndEnvironmentalStudies
Philosophy
PhysicalEducation
Physics
ProductDesignAndTechnology
Psychology
ReligionAndSociety
Sociology
StudioArts
SystemsEngineering
TextsAndTraditions
TheatreStudies
VisualCommunicationDesign
School
120www.study.vic.gov.au
Footscray City College • • • • • • • • • • • • • • • • • • • • • • • • • •
Forest Hill College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Fountain Gate Secondary College • • • • • • • • • • • • • • • • • • • • • • •
Frankston High School • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Gilmore College For Girls • • • • • • • • • • • • • • • • • •
Gleneagles Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Glen Eira College • • • • • • • • • • • • • • • • • • • • • • • •
Glen Waverley Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Highvale Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Hoppers Crossing Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Hume Central Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
John Fawkner Secondary College • • • • • • • • • • • • • • • • • • • •
Kambrya College • • • • • • • • • • • • • • • • • • • • • • • •
Keilor Downs Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • •
Kew High School • • • • • • • • • • • • • • • • • • • • • • • • • •
Keysborough Secondary College • • • • • • • • • • • • • • • • • • • • • • • • •
Koonung Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Lalor North Secondary College • • • • • • • • • • • • • • • • • • • • • •
Lilydale Heights College • • • • • • • • • • • • • • • • • • • • • •
Lyndale Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Macleod College • • • • • • • • • • • • • • • • • • • •
Maribyrnong Secondary College • • • • • • • • • • • • • • • • • • • • • •
McClelland College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
McKinnon Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • •
Melbourne Girls’ College • • • • • • • • • • • • • • • • • • • • • • • • • •
Mentone Girls’ Secondary College • • • • • • • • • • • • • • • • • • • • • • • • •
Mill Park Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Mordialloc College • • • • • • • • • • • • • • • • • • • • • • • • •
Mornington Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • •
Mount Alexander College • • • • • • • • • • • • • • • • • • •
Mount Eliza Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Mount Erin College • • • • • • • • • • • • • • • • • • • • • • • •
Mount Waverley Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Mullauna Secondary College • • • • • • • • • • • • • • • • • • • • •
Noble Park Secondary College • • • • • • • • • • • • • • • • • • • • • • • • •
Northcote High School • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Parkdale Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Point Cook Senior Secondary College • • • • • • • • • • • • • • • • • • • • • • • •
Princes Hill Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • •
Reservoir High School • • • • • • • • • • • • • • • • • • •
Ringwood Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Rosehill Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
VCE Subjects
Accounting
AgriculturalAndHorticulturalStudies
Art
AustralianAndGlobalPolitics
Biology
BusinessManagement
Chemistry
ClassicalStudies
Dance
Drama
Economics
English
EnglishLanguage
EnvironmentalScience
FoodAndTechnology
Geography
HealthAndHumanDevelopment
History
IndustryAndEnterprise
InformationTechnology
Languages(OtherThanEnglish)
LegalStudies
Literature
Mathematics
Media
Music
MusicStylesandComposition
OutdoorAndEnvironmentalStudies
Philosophy
PhysicalEducation
Physics
ProductDesignAndTechnology
Psychology
ReligionAndSociety
Sociology
StudioArts
SystemsEngineering
TextsAndTraditions
TheatreStudies
VisualCommunicationDesign
School
121 Right School Right Place 2014/2015 – Subject Matrix
Sandringham College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
South Oakleigh Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
St Albans Secondary College • • • • • • • • • • • • • • • • • • • • • • • •
Strathmore Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Sunbury Downs College • • • • • • • • • • • • • • • • • • • • • •
Sunshine College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Templestowe College • • • • • • • • • • • • • • • • • • • •
Thornbury High School • • • • • • • • • • • • • • • • • • • •
Upper Yarra Secondary College • • • • • • • • • • • • • • • • • • • • •
Vermont Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Victoria University Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Victorian College of the Arts
Secondary School
• • • • • • • • • • • • • • • • • •
Viewbank College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Wantirna College • • • • • • • • • • • • • • • • • • • • • • • • • • •
Warrandyte High School • • • • • • • • • • • • • • • • • • • • • • • •
Wellington Secondary College • • • • • • • • • • • • • • • • • • • • • • • •
Werribee Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Westall Secondary College • • • • • • • • • • • • • • • • • • • •
Wheelers Hill Secondary College • • • • • • • • • • • • • • • • • • • • • •
Williamstown High School • • • • • • • • • • • • • • • • • • • • • • • • • • •
VCE Subjects
Accounting
AgriculturalAndHorticulturalStudies
Art
AustralianAndGlobalPolitics
Biology
BusinessManagement
Chemistry
ClassicalStudies
Dance
Drama
Economics
English
EnglishLanguage
EnvironmentalScience
FoodAndTechnology
Geography
HealthAndHumanDevelopment
History
IndustryAndEnterprise
InformationTechnology
Languages(OtherThanEnglish)
LegalStudies
Literature
Mathematics
Media
Music
MusicStylesandComposition
OutdoorAndEnvironmentalStudies
Philosophy
PhysicalEducation
Physics
ProductDesignAndTechnology
Psychology
ReligionAndSociety
Sociology
StudioArts
SystemsEngineering
TextsAndTraditions
TheatreStudies
VisualCommunicationDesign
School
122www.study.vic.gov.au
123 Right School Right Place 2014/2015 – Subject Matrix
VET subjects by school
Subjects are offered based on student enrolments at each school and may change from year to year. If your study preference is not listed, please contact your education
agent or department staff.
Metropolitan Melbourne
Alkira College • • • • • • • • • • • • • • • • • • • • • • • •
Ashwood Secondary College • •
Auburn High School
Balwyn High School • • • • •
Bayside P-12 College • • • • • • • • • • • • • • • • • • • • •
Bentleigh Secondary College •
Blackburn High School • • • • • • • • • •
Box Hill High School • •
Box Hill Senior Secondary College • • • • • • • • •
Braybrook College • • • • • •
Brentwood Secondary College • • • • • • •
Brighton Secondary College • • • • • • • • • • • •
Brunswick Secondary College • • • • • • • • • • • • • • •
Buckley Park College • • • • • • •
Camberwell High School • • • • • • • • • • • • • • • • • •
Canterbury Girls’ Secondary College • • • • • • • • • • • • • • • • • •
Carwatha College • • • • • • • • • • • • • • • • • • • •
Charles La Trobe P-12 College • • • • • • • • • • • • • • • • • • • • •
Cheltenham Secondary College • • • • • • • • • • • • • • • • • • • • • • • •
Collingwood College • • • • • • • • • • • •
Copperfield College • • • • • • • • • • • • • •
Dandenong High School • • • •
Doncaster Secondary College • • • • • • • • • • • • • • • • •
East Doncaster Secondary College • • • • • • • • • • •
Elwood College • • • • • • • • •
Essendon Keilor College • • • • • • • • • • • • • • • •
Fairhills High School • • • • • • • • • • • • • • • •
Footscray City College • • • • • • • • • •
Forest Hill College • • • • • • • • • •
Frankston High School • • • • • • • • • • • • • • • •
Fountain Gate Secondary College • • • • • • • • • • • • • • • • • • •
Gilmore College For Girls • • •
VET Subjects
AdultCommunity-FurtherEducation
Agriculture
AgricultureAndHorticulture
Automotive
BuildingConstruction
Business
CiscoNetworkingAcademyProgram
ClothingDesignProduction
CommunityServices
CulturalRecreation-ArtsDesign
CulturalRecreation-Entertainment
CulturalRecreation-Racing
Dance(VCEVET)
DesktopPublishing
Electronics
Engineering
EquineIndustry
FinancialServices
FoodProcessing
Furnishing
Horticulture
Hospitality
InformationTechnology
LaboratorySkills
Multimedia
MusicIndustrySkills
PrimaryAndForest-AnimalHandling
Printing
PublicAdministrationAndSafety
RetailOperations
SmallBusinessPractice
SportAndRecreation
TrainingAndAssessment
TransportAndStorage
School
Regional Victoria
Belmont High School • • • • • • • • • • • • • • • • • • • • • • •
Bendigo Senior Secondary College • • • • • • • • • • • • •
Bright P-12 College • •
Charlton College • • • • • • • • • • • •
Dromana Secondary College • • • • • • • • • • • •
Kyneton Secondary College • • • • • •
Kurnai College • • • • • • • • • • • • • • • • • • • • • •
Mildura Senior College • • • • • • • • • • • • • • • •
Red Cliffs Secondary College • • • • • • • • • • • •
Mount Clear College • • • • • • • • • • • • • • • • • •
Stawell Secondary College • • • • •
Warrnambool College • • • • • • • • • • • • • • • •
Wycheproof P-12 College • • • • • • • • •
124www.study.vic.gov.au
VET subjects by school
Subjects are offered based on student enrolments at each school and may change from year to year. If your study preference is not listed, please contact your education
agent or department staff.
Gleneagles Secondary College • • • • • • • • • • • • • • • • • • •
Glen Eira College • • • • • • • • • • • •
Glen Waverley Secondary College •
Highvale Secondary College • •
Hoppers Crossing Secondary College • • • •
Hume Central Secondary College • • • •
John Fawkner Secondary College • • •
Kambrya College • • • • • • • • • • • • • • • • • • •
Keilor Downs Secondary College • •
Kew High School • • • • • • • • • • • • •
Keysborough Secondary College • • • • • • • • • • • • • • • • • • • •
Koonung Secondary College • • • • • • • •
Lalor North Secondary College • • • • • • • • • • • •
Lilydale Heights College • • • • • • • • • • • • • • • • • • •
Lyndale Secondary College • • • • • • • • • • • • • • • •
Macleod College • • • • • • • • • • •
Maribyrnong Secondary College • • • • • •
McClelland College • • • • • • • • • • • • • • • • • • • • • • • • •
McKinnon Secondary College • • • • • • • • •
Melbourne Girls’ College • • • • • • • • • • • • • •
Mentone Girls’ Secondary College • • • •
Mill Park Secondary College • • • • • • • • • • • • • • •
Mordialloc College • • • • • • • • • • • • • • • •
Mornington Secondary College • • • • • • • • • • • • • • • • • • • • • •
Mount Alexander College • • • • • • • •
Mount Eliza Secondary College • • • • • • • • • • • • • • • • • • • • • • •
Mount Erin College • • • • • • • • •
Mount Waverley Secondary College • •
Mullauna Secondary College • • • • • • •
Noble Park Secondary College • • •
Northcote High School • • • • • • • • • •
Parkdale Secondary College • •
Point Cook Senior Secondary College • • • • • • • • • • • • • • •
Princes Hill Secondary College • • • • • • • • • • • • • •
Reservoir High School • • • • • • • • • • • • •
Ringwood Secondary College • • • • • • • • • • • • • • • • •
Rosehill Secondary College • • • • • • • • • • • • • • • • • • • • •
Sandringham College • • • • •
South Oakleigh Secondary College •
St Albans Secondary College • • • • • • • • • • • • • • • • •
Strathmore Secondary College • • • • • • • • •
Sunbury Downs College
Sunshine College • • • • • • • • • • • •
Templestowe College • • • • • • • • • • • • • • • • •
Thornbury High School • • • • • • • • • • •
Upper Yarra Secondary College • • • • • • • • • • • • • • • •
Vermont Secondary College • • • • • • • • • • • • • • • •
Victoria University Secondary College • • • • • • • • • • • • • • • •
VET Subjects
AdultCommunity-FurtherEducation
Agriculture
AgricultureAndHorticulture
Automotive
BuildingConstruction
Business
CiscoNetworkingAcademyProgram
ClothingDesignProduction
CommunityServices
CulturalRecreation-ArtsDesign
CulturalRecreation-Entertainment
CulturalRecreation-Racing
Dance(VCEVET)
DesktopPublishing
Electronics
Engineering
EquineIndustry
FinancialServices
FoodProcessing
Furnishing
Horticulture
Hospitality
InformationTechnology
LaboratorySkills
Multimedia
MusicIndustrySkills
PrimaryAndForest-AnimalHandling
Printing
PublicAdministrationAndSafety
RetailOperations
SmallBusinessPractice
SportAndRecreation
TrainingAndAssessment
TransportAndStorage
School
Victorian College of the Arts
Secondary School
• • •
Viewbank College • • • • • • • • • • • • • •
Wantirna College • • •
Warrandyte High School • • • • • • • • • • • •
Wellington Secondary College • • • • • • • • • • • • • • •
Werribee Secondary College • • • • • • • • • • • • • •
Westall Secondary College • •
Wheelers Hill Secondary College • • • • • •
Williamstown High School • • • • • • • • • • •
VET Subjects
AdultCommunity-FurtherEducation
Agriculture
AgricultureAndHorticulture
Automotive
BuildingConstruction
Business
CiscoNetworkingAcademyProgram
ClothingDesignProduction
CommunityServices
CulturalRecreation-ArtsDesign
CulturalRecreation-Entertainment
CulturalRecreation-Racing
Dance(VCEVET)
DesktopPublishing
Electronics
Engineering
EquineIndustry
FinancialServices
FoodProcessing
Furnishing
Horticulture
Hospitality
InformationTechnology
LaboratorySkills
Multimedia
MusicIndustrySkills
PrimaryAndForest-AnimalHandling
Printing
PublicAdministrationAndSafety
RetailOperations
SmallBusinessPractice
SportAndRecreation
TrainingAndAssessment
TransportAndStorage
School
VET subjects by school
Subjects are offered based on student enrolments at each school and may change from year to year. If your study preference is not listed, please contact your education
agent or department staff.
International Student Program
Department of Education and Early
Childhood Development
GPO Box 4367
Melbourne, Victoria 3001
Australia
	 Tel: 	 +61 3 9637 2990
	 Fax: 	 +61 3 9637 2184
	 Email:	international@edumail.vic.gov.au
	 Web: 	 www.study.vic.gov.au
CRICOS Provider Code: 00861K
© State Government of Victoria 2014

RSRPFullGuideweb

  • 1.
    Right School RightPlace A Guide to Victorian Government Schools Enrolling International Students 2015–16
  • 2.
    2 Right SchoolRight Place 2014/2015 For information including how to apply visit our website, www.study.vic.gov.au, or contact an education agent in your country. Department of Education and Early Childhood Development International Education Division Tel: +61 3 9637 2990 Fax: +61 3 9637 2184 Email: international@edumail.vic.gov.au Web: www.study.vic.gov.au Published by the International Education Division Department of Education and Early Childhood Development Melbourne September 2014 © State of Victoria (Department of Education and Early Childhood Development) 2014 The copyright in this document is owned by the State of Victoria (Department of Education and Early Childhood Development), or in the case of some materials, by third parties (third party materials). No part may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968, the National Education Access Licence for Schools (NEALS) or with permission. An educational institution situated in Australia which is not conducted for profit, or a body responsible for administering such an institution, may copy and communicate the materials, other than third party materials, for the educational purposes of the institution. Authorised by the Department of Education and Early Childhood Development, 2 Treasury Place, East Melbourne, Victoria, 3002. ISBN 978-0-7594-0700-8 Accessibility If you would like to receive this publication in an accessible format, please telephone 1800 809 834, or email edline@vic.gov.au This document is also available on the internet at www.study.vic.gov.au
  • 3.
    1www.study.vic.gov.au Choosing the rightschool and right place opens windows of opportunity for life. This guide gives education agents, students and their families information about Victorian government schools. It includes the educational advantages all schools offer and unique features of individual schools. Inside you will find the key detail needed to help international students choose the right school and the right place to achieve their education goals. Where our stud shapes our future
  • 4.
    2 General information General information ––Welcome 3 –– About this guide 4 –– Important information 6 –– Comparing schools 8 –– Taking the next step 10 Location –– Location of Victorian Government Schools 12 Profiles –– Melbourne A-Z 14 –– Victorian cities (excluding Melbourne) 106 Subjects –– VCE subjects by school 119 –– VET subjects by school 123 2
  • 5.
    3 Through this guideyou’ll discover Victorian government schools are exciting, multicultural places where culture, learning and global friendships are embraced. No matter which school you decide on, a supportive and diverse education community awaits. Victoria has successfully hosted international students over many years. By enrolling in a Victorian government school, you’ll join students from around 85 countries. Through shared experiences, new ideas and interests, every global learner makes a special and valued contribution. The windows of opportunity opened by a quality education are almost endless. In Victoria, you will benefit from a distinct blend of education, outside school activity, welfare and support. Some of the advantages that make international students’ time with us fulfilling and enjoyable include: Academic excellence English language skill University pathways Student welfare focus Multicultural community Great lifestyle choices Victorian government schools are respected around the world for high education standards and individual student care. Everyone working in the Victorian education system is dedicated to creating a positive and enriching environment where students can achieve their education goals. In Victoria you will be challenged, encouraged and nurtured along the path to global citizenship. We wish you every success. Welcome We are delighted you are considering study in Victoria.
  • 6.
    Right School RightPlace is a resource guide for education agents and international students planning to study in Victoria. It contains information about Victorian government schools and provides 102 individual school profiles. About this guide 4
  • 7.
    5www.study.vic.gov.au Using this Guide Inthis publication you will find profiles of accredited Victorian government high schools, containing information about their location, number of students, special programs offered, contact details and a brief overview of the school environment. Using this information, a list of schools can be created that meet a student’s educational needs, and further research undertaken by visiting school websites. Finding information Right School Right Place is divided into four easy-to-follow sections: Page 2-11 General information Information about the guide and its use, including contents, welcome, about this guide, important information, comparing schools and taking the next step. Page 12-13 Location A colour coded map to help quickly find a school in Melbourne or another Victorian city, complete with cross-reference index to the map location and school profile page. Page 14-118 Profiles Alphabetically ordered, separate summaries for each accredited school offer a snapshot of what sets the school apart and its distinctive, nurturing education community. Page 119-125 Subjects Each school develops an original curriculum using course units from the Victorian Certificate of Education and Vocational Education and Training subjects showcased in these pages. Ask an education agent if a subject area is omitted.
  • 8.
    Victoria is Australia’seducation state, recognised worldwide for its high standards. All Victorian government schools are committed to providing international students with an outstanding education experience and high levels of personalised support. Important information 6
  • 9.
    7www.study.vic.gov.au Access to resources Allinternational students studying in Victorian government schools enjoy a range of advanced education resources. The Victorian school system offers: VCE (Victorian Certificate of Education) consisting of subject units that provide a tertiary pathway Victorian School of Languages, offering tuition in over 40 languages English language tuition, for language proficiency and VCE studies Support services, for student welfare and personal growth Career Resources, offering students vocational guidance Academic, sporting and extra- curricular learning activities VET (Vocational Education and Training) career oriented subject units AusVELS (Australian curriculum in Victoria) prep to Year 10 Accreditation In every Victorian government school, students gain advantage through unique learning environments and high education standards. Accredited schools participate in a rigorous quality program to ensure exemplary education, student support and best education practice. To achieve and maintain accreditation, schools demonstrate their quality education approach through: • Broad school community support for international students • Record of student achievement from early school to Year 12 • Desire for continued improvement across all services provided • High levels of student engagement and teacher satisfaction • Quality academic, accommodation, welfare and language support • Students successfully transitioning to preferred tertiary study Once accredited, schools are involved in a formal quality assurance system that revisits accreditation every four years. A system of measuring outcomes keeps student performance levels high and maintains supportive and engaging learning environments. All schools published in Right School Right Place are accredited. Schools are constantly achieving and renewing their accreditation, so if your school of interest is not listed, please contact the International Education Division. Study expenses At some schools, additional costs may be encountered for optional activities like camps or private music lessons. However, in general, international students should expect to pay for: • Tuition and subject levies • Homestay accommodation • Overseas student health cover • Textbooks and stationery • School uniforms (if applicable) Tertiary pathways Most international students plan to continue their study at university. Victoria has Australia’s highest school to university transition rates. So, Victorian educators are skilled and experienced in propelling students to this goal. VCE gives students the choice of progression to a Victorian university or tertiary study overseas.
  • 10.
    Many features (educatorsand staff, location, student numbers, special programs, community) contribute to the individual personality of a school. Victorian government schools provide consistently high academic standards, but their nurturing environments are what actually yield student success. omparing schools 8
  • 11.
    9www.study.vic.gov.au Location Victoria is adiverse state. Accredited schools support international students right across the state. Of the schools profiled in this guide, 90 are located in Melbourne. The remaining 12 schools are sited in other Victorian cities. Melbourne Large city with a population over 4 million Other Victorian cities Small to mid-sized metropolitan centres Every school location has something different to offer. So when comparing schools, consider the benefits students stand to gain from a particular learning environment. For easy reference, the location map on page 12-13 is divided into coloured areas. To help identify school locations, a corresponding symbol appears in the map index and on each school profile page. Curriculum A summary of VCE (Victorian Certificate of Education) and VET (Vocational Education and Training) subjects appears towards the end of the guide. From this array of course offerings, each Victorian government school develops its own distinctive curriculum. This method of independent course development allows schools to be responsive to the needs and interests of its community. The dynamic study landscape created by this approach has allowed many schools to develop specialities within their curriculum. Some schools are sought after for these specialities, that may offer students an integrated study approach to their preferred university course. In making school comparisons, consider each unique curriculum and its alignment with the student’s learning aspirations. Unique features The characteristics of each school contribute to its positive learning environment. Victorian government schools are renowned for their culture of growth and encouragement. A range of activities from music productions to camps, representative opportunities or student community service are considered vital to student personal growth and local community engagement. Some schools also feature exclusive academic opportunities. Many accredited schools support accelerated learning programs for high achieving students. Other schools offer tertiary subjects within a university extension program. These units assist students to gain prior learning recognition towards degree study at a participating university. Profiles published in this guide provide some information to help make school feature comparisons. Refer to individual school websites for full details.
  • 12.
    10 Department of Educationand Early Childhood Development International Education Division GPO Box 4367 Melbourne Victoria 3001 Australia Tel: +61 3 9637 2990 Fax: +61 3 9637 2184 Email: international@edumail.vic.gov.au Web: www.study.vic.gov.au CRICOS Provider Code: 00861K Make an application Students may make an application to study in Victoria at their school of choice. Accredited education agents and students and their families can apply online at www.study.vic.gov.au Information about study in Victorian government schools is also available from these online resources: Study Victoria www.study.vic.gov.au Victorian School of Languages www.vsl.vic.edu.au Victorian Certificate of Education www.vcaa.vic.edu.au/vce/studies/index.html Select Entry Accelerated Learning www.education.vic.gov.au Join us Connect with our online community of current and future international students on Facebook at www.facebook. com/InternationalSchoolStudentsVictoria and on WeChat at StudyMelbourne. Taking the next step More information about education services provided to international students is available from the International Division of the Department of Education and Early Childhood Development.
  • 13.
  • 14.
    12 Street addresses appearin the school profile pages following. Enter this address at www.maps.google.com.au for an accurate geographic location. School Name Map Reference Page School Name Map Reference PageSchool Name Map Reference Page Alkira Secondary College K10 15 Ashwood Secondary College H5 16 Auburn High School G5 17 Balwyn High School G4 18 Bayside P–12 College D5 19 Bentleigh Secondary College G6 20 Blackburn High School I4 21 Box Hill High School H4 22 Box Hill Senior Secondary College H4 23 Braybrook College D3 24 Brentwood Secondary College I6 25 Brighton Secondary College F6 26 Brunswick Secondary College E3 27 Buckley Park College D3 28 Camberwell High School G4 29 Canterbury Girls’Secondary College G4 30 Carwatha College P–12 I7 31 Charles La Trobe P–12 College G2 32 Cheltenham Secondary College G7 33 Collingwood College F4 34 Copperfield College B2 35 Dandenong High School J8 36 Doncaster Secondary College H3 37 Dromana Secondary College H12 38 East Doncaster Secondary College I3 39 Elwood College F5 40 Essendon Keilor College E3 41 Fairhills High School J5 42 Footscray City College D4 43 Forest Hill College I5 44 Fountain Gate Secondary College K9 45 Frankston High School H11 46 Gilmore College for Girls D4 47 Gleneagles Secondary College k7 48 Glen Eira College G6 49 Glen Waverley Secondary College I5 50 Highvale Secondary College I5 51 Hoppers Crossing Secondary College A5 52 Hume Central Secondary College E1 53 John Fawkner Secondary College F2 54 Kambrya College K9 55 Keilor Downs College C2 56 Kew High School G4 57 Keysborough Secondary College I7 / I8 58 Koonung Secondary College H4 59 Lalor North Secondary College G1 60 Lilydale Heights College K3 61 Lyndale Secondary College I7 62 Macleod College G2 63 Maribyrnong College D3 64 McClelland College H11 65 McKinnon Secondary College G6 66 Melbourne Girls’College F4 67 Mentone Girls’Secondary College G7 68 Mill Park Secondary College G1 69 Mordialloc College H8 70 Mornington Secondary College G12 71 Mount Alexander College E4 72 Mount Eliza Secondary College H12 73 Mount Erin College I12 74 Mount Waverley Secondary College H5 75 Mullauna Secondary College I4 76 Noble Park Secondary College I7 77 Northcote High School F3 78 Parkdale Secondary College H8 79 Point Cook Senior Secondary College B6 80 Princes Hill Secondary College F3 81 Reservoir High School G2 82 Ringwood Secondary College J4 83 Rosehill Secondary College D3 84 Sandringham College G7 85 South Oakleigh College H6 86 St Albans Secondary College C3 87 Strathmore Secondary College E3 88 Sunbury Downs College A1 89 Sunshine College C4 90 Templestowe College H3 91 Thornbury High School G3 92 Upper Yarra Secondary College K4 93 Vermont Secondary College I5 94 Victoria University Secondary College C2/B3 95 Victorian College of the Arts E4 96 Viewbank College H3 97 Wantirna College J5 98 Warrandyte High School I3 99 Wellington Secondary College I7 100 Werribee Secondary College A6 101 Westall Secondary College H7 102 Wheelers Hill Secondary College I6 103 Williamstown High School D5 104 Location of Victorian Government Schools Location English Language Schools Blackburn Brunswick Collingwood Hume Noble Park Western A DH5 F3 F4 E1 i7 D4 B E C F School Name Map Reference Page Victorian cities (excluding Melbourne) Belmont High School C11 107 Bendigo Senior Secondary College C11 108 Bright P–12 College D11 109 Charlton College B10 110 Kurnai College D12 111 Kyenton Secondary College C11 112 Mildura Senior College B9 113 Mount Clear College C11 114 Red Cliffs Secondary College B9 115 Stawell Secondary College B11 116 Warrnambool College B12 117 Wycheproof P-12 College B10 118 Melbourne A-Z A B A B 1 2 3 4 5 6 7 8 9 10 11 12 15kms 20kms 25kms Werribee Deer Park Delahey St Alb Ke Point Cook Hoppers Crossing CITY WEST Melbourne VICTORIA AU State of Victoria 35 80 52 95 95 101 107 108 110 113 114 118 116 117 89 115 112
  • 15.
    13 Page 2 C DE F G H i J K C D E F G H i J K 1 2 3 4 5 6 7 8 9 10 11 12 5kms 5 kms 10 kms 10kms 15 kms 20 kms 25 kms 30 kms 35 kms 45 kms 50 kms Hawthorn East McKinnon Caulfield South Williamstown Sandringham Brighton Elwood BraybrookSunshine Footscray Maidstone Richmond Southbank Brunswick Flemington Collingwood Northcote Essendon bans eilor Downs Keilor East Reservoir Broadmeadows Strathmore Thornbury Mt Eliza Frankston Keysborough Mordialloc Parkdale Dandenong Mulgrave Springvale Oakleigh South Bentleigh East Cheltenham Clayton South Springvale South Mt Waverley Noble Park Rowville Wheelers Hill Glen Waverley Knoxfield Doncaster East Ashwood Canterbury Burwood East BlackburnKew Box Hill North Templestowe Lower Doncaster Wantirna RingwoodMitcham Croydon Viewbank Heidelberg Macleod Montmorency Mill Park Box Hill Blackburn South Balwyn Epping Dandenong North Mooroolbark Mont Albert North Cranbourne Narre Warren Endeavour Hills Fawkner Warrandyte English language schools Melbourne International Airport (Tullamarine) Melbourne city centre Major road Public transport rail line Legend Secondary school School with on-site English language facilities Off map location CITY NORTH CITY EAST CITY SOUTH Port Philip Bay USTRALIA AUSTRALIA Victoria, Melbourne 16 18 19 20 21 22 23 24 25 26 28 29 31 32 34 36 37 39 40 41 53 54 42 43 44 46 47 49 50 17 51 56 57 48 59 60 62 63 64 66 67 68 69 72 73 75 76 77 78 79 81 82 38 84 85 86 87 88 90 91 92 93 94 96 97 100 102 103 104 109 111 A B D F E C 55 61 99 45 30 15 27 58 58 33 70 71 74 83 98 2 65
  • 16.
    Profiles Melbourne A-Z Accredited schools locatedwithin the city of Melbourne are listed in these pages. Search for schools that teach specific subjects at http://schlprv.vcaa.vic. edu.au/schoolsstudiessearch 14
  • 17.
    15For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Alkira Secondary College Alkira provides excellent opportunities for students to gain a truly international experience. We are a new school boasting modern and innovative facilities. Our curriculum is student centered and allows students to choose individual pathways through VCE, VCALand VET programs. Our International centre will help students with transition and offer support in literacy and English language. The school has established partnerships with both Monash and Melbourne Universities. Features of the local area • Multicultural community, active sports and cultural programs • Close to public transport, large shopping center and Monash University • Close to tourism areas: The Dandenongs, Phillip Island and the Gippsland Lakes Languages taught Chinese Other languages available through alternative provision Special programs • Experienced international teachers • Access to a T40 High Achievers mentoring program • Access to senior programs at local university • Access to a specialist Sports Academy program Intensive English Language classes Provided at English Language Centre located within 10kms of school Student support services and programs • Specialist international teachers • Full time Student Welfare officer • Part-time psychologist and access to counselling • Careers resource centre • Peer support program • Embedded literacy and Numeracy program Extracurricular activities • International student camp and tour program: China and India • World Challenge Asia • Full sports program • Performing Arts: Music Dance Drama programs Sports offered Athletics, Australian Rules Football, Baseball, Basketball, Cricket, Hockey, Netball, Soccer, Softball, Swimming, Tennis, Table Tennis, Volleyball Awards • International Confucius school group of the year, 2014 • Regional Champions Boys Basketball, Cross Country and Swimming, 2014 • State Champions Year 8 Cricket, 2013 • International Design Award, 2012 • Regional Champions Athletics, 2013 • Best School Award Berwick, Dandenong and City of Casey Art Shows, 2013-14 Reasons to choose our school Small school offering personalised experience Spirit of cooperation and belonging among staff and students Attractive school grounds including full sports fields and environmental science wetlands area Visit our school online at www.alkirasecondarycollege.com.au Address: 15 Nurture Avenue, Cranbourne North VIC 3977 Distance from Melbourne city centre: 40 km (Map Reference: Pg 12-13, K10, No. 15 ) Principal: Ian McKenzie International Student Coordinator: Simone McKenzie Telephone: +61 3 5991 3500 Fax: +61 35991 3599 Email: alkira.sc@edumail.vic.gov.au Web: www.alkirasecondarycollege.com.au Number of students: 1000 Number of international students: 2 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $250
  • 18.
    16 Right SchoolRight Place 2014/2015 – Melbourne A-Z Ashwood Secondary College Located in Melbourne’s leafy eastern suburbs, Ashwood College nurtures academic achievement and personal growth. The school offers a broad and engaging curriculum spanning the academic, technology and creative interests that support individual learning goals. Personal care and attention are Ashwood College hallmarks. The school expects to contain its size so students continue to gain this advantage. International students benefit from a range of programs designed to make living and studying in Australia a success. Features of the local area • Train, tram and bus public transport offer easy access to multicultural Melbourne • Natural local features include parks and reserves, wetland and golf courses • Close to Chadstone Shopping Centre, the Southern Hemisphere’s largest mall Languages taught French Chinese Special programs • Experienced Chinese/Korean program assistants and multicultural aides • Accelerated English, mathematics, science and language studies available • International student leadership program • 1:1 learning program (iPads and NetBooks) • Expansive visual and performing arts program • Years 7-10 flexible curriculum tailored to individual student abilities and interests Intensive English Language classes Provided at English Language Centre located within 5 kilometres of school Student support services and programs • International student tutors, homework groups and in-class multicultural teacher’s aide • Careers resource centre, student common room and dedicated Victorian Certificate of Education study centre • Complete wellbeing support program with student welfare coordinator, adolescent health nurse and part-time psychologist • Peer support program Extracurricular activities • International student camp and tour • International student sports participation • International student social events – Barbeques, dine-out and birthday parties • Special interest clubs and interschool competitions such as chess, computer club, science, mathematics, debating, and sports • Choir, musical ensembles, drama productions Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Hockey, Netball, Soccer, Softball, Squash, Surfing, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I had a great experience here at Ashwood Secondary College. It’s like my second home. The students and teachers are so friendly. They offered me lots of help both academically and on a personal level so that I can become what I am now.’ – Xinhang Xu (China). Scholarship in engineering at Monash University Awards • Kwong Lee Dow Scholarships, 2013-14 • Gateway LLen VCAL Achievement, 2013 • Royal Australia Chemical Institute Competition Gold and Silver Medals, 2013 • RACV Grand Final Championship, 2013-14 • Long Tan Scholarships, 2013 • State Championship Representatives in Track, Field and Cross Country, 2013-14 Reasons to choose our school All international students enjoy outstanding levels of personal care and attention School curriculum allows for accelerated study in English, mathematics, science and language Facilities include purpose designed state-of-the-art science centre Visit our school online at www.ashwood.vic.edu.au Address: Vannam Drive Ashwood, VIC 3147 Distance from Melbourne city centre: 10km (Map Reference: Pg 12-13, H5, No. 16 ) Principal: Kerrie Croft International Student Coordinator: Kim Elliston Telephone: +61 3 9807 1333 Fax: +61 3 9888 1441 Email: ashwood.sc@edumail.vic.gov.au Web: www.ashwood.vic.edu.au Number of students: 500 Number of international students: 50 Dress: Uniform Cost of uniform (approx.): $350 Cost of homestay per week: $250 – $280
  • 19.
    17For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Auburn High School Auburn High school is a new 7-12 school located on the site of the former Hawthorn Secondary College. The school offers a strong academic programme for all students with a particular focus on science, technology, engineering and mathematics for year 10 -12. The outstanding facilities include well-equipped classrooms, a new science discovery centre, an English language centre, a VCE study centre, a lecture theatre, art and design centre and extensive playing fields. Features of the local area • Prestigious inner Melbourne location only a short distance from Melbourne CBD. • Well serviced by train-line, tram and bus routes • Well established native gardens surrounding the school. Languages taught Chinese French Other languages at VCE level organized at Victorian School of Languages as required Special programs • Onsite English Language Centre • Extensive careers counselling for international students • University enhancement programme • Year 12 study camp • International student leadership positions Intensive English Language classes Provided at our onsite English Language Centre for years 10 - 11 Student support services and programs • Ongoing English support from Language Centre staff • After school mathematics and science tuition from bilingual tertiary students • Targeted ongoing English language and academic support for VCE students and Homework Club for junior students • Ongoing welfare support and access to Chinese speaking counsellors as required • Career resource centre • Part time psychologist Extracurricular activities • A large choice of student clubs including chess, Chinese craft and basketball • Student leadership opportunities • Excursion programme linked to curriculum • Study and adventure camps Sports offered Athletics, Swimming, Cross Country, Australian Rules Football, Basketball, Hockey, Soccer, Table Tennis, Volleyball, Netball Success story My experience studying at Hawthorn Secondary College (now Auburn High School) was warm and unforgettable. I had so much help from teachers to do well. Some teachers were like parents to me. The school is so beautiful and I made many friends. I will remember this time always. – Michelle Nguyen – Monash University Engineering Scholarship winner 2012 Awards • Three Monash University Engineering scholarships, 2012 • Swinburne University of Technology, Vice Chancellor’s Student Scholarship, 2010 • TOP VCE student in Persian, 2010 Reasons to choose our school Outstanding facilities refurbished and updated over the last 5 years in beautiful garden surroundings A small to medium sized school offering an academic programme, personalised learning and tailored support to international students A large variety of extra-curricular clubs and activities Visit our school online at www.auburnhs.vic.edu.au Address: Burgess Street Hawthorn East, VIC 3123 Distance from Melbourne city centre: 10 km (Map Reference: Pg 12-13, G5, No. 17 ) Principal: Maria Karvouni International Student Coordinator: Bernadette Caruana Telephone: +61 3 9804 6344 Fax: +61 3 9822 6837 Email: auburn.hs@edumail.vic.gov.au Web: www.auburnhs.vic.edu.au Number of students: 450 Number of international students: 65 Dress: Uniform Cost of uniform (approx.): $300 – $450 Cost of homestay per week: $270 – $300
  • 20.
    18 Right SchoolRight Place 2014/2015 – Melbourne A-Z Balwyn High School Established in 1954, today Balwyn High School is a renowned multicultural co- educational school. Located in Melbourne’s eastern suburbs, the school supports a large population of local Year 7-12 students. International students are selected on merit. Skilled and experienced staff deliver a diverse and challenging curriculum that supports consistently high Victorian Certificate of Education results. The school community encourages international students to engage with a range of activities including sport, music, student leadership and public speaking. w Features of the local area • Regular tram and bus public transport services • Surrounded by leafy parklands • Easy access to popular shopping centres Languages taught French Classical Greek Modern Greek Chinese as a first and second language Chinese as a second language advanced Special programs • Accelerated learning Program for high performing students • Exemplary music program • Learning enrichment activities • Chinese club where international students tutor Australian students in Chinese • Student leadership programs • Year 9 Xplore learning program Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Full-time International Program Coordinator • Large, air-conditioned international student centre with recreational and cooking facilities • Cross-age tutoring program • Full-time social welfare worker Extracurricular activities • Co-curricular programs such as debating, chess club, drama, sports • International buddy system • Mid-autumn festival celebration Sports offered Aerobics, Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Cycling/Mountain Biking, Golf, Gymnastics, Hockey, Netball, Rowing, Soccer, Softball, Squash, Surfing, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I was awarded bachelor with honours and masters at the University of Melbourne. I am now involved in a key project in an Australian organisation. Balwyn High School’s constant supports were impressive. I was very honoured to be selected to Balwyn High School, which has made my dreams come true.’ – Nick Yu – China Awards • ICAS Maths Competition Top Winner of Year 12, 2014 • Monash University Scholarships - Four awarded in 2013 • Australian National University Full Scholarship, 2013 • Victorian International Student of the Year & Academic Excellence Awards, 2013 • Monash University Scholarships - Five awarded in 2014 • Monash University Year 11 EAL Excellence Award, 2013 Reasons to choose our school Graduating students consistently achieve outstanding university entrance scores Effective international student administration and school vision for academic success Homestay student accommodation includes heated lunch provided daily Visit our school online at www.balwynhs.vic.edu.au Address: Buchanan Avenue Balwyn North, VIC 3104 Distance from Melbourne city centre: 8 km (Map Reference: Pg 12-13, G4, No. 18 ) Principal: Deborah Harman International Student Coordinator: Grace Yin Telephone: +61 3 9819 7911 Fax: +61 3 9819 7395 Email: balwynhs@balwynhs.vic.edu.au Web: www.balwynhs.vic.edu.au Number of students: 2000 Number of international students: 80 Dress: Uniform Cost of uniform (approx.): $400 – $500 Cost of homestay per week: $290 – $320
  • 21.
    19For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Bayside P-12 College Located only 8km from Melbourne’s central business district Bayside P-12 College offers excellence in teaching and state of the art learning facilities. The college provides students with an outstanding opportunity to gain global perspective across its three superbly located multi-cultural campuses. The Victorian Certificate of Education academic stream is complemented by a comprehensive range of vocational pathways and support programs to assist students in achieving their academic dreams. Features of the local area • Train and bus public transport offer quick, easy access to multicultural Melbourne • Attractive grounds close to native flora and fauna, Williamstown and Altona Beaches • New state of the art buildings close to local and CBD shopping Languages taught Japanese Italian Special programs • Academic acceleration program • Student Representative Council • Innovative tennis program (incorporating both curriculum and tennis component) • Advanced photography • Young Ambassadors for Industry Program in partnership with Mobil Oil and Transfield Intensive English Language classes Provided at English Language Centre located within 5 kilometres of school Student support services and programs • Careers resource centre with two pathways counsellors • English as an Additional Language homework club • Peer support program • Experienced International Student Coordinator • Three welfare coordinators • Part-time psychologist Extracurricular activities • College theatre productions and performances • International Newsletter providing student opportunities for reporting and editing • Annual visits with our Japanese sister school • Public speaking and debating club Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Bike Education, Fitness, Golf, Gymnastics, Hockey, Lacrosse, Minor Games, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘My entire experience in Australia has been spectacular. Bayside has just been icing on the cake. I have loved my time at Bayside and I can’t see myself being anywhere else. Everyone in Australia, especially at Bayside, has been so friendly.’ – Zane Shirley, Currently studying at Trinity College, Dublin Awards • VCAA Plain English Speaking Award for Public Speaking - Regional Winner, 2014 • Melbourne University - Kwong Lee Dow Scholarship - Two awarded, 2014 • State Intermediate Girls Tennis Silver Medalist, 2014 • Hobsons Bay City Council Inspirational Young Persons Award, 2014 Reasons to choose our school Modern learning facilities with an emphasis on science, technology and the arts Welcoming and supportive learning environment with strong links to local universities 100% of international students received university offers over the past two years Visit our school online at www.bayside.vic.edu.au Address: Kororoit Creek Road Williamstown, VIC 3016 Distance from Melbourne city centre: 8 km (Map Reference: Pg 12-13, D5, No. 19 ) Principal: Andrew Harnett International Student Coordinator: Tracy James Telephone: +61 3 9393 5800 Fax: +61 3 9393 5892 Email: international@bayside.vic.edu.au Web: www.bayside.vic.edu.au Number of students: 1160 Number of international students: 17 Dress: Uniform Cost of uniform (approx.): Firstbasicfree Cost of homestay per week: $230-$240
  • 22.
    20 Right SchoolRight Place 2014/2015 – Melbourne A-Z Bentleigh Secondary College Bentleigh Secondary College is a Year 7 – 12 medium-sized college, located in Melbourne about 14 Km from the city. The college is close to bus stops, shopping centres, swimming pools and other facilities. Dedicated and highly motivated staff provide strong support and leadership for all students. Students benefit from ongoing career guidance and constant feedback and strategies to improve their academic performance. Features of the local area • Wetlands, Urban Forest, Harvest Garden and Japanese Garden • Close to shopping centre, banks, post offices, medical centre and hospital • Well-serviced by train-lines and bus routes Languages taught Japanese Indonesian Special programs • Performing Arts, Instrumental Music Program, Sports and Camps. • Student Leadership • Sustainability Intensive English Language classes Provided at English Language School located within 13 km or 10 mins by car Student support services and programs • Specialist international student tutors • Careers resource centre • Peer support program • Wellbeing support program • Year 10 – 12 English support program • Experienced international Chinese program assistants Extracurricular activities • Central Australia Trip • Weekend Snow trip • Mooncake Festival at Dandenong • Open Uni-day Sports offered Athletics, Badminton, Baseball, Basketball, Cricket, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I go to University of Melbourne doing Bachelor of Science and will major in Electrical and Electronic Engineering. I wouldn’t have such an amazing University life without the experience at Bentleigh Secondary College. I really appreciate everything I had during the past 2 years and I will remember the College motto ‘being the best you can be’ forever.’ – William Gao (China). Dux of 2013 at Bentleigh Secondary College Awards • Secondary Principal of the Year, Victorian Education Excellence Awards, 2014 • Finalist, Outstanding Curriculum Innovative for Mindfulness Meditation, 2014 • United Nations of Australia Environmental School Award, 2014 • Golf Victoria Junior Champion of Champions held in Spring Valley 2013 • Finalist, Victorian Education Excellence Awards, 2014 • Pierre de Coubertin Award for excellence in sport 2013 Reasons to choose our school Spirit of cooperation and belonging among staff and students An award winning school Caring International Student Coordinators Visit our school online at www.bentleighsc.vic.edu.au Address: Vivien Street Bentleigh East, VIC 3165 Distance from Melbourne city centre: 14 km (Map Reference: Pg 12-13, G6, No. 20 ) Principal: Karen Wade International Student Coordinator: Chen Lee Telephone: +61 3 9579 1044 Fax: +61 3 9579 2720 Email: bentleigh.sc@edumail.vic.gov.au Web: www.bentleighsc.vic.edu.au Number of students: 896 Number of international students: 25 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $270
  • 23.
    21For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Blackburn High School Blackburn High School is a culturally aware learning community. Students are nurtured to academic success in an inclusive environment where the broad curriculum offers all students the possibility of high level success. Experienced teachers carefully trace student progress, always remaining sensitive to individual learning needs. Regular family contact offers international students further personal and academic support. Blackburn High School students are encouraged to participate in activities that help them become well-rounded, global citizens. Features of the local area • Well-serviced by train lines and bus routes • Nearby shopping centre, parks, sporting facilities and community hubs • 20 minutes to Melbourne by public transport Languages taught German French Special programs • Experienced Chinese and Korean assistants • On-site Victorian School of Languages • Additional English classes for students in Years 11-12 • Intensive music program including solo, ensemble and symphony orchestra • Individual instruction for piano, strings, wind and percussion instruments Intensive English Language classes Provided at English Language Centre located within 3 kilometres of school Student support services and programs • Multicultural education aides • Careers resource centre • House program with student support mentor groups • Student welfare coordinator • Part-time psychologist Extracurricular activities • Lunchtime mathematics club • Nationally recognised music program • Inclusive sports program • Student leadership program Sports offered A wide variety of sports are available for students to choose from as well as many inter-school sporting competitions. Success story ‘Blackburn gave me every opportunity to grow in experience and confidence. Surrounded by totally supportive teachers and students, I immersed myself in school life and I was voted school captain. These experiences have set me up for university and life.’ – Nhat Nguyen – graduated from the University of Melbourne (Commerce). He is currently an Australian resident and has successfully started his career as an accountant. Awards • World Education Program Scholarship – only successful Victorian student, 2011 • Pierre de Coubertin Award – academic and sporting excellence, 2011 • Nhat Nguyen Community Service Award – Richard Do, 2013 • VCE Top Acts – brass quintet, 2010 Top Class Concert – student composer, 2010 • Australian and New Zealand Student Exchange Scholarship, 2011 • Jamie Oliver Home Cooking Skills Secondary Schools Program – selected school, 2011 Reasons to choose our school Caring staff provide student-centred academic and personal mentoring An award-winning musical school Wide selection of new education facilities including Music Centre, Gymnasium and Auditorium, Food Technology Centre, Global Learning Centre and multi-space educational centres Visit our school online at www.blackburnhs.vic.edu.au Address: 60 Springfield Road Blackburn, VIC 3130 Distance from Melbourne city centre: 10 km (Map Reference: Pg 12-13, I4, No. 21 ) Principal: Dr Sandra Woodman International Student Coordinator: Isabel Zhou Telephone: +61 3 8804 6464 Fax: +61 3 8804 6499 Email: blackburn.hs@edumail.vic.gov.au Web: www.blackburnhs.vic.edu.au Number of students: 870 Number of international students: 66 Dress: Uniform Cost of uniform (approx.): $700 Cost of homestay per week: $260 – $280
  • 24.
    22 Right SchoolRight Place 2014/2015 – Melbourne A-Z Box Hill High School Established in 1930, Box Hill High School enjoys an excellent location and long, proud education history. The school is renowned for its high academic standards, achieved through a blend of welcoming atmosphere, firm discipline and active student encouragement. Every Box Hill High School student is supported in striving for their full learning potential. Our International Student Coordinator is fluent in several Asian languages and ensures international students are well supported in both study and life. Features of the local area • Well-serviced by train lines and bus routes • Exciting and culturally diverse location • Close to major shopping and business centre Languages taught Chinese German Special programs • Accelerated learning Program for high performing students • Experienced international Chinese coordinator • Science and Technology Education Resource Network (SATERN) • Model solar car design program • School theatre production and performance Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Careers resource centre • Part-time multicultural aide • Year level coordinators • Peer support program • Student counsellor Extracurricular activities • VCE student camp • International students school trip • Basketball matches Sports offered Athletics, Basketball, Netball, Soccer, Swimming Sports Success story Box Hill High School graduate, Lydia Xiao (China), is now working as an accountant while studying for her Certified Practicing Accountant qualification. She graduated from the University of Melbourne with a Bachelor of Commerce, proceeded to Monash University and graduated with a Master of Applied Finance. Awards • Premier’s VCE Award – Health and Human Development, 2010 • German Film Competition, 2010 • Premier’s VCE Award – Chinese First Language, 2010 • Science School of the Year, 2010 • Monash University Dean’s Award, 2010 Reasons to choose our school A community with strong spirit of cooperation and belonging among both staff and students The large, multicultural school campus is conveniently located to all facilities On-site Intensive English School for English language development Visit our school online at www.boxhillhs.vic.edu.au Address: 1180 Whitehorse Road Box Hill, VIC 3128 Distance from Melbourne city centre: 15 km (Map Reference: Pg 12-13, H4, No. 22 ) Principal: Kate Mitchell International Student Coordinator: Darren Wen Yap Telephone: +61 3 9877 1177 Fax: +61 3 9894 1347 Email: box.hill.hs@edumail.vic.gov.au Web: www.boxhillhs.vic.edu.au Number of students: 1000 Number of international students: 45 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $270-$290
  • 25.
    23For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Box Hill Senior Secondary College Box Hill Senior Secondary College students are encouraged to pursue their passions and achieve their best. Over 700 Year 10, 11 and 12 students are enrolled in the vibrant senior high school community. Broad curriculum options and dedicated staff support students to achieve their education goals. The school enrols a small number of international students that a dedicated team helps settle quickly into study. Homestay families are carefully selected with students’ interests in mind. Features of the local area • Major transport hub with easy access to trains, trams and buses • Positioned in a quiet, leafy neighbourhoods surrounded by parks and gardens • Box Hill is Melbourne’s multicultural heart, with an abundance of shops and cafes Special programs • Elite sports development programs with United States college system pathways • Dedicated business, science, technology and creative arts programs • Comprehensive mentoring to monitor student progress and cater for individual needs • Contemporary music, fashion and dance programs • Laptop computer program Intensive English Language classes Provided at English Language Centre located within 5 kilometres of school Student support services and programs • Small English as an Additional Language (EAL) classes • Language Support Program • Chinese and Japanese-speaking program assistants • Careers resource centre • Dedicated International Student Coordinator • Student mentoring program • Social worker and wellbeing coordinator • Buddy system Extracurricular activities • India trip • USA basketball tour • Array of camps and excursions • Student events including formal, celebration dinners and debutante ball Sports offered Students may enrol to receive intensive training in the three college sport specialties: Tennis, Basketball and Australian Rules Football. Programs include weight and fitness training with access to physiotherapist, Outdoor Education camps and other sports offered include surfing, bushwalking, mountain bike riding, snowboarding and canoeing Success story ‘I have found the staff and students here very friendly and helpful. I love the adult learning environment and being able to study dance as part of my schooling. I study English, Maths, Psychology, Studio Arts (Fashion) and belong to the cheerleading team.’ – Yun (Serena) Lu – Taiwan; studying VCE Dance, 2012 Awards • Top Arts – Fashion Design and Art award, 2011 • Australian Schools Basketball – champions, 2010 • The Australian Institute for Performing Arts – Singer Songwriter Project Award, 2011 • Australian Open and Davis Cup – junior tennis competition representatives • University of Melbourne Young Scholars Program, 2009 Reasons to choose our school A small number of international students receive genuinely personal attention Broad range of subjects choices and learning programs to select from Outstanding modern learning facilities and convenient location Visit our school online at www.bhssc.vic.edu.au Address: Dunloe Avenue Mont Albert North, VIC 3129 Distance from Melbourne city centre: 14 km (Map Reference: Pg 12-13, H4, No. 23 ) Principal: Steve Cook International Student Coordinator: Belverlyn Jian Telephone: +61 3 9890 0571 Fax: +61 3 9899 4093 Email: box.hill.senior.sc@edumail.vic.gov.au Web: www.bhssc.vic.edu.au Number of students: 720 (Years 10-12) Number of international students: 25 Dress: Non-uniform Cost of homestay per week: $260 – $280
  • 26.
    24 Right SchoolRight Place 2014/2015 – Melbourne A-Z Braybrook College Multicultural Braybrook College is a school focused on academic achievement and committed to traditional values. Students in Years 7-12 flourish within the safe, caring environment that places special emphasis on individual help and support. Facilities include extensive grounds with attractive gardens, modern learning centres and excellent sporting facilities. The co-educational college serves areas west of Melbourne including Footscray, Braybrook and Sunshine. Braybrook College is easily accessed via regular public transport services. Features of the local area • Serviced by regular train and bus transport • Nearby local Buddhist temple • Close to several modern shopping centres Languages taught Vietnamese Special programs • Established and highly regarded English as an Additional Language program • Advanced Years 7-10 classes for academically talented students • Accelerated programs • Co-curriculum program, including debating, music, camps, excursions and sport • Student leadership programs • 1:1 laptop program (all year levels) Intensive English Language classes Provided at English Language Centre located within 2 kilometres of school Student support services and programs • Three specialist International Student staff (including an International Student Welfare Coordinator) • Three Vietnamese Multicultural Teacher Aides • After school Homework Clubs for all year levels • Home Group/Pastoral Care Program • International Student Tutoring Program • Careers Resource Centre Extracurricular activities • Engaging camps and outdoor activities • Debating club and events • Instrumental music and band program • Lunchtime learning activities • Year 10 work experience program • Peer support program Sports offered Athletics, Badminton, Baseball, Basketball, Cricket, Football, Netball, Soccer, Softball, Surfing, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I’m in Year 11 and this is my second year at the college. I’ve had a great time here. The teachers are very friendly and enthusiastically help me in all my subjects and to improve my English skills. I’m aiming to get a high university entrance score and undertake a bio-engineering course.’ – Thao Dinh – Vietnam Awards • Premier’s VCE Awards in several subjects, 2013-14 • Mary Jane Lewis Scholarship, 2014 • Pierre De Courbetin Award, 2013-14 • Skyline VCE Bursary Scholarships, 2013-14 • Dafydd Lewis Trust Scholarship, 2013-14 • Braybrook College Year 11 Scholarship, 2014 Reasons to choose our school Large modern campus and dynamic multicultural learning community Recently completed purpose built science facilities Spirit of cooperation and belonging among staff and students Visit our school online at www.braybrooksc.vic.edu.au Address: 352 Ballarat Road Braybrook, VIC 3019 Distance from Melbourne city centre: 10 km (Map Reference: Pg 12-13, D3, No. 24 ) Principal: Kelly Panousieris International Student Coordinator: Arlene Bailey Telephone: +61 3 9312 2900 Fax: +61 3 9311 7668 Email: braybrook.sc@edumail.vic.gov.au Web: www.braybrooksc.vic.edu.au Number of students: 1179 Number of international students: 31 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $220 – $250
  • 27.
    25For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Brentwood Secondary College Brentwood Secondary College is a high-performing academic school. The college reflects its vibrant multicultural community in Melbourne’s east through a culture that values and respects student diversity. The safe and caring learning environment caters for students in Years 7-12 with a uniquely challenging curriculum including over 30 Victorian Certificate of Education subjects and an intensive English as an Additional Language program. Brentwood Secondary College gives every student the opportunity to pursue excellence and achieve success. Features of the local area • Easy public transport access by train and bus • Multicultural neighbourhood and local amenities • Close to shopping centres, entertainment and recreational venues Languages taught German Japanese Special programs • Monash University extension program • International student extended study program • Accelerated learning and education enrichment at all year levels • Participation in national English, Mathematics and Science competitions • Highly specialised Year 10 electives (eg. Aviation) • Year 9 extension and research projects, including the Duke of Edinburgh’s Award Intensive English Language classes Provided at several English Language Centres located within 10 kilometres of school Student support services and programs • Chinese, Japanese, German and Vietnamese speaking teachers/education support staff • Personalised course counselling program • Weekly international student tutorials • Careers resource centre • Student wellbeing centre with social workers, psychologist and chaplain • Peer support program Extracurricular activities • Year level camps across Australia • Sister school exchanges to German, Japan • Inter-school sport and debating programs • Instrumental music program, theatre productions and dance competitions • Student representative council, Green Team school environment/sustainability projects • G’day USA and World Challenge expeditions Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Golf, Hockey, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘The positive atmosphere at Brentwood made me more outgoing and confident. All the teachers are friendly and passionate. Studying at Brentwood is an unforgettable experience and one for which I will always be grateful.’ – Yang Yang Xie. Recipient of BSC’s International Student of the Year Award 2012; studying Civil Engineering at RMIT Awards • Monash University – Engineering Scholarships • Top Design Award • University of Melbourne Young Scholars Program • Top Arts Award • Pierre de Coubertin Awards Reasons to choose our school Rigorous academic programs built on student preferences and differentiated instruction Expert pastoral care program and staff to supports student wellbeing and engagement Advanced learning facilities including computers, multimedia labs, science labs and gym Visit our school online at www.brentwood.vic.edu.au Address: 65-71 Watsons Road Glen Waverley, VIC 3150 Distance from Melbourne city centre: 25 km (Map Reference: Pg 12-13, i6, No. 25 ) Principal: Vicki Forbes International Student Coordinator: Melissa Antoniuk Telephone: +61 3 8545 0300 Fax: +61 3 8545 0355 Email: brentwood.sc@edumail.vic.gov.au Web: www.brentwood.vic.edu.au Number of students: 1445 Number of international students: 35 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $260
  • 28.
    26 Right SchoolRight Place 2014/2015 – Melbourne A-Z Brighton Secondary College Located in a family-oriented suburb close to the beach, Brighton Secondary College has a tradition of excellence. The school offers students an outstanding education, delivered through its structured, supportive and caring learning environment. The curriculum features academic studies, creative and performing arts, technology subjects and sporting program. At senior levels the school provides a wide range of Victorian Certificate of Education and vocational studies, as well as University pathway connections. Features of the local area • Close to the beach, shopping centers, eateries, malls, and public transport • Wide choice of local sporting clubs, including sailing, golf, football, and tennis Languages taught Japanese French Chinese as a first language Special programs • Experienced international Chinese program assistants • University of Melbourne and Monash University study enhancement access • Education enrichment, including Accelerated learning Program for high performing students • Annual school choral competition • Instrumental music program • Local and state level sporting program Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Specialist international student tutoring • Broad ranging English as an Additional Language student support • Careers resource centre and counsellors • Student welfare team • International student committee providing peer support Extracurricular activities • Local and international camps • Array of student leadership programs • Music program and performance, including solo, bands and vocal • Chess and science clubs Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Hockey, Netball, Rugby, Soccer, Softball, Squash, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I appreciate the kindness and hard work of all of my teachers and say “thanks” to all the local students who became my friends.’ – Jing Ying Tong – China; studying accounting at the University of Melbourne Awards • National Gold Medalist in Taekwondo, 2013 • State representatives in tennis and gymnastics, 2014 • Year 8 Girls Junior Hockey and Softball State Champion teams, 2013 • Victorian International School Student Awards – Commendation Award, 2013 Reasons to choose our school Supportive College community, teachers, and caring Homestay family environment New Science, Arts and Technology facilities School renowned for academic excellence and appealing curriculum choices Visit our school online at www.brightonsc.vic.gov.au Address: 120 Marriage Road East Brighton, VIC 3187 Distance from Melbourne city centre: 12 km (Map Reference: Pg 12-13, F6, No. 26 ) Principal: Julie Podbury International Student Coordinator: Gary Agg Telephone: +61 3 9592 7488 Fax: +61 3 9592 5724 Email: brighton.sc@edumail.vic.gov.au Web: www.brightonsc.vic.edu.au Number of students: 1200 Number of international students: 100 Dress: Uniform Cost of uniform (approx.): $350 Cost of homestay per week: $290
  • 29.
    27For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Brunswick Secondary College Brunswick Secondary College has a reputation for successfully supporting students in their endeavor for academic excellence. There are over 50 nationalities at the school and an on-site English Language Centre. Brunswick Secondary delivers a wide selection of academic and specialist courses, preparing students to enter tertiary education confident and ready for academic success. The school has highly skilled staff, trained in English as an Additional Language catering for the needs of International Students. Features of the local area • Close to regular train, bus and tram routes • Near Melbourne CBD, the city’s cultural centre • Close to established learning institutions, University of Melbourne, State Library of Victoria Languages taught Chinese Italian Special programs • VCE study skills program including after- hours Maths and EAL support groups • Extra academic support at International Student Homework Club • Accelerated Learning Program for high performing students • Leadership programs and opportunities for International Students • On-site Victorian School of Languages • Chinese specialisation Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Fortnightly support sessions with International Students Coordinator • Individual help with subject selection and careers counseling • Peer support program for all new students includes induction and mentoring • International student school captain • Student wellbeing support and counseling Extracurricular activities • International student excursions and guest speakers • Study tours to Italy and China • Varied range of competitions, extension and enrichment opportunities • Vibrant performing arts program including annual whole school production • Extensive co-curricular program with over 50 clubs including chess, debating and anime • Extensive music performance opportunities Sports offered Athletics, Australian Rules Football, Basketball, Hockey, Soccer, Table Tennis, Volleyball Success story ‘School life is pleasing because of patient teachers and friendly students from different countries. We have useful English classes at the Language Centre and Brunswick Secondary. There are many interesting subjects, enthusiastic teachers and students at Brunswick Secondary College. I love my homestay - they make me feel confident and relaxed.’ – Shukun Yang – Year 10 Awards • Winner, Latrobe University High School Legal Studies Mooting Comp’n, 2013/14 • High Distinction ICAS English Competition, 2013 • Victorian International School Student Global Citizenship Award, 2014 • Hon. Mention, National History Challenge, 2013 • Winners, Year 7-9 Boys Victorian Table Tennis Championship, 2012-13 • Kwong Lee Dow Scholarships, 2013 Reasons to choose our school Dedicated teachers with expertise in the teaching of English as an Additional Language at all levels Graduating students consistently achieve excellent Victorian Certificate of Education results Motivating and aspiring student culture Visit our school online at www.brunswick.vic.edu.au Address: 47 Dawson Street, Brunswick, VIC 3056 Distance from Melbourne city centre: 4 km (Map Reference: Pg 12-13, E3, No. 27 ) Principal: Vivienne Tellefson International Student Coordinator: Anne Siciliano Telephone: +61 3 9387 6133 Fax: +61 3 9387 0061 Email: brunswick.sc@edumail.vic.gov.au Web: www.brunswick.vic.edu.au Number of students: 950 Number of international students: 21 Dress: Uniform Cost of uniform (approx.): $370 Cost of homestay per week: $285
  • 30.
    28 Right SchoolRight Place 2014/2015 – Melbourne A-Z Buckley Park College The learning foundations at Buckley Park College are its broad curriculum and safe, caring environment. The school is committed to nurturing both academic and personal development. Experienced teachers inspire and motivate students to achieve excellent Victorian Certificate of Education results. Individual progress is carefully observed as students are prepared to enter the world of university, training or employment. International students are welcomed into every aspect of school life, forming lasting relationships with teachers and peers. Features of the local area • Easy access via public transport by train, tram and bus • Multicultural neighbourhood offering a variety of sporting, cultural and community facilities • Close to both Melbourne city centre and Melbourne International Airport Languages taught Japanese German Special programs • Education enhancement programs for Victorian Certificate of Education in mathematics, sciences, English and history • Local university student mentoring • Year 11 study camp Intensive English Language classes Provided at English Language Centre, located within 2 kilometres of school Student support services and programs • Experienced English as an Additional Language support staff • Careers resource centre • Peer support program • Dedicated year level coordinators and form teachers • Welfare support including psychologist, chaplain and social worker Extracurricular activities • Germany and Japan overseas tours • Mathematics and science competitions • Instrumental music and band program • Annual school theatre production • Making a Difference Program for community action Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Cricket, Cross Country, Golf, Hockey, Netball, Soccer, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I was at Buckley Park College for two years for VCE. This has been my “greatest” time. The school has many services to support students. I had many chances to make new friends and the staff and students are a great help.’ – Phuoc Nguyen – Vietnam; studying accounting at RMIT University Awards • Rio Tinto Big Science Competition – student national distinction, 2013 • Students selected to participate in study tour to Japan, 2014 • Premier’s VCE Award – Further Mathematics ICT, 2013 • Pierre de Coubertin Award, 2014 • National Schools Constitution Convention – Victorian student delegate, 2014 • Former student awarded RMIT University Prize for Spatial Information Systems Reasons to choose our school Positive school culture embracing and cooperation teamwork between staff and students A commitment to academic learning and focus on preparing students for university study Attractive school grounds where student-centred learning occurs in a safe, nurturing environment Visit our school online at www.buckleyparkco.vic.edu.au Address: Cooper Street Essendon, VIC 3040 Distance from Melbourne city centre: 14 km (Map Reference: Pg 12-13, D3, No. 28 ) Principal: Nathan Chisholm International Student Coordinator: Justin Garrett Telephone: +61 3 9331 9999 Fax: +61 3 9331 9977 Email: buckley.park.co@edumail.vic.gov.au Web: www.buckleyparkco.vic.edu.au Number of students: 950 Number of international students: 15 Dress: Uniform Cost of uniform (approx.): $350 Cost of homestay per week: $270 – $280
  • 31.
    29For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Camberwell High School Camberwell High School was established in 1941 and is one of Melbourne’s oldest and most highly regarded schools. Having operated a successful international student program since 1996, our staff are familiar with the unique needs of these students. Indeed, all teachers strive to meet individual student needs, across the broad subject range and challenging curriculum. An on-site English Language Centre offers skilled instructors who help international students meet English education requirements. Features of the local area • Convenient to train, tram and bus routes for short trips to Melbourne city and other centres • Appealing location and safe, secure suburb with sports grounds, cycling tracks and parks • Near to Camberwell shopping and business hub with library, medical and banking facilities Languages taught Chinese (Mandarin) as a first and second language French Special programs • Acceleration and extension programs, including participation in mathematics and science competitions • Opportunity to take part in overseas trips • Extensive student leadership program including international student captains Intensive English Language classes Provided from July to December at on-site English Language Centre Student support services and programs • Careers guidance provided by experienced teachers and two careers counsellors • Dedicated International Student Coordinator and Homestay Coordinator • Welfare support provided by student welfare coordinator; psychologist referral if needed • After-school study sessions include guest speakers and specialist subject teachers • Excursions and social activities Extracurricular activities • Year level camps, study tours, overseas trips • Music instruction and performance groups • Drama festivals and biennial production • Sporting activities and competitions • Regular activities including a student organised annual Asian Moon Festival Sports offered Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Golf, Hockey, Netball, Rowing, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I loved school so much that I wanted to go even during school holidays. Everything was different – the education system was better, the people nice and the school facilities were better. I was amazed when I first stepped into the school.’ – Crystal Seah – Malaysia; Year 12 Dux, 2010; studying medicine at Monash University (achieved distinctions and high distinctions in 2010 state and national maths/ science competitions) Awards • Melbourne Schools Music Festival – gold and silver medals, 2012-13 • Premiers VCE Awards –Classics, 2013 • Melbourne School Band – Saxophone Quartet, 2012-13 and Soloist, 2014 • Distinctions and High-distinctions in state and national maths competitions • State Champions – lawn bowls, netball, hockey, 2013 and baseball, 2014 • 43% of international students achieved an ATAR score over 90%, 2013 Reasons to choose our school High performing academic program and curriculum designed to ready students for university Experienced staff provide the quality teaching and support that ensures student success Comprehensive modern facilities that promote innovative teaching and learning Visit our school online at www.camhigh.vic.edu.au Address: Prospect Hill Road Canterbury, VIC 3126 Distance from Melbourne city centre: 10 km (Map Reference: Pg 12-13, G4, No. 29 ) Principal: Jill Laughlin International Student Coordinator: Isabelle McKenzie - AP A. Beilby and P. Low - ISCs Telephone: +61 3 9836 0555 Fax: +61 3 9836 0194 Email: isc@camhigh.vic.edu.au Web: www.camhigh.vic.edu.au Number of students: 1200 Number of international students: 80 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $290 + $10 internet
  • 32.
    30 Right SchoolRight Place 2014/2015 – Melbourne A-Z Canterbury Girls’ Secondary College Canterbury Girls’ Secondary College is a highly performing academic school for girls. The College provides a quality educational environment, tailored to meet the needs of girls, with a focus on success in a range of academic, creative and sporting endeavours and the development of self-esteem and dignity. Features of the local area • Excellent public transport access that provide links across Melbourne • Close to shopping centers with all amenities • Quiet residential area with nearby parks and recreational facilities Languages taught French Japanese Special programs • Student leadership opportunities • Outstanding and extensive music and sport programs • University enhancement programs • 1:1 netbook program • Only accredited De Bono thinking school in Australia • Extensive student exchange program Intensive English Language classes Provided at English Language Centre located 8kms from the school Student support services and programs • Careers advisor and centre • Full time educational psychologist and welfare support • Peer support program • Big Sister Little Sister support program Extracurricular activities • Clubs including chess, SRC, Sustainability, Community Liaison, Social Service • Student leadership program • Extensive camp and tour program, domestic and international • Variety of local and national competitions in academia, sport and music • Annual drama and/or musical production Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Cricket, Cross Country, Dance, Diving, Golf, Gymnastics, Hockey, Lacrosse, Netball, Rowing, Soccer, Softball, Swimming, Table tennis, Tennis, Volleyball Success story ‘I had six fabulous years at Canterbury Girls’ Secondary College. I had so many amazing opportunities as a House Captain to learn leadership skills and form friendships with girls of all ages. I was taught by passionate and dedicated teachers who helped me endlessly to exceed my goals. I cannot speak highly enough of my time at Canterbury, I loved every second of it..’ – Olivia Cartledge (Class of 2013), Studying a Bachelor of Health Science and Master of Clinical Prosthetics and Orthotics, La Trobe University Awards • Victorian Outstanding Teacher contribution to School Sport, 2013 • Victorian Schools Music Festival winners of Bronze, Silver and Gold Shields, 2010-14 • VCE Top Arts and Top Design Awards, 2011-13 • Pierre de Coubertin Award, 2014 • Student recipients of scholarships, Faculty of Engineering Monash University, 2012-14 • State Finals: 9 Swimming Gold Medals, 3 Athletics Gold Medals. State Champions Senior Hockey Reasons to choose our school High academic achievements Medium sized school allowing for individualised education Student-led House program enabling interaction with all students Visit our school online at www.cgsc.vic.gov.au Address: Mangarra Rd, Canterbury, VIC 3126 Distance from Melbourne city centre: 10 km (Map Reference: Pg 12-13, G4, No. 30 ) Principal: Mary Cannon International Student Coordinator: Helene Hiotis Telephone: +61 3 9830 5099 Fax: +61 3 986 8958 Email: info@cgsc.vic.edu.au Web: www.cgsc.vic.gov.au Number of students: 1100 Number of international students: 0 Dress: Uniform Cost of uniform (approx.): $600 Cost of homestay per week: $300
  • 33.
    31For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Carwatha College P-12 A multicultural community, Carwatha College P-12 welcomes students from over 55 nationalities. Drawing enrolments from a wide geographic area, the school provides a caring, nurturing environment that empowers students to achievement and success. Carwatha College P-12 encourages both primary and secondary students to strive for academic excellence. Three-year Victorian Certificate of Education offered for all Year 10, 11 and 12 students to maximise opportunities for success. Features of the local area • Well-serviced by public transport bus routes • Quiet residential area, close to shopping, bank, sporting and recreational facilities • Just 20 minutes to Melbourne city via Monash Freeway and EastLink Languages taught French Special programs • Three-year VCE program • Mathematics extension program • Extra English and mathematics support • Instrumental music instruction and performance • Music and theatre productions • Annual Victorian Certificate of Education presentation ball and valedictory dinner Intensive English Language classes Provided at English Language Centre located within 3 kilometres of school Student support services and programs • Careers resource centre • Victorian Certificate of Education motivational sessions • Success coaching for Years 9-11 • Individual learning pathways from Years 9-12 • Wellbeing team including adolescent health nurse and psychologist • Peer support program • Leadership programs at all year levels Extracurricular activities • College wide mentoring including primary and secondary school mentors • Clubs including chess club; debating club • Annual theatre production and concerts • Array of sporting facilities and activities, including ski trip and surf safety training • School camps Sports offered Athletics, Australian Rules Football, Baseball, Basketball, Cricket, Cross Country, Hockey, Netball, Soccer, Swimming, Table Tennis, Tennis, Volleyball Success story ‘My Year 12 at Carwatha was the most wonderful and memorable experience in my life. The special care for international students made me feel safe and welcome. One of the best things is the diversity of the students’ background cultures; as a result everyone is friendly.’ – Richard Zhang – China; studying biomedical science advanced with honours at Monash University Awards • Victorian Education Excellence Award – Winner, 2014 • Ongoing success in state and regional chess competitions • Monash University Dean’s Scholar’s Award (international student), 2009 • Second place, regional Battle of the Bands, 2011 Reasons to choose our school Three-year VCE program Limited international student enrolment offers a truly personal education experience Dynamic multicultural campus with Victorian School of Languages on-site Visit our school online at www.carwatha.vic.edu.au Address: 43-81 Browns Road Noble Park North, VIC 3174 Distance from Melbourne city centre: 25 km (Map Reference: Pg <OV>-<OV>, I7, No. ) Principal: Bronwyn Hamilton International Student Coordinator: Lynne Ramsay Telephone: +61 3 9795 5848 Fax: +61 3 9790 1712 Email: carwatha.p12@edumail.vic.gov.au Web: www.carwatha.vic.edu.au Number of students: 900 Number of international students: 7 Dress: Uniform Cost of uniform (approx.): $200 Cost of homestay per week: $200 - $250 31
  • 34.
    32 Right SchoolRight Place 2014/2015 – Melbourne A-Z Charles La Trobe P-12 College One of Melbourne’s newest schools, Charles La Trobe College is set amongst appealing landscaped gardens. Just 12 kilometres from Melbourne city centre, the recently opened college boasts a range of cutting edge education facilities. The school provides a strong academic pathway to tertiary study. Unique student benefits include Quantum Victoria a Specialist Mathematics and Science Centre and a flourishing partnership with La Trobe University. Features of the local area • Well-serviced by train, tram and bus routes • Close to Northland Shopping Centre with banking, entertainment and business facilities • Nearby the Austin Hospital medical precinct Languages taught Auslan Chinese (Mandarin) Special programs • English as an Additional Language Program offered at all year levels • Strong partnership with La Trobe University • Year 7-12 Careers program • P-12 Student Leadership opportunities • Access to Quantum Victoria a Specialist Mathematics and Science Centre • Year 8-9 Specialist Mathematics and Science Program Intensive English Language classes Provided at English Language Centre located within 12 kilometres of school Student support services and programs • Experienced International Student Manager • Chinese and Vietnamese Staff • Wellbeing Team – Student Welfare Coordinator, Nurse, Psychologist, College Chaplain • Careers Resource Centre • Homework club • Free tutoring provided by La Trobe University students Extracurricular activities • Year 10 World at Work Program to assist in development of skills for career planning • High Resolves student leadership program • Sister school study tour program • School camps including VCE study camp • Inter-school sports competitions • House Debating, Art show and Talent quest Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Soccer, Softball, Table Tennis, Volleyball Success story ‘I have enjoyed my time at Charles La Trobe College because of my teachers. It is easy to engage with them as many are from my generation. They have challenged me beyond the text book and study design to give me a deeper knowledge of the subjects I am studying.’ – Ben Dinh – (Vietnam) studying Year 12 (Rosanna Rotary Club Scholarship holder) Awards • University of Melbourne Young Scholars Program- Kwong Lee Dow Award • Australian Defence Award • Rotary Club Scholarships Years 8-11 Reasons to choose our school Multi-cultural school with a welcoming school community that supports students from diverse backgrounds A strong technology focus across all areas of learning New modern classroom spaces and facilities Visit our school online at www.charleslatrobecollege.vic.edu.au Address: 235 Kingsbury Drive Macleod West, VIC 3085 Distance from Melbourne city centre: 12 km (Map Reference: Pg 12-13, G2, No. 32 ) Principal: Jason Bek International Student Coordinator: Bernadette Smith Telephone: +61 3 9223 1400 Fax: +61 3 9223 1499 Email: charles.la.trobe.p12@edumail.vic.gov.au Web: www.charleslatrobecollege.vic.edu.au Number of students: 470 Number of international students: 24 Dress: Uniform Cost of uniform (approx.): $350 Cost of homestay per week: $270
  • 35.
    33For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Cheltenham Secondary College Cheltenham Secondary College is renowned for its caring and supportive learning environment. The school fosters a culture of courtesy, self-discipline and respect amongst its welcoming students and staff. A strong discipline and welfare structure are cornerstones of the college community. The school’s Victorian Certificate of Education program is characterised by course counselling and personal learning pathways. The support of a skilled and experienced teaching team has rewarded many graduating Year 12 students with outstanding results. Features of the local area • Close to regular public transport services • Warm, safe and friendly neighbourhood • Nearby major shopping centres and other lifestyle amenities Languages taught Italian Special programs • International student additional English support for two hours each week • University of Melbourne sponsored mathematics program • Daily after-school tutoring program • All senior students receive personal laptop computers • Instrumental music program • Sports coaching Intensive English Language classes Provided at English Language School on-site or located within 10 kilometres of school Student support services and programs • Careers resource centre • Peer support program • Part-time psychologist Extracurricular activities • International student camp and tour program • Regular international student events and social activities Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Golf, Hockey, Netball, Soccer, Swimming, Table Tennis Success story ‘I met lots of Cheltenham classmates at the University of Melbourne. Teachers at Cheltenham are very friendly to us. Cheltenham has a nice education, nice friendship and most important thing is Cheltenham can provide a very comfortable environment for students to improve English skills.’ – Jack Hou – China; studying architecture at the University of Melbourne Awards • Australian Schools mathematics competitions – top performer • Caltex All-Rounder Award • Australian Schools science competitions – top performer • University of Melbourne Young Scholars program recipients Reasons to choose our school High local student to international student ratio offers genuine integration Graduating students achieve consistently outstanding Victorian Certificate of Education results Tertiary level mathematics program in conjunction with the University of Melbourne Visit our school online at www.cheltsec.vic.edu.au Address: Bernard Street Cheltenham, VIC 3192 Distance from Melbourne city centre: 18 km (Map Reference: Pg 12-13, G7, No. 33 ) Principal: Keith Muller International Student Coordinator: Judy Ponton Telephone: +61 3 9555 5955 Fax: +61 3 9555 8617 Email: cheltenham.sc@edumail.vic.gov.au Web: www.cheltsec.vic.edu.au Number of students: 1100 Number of international students: 35 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $270
  • 36.
    34 Right SchoolRight Place 2014/2015 – Melbourne A-Z Collingwood College Established in 1882, Collingwood College is one of Melbourne’s oldest and finest inner city schools. Located a short distance of the city centre, the college supports P-12 students over two modern campuses. The school fosters a friendly and supportive learning atmosphere that motivates students to accomplish personal learning goals. Every student is passionately encouraged to be their best and strive for academic excellence. Collingwood College students consistently gain 100% completion of Victorian Certificate of Education studies. Features of the local area • Well-serviced by trains, trams and a variety of bus routes • Multicultural environment within a vibrant inner city locale, close to Melbourne CBD • Near to Melbourne, RMIT, La Trobe and Victoria universities as well as other further education facilities Languages taught Chinese (Mandarin) Spanish Vietnamese Special programs • Intensive English as an Additional Language classes • Mathematics and science streams to cater for a variety of student abilities • La Trobe University advocacy program • Vocational Education and Training subjects • After-school homework club Intensive English Language classes Provided at English Language Centre, located within 10 minutes’ walk of school Student support services and programs • Early morning student tutorials • After-school specialist tutors • Career guidance with local organisations • Peer support program • Part-time welfare worker, psychologist and paediatrician • Speech pathologist and youth worker available by appointment Extracurricular activities • International student overnight camp • Clubs (Chess, Drama, Tai Chi, Soccer, Art) • Cultural Festival Celebrations (Spring Festival, Mid-Autumn Festival) • Other Social activities (Welcome Picnic, Birthday Parties, Snow Playing) Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Cycling, Hockey, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story Duc Truong, from Vietnam, received a Premier’s Award for outstanding academic achievement in his Victorian Certificate of Education year at Collingwood College. Duc recently graduated from the University of Melbourne with a double degree. Duc encouraged his cousin Khanh to enrol at Collingwood College when she had several options owing to her excellent academic achievement and her IELTS 6.5. Awards • State Top Design — Design Exhibits in National Gallery of Victoria, 2013 • Kwong Lee Dow Young Scholar, 2014 • Top VCE student in Vietnamese, 2013 • Three Skyline Scholarships, 2014 Reasons to choose our school Emphasis on academic achievement with around 100 VCE units offered on two campuses Friendly, supportive and competitive learning environment with strong links to local universities Modern learning facilities including a state-of-the-art design and technology centre Visit our school online at www.collingwood.vic.edu.au Address: Cnr. Cromwell St & McCutcheon Way Collingwood, VIC 3066 Distance from Melbourne city centre: Principal: Dale Perichon International Student Coordinator: Lucy Wang Telephone: +61 3 9417 6681 Fax: +61 3 9416 1279 Email: collingwood.co@edumail.vic.gov.au Web: www.collingwood.vic.edu.au Number of students: 680 Number of international students: 25 Dress: Non-uniform Cost of homestay per week: $260 – $280 1.6 km (Map Reference: Pg <OV>-<OV>, F4, No. 34 )
  • 37.
    35For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Copperfield College Copperfield College is a culturally diverse school. Its modern facilities span two Years 7-10 campuses and one Years 11-12 campus where students may access all Victorian Certificate of Education studies. The stimulating senior campus environment helps students achieve high results and gain university entry. Accelerated learning opportunities and the extra support of English as an Additional Language classes encourage students to excel. A leadership program gives all students the chance to develop personal leadership skills. Features of the local area • Well serviced by public transport including train-lines and bus routes • Convenient location near to shopping centre Languages taught Japanese Italian Special programs • English as an Additional Language • Year 12 holiday VCE exam preparation • Homework club • Student leadership and environmental leadership programs • Student literacy program • Challenge Day participation • Production and instrumental music • Access to a broad range of Vocational Education and Training in school courses • Camps/activity program for all year levels Intensive English Language classes Provided at English Language Centre located within 5 kilometres of school. Small English as an Additional Language classes provide focused individual tuition at school. Student support services and programs • Victorian Certificate of Education centre • Libraries with extensive resources and internet access on each campus • Mentor/home group program • Careers resource centre and counsellors • Trade training centre • Full-time psychologist at each campus Extracurricular activities • Student leadership opportunities • Debating club • School theatre production and instrumental classes • Sports (full-size gymnasium, artificial turf sports ground, basketball/netball courts) • Environmental program Sports offered Athletics, Australian Rules Football, Soccer, Rugby, Softball, Badminton Success story ‘The best things about my time at Copperfield were the great learning environment, new friends, the teachers and the new experiences for life and study.’ – Yitong Lin – China; Dux of College, 2011; member of the Leadership Team to support other international students and contribute to school programs Awards • School received state leadership Award – Numeracy, 2011 • VCE Curriculum Excellence Award • Kool Skools music and video – winner, 2013 • Waka Kiri performance award, 2013 • Science and Mathematics Education Excellence Award, 2011 Reasons to choose our school Multi-campus and multicultural school fostering a spirit of cooperation and belonging Broad choice of subjects and pathways at VCE level with various acceleration opportunities Extra English tutoring offered above regular English as an Additional Language classes Visit our school online at www.copperfieldcollege.vic.edu.au Address: Goldsmith Avenue Delahey, VIC 3037 (senior campus) Distance from Melbourne city centre: 18 km (Map Reference: Pg<OV>-<OV>,B2,No. 35 ) Principal: Tony Simpson International Student Coordinator: Sue Wettenhall Telephone: +61 3 9307 5555 Fax: +61 3 9307 5444 Email: copperfield.co@edumail.vic.gov.au Web: www.copperfieldcollege.vic.edu.au Number of students: 1850 Number of international students: 25 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $230 – $250
  • 38.
    36 Right SchoolRight Place 2014/2015 – Melbourne A-Z Dandenong High School Established in 1919, Dandenong High School is one of the oldest, largest and most culturally-diverse secondary schools in Victoria. Experienced and caring teachers ensure students develop a deep sense of connectedness to the school and excel in their academic studies. The school has an innovative curriculum based on the principles of inquiry and deep learning and offers a broad range of opportunities for all students. We offer a comprehensive EAL Program and a strong Sports and Performing Arts program. Features of the local area • Serviced by regular train and bus public transport routes • Multicultural community, close to vibrant shopping preincints • Close to Tertiary institutions - Deakin and Monash Universities and Chisholm TAFE Languages taught Japanese French Latin Special programs • EAL including experienced multicultural education assistance • Laptop 1:1 program with Multimedia/IT focus • Instrumental music program with private tuition • Select Entry Accelerated Learning Program • Drama and dance, debating and public speaking • Literacy and numeracy support programs Intensive English Language classes Provided at English Language Centre located within 4 kilometres of school Student support services and programs • Victorian School of Languages located onsite • Well-supported International Student program • Full-time wellbeing staff including psychologist, speech therapist, school nurse • Careers resource centre • Well-equipped Learning Resource Centre • Partnerships with Monash and Deakin Universities Extracurricular activities • Harmony Ambassadors/International Week • House competitions including chorals, athletics and swimming • Surf, ski, and outdoor education camps • Performing Arts Gala, Dance Showcase and School Production • Homework Club Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Futsal, Golf, Hockey, Netball, Rugby, Soccer, Softball, Squash, Swimming, Table Tennis, Tennis, Touch Rugby, Volleyball Success story ‘It has been a privilege to be part of Dandenong High School. The coordinated learning environment offered both a personal and social zone where I made many friends who inspired and helped me through my unforgettable journey across high school.’ – Chamnap Phok – International Student from Cambodia Awards • VCE Top Schools awards in Media and Design, 2010-14 • CEFPI Education Facilities Awards Australian Region-Winner Major Facility, 2009-10 • University of Melbourne’s Kwong Lee Dow Young Scholarships Program, 2013 • DEECD School Design Awards - Best Overall School • Garth Boomer Curriculum Leadership Award, 2011 • DEECD School Design Awards - Best Secondary School, 2009 Reasons to choose our school Well-established, highly-innovative and internationally-renowned educational precinct Large multicultural school with architecturally-designed, state of the art facilities An environment that fosters curiosity, inclusion, empathy, respect, excellence and tolerance for diversity Visit our school online at www.dandenong-hs.vic.edu.au Address: 92-106 Princes Highway Dandenong, VIC 3175 Distance from Melbourne city centre: 30 km (Map Reference: Pg 12-13, J8, No. 36 ) Principal: Susan Ogden International Student Coordinator: Carol Collins Telephone: +61 3 9792 0561 Fax: +61 3 9706 8028 Email: dandenong.hs@edumail.vic.gov.au Web: www.dandenong-hs.vic.edu.au Number of students: 1900 Number of international students: 20 Dress: Uniform Cost of uniform (approx.): $250 – $300 Cost of homestay per week: $230 – $250
  • 39.
    37For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Doncaster Secondary College Doncaster Secondary College is noted for the strong academic performance of its international students. Close attention is paid to the learning needs and welfare of this unique student group. An experienced team of dedicated staff support our international students to achieve success and progress to tertiary education. New students joining the on-site Intensive English Language Program have the optional advantage of participating in mainstream elective and mathematics extension classes to rapidly consolidate their English language skills. Features of the local area • Well serviced by regular bus routes that also link to Melbourne city centre • An array of nearby recreational and sporting amenities • Positioned close to major shopping and entertainment centre Languages taught Chinese French Italian Special programs • University of Melbourne and Monash University extension programs • Mathematics acceleration program • Learning enhancement and enrichment • Academic competition program in English, mathematics and science • Student leadership opportunities • House drama, orchestra and school choir Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Specialist classroom support • Careers adviser and resource centre • Homegroup support and social development program • After-school homework club and mathematics tuition program • Welfare coordinator and school chaplain • Health centre including on-site school nurse Extracurricular activities • International students excursions around Victoria • International students basketball club • Debating and public speaking clubs • Vocal ensemble and performances • Chess club • Badminton and tennis Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Dance, Hockey, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘Coming to Australia and being an international student is one of the best experiences of my life. I enjoyed my school life in DSC and made lots of friends through joining many interesting school activities. Teachers in DSC helped me to achieve my best possible academic results (University entrance score of 98.15). I learned to be assertive and independent and now I am also a part-time manager of a small company.’ – Chen (Anna) Liu – China; studying commerce at the University of Melbourne Awards • Multiple Premiers Awards for top VCE students including Chinese language, 2013 • Melbourne University Kwong Lee Dow Youth Scholars Program, 2013 • Monash University Engineering Scholarships awarded to international students, 2011-13 • Statewide Top Design Exhibiters Award for Visual Communication and Design, 2013 • International and National Mathematics Olympiad awards, 2010, 2012 • Swinburne University Deans Scholarship for Design , 2012 Reasons to choose our school Highly individualised welfare and academic support A very well regarded and long standing international student program A caring supportive teaching staff with a focus on academic achievement and leadership Visit our school online at www.doncastersc.vic.edu.au Address: 123 Church Road Doncaster, VIC 3108 Distance from Melbourne city centre: 15 km (Map Reference: Pg 12-13, H3, No. 37 ) Principal: Eva McMaster International Student Coordinator: Susan Qu Telephone: +61 3 9848 4677 Fax: +61 3 9840 1390 Email: doncaster.sc@edumail.vic.gov.au Web: www.doncastersc.vic.edu.au Number of students: 1300 Number of international students: 110 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $280
  • 40.
    38 Right SchoolRight Place 2014/2015 – Melbourne A-Z Dromana Secondary College Dromana College is located on 40 Hectares in a rural setting overlooking Port Philip Bay. The College provides a broad curriculum and flexible learning environment tailoring individual need with academic excellence. Our highly skilled and passionate staff ensure students become independent learners with the knowledge, skills and values necessary to experience successful, rewarding and fulfilling lives. The College is proud of its VCE results which gives students access to a range of University and other tertiary courses. Features of the local area • Close to native Australian flora and fauna • Spectacular beaches • Bush walking opportunities Languages taught Japanese Indonesian Special programs • St John Ambulance Cadets • Partnership with Monash University • Dance • Notebook laptop program • Annual readers and writers festival • Musical productions • Debating and public speaking • Camps and tours • Comprehensive sports program • Human powered vehicle Intensive English Language classes Provided at nearby English Language Centre Student support services and programs • Part-time psychologist • Careers resource center • Peer support program • College Chaplain • College Nurse • St John Ambulance officer on duty school hours Extracurricular activities • Mountain bike program • Human powered vehicle • Junior & senior drama productions Sports offered Athletics, Australian Rules Football, Basketball, Netball, Soccer, Surfing, Swimming Success story ‘Dromana gave me the opportunity to explore the subjects I wanted to do, as well as assisting me and always concerned with my wellbeing. The whole school body was happy to have me. Therefore I could really enjoy every moment of this fantastic semester abroad. My six months here were full of new, interesting and sometimes strange experiences, but I am most thankful for the friendly people who surrounded me. The host family was a stroke of luck, but also my school Dromana College.’ – Juliana Svoboda – Austria Awards • Pierre De Coubertin Award • Young Adventurers Award • Top Arts • State Swimming Championship – Gold medalist Reasons to choose our school Spirit of cooperation and belonging among staff and students Small school offering personalised experience Attractive school grounds close to native flora and fauna Visit our school online at www.dsc.vic.edu.au Address: 110 Harrison Road Dromana, VIC 3936 Distance from Melbourne city centre: 80 km (Map Reference: Pg 12-13, H12, No. 38 ) Principal: Alan Marr International Student Coordinator: Simon Jones Theresa Stelling Telephone: +61 3 5987 2805 Fax: +61 3 5981 4345 Email: dromana.sc@edumail.vic.gov.au Web: www.dsc.vic.edu.au Number of students: 1000 Number of international students: 2 Dress: Uniform Cost of uniform (approx.): $500 Cost of homestay per week: $200 – $300
  • 41.
    39For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch East Doncaster Secondary College Situated 16 kilometres from Melbourne CBD, East Doncaster Secondary College offers modern facilities set amongst substantial grounds and playing fields. The multicultural environment provides students with abundant subject choice. A broad curriculum includes languages, sciences, mathematics, humanities, technology and the arts. Skilled teachers and staff nurture a culture of curiosity to develop students’ academic and social skills. Almost 100% of graduating Victorian Certificate of Education students gain university and tertiary college entry. Features of the local area • Easy public transport access to school, universities, Technical and Further Education colleges and city • Peaceful, safe residential area with abundant parks and sporting facilities • Close to shopping centres, libraries, restaurants, banks • Chinese and western medical practitioners nearby Languages taught Chinese (Mandarin) Italian Special programs • Victorian Certificate of Education student university orientation program • Years 10-12 study skills program • Regular excursions and cultural activities • Intensive student orientation program Intensive English Language classes Provided at two English Language Centres located within 8 kilometres of school Student support services and programs • Two specialist international student assistants • Careers resource centre and personalised course counselling • English conversation club • Homework program • Orientation program Extracurricular activities • Academic competitions and extension work • Student leadership opportunities • Instrumental music with multiple choirs, ensembles and performance opportunities • Drama and musical productions • Participation in a wide range sports • Debating Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Golf, Hockey, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘The teachers at my school were very friendly and patient. The ESL teachers and the language assistants helped me to improve my English and to be more confident in speaking to my classmates. This has been a big help to me at university.’ – Jia Gu – China; awarded Masters of Finance, Monash University, 2011 Awards • Top VCE students – Physical Education, Visual Communication and Design, 2010 • State soccer and athletics – champions, 2010; cross country – champions, 2011 • Melbourne School Strings Festival – medalists, 2010-14 • Premier’s Award - Top 1% VCE in IT, 2011 -12 EAL, 2013, Business Management, 2014 • State Sport Diving Award, 2014 • Australian Intermediate Mathematics Olympiad – students selected, 2011 Reasons to choose our school Large multicultural campus with a friendly and cohesive learning atmosphere Exemplary record of academic success and forging tertiary pathways with wide subject choices Extensive co-curricular program giving students the chance to extend particular talents Visit our school online at www.edsc.vic.edu.au Address: 20 George Street East Doncaster, VIC 3109 Distance from Melbourne city centre: 16 km (Map Reference: Pg 12-13, I3, No. 39 ) Principal: John Handley International Student Coordinator: Simon Veerhuis Telephone: +61 3 9842 2244 Fax: +61 3 9841 8010 Email: east.doncaster.sc@edumail.vic.gov.au Web: www.edsc.vic.edu.au Number of students: 1500 Number of international students: 60 Dress: Uniform Cost of uniform (approx.): $350 Cost of homestay per week: $280
  • 42.
    40 Right SchoolRight Place 2014/2015 – Melbourne A-Z Elwood College Set in a charming beachside suburb, Elwood College is just 15 minutes from Melbourne CBD. The popular international program is run by dedicated staff, committed to providing a quality education program. Students settle into study and life, supported by excellent Homestay care and dedicated student welfare. Exciting sports and other activities complete the positive learning experience. Elwood College is known for its high level of Year 12 success and the number of students progressing to tertiary education. Features of the local area • Excellent public transport connections to all parts of the city • Beautiful local area with beaches, parks, restaurants and shops • Within easy reach of Melbourne CBD Languages taught Japanese as a first and second language Chinese as a first and second language French Special programs • Experienced international Chinese, Korean, Japanese, Vietnamese program assistants • Intensive English Language program • Outstanding science/mathematics programs • Business, accounting and information technology courses • Specialist art, design and photography instruction • Student orientation program Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Dedicated international program staff • Language assistants to help new students • Tutorial program for extra learning support • Homework classes for international students • Translation services in Japanese, Chinese, Korean, Vietnamese, Russian, French, Spanish and German • Part-time psychologist and dedicated student wellbeing team Extracurricular activities • International student camp and tours, including interstate and local excursions • Extensive music and theatre program including yearly musical production • Annual school art show • Ski and snowboarding camp • Sports teams • Outdoor education and adventure camps Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Futsal, Handball, Hockey, Lacrosse, Netball, Snow Skiing, Soccer, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I loved my time at Elwood College. I made so many friends and we all supported each other during the hard work for the VCE. I had so much assistance from the teachers and the aides at the college. I am really happy with my results.’ – Jiang Yishan – China; studying Engineering at RMIT University Awards • Monash University Vice Chancellor’s Award – Mathematics, 2013 • Australian Defence Force Academy Scholarship, 2012 • University of Melbourne Kwong Lee Dow Scholarship, 2013 • Swinburne University Vice Chancellor’s Scholarship – Design, 2013 Reasons to choose our school All Year 12 students successfully graduate and around 90% progress to university or Technical and Further Education Superbly appointed new science, language and senior study facilities opened recently Diverse, multicultural student population from Australia, Asia, Europe, North and South America Visit our school online at www.elwood.vic.edu.au Address: 101 Glenhuntly Road, Elwood, Vic 3184 Distance from Melbourne city centre: 6 km (Map Reference: Pg 12-13, F5, No. 40 ) Principal: Rhonda Holt International Student Coordinator: Greg Pritchard Stella Turchina Telephone: +61 3 9531 9566 Fax: +61 3 9525 6213 Email: elwood.co@edumail.vic.gov.au Web: www.elwood.vic.edu.au Number of students: 600 Number of international students: 65 Dress: Uniform Cost of uniform (approx.): $230 Cost of homestay per week: $275
  • 43.
    41For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Essendon Keilor College A co-educational school, Essendon Keilor College is close to Melbourne CBD. The college spans two Years 7-9 (East Keilor and Niddrie) and one senior campus (Essendon). Year 10-12 students enjoy a comprehensive choice of Victorian Certificate of Education and Vocational Education and Training subjects and courses. Students flourish within the caring environment with its personal achievement focus. International students are actively encouraged to participate in the academic, extracurricular and social sides of school life. Features of the local area • Excellent public transport services including tram, train and bus routes • Very close to the vibrant centre of Melbourne • Nearby major shopping, business and entertainment areas Languages taught Chinese for first language speakers (Years 11-12) Japanese (Years 7-12) Italian (Years 7-12) Special programs • Experienced Chinese and Vietnamese international program staff assist students and communicate with families • Intensive university entrance counselling for Victorian Certificate of Education students • International student excursions and activities • International family visits by school staff • Study seminars Intensive English Language classes • On-site English Language Centre at Essendon Campus • Extra English language enrichment tuition sessions for Years 10-12 international students • Junior campuses English assistance Student support services and programs • Specialist international support staff • Careers resource centre • Well managed Homestay program • Personal computer provided for Years 10-12 students • Comprehensive welfare service Extracurricular activities • Engaging excursions and activities • Interstate and overseas tours • Annual college musical production • Debutante ball and college formal • Interschool sport Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story Pham Truong Thinh Le came to us from Vietnam and commenced in Year 10. He gained a university entrance score of 99.5 and accepted a full scholarship to study commerce at the University of Melbourne. Thinh also received a Premier’s Award as one of the best three international students of his year. He has since won the first year mathematics prize and the final year commerce prize at the University of Melbourne. Awards • Premier’s Prize – one of top three international students • Victorian Education Excellence awards, finalist • Pierre de Coubertin Award Reasons to choose our school Spirit of cooperation and belonging among staff and students Small school offering personalised experience Large multicultural campus Visit our school online at www.ekc.vic.edu.au Address: 286 Buckley Street Essendon, VIC 3040 Distance from Melbourne city centre: 8 km (Map Reference: Pg 12-13, E3, No. 41 ) Principal: David Adamson International Student Coordinator: Alistair McCrum Telephone: +61 3 9319 1300 Fax: +61 3 9319 1343 Email: essendon.keilor.co@edumail.vic.gov.au Web: www.ekc.vic.edu.au Number of students: 950 Number of international students: 60 Dress: Uniform Cost of uniform (approx.): Provided by school Cost of homestay per week: $290
  • 44.
    42 Right SchoolRight Place 2014/2015 – Melbourne A-Z Fairhills High School Located east of Melbourne city, Fairhills High School is a medium size, co- educational school. International students are welcomed into a nurturing school environment that values cultural diversity. Annual exchanges with Germany and Japan extend students’ global perspective. Diverse curriculum choices offer distinct academic and vocational learning pathways. Students live with friendly local families while undertaking the Victorian Certificate of Education or Vocational Education and Training/Victorian Certificate of Applied Learning program Features of the local area • Nearby the scenic Dandenong Ranges National Park with abundant flora and fauna • Close to a major shopping and cinema complex, sporting and leisure amenities • Well-serviced by train-lines and bus routes Languages taught Japanese German Special programs • Experienced international program assistants • Accelerated learning program for high performing students • Monash University science and language enhancement at Victorian Certificate of Education level. • Links to Swinburne University and a high-tech science learning centre (KIOSC) • Deakin University Annual Study Skills Conference with access to teaching facilities • Basketball Academy and Performing Arts Centre Intensive English Language classes • Students commence studies at a nearby English Language Centre • Qualified staff lead small groups for Intensive English as an Additional Language support Student support services and programs • Free intensive personal tutoring for international students • Individual vocation guidance counselling at careers resource centre • Peer support program • School leadership program • Part-time social worker, psychologist and chaplain Extracurricular activities • International student tour and camp program • Musical and inter-school dance competitions • Inter-school debating • Sports including basketball and martial arts clubs • Chess club Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Bike Education, Cricket, Cross Country, Indoor Soccer, Golf, Hockey, Netball, Snow Skiing, Soccer, Softball, Swimming, Table Tennis, Tennis, Touch Rugby, Volleyball Success story ‘Fairhills High School is undoubtedly an excellent school and we have experienced a great school life. All of the teachers have supported us with kindness and they are extremely reliable. Also local students have been very helpful and friendly, helping us in class as “mates” and inviting us to enjoy socialising with them even outside school.’ – Masa Hatoyama – Japan; studying law at Ritsumeikan University in Japan Awards • State Super 8 Cricket – champions, 2010 • Rock Eisteddfod Challenge state finals – winners • State golf – champion (international student), 2010 • National Volleyball Championship Under-17 Girls – bronze medal Reasons to choose our school Personalised education provided by qualified, dedicated staff in a safe and caring environment Award-winning performing arts high school A top regional sporting school with state-of-the-art stadium facilities Visit our school online at www.fairhillshs.vic.edu.au Address: 330 Scoresby Road Knoxfield, VIC 3180 Distance from Melbourne city centre: 27 km (Map Reference: Pg 12-13, J5, No. 42 ) Principal: Harvey Wood International Student Coordinator: Sally Newnham Telephone: +61 3 9758 5022 Fax: +61 3 9752 2597 Email: fairhills.hs@edumail.vic.gov.au Web: www.fairhillshs.vic.edu.au Number of students: 792 Number of international students: 11 Dress: Uniform Cost of uniform (approx.): $320 Cost of homestay per week: $260
  • 45.
    43For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Footscray City College International focus is a feature at Footscray City College. Students are drawn from diverse backgrounds, including Germany, Vietnam, Malaysia, Indonesia, China, Japan, Denmark and Hong Kong. The academic curriculum is complemented by multimedia, music, dance and sporting programs. Academic and personal progress is closely observed. International students benefit from the guidance of a welfare coordinator, careers advisor an experienced English as an Additional Language staff. The school is close to Melbourne city and adjacent to Victoria University. Features of the local area • Easy public transport access with regular tram, train and bus services • Appealing landscaped gardens with spectacular views of Melbourne city centre • Nearby a bustling Asian market and close to major shopping centre Languages taught Japanese Italian Special programs • Experienced international Chinese and Vietnamese program assistants • Local university student mentoring • Access to Victoria University teaching facilities Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Two specialist international student tutors • Careers resource centre • Specialist bilingual mathematics tutors • Homework program four afternoons a week • Student welfare coordinator • Part-time psychologist Extracurricular activities • International student orientation camp and tour program • Annual welcome dinner for Homestay families and education agents • Year 12 celebratory end-of-year function • International student social activities including regular morning teas and luncheons • Strong music program • Arts and multimedia program • Outdoor education program • Interstate and overseas trips available Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Cricket, Dance, Fitness, Golf, Soccer, Gymnastics, Hockey, Indoor Cricket, Lawn Bowls, Martial Arts, Netball, Rollerblading, Softball, Swimming, Table Tennis, Volleyball Success story Hilda Liu, from China, attended Footscray City College from Year 10. Since graduating in accountancy at RMIT University (including studies in London) Hilda returned to Melbourne. She is now working at a Brighton accountancy firm while undertaking further studies to become a Chartered Accountant. On reflection Hilda was delighted to find the school staff and students friendly and helpful. Also of great importance to Hilda’s remarkable success were her supportive Homestay families. Awards • University of Melbourne Science Award, 2011 • Victorian School Garden Award, 2009 • Australian Mathematics Competition Award, 2011 • Top VCE student – Vietnamese, 2010 Reasons to choose our school Strong focus on academic performance, with a wide range of subject choices Attractive school grounds and modern facilities close to Melbourne’s city centre English Language Centre on-site Visit our school online at www.footscray.vic.edu.au Address: Kinnear Street Footscray, VIC 3011 Distance from Melbourne city centre: 7 km (Map Reference: Pg 12-13, D4, No. 43 ) Principal: Maria Bawden International Student Coordinator: Maureen O’Flaherty Telephone: +61 3 8387 1500 Fax: +61 3 8387 1599 Email: info@footscray.vic.edu.au Web: www.footscray.vic.edu.au Number of students: 900 Number of international students: 40 Dress: Uniform in Years 7-12 only Cost of uniform (approx.): $300 Cost of homestay per week: $235
  • 46.
    44 Right SchoolRight Place 2014/2015 – Melbourne A-Z Forest Hill College Forest Hill College, in Melbourne’s eastern suburbs, is supported by a wonderful community. Students enjoy the beautiful school gardens, benefit from excellent facilities and access state-of-the-art technology. An established international program offers a dynamic learning experience, supported by regular overseas family contact and visits. The on-site Language Centre helps students achieve secondary education English requirements and transition smoothly into mainstream classes. Features of the local area • Well-serviced by train lines and bus routes • 10 minutes bus to Melbourne’s second ‘Chinatown’ – Box Hill • Healthy, clean local environment featuring parkland, gardens and low hills • Close to shopping centre, sporting facilities, theatre Languages taught Chinese as a first language in Year 12 and as a Language other than English in other year levels French Auslan Special programs • Elite Soccer Program • Special Tennis Program • Instrumental Music • Student leadership Courses • Outdoor Education • Flexible Learning Programs Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Experienced ISP Language Assistants • VCE Study Centre • Careers Resource Centre • Homework Club • Breakfast Club • Annual overseas parent/teacher interview Extracurricular activities • Study skills camp • Excursions to familiarise student with locale and see Australian animals • Instrumental music program including ensembles, orchestras and stage bands • Annual school musical performance • Elite fitness squad • Chess club • Debating club Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball (24-Hour Basketball Marathon), Soccer (Elite Soccer Program), Table Tennis, Volleyball Success story In 2014, four Year 12 International Students are already studying at Melbourne University as they are in the Extension Maths Program. This will assist their ATAR and be recognised by their University in 2015. Awards • Premier’s Award – LOTE, 2012 • Monash University Scholarships – Engineering and Science • Teacher of the Year Award, 2013 • World Challenge Borneo – Student Leadership Award, 2012 Reasons to choose our school Wonderful level of care for international students in a medium/small school setting International student transition is aided by local students learning Chinese as second language Newly completed school resources include a dedicated science facility and modern classrooms Visit our school online at www.fhc.vic.edu.au Address: 178-180 Mahoneys Road East Burwood, VIC 3151 Distance from Melbourne city centre: 16 km (Map Reference: Pg 12-13, I5, No. 44 ) Principal: David Rogers International Student Coordinator: Jacki Hood Telephone: +61 3 9814 9444 Fax: +61 3 9887 8126 Email: forest.hill.co@edumail.vic.gov.au Web: www.fhc.vic.edu.au Number of students: 570 Number of international students: 70 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $260
  • 47.
    45For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Visit our school online at www.fountaingatesc.vic.edu.au Address: 41 Josephine Avenue Narre Warren, VIC 3805 Distance from Melbourne city centre: 40 km (Map Reference: Pg 12-13, K9, No. 45 ) Principal: Vicki Walters International Student Coordinator: James Orange Telephone: +61 3 8762 6839 Fax: +61 3 9796 7401 Email: fountain.gate.sc@edumail.vic.gov.au Web: www.fountaingatesc.vic.edu.au Number of students: 1053 Number of international students: 4 Dress: Uniform Cost of uniform (approx.): $500 Cost of homestay per week: $250 Fountain Gate Secondary College Fountain Gate Secondary College, located 40 minutes from Melbourne CBD, is close to wide a range of facilities including a shopping precinct, medical centres, sport and recreational venues. The area is well-serviced by public transport. Through an alliance with two local secondary colleges, we have able to offer senior students the widest selection of VCE and VETiS in Victoria. We are committed to a providing our international students an excellent comprehensive education in a secure, supportive and educationally challenging environment. Features of the local area • Well serviced by train lines and bus routes • Close to second largest shopping centre precinct in Victoria • Two local Primary Schools within 1km • Close to quality sporting and recreational facilities Languages taught German Indonesian Special programs • Instrumental Music Program • High Achievers Program for gifted students • Intensive English as an Additional Language classes • Weekly Homework Support club • I Learn 24/7 program IT Program • Wide range of elective subjects at Year 9 and 10 Intensive English Language classes Provided at English Language Centre located within 13kms of school Student support services and programs • Student Wellbeing Centre • Counseling and support services • International Student Mentor • Careers Resource Centre • Full-time nurse Extracurricular activities • Student Leadership Program • School camps, field trips and excursion program • Interschool sports • Future Problem Solving and other national competitions • Performing arts program e.g. school production • Instrumental Music Sports offered Aerobics, Athletics, Australian Rules Football, Badminton, Basketball, Baseball, Hockey, Rugby League, Rugby Union, Soccer, Softball, Swimming, Volleyball Success story ‘Since I arrived at FGSC three years ago I have found the teachers to be very friendly and always willing to give extra time and support to me. This year in Year 12, I am currently studying Specialist Maths, Maths Methods, EAL and Physics. I have made lots of great friends who also support with my studies.’ – Dung (Arthur) Bui – Year 12, Vietnam Awards • Second Place International Future Problem Solving Competition USA, 2014 • Spirit of ANZAC state award, 2014 • State Champions Rugby Union, 2011-13 • State Champions Aerobics Team, 2014 • Premier’s VCE Award – Further Mathematics, 2013 • South-Eastern Junior AFL Champions, 2013 Reasons to choose our school Large multicultural campus Friendly students and staff Strong wellbeing support for students
  • 48.
    46 Right SchoolRight Place 2014/2015 – Melbourne A-Z Frankston High School A long tradition of academic excellence makes Frankston High School a popular choice for international students. Located near pristine Port Phillip Bay, the school enjoys a tranquil, appealing garden setting. Enrolments are drawn from various countries to form a vibrant, multicultural student body. Friendly Homestay families provide a comfortable, safe and happy ‘home away from home’. A settled home assists caring, professional teachers to support international students in their development and inspire them to succeed. Features of the local area • Well-serviced by train lines and buses • Nearby scenic and clean swimming beaches • Excellent local shopping malls and cinema complexes Languages taught Japeanese French Chinese (First language) Special programs • Accelerated program for high achievers • Established close links with local university • Site-wide computer access over secure wireless connections • Highly regarded music program • Extensive range of sporting teams • Exemplary student leadership programs Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Specialist language assistants • Dedicated international student tutors • Highly skilled English language teachers • Well-established careers resource centre • Active international committee • Lunchtime tutorials in many subjects Extracurricular activities • International student camps and tours • Elite sports training program • Concert bands, jazz bands and choir • Art and design clubs and annual drama production with performance opportunities • Surf lifesaving program • Choice of many sports Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Diving, Golf, Gymnastics, Hockey, Lawn Bowls, Netball, Rowing, Soccer, Softball, Squash, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I loved my time at Frankston High School. The students are so friendly and the teachers are patient and kind. My host family was very supportive and lots of fun. I set high goals and am proud that I achieved them.’ – Xiang Zhao – China; graduate, computer engineering at the University of Melbourne Awards • State Music Awards • Environmental awards • State/National Sports Championships • Student Leadership Awards Reasons to choose our school Varied international program with students drawn from many different countries and cultures Recent completion and launch of purpose designed high-tech science wing Indoor heated swimming pool and well equipped fitness centre on-site Visit our school online at www.fhs.vic.edu.au Address: Foot Street Frankston, VIC 3199 Distance from Melbourne city centre: 40 km (Map Reference: Pg 12-13, H11, No. 46 ) Principal: John Albiston International Student Coordinator: Cathy Hogg Sharon Koning Telephone: +61 3 9783 7955 Fax: +61 3 9783 7689 Email: frankston.hs@edumail.vic.gov.au Web: www.fhs.vic.edu.au Number of students: 1700 Number of international students: 50 Dress: Uniform Cost of uniform (approx.): $200 Cost of homestay per week: $240
  • 49.
    47For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Gilmore College for Girls Gilmore College for Girls enables young women to achieve their potential in an all-girls’ environment of educational excellence. We develop inquiring, knowledgeable and caring young women who help to create a better and more peaceful world through inter-cultural understanding and respect. Our programs encourage students to become active, compassionate and lifelong learners with a global perspective. We are a candidate school for the International Baccalaureate Middle Years Program (IBMYP). Features of the local area • Easy access to Universities, Melbourne CBD and international airport • Close to shops, accommodation, markets and restaurants • Well-serviced by train-lines and bus routes Languages taught Italian Other languages through VSL Special programs • Melbourne University enhancement program with student mentoring and other activities • Woman’s Leadership program in partnership with PricewaterhouseCoopers • Kwong Lee Dow Young Scholars Program • Student netbook program and Instrumental music program • Duke of Edinburgh Award • 4-period days – fewer teachers assists students to better engage in study Intensive English Language classes Provided at English Language Centre located within 2 kilometres of school Student support services and programs • Afterschool homework club with tutors • Student welfare officer and school nurse • Careers Resource Centre • Online Mathematics tutoring and support. • Wireless Internet and Intranet Extracurricular activities • Interschool debating and public speaking • Science club and academic competitions. • Drama productions and School’s Spectacular • University enhancement program. • Recreation and leadership camps • Interschool Sports Competition Sports offered Athletics, Badminton, Basketball, Cricket, Gymnastics, Hockey, Netball, Physical Education, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘My first impression of Gilmore College was the small size of the classes. That means you are able to ask questions when you are not sure about something. You will get good care from specialist teachers and gain opportunities to express yourself. The teacher are very helpful.’ – Misa Tran-Nguyen – Vietnam; VCE at Gilmore College, Bachelor of Commerce, University of Melbourne Awards • Pierre de Coubertin Award Winner, 2014 • Trinity College International Summer School Scholarships, 2013 • Badminton Zone Finalists , 2014 • University of Melbourne International Summer School Scholarships , 2013 • WYNSPEAK Public Speaking Competition Finalists , 2013 Reasons to choose our school Candidate school for the International Baccalaureate Middle Years Program (IBMYP) Afterschool support with English and other subjects. Our students are friendly and welcoming New science facilities with modern laboratories and equipment Visit our school online at www.gilmoregirls.vic.edu.au Address: 298 Barkly Street Footscray, VIC 3011 Distance from Melbourne city centre: 8 km (Map Reference: Pg 12-13, D4, No. 47 ) Principal: Bette Prange International Student Coordinator: Peter Walker Telephone: +61 3 9689 4788 Fax: +61 3 9687 3867 Email: gilmoregirls.co@edumail.vic.gov.au Web: www.gilmoregirls.vic.edu.au Number of students: 280 Number of international students: 8 Dress: Uniform Cost of uniform (approx.): $350 Cost of homestay per week: $250
  • 50.
    48 Right SchoolRight Place 2014/2015 – Melbourne A-Z Gleneagles Secondary College Gleneagles provides excellent opportunities for students to explore their individual talents and aspirations in a supportive, harmonious and well-resourced school environment. An extensive and well-regarded VCE program, and access to VCAL, VET and the Trade Training Centre, provides various study options for our senior students, supported by our skilled staff who deliver a solid grounding in the basics of English along with a dedicated EAL/D Centre to ensure each learner is challenged to reach their potential. The school has strong ties to Monash and Deakin Universities. Features of the local area • Natural features including Lysterfield Lake Park • Close to shopping centre • Well-serviced by bus routes from Dandenong • Close to a range of primary schools Languages taught German Indonesian Chinese (2015) Special programs • Experienced multicultural aides/program assistants • Experienced EAL/D teachers • Mentoring with local university • Access to teaching facilities at network schools • SEAL program for high achievers Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Specialist international student tutor • Part-time psychologist/speech pathologist/ mental health professional and social worker • Careers resource centre • Peer support program • After hours homework club with university tutors and dedicated teachers • Breakfast club Extracurricular activities • VCE student study camp • Year 7 Phillip Island camp • Year 8 Lorne Camp/CPR Lifesaving training • Year 9 CBD excursion • Year 10 Sports’ coaching program • Chess club, book club, art club • Orchestra, choir, school production • Kick boxing and yoga Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Hockey, Lacrosse, Netball, Soccer, Swimming, Table Tennis, Volleyball Awards • Australian Schools Maths Competition • State Soccer/Football Champions • Short Story Competition • Top VCE student Arts Award Reasons to choose our school Large multicultural campus Attractive school grounds close to native flora and fauna Access to VCAL, VET and the Trade Training Centre provides various study options for our senior students Visit our school online at www.gleneagles.vic.edu.au Address: Reema Boulevard Endeavour Hills, VIC 3802 Distance from Melbourne city centre: 38 km (Map Reference: Pg 12-13, K7, No. 48 ) Principal: Sue Peddlesden International Student Coordinator: Penelope Andrews Telephone: +61 3 9708 1319 Fax: +61 3 9708 1324 Email: gleneagles.sc@edumail.vic.gov.au Web: www.gleneagles.vic.edu.au Number of students: 1370 Number of international students: 2 Dress: Uniform Cost of uniform (approx.): $1,000 Cost of homestay per week: N/A
  • 51.
    49For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Glen Eira College Students at Glen Eira College access learning programs and education facilities that meet today’s global challenges. A new learning facility houses one of five government-accredited English Language Centres within metropolitan Melbourne. The College provides high levels of individual care and attention to create a learning atmosphere where students achieve personal and education goals. Curriculum breadth, choice of co and extracurricular programs and staff committed to professional growth support student success. Features of the local area • Easy public transport access to school • Safe, attractive suburb nearby parks, swimming beach and shopping centres • Adjacent to Monash University (Caulfield) Languages taught Chinese CNED (French Government Distance Education) French Program Hebrew Special programs • Experienced international student program team including language teacher assistants • Accelerated learning program for advanced students • Academic extension and transition programs • University of Melbourne and Monash University career pathways program • Student leadership programs including international student captain • Camps, excursions, optional overseas trips Intensive English Language classes • Provided at on-site English Language Centre • One of five metropolitan government- accredited English Language Centres Student support services and programs • English as an Additional Language support • Careers resource centre and careers adviser • Airport reception and orientation program • Homestay monitoring/ongoing welfare support • Wellbeing centre for student counselling, health and study plans • Extra after-school/lunchtime homework tuition Extracurricular activities • Maths/science national and state competitions • University enhancement studies and activities • High Achievers’ Club • Student representative council and leadership program participation • Performing arts centre – music tuition, drama and dance with performance opportunities • Lunchtime activities; sports, robotics, chess Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Diving, Futsal, Hockey, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘Glen Eira College is a global community where I can follow my dreams. Teachers understand the challenges we have as ESL students and are always there to help us. I was proud to receive the Award for Academic Excellence for 2011.’ – Huang Yanbing – International Student Captain, 2011 Awards • Australian Defence Force Leadership Award, 2013 • Year 8 National History Competition winner, 2013 • Glen Eira City Leadership Awards, 2013 • Rotary Club of Glen Eira scholarship winner, 2014 • Pierre de Coubertin Award, 2012 • Berthe Mouchette Poetry recitation finalists, 2014 Reasons to choose our school Students are provided with a high level of individual care and attention Government-accredited English Language Centre located on-site housed in newly built facility Transition program to next level and ongoing English as an Additional Language classes Visit our school online at www.gec.vic.edu.au Address: 76 Booran Road Caulfield East, VIC 3145 Distance from Melbourne city centre: 8 km (Map Reference: Pg 12-13, G6, No. 49 ) Principal: Sheereen Kindler International Student Coordinator: Matthew Polwarth Telephone: +61 3 9571 7838 Fax: +61 3 9571 0079 Email: glen.eira.co@edumail.vic.gov.au Web: www.gec.vic.edu.au Number of students: 620 Number of international students: 30 Dress: Uniform Cost of uniform (approx.): $250 Cost of homestay per week: $280
  • 52.
    50 Right SchoolRight Place 2014/2015 – Melbourne A-Z Glen Waverley Secondary College Glen Waverley Secondary College is an international learning community. College enrolments are drawn from over 40 nationalities and more than 50 languages are represented. Renowned for its student success, the college learning program is designed to support individuals and develop the whole person. Every student is encouraged to grow their global awareness and develop an international perspective. The school promotes an atmosphere where students discover the importance of acquiring skills to function successfully as global citizens. Features of the local area • Close to regular public transport services • Appealing urban treed setting • Nearby major shopping centre • Multicultural local community Languages taught Italian French Chinese Chinese as a second language Special programs • Inquiry Learning Program (sustainability focus) • Literacy and numeracy • Head start program to prepare students for Years 11-12 • Living and learning • Music • Sport Intensive English Language classes Provided at English Language Centre located within 5 kilometres of school Student support services and programs • Dedicated study hall area • Peer support program • Wellbeing coordinator and chaplain Extracurricular activities • Camps and cultural exchanges • Chess club • Debating • Book club • Community service Sports offered Athletics, Badminton, Basketball, Swimming, Table Tennis Success story ‘I have to admit now that I regard Glen Waverley Secondary College as my second home – the people here are fantastic and have really made me feel at home! Thanks to Glen Waverley Secondary College for giving me such a wonderful experience.’ – Joshua Lee – International student; Dux of the Class of 2010 Awards • NAB Schools First Award in Sustainability, 2013 • Premier’s VCE Award – Japanese Second Language, 2012 • Premier’s VCE Awards – Chinese First Language and Hindi, 2013 • Premier’s VCE Award – Accounting and VET Technical Production, 2012 • Premier’s VCE Award – Physics and Maths Methods, 2013 • National Chess champions and runners up (Open & Junior divisions), 2012-13 Reasons to choose our school Large multicultural campus populated by a dynamic and welcoming student group An award-winning music program offering instruction and performance opportunities Reputation for supporting students to achieve outstanding academic outcomes Visit our school online at www.gwsc.vic.edu.au Address: O’Sullivan Road Glen Waverley, VIC 3150 Distance from Melbourne city centre: 27 km (Map Reference: Pg 12-13, I5, No. 50 ) Principal: Gerard Schiller International Student Coordinator: Lena Tan Telephone: +61 3 8805 6700 Fax: +61 3 8805 6701 Email: enquiries@gwsc.vic.edu.au Web: www.gwsc.vic.edu.au Number of students: 2000 Number of international students: 59 Dress: Uniform Cost of uniform (approx.): $270 Cost of homestay per week: $290
  • 53.
    51For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Highvale Secondary College Students attending Highvale Secondary College enjoy excellent learning opportunities. Set amongst spacious grounds 20 kilometres from Melbourne city centre, the school offers an international education experience. A broad curriculum and two learning pathways are supported by personal course counselling and careers guidance. Strong ties with Monash and Deakin Universities strengthen student achievement in studies of science, mathematics, commerce, technology and the arts. Students may also pursue vocational courses or Technical and Further Education pathways. Features of the local area • Major public transport links with train and bus terminals • Nearby tennis courts, sporting tracks and the large native reserve, Jells Park • Established, medium density residential area • Close to The Glen and Kingsway multicultural mall and strip shopping Languages taught German French Chinese (weekend classes) Special programs • Experienced international Chinese program assistants • Monash University acceleration program • Local university student mentoring • Flourishing music program with Victorian Certificate of Education Music studies Intensive English Language classes Provided at Blackburn English Language School or other private providers located within 10 kilometres of school Student support services and programs • Pupil Welfare Manager • Two specialist international student tutors • Part-time psychologist • Careers Resource Centre Extracurricular activities • International student morning teas and social activities • Inter-school and local community music performances • Chess Club • Debating • Sporting events • Debutante Ball and formal school social occasions Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Fencing, Netball, Soccer, Swimming, Table Tennis, Tennis Success story ‘Highvale has given me the most wonderful study experience. Only when I stayed here I realized the sky is really the limit. There were no boundaries stopping me from achieving my goals. We all know this was the place where we were all given a momentous opportunity to explore our potential, enjoy every moment of our study life and grow as a person.’ – Giang To – Victorian International School Student - Arts Achievment Award winner, 2013 Awards • High distinctions and distinctions in Australian schools competitions • Westpac Maths Award winner, 2013 • University of Melbourne Scholars Program recipients, 2013 • Victorian International School Student - Arts Achievement Award, 2013 • Young Scholars Award, 2013 • Forest Hill Endeavour Award Reasons to choose our school Medium-sized school with a collaborative, welcoming community offering personalised learning Senior study centre offering VCE students regular extra tutoring, included in tuition fee Closely ties with Monash University and appealing Melbourne location central to all amenities Visit our school online at www.highvalesc.vic.edu.au Address: Capital Avenue Glen Waverley, VIC 3150 Distance from Melbourne city centre: 20 km (Map Reference: Pg 12-13, I5, No. 51 ) Principal: Ian Watkins International Student Coordinator: Kate Grennan Telephone: +61 3 9803 5144 Fax: +61 3 9803 4310 Email: highvale.sc@edumail.vic.gov.au Web: www.highvalesc.vic.edu.au Number of students: 950 Number of international students: 52 Dress: Uniform Cost of uniform (approx.): $600 Cost of homestay per week: $260 + $20 per month internet
  • 54.
    52 Right SchoolRight Place 2014/2015 – Melbourne A-Z Hoppers Crossing Secondary College Located in the western metropolitan area, approximately 30 minutes from Melbourne’s CBD, the College offers a whole school enrichment program so that students are challenged and encouraged to reach their full potential. The College offers a 1:1 Netbook Program, a wide subject choice and is renowned for its student leadership programs designed to create global citizens. The recent addition of the $2 million Science complex has seen the College take on a leading role in the education of students in the area. Features of the local area • Approx. 30 minutes from Melbourne’s CBD • Located in the City of Wyndham • Close to a major shopping centre • Well-serviced by train-lines and bus routes Languages taught Italian Special programs • International Sister Schools in Costa Mesa, California, USA and Forli, Italy • Annual Overseas Learning Experience to China – Utahloy International School • 1:1 Netbook Program • University Enhancement Programs offered at Year 12 • Year 7-12 Enrichment Program • Hoppers TV and Hoppers FM (TV and Radio Productions) • Structured Student Leadership Program (Year 7-10) Intensive English Language classes Provided at English Language Centre located within 10 kilometres of school Student support services and programs • Careers Resource Centre • Peer Support Program • Student Wellbeing Team • Part Time Speech Pathologist and School Nurse Extracurricular activities • Wakakirri Dance Spectacular • Whole School Swimming and Athletics Carnival • Interschool Sports Program • High Achievers Preparation Program (HAPP) • Debutante Ball • Student Leadership Program Sports offered Athletics, Australian Rules Football, Basketball, Netball, Soccer, Table Tennis, Tennis, Volleyball Success story ‘From the start I felt included completely. Lots of people helped me to integrate myself at the College. I got involved in different programs and everyone was friendly. I’m a big fan of your Course Selection.’ – Marie-Luise Schlesinger, Germany Awards • Deakin University Scholarship, 2013 • Wakakirri Dance Spectacular – Best Blockbuster • Rotary Citizenship Award, 2012-13 • Wynspeak Public Speaking Competition Winner, 2008, 2010, 2012 • Wakakirri Dance Spectacular – Best Choreography • Australian Toastmasters Public Speaking Competition Winner, 2008 Reasons to choose our school Large multicultural campus Attractive school grounds New $2 million science facility Visit our school online at www.hopcross.vic.edu.au Address: 2 Fraser Street Hoppers Crossing, VIC 3029 Distance from Melbourne city centre: 30 km (Map Reference: Pg 12-13, A5, No. 52 ) Principal: Wayne Terrill International Student Coordinator: Keith Halge Telephone: +61 3 9974 7777 Fax: +61 3 9748 6645 Email: hoppers.crossing.sc@edumail.vic.gov.au Web: www.hopcross.vic.edu.au Number of students: 1400 Number of international students: 3 Dress: Uniform Cost of uniform (approx.): $250 Cost of homestay per week: N/A
  • 55.
    53For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Hume Central Secondary College A culturally rich learning community giving young people the knowledge and skills they need to thrive in school and life. The College has three campuses and an on-site English Language Centre where international students are supported to develop their English language skills. New facilities and a broad curriculum ensure students are engaged and excited by learning with 96% of our Year 12 students gaining a University or TAFE position. Features of the local area • Well-serviced train and bus routes. • Vibrant multicultural community with extensive community services • Sporting and leisure facilities close-by Languages taught Turkish Other languages through the Victorian School of Languages Special programs • VCE tutorials and workshops to optimize year 12 results • Special Entry Accelerated Leaning program • College offers a 1:1 Netbook • Performing Arts Program • Mentoring with local university • Sister school in Spain Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Afterschool support and enrichment tutorials for Year 12 students • Collaboration with Universities and high performing colleges to enhance VCE student performance • Student wellbeing co-coordinators, youth workers, nurses and psychologists • Careers support • Mentoring Program • Student leadership programs • Homework club Extracurricular activities • International student support and tour program • Well-established Performing Arts (music, drama and dance) program with an annual production • School camps, e.g. outdoor education camps and program • City school experience programs • Extensive sports program • Specialised soccer training Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Netball, Rugby, Soccer, Table Tennis, Volleyball Success story ‘When I first arrived at Hume Central Secondary College I had a lot of support from teachers which enabled me to grow in confidence and take on opportunities the college offered me. Now in VCE, initially I was nervous, but my hard work and support from my teachers I am on my way to achieving my goals.’ – Reshani – Year 11 student from Sri Lanka Awards • Australian Mathematics Champion Awards – Distinction • Smith Family Scholarships • State Rugby Champions • Australian Defence Award • Hume City Council Performing Arts Scholarships, 2013 Reasons to choose our school The College offers a diverse range of subject and experiences with close links with Universities Large multicultural campus offering extensive support to students New attractive school grounds close transports and leisure facilities Visit our school online at www.humecentralsc.vic.edu.au Address: 60-78 Tanderrum Way, Broadmeadows VIC 3047 Distance from Melbourne city centre: 17 km (Map Reference: Pg 12-13, E1, No. 53 ) Principal: Glenn Proctor International Student Coordinator: Snezana Veljanovski Telephone: +61 3 9066 3600 Fax: +61 3 9066 3636 Email: hume.central.sc@edumail.vic.gov.au Web: www.humecentralsc.vic.edu.au Number of students: 1120 Number of international students: 3 Dress: Uniform Cost of uniform (approx.): $300 – $500 Cost of homestay per week: $250
  • 56.
    54 Right SchoolRight Place 2014/2015 – Melbourne A-Z John Fawkner Secondary College John Fawkner College is located on spacious grounds 17kms from the CBD. The College prepares students for tertiary and career pathways through a broad curriculum of VCE and VET subjects. Skilled staff at our on-site English language centre help students meet the English requirements of secondary education. The College also partners wih Latrobe University to offer a unique Sports Industry Pathway Program for students wishing to pursue a vocation in the sports industry. Features of the local area • Well-serviced by train lines and bus routes • Close to a number of large and small shopping centres • Close to the Merri Creek natural parkland Languages taught Italian Vietnamese, Syriac and Arabic offered through the Victorian School of Languages Special programs • Comprehensive Language Support program • Extensive Leadership Development program • Senior Sports Specialist Pathway program • Facilitators of the Melbourne City College of Football • Selection of VET subjects Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • English language support staff • Part-time psychologist • Careers resource centre • Peer support program Extracurricular activities • Student camp • Sports program • Student Leadership program • Work Placement program Sports offered Athletics, Australian Rules Football, Basketball, Cricket, Netball, Rugby, Soccer, Swimming, Volleyball Success story ‘International students at John Fawkner College have often commented on how the schools made them feel welcomed. One of the reasons is because we are a small secondary school and as a result students and staff are able to really get to know each other well.’ Awards • State Junior Futsal Champions, 2011 • Top VCE student in in VET Multimedia, 2011 • State Intermediate Soccer Championships, 2007 Reasons to choose our school New Language Centre opened in 2012 New Sports/Learning Complex in 2014 An award winning sports school Visit our school online at www.jfc.vic.edu.au Address: 51 Jukes Road Fawkner VIC 3060 Distance from Melbourne city centre: 17 km (Map Reference: Pg 12-13, F2, No. ) Principal: Gus Napoli International Student Coordinator: Suzie Spirova Telephone: +61 3 9359 1166 Fax: +61 3 9357 1783 Email: john.fawkner.co@edumail.vic.gov.au Web: www.jfc.vic.edu.au Number of students: 380 Number of international students: 5 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: N/A 54
  • 57.
    55For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Kambrya College With its strong focus on academic excellence, Kambrya College is highly regarded as an outstanding international school. The broad school curriculum offers students excellent learning opportunities and a truly international experience. Our on-site Intensive English Language Program assists students meet the English requirements of secondary and higher education. Almost 100% of graduating Victorian Certificate of Education students gain university and tertiary college entry. Features of the local area • Close to major shopping centre, cinema complex, restaurants, banks, quality medical facilities • Peaceful, safe family area with many local parks and sporting facilities • Well serviced by train lines and bus routes • Located in education precinct close to primary schools, Monash University, Chisholm TAFE Languages taught Japanese German Chinese Special programs • Select Entry Accelerated Learning program (SEAL) for high achievers • Extensive range of sporting teams • Established Later Years Careers Program • Commencement program to prepare students for Years 11 and 12 Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Highly skilled English language teachers • Lunchtime tutorials in many subjects • Dedicated study hall area • Careers Resource Centre and personalised course counseling • Strong student welfare focus • Full time nurse Extracurricular activities • Large range of sporting programs • Lunchtime activities program offering a broad range of activities • Local and international student camp and tour program • Community service • Student leadership opportunities Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Hockey, Netball, Touch Rugby, Softball, Soccer, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I enjoy the atmosphere at Kambrya College and was very welcomed on the first day. I have made lots of friends and the teachers are great.’ – Seong Kim – South Korea; Year 10; hopes to study medicine at the University of Melbourne Awards • Top VCE student – Chinese, 2010 • VCE Premiers Award, 2012 • Prime Minister’s Award for Excellence • Intermediate Girls State Softball champions, 2014 • State Touch Rugby champions, 2014 • Australian Clay Target champion, 2013 Reasons to choose our school Excellent VCE results – top 20% of government schools Council of International Schools accreditation as a school of very high quality Well-appointed school gymnasium complex recently completed and opened Visit our school online at www.kambryacollege.com Address: 68 Bemersyde Drive Berwick, VIC 3806 Distance from Melbourne city centre: 45 km (Map Reference: Pg 12-13, K9, No. ) Principal: Michael Muscat International Student Coordinator: Sue Kirkham Chrissie Chen Telephone: +61 3 9707 7600 Fax: +61 3 9702 6277 Email: kambrya.co@edumail.vic.gov.au Web: www.kambryacollege.com Number of students: 1000 Number of international students: 11 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $250 55
  • 58.
    56 Right SchoolRight Place 2014/2015 – Melbourne A-Z Keilor Downs College Keilor Downs College is located on the north-western edge of metropolitan Melbourne. The College has a strong history of academic achievement providing students with an engaging curriculum, including a wide choice of Victorian Certificate of Education studies. Great value is attached to the diversity of our community with staff and students representing over 30 different language backgrounds. The College also offers individual course and career pathway counselling to assist students to reach their personal and academic goals. Features of the local area • Well-serviced by local bus routes and train services • Quiet leafy suburban area near attractive open air parklands • Within easy access of Melbourne International Airport • Close to several large shopping centres Languages taught Italian Japanese Special programs • Victorian School Of Languages on-site Saturday school • Accelerated learning Program for high performing students • Student leadership program and Students Making a Difference (SMAD) community action program • Sporting and PE programs with championship winning success Intensive English Language classes Provided at English Language Centre located within 10 kilometres of school Student support services and programs • Dedicated international student program and facility • International student committee providing peer support • English language support for new students • Specialised in-class student support • Extensive student leadership programs • Individual course and careers counselling Extracurricular activities • Maths and Science competitions • University enhancement studies • Curriculum and Year-level based camps • Music program and performance, including band, solo groups and vocals • Debating teams, book club and chess club • Team sports, fitness club and specialised soccer training Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Hockey, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I really enjoyed my time at KDC. The things I liked best were the environment of the school and the flexibility of the timetable for studying. I also liked my teachers, they were good and really helped me with my work.’ – Dat Cao – Business Management, RMIT Awards • Premier’s Award for Excellence in Food Technology, 2013 • Third Place in Senior Boys Baseball State Finals, 2013 • Perfect score of 50 in VCE Chemistry, 2013 • First Place National Running Championships in 400m, 2013 • Gold and Silver Medals at The Royal Australian Chemical Institute Titration Competition, 2013 Reasons to choose our school Inclusive ethos and culture of acceptance across the school community Students who strive for their best and reach high standards of academic achievement Targeted support and tuition for international students Visit our school online at www.kdc.vic.edu.au Address: 100-110 Odessa Avenue Keilor Downs, VIC 3038 Distance from Melbourne city centre: 20 km (Map Reference: Pg 12-13, C2, No. 56 ) Principal: Stuart Andrews International Student Coordinator: Katherine Judge Anh Tsibouriaris Telephone: +61 3 9365 8000 Fax: +61 3 9367 6490 Email: keilor.downs.sc@edumail.vic.gov.au Web: www.kdc.vic.edu.au Number of students: 1200 Number of international students: 26 Dress: Uniform Cost of uniform (approx.): $170 – $370 Cost of homestay per week: $260 – $270
  • 59.
    57For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Kew High School Within easy access of Melbourne city, Kew High School is a performance oriented secondary school. Renowned for helping students reach their full potential, the school offers a secure environment and outstanding facilities. The high quality learning experience supports all students in their personal and academic growth. A strong support network encourages international students to participate fully in school life. This also assists with the study and social development needed to help achieve their dreams in Australia. Features of the local area • Public transport access by regular tram and bus services • Attractive locale within 10 kilometres of Melbourne city centre • Nearby several strip shopping venues and close to major shopping mall Languages taught Chinese First Language French Japanese Second Language Vietnamese Special programs • Timetabled foundation English classes to give students extra English language support • Math homework club • Year 12 study camp • International student leadership • Participation in state, national and international academic competitions Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Dedicated and experienced support staff including International Student Coordinator (fluent in English and Chinese), Homestay Coordinator and English Language Center Coordinator • Reporting trips to parents in home countries • Careers counseling service • After-school homework club Extracurricular activities • Melbourne and Monash Universities Campus Day • Year 11 Biology camp at Queenscliff Marine Study Centre, and Year 12 study camp • Excursions and incursions in the Arts, Chemistry, EAL, Legal Studies, Media, Physics, and Theatre Studies • Swimming Carnival, House Athletics, and Music Festivals Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Golf, Hockey, Netball, Soccer, Softball, Squash, Swimming, Table Tennis, Volleyball Success story ‘We have the best school support here. All the teachers are enthusiastic and willing to give us extra help at any time. Making ourselves part of school life is the most important thing. So, let’s enjoy the sports, band music and interactions with local students. Having faith in ourselves and others can help put everything just in the right order.’ – Xiaoyu Li – China; studying commerce at the University of Melbourne Awards • The University of Melbourne – Academic Excellence Award winner, 2013 • Australian Math Competition – Prudence Award winner, 2010 • Premier’s VCE Awards – Chinese First Language, 2012 • International Student – School Dux winner, 2009 • Monash University – Engineering Scholarship winner, 2011 Reasons to choose our school Outstanding student outcomes in both academic results and personal development On-site English Language School facilitates a smooth transition into mainstream classes Strong wellbeing support, broad and challenging curriculum and extra-curricular activities provide students with a rewarding and memorable experience Visit our school online at www.kew.vic.edu.au Address: 1393 Burke Road East Kew, VIC 3102 Distance from Melbourne city centre: 10 km (Map Reference: Pg 12-13, G4, No. 57 ) Principal: Clare Entwisle International Student Coordinator: Junling Yang Telephone: +61 3 9859 8652 Fax: +61 3 9819 7880 Email: kew.hs@edumail.vic.gov.au Web: www.kew.vic.edu.au Number of students: 1100 Number of international students: 80 Dress: Uniform Cost of uniform (approx.): $300 – $400 Cost of homestay per week: $290 – $310
  • 60.
    58 Right SchoolRight Place 2014/2015 – Melbourne A-Z Keysborough Secondary College Students of Keysborough Secondary College enjoy a range of education choices. The school operates over two modern campuses offering a broad subject curriculum supporting both academic and vocational study pathways. Studies of science, mathematics, commerce, technology and the arts provide university pathways. Other courses guide students towards Technical and Further Education. International students are welcomed into a safe, caring education environment and supported to achieve success. An English Language Centre is located on-site. Features of the local area • Easy public transport access by regular train and bus services • Urban features, including parks, playing fields and modern lifestyle amenities • Conveniently located to shopping centre and other services Languages taught Chinese French Special programs • Experienced international Chinese, Khmer and Vietnamese program assistants • Local university student mentoring • Leadership training program for students Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Highly experienced international student program staff team • Additional after school tuition for international students provided free • Careers resource centre • Junior and senior resource centres • School nurse Extracurricular activities • Student camp and interesting excursions • Homework club after school • Sports program offering a choice of activities Sports offered Athletics, Badminton, Basketball, Cricket, Cross Country, Futsal, Netball, Soccer, Swimming, Table Tennis, Tennis, Volleyball Success story ‘Keysborough College helped me a lot during my high school years and I was able to achieve the results required to get into my ideal course. Teachers at school were very dedicated and enthusiastic in teaching and supporting us. I am always proud of being a student of Keysborough Secondary College.’ – Vien Huynh – Vietnam; studying electrical engineering and computer systems on scholarship at Monash University Awards • Monash University Dean’s Scholars Award, 2013 • Australian Defence Force University – scholarship, 2013 • Caltex Best All-Rounder Award, 2013 • Debating Association of Victoria – finalists, 2012 • Distinctions in Australian Mathematics Competition, 2013 Reasons to choose our school Accepting school community with a strong sense of teamwork among staff and students A range of purpose built education facilities includes brand-new smart classrooms for all year levels Pioneering education programs resourced with high level, best of breed ICT equipment Visit our school online at www.keysboroughsc.vic.edu.au Address: AcaciaCampus: Isaac Road Keysborough, VIC 3173 BanksiaCampus: Janine Road Springvale South, VIC 3172 Distance from Melbourne city centre: 25 km (Map Reference: Pg 12-13, I7/I8, No. 58 ) Principal: Heather Lindsay International Student Coordinator: Mitze Ho Telephone: Fax: AcaciaCampus: +61 3 9798 1877 +61 3 9798 5196 BanksiaCampus: +61 3 9546 4144 +61 3 9558 5761 Email: keysborough.sc@edumail.vic.gov.au Web: www.keysboroughsc.vic.edu.au Number of students: 1600 Number of international students: 70 Dress: Uniform Cost of uniform (approx.): $350 – $450 Cost of homestay per week: $250
  • 61.
    59For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Koonung Secondary College Bordering cosmopolitan Box Hill, Koonung Secondary College in Mont Albert North is a co-educational Years 7-12 school. Staffed by a team of qualified and committed professionals, the college nurtures a stimulating learning environment. Students access a challenging, wide-ranging curriculum and study within a secure, disciplined environment. Both academic and personal development is actively encouraged. The college promotes a culture of excellence that endorses respect for others and generates student leadership interest and opportunities. Features of the local area • Well-serviced by train lines and bus routes • Central location within easy access of Deakin, Monash, Melbourne and RMIT universities • Close proximity to the popular multicultural Box Hill shopping district Languages taught Chinese to Year 12 French to Year 12 Japanese to Year 12 Special programs • Years 7-12 English as an Additional Language classes • Innovative, state-of-the-art teacher program with University of Melbourne student teachers assisting in classrooms • Notebook computers as student study aids • Year 10 pathways program focusing on careers and tertiary study transition • Year 9 Live Life Program aimed at engaging students Intensive English Language classes Provided at two English Language Centres located within 5 kilometres of school Student support services and programs • Experienced international Chinese and Vietnamese program assistants • Careers resource centre • International student captains • Peer support program • School counsellor • School nurse Extracurricular activities • Chinese, French and Japanese study tours • Homework club to assist with student progress and development • World Challenge overseas educational expeditions • Annual school musical production • Instrumental music instruction • Sport for all year levels • Lunchtime clubs and activities Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Fitness Testing, Golf, Hockey, Minor Games, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story In 2013, all international students achieved very pleasing VCE results with the top two ATAR’s of 97.2 and 96.9. In addition, Lingya Zhang’s sporting contribution to Victoria was recognised through a Victorian International School Student Award. Hye Yeon Baek (International Student Captain) achieved an exceptional university entrance score of 99.55 in 2011 and is currently studying commerce at Melbourne University. Awards • Premier’s VCE Award – Maths Methods, 2013 • Victorian International School Student – Sports Achievement Award, 2013 • ICAS Writing Award Top Medal, 2013 • State Hockey Champtions, 2013 Reasons to choose our school Student leadership opportunities enhanced by a positive and well-bonded school community Year 12 students overwhelmingly achieve successful completion of VCE Language and senior study centres located close to international student coordinators Visit our school online at www.koonung.vic.edu.au Address: 615 Elgar Road Mont Albert North, VIC 3129 Distance from Melbourne city centre: 14 km (Map Reference: Pg 12-13, H4, No. 59 ) Principal: Peter Wright International Student Coordinator: Tracey Song Telephone: +61 3 9890 9662 Fax: +61 3 9899 0228 Email: koonung.sc@edumail.vic.gov.au Web: www.koonung.vic.edu.au Number of students: 1080 Number of international students: 50 Dress: Uniform Cost of uniform (approx.): $500 Cost of homestay per week: $270
  • 62.
    60 Right SchoolRight Place 2014/2015 – Melbourne A-Z Lalor North Secondary College A co-educational school in Melbourne’s northern suburbs, a convenient location well-served by public transport, close to shops and sporting facilities. We have students from over 40 countries and multiculturalism is celebrated. We have international students who are integrated fully with mainstream English-speaking students in all programs. We offer a balanced and varied program which includes academic, practical, vocational and physical options. There is strong welfare support and the Coordinator works closely with parents and host families. Features of the local area • Serviced by regular public transport train and bus routes • Located at the urban fringe with parks, waterways, walking and bicycle tracks • Close to shopping centres, cosmopolitan markets and the Preston dining precinct • Easy commute to the city Languages taught Italian Special programs • Music Futures Program VET certificate in Music; singing, instrumental, performances • Student leadership program • A focus on academic success with extensive literacy and numeracy programs • Multi-ethnic aides to assist in classes and with community issues. • La Trobe University partnership provides student mentoring and tutoring • 1:1 Student laptop program Intensive English Language classes Provided at English Language Centre located within 4 kilometres of school Student support services and programs • Team-based teachers and coordinators • After-school homework club • Careers resource centre • University student tutors program • School leaders program • Peer support program • Part-time psychologist, welfare support Extracurricular activities • Year level student camps and tours including snow trips, surf days, bush walking • Dancing • Student led excursions such as city tours, football matches, restaurant visits, beach days Sports offered Athletics, Australian Rules Football, Baseball, Basketball, Cricket, Netball, Soccer, Softball, Table Tennis, Tennis, Volleyball Success story ‘School and teaching is very different in Australia, but there is help. I had to learn to ask more questions and work in teams. I did not enjoy oral presentations until I knew the other students – this was good in a mixed class. Uni life is different – you have to get the information before you make your choice.’ – Thi Thuy Tram Pham – Vietnam; studying mathematics/statistics at RMIT University Awards • Italian Poetry Competition Finalists, 2013 • Australian National Chemistry Quiz – Distinction, 2013 • The University of Melbourne – Kwong Lee Dow Scholarship Winner, 2013 • Australian Mathematics Trust – Distinction, 2013 • University of New South Wales – Science Competition High achievers, 2013 Reasons to choose our school Small school offering students a personal learning experience and life within a close community Multicultural campus with comprehensive team-based student welfare support Good range of curriculum study choices including music, sport and elective options Visit our school online at www.lalornthsc.vic.edu.au Address: 114 Childs Road Epping, VIC 3078 Distance from Melbourne city centre: 20 km (Map Reference: Pg 12-13, G1, No. 60 ) Principal: Denise Veltre International Student Coordinator: Margaret Badham Telephone: +61 3 9401 3888 Fax: +61 3 9408 6983 Email: lalor.north.sc@edumail.vic.gov.au Web: www.lalornthsc.vic.edu.au Number of students: 450 Number of international students: 16 Dress: Uniform Cost of uniform (approx.): $300 – $390 Cost of homestay per week: $280 – $350
  • 63.
    61For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Lilydale Heights College Lilydale Heights College provides excellent opportunities for students in a positive and safe environment. We enjoy spacious and attractively treed grounds near the Yarra Valley. Our broad curriculum caters for all students with specialist programs in Health/PE, Music, Arts and Technology. Students focus on independent learning with the opportunity to select studies to develop their talents. Our dedicated mentors, academic tutors and wellbeing staff will support students during their time at the College. Features of the local area • Gateway to the Yarra Valley • Close to shopping centres and sporting facilities • Well-serviced by train-lines and bus routes Languages taught Japanese Indonesian Special programs • Sister Schools in Japan and China • Music enrichment program • Sports programs • Education enhancement programs • Accelerated VCE program • Year 12 Study Camp • Year 10 Work Experience Intensive English Language classes Provided at English Language Centre located within 15kms from the school Student support services and programs • One specialist international student tutor • Part-time psychologist • Part-time Adolescent Health Nurse • Part-time Mental Health Nurse • Careers resource centre • Peer Support Program • Supportive Friends Program • Mentoring Program Extracurricular activities • School camps and tours including annual Japan Tour, Central Australia Tour, Ski Trips • College Production • Music performances, bands and camps • Art exhibition and film festival • Variety of clubs including Robotics, Art, Games, Book Club, Homework, Maths Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Cricket, Hockey, Netball, Soccer, Swimming, Table Tennis, Volleyball Success story ‘I have made so many friends and will never forget my time at the College. I have learnt so much about the culture and school life in Australia. The support I received from the staff and students has made my time memorable.’ – Charlotte, Year 9 student France Awards • Gold, Silver and Bronze Shield winners at the Melbourne Bands Festivals • TAC Cup Players • Kwong Lee Dow recipients • Representative of cricket overseas • State Rugby Players • State Cricket Players Reasons to choose our school Dedicated learning space and team of teachers at each year level Small school offering personalised experience An award winning musical school Visit our school online at www.lilydaleheights.vic.edu.au Address: 17-19 Nelson Rd Lilydale VIC 3140 Distance from Melbourne city centre: 40 km (Map Reference: Pg 12-13, K3, No. 61 ) Principal: Greg Hancock International Student Coordinator: Isabella Phillips Telephone: +61 3 9735 1133 Fax: +61 3 9739 5463 Email: lilydale.heights.co@edumail.vic.gov.au Web: www.lilydaleheights.vic.edu.au Number of students: 600 Number of international students: 0 Dress: Uniform Cost of uniform (approx.): $200 Cost of homestay per week: $220
  • 64.
    62 Right SchoolRight Place 2014/2015 – Melbourne A-Z Lyndale Secondary College The positive learning community of Lyndale Secondary College takes pride in helping students fulfil their education ambition. Success is constant cause for celebration as the comprehensive curriculum invests in students a diverse range of skills and knowledge. A dedicated studies wing prepares senior students for further study in an adult learning environment. Year 12 students may even enhance their learning by incorporating Monash University or University of Melbourne degree studies within the Victorian Certificate of Education. Features of the local area • Serviced by regular train and bus routes • Within close proximity of the picturesque Dandenong Ranges and national park • A short distance from Monash University • Easily access to Melbourne city centre Languages taught Japanese French Special programs • Enrichment and accelerated learning including Accelerated learning Program for high performing students • Monash University and University of Melbourne enhancement studies • Modern science facilities • New language centre • Instrumental music program • Sporting program at local and state level Intensive English Language classes Provided at English Language Centre located within 5 kilometres of school Student support services and programs • International student committee to support new students • Access to extensive English as an Additional Language support • Careers resource centre and counsellors • Student welfare team • Full-time psychologist Extracurricular activities • Local and international camps • Choice of student leadership activities and programs • Instrumental music, including individual, bands, vocal instruction and performance • Chess and science clubs Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Hockey, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I would like to thank all of my teachers at Lyndale Secondary College for helping me achieve very good results and also to the many friends I have made at the school.’ – Tracy Nguyen – Vietnam Awards • Boys Baseball State Champions, 2008-09, 2011, 2013 • Boys Table Tennis Champions, 2012 • Three students awarded sport scholarships to College in Canada and USA, 2014 Reasons to choose our school Family-like school community and a supportive, caring environment A reputation for academic excellence and range of curriculum subject choice Various opportunities for students to participate in leadership and personal development Visit our school online at www.lyndale.vic.edu.au Address: Gladstone Road Dandenong North, VIC 3175 Distance from Melbourne city centre: 24 km (Map Reference: Pg 12-13, I7, No. 62 ) Principal: Mark Moir International Student Coordinator: Pam Robinson Telephone: +61 3 9795 2366 Fax: +61 3 9790 1466 Email: lyndale.sc@edumail.vic.gov.au Web: www.lyndale.vic.edu.au Number of students: 1200 Number of international students: 12 Dress: Uniform Cost of uniform (approx.): $250 – $300 Cost of homestay per week: $250 – $300
  • 65.
    63For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Macleod College Macleod College enjoys a reputation for academic success and excellent Victorian Certificate of Education results. Student achievement in physics, biology, psychology and music is of particular note. The college educates Years Prep-12 and offers an exceptional range of subject choice. Extracurricular programs are a special strength and include the Macleod College Music Academy, student leadership and resilience and wellbeing programs. The school enjoys close ties with La Trobe University, located just two kilometres away. Features of the local area • Very well-serviced by train lines and bus routes • Native parklands within walking distance from school (Gresswell Forest and kangaroos) • Close to shopping centre • 20 minutes by train to Melbourne city centre Languages taught German Special programs • International students pastoral care and extra study support • School partnerships in China and Germany • Student leadership program, including international student captaincy • School camps and interstate trips • Vocational Education and Training/Victorian Certificate of Applied Learning programs • Years 7-10 High Achievers Program • Before and after-school care Intensive English Language classes Provided at English Language Centre located within 12 kilometres of school Student support services and programs • Health and wellbeing team (School nurse, chaplain, youth worker) • Careers resource centre including full-time careers and further education teacher • Multiple subject teachers instruct the same class to provide learning stability • Peer support program • Student welfare coordinator • School psychologist Extracurricular activities • Range of student leadership opportunities • Homework Club, (English, Mathematics, Science) • School Radio Station • Music Program • Sport Program Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Cricket, Cross Country, Fencing, Fitness, Handball, Hockey (Field and Indoor), Netball, Recreational Sports, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘Macleod College is a wonderful school as there are many friendly people here from lots of different countries. The teachers in all of my subjects are helpful and my English has improved. I am enjoying the subjects that I have chosen and am learning a lot. I hope that I will be able to get into a university course to study engineering.’ – Macleod College student Awards • Annual ADF Long Tan Leadership and Teamwork Award • String Orchestra – Highly Commended at South Street Festival, 2013 • University of Melbourne Kwong Lee Dow Award • Gold Medal Winners – National Schools Basketball Tournament, 2011 • State Finalists – Senior Table Tennis, 2013 • Jazz Bands – Silver and Bronze Shields – Victorian School Bands Festival, 2013 Reasons to choose our school Individually focused learning experience in a friendly, cooperative and respectful environment Experienced specialist teachers providing English as an Additional Language classes International Student Coordinator liaises regularly with students, parents and Homestay families Visit our school online at www.macleod.vic.edu.au Address: Carwarp Street Macleod, VIC 3085 Distance from Melbourne city centre: 12 km (Map Reference: Pg 12-13, G2, No. 63 ) Principal: Mario Panaccio International Student Coordinator: Colleen Cochrane Telephone: +61 3 9459 0222 Fax: +61 3 9458 1878 Email: macleod.co@edumail.vic.gov.au Web: www.macleod.vic.edu.au Number of students: 620 Number of international students: 24 Dress: Uniform Cost of uniform (approx.): $250 – $300 Cost of homestay per week: $250 – $280
  • 66.
    64 Right SchoolRight Place 2014/2015 – Melbourne A-Z Maribyrnong College Bordering an outdoor reserve and nearby river parklands, Maribyrnong College is just 8km from Melbourne’s heart. Students enjoy excellent new and refurbished facilities and the school is rapidly establishing a reputation for academic excellence and high standards of student behaviour. Teachers from diverse backgrounds are skilled in supporting non-English speaking students both in class and after school. Maribyrnong College is well serviced by public transport and close to both Victoria University and Highpoint shopping centre. Features of the local area • Regular tram and bus public transport services • Adjacent to parkland and Peaceful river precinct • Adjacent to Highpoint Shopping Centre and Maribyrnong Aquatic Centre; close to Melbourne city Languages taught Italian Vietnamese at the nearby Victorian School of Languages Special programs • Experienced Vietnamese international program assistants • Tertiary style learning and student mentoring at nearby Victoria University • Extra tuition in Victorian Certificate of Education subjects after school • Sports academy program – outstanding sports school Intensive English Language classes • Provided at English Language Centre located within 5 kilometres of school • Small class sizes in English as an Additional Language and foundation English Student support services and programs • Two specialist international student program facilitators • Careers resource centre with experience helping students plan tertiary pathways • Peer support program Extracurricular activities • Year 12 High Achievers’ Club • Year 12 Leadership Camp • Year 11 Study Camp • Sports including after-school badminton • Chess club • International Student event each term Sports offered The college offers many sports and opportunities to participate in representative school teams. Sporting strengths include Athletics, Badminton, Basketball, Swimming and Soccer. Success story ‘Maribyrnong offered me the best opportunities to develop both in my study and in my life. It provided modern facilities, after-school classes and professional teachers who were willing to help me whenever I needed. Maribyrnong was like my second home.’ – Huy Le was our first International Student leader at the College. He is now in his third year of a Teaching Degree at Victoria University. Awards • Dux of the School – International Student Huy Vu, 2013 • State Champions in intermediate boys tennis and baseball, 2014 • Victorian International School Student – Sports Achievement Award, 2012 • Top VCE student in Vietnamese, 2011 • State Champions in senior girls cricket, 2013 • State Champions in many sports, 2011-13 Reasons to choose our school Superb new sports facilities including badminton, basketball and soccer stadiums Recent school works including classroom renovations, new science facilities and grounds landscaping A diverse student population and a positive, multicultural school community Visit our school online at www.maribsc.vic.edu.au Address: 2 River Street Maribyrnong, VIC 3032 Distance from Melbourne city centre: 8 km (Map Reference: Pg 12-13, D3, No. 64 ) Principal: Nick Scott International Student Coordinator: Judy Cameron Telephone: +61 3 9091 8100 Fax: +61 3 9318 4251 Email: maribyrnong.sc@edumail.vic.gov.au Web: www.maribsc.vic.edu.au Number of students: 1180 Number of international students: 30 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $230 – $250
  • 67.
    65For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch McClelland College McClelland College is located in spacious, leafy grounds minutes from pristine beaches, beautiful parks and shopping centres, with good transport links to the CBD. Our caring and experienced teachers coupled with our personalised learning approach guarantees each student has an individual learning program and career plan to suit their needs. Students enjoy the unique Academy Program where they follow their passion and perfect their skills. The school has strong ties to Monash and Melbourne Universities. Features of the local area • Very close to public transport; well-serviced by train-lines (to the CBD) and bus routes • Close to beautiful beaches, shopping centre and cinemas • Close to Monash University Peninsula Campus Languages taught Japanese (first language and second language) Special programs • Accelerated learning programs • Experienced English Language teachers • Specialised academy programs including Soccer, Maths, Science, Basketball and Music. • Student leadership programs • Established close links with Monash and Melbourne University • School-owned camp in the foothills of the Victorian ski slopes Intensive English Language classes • Provided at nearby English Language Centre • Extra English language enrichment tuition for international students by qualified EAL teacher Student support services and programs • Part-time psychologist and full-time access to a personal counselor • Careers Resource Centre and personalised Career Pathway Advisor • Access to state-of-the-art gymnasium and indoor heated swimming pool • International Student Centre with computer access and kitchen facilities • After school study club Extracurricular activities • Camps and Excursions; Central Australia, Snow and Surf Camps • International student orientation tour program • State Emergency Service Rescue Training • Maths and Science Competitions and Tutoring • International Exchange to USA, Fiji, Japan Sports offered Athletics, Australian Rules Football, Baseball, Basketball, Cricket, European Handball, Hockey, Netball, Rugby, Soccer, Softball, Table Tennis, Tennis, Volleyball Success story ‘I thoroughly enjoyed my time studying at McClelland College. The teaching staff were very caring and supportive, which helped me to achieve entry into my dream course at the University of Melbourne.’ – Josh Hughes, former McClelland College School Captain and current Bachelor of Science student at Melbourne University, majoring in Physics Awards • Monash University Extension Studies DUX, 2013 • Early Entry into University awarded to McClelland students, 2014 • VCE Top Achiever Business Management – Perfect VCE Study Score of 50, 2013 • Environmental Sustainability Awards, 2011-14 • Best Secondary School Leadership Team in Victoria, 2013 • National Excellence in Teaching Award, 2012 Reasons to choose our school We know every student and care about the whole student: their education, personal development, career and tertiary pathways Excellent academic programs tailored to suit individual student learning needs McClelland Academy Program – every student follows their passion! Visit our school online at www.mcclellandcollege.vic.edu.au Address: Belar Avenue, Frankston VIC 3199 Distance from Melbourne city centre: 40 km (Map Reference: Pg 12-13, H11, No. ) Principal: Amadeo Ferra International Student Coordinator: Kathryn Henderson Telephone: +61 3 9789 4544 Fax: +61 3 9776 5211 Email: mcclelland.sc@edumail.vic.gov.au Web: www.mcclellandcollege.vic.edu.au Number of students: 900 Number of international students: 0 Dress: Uniform Cost of uniform (approx.): $250 Cost of homestay per week: $240 - $260 65
  • 68.
    66 Right SchoolRight Place 2014/2015 – Melbourne A-Z McKinnon Secondary College Most McKinnon Secondary College students aspire to and achieve university entry. A large co-educational school, the college has a long and proud tradition of academic excellence. Abundant student choice is a feature of the broad curriculum, offering over 30 Victorian Certificate of Education subjects. Learning is based on traditional subject disciplines that maximise the alternatives available to students in later years. The south-eastern location is easily accessed by public transport and close to Monash University. Features of the local area • Serviced by regular train and bus routes • Busy and vibrant suburb with a pleasing, leafy aspect close to the city and beach reserves • Nearby major shopping centre Languages taught French German Special programs • Experienced Chinese aide • Close links with local university • Extensive instrumental music program • Wide choice of sporting activities Intensive English Language classes Provided at English Language Centre located within 4 kilometres of school Student support services and programs • Student manager support at all year levels • Careers resource centre • Peer support program • Student welfare program Extracurricular activities • Camps and excursions at all year levels • Junior and senior leadership roles • Debating and drama opportunities Sports offered Alternative Sport Gala Day, Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Netball, Rugby, Soccer, Softball, Swimming, Table Tennis, Tennis Success story ‘My greatest achievement during these two years of study at MSC was making friends, taking part in fun and meaningful activities and sharing precious moments with my classmates and teachers’ – Shirley Cao – China. Dux of school 2013. ATAR 99.85 studying Science, Melbourne University Overall, our international students are consistently successful with 40% placing in the top 10% of the State Awards • Two Premier’s VCE Awards, 2013 • Numerous winners in national mathematics, English and geography competitions • Top VCE student awards, 2010 • State winners in debating competitions • State champions in football, soccer, hockey, netball and cross country in recent years Reasons to choose our school Renowned as one of the top performing Victorian Certificate of Education schools in Victoria Numerous music instruction and performance as well as sporting opportunities Newly built facilities for Year 7, administration and staff recently opened Visit our school online at www.mckinnonsc.vic.edu.au Address: McKinnon Road McKinnon, VIC 3204 Distance from Melbourne city centre: 12 km (Map Reference: Pg 12-13, G6, No. 66 ) Principal: Pitsa Binnion International Student Coordinator: Stuart Baker Telephone: +61 3 8520 9000 Fax: +61 3 9578 9253 Email: mckinnon.sc@edumail.vic.gov.au Web: www.mckinnonsc.vic.edu.au Number of students: 1850 Number of international students: 48 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $280
  • 69.
    67For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Melbourne Girls’ College Melbourne Girls’ College, “Where Girls Lead and Achieve”, provides a quality educational experience incorporating intellectual challenge as well as opportunities for personal and social development. Our students learn in a safe and caring environment. We encourage high standards of achievement, leadership, discipline and responsibility. MGC values the diversity of our student population and encourages a harmonious community that embraces opportunities to foster global citizenship. Features of the local area • Set in gardens opposite parklands overlooking the Yarra River • Accessed from CBD by 3 trams, a train line and by suburban bus • 15 minutes from Melbourne CBD and close to Victoria Gardens Shopping Centre Languages taught French Chinese Other languages arranged through VSL Special programs • Competitions in public speaking, mathematics, writing, science and art • Acceleration: Gifted & Talented, access to University Enhancement Programs • VET: hospitality, community service, sport • Selected as a Confucius School • Careers Program including mock job interviews, work experience and tertiary information sessions Intensive English Language classes Provided at nearby English Language Centre. Transition to MGC Program including liaison to develop EAL students’ language competency Student support services and programs • Full-time International Student Manager and a Chinese/Vietnamese-speaking assistant • Psychologist/counselor, careers advisor • Academic support by email contact with teachers at any time • Designated study areas and resources • Peer Support and Supportive Friends • After school Homework Help Program Extracurricular activities • Instrumental music studios • Performing Arts Centre (music, drama, dance) • Aerobics and personal training fitness centre • Rowing from our own pontoon • Tennis on school’s own courts • Year Level camps, class excursions and student clubs Sports offered Badminton, Basketball, Cricket, Cross Country, Cycling, Diving, Hockey, Netball, Rowing, Soccer, Surf Lifesaving, Table Tennis, Tennis, Volleyball Success story ‘Attending MGC was the best decision I have ever made because MGC is such an outstanding school. Through my years at MGC, I did not only learn to excel academically; but most of all, I made friends and learned about myself, my capabilities and my passions. I am very grateful for my teachers’ and friends’ support for bringing me to where I am today.’ – Hannah Nguyen – ATAR 98.2 – currently studying Bachelor of Science (Honours) at the University of Melbourne Awards • Top VCE Scorers Award from the Victorian School of Languages for Chinese • State Schools Sports Awards • Premier’s Award for LOTE and VET Hospitality • Outstanding Achievement Award from World Vision 40 Hour Famine • Rotary International Public Speaking Award and Writing Award • Sustainability Victoria Resource Smart Schools Awards Reasons to choose our school Impressive academic results with VCE scores in top 10% of government schools An exciting student leadership program: SRC, peer support, junior ambassadors, captains New include contemporary cafeteria, mezzanine performance studio Visit our school online at www.mgc.vic.edu.au Address: Yarra Boulevard Richmond, VIC 3121 Distance from Melbourne city centre: 4 km (Map Reference: Pg 12-13, F4, No. 67 ) Principal: Karen Money International Student Coordinator: Bronwyn McGarry Telephone: +61 3 9428 8955 Fax: +61 3 9428 2737 Email: melbourne.girls.co@edumail.vic.gov.au Web: www.mgc.vic.edu.au Number of students: 1200 Number of international students: 65 Dress: Uniform Cost of uniform (approx.): $500 Cost of homestay per week: $285 – $300
  • 70.
    68 Right SchoolRight Place 2014/2015 – Melbourne A-Z Mentone Girls’ Secondary College Mentone Girls’ College students gain outstanding learning and student leadership opportunities with a unique girls-only education. Catering for both academic and vocational study streams, the curriculum offers a wide subject choice of Science, Maths, Commerce, Technology and Art creating university pathways. Other subjects may lead to Technical and Further Education. Located beside the bay, 23 kilometers from Melbourne CBD. The College has strong links with Melbourne, Monash and Deakin Universities. Features of the local area • Well-serviced by train lines and bus routes • Three minutes from swimming beach • Close to large Southland Shopping Centre Languages taught Japanese French Special programs • Year 12 Victorian Certificate of Education study conference • Student leadership program • School sponsors a student from Soweto to study in Australia • Student environment committee Intensive English Language classes Provided at English Language Centre located within 8kms of school (English Language School onsite from 2015) Student support services and programs • Full-time student wellbeing coordinator • Careers resource centre • Peer support program • Supportive friends program • Safe Schools Coalition member • Part-time psychologist Extracurricular activities • Camps program • Sister schools in France, Japan, South Africa and China • World Challenge overseas educational expeditions • Co-curricular activities in debating, performing arts, sport, leadership • Music program Sports offered Aerobics, Archery, Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Beach Activities, Circus Skills, Cross Country, European Handball, Golf, Gymnastics, Hip Hop, Hockey, Indoor Hockey, Korfball, Lacrosse, Netball, Orienteering, Soccer, Swimming,TableTennis,Tchoukball,Tennis, Volleyball,Weights/Fitness, Zumba Success story ‘I benefited a lot from this experience. My English has improved in leaps and bounds. School offers a wide range of subjects. You can choose the subjects that you enjoy. I live in a home-stay. It’s just like my second home.’ – Tear, Year 12 – Hohhot, China Awards • National History Challenge finalists, 2013 • Top Designs – multiple selections, 2012 • State sporting competitions – multiple finalists • Australian Brain Bee competition – multiple finalists • Pierre de Coubertin Award, 2014 • Maths Challenge for Young Australians – multiple distinctions Reasons to choose our school Excellent facilities including purpose designed music centre and newly built media centre Outstanding VCE results with the vast majority of student progressing to tertiary study School teams in a wide range of sports competing at state level and beyond Visit our school online at www.mgsc.vic.edu.au Address: Cnr Balcombe and Charman Roads Mentone, VIC 3194 Distance from Melbourne city centre: 23 km (Map Reference: Pg 12-13, G7, No. 68 ) Principal: Deborah Lehner International Student Coordinator: Doanvy Roberts Ekaterina Xanthopoulos Telephone: +61 3 9581 5200 Fax: +61 3 9585 1012 Email: mentone.girls.sc@edumail.vic.gov.au Web: www.mgsc.vic.edu.au Number of students: 1100 Number of international students: 11 Dress: Uniform Cost of uniform (approx.): $600 Cost of homestay per week: $280 – $300
  • 71.
    69For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Mill Park Secondary College Located north of Melbourne’s city centre, Mill Park Secondary College is a dual- campus co-education school. Its generous school population allows the college to offer a wide-ranging choice of Victorian Certificate of Education subjects. International students enjoy the use of a dedicated centre and are further supported by an on-site English Language Centre. The school enjoys an outstanding record of academic success. Many graduates achieve high Victorian Certificate of Education results and gain admission to world-class universities. Features of the local area • Close to train-line and bus routes • Close to major shopping centers • Enjoyable lifestyle amenities including public libraries, parks, sporting and entertainment facilities Languages taught Italian Special programs • Uni Bridges Science themed program that has direct entry into selected LaTrobe University Degree courses • Student leadership possibilities • Select Accelerated Learning Programs for high performing students • Extensive Visual and Performing Arts Programs • Wide choice of Vocational Educational and Training subjects Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Dedicated International Student Coordinator • Careers centre with dedicated careers counsellors • Caring and experienced student welfare team • Years 7-12 pastoral care program • Homework club Extracurricular activities • Instrumental music tuition and performance • Debating and public speaking teams • Annual college production Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Netball, Soccer, Softball, Swimming, Tennis, Volleyball Success story ‘I came to Mill Park Secondary College two years ago from Vietnam and soon learnt that the teachers in this college are very happy to spend extra time helping students. This has prepared me well for my final year of VCE. Thank you to all my teachers.’ – Thien Tin Pham – Vietnam; Year 11 Awards • Scholarship – University of Melbourne and Trinity College Young Leaders Program • Winner of the Living Spirit Fellowship Award • Runners-Up in the La Trobe University Mooting Competition • Runners-Up in the Middle Years Division Chess Competition • Bronze – Under-16 200m at Australian Junior Track and Field National Championships Reasons to choose our school Dedicated International Student Centre Large multicultural campus offering a smaller, more personalised program Excellent science facilities including specialist rooms for chemistry and physics studies Visit our school online at www.millparksc.vic.edu.au Address: Moorhead Drive Mill Park, VIC 3082 Distance from Melbourne city centre: 22 km (Map Reference: Pg 12-13, G1, No. 69 ) Principal: Tricia Horner International Student Coordinator: Marilyn Pridmore Telephone: +61 3 9409 8222 Fax: +61 3 9401 5966 Email: mill.park.sc@edumail.vic.gov.au Web: www.millparksc.vic.edu.au Number of students: 1600 Number of international students: 24 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $260 – $280
  • 72.
    70 Right SchoolRight Place 2014/2015 – Melbourne A-Z Mordialloc College Mordialloc College is at the gateway to Victoria’s beautiful Mornington Peninsula. A co-educational school, the college serves south-eastern suburbs and is only a train ride from Melbourne CBD. A tradition of academic excellence showcases high teaching standards and celebration of student success. The school also enjoys a reputation for nurturing personal development and motivating students to achieve. Staff take great pride in fostering the development of future global citizens. Features of the local area • Public transport access by regular train and bus services • Beautiful natural setting with generous school grounds and close to swimming beaches • Nearby local shopping centre Languages taught French Special programs • Accelerated learning program for high performing students • Music and performing arts programs • Art and studio arts courses • ‘Advance’ outdoor education program • Camps and excursions • Year 9 ‘Mordialloc Experience’ community- based learning • Years 7-8 enquiry learning programs • Life saving club partnership Intensive English Language classes Provided at English Language Centre located within 15 kilometres of school Student support services and programs • English as an Additional Language support • Excellent careers centre advising on a range of study and careers pathways • Teacher supervised Years 7-12 after school study clubs • Study skills program running all year at all year levels • Full-time wellbeing counsellor, part-time psychologist, school nurse • Victorian Certificate of Education one-to-one student NetBook program Extracurricular activities • Year level camps • Performing arts program including annual production or Rock Eisteddfod Challenge • Participation in inter-school sporting competitions Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Hockey, Netball, Surf Life Saving, Swimming, Table Tennis Success story ‘Studying in Mordialloc College has been a memorable and precious time in my life. Its friendly, rich Aussie atmosphere helped me to embrace a different culture and mix into mainstream society easily. The friends I made in Mordialloc are my treasure forever. Advice from the teachers will guide me through on my way to success.’ – Luya (Joyce) Wang – China; studying actuarial studies at the University of Melbourne Awards • Only Victorian secondary school invited to present at the Future Schools Conference, Sydney, 2014 • City of Kingston Citizen of the Year Award, 2013 • Finalist in many sporting competitions, 2013-14 Reasons to choose our school Harmonious learning community of staff and students working towards common goals Delivery of inspired junior programs and commitment to academic focus in senior years Recently opened science centre and brand new multimedia resource hub Visit our school online at www.mcsc.vic.edu.au Address: 1 Station Street Mordialloc, VIC 3195 Distance from Melbourne city centre: 20 km (Map Reference: Pg 12-13, H8, No. 70 ) Principal: Michelle Roberts International Student Coordinator: Di Douglas Telephone: +61 3 9580 1184 Fax: +61 3 9587 5443 Email: mordialloc.co@edumail.vic.gov.au Web: www.mcsc.vic.edu.au Number of students: 600 Number of international students: 5 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $270 (Plus contribution to internet cost)
  • 73.
    71For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Mornington Secondary College Mornington Secondary College provides an inspirational learning environment. Located on Mornington Peninsula’s picturesque natural coastline, the college offers outstanding facilities and resources. Expansive grounds provide a setting for sports, performing arts and recreational facilities. Specialist classrooms and up-to-date computer equipment also feature. The school promotes a strong work ethic in supporting students to reach study goals. Blending academic rigour, initiative and self discipline is integral to the culture that supports each student’s path to success. Features of the local area • Within a short distance of beautiful bay and ocean surf beaches • Close to famous Mornington Peninsula gourmet food and wine growing region Languages taught Japanese Indonesian Special programs • Osaka, Japan sister city relationship • Denpasar, Bali, Indonesia senior high sister school • School Access Monash – Preparing students of University • Instrumental music and choir ensembles and performances • Sports Specialism School – Basketball, Netball, Swimming, Athletics • Student Ambassadors – Student Leadership Intensive English Language classes Provided at English Language Centre onsite Student support services and programs • International Student Coordinator • International student Homestay coordinator • Careers/pathways resource centre • Student welfare program • School chaplain Extracurricular activities • World Challenge overseas student camp • Theatre production camp • Music camp • Outdoor education ski camps • Human powered vehicle program and events Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Futsal, Golf, Hockey, Netball, Rugby, Soccer, Softball, Swimming, Table Tennis, Tennis Success story ‘Studying at MSC is fun! Teachers are very knowledgeable and are able to simplify teaching to help me understand the lesson well. They give so much effort to take a personal interest in helping me with my school work. I loved the atmosphere in the school and the way the school offered a lot of activities which made learning fun.’ – Anne Orbon – Philippines Awards • Boys Cross Country State Champions, 2014 • Junior girls gymnastics state champions, 2013 • Aerobics Year 7 State Champions, 2014 • Girls diving state finalists, 2013 • Junior boys soccer state finalists, 2013 • Individual girl gymnastics state champion, 2013 Reasons to choose our school Positive school spirit among staff and students inspiring a strong sense of community Extensive program of academic subject choices and individual or team sporting activities Well resourced school set in attractive grounds close to beautiful bay beaches Visit our school online at www.mornsc.vic.edu.au Address: 1051 Nepean Highway Mornington, VIC 3931 Distance from Melbourne city centre: 60 km (Map Reference: Pg 12-13, G12, No. 71 ) Principal: Sarah Burns International Student Coordinator: Jim Papas Telephone: +61 3 5970 0200 Fax: +61 3 5970 0299 Email: mornington.sc.@edumail.vic.gov.au Web: www.mornsc.vic.edu.au Number of students: 1400 Number of international students: 3 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $230 – $250
  • 74.
    72 Right SchoolRight Place 2014/2015 – Melbourne A-Z Mount Alexander College Senior secondary students at Mount Alexander College enjoy small class sizes and excellent learning opportunities. The school boasts a new science centre plus purpose designed Information and Communications Technology and multimedia facilities. The Middle Years education program takes an individual wellbeing and learning style focus. Experienced staff and advanced resources support student learning right across the curriculum. Situated close to Melbourne city, RMIT and Victoria Universities, the college is easily accessed by public transport. Features of the local area • Well-serviced by train lines and bus routes • Exciting inner city urban environment • Close to major shopping centre Languages taught Italian Chinese Special programs • Melbourne University student mentoring • Access to nearby university teaching facilities • Drama and art • Student leadership and girls leadership programs • SEAL program • The Duke of Edinburgh’s Award Intensive English Language classes Provided at English Language Centre located within 4 kilometres of school Student support services and programs • International Student Coordinator • Careers resource centre • Student welfare coordinator • School nurse • Speech therapist • Special education consultant Extracurricular activities • Year level camps • School band and performance opportunities • Arts, film festival and music participation • Chess, computer and soccer clubs • Breakfast club Sports offered Athletics, Basketball, Australian Rules Football, Netball, Soccer, Swimming, Volleyball Success story ‘Teachers are dedicated. Class sizes are small, so we get lots of help from teachers. I quickly improve my English through the ESL class and get one-to-one tutoring from a university student in the Ormond College tutoring program.’ – Xuan Loc Le – Vietnam Awards • VCE Top Achiever – Arabic, 2011, Vietnamese, 2012 • High Distinctions Australian Mathematics Competition, 2013 • LOTE Film Festival Award • High Distinctions Australian National Chemistry Awards, 2013 • Bayside Film Festival Award Reasons to choose our school Unified and welcoming school community offering students a personal learning experience Vibrant multicultural school community with students from diverse backgrounds Outstanding musical program and science facilities Visit our school online at www.mountalexandercollege.vic.edu.au Address: 169-175 Mt Alexander Road Flemington, VIC 3031 Distance from Melbourne city centre: 4 km (Map Reference: Pg 12-13, E4, No. 72 ) Principal: Alan Davis International Student Coordinator: David Hanna Telephone: +61 3 9376 1622 Fax: +61 3 9376 5232 Email: mount.alexander.712@edumail.vic.gov.au Web: www.mountalexandercollege.vic.edu.au Number of students: 310 Number of international students: 6 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $270 – $300
  • 75.
    73For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Mount Eliza Secondary College A successful international program has been a long-standing feature at Mount Eliza Secondary College. Many participating students have excelled in Victorian Certificate of Education Studies and gained entry to top Melbourne universities. International students thrive personally and academically within the healthy, nurturing environment provided at school and by Homestay families. The college is situated within a scenic natural coastal environment. Public transport is easily accessed as are spectacular beaches and Monash University Peninsula Campus. Features of the local area • Close to public transport and shopping centre • An short distance to numerous clean, safe swimming beaches • Nearby Monash University Peninsula Campus Languages taught Chinese as a first language Indonesian German Special programs • International student tutorial program • International study tours • Acceleration studies offered in all subjects • University enhancement for high-performing students • Innovative student leadership program incorporating international student captain • Mentor program • Homework club Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • International student secretary and homestay coordinator; Assistant Principal as International Student Coordinator • Chinese teacher fostering close contact and communication with families and students • Careers resource centre with full time counsellor • Peer support program • Instrumental music program • Victorian Police Youth Corp Program Extracurricular activities • Camps including Central Australian tour • International student excursions/study tours • Cultural Diversity programs • Functions including Year 10 Formal, Debutante Ball, Valedictory Dinner • Interschool sport • Lunchtime activities Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Hockey, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘The best thing about Mount Eliza Secondary College is the wonderful teachers. All the teachers have lots of patience with the International students and try many different ways to help us understand. And we are lucky, too, because the homestay families are very good hearted and make us feel like part of their family.’ – Ouyang Ying, China, studying a Bachelor of Business / Commerce degree, 2013 Awards • National Skating Champion, 2013 • National Junior Badminton Champion, 2011-13 • Archibald Prize -Young Artist awards, 2013 • State Debate Champions, 2012 • Multiple awards regional and state-level sports, 2011-13 Reasons to choose our school Specialised international program facilities incorporating English Language Centre on-site Outstanding Homestay program with established, caring Homestay families in large homes Excellent academic program which provides students with a school netbook free of charge Visit our school online at www.mesc.vic.edu.au Address: Canadian Bay Road Mt Eliza, VIC 3930 Distance from Melbourne city centre: 55 km (Map Reference: Pg 12-13, H12, No. 73 ) Principal: Angela Pollard International Student Coordinator: Andrew Musgrave Telephone: +61 3 9787 6288 Fax: +61 3 9787 9888 Email: mount.eliza.sc@edumail.vic.gov.au Web: www.mesc.vic.edu.au Number of students: 750 Number of international students: 30 Dress: Uniform Cost of uniform (approx.): $250 Cost of homestay per week: $230 – $240
  • 76.
    74 Right SchoolRight Place 2014/2015 – Melbourne A-Z Mount Erin College Positioned on the border of beautiful Mornington Peninsula, Mount Erin College offers a rich academic curriculum and harmonious learning environment. Year 12 academic results place Mount Erin among the best-performing government colleges within the south-eastern region. The school enjoys strong ties with nearby Monash University, where many graduating Year 12 students continue on to world class tertiary education. Mount Erin College is located just one hour from Melbourne. Features of the local area • Well serviced by train and bus • Only 4 kilometers to swimming beaches • Provincial school campus • Nearby shopping centres Languages taught Auslan Indonesian Chinese can be studied by arrangement (off-site) Special programs • Experienced international Chinese and Indonesian program assistants • Accelerated learning Program for high performing students • Monash University student mentoring • Sports academy • Arts academy • Management committee for students to plan events such as fund-raisers Intensive English Language classes Provided at English Language centre located within 3km Student support services and programs • Tutorial system to support VCE students • Careers Counsellor and resource Centre • Order of Australia Peer Support Program Extracurricular activities • New Zealand excursion • Indonesian excursion • Pre-driver education • School theatre production night • School band performances Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Golf, Hockey, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story Mount Erin College’s first international student, Li Jun Yan, rapidly developed her English in our Accelerated English classes, and assimilated quickly with the local students here. She rapidly became very confident and capable in class, and relished the cultural experiences the College gave her the opportunity to experience. Li Jun Yan trod the path first that many will follow! Awards • Order of Australia Award for Supportive Friends Program • Monash and Deakin University High Achievers Awards for Academic Excellence • Young Leaders Award – Frankston Shire • Kwong Lee Dow Melbourne University Scholarships, 2010-14 • Long Tan Leadership and Teamwork Awards, 2009-14 • Regional, State and National sports representatives Reasons to choose our school Monash University alliance offering student tuition and tertiary pathways $9 million building program for expanded science facility and senior annex Multilingual teachers including Chinese and Indonesian Visit our school online at www.mounterin.vic.edu.au Address: Robinsons Road Frankston South, VIC 3199 Distance from Melbourne city centre: 53 km (Map Reference: Pg 12-13, I12, No. 74 ) Principal: Karen Lee International Student Coordinator: Karen Lee Telephone: +61 3 5971 6000 Fax: +61 3 5971 1421 Email: mount.erin.sc@edumail.vic.gov.au Web: www.mounterin.vic.edu.au Number of students: 896 Number of international students: 0 Dress: Uniform Cost of uniform (approx.): $380 Cost of homestay per week: $240
  • 77.
    75For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Mount Waverley Secondary College Mount Waverley Secondary College is a co-educational school in Melbourne’s east. One the largest government schools in Victoria, the college is noted for its students’ consistent academic success. Set over two campuses, the school offers modern junior facilities for Years 7-8, designed to meet the specific learning and developmental needs of adolescents. A separate senior site supports Years 9-12 with advanced resources and stimulating environments. A majority of graduates receive university offers and progress to tertiary study. Features of the local area • Well-serviced by train lines and bus routes • Peaceful, leafy suburb in easy proximity to city • Shopping centres, churches, public library, hospitals Languages taught German Japanese Chinese as a first language Special programs • Monash University enhancement program for high achieving students • Year 12 university residential program prepare students for Victorian Certificate of Education challenges • Enrichment programs including poetry, debating, mathematics competitions, Science Talent Search, World Skill Competition • Engaging programs at all year levels including camps and ‘City Experience’ Intensive English Language classes Provided at English Language Centre located within 4 kilometres of school Student support services and programs • English as an Additional Language support • Careers resource centre • Mentor groups for senior students • Peer support program • Nurses and counsellors • After-school homework club Extracurricular activities • Study tours to Japan and Germany • Victorian Certificate of Education team- building programs • Exam preparation and revision program for Victorian Certificate of Education students • Debutante ball, fancy dress ball, valedictory dinner • Swimming, gymnastics, lunchtime activities and active sports programs Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Hockey, Netball, Soccer, Swimming, Table Tennis, Tennis Success story Won-Ki Noh came to study in Australia as an international student and graduated in 2007 achieving a university entrance score of 99.55. He is now studying a Bachelor of Dental Science at the University of Melbourne, which is his dream come true. After graduating Year 12 in 2011, Chunkai Qiu has won a coveted scholarship to Monash University, Engineering Faculty in 2012. Awards • VCE Premier’s Award for Further Maths – Minh Wayne Tat, 2013 • World Vision Victorian Youth Ambassador, 2014 • Australian Maths Competition – 17 High Distinctions and 118 Distinctions, 2013 • Norman A Smith Memorial Scholarship, 2013 • Pierre de Coubertin Award, 2013 • Oaktree Ambassador, 2014 Reasons to choose our school Renowned for Victorian Certificate of Education student pass rate and high level of first-round university offers Years 7-9 education enrichment classes and university subjects available at Year 12 Dedicated learning centres for music, art, design, media and drama plus a separate VCE area Visit our school online at www.mwsc.vic.edu.au Address: Lechte Road Mount Waverley, VIC 3149 Distance from Melbourne city centre: 18 km (Map Reference: Pg 12-13, H5, No. 75 ) Principal: Mark Kosach International Student Coordinator: Linda Smith Telephone: +61 3 9803 6811 Fax: +61 3 9887 9308 Email: oss@mwsc.vic.edu.au Web: www.mwsc.vic.edu.au Number of students: 1850 Number of international students: 35 Dress: Uniform Cost of uniform (approx.): $400 – $500 Cost of homestay per week: $270
  • 78.
    76 Right SchoolRight Place 2014/2015 – Melbourne A-Z Mullauna Secondary College Positioned in Mitcham, an eastern suburb of Melbourne, Mullauna College is an academic, co-educational secondary school for Years 7 – 12 students. Mullauna has a strong tradition of academic excellence, active student leadership and outstanding music, visual arts and sporting programs. The College staff delivers a comprehensive curriculum, and employs targeted teaching strategies to maximise individual student potential. Personalised course counseling supports students’individual pathways to university. Features of the local area • Convenient and regular public transport by train and bus; 20 minutes to the city • Close to multi-cultural Box Hill and Doncaster, and shops, entertainment and recreational venues • Easy access to universities and TAFE colleges Languages taught German Indonesian Special programs • Accelerated learning and education enrichment at all year levels • International student extended study program • English as an Additional Language classes and support • Participation in national English, Mathematics and Science competitions • Student Leadership, debating, visual arts, music and sport programs Intensive English Language classes Provided at English Language Centre located within 5 kilometres of school Student support services and programs • Experienced International Chinese Coordinator • Chinese, Vietnamese and German speaking teachers/Education Support staff • Pastoral Care program • Specialist international student tutors • Student Wellbeing Coordinator and part-time psychologist • Career counselling tailored to individual pathways Extracurricular activities • VCE Study Camp at Melbourne University and camps at all year levels • World Challenge Expedition • Instrumental music tuition and annual School Production • Debating and inter-school sport Sports offered Aerobics/Dance, Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Fitness, Football Codes, Hockey, Netball, Outdoor Education, Soccer, Softball, Sport Games, Swimming, Table Tennis, Volleyball Success story ‘I loved this school. The teachers were passionate and willing to help. This made me feel important and special. I have kept friends I made here to this day. I enjoyed the sporting activities. Accepting leadership roles of Connect Leader and College Captain was a rewarding experience and allowed me to make a difference for other new arrivals’. – Meng Sam – Cambodia; studying commerce (honours) at the University of Melbourne Awards • Premier’s Commendation for Academic Excellence – International Student, 2013 • Australian Maths Competition – High Distinctions and Distinctions • The Victoria Shield for Excellence in Debating, 2011-13 • Monash University Dean’s Scholars 2011-12, Ancor Imparo Leadership Program, 2013 • Pierre de Coubertin Award – academic and sporting excellence, 2013-14 • Melbourne University Kwong Lee Dow Scholar Program Reasons to choose our school Rigorous academic programs built on student preferences and differentiated instruction Strong sense of community between staff, parents and students Extensive, modern facilities including computers, laboratories, double court stadium and a new air conditioned VCE Learning Centre opened in 2014 Visit our school online at www.mullauna.vic.edu.au Address: 456 Springfield Road Mitcham, VIC 3132 Distance from Melbourne city centre: 16 km (Map Reference: Pg 12-13, I4, No. 76 ) Principal: Barbara Laidlaw International Student Coordinator: Chiu Kwan Tong Telephone: +61 3 9874 3422 Fax: +61 3 9873 2943 Email: mullauna.sc@edumail.vic.gov.au Web: www.mullauna.vic.edu.au Number of students: 550 Number of international students: 15 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $260
  • 79.
    77For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Noble Park Secondary College A vibrant multicultural school, Noble Park Secondary College offers diverse learning opportunities. Mathematics, Science and Technology subjects carry strong curriculum emphasis and students access a large number of other academic subjects. Intermingled with a caring and supportive environment, Noble Park Secondary College prioritises the use of technology as a tool to develop 21st Century learning. All students have their own individual netbook/laptop to enable learning ‘anywhere anytime’ Features of the local area • Well-serviced by train lines and bus routes • Close to other multiculturally diverse suburbs • Nearby a number of shopping centres • Close to Monash University Languages taught Japanese Special programs • Student-centered English as an Additional • Language • VCE, VCAL and VET learning pathways • Homework support club • One-to-one Net Book program • Student-focused Year 7 program • Personalised learning program for all students Intensive English Language classes Provided at English Language Centre located within 1 kilometre of school Student support services and programs • International student services and lounge • University Tutors for senior students • Careers resource centre • Peer support and mentor programs • College Psychologists • Speech therapist • Literacy / Numeracy support • Junior and Senior Year Level Coordinator’s • Student Leadership • School bus for student pick up and drop off Extracurricular activities • Local and interstate camps • Japanese exchange program • International student events and excursions • Music bands, instrumental music, private tuition, annual productions • Public speaking and debating Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Cricket, Futsal, Golf, Hockey, Lunchtime Sports Activities, Netball, Rugby Union, Soccer, Swimming, Table Tennis, Tennis Success story Noble Park Secondary College has had many success stories. In 2012/2013, 100% of our students received their desired pathways. Mi Do was Dux of Noble Park Secondary College. Mi Do had only been in Australia for three years when she scored a University entrance score of 99 in the Victorian Certificate of Education. Her subjects included Specialist Maths, Chemistry, Maths Methods and Physics. Awards • Academic excellence and Endeavour Award • Arthur William Junior Citizenship Award • Caltex award for outstanding effort and contribution in work experience • Debaters Association of Victoria – multiple best speaker awards • Commonwealth Bank Math Award • Eye to Eye Award (Art) Reasons to choose our school Right size to personalise learning for every student New state of the art technology and facilities Comprehensive senior education program including VCE/VCAL/VET and student mentoring Visit our school online at www.nobleparksc.vic.edu.au Address: 3 Callaghan Street Noble Park, VIC 3174 Distance from Melbourne city centre: 35 km (Map Reference: Pg 12-13, I7, No. 77 ) Principal: Pam Dyson International Student Coordinator: Elizabeth Roshiah Telephone: +61 3 9546 9066 Fax: +61 3 9562 4757 Email: noble.park.sc@edumail.vic.gov.au Web: www.nobleparksc.vic.edu.au Number of students: 473 Number of international students: 25 Dress: Uniform Cost of uniform (approx.): $230 Cost of homestay per week: $230 – $250
  • 80.
    78 Right SchoolRight Place 2014/2015 – Melbourne A-Z Northcote High School Northcote High School is set in generous grounds, 2 kilometres north of Melbourne CBD. The school was established 85 years ago and supports students to achieve outstanding academic results. Highly qualified and experienced staff teach a wide subject curriculum. Sciences, mathematics, commerce, humanities, technology and the arts studies are all offered. The international program is a valued part of the co-educational school’s culturally diverse learning community. Northcote High School is nearby universities and tertiary institutions. Features of the local area • Excellent public transport including tram, train and bus services • Adjacent to parkland surrounds of Merri Creek • Convenient to the busy High Street Northcote Strip Shopping Precinct and within easy access of Northland shopping centre Languages taught Chinese as a first and second language French Italian Modern Greek Special programs • Acclaimed music program • Outstanding sports program • Strong sister school program in China, Italy and France • Over 40 Victorian Certificate of Education study choices • Mentoring by local university students Intensive English Language classes Provided at English Language Centres located within 2-4 kilometres of school Student support services and programs • Strong English as an Additional Language program • Additional English, Maths and Science tuition for international students • Strong, supportive group of inspirational and committed teachers • Well-established international program with a very able support team • Experienced international program assistants • After-school support Extracurricular activities • International student camp outside Melbourne • Trips and excursions to experience the beauty of Australia’s coastline and rural retreats • Staff and student discos, dinners and celebratory events Sports offered Athletics, Basketball, Cricket, Football, Hockey, Netball, Soccer, Table Tennis Success story ‘I fell in love with the dark red colour of the school buildings on my first school day. Red colour makes me feel warm. I then quickly found out that all the teachers and classmates have warm hearts too. This is a very happy and exciting school and I enjoy every minute here.’ – Year 11 student from China Awards • Australian Mathematics Competition award, 2013 • State girls intermediate soccer – champions, 2013 • Premier’s VCE Awards – 50-Perfect VCE Study Scores students • Victorian International School Student – Arts Achievement Award, 2012 • State athletics championship – gold medallist, 2013 • National Girls Volleyball Team and National Girls Aerobic Team, 2013 Reasons to choose our school A learning community with a strong academic work ethic among both students and staff Large school with capacity to offer a broad subject choice and varied education experiences Strong partnership links with the top universities – The University of Melbourne, RMIT University, Latrobe University and Monash University Visit our school online at www.nhs.vic.edu.au Address: St. George’s Road Northcote, VIC 3070 Distance from Melbourne city centre: 2 km (Map Reference: Pg 12-13, F3, No. 78 ) Principal: Kate Morris International Student Coordinator: Lixia Wang Telephone: +61 3 9488 2334 Fax: +61 3 9488 2399 Email: info@nhs.vic.edu.au Web: www.nhs.vic.edu.au Number of students: 1700 Number of international students: 85 Dress: Uniform Cost of uniform (approx.): $300 – $350 Cost of homestay per week: $285
  • 81.
    79For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Parkdale Secondary College Located within Melbourne’s bayside suburbs, Parkdale Secondary College stands proud as a progressive and student-focused government school. A body of over 1100 students attend the co-educational college that promotes a safe, supportive and welcoming learning environment. Success is embraced for every student as the school’s quality teaching guides individuals on a dynamic, stimulating and engaging learning journey. Each student is challenged to reach their potential, becoming life-long learners and effective, caring community members. Features of the local area • Serviced by easy to access public transport – buses and trains • Close distance to bayside swimming beaches Languages taught Japanese French Special programs • Elite Sports Program • Art Enhancement Program – Dance • Science, Technology, Engineering Program • Links with local Universities • Leadership pathways • Experienced international assistants supporting students with transition to Victorian government school Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Specialist international student tutors • Careers resource centre • International student program centre • International student buddy program • Full-time psychologist Extracurricular activities • Various excursions around Victoria • Regular city excursions • Surf safety training • School music ensembles and theatre productions • Lunchtime activities • Games club • High performance programs with national level coaching support Sports offered Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Futsal, Golf, Hockey, Netball, Soccer, Softball, Squash, Table Tennis, Tennis, Volleyball, Success story ‘Parkdale Secondary College is a great place to come to study as an international student. The facilities are of high quality and there are many more to come. The environment is a very positive one where all students and staff work together well. There is plenty of support available for students should any need arise. Students are given many opportunities to develop leadership, academics, sports and arts.’ – Keit Loi – Malaysia; Year 12 student and school captain Awards • Premier’s VCE Awards – Chinese First Language; Dance, 2009 • University of Melbourne Young Scholars program, 2010 • Pierre De Coubertin Annual Award – Spirit of Sportsmanship Reasons to choose our school Strong network of support for students extending both inside and outside school Excellent academic programs tailored to suit individual student learning needs Sports, science and performing arts programs that showcase student strengths and talents Visit our school online at www.parkdalesc.vic.edu.au Address: Warren Road Mordialloc, VIC 3195 Distance from Melbourne city centre: 22 km (Map Reference: Pg 12-13, H8, No. 79 ) Principal: Gregory McMahon International Student Coordinator: Debby Chaves Telephone: +61 3 9580 6311 Fax: +61 3 9587 3142 Email: parkdale.sc@edumail.vic.gov.au Web: www.parkdalesc.vic.edu.au Number of students: 1350 Number of international students: 35 Dress: Uniform Cost of uniform (approx.): $400 – $600 Cost of homestay per week: $260 – $280
  • 82.
    80 Right SchoolRight Place 2014/2015 – Melbourne A-Z Point Cook Senior Secondary College Point Cook Senior Secondary College students benefit from a full range of education pathway options. A program of Individual Learning and Pathways Plans helps students develop their study, career and tertiary education focus. Years 11-12 students access a subject range spanning academic and vocational courses. Study units are offered alongside school based apprenticeships and vocational subject choices. In partnership with local universities, the school also offers accelerated tertiary study in areas like mathematics and information technology. Features of the local area • Public transport access by frequent train and bus services • Within easy distance of Melbourne city centre • Full local shopping facilities within 1 kilometre of school Special programs • Select Tertiary Admission Masters Program (STAMP) • Access to local university teaching facilities • Vocational Education and Training Aero Skills subject available • English as an Additional Language program available, years 10-12 Intensive English Language classes Provided at English Language Centre located within 10 kilometres of school Student support services and programs • Well-resourced careers centre with experienced careers counsellor • Student advisory program at all year levels • Student wellbeing leader • Community outreach services Extracurricular activities • Year 12 study camp • Year 12 valedictory function • Year 11 careers evening • Year 10 Queensland tour • Year 10 work experience • Year 10 formal Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Cricket, Netball, Soccer, Swimming, Table Tennis, Tennis Success story ‘Every student at this school is supported to achieve success in their chosen pathway.’ – Jane Iwunze; College student leader, 2011 Awards • University of Melbourne Young Scholare Program • Architectural Design Award, 2009 • Telecome Advertising Design Competition – winner, 2010 Reasons to choose our school Individual student planning to create personal learning, career and tertiary pathways A young adult learning environment supported by advisory program at all year levels Full range of education pathway options including VCE, VCAL and VET studies Visit our school online at www.pointcooksenior.vic.edu.au Address: Cnr Boardwalk Boulevard and Bergamot Drive, Point Cook, VIC 3030 Distance from Melbourne city centre: 25 km (Map Reference: Pg 12-13, B6, No. 80 ) Principal: Greg Sperling International Student Coordinator: Chris Mooney Telephone: +61 3 9395 9271 Fax: +61 3 9395 4964 Email: point.cook.senior.sc@edumail.vic.gov.au Web: www.pointcooksenior.vic.edu.au Number of students: 760 Number of international students: 10 Dress: Uniform Cost of uniform (approx.): $400 – $500 Cost of homestay per week: $250 – $270
  • 83.
    81For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Princes Hill Secondary College Princes Hill Secondary College supports the development of the whole person. The college program encourages students to always seek excellence and respect the rights of others. Limited international student numbers provide a good opportunity to improve and consolidate English quickly. Students are actively encouraged to communicate with their local peers and contribute in class. The school fosters an environment where students grow confident, gaining internationally valued skills and knowledge to support their university study or employment. Features of the local area • Well-serviced by trams, trains and bus routes • Walking distance to University of Melbourne, Melbourne Museum, Lygon Street shops and cinema in Carlton • Close to the Melbourne city centre Languages taught Italian French Special programs • Intensive English as an Additional Language lasses • Access to University of Melbourne teaching facilities • Large music/drama program with 400-seat theatre and 20 instrumental music teachers • Inclusive sports and health program catering for all interests and abilities • Technical and Further Education subjects available in Year 11-12 • Victorian Certificate of Applied Learning Intensive English Language classes Provided at two English Language Centres located within 4 kilometres of school Student support services and programs • Experienced Chinese multicultural aide • Supportive team of English as an Additional Language teachers • Intensive career advice from a team of pathways teachers • Peer support program • Full-time student welfare coordinator • Part-time psychologist Extracurricular activities • Camps for skiing, boot camp, Year 7 orientation, art at Mirimbah campsite • International study tours program: Italy, China, New York, Russia, France, Vietnam • University of Melbourne science activities • Large debating, drama and music programs • Active interschool sports program • Student leadership forum Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Futsal, Hockey, Netball, Snow Sports, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I made a lot of friends throughout my time at Princes Hill. The teachers were very nice and they were willing to help me achieve my best results. The subjects were very interesting and I really enjoyed school.’ – Fei – China; studying commerce at the University of Melbourne Awards • State Athletics Finalists, 2014 • LaTrobe University Vice Chancellor’s Scholarship, 2013 • Science Talent Search Finalist, 2014 • VCE Top Arts - selected multiple years • French Alliance Francais - Year 12 First Place, 2014 Reasons to choose our school Excellent Victorian Certificate of Education results and record; 100% of international students gain university entrance Collegiate community spirit and strong sense of belonging among staff and students Broad study choices across a range of core subjects with VCE, VET, VCAL all offered Visit our school online at www.phsc.vic.edu.au Address: Arnold Street Princes Hill, VIC 3054 Distance from Melbourne city centre: 2 km (Map Reference: Pg 12-13, F3, No. 81 ) Principal: Trevor Smith International Student Coordinator: Debra Icely Telephone: +61 3 9389 0600 Fax: +61 3 9387 0108 Email: princes.hill.sc@edumail.vic.gov.au Web: www.phsc.vic.edu.au Number of students: 850 Number of international students: 9 Dress: Non-uniform Cost of homestay per week: $280 – $300
  • 84.
    82 Right SchoolRight Place 2014/2015 – Melbourne A-Z Reservoir High School The modern facilities at Reservoir High School are set within spacious grounds. A full complement of academic and vocational studies is offered so students may develop personal learning pathways to university, employment and further education. The school supports a student body drawn from many different backgrounds with dedicated, caring staff and English as an Additional Language classes at each year level. A short distance from Melbourne city centre, the school is easily accessed by public transport services. Features of the local area • Well-serviced by trams, train lines and bus routes • Very close to a variety of restaurants, shopping centres and markets • Melbourne, La Trobe and RMIT universities are all within close proximity of school Languages taught Italian Special programs • Experienced international Chinese, Vietnamese and Arabic program assistants • Extra tutoring for international students in all subject areas • University of Melbourne and LaTrobe University extension programs • Accelerated learning Program for high performing students • Interschool sports competitions • Leadership programs and extension activities Intensive English Language classes Provided at English Language Centre located within 10 kilometres of school Student support services and programs • Specialist international student tutors • Sister schools in China and Italy • Dedicated centre for Victorian Certificate of Education students • Careers resource centre • Homework programs Extracurricular activities • International student camp and tour program • Musical and theatrical performance opportunities • Popular sports activities and competitions • Debating team Sports offered Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Hockey, Netball, Soccer, Softball, Table Tennis, Tennis, Volleyball Success story ‘I experienced a wonderful and memorable life at Reservoir High School. From day one teachers and classmates warmly welcomed me and during the past two years I’ve made lots of supportive friends. Nothing has given me more happiness than the feeling of being part of a big, warm and caring family. I would like to express my appreciation towards the school that provided such a caring environment for me, so that I could adapt into a new culture and pursue my dream.’ – Wenxin Cai – China; studying Bachelor of Medicine, Surgery and Science at the University of Queensland Awards • VCE Premier’s Award and VCE Top Arts Awards • Australian Schools Mathematics Competition - Distinctions • University of Melbourne Kwong Lee Dow Scholarship • Pierre De Coubertin Athletics Award • Wakakirri Dance Performance Awards and State Finalists, 2014 • Victorian Brain Bee National Science Challenge Award Reasons to choose our school Culture of nurturing individuals and supporting students to achieve academic excellence Multicultural school offering intensive English as an Additional Language class support Wide variety of exciting extracurricular activities including science, music and performance Visit our school online at www.reservoirhs.vic.edu.au Address: 855 Plenty Road Reservoir, VIC 3073 Distance from Melbourne city centre: 10 km (Map Reference: Pg 12-13, G2, No. 82 ) Principal: Mark Jessup International Student Coordinator: Christine Farrugia Telephone: +61 3 9466 0900 Fax: +61 3 9471 0252 Email: reservoir.hs@edumail.vic.gov.au Web: www.reservoirhs.vic.edu.au Number of students: 600 Number of international students: 35 Dress: Uniform Cost of uniform (approx.): $350 Cost of homestay per week: $270 Other fees: Optional school camps
  • 85.
    83For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Ringwood Secondary College Located east of Melbourne, Ringwood Secondary College offers a rich education opportunity. Students are challenged to extend themselves across both academic and vocational studies. Technical, creative, scientific and business pathways are balanced by a breadth of practical training programs. Talented staff ensure wellbeing and inclusion while personal study and career guidance is also provided. English as an Additional Language support is accessed on-site. The college is renowned for academic success, sporting prowess and a proud historical heritage. Features of the local area • Easy school access by rail and bus • Positioned at the gateway to the beautiful Dandenong Ranges and national park • Walking distance to Eastland shopping complex and business precinct Languages taught French Indonesian Special programs • International and provincial school tours • Range of education extension activities • Instrumental music program • Individual student mentoring • Year 9 challenge program Intensive English Language classes Provided at English Language School onsite/or located within 6 km Student support services and programs • Dedicated international student tutors • Tight-knit international student group led by an international student prefect • Careers resource centre • Proactive student counselling programs • Peer support program • Overseas visits/guests • School chaplain Extracurricular activities • Regular camps and social events • Common period events • Concerts and performances • Aerobics and all sports • Debutante ball • Student and staff recognition events for science, sport, art and heritage Sports offered Aerobics, Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Equestrian, Golf, Hockey, Netball, Skiing, Soccer, Squash, Swimming, Table Tennis, Tennis, Volleyball Success story The Truong family have sent four of their children to the College. Naomi, their youngest, comments “I am here to explore every opportunity given to me by Ringwood Secondary College. I make the most of everything which comes my way and have fun at the same time.” She still resides with the same home stay as her siblings. The friendship, family interaction and rapport that emanates is pure joy and typifies the nature of the international experience. Awards • State Plain English Speaking Award – finalist • Victorian Premier’s Award – Textiles • Winner, jazz ensemble, national performing arts eisteddfod • VCE Top Arts and media awards Reasons to choose our school High levels of participation in sport, performing arts and a strong student voice Excellent academic outcomes with students successfully achieving education goals Learning community with a definite spirit of engagement between staff and students Visit our school online at www.ringwoodsc.vic.edu.au Address: Bedford Road Ringwood VIC 3134 Distance from Melbourne city centre: 27 km (Map Reference: Pg 12-13, J4, No. 83 ) Principal: Michael Phillips International Student Coordinator: Leah Pritchard Telephone: +61 3 9870 2002 Fax: +61 3 9879 5414 Email: ringwood.sc@edumail.vic.gov.au Web: www.ringwoodsc.vic.edu.au Number of students: 1450 Number of international students: 19 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $260–$280
  • 86.
    84 Right SchoolRight Place 2014/2015 – Melbourne A-Z Rosehill Secondary College A single campus, co-educational school, Rosehill Secondary College motivates students to academic excellence. Set within appealing grounds, the school provides a safe and stimulating environment where students are encouraged to reach their full potential. Students may select from a wide array of Victorian Certificate of Education subjects. Acceleration options like the University of Melbourne Mathematics Extension Program are also offered. International students are quickly immersed into the student body with the benefit of a dedicated support network. Features of the local area • Well-serviced by train lines, tram and bus routes • Excellent range of nearby sporting facilities and clubs • Close to shopping centre Languages taught Japanese Italian Special programs • University of Melbourne Mathematics Extension Program • One to One senior mathematics and science tuition • Accelerated studies in most learning areas • Years 7-10 Selective Talent Enrichment Program • Instrumental music program • Kogakkan High School, Japan sister school exchange program Intensive English Language classes Provided at English Language Centre located within 10 kilometres of school Student support services and programs • Three specialist international student tutors • Part-time psychologist • Careers resource centre • Peer support program Extracurricular activities • Student leadership programs and competitions • Overseas trips to Italy and Japan • Musical, cabaret and theatre productions • Year 11 Debutante Ball • School camp program, including ski and outdoor activities • Instrumental music performance and concerts Sports offered Athletics, Australian Rules Football, Baseball, Basketball, Cricket, Futsal, Golf, Hockey, Lawn Bowls, Netball, Rugby, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I feel very happy to be studying at Rosehill. My friends are kind and helpful; they are from all over the world including Finland, Vietnam, Greece, Italy and China. My Teachers are very supportive, it’s a great school. I am studying double mathematics, physics, chemistry and EAL. When I finish Year 12 I plan to study Civil Engineering at RMIT University.’ – Zhi Hong Chen – China, Year 12 Student Awards • Outstanding School Leadership for Sustained Numeracy Improvement, 2011 • VCE DUX Annual Award • Kwong Lee Dow Young Scholars • State swimming – finalist, 2011 • Victoria University Science Award • State senior boys basketball – finalist, 2011 Reasons to choose our school A strong sense of community, and spirit of cooperation between staff and students Academic rigor and an individualised tailored curriculum providing a comprehensive range of subjects New state of the art science facilities opening in 2015 Visit our school online at www.rosehillsc.vic.edu.au Address: Sapphire Street Niddrie, VIC 3042 Distance from Melbourne city centre: 8 km (Map Reference: Pg 12-13, D3, No. 84 ) Principal: Peter Rouse International Student Coordinator: Arthur Soumalias Telephone: +61 3 9337 2488 Fax: +61 3 9331 0525 Email: rosehill.sc@edumail.vic.gov.au Web: www.rosehillsc.vic.edu.au Number of students: 1160 Number of international students: 5 Dress: Uniform Cost of uniform (approx.): $250 Cost of homestay per week: $270
  • 87.
    85For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Sandringham College A beautiful bayside environment is the setting for Sandringham College. The school welcomes students from Europe, South America and Asia to enjoy its tradition of excellence and opportunity. One of the largest VCE providers in Melbourne, Sandringham College offers over 70 VCE subject choices. Specialist teachers and an experienced international team ensure excellent teaching and smooth integration with local students. The supportive community helps international students to enjoy Victoria and achieve both learning and personal goals. Features of the local area • Well-serviced by train lines and bus routes • Safe and established residential area with easy access to beautiful swimming beaches • Close to shopping centres and essential lifestyle amenities Languages taught Indonesian French Special programs • English as an Additional Language classes • Free after school tutoring program three nights a week • Golf Academy • Student Leadership Program • Pre-VCE support and orientation program • Well-established music, arts, dance, science humanities and vocational learning programs Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Chinese and Japanese multicultural aides • International student Homestay coordinator and international program leader • Careers resource centre with careers counsellor providing study and career advice • Peer support program • Full-time welfare counsellor • Part-time psychologist on site Extracurricular activities • Golf Academy • Ski and outback camps program • International student recreation lounge • Whole school music and dance productions • Round robin sporting program • Europe/USA Dramatic Arts Tour Sports offered Athletics, Australian Rules Football, Basketball, Cycling, Golf, Kayaking, Netball, Orienteering, Rock Climbing, Sailing, Soccer, Snorkelling, Snow Skiing, Surfing, Swimming, Tennis, Wind Surfing Success story ‘I originally enrolled for a 6 month program, but loved the school and environment so much that I extended to complete my VCE. With my Food Technology and Hospitality qualifications from Sandringham, I won a scholarship to the International College of Hotel Management, Adelaide, the great Sandy staff helped me find this career path!’ – Barnaby Rautenberg, 2013 Awards • Prime Minister’s Award for Excellence in Music and Global Politics, 2013 • Vocational Education and Training Provider Award, 2013 • Two VCE Top Design Awards for Fashion, 2013 • Six Applied Learning Awards, 2013 Reasons to choose our school School population drawn from many nations offering a diverse learning experience Safe, clean beachside setting An award winning college with strong links to Monash, Melbourne and RMIT universities Visit our school online at www.sandringhamsc.vic.edu.au Address: Holloway Road Sandringham, VIC 3191 Distance from Melbourne city centre: 15 km (Map Reference: Pg 12-13, G7, No. 85 ) Principal: Allen McAuliffe International Student Coordinator: Denise Cornish Telephone: +61 3 8599 0548 Fax: +61 3 8599 0504 Email: sandringham.co@edumail.vic.gov.au Web: www.sandringhamsc.vic.edu.au Number of students: 1200 Number of international students: 63 Dress: Uniform in Years 7-10 only Cost of uniform (approx.): No charge Cost of homestay per week: $280
  • 88.
    86 Right SchoolRight Place 2014/2015 – Melbourne A-Z South Oakleigh College South Oakleigh College counts over 55 nationalities amongst its student population. A co-educational campus, the school is located to the south-east of Melbourne city centre. The dedicated and professional staff cultivates a secure, stimulating atmosphere that nurtures all students to achieve their personal best. Indeed, its ‘Respect Responsibility Resilience’ motto exemplifies the mutual commitment of both college and students. Pursuit of academic excellence, personal growth and development of global citizens are natural outcomes. Features of the local area • Well-serviced by train lines and bus routes • Attractive school grounds close to native parkland reserve and golf courses • Close to Monash University Clayton Campus Languages taught Japanese Greek Special programs • Enhanced learning opportunities at all year levels • School holiday senior study classes • Writing workshops featuring guest speakers, authors and writers-in-residence • Instrumental music program • Student leadership training, including student representative council, peer support program, peer mediation program, college and year level captains, house captains • TV studio, Media Communication Centre linked to whole curriculum Intensive English Language classes Provided at English Language Centre located within 3 kilometres of school Student support services and programs • Experienced professional international student program assistant • Careers advice and expert course counselling • After-school homework club • Dedicated welfare team including student welfare coordinator, chaplain, school nurse Extracurricular activities • Local and interstate camps, international study tours • English, mathematics, science and art competitions • Music performances, talent quest and a major annual theatre production • College inter-school sports participation, athletics and swimming carnivals • Beach safety training • Year 9 alternative sports program Sports offered • Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cross Country, Netball, Rugby, Soccer, Softball, Swimming, Table Tennis Success story ‘I’m currently studying Business at Monash University. I found the Enrichment Programs in the areas of English, Mathematics and Science challenging and exciting. The teachers and students supported me in every way.’ – Jingham Zhang, currently studying a Bachelor of Business at Monash Universuty – Graduatated 2013 Awards • UNSW ICAS Year 8 Mathematics Competition – gold medal, 2013 • Youth For Human Rights Art Award – paid New York trip • UNSW ICAS Year 12 English Competition – two gold medals, 2012 • Greek Essay Writing Competition – paid Athens trip, 2012-14 • Gold Medal in Javelin, 2012 • Teacher awards – nuclear research CERN in Geneva and Google Teacher Academy Reasons to choose our school Secure education environment where students are safe to pursue their individual best Respect, responsibility and resilience commitment among both staff and students Caring and devoted staff who provide all students with high quality learning experiences Visit our school online at www.sosc.vic.edu.au Address: Bakers Road Oakleigh South, VIC 3167 Distance from Melbourne city centre: 20 km (Map Reference: Pg 12-13, H6, No. 86 ) Principal: Helen Koziaris International Student Coordinator: Helen Koziaris Telephone: +61 3 9579 2322 Fax: +61 3 9579 2946 Email: south.oakleigh.sc@edumail.vic.gov.au Web: www.sosc.vic.edu.au Number of students: 430 Number of international students: 7 Dress: Uniform Cost of uniform (approx.): $350 – $400 Cost of homestay per week: $240 – $270
  • 89.
    87For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch St Albans Secondary College The multicultural learning community of St Albans Secondary College embraces international students. The college fosters a positive sense of self and academic success across its co-educational, Years 7-12 campus. All students are challenged and encouraged to fulfil their academic potential and confidently pursue chosen pathways. International students gain the specialist support of a dedicated Chinese and Vietnamese-speaking coordinator. Staff resolutely support individual development and ensure students leave the school as young adults with qualifications that count. Features of the local area • Regular public transport access by train and bus services • Renowned multicultural area offering a range of international experiences • Close to local markets and shopping centres Languages taught Vietnamese French Italian Japanese Special programs • English as an Additional Language offered at all year levels • Established international student program • Select Entry Accelerated Learning program for high achievers • Enrichment learning opportunities • Business and community partnerships • Arts, performance, student leadership, sports, camps and outdoor education programs Intensive English Language classes Provided at English Language Centre located within 8 kilometres of school Student support services and programs • Careers counselling and pathway planning • Study skills programs • After school tutoring • Peer support programs • Health promotion programs • Wellbeing department with counsellors, psychologists and school nurse Extracurricular activities • Enrichment program for high achieving students • Instrumental music instruction and performance opportunities • Annual drama production • Individual and team inter-school sports • Lunchtime clubs and activities • Inter-school debating Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Cricket, Futsal, Soccer, Swimming, Table Tennis, Volleyball Success story ‘Thank you, St Albans Secondary College, for the special care through the international students program. I was encouraged and assisted by teachers to improve my English skills as well as integrate me into the Australian multicultural society. My family is very proud of my university entrance score of 99.55.’ – Khuu Chau Ngan Ha – Vietnam Awards • Premier’s VCE Awards, 2010-11 • Australian Fashion Awards, 2005-13 • Australian Defence Force Scholarships, 2010-13 • University of Melbourne Young Scholars Program recipients • Regional and State sporting championships • University scholarships Reasons to choose our school Intensive English as an Additional Language program Consistently high Victorian Certificate of Education scores ensure students transition to further study at University and technical education Student reports in native language and overseas progress visits with parents and family Visit our school online at www.stalbanssc.vic.edu.au Address: 289 Main Road East St Albans, VIC 3021 Distance from Melbourne city centre: 18 km (Map Reference: Pg 12-13, C3, No. 87 ) Principal: Kerrie Dowsley International Student Coordinator: Maranda Truong Telephone: +61 3 9366 2555 Fax: +61 3 9367 9361 Email: st.albans.sc@edumail.vic.gov.au Web: www.stalbanssc.vic.edu.au Number of students: 1170 Number of international students: 50 Dress: Uniform Cost of uniform (approx.): $350 – $400 Cost of homestay per week: $220 – $240
  • 90.
    88 Right SchoolRight Place 2014/2015 – Melbourne A-Z Strathmore Secondary College Strathmore Secondary College is set in a safe suburban location between Melbourne city centre and international airport. The Years 7-12 campus is just 20 minutes by train from the city and set within beautifully landscaped gardens. International students enjoy a friendly environment where both staff and fellow students support their personal development and academic success. Individual learning programs are planned with care and attention to ensure all students achieve their best and gain excellent academic results. Features of the local area • Well-serviced by trains, buses and trams • Lovely urban environment with well- maintained homes in safe suburb • 20 minutes by train to Melbourne city and 15 minutes by car to international airport Languages taught Chinese as a first language (Year 11-12) Japanese as a second language (Years 7-12) Italian (Years 7-12) Greek (Years 7-12) Special programs • Advanced mathematics • New VCE subject Algorithmics (credit towards first year at Melbourne/Monash Universities) • ipad program for all students in Year 10 • Victorian Space Science Education Centre • Instrumental music program and wide range of drama and visual arts activities • Extensive sport programs and facilities including a swimming pool on site Intensive English Language classes Provided at two English Language Centres located within 5 kilometres of school Student support services and programs • Very experienced International Student Coordinator and assistant • Two native speaking international student tutors • Specialist advice on university applications • Knowledgeable careers coordinator • Student wellbeing officers Extracurricular activities • International student camp and tour program • Option to go on ‘Mission to Mars’ at Space Centre • After-school homework support • Musical ensembles and orchestras • Annual school theatre production • International students’ basketball and badminton club Sports offered Aquatics, Athletics, Badminton, Baseball, Basketball, European Handball, Fitness, Futsal, Golf, Hockey, International Rules/Touch Football, Lacrosse, Netball, Soccer, Softball, Swimming, Tennis, Ultimate Games, Volleyball, Water Polo Success story ‘Strathmore is green and beautiful, with really good equipment and facilities. My classmates are very friendly to me and help me to understand the classwork. I have been really well looked after by my Homestay and International Student Coordinator and I feel really comfortable and safe in Melbourne.’ – Mike Yu – Year 12 student; applying for Bachelor of Environments at University of Melbourne Awards • Victorian International School Student – Academic Excellence Award and International School Student of the Year Award, 2012 • Premier’s VCE Award – Outstanding Performance Software Development, 2013 • Two International Space Settlement Design Competition nominations, 2013 • Australian Space Settlement Design Competition Entry Awards, 2009-13 • Two State Top Designs Season of Excellence entrants for Visual Communication, 2013 Reasons to choose our school Highly respected school with a strong record of student academic achievement University level science equipment in renowned Victorian Space Science Education Centre Individual support for all international students and development of personal learning pathways Visit our school online at www.strathmore.vic.edu.au Address: Pascoe Vale Road Strathmore, VIC 3041 Distance from Melbourne city centre: 10 km (Map Reference: Pg 12-13, E3, No. 88 ) Principal (acting): Jillian English International Student Coordinator: Lois Kruger Telephone: +61 3 9379 7999 Fax: +61 3 9379 2812 Email: strathmore.sc@edumail.vic.gov.au Web: www.strathmore.vic.edu.au Number of students: 1500 Number of international students: 70 Dress: Uniform in Years 7-11 only Cost of uniform (approx.): $350 Cost of homestay per week: $270 – $280
  • 91.
    89For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Sunbury Downs College Sunbury Downs College is an academic school offering a wide range of VCE subjects and is the only secondary school in the area that offers an Accelerated Curriculum Enrichment (ACE) program which includes early commencement of VCE and Tertiary studies. Students also benefit from a vibrant inter-school sports program and co-curricular activities including an overseas Italian Study Tour, Outdoor Education, Instrumental Music, Annual Musical Production and student leadership programs. The College creates students who are confident and independent learners for life. Features of the local area • Close to native Australian flora and fauna • Serviced by train line and buses • Friendly local community Languages taught Italian Special programs • English extension program for Year 12 Students. • Rigour Writing program for students requiring tutorials on writing that runs after school • Homework Program (Magnus Opus) runs every Wednesday to support VCE students with their studies Intensive English Language classes Provided at nearby English Language Centre Student support services and programs • Highly-qualified health, wellbeing and guidance officers • Careers counsellors • School Nurse • College Chaplain Extracurricular activities • Outdoor Education Program • Camps and Excursions including an overseas Italian Study Tour • Outdoor Education Program • Instrumental Music Program including Annual Musical Production • Debating Program • Student Leadership Programs Sports offered Athletics Carnival, Australian Rules Football, Badminton, Basketball, Cross Country Running, Netball, Soccer, Surfing, Swimming Carnival Reasons to choose our school Attractive school grounds with well-maintained facilities Accelerated Curriculum Enrichment program Comprehensive instrumental music and extensive camps programs Visit our school online at www.sunburydowns.vic.edu.au Address: 148-174 Mitchells Lane Sunbury, VIC 3429 Distance from Melbourne city centre: 38 km (Map Reference: Pg 12-13, A1, No. 89 ) Principal: Brett Moore International Student Coordinator: Rhona Quon Telephone: +61 3 9744 7366 Fax: +61 3 9744 1604 Email: sunbury.downs.sc@edumail.vic.gov.au Web: www.sunburydowns.vic.edu.au Number of students: 750 Number of international students: 0 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $270 plus internet
  • 92.
    90 Right SchoolRight Place 2014/2015 – Melbourne A-Z Sunshine College Set within a vibrant multicultural community, Sunshine College helps students build a positive and purposeful future. An engaging curriculum is offered across vocational and academic subjects, including mathematics, science, technology, commerce and the arts. Strong ties to Melbourne, RMIT and Victoria universities help students gain confidence in their further education choices and school to university transition. Sunshine College is located just 10km from Melbourne city centre and students enjoy excellent access by public transport. Features of the local area • Public transport hub with easy access to Melbourne centre and surrounding suburbs • Dynamic local Asian communities • Close to local markets and a range of different shopping venues Languages taught Vietnamese Italian Special programs • Experienced Vietnamese international program teacher and assistant • Language support programs for new arrivals to Australia • Special access to RMIT University and other universities • Award-winning school to university transition programs • Literacy program for all junior students Intensive English Language classes Provided at English Language Centre located within 4 kilometres of school Student support services and programs • Teachers skilled and experienced in supporting international students • Well developed career support with four annual student interviews • Structured after hours homework support • Established facilities with learning centres led by dedicated subject teachers • Student focused pastoral care and support Extracurricular activities • School theatre production • Dinner twice yearly for international students and families • Excursions, trips and social events Sports offered Australian Rules Football, Basketball, Indoor Soccer, Netball, Rugby, Soccer, Volleyball Success story ‘The thing that all international students will say is that the teachers at Sunshine College are dedicated and really care for their students. You are made to feel welcome by the students and everyone is focussed on doing their best. I have improved my English so much since Year 10 that I feel really confident about going to University.’ – (Sandy) Phu Quyen Tran – Vietnam; studying commerce at the University of Melbourne Awards • Victorian Premier’s Awards – academic achievement • State sports teams – champions • Best practice – school to university transition program Reasons to choose our school Proven success transitioning high numbers of student graduates to university, including international students who consistently achieve high university entrance scores International Student Coordinators who travel to Vietnam and China for family meetings Curriculum and learning environment with a strong literacy emphasis Visit our school online at www.sunshine.vic.edu.au Address: Graham Street Sunshine, VIC 3020 Distance from Melbourne city centre: 10 km (Map Reference: Pg 12-13, C4, No. 90 ) Principal: Tim Blunt International Student Coordinator: Graeme Newman Telephone: +61 3 8311 5200 Fax: +61 3 8311 5209 Email: sunshine.co@edumail.vic.gov.au Web: www.sunshine.vic.edu.au Number of students: 1021 Number of international students: 32 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $250
  • 93.
    91For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Templestowe College Located east of Melbourne city, Templestowe College is a safe and caring school. Students flourish in a positive learning environment sustained by the whole college community. The school fosters development of student leadership skills and encourages success in both personal and academic pursuits. A strong pastoral care program ensures the welfare needs of international students are met. The on-site English Language Centre program assists students with initial English skill development and supports their transition into mainstream classes. Features of the local area • Excellent public transport to city and suburbs • Attractive natural school grounds set in a pleasant residential area • Close to major shopping centre Languages taught Chinese as a first language Special programs • Experienced international Chinese and Vietnamese program assistants • Victorian Certificate of Education studies available from Year 10 • Two year Language Centre/Victorian Certificate of Education option for highly-able students • Bring Your Own Device laptop program for all students • Full fitness gym free for international students • Full student kitchen facility • Newly renovated buildings Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Well equipped careers resource centre • Student learning mentors • Homework club until 5.30pm • After school tutoring available Extracurricular activities • Extensive camps program • Instrumental music program • Annual school theatre production • Public speaking Sports offered Athletics, Australian Rules Football, Badminton, Cricket, Cross Country Running, Table Tennis, Fitness, Netball, Soccer, Swimming, Volleyball. Elite Basketball and Squash Programs Success story ‘The Templestowe College community supported me to achieve my dreams and aspirations. I participated in every aspect of College life – excursions, camps, sports, music and was very proud of my Global Citizenship Award. I am now a cultural ambassador for Templestowe College.’ – Yena Lee – recipient of Victorian International School Student - Global Citizenship, International Leader and Long Tan Leadership Awards; studying Bachelor of Nursing at Australian Catholic University Awards • VCEExcellenceAward,VCALExcellenceAward, 2013 • Australian National Rock Climbing Champion, 2014 • Top VCE Student for Persian, 2013 • Battle of the Bands Winners, 2014 • Long Tan Youth Leadership Teamwork Awards, 2013 • 3 on 3 Basketball Competition Winners, 2014 Reasons to choose our school 16 years experience with international students Teachers and other staff highly experienced in assisting international students Regular cultural activities and structured conversation classes with local students Visit our school online at www.templestowec.vic.edu.au Address: Cypress Avenue Lower Templestowe, VIC 3107 Distance from Melbourne city centre: 15 km (Map Reference: Pg 12-13, H3, No. 91 ) Principal: Peter Hutton International Student Coordinator: Angela Hoptroff Jin Kim Telephone: +61 3 9850 6333 Fax: +61 3 9852 0728 Email: templestowe.co@edumail.vic.gov.au Web: www.templestowec.vic.edu.au Number of students: 520 Number of international students: 50 Dress: Uniform Cost of uniform (approx.): $300 – $400 Cost of homestay per week: $280
  • 94.
    92 Right SchoolRight Place 2014/2015 – Melbourne A-Z Thornbury High School Located 8 kilometres from Melbourne, Thornbury High School is set amid lovely spacious grounds. The school provides a commitment to academic excellence and successful education outcomes. Victorian Certificate of Education studies span broad and invigorating subject choices that result in excellent student achievements. A blend of professional, dedicated staff, well resourced learning facilities and close ties with several universities creates a uniquely positive learning experience. The safe suburban neighbourhood is easily accessed by public transport. Features of the local area • Close to all public transport services • Safe neighbourhood near Melbourne centre • Near to major shopping centres Languages taught Chinese (Mandarin) Indonesian Greek Italian Special programs • Accelerated and enrichment programs • Pathways to enable students to directly access Melbourne, RMIT and La Trobe universities • Established English as an Additional Language programs • Supervised homework program • Extensive co-curricular program, including music, sport, leadership, camp, debating • Classroom assistance provided by student teachers from University of Melbourne Intensive English Language classes Provided at English Language Centre located within 5 kilometres of school Student support services and programs • Chinese and Vietnamese international student program assistants • International Student Program Coordinator • Careers and learning pathways guidance • Peer support program • Pastoral care program • Part-time psychologist and nurse and full-time youth worker • Supervised homework program Extracurricular activities • International student camp and tour program • Award-winning music program with bands and instrumental tuition and performance • Annual school musical production • Class TV student television program • Extensive individual and team sport program • Chess and science clubs Sports offered Athletics, Australian Rules Football, Basketball, Cricket, Cross Country, Futsal, Golf, Gymnastics, Indoor Hockey, Indoor Soccer, Minor Games, Netball, Rugby, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘I have made many new friends at Thornbury. The year level coordinators, international student staff and the teaching staff have been very supportive and have helped my transition into an Australian school.’ – Ashkan Mehrnejad – Iran; Year 12 student Awards • Rio Tinto Big Science Competition – winner, 2011 • Melbourne School Bands Festival – gold award, 2010 • State cross country championship – winner, 2011 • School district athletics – winners, 2009-11 • Silver award, national performing arts eisteddfod Reasons to choose our school Multicultural school where diversity is embraced Well resourced modern facilities, including comfortable air-conditioned class rooms Vibrant and welcoming school community with a maximum of 25 students per class Visit our school online at www.thornburyhs.vic.edu.au Address: 238 Collins Street Thornbury, VIC 3071 Distance from Melbourne city centre: 8 km (Map Reference: Pg 12-13, G3, No. 92 ) Principal: Peter Egeberg International Student Coordinator: Paul Mameghan Telephone: +61 3 9480 4066 Fax: +61 3 9480 1314 Email: thornbury.hs@edumail.vic.gov.au Web: www.thornburyhs.vic.edu.au Number of students: 1100 Number of international students: 15 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $260
  • 95.
    93For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Upper Yarra Secondary College Upper Yarra Secondary College is nestled within the charming Yarra Valley, 65 kilometres east of Melbourne. The local area is renowned for its natural beauty and allows international students to experience a semi-rural lifestyle. The college offers senior students both academic studies and vocational courses. Exhilarating outdoor education (including rock climbing, kayaking and skiing) promotes self-discipline, challenge and leadership. Students may also enjoy hands-on hospitality and cabinet making training at the school’s polytechnic campus. Features of the local area • Mount Donna Buang alpine area is popular for snow sports • Area abounding with natural caves and rock climbing locations • Nearby picturesque Yarra River parkland Languages taught German Japanese Special programs • Established German and Japanese exchange programs as well as a new Chinese sister school agreement • Senior students academic excellence program • School bands Intensive English Language classes Provided through on-site language classes Student support services and programs • Well equipped careers resource centre • Strong student wellbeing program • Part-time psychologist Extracurricular activities • School camps at all year levels • Outdoor education camps Sports offered Athletics, Australian Rules Football, Basketball, Hockey, Soccer, Table Tennis, Volleyball Success story Upper Yarra Secondary College has educated a number of distinguished alumni. The school counts a weather forecaster, football and basketball champions, medical research scientist, television journalist and actors amongst its graduates. Other former students have become successful business owners. Awards • VCE Top Arts, 2011 • Scholarships to various Universities have recently been awarded for Law and Medical degrees with one student already receiving a scholarship for 2015 Reasons to choose our school Small school on 11 acres of attractive grounds with magnificent Yarra Valley views Within easy access of alpine snowfields and natural landscapes with rivers and caves Dedicated hospitality and cabinetmaking facilities in new polytechnic training campus and newly-appointed fitness centre Visit our school online at www.uysc.vic.edu.au Address: Little Yarra Road Yarra Junction, VIC 3799 Distance from Melbourne city centre: 65 km (Map Reference: Pg 12-13, K4, No. 93 ) Principal: Robert Miller International Student Coordinator: Deborah Morrish Telephone: +61 3 5967 1877 Fax: +61 3 5967 2109 Email: upper.yarra.sc@edumail.vic.gov.au Web: www.uysc.vic.edu.au Number of students: 500 Number of international students: 0 Dress: Uniform Cost of uniform (approx.): $350 Cost of homestay per week: $280 including internet
  • 96.
    94 Right SchoolRight Place 2014/2015 – Melbourne A-Z Vermont Secondary College Vermont Secondary College is a coeducational school set in spacious grounds and first class facilities located 19km from the CBD. It has a strong focus on academic rigour, extensive co-curricular opportunities and excellent student leadership programs in an IT-rich environment. We offer VCE and VET subjects that include: English, Mathematics, Science, Commerce, Arts, Technology, PE/Health, History, Music, Geography, Languages (French and German). Features of the local area • Attractive natural parks and bush land • Close to shopping centre • Well-serviced by train-lines and bus routes Languages taught German French Special programs • Gifted student program LEEP for highly-able students • Close links with Melbourne, Monash, Swinburne and Deakin Universities and access to University studies • Excellent music and performing arts programs • Outstanding camps and excursions program • Extensive sport and outdoor education programs including Duke of Edinburgh • Excellent German and French programs Intensive English Language classes Provided on-site or at English Language Centre located 6 kilometres from school Student support services and programs • Two specialist Student Welfare Coordinators • Part-time psychologist • Specialist Pathways and Transition Coordinator and Careers Resource Centre • Full time First Aid Officer • Excellent House System that fosters connectedness Extracurricular activities • School Tours to Germany and France • Extensive Camps program that includes: Surf, Central Australia, Ski, Year 12 Study, City Experience and Orientation camps, and Duke of Edinburgh program • Outstanding Sport and Outdoor Education program • Annual School Production • A range of musical and choral ensembles Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cross Country, Hockey, Netball, Soccer, Swimming, Tennis, Volleyball Success story Yen Wei Chang is a Year 10 student who arrived at Vermont Secondary College in 2010 from Taiwan. He has made many new friends and highlights include the Year 9 surf camp and the Year 10 camp to Central Australia. He has attended English as an Additional Language classes that provided extra assistance with his English and he intends on going to university to study architecture. Awards • Nearly 50% of Year 12 VCE students achieve a score of 80 or more towards Uni entrance • State football team champions • Students obtained a perfect score of 99.95 in Year 12 VCE • Australian Schools Chemistry and Mathematics Competitions • World class cyclists and swimming champions Reasons to choose our school Positive school environment that nurtures a spirit of cooperation and belonging among staff and students An award winning academic, sporting and musical school New library facilities, Senior Study Centre, Year 7 Centre, Auditorium and extensive computer facilities Visit our school online at www.vermontsc.vic.edu.au Address: Morack Road Vermont, VIC 3133 Distance from Melbourne city centre: 19 km (Map Reference: Pg 12-13, I5, No. 94 ) Principal: Tony Jacobs International Student Coordinator: Joanna Alexander Telephone: +61 3 9873 1077 Fax: +61 3 9874 4368 Email: vermont.sc@edumail.vic.gov.au Web: www.vermontsc.vic.edu.au Number of students: 1300 Number of international students: 12 Dress: Uniform Cost of uniform (approx.): $800 Cost of homestay per week: N/A
  • 97.
    95For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Victoria University Secondary College Victoria University Secondary College sets ambitious standards for itself and its students. The college community fosters a warm and welcoming environment that caters for the needs of every individual student. A best practice education approach is used to develop the challenging and purposeful curriculum. An innovative and exciting range of enrichment programs helps personalise each students’ learning pathways. Intensive literacy and numeracy programs encourage students to achieve learning goals in all their studies. Features of the local area • Ready access to both public and school-run bus services • Just 30 minutes by train to Melbourne city • Close to numerous shopping outlets, banking, medical and recreation facilities Languages taught Italian Chinese Special programs • Programs to prepare students for University • Vibrant music and performing arts programs • Sports Academy including rugby league, rugby union and soccer development • Student Leadership programs • Mentoring and tutoring by University students and business professionals Intensive English Language classes Provided on-site or at English Language Centre located within 5 kilometres of school Student support services and programs • Careers and education pathways services • Dedicated student welfare co-ordinators • Onsite psychologist • Onsite speech therapist • Onsite youth worker Extracurricular activities • Music and theatre performances • Interschool sporting teams • Debating teams Sports offered A successful sporting school with strong partnerships with the Melbourne Storm Rugby League Club, Melbourne Rebels Rugby Union Club and the Melbourne Victory Football Club to develop our students’ skills and athletic ability. Success story Many of our students have progressed to exciting education and career pathways. Current students represent Victoria in rugby league and union. Past students have successfully forged careers in the workforce, including a mathematician, professor of genetics, builder, landscaping business owner, statistician and ICT professional. Awards • VCE Season of Excellence – Top Acts (Music), 2014 • Joint Winners of Melbourne Storm Cup, 2013 • Gorton Young Leaders Awards, 2014 • Gorton Young Leaders Awards, 2013 • Victorian School and Community Partnerships Sports Award, 2013 • Debating – fourth-ranked in the Sunshine debating network, 2011 Reasons to choose our school Supportive and caring staff Unique blend of open learning and specialist teaching spaces caters for all learning styles Rich program of learning with engaging and comprehensive curriculum Visit our school online at www.vusc.vic.edu.au Address: Senior Campus: 5A Jamieson Street St Albans VIC 3021 JuniorCampus: 88 Billingham Road Deer Park VIC 3023 Distance from Melbourne city centre: 20 km (Map Reference: Pg 12-13, C2/B3, No. 95 ) Principal: Genevieve Simson International Student Coordinator: Sue Atzarakis Telephone: Fax: SeniorCampus: +61 3 8312 0200 +61 3 8312 0211 JuniorCampus: +61 3 9363 1155 +61 3 9363 8681 Email: victoria.university.sc@edumail.vic.gov.au Web: www.vusc.vic.edu.au Number of students: 1050 Number of international students: 3 Dress: Uniform Cost of uniform (approx.): $300 – $500 Cost of homestay per week: $150
  • 98.
    96 Right SchoolRight Place 2014/2015 – Melbourne A-Z Victorian College of the Arts Secondary School The Victorian College of the Arts Secondary School is Victoria’s premier school for the education and training of talented young dancers, musicians and visual artists. The VCA Secondary School provides a training program supported by a high-quality education to prepare talented young people for professional careers in music, dance and the visual arts. Entry to the school is by competitive audition or interview, held every August. Overseas students are able to audition by video. Students perform in professional venues throughout the year and have access to master classes. Features of the local area • City experience • Located in arts precinct • Easy access to all public transport Languages taught French Bi-lingual students may study at the Victorian School of Languages or Distance Education Special programs • Music, dance and visual arts teachers with industry experience • Close association with professional performing arts companies • Close association with University of Melbourne and Tertiary Specialist Education Institutions Intensive English Language classes Provided at nearby English Language Centres, located within the Melbourne metropolitan area Student support services and programs • International student tutors available • School Wellbeing program • Access to students with like interests • Multicultural community Extracurricular activities • All activities form key parts of the distinctive performing arts education program, eg; • Junior camp activity • Dance performance season at Melbourne’s Malthouse Theatre • Music performance at Melbourne Recital Centre Success story Our international students are successful in achieving places in the finest Universities and tertiary training institutions in Australia and overseas Awards • Premier’s VCE Awards – multiple awards each year • Ranked as one of the highest quality performing arts schools in Victoria Reasons to choose our school Spirit of cooperation and belonging among staff and students Small school offering personalised experience Purpose built and award winning school facilities Visit our school online at www.vcass.vic.edu.au Address: 57 Miles Street Southbank, VIC 3006 Distance from Melbourne city centre: 2 km (Map Reference: Pg 12-13, E4, No. 96 ) Principal: Colin Simpson International Student Coordinator: Ludi Servadei Telephone: +61 3 8644 8644 Fax: +61 3 8644 8699 Email: victorianarts.ss@edumail.vic.gov.au Web: www.vcass.vic.edu.au Number of students: 340 Number of international students: 3 Dress: Uniform in specialist activities Cost of uniform (approx.): $300 Cost of homestay per week: $250
  • 99.
    97For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Viewbank College Positioned within generous grounds, Viewbank College offers an excellent variety of learning opportunities. Students experience a broad academic curriculum, covering 43 Victorian Certificate of Education study areas. Subjects offered include science, mathematics, commerce, technology, humanities and the arts. International students also enjoy the intensive support of English as an Additional Language classes. The learning atmosphere promoted across the Viewbank College community encourages students to fulfil their potential and progress to tertiary study or work. Features of the local area • Serviced by regular train lines and bus routes, with easy access to the Melbourne city centre • Attractive school grounds close to a range of native flora and fauna reserves • Close to shopping centres, banking, medical and entertainment amenities Languages taught Japanese German Special programs • Advanced mathematics and science opportunities • Extensive instrumental music program • ICT and media studies • Access to external Vocational Educational Studies Intensive English Language classes English language instruction provided at suitable external sites Student support services and programs • Strong English as an Additional Language support program • Homework clubs in mathematics/science and English/humanities • Student leadership program • Pastoral care and student counselling support • College nurse Extracurricular activities • Work experience program • Musical instrument tuition and performance • College production and drama performances • Sporting program • Debating and public speaking • Lunchtime activities program Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Hockey, Netball, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Success story ‘Viewbank College is where I felt supported and accepted by all the encouraging staff and friendly schoolmates. It’s a place to call home and it’s where excellence starts.’ – Yiming Guo – China, graduated in 2013, currently studying Engineering at Monash University Awards • VCE Drama award – Top Class solo performance, 2013 • Victorian Sporting Blue award – women’s football, 2013 • 15 sporting teams to State finals, 2013 Reasons to choose our school Learning community with a strong spirit of unity where staff and students work together Well maintained facilities that support student choices and future directions Student academic achievement and results firmly supported by caring, professional staff Visit our school online at www.viewbank.vic.edu.au Address: Warren Road Rosanna, VIC 3084 Distance from Melbourne city centre: 17 km (Map Reference: Pg 12-13, H3, No. 97 ) Principal: Judith Craze International Student Coordinator: Kaye Mackenzie Telephone: +61 3 9458 2811 Fax: +61 3 9459 0512 Email: viewbank.co@edumail.vic.gov.au Web: www.viewbank.vic.edu.au Number of students: 1200 Number of international students: 25 Dress: Uniform Cost of uniform (approx.): $600 Cost of homestay per week: $280
  • 100.
    98 Right SchoolRight Place 2014/2015 – Melbourne A-Z Wantirna College Wantirna College enjoys a reputation for its academic focus. The school curriculum extends across a broad range of study areas to include academic subjects and vocational courses. The multicultural school community comprises well-trained bi-lingual staff that supports Years 10-12 English as an Additional Language studies. Wantirna College is within close proximity of a large shopping and entertainment district. International students are welcomed into carefully chosen Homestay families and most often live within walking distance of school. Features of the local area • Major shopping centre and bus terminus nearby • Picturesque location, green and spacious • Safe, friendly residential area Languages taught Chinese Spanish Special programs • Weekly Study Support for international students • Weekly tutoring in most subjects by honour roll graduates • Student leadership, including International Student Captain • Highly regarded Music and Performing Arts program • Full range of VCE Science subjects Intensive English Language classes Provided at English Language Centre located within 6 kilometres of school Student support services and programs • Three bilingual International Student Program staff • Careers resource centre and university entry counseling • Peer support program • Health centre with full-time nurse • Part-time psychologist • Full-time social worker Extracurricular activities • A wide range of camps and excursions • Individual instrumental music classes • Annual school musical production • Sporting team competitions up to state level • Year 11 Central Australia trip • Year 11 Presentation ball Sports offered Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country Running, Dodge Ball, Soccer, Golf, Hockey, Netball, Soccer, Softball, Swimming Diving, Tennis, Table Tennis, Track Field (Athletics), Volleyball Success story Dongqi Yang is an active student leader in his role as the International Student Captain at Wantirna College. Since arriving at the school he has excelled in English and Maths and made many friends amongst local and international students. Dongqi’s contribution to Victoria was recently recognised through two Victorian International School Student Awards. Dongqi has set a high standard for all student leaders at the school. – Dongqi Yang - China Awards • Ruth Chapman Award for Service to the Careers Industry, 2014 • Victorian International School Student - Community Engagement Award, 2013 • Royal South Street Competitions – College Choir Senior Percussion Ensemble, 2013 • Victorian International School Student - Student Leadership Award, 2013 • Intermediate Cricket Victorian State Champions, 2013, and Finalists, 2014 • Premier’s VCE Award – Health, 2011 and 2013 Reasons to choose our school A rich co-curricular program including sports, music and the performing arts Experienced teachers of English as an Additional Language and Multicultural Aides Strong academic curriculum delivered in recently constructed facilities Visit our school online at www.wantirnacollege.vic.edu.au Address: Harold Street Wantirna, VIC 3152 Distance from Melbourne city centre: 25 km (Map Reference: Pg 12-13, J5, No. 98 ) Principal: Sue Bell International Student Coordinator: Kenn Stollery-Jones Telephone: +61 3 9801 9700 Fax: +61 3 9800 2590 Email: international@wantirnacollege.vic.edu.au Web: www.wantirnacollege.vic.edu.au Number of students: 1250 Number of international students: 28 Dress: Uniform Cost of uniform (approx.): $200 – $300 Cost of homestay per week: $250 + internet
  • 101.
    99For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Warrandyte High School Warrandyte High School is a medium-sized co-educational school for years 7-12. The school has a strong reputation for consistent academic and creative achievement in a holistic learning environment, where every student is valued and supported to achieve their personal best. Warrandyte’s size allows for broad subject choices and extra-curricular activities. The school also enjoys rich partnerships with local community groups, businesses and individuals. Features of the local area • Direct bus links to the CBD and close to a major shopping centre • Superb natural surroundings adjacent to Warrandyte State Park • Sought after eastern suburbs location Languages taught Italian Special programs • 1:1 laptop computer program (all year levels) • Annual school musical theatre performance • VCE acceleration program • Lunchtime mathematics help • Extensive 1:1 pathways counseling for all students at Years 9-12 • Year 9 Taking the Challenge Program Intensive English Language classes Provided at several English Language centres located within 15km of the school Student support services and programs • School psychologist • Dedicated wellbeing leader • Careers advisory centre onsite • Peer support program • School leaders program • Online learning materials and teacher email contact for extracurricular support Extracurricular activities • Duke of Edinburgh Awards Scheme • Year level student camps including Year 11 Central Australia trip • Extensive excursion and incursion program • Yearly school musical • Instrumental Music and School Band program • VCE Art show Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Cricket, Cross Country, Fitness, Hockey, Mountain Biking, Netball Soccer, Rugby, Softball, Swimming, Table Tennis, Tennis, Triathlon, Volleyball Success story ‘Warrandyte High has many things that I love. The students and teachers are very friendly and help me a lot. Everyone greets me in the yard. The school’s environment also attracted me. The school is big and beautiful, its classrooms are big and bright and I like them very much.’ – Haoyuan Song, Beijing China, Current Year 8 Student Awards • Two exhibitors in the ‘Top Arts’ award exhibition, 2014 • Bendigo Community Bank Scholarship winners, 2012-14 • Two exhibitors in the ‘Top Design’ award exhibition, 2013 • Finalists in the Eureka Science Awards, 2012 • Pierre de Coubertin Award Finalist – academic and sporting excellence, 2012-13 Reasons to choose our school Small number of international students which allows for English immersion Medium sized school allows for individualised education Award winning art and design program Visit our school online at www.warrandytehigh.vic.edu.au Address: 241-247 Heidelberg Warrandyte Road, Warrandyte, VIC 3113 Distance from Melbourne city centre: 24 km (Map Reference: Pg 12-13, I3, No. 99 ) Principal: Stephen Parkin International Student Coordinator: Pamela Dunstall Telephone: +61 3 9844 2749 Fax: +61 3 9844 1813 Email: warrandyte.hs@edumail.vic.gov.au Web: www.warrandytehigh.vic.edu.au Number of students: 515 Number of international students: 4 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $270-$280
  • 102.
    100 Right SchoolRight Place 2014/2015 – Melbourne A-Z Wellington Secondary College The motto ‘Caring, Striving, Learning’ underpins Wellington Secondary College traditional values. Good behaviour, leadership and academic excellence are qualities nurtured in all students. An experienced international program provider, the school retains a dedicated, experienced staff. Specific international student support includes carefully chosen Homestay families, intensive English as an Additional Language classes and regular first language academic and social progress reports for parents. Located close to Monash University, the college offers personal care to each student. Features of the local area • Serviced by frequent public bus routes and college charter bus service • Close to Monash University Clayton Campus • Nearby Waverley Gardens Shopping Centre, business and entertainment precinct Languages taught French (to Year 10) Mandarin Special programs • Strong lunchtime/after school engagement program/homework clubs • Experienced international Chinese and Vietnamese program assistants • Cambodian Multicultural Aide • Annual Multicultural Concert • Teachers with international teaching experience Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Annual in-country visits to parents • Multilingual Staff • Careers Resource Centre (experienced team) • Wellbeing Centre (services of professional health workers including doctor on site weekly) Extracurricular activities • Regular school camps and excursions • Exciting lunchtime engagement program Sports offered Athletics, Badminton, Basketball, Cross Country, Soccer, Swimming, Table Tennis, Volleyball Success story ‘Since the first day I started I knew I was lucky to be at Wellington Secondary College. The students worked hard; the environment for learning new skills and knowledge was inspiring; classmates were friendly in and out of the classroom. I was made to feel accepted in this totally new environment.’ – Mengdi Mandy Li – China – Bachelor of Commerce, University of Melbourne; currently studying her Masters at Oxford University, London Awards • Australian Mathematics Competition – high distinctions annually • Monash University Scholarships awarded each year to Year 12 students • Wheelers Hill Rotary Club Scholarships awarded each year Reasons to choose our school New International Centre on-site with excellent facilities and equipment Very caring International Programs Team providing ongoing support in and out of school Strong EAL department with highly experienced teachers Visit our school online at www.wellingtonsc.vic.edu.au Address: 91 Police Road Mulgrave, VIC 3170 Distance from Melbourne city centre: 25 km (Map Reference: Pg 12-13, I7, No. 100 ) Principal: Edward Hugh Blaikie International Student Coordinator: Connie Tzelepis Telephone: +61 3 9547 6822 Fax: +61 3 9548 4483 Email: wellington.sc@edumail.vic.gov.au Web: www.wellingtonsc.vic.edu.au Number of students: 1400 Number of international students: 80 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $2
  • 103.
    101For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Werribee Secondary College Werribee Secondary College is a fully accredited international school. The college is renowned for its level of student academic achievement and the high standard of curriculum programs. The motto ‘Live Worthily’ encapsulates the school vision and goals. Students are empowered with resilience and skills that enhance their post-secondary education options, within Australia and overseas. The contemporary education facilities at Werribee Secondary College are centrally located and within an easy walk of train or bus services. Features of the local area • Convenient access to Melbourne city centre via train network and other public transport • Expansive parklands and recreation facilities • Diverse multicultural community • Easily accessible local shopping area Languages taught Chinese as a first language Chinese as a second language Japanese Italian Spanish Special programs • International Baccalaureate Diploma offered • Outstanding music program with ensembles • Accelerated learning Program for high performing students • Extensive extracurricular program Intensive English Language classes Provided at English Language Centre located within 3 kilometres of school Student support services and programs • Team of professionals providing academic and welfare support to international students • Personal careers counselling to aid students with course choices and university placement • Careers office with careers counselling team • After-school study program • Full-time college welfare coordinator Extracurricular activities • International student excursions • Multicultural celebration days • Instrumental music recitals and performances • School theatre productions • School musicals • Debating • Public speaking • Chess Sports offered Athletics, Australian Rules Football, Basketball, Cricket, Netball, Soccer, Swimming, Tennis Success story ‘Although I am an international student, I feel the college is my “home”. I’ve made lots of friends at school who are international students from all over the world, and also many local students. The teachers in my school are excellent and patient too. Werribee Secondary College not only creates a great environment for my studies, but also teaches me how to “live worthily”.’ – Connie Xu – China; Year 12 in 2011 Awards • Premier’s VCE Awards – multiple recipients, 2009-10 • State swimming championships – gold medal, 2011 • Australian Defence Force Academy – scholarship, 2009 • Sporting Blue award for high achievement in athletics and sport, 2010 • University of Melbourne – Dean’s Awards, 2009-2011 • University of Melbourne – Dafydd Lewis Scholarship, 2011 Reasons to choose our school School offering the Accelerated learning Program for high performing students Facilities include well equipped science, mathematics, language and technology centres Strong pastoral care focus, including extra international student support and after-school tuition Visit our school online at www.werribeesc.vic.edu.au Address: Duncans Road Werribee, VIC 3030 Distance from Melbourne city centre: 30 km (Map Reference: Pg 12-13, A6, No. 101 ) Principal: Steve Butyn International Student Coordinator: Angela Callea Telephone: +61 3 9741 1822 Fax: +61 3 9742 3164 Email: werribee.sc@edumail.vic.gov.au Web: www.werribeesc.vic.edu.au Number of students: 1380 Number of international students: 35 Dress: Uniform Cost of uniform (approx.): $650 Cost of homestay per week: $240
  • 104.
    102 Right SchoolRight Place 2014/2015 – Melbourne A-Z Westall Secondary College At Westall Secondary College, students gain a genuine international learning experience. First-rate education opportunities are provided across a broad curriculum and the exemplary Victorian Certificate of Education academic program. Students study across a breadth of subjects including biology, physics, chemistry, psychology, accounting, business management and mathematics streams. Experienced staff help international students gain English competence at the English Language Centre provided on-site. The school enjoys firm links to Monash University and easy public transport access. Features of the local area • Well-serviced by train lines and bus routes • Close to shopping centre and Asian food markets • Located in pleasant, modern, residential area, close to Monash University Languages taught Chinese Special programs • Extra English as an Additional Language classes and support for international students • Weekly after-school homework program • Instrumental music program • Junior school iPad program Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Chinese and Vietnamese international student aides • Careers resource centre • Full-time student counsellor • Part-time school nurse • Breakfast club Extracurricular activities • Frequent international student excursions • Participation in academic subject competitions • Numerous sporting clubs • Camp program • College formal dinner • Lunch time activities such as Cambodian club Sports offered Athletics, Australian Rules Football, Cricket, Netball, Rugby, Soccer, Table Tennis, Volleyball Success story ‘My time at Westall Secondary College has provided me with not only a concrete preparation for my further studies but also exposure to a diverse cultural exchange. Both the students and teachers have become my extended family and I am extremely grateful for the experience of being an international student.’ – Nhi Vuong – graduated in 2012 with an ATAR of 98.95; studying a Bachelor of Science at the University of Melbourne Awards • Victorain International School Student – Student Leadership Award, 2013 • Top VCE ATAR 99.55 (student accepted into medicine at Monash University), 2013 • University of NSW Mathematics Competition-ICAS, Top Year 10 Student in the State of Victoria • University of Melbourne Mathematics Competition, 2nd Place Winner, 2014 Reasons to choose our school An international house for the exclusive study and social use of international students Small secondary school with ability to offer personal learning support to all students Attractive school grounds with abundance of modern facilities, including a new science building Visit our school online at www.westallsc.vic.edu.au Address: 88 Rosebank Avenue Clayton South, VIC 3169 Distance from Melbourne city centre: 22 km (Map Reference: Pg 12-13, H7, No. 102 ) Principal: David Tyson International Student Coordinator: Po Sim Ngian Telephone: +61 3 9546 3233 Fax: +61 3 9547 5785 Email: info@westallsc.vic.edu.au Web: www.westallsc.vic.edu.au Number of students: 420 Number of international students: 55 Dress: Uniform Cost of uniform (approx.): $300–$350 Cost of homestay per week: $250 – $280
  • 105.
    103For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Wheelers Hill Secondary College Established in 1980 the College is located in spacious grounds, boasts superb modern facilities with more than 40 nationalities and 25 languages represented. An established international program enables the school to provide excellent learning opportunities where students gain a global perspective. Experienced, caring staff help students achieve secondary education English requirements. A comprehensive curriculum bridges academic and vocational pathways, supporting student progress to university and Vocation Education and Training programs. Features of the local area • Close to Monash University, Clayton Campus and Holmesglen TAFE • Well-serviced by train-lines and bus routes • Within easy proximity of Melbourne city centre and popular shopping complexes Languages taught French Indonesian Special programs • Extension and enrichment program • Extensive student leadership program including international student captains • Instrumental music and performing arts instruction and performance • Inter- and intra-school school sports competitions • Extensive camp program, including Central Australian trip and Urban City experience • VCE valedictory dinner and formal Intensive English Language classes Provided at English Language Centre located within 10 kilometres of school Student support services and programs • Experienced full-time International Student Coordinator • Experienced Chinese and other language assistants • Well-equipped Careers Resource Centre • Peer Support program • English as Additional Language classes and support to VCE level • Student Wellbeing Coordinator Extracurricular activities • English, Maths, Science, Chess and Debating Competitions • Extensive camp program including outdoor education, G’Day USA trip, World Challenge expedition • School theatrical production • Year 12 study skills camp Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Diving, Hockey, Netball, Soccer, Softball, Table Tennis, Tennis, Volleyball, Swimming Success story ‘I was impressed with the friendly atmosphere of students and found teachers to be helpful, kind and always happy to help students. The teachers teach with enthusiasm, which makes the atmosphere in classrooms most interesting.’ – Xuân Pham – Vietnam; studying marketing/management at Monash University) Awards • Westpac Australian Mathematics Competition, High Distinctions, 2013 • University of New South Wales Mathematics Competition, Distinctions, 2013 • Monash University Science scholarship, 2013 Reasons to choose our school Supportive and caring school community Modern learning facilities including science labs, drama centre and multi-media facilities Opportunities for student leadership including college, drama and sports captains Visit our school online at www.whsc.vic.edu.au Address: Raphael Drive Wheelers Hill, VIC 3150 Distance from Melbourne city centre: 21 km (Map Reference: Pg 12-13, I6, No. 103 ) Principal: Marie Ghirardello International Student Coordinator: Ms Terry Ashton Telephone: +61 3 9561 5811 Fax: +61 3 9561 8227 Email: whsc@whsc.vic.edu.au Web: www.whsc.vic.edu.au Number of students: 550 Number of international students: 12 Dress: Uniform Cost of uniform (approx.): $300 Cost of homestay per week: $250 – $260
  • 106.
    104 Right SchoolRight Place 2014/2015 – Melbourne A-Z Williamstown High School Established in 1914, Williamstown High School is one of Melbourne’s oldest and most distinguished schools. Today’s learning community reflects proudly on its past but looks firmly to the future. Senior students are well supported and achieve consistently high Victorian Certificate of Education results. Active participation in an array of engaging extra-curricular activities is also encouraged. International students are welcomed in Years 10-12. They join local students preparing for academic achievement and productive, responsible adult lives. Features of the local area • Outstanding location 50 metres from the Williamstown Beach railway station • Only 500 metres to Williamstown Beach and scenic parkland surrounds • Close to Williamstown shopping centre and restaurant district Languages taught Indonesian French Special programs • Advanced best practice science program • Extensive art and technology program • Lively theatre and music departments • Active sport, recreation and camp program • Year 10 work experience program • Year 10 cadet sailing program Intensive English Language classes Provided at English Language Centre located within 10 kilometres of school Student support services and programs • International student program support centre • Teacher support through homegroup and year level coordinators • Well equipped careers resource centre • Active student representative council • Full-time student welfare counsellor teacher Extracurricular activities • Instrumental music tuition and performance program • Annual school drama and music production • Debating and public speaking Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Golf, Hockey, Lacrosse, Netball, Soccer, Softball, Squash, Swimming, Table Tennis, Tennis, Touch Rugby, Volleyball Success story Zheng Jie Zhong is currently studying engineering at Monash University. After an outstanding 2010 Victorian Certificate of Education result he was offered a partial scholarship toward his enrolment fees. Awards • Premier’s VCE Award – Academic Excellence, 2011, 2013 • Kwong Le Dow Scholarship, 2011-14 • Victorian School Sport’s Award, 2011-14 • Pierre De Coubertin Award, 2011-14 • Monash University Engineering – scholarship, 2012 Reasons to choose our school Graduating Year 12 students consistently achieve outstanding Victorian Certificate of Education results, including perfect scores obtained each year in a range of individual subjects International international program offering truly individual support to each student Highly committed, experienced staff help maximise student achievements Visit our school online at www.willihigh.vic.edu.au Address: Pasco Street Williamstown, VIC 3016 Distance from Melbourne city centre: 9 km (Map Reference: Pg 12-13, D5, No. 104 ) W I L L I A M S TO W N H I G H S C H O O L 1914 - 2014 H O L D FAST Principal: Gino Catalano International Student Coordinator: Lucie Compton Telephone: +61 3 9397 1899 Fax: +61 3 9397 6899 Email: williamstown.hs@edumail.vic.gov.au Web: www.willihigh.vic.edu.au Number of students: 1480 Number of international students: 30 Dress: Uniform Cost of uniform (approx.): $350 – $400 Cost of homestay per week: $250 + internet
  • 107.
  • 108.
    Victorian cities (excluding Melbourne) Accreditedschools located in cities across Victoria are listed in these pages. Search for schools that teach specific subjects at http://schlprv.vcaa.vic. edu.au/schoolsstudiessearch 106
  • 109.
    107For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Belmont High School Students are encouraged to achieve excellence at Belmont High School. The school is committed to global education and offers a diverse academic experience, supported by international exchange and extensive extracurricular programs. An on-site English Language Centre provides international students with intensive language support. Victoria’s second largest city offers students a safe living and learning environment nearby Deakin University Geelong campus. The school’s location offers easy access to city amenities, including Melbourne universities. Features of the local area • Safe city location close to universities • Near Port Phillip Bay and scenic Surf Coast • Easy access to local sporting clubs Languages taught Italian Indonesian Special programs • University extension studies for senior students • Accelerated learning Program for high performing students • On-site bioLAB (mathematics/science centre) program access linked to Deakin University • Opportunities to participate in a wide range of academic competitions • Outstanding music program • Extensive student welfare support Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • English as an Additional Language tutors • Careers and pathways resource centre • Peer support programs • Health centre with full-time nurse • Part-time psychologist • Full-time student wellbeing counsellor Extracurricular activities • International student camp • Various international student excursions • Extensive sporting program • Co-curricular activities: debating, drama, Rock Eisteddfod Challenge, university competitions • Exemplary music program with a range of school band participation opportunities Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Cricket, Cross Country, Golf, Hockey, Lawn Bowls, Netball, Soccer, Softball, Surfing, Swimming, Table Tennis, Tennis, Volleyball Success story ‘Studying at Belmont High School was one of the greatest and unique experiences I have ever had in my life. The understanding teachers helped my quickly improve my English. During my time at the school I formed friendships with local students who helped me adjust to my new lifestyle and I met many students from diverse backgrounds and cultures.’ – Wee Chaimanowong – Thailand; studying science at Monash University Awards • National Youth Science Forum, 2013 • Pierre De Coubertin Olympic Award, 2013 • Premier’s VCE Award – History Revolutions, Further Mathematics and English, 2013 • State Champions in junior boys netball, 2013 • University of Melbourne Young Scholars Program, 2013 • State Finalists in swimming, athletics cross country, 2013 Reasons to choose our school bioLAB specialist mathematics/science centre on-site with links state-wide Extensive curriculum offers broad Victorian Certificate of Education subject choice and extra English as an Additional Language tutoring support Integrated pastoral care programs and small class sizes Visit our school online at www.bhs.vic.edu.au Address: Rotherham Street Belmont, VIC 3216 Distance from Melbourne city centre: 80 km (Map Reference: Pg 12-13, C11, No. 107 ) Principal: Garry Schultz International Student Coordinator: Michael Caccamo Telephone: +61 3 5243 5355 Fax: +61 3 5243 2420 Email: belmont.hs@edumail.vic.gov.au Web: www.bhs.vic.edu.au Number of students: 1204 Number of international students: 15 Dress: Uniform Cost of uniform (approx.): $400 – $600 Cost of homestay per week: $260
  • 110.
    108 Right SchoolRight Place 2014/2015 – Victorian cities (excluding Melbourne) Bendigo Senior Secondary College Bendigo Senior Secondary College enjoys a leafy location in Rosalind Park, at the heart of Bendigo city. Its robust population makes the school Victoria’s largest Victorian Certificate of Education provider. Wide curriculum choices allow individual students to personalise education pathways and relationships with major Australian universities assist in preparing for further education. The first government school accredited by the Council for International Schools, Bendigo Secondary College boasts a Confucius Classroom and modern English Language Centre on-site. Features of the local area • Access to modern transport, shops and amenities • Easy living within 90 minutes from Melbourne • Outdoor lifestyle featuring gardens, sports, recreation, festivals and events • Strong historical Chinese connections Languages taught Chinese Indonesian French German Auslan Special programs • Confucius Classroom; visiting Chinese teachers promote language and culture • Microsoft Worldwide Pathfinder Schools program (one of 52 schools worldwide) • Local mentoring/vocational opportunities • Exchanges/tours to global sister schools • Personal computers for all students Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Award-winning career program and school to university transition pathway advisors • Health and wellbeing support: counsellors, nurse, visiting doctor • Experienced team dedicated to international student support • Regular contact and overseas family visits to report on progress and welfare Extracurricular activities • Student council, international student forums, leadership programs and camps • Entry support for Science, mathematics, Young Inventors and other competitions • Cultural celebrations including school tours, festivals and Homestay families events Sports offered Athletics, Australian Rules Football, Badminton, Baseball, Basketball, Beach Volleyball, Clay Shooting, Cricket, Cycling, Diving, Golf, Hockey, Lacrosse, Lawn Bowls, Mountain Biking, Netball, Orienteering, Rowing, Soccer, Softball, Swimming, Table Tennis, Tennis, Touch Football Success story ‘Bendigo is the ideal place for teenagers to study because it is very peaceful. Teachers are very helpful and friendly and treat students very nicely.’ – Zhou Yimei – China; 99.9 University Entrance Score; three Premier’s Awards, Dux of college and regional top Victorian Certificate of Education student Awards • Victorian Education Excellence Awards – student support excellence, 2009-11 • International student VCCA VCE Season of Excellence Award, 2010 • Microsoft Worldwide Pathfinder School Program, 2010 • Victorian Student Representative Councils Award, 2010 • Premier’s VCE Awards (multiple) – outstanding student performance, 2009-11 • Bendigo Young Inventor of the Year – carbon fibre wheel, 2011 Reasons to choose our school Innovative, multi award-winning college that creates and supports individual student programs Established international student program with advanced resources and modern facilities Lovely garden setting and safe, clean environment with experienced Homestay families Visit our school online at www.bssc.edu.au Address: Rosalind Park Bendigo, VIC 3552 Distance from Melbourne city centre: 145 km (Map Reference: Pg 12-13, C11, No. 108 ) Principal: Dale Pearce International Student Coordinator: Juncai Lin Telephone: +61 3 5443 1222 Fax: +61 3 5441 4548 Email: bendigo.senior.sc@edumail.vic.gov.au Web: www.bssc.edu.au Number of students: 1700 Number of international students: 24 Dress: Non-uniform Cost of homestay per week: $238
  • 111.
    109For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Bright P-12 College Nestled within the picturesque Ovens Valley, the setting for Bright P-12 College is 10 hectares of landscaped grounds. The town of Bright is located 310 kilometres north-east of Melbourne amongst magnificent alpine country. River valleys and mountains offer year-round activities and a wide range of sports including skiing, bushwalking and bike riding. College facilities encompass appealing recreational environments and extensive outdoor sporting amenities. During the winter ski season a school annexe operates at Dinner Plain. Features of the local area • Alpine environment nearby ski resorts, hiking and hang gliding facilities • Popular tourist town serviced by all typical visitor amenities • Rural community with some associated small towns on a major highway Languages taught German Japanese Indigenous languages: Murrinh-patha Dhudhuroa Special programs • Participation in Australian mathematics, computer, English and science competitions • Firmly established exchange programs with sister schools in Japan and Germany • Music (including instrumental and choir) • Indigenous studies with opportunity for travel to Australia’s Northern Territory • Visual arts, wood, metal and food technology Intensive English Language classes On-site language support provided Student support services and programs • Careers resource centre and coordinator • Peer support program • Active student representative council • Student leadership • Year level camps • Student Welfare Support Staff • SunSmart school promoting sun protection for students Extracurricular activities • Ski program • Unique camps including Wadeye indigenous camp in the Northern Territory, Apollo Bay, Bogong Outdoor Education Centre • Language speaking competitions • Local Youth of the Year participation • Local Lions Club speaking competition • School for Student Leadership (Alpine, Marlo, Gnurad Gundidj) Sports offered Athletics, Australian Rules Football, Baseball, Basketball, Cricket, Cross Country Running, Gymnastics, Mountain Biking, Netball, Soccer, Skiing, Swimming, Volleyball, Tennis Success story I loved participating in classes, which are not available in my school in Germany, like Outdoor Recreation and Australian Indigenous Languages. I learned and experienced a lot, for example, Rock climbing, Bushwalking, Kayaking and Caving. It was always great fun and it increased my knowledge about the outdoors a lot. Out of school, I played Australian Rules Football and I really enjoyed it. It is also, in my opinion, way better than soccer. – Severin – Germany, 2014 Awards • Australian Olympic Committee Pierre de Coubertin Award, 2014 • State swimming championship bronze medal, 2014 • Newsboys Foundation Leadership Award, 2013 • Victorian Multicultural Commission Harmony Day grant, 2014 • AGTV Year 10 German Award, 2013 Reasons to choose our school Small school offering personalised learning in small classes with mentoring opportunities Welcoming community that is experienced with hosting exchange students Fabulous grounds close to native Australian flora and fauna Visit our school online at www.brightp12.vic.edu.au Address: Park Street Bright, VIC 3741 Distance from Melbourne city centre: 310 km (Map Reference: Pg 12-13, D11, No. 109 ) Principal: Ms Jean Olley International Student Coordinator: Katrina Ciolli Telephone: +61 3 5755 1166 Fax: +61 3 5755 1770 Email: bright.p12@edumail.vic.gov.au Web: www.brightp12.vic.edu.au Number of students: 420 Number of international students: 2 Dress: Uniform Cost of uniform (approx.): $250 Cost of homestay per week: $240–$260 Other fees: $250
  • 112.
    110 Right SchoolRight Place 2014/2015 – Victorian cities (excluding Melbourne) Charlton College Charlton College is a Preparatory to Year 12 school in the rural town of Charlton, 255 km north-west of Melbourne and 110 km west of Bendigo in Victoria. Charlton College has a professional team of staff and well-equipped with technology facilities. Our students have high expectations of the school and over the years students have achieved excellent results in both Victorian Certificate of Education (VCE) and Victorian Certificate of Applied Learning (VCAL). A Trade Training Centre is in the process of being completed which enables 11 VET courses to be delivered. Features of the local area • Natural features – Avoca River, river red gums, Buckrabanyule and Yawong Hills • Small country town environment • All facilities are close by Languages taught Indonesian Chinese Special programs • Video conferencing to provide breadth of VCE and VET Curriculum • CSOAR mentoring program with community members • Music and sports program Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Chinese speaking staff member • Part-time psychologist • Careers advisor • Teacher Advisory Program Extracurricular activities • Pre-driver Education • Music • Sport Sports offered Athletics, Australian Rules Football, Basketball, Hockey, Netball, Soccer Awards • Regular finalists in badminton state competitions Reasons to choose our school New Science Language Centre opened in 2013 New Primary facilities opened in 2013 Trade Training Centre to open in 2014 Visit our school online at www.charlton.vic.edu.au Address: Davies Street Charlton, VIC 3525 Distance from Melbourne city centre: 255 km (Map Reference: Pg 12-13, B12, No. 110 ) Principal: Kelvin Baird International Student Coordinator: Kelvin Baird Telephone: +61 3 5491 1280 Fax: +61 3 5491 1703 Email: charlton.co@edumail.vic.gov.au Web: www.charlton.vic.edu.au Number of students: 150 Number of international students: 1 Dress: Uniform Cost of uniform (approx.): $200 Cost of homestay per week: N/A
  • 113.
    111For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Kurnai College Kurnai College is part of an exciting education development – positioned within the beautiful grounds of Federation University, students enjoy access to stunning facilities, like the $1.5m Information Communications Technology hub. This partnership allows the College use of Federation University facilities, including the University library. Students have access to tutoring from Federation University students to support their study in a full range of Victorian Certificate of Education subjects. Features of the local area • Close to both the ocean and mountains, yet within 90 minutes of Melbourne • Provincial city of Latrobe provides excellent modern lifestyle facilities • Easy transition for international students to study at Federation University Gippsland Languages taught Chinese (Mandarin) German Special programs • Experienced Chinese/Japanese/German international program assistants and aides • Access to all Federation University facilities and free tutoring from Federation students • 1:1 Learning program with free netbook computer for all international students • Free camps and excursions for international students, including interstate trips • Confucius Classrooms run in collaboration with Hanban of Chinese government Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Four specialist international student tutors, homework clubs and multicultural aide • Advanced language and culture centre with technology-rich learning environment • Selective homestay program with local families. Generally only one student in a homestay but never two from the same language background • Careers resource centre, student common room and state-of-the-art library provide a quiet study environment • Strong student welfare support team Extracurricular activities • Principal’s farm trip to experience local culture • Music tuition and calendar of concert events • Sporting teams where international students participate in local competitions • School holiday excursion and trips Sports offered Athletics, Badminton, Basketball, Netball, Soccer, Table Tennis, Volleyball Success story ‘I feel very lucky to have attended Kurnai College. The school created a safe and quiet environment without the distractions and noise of the big city. I experienced authentic Australian culture, improved my English and achieved a high score in my VCE exams. I was very well looked after and supported by the school, from the principals, teachers to the International Program staff. All these have led to my success. Now that I am doing my medical degree at the University of Melbourne, I still miss the days I spent at Kurnai College and will definitely go back and visit the school and my teachers. Thank you Kurnai College!’ – Zhenwei Zhang – China; Biomedicine, University of Melbourne, 2012 Awards • Deakin University Merit Scholarship, 2014 • Constitution Convention – Australian finalist, 2011 • Three full scholarships to the University of Melbourne 2009-2011 • State champions, girls soccer, 2011 • Eight full and partial Monash University Scholarships 2009-2011 • Fulbright Scholar – Molecular Biology, 2009 Reasons to choose our school A friendly, safe community for students to experience authentic Australian culture and quickly improve their English Located within Federation University campus, accessing its facilities and study Strong personalised care and support for international students and their families Visit our school online at www.kurnaicollege.vic.edu.au Address: Northways Road Churchill, VIC 3842 Distance from Melbourne city centre: 140 km (Map Reference: Pg 12-13, D12, No. 111 ) Principal: Anthony Rodaughan International Student Coordinator: Danny Johnston James Yao Telephone: +61 3 5132 3800 Fax: +61 3 5132 3828 Email: kurnai.co@edumail.vic.gov.au Web: www.kurnaicollege.vic.edu.au Number of students: 1200 Number of international students: 19 Dress: No Uniform Cost of uniform (approx.): No charge Cost of homestay per week: $220
  • 114.
    112 Right SchoolRight Place 2014/2015 – Victorian cities (excluding Melbourne) Kyenton Secondary College A caring school dedicated to providing our students with the best possible education in a safe and engaging environment. We have a proud history of student achievement and community involvement. Throughout our 100 years, virtually all students completing Year 12 at Kyneton Secondary College have gained entry to their preferred tertiary courses, traineeships, apprenticeships and employment choices. We enjoy an envious record of achievement in the performing arts and provide a wide range of extracurricular activities for all students. Features of the local area • Rural environment • Close to Melbourne airport • Good public transport Languages taught Indonesian French Special programs • Intensive literacy support program for Years 7-9 • Friendly, small school with supportive staff • Comprehensive VCE, VCAL VET programs • Offers Virtual Learning Network for some subjects • Access to certificate training in several areas Intensive English Language classes Provided at English Language School located in Melbourne. Some language assistance may be provided. Student support services and programs • Part-time psychologist • Careers resource centre • School counsellor and nurse • Links to Cobaw Community Health Services • Teen mental health training provided at Year 11 Extracurricular activities • Camps at most year levels • Debutante Ball at Year 11 • School production • School bands and choir • Driver education programs • Outdoor Education programs Sports offered Athletics, Australian Rules Football, Basketball, Diving, Netball, Rugby, Soccer, Swimming Awards • Premier’s Award for Systems Engineering, 2013 • Premier’s Award for Engineering, 2014 Reasons to choose our school Spirit of cooperation and belonging among staff and students Small school offering personalised experience New science facilities opened in 2014 Visit our school online at www.kynsec.vic.edu.au Address: Epping Street Kyneton, VIC 3444 Distance from Melbourne city centre: 88 km (Map Reference: Pg 12-13, C11, No. 112 ) O NWAR D A WARDP U K Y N E T O N N D Principal: Mark Ridgeway International Student Coordinator: Annette Brown Telephone: +61 3 5421 1100 Fax: +61 3 5422 3505 Email: kyneton.sc@edumail.vic.gov.au Web: www.kynsec.vic.edu.au Number of students: 536 Number of international students: 0 Dress: Uniform Cost of uniform (approx.): $130 Cost of homestay per week: $100
  • 115.
    113For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Mildura Senior College Mildura Senior College is a Year 11- and 12-only College that provides an extensive list of subject offerings across VCE, VETis and VCAL and has an English Language Centre on Campus. Mildura Senior College is committed to providing a stimulating learning environment for all students. The College has a positive culture to engage and support student learning so that students reach their full educational potential in a happy, healthy and safe environment. Features of the local area • Close to shopping centre • Natural features Languages taught Italian VSL access available Special programs • Partnerships with local university • English Language Centre on site Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Youth Worker • Careers resource centre • Chaplin • School Nurse • GP access on site Extracurricular activities • Tertiary Trips • Debutant Balls • Extensive Sport Team Opportunities Sports offered Athletics, Australian Rules Football, Basketball, Hockey, Soccer, Softball, Swimming, Table Tennis, Tennis, Volleyball Awards • Australian School Based Apprentice of the Year, 2013 • Top VET Engineering Student, 2012 Reasons to choose our school Spirit of cooperation and belonging among staff and students Large multicultural campus Attractive school grounds Visit our school online at www.milsen.vic.edu.au Address: Deakin Avenue Mildura, VIC 3500 Distance from Melbourne city centre: 550 km (Map Reference: Pg 12-13, B9, No. 113 ) Principal: Andrew Ough International Student Coordinator: Belinda Hudak Telephone: +61 3 5021 2911 Fax: +61 3 5023 2440 Email: mildura.senior.co@edumail.vic.gov.au Web: www.milsen.vic.edu.au Number of students: 900 Number of international students: 3 Dress: No Uniform Cost of uniform (approx.): Cost of homestay per week: N/A
  • 116.
    114 Right SchoolRight Place 2014/2015 – Victorian cities (excluding Melbourne) Mount Clear College Excellence is the goal of all programs offered at Mount Clear College. Located within the city of Ballarat, the college nurtures a safe, caring and inclusive learning environment. Highly qualified and experienced staff inspire students to achieve the highest academic outcomes. International students enjoy access to a diverse curriculum and challenging educational program. Parents receive regular reports of student progress under the careful watch provided by a supportive college community. Features of the local area • Excellent local public transport and only one-hour by train from Ballarat to Melbourne • Safe and encouraging learning environment supported by welcoming local community • Large provincial city with outstanding educational facilities and two universities Languages taught Chinese Japanese Special programs • Accelerated learning Program for high performing students • Experienced international Chinese program assistants • Local university mentoring and access to university teaching facilities • Special mathematics and science programs in resources and alternative energy areas Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Complete range of wellbeing services to ensure the all students’ health and happiness • Careers resource centre and adviser to guide students on subject choices and university • Native speaking Chinese and Japanese International Student Coordinators • Mentoring program for all international students • On-site doctor and psychologist Extracurricular activities • International student camp and tour program • Broad range of sporting, music, performing arts and academic programs Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Cricket, Cross Country, Martial Arts, Netball, Soccer, Swimming, Tennis Success story ‘Mount Clear College is a very friendly school. It has wonderful facilities and very modern equipment. We are excited about the range of subjects available to study. The environment of the school is very beautiful. Our homestay family looks after us and makes us feel very welcome.’ – Dong Wang Awards • Prime Minister’s Award for Excellence • Premier’s VCE Awards • Australian Mathematics Competition – excellence awards • Vocational Educational Training Excellence Awards – Year 6 student Reasons to choose our school A good place to learn English language High-quality homestay environments Magnificent Language Centre for international students Visit our school online at www.mtclearsc.vic.edu.au Address: Olympic Avenue Mount Clear, VIC 3350 Distance from Melbourne city centre: 100 km (Map Reference: Pg 12-13, C11, No. 114 ) Principal: Lynita Taylor International Student Coordinator: Andrew Lang Hongxia Wei Telephone: +61 3 5330 1500 Fax: +61 3 5330 2670 Email: mount.clear.sc@edumail.vic.gov.au Web: www.mtclearsc.vic.edu.au Number of students: 1200 Number of international students: 24 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $240
  • 117.
    115For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Red Cliffs Secondary College Red Cliffs Secondary College is located in spacious grounds in a rural community 600 kilometers from the city of Melbourne. The school provides excellent opportunities for students to gain a truly international experience. Our broad curriculum offers students across years 7-12 allows students to be a skilled global citizen as they move on to tertiary study and or their career. Our skilled teaching and non-teaching staff aim to care and support the whole student. Features of the local area • Well serviced by bus routes • Traditional values in regard to manners, behaviour and community expectations • Well serviced by train lines and bus routes Languages taught Chinese Indonesian Other languages through the Victorian School of Languages Special programs • Flexible learning program for students in Years 8 and 9 • Students in Year 10, 11 and 12 can accelerate their studies • Instrumental music program • Comprehensive sport program • Student leadership program • Student Representative Council • Supportive friends training • Peer Leadership training Intensive English Language classes Provided at English Language School located 15kms from school Student support services and programs • Teacher aides to assist students • Fully staffed library / resource Centre • Full time social worker • Part time Chaplin – both male and female • School nurse • Careers resource centre with a dedicated careers person • Peer support program • Tutoring program for students before school Extracurricular activities • School camps and all year levels • Range of lunchtime programs and clubs • Live theatre performances Sports offered Athletics, Australian Rules Football, Badminton, Basketball, Cross Country Running, Hockey, Netball, Shooting, Soccer, Table Tennis, Volleyball Awards • University of Melbourne – Kwong Lee Dow Young Scholars Program • Eisteddfod Awards in the performing arts • Long Tan Leadership Awards • Premier’s VCE Awards Reasons to choose our school New science facilities and wellbeing centre opened in 2013 Small school offering personalised experience Purpose built young adult playground Visit our school online at www.red-cliffs-sc.vic.edu.au Address: Fitzroy Avenue Red Cliffs, VIC 3496 Distance from Melbourne city centre: 600 km (Map Reference: Pg 12-13, B9, No.115 ) Principal: David Browne International Student Coordinator: Helen Popovski Telephone: +61 3 5024 1522 Fax: +61 3 5024 2982 Email: red.cliffs.sc@edumail.vic.gov.au Web: www.red-cliffs-sc.vic.edu.au Number of students: 680 Number of international students: 0 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $200
  • 118.
    116 Right SchoolRight Place 2014/2015 – Victorian cities (excluding Melbourne) Stawell Secondary College Stawell Secondary College offers all students exceptional education opportunities. International students are embraced by the school community and well supported in meeting secondary education English requirements. A new on-site Language Centre provides a motivational venue for intensive English tuition by skilled staff. The broader college curriculum offers a variety of study choices and possible university pathways. Graduate international students have progressed to further study at Melbourne, La Trobe, Deakin, Canberra and Sydney universities. Features of the local area • Well-serviced by train lines and bus routes • Safe location free of big city distractions • Near to Stawell shopping centre and sporting facilities Languages taught Chinese German Special programs • Experienced teachers for Chinese and German international student programs • Chinese and German teachers/interpreters assist with parent communications • Notebook computers for every student • Dedicated Year 12 VCE study centre • Hair and beauty teaching salon Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Advice with subject selections, careers and University selection • Full time counsellor • Careers resource centre • Support programs via a vertical house system to ensure social and emotional learning best practice • Football and soccer fields, basketball courts and gymnasium Extracurricular activities • Year 12 study camp • Surfing training • Outdoor education camps including rock climbing, canoeing and bush cooking • School and local sports competitions • Day trips and excursions to places of interest Sports offered Australian Rules Football, Basketball, Cricket, Netball, Racquetball, Shooting, Soccer, Swimming, Table Tennis, Tennis Success story Relationships with Sister Schools in China have enabled International students and local students to learn and travel together in both countries. Awards • 100% of students satisfactorily completed the VCE, 2013 • Kwong Lee Dow Young Scholars Program, 2014 Reasons to choose our school New purpose built on-site English Language Centre New technology access with laptop computers issued to every student in the school Attractive school grounds close to Grampians National Park Visit our school online at www.stawellsc.vic.edu.au Address: 79-97 Patrick Street Stawell, VIC 3380 Distance from Melbourne city centre: 230 km (Map Reference: Pg 12-13, B11, No. 116 ) Principal: Colin Axup International Student Coordinator: Cindy Bibby Telephone: +61 3 5358 1700 Fax: +61 3 5358 3096 Email: stawell.sc@edumail.vic.gov.au Web: www.stawellsc.vic.edu.au Number of students: 420 Number of international students: 0 Dress: Uniform Cost of uniform (approx.): $320 Cost of homestay per week: N/A
  • 119.
    117For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Warrnambool College Positioned within a key Victorian coastal centre, Warrnambool College offers an outstanding academic program. Supported by highly capable teachers, students are encouraged to prepare for University. Advanced science and language facilities and easy technology access support student achievement. Skilled staff from our language centre assist students to meet the English requirements of secondary education. The school has strong ties to the Warrnambool campus of Deakin University and also the Warrnnambool TAFE Features of the local area • Inspirational rural landscapes • Key Victorian coastal centre, well serviced by retail, medical, sporting and lifestyle amenities • Close to swimming and surfing beaches Languages taught Indonesian French Special programs • Accelerated learning Program for high performing students • Student international study tours • Vocational Education and Training course in sustainable and emerging technology • Award-winning music program Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Careers resource centre • House system promotes close partnerships between students, families and school • Homestay accommodation • Camps programs • School counsellors and chaplain Extracurricular activities • Duke of Edinburgh’s Award • World Challenge overseas educational expeditions • Rock Eisteddfod Challenge • Student Representative Council and student leadership opportunities • College bands and music performance • Drama and dance school productions • Environmental action groups Sports offered Athletics, Australian Rules Football Academy, Badminton, Basketball Academy, Hockey Academy, Lawn Bowls, Soccer Academy, Table Tennis Academy, Volleyball, Swimming Club and Ocean Swimming Success story Many of our international students continue to tertiary education, both in Australia and their home country. One student is completing a Bachelor of Arts as a participant in the Dean’s Scholars Program at Monash University, majoring in Indonesian and also studying Spanish, Asian studies and history. She was College Dux in 2009 with a high score of 99.55. Awards • Top VCE results in region • Best Art House Production – Victorian State Winner • Victorian Education Excellence Award • State and national finalists – Basketball, Football, Hockey, Swimming • Duke of Edinburgh – Gold Award Presentations • Award winning music ensembles – Senior, Junior and Jazz Bands, Drum, Flute and Brass Reasons to choose our school Select international program offering students personal attention from experienced staff Recently opened purpose-built science centre and language facilities An award-winning music program available to all students Visit our school online at www.wblcoll.vic.edu.au Address: Grafton Road Warrnambool, VIC 3280 Distance from Melbourne city centre: 270 km (Map Reference: Pg 12-13, B12, No. 117 ) Principal: Michael Fitzgerald International Student Coordinator: Emma Miller Telephone: +61 3 5564 4444 Fax: +61 3 5561 2356 Email: warrnambool.co@edumail.vic.gov.au Web: www.wblcoll.vic.edu.au Number of students: 1180 Number of international students: 2 Dress: Uniform Cost of uniform (approx.): $400 Cost of homestay per week: $230
  • 120.
    118For a listingof studies by school, please visit http://schlprv.vcaa.vic.edu.au/schoolsstudiessearch Wycheproof P-12 College Wycheproof P-12 College provides an engaging and diverse education from Prep to Year 12. The school aims to meet the educational, social and cultural needs of the students through promoting a caring, supportive and educationally challenging environment. There is a culture of high expectations in terms of student learning and behaviour. Students are encouraged to ‘be their best’ in all that they undertake. The College community takes great pride in celebrating exemplary achievements. Features of the local area • Safe location supported by a welcoming community • Unique country lifestyle experience that enhances character development • Well-serviced public transport routes Languages taught Chinese Italian Japanese French Special programs • Laptops for all students • Safe, high-quality English-speaking homestay experiences • Regular international student excursions to Melbourne universities • Student leadership opportunities Intensive English Language classes Provided at on-site English Language Centre Student support services and programs • Individual support for all international students • Academic enrichment programs for high- achieving students • Student welfare program • School Nurse and School Chaplain • After school study program • Chinese-speaking teacher Extracurricular activities • International student camp and tour program • Public speaking • Extensive camps program • Instrumental music program • Lunchtime activities Sports offered Athletics, Australian Rules Football, Cricket, Cross Country, Golf, Hockey, Netball, Table Tennis, Tennis, Soccer, Swimming Success story The school provided a very happy study experience. Beautiful school with few people and the students from Year 5 onwards can have their own computers - which is an advantage.” – Jiaqi Chen - 2013 “I particularly enjoyed the hospitality and good manners of students, classes are very interesting.” – Leyan Zeng – 2013 Awards • Kwong Lee Dow Young Scholars Program – University of Melbourne, 2014 • Sustainably Active School - Tidy Towns Sustainable Communities Award, 2012 • Australian Mathematics Competition – High Distinction student awards, 2014 • Regional and state level sports – multiple awards • 15.6% of students obtained a study score of 40 or higher (above the state average), 2012 • Long Tan Leadership Awards, 2014 Reasons to choose our school Highly-respected school with a strong record of academic excellence Unique cultural experience where staff are genuinely involved in each child’s progress An environment in which the school is as ambitious for your child as you are Visit our school online at www.wychep12.vic.edu.au Address: McKenzie Cres, Wycheproof VIC 3527 Distance from Melbourne city centre: 320 km (Map Reference: Pg 12-13, B10, No. 118 ) Principal: Christine McKersie International Student Coordinator: Qin Zhang Telephone: +61 3 5493 7409 Fax: 61 3 5493 7506 Email: wycheproof.p12@edumail.vic.gov.au Web: www.wychep12.vic.edu.au Number of students: 130 Number of international students: 0 Dress: Uniform Cost of uniform (approx.): $150 Cost of homestay per week: $220
  • 121.
    119 Right SchoolRight Place 2014/2015 – Subject Matrix Regional Victoria Belmont High School • • • • • • • • • • • • • • • • • • • • • • • • • • • • Bendigo Senior Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Bright P-12 College • • • • • • • • • • • • • • • • • • Charlton College • • • • • • • • • • • • • • • • • • • • • • • Dromana Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • Kurnai College • • • • • • • • • • • • • • • • • • • • • • • • • • • • Kyneton Secondary College • • • • • • • • • • • • • • • • • • • • • • • • Mildura Senior College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Mount Clear College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Red Cliffs Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • Stawell Secondary College • • • • • • • • • • • • • • • • • • Warrnambool College • • • • • • • • • • • • • • • • • • • • • • • • Wycheproof P-12 College • • • • • • • • • • • • • • • • • • • • • Metropolitan Melbourne Alkira College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Ashwood Secondary College • • • • • • • • • • • • • • • • • • • • Auburn High School • • • • • • • • • • • • • • • • • • • • • Balwyn High School • • • • • • • • • • • • • • • • • • • • • • • • • • • • Bayside P-12 College • • • • • • • • • • • • • • • • • • • • • • • • • Bentleigh Secondary College • • • • • • • • • • • • • • • • • • • • • • • Blackburn High School • • • • • • • • • • • • • • • • • • • • • • • • • • • Box Hill High School • • • • • • • • • • • • • • • • • • • • • • • Box Hill Senior Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • Braybrook College • • • • • • • • • • • • • • • • • • • • • • Brentwood Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • Brighton Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • Brunswick Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • Buckley Park College • • • • • • • • • • • • • • • • • • • • • • • • Camberwell High School • • • • • • • • • • • • • • • • • • • • • • • • • • • • Canterbury Girls’ Secondary College • • • • • • • • • • • • • • • • • • • • • • • Carwatha College • • • • • • • • • • • • • • • • • • • • • • • Charles La Trobe P-12 College • • • • • • • • • • • • • • • • • • Cheltenham Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • Collingwood College • • • • • • • • • • • • • • • • • • • • • • • • • • Copperfield College • • • • • • • • • • • • • • • • • • • • • • • • • • • Dandenong High School • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Doncaster Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • East Doncaster Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • Elwood College • • • • • • • • • • • • • • • • • • • • • Essendon Keilor College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Fairhills High School • • • • • • • • • • • • • • • • • • • • • • • • • VCE subjects by school Subjects are offered based on student enrolments at each school and may change from year to year. If your study preference is not listed, please contact your education agent or department staff. Subjects VCE Subjects Accounting AgriculturalAndHorticulturalStudies Art AustralianAndGlobalPolitics Biology BusinessManagement Chemistry ClassicalStudies Dance Drama Economics English EnglishLanguage EnvironmentalScience FoodAndTechnology Geography HealthAndHumanDevelopment History IndustryAndEnterprise InformationTechnology Languages(OtherThanEnglish) LegalStudies Literature Mathematics Media Music MusicStylesandComposition OutdoorAndEnvironmentalStudies Philosophy PhysicalEducation Physics ProductDesignAndTechnology Psychology ReligionAndSociety Sociology StudioArts SystemsEngineering TextsAndTraditions TheatreStudies VisualCommunicationDesign School
  • 122.
    120www.study.vic.gov.au Footscray City College• • • • • • • • • • • • • • • • • • • • • • • • • • Forest Hill College • • • • • • • • • • • • • • • • • • • • • • • • • • • Fountain Gate Secondary College • • • • • • • • • • • • • • • • • • • • • • • Frankston High School • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Gilmore College For Girls • • • • • • • • • • • • • • • • • • Gleneagles Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Glen Eira College • • • • • • • • • • • • • • • • • • • • • • • • Glen Waverley Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Highvale Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • Hoppers Crossing Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Hume Central Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • John Fawkner Secondary College • • • • • • • • • • • • • • • • • • • • Kambrya College • • • • • • • • • • • • • • • • • • • • • • • • Keilor Downs Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • Kew High School • • • • • • • • • • • • • • • • • • • • • • • • • • Keysborough Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • Koonung Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • Lalor North Secondary College • • • • • • • • • • • • • • • • • • • • • • Lilydale Heights College • • • • • • • • • • • • • • • • • • • • • • Lyndale Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • Macleod College • • • • • • • • • • • • • • • • • • • • Maribyrnong Secondary College • • • • • • • • • • • • • • • • • • • • • • McClelland College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • McKinnon Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • Melbourne Girls’ College • • • • • • • • • • • • • • • • • • • • • • • • • • Mentone Girls’ Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • Mill Park Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Mordialloc College • • • • • • • • • • • • • • • • • • • • • • • • • Mornington Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • Mount Alexander College • • • • • • • • • • • • • • • • • • • Mount Eliza Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • Mount Erin College • • • • • • • • • • • • • • • • • • • • • • • • Mount Waverley Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • Mullauna Secondary College • • • • • • • • • • • • • • • • • • • • • Noble Park Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • Northcote High School • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Parkdale Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • Point Cook Senior Secondary College • • • • • • • • • • • • • • • • • • • • • • • • Princes Hill Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • Reservoir High School • • • • • • • • • • • • • • • • • • • Ringwood Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • Rosehill Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • VCE Subjects Accounting AgriculturalAndHorticulturalStudies Art AustralianAndGlobalPolitics Biology BusinessManagement Chemistry ClassicalStudies Dance Drama Economics English EnglishLanguage EnvironmentalScience FoodAndTechnology Geography HealthAndHumanDevelopment History IndustryAndEnterprise InformationTechnology Languages(OtherThanEnglish) LegalStudies Literature Mathematics Media Music MusicStylesandComposition OutdoorAndEnvironmentalStudies Philosophy PhysicalEducation Physics ProductDesignAndTechnology Psychology ReligionAndSociety Sociology StudioArts SystemsEngineering TextsAndTraditions TheatreStudies VisualCommunicationDesign School
  • 123.
    121 Right SchoolRight Place 2014/2015 – Subject Matrix Sandringham College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • South Oakleigh Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • St Albans Secondary College • • • • • • • • • • • • • • • • • • • • • • • • Strathmore Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Sunbury Downs College • • • • • • • • • • • • • • • • • • • • • • Sunshine College • • • • • • • • • • • • • • • • • • • • • • • • • • • Templestowe College • • • • • • • • • • • • • • • • • • • • Thornbury High School • • • • • • • • • • • • • • • • • • • • Upper Yarra Secondary College • • • • • • • • • • • • • • • • • • • • • Vermont Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Victoria University Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Victorian College of the Arts Secondary School • • • • • • • • • • • • • • • • • • Viewbank College • • • • • • • • • • • • • • • • • • • • • • • • • • • Wantirna College • • • • • • • • • • • • • • • • • • • • • • • • • • • Warrandyte High School • • • • • • • • • • • • • • • • • • • • • • • • Wellington Secondary College • • • • • • • • • • • • • • • • • • • • • • • • Werribee Secondary College • • • • • • • • • • • • • • • • • • • • • • • • • • • • Westall Secondary College • • • • • • • • • • • • • • • • • • • • Wheelers Hill Secondary College • • • • • • • • • • • • • • • • • • • • • • Williamstown High School • • • • • • • • • • • • • • • • • • • • • • • • • • • VCE Subjects Accounting AgriculturalAndHorticulturalStudies Art AustralianAndGlobalPolitics Biology BusinessManagement Chemistry ClassicalStudies Dance Drama Economics English EnglishLanguage EnvironmentalScience FoodAndTechnology Geography HealthAndHumanDevelopment History IndustryAndEnterprise InformationTechnology Languages(OtherThanEnglish) LegalStudies Literature Mathematics Media Music MusicStylesandComposition OutdoorAndEnvironmentalStudies Philosophy PhysicalEducation Physics ProductDesignAndTechnology Psychology ReligionAndSociety Sociology StudioArts SystemsEngineering TextsAndTraditions TheatreStudies VisualCommunicationDesign School
  • 124.
  • 125.
    123 Right SchoolRight Place 2014/2015 – Subject Matrix VET subjects by school Subjects are offered based on student enrolments at each school and may change from year to year. If your study preference is not listed, please contact your education agent or department staff. Metropolitan Melbourne Alkira College • • • • • • • • • • • • • • • • • • • • • • • • Ashwood Secondary College • • Auburn High School Balwyn High School • • • • • Bayside P-12 College • • • • • • • • • • • • • • • • • • • • • Bentleigh Secondary College • Blackburn High School • • • • • • • • • • Box Hill High School • • Box Hill Senior Secondary College • • • • • • • • • Braybrook College • • • • • • Brentwood Secondary College • • • • • • • Brighton Secondary College • • • • • • • • • • • • Brunswick Secondary College • • • • • • • • • • • • • • • Buckley Park College • • • • • • • Camberwell High School • • • • • • • • • • • • • • • • • • Canterbury Girls’ Secondary College • • • • • • • • • • • • • • • • • • Carwatha College • • • • • • • • • • • • • • • • • • • • Charles La Trobe P-12 College • • • • • • • • • • • • • • • • • • • • • Cheltenham Secondary College • • • • • • • • • • • • • • • • • • • • • • • • Collingwood College • • • • • • • • • • • • Copperfield College • • • • • • • • • • • • • • Dandenong High School • • • • Doncaster Secondary College • • • • • • • • • • • • • • • • • East Doncaster Secondary College • • • • • • • • • • • Elwood College • • • • • • • • • Essendon Keilor College • • • • • • • • • • • • • • • • Fairhills High School • • • • • • • • • • • • • • • • Footscray City College • • • • • • • • • • Forest Hill College • • • • • • • • • • Frankston High School • • • • • • • • • • • • • • • • Fountain Gate Secondary College • • • • • • • • • • • • • • • • • • • Gilmore College For Girls • • • VET Subjects AdultCommunity-FurtherEducation Agriculture AgricultureAndHorticulture Automotive BuildingConstruction Business CiscoNetworkingAcademyProgram ClothingDesignProduction CommunityServices CulturalRecreation-ArtsDesign CulturalRecreation-Entertainment CulturalRecreation-Racing Dance(VCEVET) DesktopPublishing Electronics Engineering EquineIndustry FinancialServices FoodProcessing Furnishing Horticulture Hospitality InformationTechnology LaboratorySkills Multimedia MusicIndustrySkills PrimaryAndForest-AnimalHandling Printing PublicAdministrationAndSafety RetailOperations SmallBusinessPractice SportAndRecreation TrainingAndAssessment TransportAndStorage School Regional Victoria Belmont High School • • • • • • • • • • • • • • • • • • • • • • • Bendigo Senior Secondary College • • • • • • • • • • • • • Bright P-12 College • • Charlton College • • • • • • • • • • • • Dromana Secondary College • • • • • • • • • • • • Kyneton Secondary College • • • • • • Kurnai College • • • • • • • • • • • • • • • • • • • • • • Mildura Senior College • • • • • • • • • • • • • • • • Red Cliffs Secondary College • • • • • • • • • • • • Mount Clear College • • • • • • • • • • • • • • • • • • Stawell Secondary College • • • • • Warrnambool College • • • • • • • • • • • • • • • • Wycheproof P-12 College • • • • • • • • •
  • 126.
    124www.study.vic.gov.au VET subjects byschool Subjects are offered based on student enrolments at each school and may change from year to year. If your study preference is not listed, please contact your education agent or department staff. Gleneagles Secondary College • • • • • • • • • • • • • • • • • • • Glen Eira College • • • • • • • • • • • • Glen Waverley Secondary College • Highvale Secondary College • • Hoppers Crossing Secondary College • • • • Hume Central Secondary College • • • • John Fawkner Secondary College • • • Kambrya College • • • • • • • • • • • • • • • • • • • Keilor Downs Secondary College • • Kew High School • • • • • • • • • • • • • Keysborough Secondary College • • • • • • • • • • • • • • • • • • • • Koonung Secondary College • • • • • • • • Lalor North Secondary College • • • • • • • • • • • • Lilydale Heights College • • • • • • • • • • • • • • • • • • • Lyndale Secondary College • • • • • • • • • • • • • • • • Macleod College • • • • • • • • • • • Maribyrnong Secondary College • • • • • • McClelland College • • • • • • • • • • • • • • • • • • • • • • • • • McKinnon Secondary College • • • • • • • • • Melbourne Girls’ College • • • • • • • • • • • • • • Mentone Girls’ Secondary College • • • • Mill Park Secondary College • • • • • • • • • • • • • • • Mordialloc College • • • • • • • • • • • • • • • • Mornington Secondary College • • • • • • • • • • • • • • • • • • • • • • Mount Alexander College • • • • • • • • Mount Eliza Secondary College • • • • • • • • • • • • • • • • • • • • • • • Mount Erin College • • • • • • • • • Mount Waverley Secondary College • • Mullauna Secondary College • • • • • • • Noble Park Secondary College • • • Northcote High School • • • • • • • • • • Parkdale Secondary College • • Point Cook Senior Secondary College • • • • • • • • • • • • • • • Princes Hill Secondary College • • • • • • • • • • • • • • Reservoir High School • • • • • • • • • • • • • Ringwood Secondary College • • • • • • • • • • • • • • • • • Rosehill Secondary College • • • • • • • • • • • • • • • • • • • • • Sandringham College • • • • • South Oakleigh Secondary College • St Albans Secondary College • • • • • • • • • • • • • • • • • Strathmore Secondary College • • • • • • • • • Sunbury Downs College Sunshine College • • • • • • • • • • • • Templestowe College • • • • • • • • • • • • • • • • • Thornbury High School • • • • • • • • • • • Upper Yarra Secondary College • • • • • • • • • • • • • • • • Vermont Secondary College • • • • • • • • • • • • • • • • Victoria University Secondary College • • • • • • • • • • • • • • • • VET Subjects AdultCommunity-FurtherEducation Agriculture AgricultureAndHorticulture Automotive BuildingConstruction Business CiscoNetworkingAcademyProgram ClothingDesignProduction CommunityServices CulturalRecreation-ArtsDesign CulturalRecreation-Entertainment CulturalRecreation-Racing Dance(VCEVET) DesktopPublishing Electronics Engineering EquineIndustry FinancialServices FoodProcessing Furnishing Horticulture Hospitality InformationTechnology LaboratorySkills Multimedia MusicIndustrySkills PrimaryAndForest-AnimalHandling Printing PublicAdministrationAndSafety RetailOperations SmallBusinessPractice SportAndRecreation TrainingAndAssessment TransportAndStorage School
  • 127.
    Victorian College ofthe Arts Secondary School • • • Viewbank College • • • • • • • • • • • • • • Wantirna College • • • Warrandyte High School • • • • • • • • • • • • Wellington Secondary College • • • • • • • • • • • • • • • Werribee Secondary College • • • • • • • • • • • • • • Westall Secondary College • • Wheelers Hill Secondary College • • • • • • Williamstown High School • • • • • • • • • • • VET Subjects AdultCommunity-FurtherEducation Agriculture AgricultureAndHorticulture Automotive BuildingConstruction Business CiscoNetworkingAcademyProgram ClothingDesignProduction CommunityServices CulturalRecreation-ArtsDesign CulturalRecreation-Entertainment CulturalRecreation-Racing Dance(VCEVET) DesktopPublishing Electronics Engineering EquineIndustry FinancialServices FoodProcessing Furnishing Horticulture Hospitality InformationTechnology LaboratorySkills Multimedia MusicIndustrySkills PrimaryAndForest-AnimalHandling Printing PublicAdministrationAndSafety RetailOperations SmallBusinessPractice SportAndRecreation TrainingAndAssessment TransportAndStorage School VET subjects by school Subjects are offered based on student enrolments at each school and may change from year to year. If your study preference is not listed, please contact your education agent or department staff.
  • 129.
    International Student Program Departmentof Education and Early Childhood Development GPO Box 4367 Melbourne, Victoria 3001 Australia Tel: +61 3 9637 2990 Fax: +61 3 9637 2184 Email: international@edumail.vic.gov.au Web: www.study.vic.gov.au CRICOS Provider Code: 00861K © State Government of Victoria 2014