Ruoyao Zhuo (Roy)
188 Doris Ave #903 North York, Ontario M2N 6Z5
647-868-8702 | zhuoroy@hotmail.com
PROFILE
• Dedicated and result-oriented individual with passion in deploying BIM construction
process to facilitate communication between construction design team and contractors.
Experienced with working in fast-paced environment and possess high level of attention
to details.
• Demonstrated problem-solving capability and leadership skill through various school
works and field projects.
• Preparing BIM Execution Plan
• Use 3D Scanner (Topcon and Faro) for scanning project field site.
• Dependable, hardworking individual with a strong work ethic
• Valid Ontario driver’s license and use of a personal vehicle
EDUCATION
Building Information Modeling Management September 2015-September 2016
George Brown College, Toronto, Ontario
Post Graduate Certificate
A one-year Program that provided me with an excellent set of inter-disciplinary skills related to
AEC industry using different BIM platforms, Tools and Techniques
• Deployed BIM applications in Integrated Project Delivery from project conceptualization,
design and construction to facilities management.
• Worked on a Multidisciplinary BIM Models using Sketch up, Tekla, Revit Architecture,
Structure and MEP, and Performed clash detection, 4D Project Scheduling and 5D Cost
Estimation and project simulation using Navisworks and Tekla
• Successfully delivered an integrated BIM model based on laser scans and points cloud
taken from Topcon GLS-2000 scanner
• Developed BIM execution plan documents, WBS charts and Schedules and LOD charts
for SD, DD and CD phases
Bachelor of Construction Science & Management Degree September 2013-June 2015
George Brown College, Toronto, Ontario
• Relevant Coursework: Revit, Sustainability Development & Environment, Building Science,
Construction Estimating, Construction Materials
SKILLS
Proficiency with Revit (Architecture, Construction & EMP), Naviswork, Autodesk CAD,
Photoshop & AutoCAD, Estimating
WORK & LEADERSHIP EXPERIENCE
George Brown College, Toronto, Ontario
Student Researcher June 2016- August 2016
Water Front Project
• Bim execution Plan
• Scanning to Field of project using Topcon and Faro Scanner.
• Create 3D Model.
Sikee Electric Fire Protection Inc. Toronto, Canada
Estimator May 2015-July 2015
• Read and interpreted construction fabrication drawings and specifications to better
provide assistance to team members
• Established budget plan and estimated construction cost through monitoring prices and
billing schedules for projects
Frontop, Engineering Ltd. Toronto, Canada
Field Technician April 2014– July 2014
• Participated in measuring activities and ensured compliance with safety standards for the
Toronto Transit Commission (TTC)
• Analyzed preliminary data collected through household preconstruction surveys and
created a report summarizing the results
• Attended contractor orientation course and obtained safety pass for preforming
measurement on the field
REC Mechanical & Electrical Engineering Co., Ltd Shanghai, China
Engineering Assistant November 2012 – April 2013
• Used Photoshop to perform adjustments on blue prints according to various change made
on the actual construction site
• Performed measuring work on the foundation and basement of the construction site
• Organized information and produced reports for on-site engineers
OUTSIDE ACTIVITIES & PROJECTS
Single House Capstone Project 2016 Toronto, Canada
• Simulated a single house construction process through designing construction schedule
(Navisworks Schedules) and coordinating workflow with focus on Level of Detail
specifications including Schematic Design, Design Development and Construction
Document
• Used Revit Architecture to construct 3D building model and quantity take off
TCIC Student Bid Competition 2014 & 2015 Toronto, Canada
Bidder
• Led a team of students to estimated construction cost through the utilization of
construction drawings, specifications and addenda
OTHER
• Languages: Fluent in Mandarin and English
• Upon Request

Roy_Resume_2016

  • 1.
    Ruoyao Zhuo (Roy) 188Doris Ave #903 North York, Ontario M2N 6Z5 647-868-8702 | zhuoroy@hotmail.com PROFILE • Dedicated and result-oriented individual with passion in deploying BIM construction process to facilitate communication between construction design team and contractors. Experienced with working in fast-paced environment and possess high level of attention to details. • Demonstrated problem-solving capability and leadership skill through various school works and field projects. • Preparing BIM Execution Plan • Use 3D Scanner (Topcon and Faro) for scanning project field site. • Dependable, hardworking individual with a strong work ethic • Valid Ontario driver’s license and use of a personal vehicle EDUCATION Building Information Modeling Management September 2015-September 2016 George Brown College, Toronto, Ontario Post Graduate Certificate A one-year Program that provided me with an excellent set of inter-disciplinary skills related to AEC industry using different BIM platforms, Tools and Techniques • Deployed BIM applications in Integrated Project Delivery from project conceptualization, design and construction to facilities management. • Worked on a Multidisciplinary BIM Models using Sketch up, Tekla, Revit Architecture, Structure and MEP, and Performed clash detection, 4D Project Scheduling and 5D Cost Estimation and project simulation using Navisworks and Tekla • Successfully delivered an integrated BIM model based on laser scans and points cloud taken from Topcon GLS-2000 scanner • Developed BIM execution plan documents, WBS charts and Schedules and LOD charts for SD, DD and CD phases Bachelor of Construction Science & Management Degree September 2013-June 2015 George Brown College, Toronto, Ontario • Relevant Coursework: Revit, Sustainability Development & Environment, Building Science, Construction Estimating, Construction Materials SKILLS Proficiency with Revit (Architecture, Construction & EMP), Naviswork, Autodesk CAD, Photoshop & AutoCAD, Estimating WORK & LEADERSHIP EXPERIENCE George Brown College, Toronto, Ontario Student Researcher June 2016- August 2016 Water Front Project
  • 2.
    • Bim executionPlan • Scanning to Field of project using Topcon and Faro Scanner. • Create 3D Model. Sikee Electric Fire Protection Inc. Toronto, Canada Estimator May 2015-July 2015 • Read and interpreted construction fabrication drawings and specifications to better provide assistance to team members • Established budget plan and estimated construction cost through monitoring prices and billing schedules for projects Frontop, Engineering Ltd. Toronto, Canada Field Technician April 2014– July 2014 • Participated in measuring activities and ensured compliance with safety standards for the Toronto Transit Commission (TTC) • Analyzed preliminary data collected through household preconstruction surveys and created a report summarizing the results • Attended contractor orientation course and obtained safety pass for preforming measurement on the field REC Mechanical & Electrical Engineering Co., Ltd Shanghai, China Engineering Assistant November 2012 – April 2013 • Used Photoshop to perform adjustments on blue prints according to various change made on the actual construction site • Performed measuring work on the foundation and basement of the construction site • Organized information and produced reports for on-site engineers OUTSIDE ACTIVITIES & PROJECTS Single House Capstone Project 2016 Toronto, Canada • Simulated a single house construction process through designing construction schedule (Navisworks Schedules) and coordinating workflow with focus on Level of Detail specifications including Schematic Design, Design Development and Construction Document • Used Revit Architecture to construct 3D building model and quantity take off TCIC Student Bid Competition 2014 & 2015 Toronto, Canada Bidder • Led a team of students to estimated construction cost through the utilization of construction drawings, specifications and addenda OTHER • Languages: Fluent in Mandarin and English • Upon Request