The document summarizes the Rowland Hall HVAC retrofit project. It will involve converting the building from a constant air volume (CAV) system to a variable air volume (VAV) system, upgrading existing equipment, and installing new controls. The project team is listed, along with phases of the work, potential disruptions, safety procedures, and contacts for issues. The retrofit is expected to improve energy efficiency by at least 15% compared to the old pneumatic system.