Rob Abbey
Graphic Design
Ellipsis Magazine | Front cover & contents DPS | 2 days
A BIG BREATH
Florence and
the Machine
CAN WE
WEATHER
THE STORM?
David Johnston
LUX
Dominate and
control nature
WILLIAM
EGGLESTONE
Master
of colour
photography
AIR
Jean-Benoit
Dunckel talks
about Air’s
new album
Spring 2011
UK £7, AUD $15, US $12
20
CEMENT TOWN
Report by Hans Loos
24
ONE ON ONE WITH
Jon & Annie, Rebecca & Marnie
Mic & Jessie, Beci and Shauna
32
A BIG BREATH
Florence and the Machine
38
CLOSET TALES
Insider secrets on the box
40
TRACKSUITS OF ST MARY’S
Scorned, adored, and
defiantly immortal
42
THE ENIGMA
Interview with photographer
William Eggleston
56
ROLLING FLASH
Revival of the ultimate
four letter stone
60
SOUND AS EVER
Two trashbags, four jailbait
and one prissy miss
66
MATTIJS
Dutch fashion designer
Mattijs van Bergen
70
MARTIN GRANT
The man who built
his own house
74
CAN WE WEATHER
THE STORM?
by David Johnston
80
DELUGE
82
LUX
Photography by
Christina Seely
88
IRENE GRISHIN SELZER
Concrete Lover
96
THEN
by Christopher Ferguson
112
BLUEY
by Kristina Soljo
118
HENRY MOORE
by Harold David
128
EXIT
by Derek Henderson
136
WHITE LIGHT
by David Manelberg
152
NIGHT WANDERER
by Pierre Toussaint
162
DRAWN
by Bec Parsons
170
SON MEDIA
by Derek Henderson
182
SECTION 6
by Christopher Ferguson
192
STOCKISTS
193
PERSONALS:
WINTER READING
Secrets and stories from
our favourite people
46
AIR
Jean-Benoit Dunckel talks
about Air’s new album
British Film Institute | Gangster movie festival | A5 concertina brochure | 2 days
Throughout the years, there have been hundreds of “Gangster
Movies” that have hit the big screen. Movies about mobsters,
drugs, drug lords, bank robbers, grand theft auto, robberies,
and heists have had us all at the edge of our seat at one point
or another, rooting for the bad guy. How many people, for at
least a split second, wanted to be like Tony Montana from
Scarface? The action and thrill of it all just gets our blood
pumping. Is it the power, the money, the fame, or is it the
respect? Regardless of what it is, the following list of movies
is sure to put you at the edge of your seat. So get ready to
“Say Hello to My Little Friend” because it’s time to enjoy
the BFI Gangster Films.
BRITISH FILM INSTITUTE (BFI)
21 STEPHEN STREET
LONDON, W1T 1LN
Tel: +44 (0)20 7255 1444
BFI SOUTHBANK
BELVEDERE ROAD
SOUTH BANK‚ WATERLOO
LONDON, SE1 8XT
Box Office: +44 (0)20 7928 3232
Switchboard: +44 (0)20 7928 3535
BFI IMAX
1 CHARLIE CHAPLIN WALK
SOUTH BANK
WATERLOO
LONDON‚ SE1 8XR
Box Office: +44 (0)870 787 2525
WHITE HEAT, 1949
Screening Jan 11 @ 6pm
BFI IMAX
Cody Jarrett is the sadistic leader of
a ruthless gang of thieves. Afflicted by
terrible headaches and fiercely devoted
to his ‘Ma,’ Cody is a volatile, violent,
and eccentric leader. Cody’s top henchman
wants to lead the gang and attempts to
have an ‘accident’ happen to Cody, while
he is running the gang from in jail. But
Cody is saved by an undercover cop, who
thereby befriends him and infiltrates the
gang. Finally, the stage is set for Cody’s
ultimate betrayal and downfall, during a
big heist at a chemical plant.
Director Raoul Walsh
Writer Ivan Goff
Producer Louis F. Edelman
Stars James Cagney, Virginia Mayo
Edmond O’Brien
CARLITO’S WAY, 1993
Screening Jan 12 @ 6pm
BFI IMAX
Carlito has just gotten out of prison
due to technicalities with the help of
his sleazy lawyer. After a life spent
trafficking heroin he decides not to
pursue the life of the streets. He buys
into a night club and begins saving
money to move to the Bahamas, but
his presence as a known player makes
it inevitable that he get sucked back
into his violent former life.
Director Brian De Palma
Writer Edwin Torres
Producer Martin Bregman
Stars Al Pacino, Sean Penn
Penelope Ann Miller
John Leguizamo
SCARFACE, 1983
Screening Jan 13 @ 6pm
BFI IMAX
Scarface (1983) follows gangster
Tony Montana and his close friend
Manny Ray from their trip on the
Cuban Boat Lift for refugees to their
arrival in Miami. After killing a
powerful Cuban figure, Montana and
company gain the ability to leave their
refugee camps and roam around the
U.S. After unsuccessfully trying to make
it legitamately in the country, Montana
and Ray resort to selling cocaine to
dealers around the world. Tony’s rise
is quick, but as he becomes more
powerful, his enemies and his own
paranoia begin to plague his empire.
Director Brian De Palma
Writer Oliver Stone
Producer Martin Bregman
Stars Al Pacino, Steven Bauer
Michelle Pfeiffer
Mary Elizabeth Mastrantonio
ONCE UPON A TIME IN AMERICA, 1984
Screening Jan 14 @ 6pm
BFI Southbank
Epic, episodic, tale of the lives of a
small group of New York City Jewish
gangsters spanning over 40 years. Told
mostly in flashbacks and flash-forwards,
the movie centers on small-time hood
David ‘Noodles’ Aaronson and his lifelong
partners in crime; Max, Cockeye and
Patsy and their friends from growing-up
in the rough Jewish neighborhood of
New York’s Lower East Side in the
1920s, to the last years of Prohibition
in the early 1930s, and then to the late
1960s where an elderly Noodles returns
to New York after many years in hiding
to look into the past.
Director Sergio Leone
Writer Harry Grey
Producer Claudio Mancini
Stars Robert De Niro, James Woods
Elizabeth McGovern
Joe Pesci, Burt Young
LOCK, STOCK AND
TWO SMOKING BARRELS, 1998
Screening Jan 15 @ 6pm
BFI Southbank
Four Cockney wide-boys are tricked
into owing 500,000 nicker to the local
gang-land boss and porn king, ‘Hatchet’
Harry Lonsdale. With the very real
threat of finger amputation looming
over them the lads come up with
a plan to nick the cash from their
next-door neighbours: a gang of
hardcase drug-dealers… Meanwhile,
‘Hatchet’ ain’t none too pleased when
a pair of antique shotguns wot he wants
are sold on by a pair of Scouse thieves,
to be used in a “job”… The involvement
of a conscientious debt-collector, some
public school “chemists”, a psychotic
hash-baron, a lot of guns and knives,
ensures that karma is surrealistically
resolved (just!) before the end.
Director Guy Ritchie
Writer Guy Ritchie
Producer Matthew Vaughn
Stars Jason Flemyng
Dexter Fletcher
Nick Moran
Jason Statham
PULP FICTION, 1994
Screening Jan 16 @ 6pm
BFI Southbank
Jules and Vincent work as hitmen
for crime boss Marcellus Wallace.
Wallace is currently dealing with
Butch Collidge, a boxer who failed to
throw a fight after taking Wallace’s
money and is now planning to flee the
city, but can’t leave his father’s watch
behind. Vincent faces some problems
of his own when Wallace asks him to
show his wife Mia a good time while
he’s away. Some of these people
redeem themselves and some don’t,
and all meet an end appropriate
to their choices.
Director Quentin Tarantino
Writer Quentin Tarantino
Producer Matthew Vaughn
Stars John Travolta, Tim Roth
Samuel L. Jackson
Amanda Plummer
Bruce Willis
GOODFELLAS, 1990
Screening Jan 19 @ 6pm
BFI IMAX
The lowly, blue-collar side of New York’s
Italian mafia is explored in this crime
biopic of wiseguy Henry Hill. As he
makes his way from strapping young
petty criminal, to big-time thief, to
middle-aged cocaine addict and dealer,
the film explores in detail the rules and
traditions of organized crime. Watching
the rise and fall of Hill and his two
counterparts, the slick jack-of-all-trades
criminal Jimmy Conway and the brutish,
intimidating Tommy DeVito, this true
story realistically explores the core,
blue-collar part of the mob.
Director Martin Scorsese
Writer Nicholas Pileggi
Producer Irwin Winkler
Stars Robert De Niro, Ray Liotta
Joe Pesci, Lorraine Bracco
THE GODFATHER, 1972
Screening Jan 20 @ 6pm
BFI Southbank
Vito Corleone is the ageing don (head) of
the Corleone Mafia Family. His youngest
son Michael has returned from WWII
just in time to see the wedding of Connie
Corleone (Michael’s sister) to Carlo Rizzi.
All of Michael’s family is involved with
the Mafia, but Michael just wants to live
a normal life. Drug dealer Virgil Sollozzo
is looking for Mafia Families to offer
him protection in exchange for a profit
of the drug money. He approaches Don
Corleone about it, but, much against the
advice of the Don’s lawyer Tom Hagen,
the Don is morally against the use of
drugs, and turns down the offer. This
does not please Sollozzo, who has the
Don shot down by some of his hit men.
The Don barely survives, which leads his
son Michael to begin a violent mob war
against Sollozzo and tears the Corleone
family apart.
Director Martin Scorsese
Writer Mario Puzo
Producer Matthew Vaughn
Stars Marlon Brando, Al Pacino
James Caan
Richard S. Castellano
Robert Duvall
Pfizer Annual Report 2012 | Front cover and DPS | 2 days
Chantix
Most people who smoke want to quit, and for good reason. Reliable estimates
say that smoking-related illnesses kill more than 5 million people around the
world each year. At the time of its approval in 2008, Chantix (marketed outside
the U.S. as Champix) was the first prescription smoking cessation medicine
to be approved in 10 years. A non nicotine-based pharmaceutical, Chantix is
proven more effective in helping smokers quit than its leading competitor in
the prescription-only market.
In the U.S., Pfizer offers the GETQUIT Plan for free with a Chantix prescription.
This tailored, 52-week, Web and phone-based behavior modification program
helps patients prepare for a ife without cigarettes. It provides ongoing support
with a hotline staffed with Mayo Clinic-trained Quit Coaches and daily support
during the first 12 weeks to help smokers learn how to trade old smoking
routines for new and healthier habits.
10 MILLION - Approximate number of people globally
prescribed Chantix since its approval
“I started taking Chantix
thinking that it wasn’t
going to work and that
I’d prove my doctor
wrong. But I ended up
throwing my cigarettes
away and I haven’t
looked back since.”
Stacy Berenbaum, New York
09 10
Pfizer-Wyeth will build a more diversified company
The proposed combination of Pfizer and Wyeth addresses
one of the largest concerns of Pfizer investors: the expected
loss-of-exclusivity for Lipitor in 2011. No single medicine
is expected to account for more than 10 percent of the
combined company’s sales in 2012.
Pfizer Today
Total Primary 75% / Total Specialty 17%
Capsugel - 2%
Infectious Diseases - 4%
Oncology - 5%
Central Nervous System - 11%
Cardiovascular - 27%
Other Primary - 31%
Combined Company: Projected 2012
Total Primary 55% / Total Specialty 30%
Cardiovascular - 5%
Inflammation - 6%
Animal Health - 6%
Other Speciality - 10%
Infectious Diseases - 10%
Central Nervous System - 11%
Other Primary - 35%
DOING THINGS
DIFFERENTLY
Pfizer Annual Review
2012
THINGSNTLY
Restock Property Redevelopment | Branding | 2 days
PROPERTY REDEVELOPMENT
restock
225 E,Grand Avenue
Chicago, IL 60611
Tel: 312 512 1313
Fax: 312 512 1314
info@restock.com
www.restockchicago.com
PROPERTY REDEVELOPMENT
restock
225 E,Grand Avenue
Chicago, IL 60611
Tel: 312 512 1313
Fax: 312 512 1314
info@restock.com
www.restockchicago.com
PROPERTY REDEVELOPMENT
restock
225 E,Grand Avenue
Chicago, IL 60611
Tel: 312 512 1313
Fax: 312 512 1314
jerry@restock.com
www.restockchicago.com
Jerry McCabe
Chief Executive
Restock Property Redevelopment | Concertina brochure - 8 pages | 2 days
PROPERTY REDEVELOPMENT
restock
225 E,Grand Avenue
Chicago, IL 60611
Tel: 312 512 1313
Fax: 312 512 1314
jerry@restock.com
www.restockchicago.com
Jerry McCabe
Chief Executive
Our Story
Having been based in New York and
successfully built a mix of commercial
and residential properties in and around
the SoHo neighbourhood, Phoenix saw
an opportunity to create the same dynamic
in Chicago.
Here, at Phoenix, we prefer to consider ourselves
‘environmentally responsible’.
Location
Our headquarters are based in Chicago's
River North neighborhood. River North
has completely transformed from it's
simple beginning as an industrial area
and warehouse district. The warehouses
closed down in the 1970's, leaving large
empty buildings. The area attracted
various artists and writers looking for
loft and studio space, thus creating a
neighborhood that was artistic, but
also struggling.
Such was the River North neighborhood
30 years ago. Since then, however, it has
grown into what is now a chic, cultural
hub filled with art galleries, antique
stores, boutiques and of course urban
professionals. We felt this would be the
most fitting environment for restock,
as this represents who we are and
what we do!
“In the beginning there
were factories that were
not longer working. Yet
we thought they
were beautiful”
What does environmental
responsibility actually mean?
It means reusing, instead of knocking
down and building new. Keeping what’s
good and improving what’s not. This
uses less energy and leaves less mess
than knocking down and building again.
A place depends on the community that
lives there and the people who work
there. We fill the commercial spaces of
our buildings with local businesses and
independents, because we think they
can do something a bit better than your
average Mr Mega Coffee Hut.
It’s all about creating something that’s
lasting. Sustain-ability, you see, the clue
is in the word. We don’t do short term. We
don’t do cheap and cheerful. We want our
places to keep working once the for-sale
signs have gone down. It means making
sure places can grow.
We try to make sure our developments
give something back, take less, last
longer. We aim to prove that we can do it,
and do it now. It just takes a little bit more
imagination. All you have to do is move in.
Mission Statement
We wanted to restock them. We thought
that they’d make good places to live,
buildings with a bit of soul! We thought
that we could make them into amazing
homes with a bit of imagination and some
top notch architecture.
restock embraces a very wide agenda:
established as world class architects
we produce world class buildings and
places; delivering mixed use buildings;
marrying the old with the new; and finally
and probably most importantly being
environmentally responsible.
We believe that there’s no conflict in
being thoroughly modern and style-
conscious while also being socially and
environmentally responsible. In fact we
think that one should inform the other.
We design inspirational spaces, both
commercial and residential. We want
to create spaces for a new generation
to make something worthwhile.
Our Services
Our expertise extends to every aspect
of the real estate development process.
We take care of the preparation and
production of your entire project, working
from your initial brief to take it through
every stage to completion.
Construction Services
• Space planning & optimisation
• Interiors specification
• Amenity spaces
• External facades & key elevations
• Landscaping
• Show apartments
• Sales centers
Marketing and
Branding Services
• Overall marketing plan
& campaign structure
• Brochure design & other
hard print collateral
• Press & public relations
• Advertising
• Hoarding
• Website
• Launch event
“In the beginning there were
empty warehouses. Yet we
thought they were beautiful”
Jerry McCabe is an award-winning
architect and developer who served
as President of the New York
Chapter of the American Institute
of Architects. He draws from
over 20 years of experience while
overseeing the design, bid, contract
and construction management of all
of his projects. McCabe also directs,
administers and coordinates each
project from the initial concept plans
through conclusion of construction,
allowing for maximum attention
to critical details, time schedules
and budgets.
Prior to founding restock, McCabe
formed Next Generation with
Murray Butler, a 35-person
architect firm which superseded
McCabe’s first company that he
started, Brim Braun Associates,
a 20-person firm.
McCabe has designed and built for
such clients as Centrum Properties,
Lexington Homes, Joseph Freed
& Co., Fifield Development, Hyatt
Hotels, The Shidler Group and
Walgreens. McCabe served for
several years as the chairman of
the Appearance Commission in
the Village of Glenview and while
working at Harry Weese, McCabe
designed the specifications for
the Washington, D. C. Subway,
Draper and Kramer and the
K-Mart Corporation.
Testimonials
“We always enjoy working with Jerry
because he get’s it, he is creative, has
a can-do attitude, nothing is ever ‘too
much trouble’ and he never fails to
exceed our expectations.”
Jacqui Moore
Group Brand Communications
“The condo’s Jerry build for Skyline in
New York achieved incredible 15-20%
premium prices over the local market,
with sales largely complete within
a matter of months of their release.
We have not observed anything like
it before.”
David Pollock
CEO & MD
The Home Group
“Studio 10 have enjoyed a very successful
relationship with Jerry McCabe. We
really value his help in achieving our
goals and in particular his innovative
creative thinking which transforms what
is perceived as a derelict building into
something utterly desirable!”
Rex Sheehy
Marketing Manager
Studio 10
PROPERTY REDEVELOPMENT
COMPANY
OVERVIEW
restock
225 E, Grand Avenue
Chicago, IL 60611
Tel: 312 512 1313
Fax: 312 512 1314
info@restockchicago.com
www.restockchicago.com
Track Record
SOURCE Fashion Event | London Fashion Week | Folding brochure | 2 days
Home
Designed by Tracey Neuls
Contact: +44 (0)20 7935 0039
www.traceyneuls.com 
Unadulterated creative play is truly only found as a child. For
Tracey Neuls and Nicola Yeoman, design is rooted in this emo-
tional freedom.  Together, the pair have rekindled the innocence
explored in their architectural makings as children. An emotive
explosion personal to the lives and work of both designers, Home
plays with perspective and form.
Stockists: Bread and Honey 020 7253 4455, Jezebelle 020 7935
7109, Hoxton Boutique 020 7684 2083
HOME
Designed by Tracey Neuls
Contact: +44 (0)20 7935 0039
www.traceyneuls.com
Unadulterated creative play is truly only found as
a child. For Tracey Neuls and Nicola Yeoman, design
is rooted in this emotional freedom. Together,
the pair have rekindled the innocence explored in
their architectural makings as children. An emotive
explosion personal to the lives and work of both
designers, Home plays with perspective and form.
Stockists:
Bread and Honey: 020 7253 4455
Jezebelle: 020 7935 7109
Hoxton Boutique: 020 7684 2083
ARCHIVE
Designed by Christophe Sawhney
Contact: +44 (0)20 7834 0124
www.springprojects.co.uk
Spring Projects presents Archive, a exhibition
of work by Christophe Sawhney. Archive will
showcase Sawhney’s explorations into the
body, movement and voyeurism and highlight
his fascination with form and process.
Stockists:
Hub: 020 7254 4494
Santos & Mowen: 020 7836 4365
Start: 020 7739 3636
HOLD THAT THOUGHT
Designed by Lee Klabin
Contact: +44 (0)20 7613 1111
www.leeklabin.com
The hidden desires of femininity are exquisitely
expressed through Lee Klabin’s Autumn/Winter
2011 Collection. Explorations in texture and
tailoring with inspiration drawn from ‘Reflections
From Within’. “Nothing in life is to be feared it is
only to be understood”, Marie Curie.
Stockists:
Beyond The Valley: 020 7437 7338
Comfort and Joy: 020 7359 3898
UNTOLD
Designed by Rashmi Shastri
Contact: press@un-told.co.uk
www.un-told.co.uk
A Pandora’s Box of fashion, jewellery and art
bursting at the seams with a colourful array
of creative fashion and accessories.
Stockists:
Beyond The Valley: 020 7437 7338
Bread and Honey: 020 7253 4455
CABINET
Designed by Gemma Critchley
& Zara Braganca
Contact: (+)44 (0)79 6640 1228
www.cabinetstudios.co.uk
Tropical ornithology meets Brigitte Bardot.
The designs have botanical undertones, flashes
of sun-bleached brights cascade onto faded
neutrals - whilst colonial militaria prompt
historical references and timeless legends.
Stockists:
Bread and Honey: 020 7253 4455
KJ’s Laundry: 020 7486 7855
Shoon: 020 7487 3001
LOLA ROSE
Designed by Nicola Gerwitz
Contact: roger@lolarose.co.uk
www.lolarose.co.uk
Inspired by Nikki’s childhood family holidays spent
on the shores of the English coast, the collection
concentrates on strong motifs such as florals,
hearts and beautiful, tactile shapes.
Stockists:
Jezebelle: 020 7935 7109
Labour of Love: 020 7354 9333
Bread and Honey: 020 7253 4455
Robert_Abbey_PDF_Portfolio

Robert_Abbey_PDF_Portfolio

  • 1.
  • 2.
    Ellipsis Magazine |Front cover & contents DPS | 2 days A BIG BREATH Florence and the Machine CAN WE WEATHER THE STORM? David Johnston LUX Dominate and control nature WILLIAM EGGLESTONE Master of colour photography AIR Jean-Benoit Dunckel talks about Air’s new album Spring 2011 UK £7, AUD $15, US $12 20 CEMENT TOWN Report by Hans Loos 24 ONE ON ONE WITH Jon & Annie, Rebecca & Marnie Mic & Jessie, Beci and Shauna 32 A BIG BREATH Florence and the Machine 38 CLOSET TALES Insider secrets on the box 40 TRACKSUITS OF ST MARY’S Scorned, adored, and defiantly immortal 42 THE ENIGMA Interview with photographer William Eggleston 56 ROLLING FLASH Revival of the ultimate four letter stone 60 SOUND AS EVER Two trashbags, four jailbait and one prissy miss 66 MATTIJS Dutch fashion designer Mattijs van Bergen 70 MARTIN GRANT The man who built his own house 74 CAN WE WEATHER THE STORM? by David Johnston 80 DELUGE 82 LUX Photography by Christina Seely 88 IRENE GRISHIN SELZER Concrete Lover 96 THEN by Christopher Ferguson 112 BLUEY by Kristina Soljo 118 HENRY MOORE by Harold David 128 EXIT by Derek Henderson 136 WHITE LIGHT by David Manelberg 152 NIGHT WANDERER by Pierre Toussaint 162 DRAWN by Bec Parsons 170 SON MEDIA by Derek Henderson 182 SECTION 6 by Christopher Ferguson 192 STOCKISTS 193 PERSONALS: WINTER READING Secrets and stories from our favourite people 46 AIR Jean-Benoit Dunckel talks about Air’s new album
  • 3.
    British Film Institute| Gangster movie festival | A5 concertina brochure | 2 days Throughout the years, there have been hundreds of “Gangster Movies” that have hit the big screen. Movies about mobsters, drugs, drug lords, bank robbers, grand theft auto, robberies, and heists have had us all at the edge of our seat at one point or another, rooting for the bad guy. How many people, for at least a split second, wanted to be like Tony Montana from Scarface? The action and thrill of it all just gets our blood pumping. Is it the power, the money, the fame, or is it the respect? Regardless of what it is, the following list of movies is sure to put you at the edge of your seat. So get ready to “Say Hello to My Little Friend” because it’s time to enjoy the BFI Gangster Films. BRITISH FILM INSTITUTE (BFI) 21 STEPHEN STREET LONDON, W1T 1LN Tel: +44 (0)20 7255 1444 BFI SOUTHBANK BELVEDERE ROAD SOUTH BANK‚ WATERLOO LONDON, SE1 8XT Box Office: +44 (0)20 7928 3232 Switchboard: +44 (0)20 7928 3535 BFI IMAX 1 CHARLIE CHAPLIN WALK SOUTH BANK WATERLOO LONDON‚ SE1 8XR Box Office: +44 (0)870 787 2525 WHITE HEAT, 1949 Screening Jan 11 @ 6pm BFI IMAX Cody Jarrett is the sadistic leader of a ruthless gang of thieves. Afflicted by terrible headaches and fiercely devoted to his ‘Ma,’ Cody is a volatile, violent, and eccentric leader. Cody’s top henchman wants to lead the gang and attempts to have an ‘accident’ happen to Cody, while he is running the gang from in jail. But Cody is saved by an undercover cop, who thereby befriends him and infiltrates the gang. Finally, the stage is set for Cody’s ultimate betrayal and downfall, during a big heist at a chemical plant. Director Raoul Walsh Writer Ivan Goff Producer Louis F. Edelman Stars James Cagney, Virginia Mayo Edmond O’Brien CARLITO’S WAY, 1993 Screening Jan 12 @ 6pm BFI IMAX Carlito has just gotten out of prison due to technicalities with the help of his sleazy lawyer. After a life spent trafficking heroin he decides not to pursue the life of the streets. He buys into a night club and begins saving money to move to the Bahamas, but his presence as a known player makes it inevitable that he get sucked back into his violent former life. Director Brian De Palma Writer Edwin Torres Producer Martin Bregman Stars Al Pacino, Sean Penn Penelope Ann Miller John Leguizamo SCARFACE, 1983 Screening Jan 13 @ 6pm BFI IMAX Scarface (1983) follows gangster Tony Montana and his close friend Manny Ray from their trip on the Cuban Boat Lift for refugees to their arrival in Miami. After killing a powerful Cuban figure, Montana and company gain the ability to leave their refugee camps and roam around the U.S. After unsuccessfully trying to make it legitamately in the country, Montana and Ray resort to selling cocaine to dealers around the world. Tony’s rise is quick, but as he becomes more powerful, his enemies and his own paranoia begin to plague his empire. Director Brian De Palma Writer Oliver Stone Producer Martin Bregman Stars Al Pacino, Steven Bauer Michelle Pfeiffer Mary Elizabeth Mastrantonio ONCE UPON A TIME IN AMERICA, 1984 Screening Jan 14 @ 6pm BFI Southbank Epic, episodic, tale of the lives of a small group of New York City Jewish gangsters spanning over 40 years. Told mostly in flashbacks and flash-forwards, the movie centers on small-time hood David ‘Noodles’ Aaronson and his lifelong partners in crime; Max, Cockeye and Patsy and their friends from growing-up in the rough Jewish neighborhood of New York’s Lower East Side in the 1920s, to the last years of Prohibition in the early 1930s, and then to the late 1960s where an elderly Noodles returns to New York after many years in hiding to look into the past. Director Sergio Leone Writer Harry Grey Producer Claudio Mancini Stars Robert De Niro, James Woods Elizabeth McGovern Joe Pesci, Burt Young LOCK, STOCK AND TWO SMOKING BARRELS, 1998 Screening Jan 15 @ 6pm BFI Southbank Four Cockney wide-boys are tricked into owing 500,000 nicker to the local gang-land boss and porn king, ‘Hatchet’ Harry Lonsdale. With the very real threat of finger amputation looming over them the lads come up with a plan to nick the cash from their next-door neighbours: a gang of hardcase drug-dealers… Meanwhile, ‘Hatchet’ ain’t none too pleased when a pair of antique shotguns wot he wants are sold on by a pair of Scouse thieves, to be used in a “job”… The involvement of a conscientious debt-collector, some public school “chemists”, a psychotic hash-baron, a lot of guns and knives, ensures that karma is surrealistically resolved (just!) before the end. Director Guy Ritchie Writer Guy Ritchie Producer Matthew Vaughn Stars Jason Flemyng Dexter Fletcher Nick Moran Jason Statham PULP FICTION, 1994 Screening Jan 16 @ 6pm BFI Southbank Jules and Vincent work as hitmen for crime boss Marcellus Wallace. Wallace is currently dealing with Butch Collidge, a boxer who failed to throw a fight after taking Wallace’s money and is now planning to flee the city, but can’t leave his father’s watch behind. Vincent faces some problems of his own when Wallace asks him to show his wife Mia a good time while he’s away. Some of these people redeem themselves and some don’t, and all meet an end appropriate to their choices. Director Quentin Tarantino Writer Quentin Tarantino Producer Matthew Vaughn Stars John Travolta, Tim Roth Samuel L. Jackson Amanda Plummer Bruce Willis GOODFELLAS, 1990 Screening Jan 19 @ 6pm BFI IMAX The lowly, blue-collar side of New York’s Italian mafia is explored in this crime biopic of wiseguy Henry Hill. As he makes his way from strapping young petty criminal, to big-time thief, to middle-aged cocaine addict and dealer, the film explores in detail the rules and traditions of organized crime. Watching the rise and fall of Hill and his two counterparts, the slick jack-of-all-trades criminal Jimmy Conway and the brutish, intimidating Tommy DeVito, this true story realistically explores the core, blue-collar part of the mob. Director Martin Scorsese Writer Nicholas Pileggi Producer Irwin Winkler Stars Robert De Niro, Ray Liotta Joe Pesci, Lorraine Bracco THE GODFATHER, 1972 Screening Jan 20 @ 6pm BFI Southbank Vito Corleone is the ageing don (head) of the Corleone Mafia Family. His youngest son Michael has returned from WWII just in time to see the wedding of Connie Corleone (Michael’s sister) to Carlo Rizzi. All of Michael’s family is involved with the Mafia, but Michael just wants to live a normal life. Drug dealer Virgil Sollozzo is looking for Mafia Families to offer him protection in exchange for a profit of the drug money. He approaches Don Corleone about it, but, much against the advice of the Don’s lawyer Tom Hagen, the Don is morally against the use of drugs, and turns down the offer. This does not please Sollozzo, who has the Don shot down by some of his hit men. The Don barely survives, which leads his son Michael to begin a violent mob war against Sollozzo and tears the Corleone family apart. Director Martin Scorsese Writer Mario Puzo Producer Matthew Vaughn Stars Marlon Brando, Al Pacino James Caan Richard S. Castellano Robert Duvall
  • 4.
    Pfizer Annual Report2012 | Front cover and DPS | 2 days Chantix Most people who smoke want to quit, and for good reason. Reliable estimates say that smoking-related illnesses kill more than 5 million people around the world each year. At the time of its approval in 2008, Chantix (marketed outside the U.S. as Champix) was the first prescription smoking cessation medicine to be approved in 10 years. A non nicotine-based pharmaceutical, Chantix is proven more effective in helping smokers quit than its leading competitor in the prescription-only market. In the U.S., Pfizer offers the GETQUIT Plan for free with a Chantix prescription. This tailored, 52-week, Web and phone-based behavior modification program helps patients prepare for a ife without cigarettes. It provides ongoing support with a hotline staffed with Mayo Clinic-trained Quit Coaches and daily support during the first 12 weeks to help smokers learn how to trade old smoking routines for new and healthier habits. 10 MILLION - Approximate number of people globally prescribed Chantix since its approval “I started taking Chantix thinking that it wasn’t going to work and that I’d prove my doctor wrong. But I ended up throwing my cigarettes away and I haven’t looked back since.” Stacy Berenbaum, New York 09 10 Pfizer-Wyeth will build a more diversified company The proposed combination of Pfizer and Wyeth addresses one of the largest concerns of Pfizer investors: the expected loss-of-exclusivity for Lipitor in 2011. No single medicine is expected to account for more than 10 percent of the combined company’s sales in 2012. Pfizer Today Total Primary 75% / Total Specialty 17% Capsugel - 2% Infectious Diseases - 4% Oncology - 5% Central Nervous System - 11% Cardiovascular - 27% Other Primary - 31% Combined Company: Projected 2012 Total Primary 55% / Total Specialty 30% Cardiovascular - 5% Inflammation - 6% Animal Health - 6% Other Speciality - 10% Infectious Diseases - 10% Central Nervous System - 11% Other Primary - 35% DOING THINGS DIFFERENTLY Pfizer Annual Review 2012 THINGSNTLY
  • 5.
    Restock Property Redevelopment| Branding | 2 days PROPERTY REDEVELOPMENT restock 225 E,Grand Avenue Chicago, IL 60611 Tel: 312 512 1313 Fax: 312 512 1314 info@restock.com www.restockchicago.com PROPERTY REDEVELOPMENT restock 225 E,Grand Avenue Chicago, IL 60611 Tel: 312 512 1313 Fax: 312 512 1314 info@restock.com www.restockchicago.com PROPERTY REDEVELOPMENT restock 225 E,Grand Avenue Chicago, IL 60611 Tel: 312 512 1313 Fax: 312 512 1314 jerry@restock.com www.restockchicago.com Jerry McCabe Chief Executive
  • 6.
    Restock Property Redevelopment| Concertina brochure - 8 pages | 2 days PROPERTY REDEVELOPMENT restock 225 E,Grand Avenue Chicago, IL 60611 Tel: 312 512 1313 Fax: 312 512 1314 jerry@restock.com www.restockchicago.com Jerry McCabe Chief Executive Our Story Having been based in New York and successfully built a mix of commercial and residential properties in and around the SoHo neighbourhood, Phoenix saw an opportunity to create the same dynamic in Chicago. Here, at Phoenix, we prefer to consider ourselves ‘environmentally responsible’. Location Our headquarters are based in Chicago's River North neighborhood. River North has completely transformed from it's simple beginning as an industrial area and warehouse district. The warehouses closed down in the 1970's, leaving large empty buildings. The area attracted various artists and writers looking for loft and studio space, thus creating a neighborhood that was artistic, but also struggling. Such was the River North neighborhood 30 years ago. Since then, however, it has grown into what is now a chic, cultural hub filled with art galleries, antique stores, boutiques and of course urban professionals. We felt this would be the most fitting environment for restock, as this represents who we are and what we do! “In the beginning there were factories that were not longer working. Yet we thought they were beautiful” What does environmental responsibility actually mean? It means reusing, instead of knocking down and building new. Keeping what’s good and improving what’s not. This uses less energy and leaves less mess than knocking down and building again. A place depends on the community that lives there and the people who work there. We fill the commercial spaces of our buildings with local businesses and independents, because we think they can do something a bit better than your average Mr Mega Coffee Hut. It’s all about creating something that’s lasting. Sustain-ability, you see, the clue is in the word. We don’t do short term. We don’t do cheap and cheerful. We want our places to keep working once the for-sale signs have gone down. It means making sure places can grow. We try to make sure our developments give something back, take less, last longer. We aim to prove that we can do it, and do it now. It just takes a little bit more imagination. All you have to do is move in. Mission Statement We wanted to restock them. We thought that they’d make good places to live, buildings with a bit of soul! We thought that we could make them into amazing homes with a bit of imagination and some top notch architecture. restock embraces a very wide agenda: established as world class architects we produce world class buildings and places; delivering mixed use buildings; marrying the old with the new; and finally and probably most importantly being environmentally responsible. We believe that there’s no conflict in being thoroughly modern and style- conscious while also being socially and environmentally responsible. In fact we think that one should inform the other. We design inspirational spaces, both commercial and residential. We want to create spaces for a new generation to make something worthwhile. Our Services Our expertise extends to every aspect of the real estate development process. We take care of the preparation and production of your entire project, working from your initial brief to take it through every stage to completion. Construction Services • Space planning & optimisation • Interiors specification • Amenity spaces • External facades & key elevations • Landscaping • Show apartments • Sales centers Marketing and Branding Services • Overall marketing plan & campaign structure • Brochure design & other hard print collateral • Press & public relations • Advertising • Hoarding • Website • Launch event “In the beginning there were empty warehouses. Yet we thought they were beautiful” Jerry McCabe is an award-winning architect and developer who served as President of the New York Chapter of the American Institute of Architects. He draws from over 20 years of experience while overseeing the design, bid, contract and construction management of all of his projects. McCabe also directs, administers and coordinates each project from the initial concept plans through conclusion of construction, allowing for maximum attention to critical details, time schedules and budgets. Prior to founding restock, McCabe formed Next Generation with Murray Butler, a 35-person architect firm which superseded McCabe’s first company that he started, Brim Braun Associates, a 20-person firm. McCabe has designed and built for such clients as Centrum Properties, Lexington Homes, Joseph Freed & Co., Fifield Development, Hyatt Hotels, The Shidler Group and Walgreens. McCabe served for several years as the chairman of the Appearance Commission in the Village of Glenview and while working at Harry Weese, McCabe designed the specifications for the Washington, D. C. Subway, Draper and Kramer and the K-Mart Corporation. Testimonials “We always enjoy working with Jerry because he get’s it, he is creative, has a can-do attitude, nothing is ever ‘too much trouble’ and he never fails to exceed our expectations.” Jacqui Moore Group Brand Communications “The condo’s Jerry build for Skyline in New York achieved incredible 15-20% premium prices over the local market, with sales largely complete within a matter of months of their release. We have not observed anything like it before.” David Pollock CEO & MD The Home Group “Studio 10 have enjoyed a very successful relationship with Jerry McCabe. We really value his help in achieving our goals and in particular his innovative creative thinking which transforms what is perceived as a derelict building into something utterly desirable!” Rex Sheehy Marketing Manager Studio 10 PROPERTY REDEVELOPMENT COMPANY OVERVIEW restock 225 E, Grand Avenue Chicago, IL 60611 Tel: 312 512 1313 Fax: 312 512 1314 info@restockchicago.com www.restockchicago.com Track Record
  • 7.
    SOURCE Fashion Event| London Fashion Week | Folding brochure | 2 days Home Designed by Tracey Neuls Contact: +44 (0)20 7935 0039 www.traceyneuls.com¬† Unadulterated creative play is truly only found as a child. For Tracey Neuls and Nicola Yeoman, design is rooted in this emo- tional freedom.¬† Together, the pair have rekindled the innocence explored in their architectural makings as children. An emotive explosion personal to the lives and work of both designers, Home plays with perspective and form. Stockists: Bread and Honey 020 7253 4455, Jezebelle 020 7935 7109, Hoxton Boutique 020 7684 2083 HOME Designed by Tracey Neuls Contact: +44 (0)20 7935 0039 www.traceyneuls.com Unadulterated creative play is truly only found as a child. For Tracey Neuls and Nicola Yeoman, design is rooted in this emotional freedom. Together, the pair have rekindled the innocence explored in their architectural makings as children. An emotive explosion personal to the lives and work of both designers, Home plays with perspective and form. Stockists: Bread and Honey: 020 7253 4455 Jezebelle: 020 7935 7109 Hoxton Boutique: 020 7684 2083 ARCHIVE Designed by Christophe Sawhney Contact: +44 (0)20 7834 0124 www.springprojects.co.uk Spring Projects presents Archive, a exhibition of work by Christophe Sawhney. Archive will showcase Sawhney’s explorations into the body, movement and voyeurism and highlight his fascination with form and process. Stockists: Hub: 020 7254 4494 Santos & Mowen: 020 7836 4365 Start: 020 7739 3636 HOLD THAT THOUGHT Designed by Lee Klabin Contact: +44 (0)20 7613 1111 www.leeklabin.com The hidden desires of femininity are exquisitely expressed through Lee Klabin’s Autumn/Winter 2011 Collection. Explorations in texture and tailoring with inspiration drawn from ‘Reflections From Within’. “Nothing in life is to be feared it is only to be understood”, Marie Curie. Stockists: Beyond The Valley: 020 7437 7338 Comfort and Joy: 020 7359 3898 UNTOLD Designed by Rashmi Shastri Contact: press@un-told.co.uk www.un-told.co.uk A Pandora’s Box of fashion, jewellery and art bursting at the seams with a colourful array of creative fashion and accessories. Stockists: Beyond The Valley: 020 7437 7338 Bread and Honey: 020 7253 4455 CABINET Designed by Gemma Critchley & Zara Braganca Contact: (+)44 (0)79 6640 1228 www.cabinetstudios.co.uk Tropical ornithology meets Brigitte Bardot. The designs have botanical undertones, flashes of sun-bleached brights cascade onto faded neutrals - whilst colonial militaria prompt historical references and timeless legends. Stockists: Bread and Honey: 020 7253 4455 KJ’s Laundry: 020 7486 7855 Shoon: 020 7487 3001 LOLA ROSE Designed by Nicola Gerwitz Contact: roger@lolarose.co.uk www.lolarose.co.uk Inspired by Nikki’s childhood family holidays spent on the shores of the English coast, the collection concentrates on strong motifs such as florals, hearts and beautiful, tactile shapes. Stockists: Jezebelle: 020 7935 7109 Labour of Love: 020 7354 9333 Bread and Honey: 020 7253 4455