1. Name: Niamh Giddings Film Title: The Box
Filming Date: 20.01.2020
Team members
List those involved
Niamh, Piper, Alex, Jonatan
Location
Where are you planning to film Castlefield House
Hazard Who is at risk Risk Level Control measures
Outline of risk assessment
Summary of what is proposed in
terms of sequences and set ups.
List whomightbe harmed
from this activity
e.g. public, etc.
For each hazard, decide
level of risk
i.e. if you were to do the
activitywithout your controls
List the measures you will be taking to minimise the risk identified
e.g. moving trip obstacles, allocate responsibilityfor equipment, film awayfrom traffic, have bottled water
etc.
Falling downstairs Team members Low Walk only, hold onto handrail.
Tripping over wires, tripod or
lights
Team members Low Make everyone aw are that the objects are there.
Electricity Team members Low Turn plugs off if not being used.