Curriculum Vitae
Sushil Kumar Khanduri
Total 24 Years +
HARIG INDIA LTD. Mohan Nagar Ghaziabad . (U.P).
HEAVY ENGINEERING WORKSHOP REWA (M.P)
( A Unit of JAYPEE GROUP)
ALSTOM PROJECTS INDIA LTD. A Unit of GE. ( Vadodara Guj.)
SANTO ENGINEERING CO. PVT. LTD. (Umbergaon, Dist.โ€“ Valsad Guj )
Experience Criteria: Machining, Fabrication, Welding,
Welder Test (PQR& WPS), Painting, Hard coating/Plating as Zinc,
chromium, Blasting/Painting, Assembly (Erection of hydro
turbine)
1. Good interpretation skills of engineering drawings, inspection and checking
method of components / assembly etc.
2. Familiar for using of CMM (faro gauge and laser tracker)
3. Familiar for using of various measuring instruments / equipment's for
inspection purpose
4. NDT qualification in PT,MT, UT in Level-II
5. Familiar for preparing the final inspection report as per drawing dimensions.
6. Ensure the quality of the parts produced to meet all ITP parameters.
7. Quickly and effectively generate the non-conformance report whenever
required.
8. Resolve quality issues of capability, tolerances, and materials related issues.
9. Preparation of inspection checks sheet and routine inspection activities in shop
floor.
10- NCR Management in shop floor and monitoring for necessary rework
defined on NCRs
Certification of ASNT โ€“ NDT Level II- UT, MPT & DPT
Preferences
Expected Monthly Salary : Negoation
Minimum time required for joining : 1 Month
Professional Objective
To work in a reputed organization with full responsibility, and to purse a
challenging & rewarding career in the field of Quality Assurance / Quality
Control, and Fabrication which utilizes my skills & knowledge, provide
avenues for excellent growth.
Professional Experience
Total 24 Years +
Quality Coordinator since July -2016 up to Till Date.
COMPANY PROFILE
Santo Engineering Co. Pvt. Ltd. (ISO 9001:2008) is highly recognized for its
engineering expertise. Santo has Heavy machine shop along with fabrication and
painting shops so as to provide a complete design, manufacturing and re-engineering
solutions.
RESPONSIBILITIES :
โ€ข Handling cast parts of Wind World India Ltd. from receiving up to dispatch.
Studying Inspection Plan/ QAP of all customers (GE, Wind World India,
AndritzHydro, Alstom India, and KABRA Extrusion) and other quality
requirements.
Understanding customer requirements and carry out the inspection accordingly.
After final internal inspection giving call for customer inspection and completing
final inspection and documentation with customer coordination.
Customers Inspection & Documentation according to ISO 9001:2008.
Customers Dossier preparation for Customer Clients.
Clients Iโ€™ve Worked For : โ€ข Toshiba (Japan), โ€ขGeneral Energy (GE) โ€ข Andritz
Hydro India โ€ข Alstom India Ltd โ€ข Voith hydro Noida, โ€ขWind World India Ltd.โ€ข
Kabra Extrusion Technique.โ€ข Velmet (China), Jagmohan Pla Machining โ€ข Regan
Powertech.
GE RENEWABLE ENERGY, VADODARA (1st
April 2011 to 31-06-2016 )
A Global Leader in Power Generation (Hydro Turbine & Generator
Vadodara Gujrat . As Out sourcing Quality SR. EXCUTUIVE ENGINEER
COMPANY PROFILE:-
GE RENEWABLE ENERGY, VADODARA
ROLE : SR. EXCUTUIVE ENGINEER
Purpose of the Role
Contribute to GEโ€™s competitiveness and Quality by ensuring on time delivery and respect of
contractual specifications from suppliers of outsourced commodities and components.
๏ท Guarantee OTD of expedited commodities by strict control of supplier production
plan/progress versus project planning
๏ท Monitor and report actual supplier production progress and analyze deviations regularly to
Minimize unexpected and/or undesirable delays.
๏ท Anticipate risks & issues, propose mitigation plan and drive it
๏ท Make sure that main process, related to the manufacturing of the component, such as
Machining and NDT are in accordance with contract documents and are performed by
qualified people.
๏ท Support supplier in understanding GE specifications and requirements.
๏ท Maintain a schedule presence in the subcontractor to physically observe production and
related activity such as protection, packaging, testing.
๏ท Inspection of machining components respect to supporting documents (Drawing, BOM, QWP,
Process sheet, etcโ€ฆ) also Inspecting Geometry (On machine) for critical Geometrical
parameters.
๏ท Responsible for First Piece Qualification (FPQ)
๏ท Responsible for customer inspection at supplier end. (CHP)
๏ท To carry out kick off meeting (technical discussion) at supplier end to define actual quality
requirement as well as implementation of quality package.
๏ท Preparing measuring instruction & checklists at supplier end, handling different
Nondestructive tests like LPT & MPI
๏ท Carry out stage wise inspection so well aware about different types of machining processes as
well as machines.
๏ท Working knowledge of various types of measuring instruments.
๏ท Maintaining NCR Database Base On daily basis with reference to inspection report
(immediate of NCR after defect detection)
๏ท Corrective action & preventive action at supplierโ€™s end with implementation of New
inspection criteria/Quality working plan with help of preventive tool (Like 8D)
Ensuring Good Housekeeping and Safe work environment at supplier end through making a team
alert about danger of operations by reporting on any unsafe conditions, operations, and accidents to
improve safety Alstom in Indiaโ€™s Hydro Business Manufacturing facility is located in
Vadodara, Gujarat. Manufacturing facilities for machining new stationary components
and repair, servicing of rotors and assembly of turbine, generators & bearing of
medium & large size Hydro units.
JOB PROFILE:-
Inspection ALL Types of Bearing shell/ Pad with Babbitt stage process in Omega rank
Bearing Bhopal & DVB Tech. Dum-Dum Kolkata last five years,
๏ƒ˜ Inspection of all type Machining & Fabricated components according to
supporting documents at suppliers end & in house shop.
๏ƒ˜ Ensure inspections execution and completeness and correctness of quality records
in line with quality plan requirements
๏ƒ˜ Detect all non-conformities before release of the parts.
๏ƒ˜ Acknowledge reception and review the content of the mission order and the
attached documents file prepared by the project sourcing coordinator or
commodity buyer
๏ƒ˜ Organize his mission and inform the supplier of his visit.
๏ƒ˜ Re-inspect the repairs of the non-conformities detected and ensure all defects are
treated according to design office requests.
๏ƒ˜ Give to Project Sourcing Coordinator or Project Buyer his approval to release for
shipment.
๏ƒ˜ To maintain NCR Database on daily basis with ref. to inspection report
(immediate of NCR after defect detection).
๏ƒ˜ Main Supplier allot As Gujrat Ambica Engetech ,Wellbore Engineers, Vin-
Tech .Perfect engineers, Santo ,Mani-lal ,Indomac ,Indo-AIR etc.
7 Years
15th
April 2004 to 28 March 2011 in Jai Prakash Associates
Limited Heavy Machining Engineering Workshop division a
unit of Jaypee Group (JAYPEE Cement) worked as QC Foreman.
13.5 Years+ (AUTOMOBILE )
05th
Aug 1990to 27th
March 2004 in Harig India Limited G.T. Road Mohan Road
Ghaziabad, working as a Sr. QC Inspector.
Latest Employment
Heavy Engineering Workshop
(A unit of Jai Prakash Associates Limited).
Position Title : QC Foreman
Position Level : Staff
Industry : Machinery / Fabrication/ Heavy Industrial/Assembly
Duration : April 2004 โ€“ 28 MARCH-2011
Company Profile
Heavy Engineering Workshop (A unit of Jai Prakash Associated Limited) a
unit of Jaypee Group has consisting in the Hydro Mechanical Equipments like
Hydro Mechanical Gates, Hoist Support Structures, Embedded Parts & their
Guide Roller & Wheel Assly. (i.e. Fixed Wheel, Intake Fixed Wheel, Chute
Spillway Radial, Main Spillway Radial, Tail Race Outfall, & Draft Tube Gates)
for various Hydro electric projects at various locations in India such as
Omkareshwar-OHEP(Khandwa M.P.), Baglihar-BHEP (J&K), Karcham
Wangtoo (Himachal Pradesh), Vishnu-prayag-VHEP & Baspa etc.
HEW Has also has been consisting in the machining of Turbine Runners for various
Hydro Electric Project. HEW has also been consisting in fabrication of Cement plant
& captive power plant equipments like Kiln Shells, Tyre Shells, Kiln Base Plates,
Stacker, Reclaimers, their Gantry Structures & other parts, Raw Mills, Coal Mills,
their foundation parts, Classifiers, Kiln Hoods, ETA Coolers, H-Beams, Fabricated
Pulleys, Wheels & Plummer blocks for stacker & reclaimers, Tower Crane Panels
for erection, Preheter Structures, Boiler support structures, ducting & Pipe lines for
various Cement plants of Jaypee Group & other Companies (KHD Hum bolt, L&T,
PHB -Spain Madden- Saudi Arabia).
Inspection of Fabricated, Machined & Final assembly such as Hydro electric
power projects Radial, Bonneted, Tail race out fall, Fixed Wheel, Draft tube
Gates and their Embedded Parts, Wheel Assemblies, Hoist Support structures,
Columns, etc. as per IS: 9349, IS: 7718, IS: 4623, IS: 2825, IS: 7318, IS: 7215,
ASME Sec II, V, VIII, IX & AWS D1.1 etc.
Inspection of various type of Cement Plant Equipments Like Kiln Shells, Tyre
Shells, Kiln Base Plates, Raw mills, Coal mills & their Foundation parts,
Stacker Reclaimers & their other items and inspection of various type of
Machining items & wheel & pulley assemblies of various projects for Jaypee
Group as per IS: 9349, IS: 919, IS: 7718, IS: 4623, IS: 2825, IS: 7318, IS: 7215,
ASME Sec II, V, VIII, IX & AWS D1.1 etc.
Preparation of QAP & Check List of the various products as per drawing.
Machining Inspection of Runner.
Carry out Weld visual & NDT inspection such as UT & DP test.
Inspection of Bought out items before receiving in stores.
Preparation of WPS & PQR & also doing welder qualification as per ASME
section โ€“ IX.
Carry out Weld visual & NDT inspection such as DP test .Preparation of
inspection reports & QA/QC documents as per ISO- 9001-2000.
Preparation of documents & reports for ISO-14001 & OHSAS - 18001.
Assignment Handled
Inspection of Kiln Shell & Base Plates for Sun & Sardar Project.
Inspection of Lime & Coal Stacker Reclaimer for Sun Project.
Company Profile
HARIG India Limited
Harig india Ltd. is ISO 19001 , MNC Company for making Hydraulic
Equipments as ESCORT , FARMTRAC, L&T JOUNDER ( Pune) SONALICA,
HMT & FORD ( HOLLAND).
Work Responsibilities (QC / QA)
Machining Inspection of Main Shaft , Connecting Rod , Hydraulic Cylinder & Pump,
Crank Shaft, Ram Arm , Piston .with Standard room inspection ( CMM )
Incoming Raw Material Inspection as per indent.
During Inspection handling of Instruments as like Inside /Outside Micrometer, Vernier
calipers, Bore Gauge, Height gauge etc.
Permanent Address
Permanent Address - C-39 , Kasev Puram
DDA FLAT ,Laurence Road
New- Delhi.
Telephone No. : 9033291842
Mobile No. : 9727787341
Email : khanduri.sushil@rediffmail.com
Postal Address : Sushil Kumar Khanduri
E-23, Ayodhya Township
Behind Air force
Makerpura Vadodara
Gujrat-390010
Personal Particulars
Date of Birth : 10th
Oct 1967
Nationality : Indian
Gender : Male
Fathers Name : Late Shri Hari Prasad khanduri
Mothers Name : Smt. Sateswari Devi
Religion : Hindu
Marital Status : Married
Language : Punjabi, Hindi, English,
Highest Qualification
Bachelor of Science
Field of Study : Physics, Mathโ€™s & Geology
Institute/University: H.N.V.GARHWAL UNIVERSITY, UTTRANCHAL
Grade : Grade B
Passing year : 1987-88
DECLARATION:
I hereby certify that the above information is correct and true to the best of my
knowledge and belief.
With Best Regards
RESUME.pdf

RESUME.pdf

  • 1.
    Curriculum Vitae Sushil KumarKhanduri Total 24 Years + HARIG INDIA LTD. Mohan Nagar Ghaziabad . (U.P). HEAVY ENGINEERING WORKSHOP REWA (M.P) ( A Unit of JAYPEE GROUP) ALSTOM PROJECTS INDIA LTD. A Unit of GE. ( Vadodara Guj.) SANTO ENGINEERING CO. PVT. LTD. (Umbergaon, Dist.โ€“ Valsad Guj ) Experience Criteria: Machining, Fabrication, Welding, Welder Test (PQR& WPS), Painting, Hard coating/Plating as Zinc, chromium, Blasting/Painting, Assembly (Erection of hydro turbine) 1. Good interpretation skills of engineering drawings, inspection and checking method of components / assembly etc. 2. Familiar for using of CMM (faro gauge and laser tracker) 3. Familiar for using of various measuring instruments / equipment's for inspection purpose 4. NDT qualification in PT,MT, UT in Level-II 5. Familiar for preparing the final inspection report as per drawing dimensions. 6. Ensure the quality of the parts produced to meet all ITP parameters. 7. Quickly and effectively generate the non-conformance report whenever required. 8. Resolve quality issues of capability, tolerances, and materials related issues. 9. Preparation of inspection checks sheet and routine inspection activities in shop floor. 10- NCR Management in shop floor and monitoring for necessary rework defined on NCRs Certification of ASNT โ€“ NDT Level II- UT, MPT & DPT Preferences Expected Monthly Salary : Negoation Minimum time required for joining : 1 Month Professional Objective
  • 2.
    To work ina reputed organization with full responsibility, and to purse a challenging & rewarding career in the field of Quality Assurance / Quality Control, and Fabrication which utilizes my skills & knowledge, provide avenues for excellent growth. Professional Experience Total 24 Years + Quality Coordinator since July -2016 up to Till Date. COMPANY PROFILE Santo Engineering Co. Pvt. Ltd. (ISO 9001:2008) is highly recognized for its engineering expertise. Santo has Heavy machine shop along with fabrication and painting shops so as to provide a complete design, manufacturing and re-engineering solutions. RESPONSIBILITIES : โ€ข Handling cast parts of Wind World India Ltd. from receiving up to dispatch. Studying Inspection Plan/ QAP of all customers (GE, Wind World India, AndritzHydro, Alstom India, and KABRA Extrusion) and other quality requirements. Understanding customer requirements and carry out the inspection accordingly. After final internal inspection giving call for customer inspection and completing final inspection and documentation with customer coordination. Customers Inspection & Documentation according to ISO 9001:2008. Customers Dossier preparation for Customer Clients. Clients Iโ€™ve Worked For : โ€ข Toshiba (Japan), โ€ขGeneral Energy (GE) โ€ข Andritz Hydro India โ€ข Alstom India Ltd โ€ข Voith hydro Noida, โ€ขWind World India Ltd.โ€ข Kabra Extrusion Technique.โ€ข Velmet (China), Jagmohan Pla Machining โ€ข Regan Powertech. GE RENEWABLE ENERGY, VADODARA (1st April 2011 to 31-06-2016 ) A Global Leader in Power Generation (Hydro Turbine & Generator Vadodara Gujrat . As Out sourcing Quality SR. EXCUTUIVE ENGINEER COMPANY PROFILE:- GE RENEWABLE ENERGY, VADODARA ROLE : SR. EXCUTUIVE ENGINEER Purpose of the Role
  • 3.
    Contribute to GEโ€™scompetitiveness and Quality by ensuring on time delivery and respect of contractual specifications from suppliers of outsourced commodities and components. ๏ท Guarantee OTD of expedited commodities by strict control of supplier production plan/progress versus project planning ๏ท Monitor and report actual supplier production progress and analyze deviations regularly to Minimize unexpected and/or undesirable delays. ๏ท Anticipate risks & issues, propose mitigation plan and drive it ๏ท Make sure that main process, related to the manufacturing of the component, such as Machining and NDT are in accordance with contract documents and are performed by qualified people. ๏ท Support supplier in understanding GE specifications and requirements. ๏ท Maintain a schedule presence in the subcontractor to physically observe production and related activity such as protection, packaging, testing. ๏ท Inspection of machining components respect to supporting documents (Drawing, BOM, QWP, Process sheet, etcโ€ฆ) also Inspecting Geometry (On machine) for critical Geometrical parameters. ๏ท Responsible for First Piece Qualification (FPQ) ๏ท Responsible for customer inspection at supplier end. (CHP) ๏ท To carry out kick off meeting (technical discussion) at supplier end to define actual quality requirement as well as implementation of quality package. ๏ท Preparing measuring instruction & checklists at supplier end, handling different Nondestructive tests like LPT & MPI ๏ท Carry out stage wise inspection so well aware about different types of machining processes as well as machines. ๏ท Working knowledge of various types of measuring instruments. ๏ท Maintaining NCR Database Base On daily basis with reference to inspection report (immediate of NCR after defect detection) ๏ท Corrective action & preventive action at supplierโ€™s end with implementation of New inspection criteria/Quality working plan with help of preventive tool (Like 8D) Ensuring Good Housekeeping and Safe work environment at supplier end through making a team alert about danger of operations by reporting on any unsafe conditions, operations, and accidents to improve safety Alstom in Indiaโ€™s Hydro Business Manufacturing facility is located in Vadodara, Gujarat. Manufacturing facilities for machining new stationary components and repair, servicing of rotors and assembly of turbine, generators & bearing of medium & large size Hydro units. JOB PROFILE:- Inspection ALL Types of Bearing shell/ Pad with Babbitt stage process in Omega rank Bearing Bhopal & DVB Tech. Dum-Dum Kolkata last five years, ๏ƒ˜ Inspection of all type Machining & Fabricated components according to supporting documents at suppliers end & in house shop.
  • 4.
    ๏ƒ˜ Ensure inspectionsexecution and completeness and correctness of quality records in line with quality plan requirements ๏ƒ˜ Detect all non-conformities before release of the parts. ๏ƒ˜ Acknowledge reception and review the content of the mission order and the attached documents file prepared by the project sourcing coordinator or commodity buyer ๏ƒ˜ Organize his mission and inform the supplier of his visit. ๏ƒ˜ Re-inspect the repairs of the non-conformities detected and ensure all defects are treated according to design office requests. ๏ƒ˜ Give to Project Sourcing Coordinator or Project Buyer his approval to release for shipment. ๏ƒ˜ To maintain NCR Database on daily basis with ref. to inspection report (immediate of NCR after defect detection). ๏ƒ˜ Main Supplier allot As Gujrat Ambica Engetech ,Wellbore Engineers, Vin- Tech .Perfect engineers, Santo ,Mani-lal ,Indomac ,Indo-AIR etc. 7 Years 15th April 2004 to 28 March 2011 in Jai Prakash Associates Limited Heavy Machining Engineering Workshop division a unit of Jaypee Group (JAYPEE Cement) worked as QC Foreman. 13.5 Years+ (AUTOMOBILE ) 05th Aug 1990to 27th March 2004 in Harig India Limited G.T. Road Mohan Road Ghaziabad, working as a Sr. QC Inspector. Latest Employment Heavy Engineering Workshop (A unit of Jai Prakash Associates Limited). Position Title : QC Foreman Position Level : Staff Industry : Machinery / Fabrication/ Heavy Industrial/Assembly Duration : April 2004 โ€“ 28 MARCH-2011 Company Profile Heavy Engineering Workshop (A unit of Jai Prakash Associated Limited) a unit of Jaypee Group has consisting in the Hydro Mechanical Equipments like Hydro Mechanical Gates, Hoist Support Structures, Embedded Parts & their Guide Roller & Wheel Assly. (i.e. Fixed Wheel, Intake Fixed Wheel, Chute Spillway Radial, Main Spillway Radial, Tail Race Outfall, & Draft Tube Gates) for various Hydro electric projects at various locations in India such as
  • 5.
    Omkareshwar-OHEP(Khandwa M.P.), Baglihar-BHEP(J&K), Karcham Wangtoo (Himachal Pradesh), Vishnu-prayag-VHEP & Baspa etc. HEW Has also has been consisting in the machining of Turbine Runners for various Hydro Electric Project. HEW has also been consisting in fabrication of Cement plant & captive power plant equipments like Kiln Shells, Tyre Shells, Kiln Base Plates, Stacker, Reclaimers, their Gantry Structures & other parts, Raw Mills, Coal Mills, their foundation parts, Classifiers, Kiln Hoods, ETA Coolers, H-Beams, Fabricated Pulleys, Wheels & Plummer blocks for stacker & reclaimers, Tower Crane Panels for erection, Preheter Structures, Boiler support structures, ducting & Pipe lines for various Cement plants of Jaypee Group & other Companies (KHD Hum bolt, L&T, PHB -Spain Madden- Saudi Arabia). Inspection of Fabricated, Machined & Final assembly such as Hydro electric power projects Radial, Bonneted, Tail race out fall, Fixed Wheel, Draft tube Gates and their Embedded Parts, Wheel Assemblies, Hoist Support structures, Columns, etc. as per IS: 9349, IS: 7718, IS: 4623, IS: 2825, IS: 7318, IS: 7215, ASME Sec II, V, VIII, IX & AWS D1.1 etc. Inspection of various type of Cement Plant Equipments Like Kiln Shells, Tyre Shells, Kiln Base Plates, Raw mills, Coal mills & their Foundation parts, Stacker Reclaimers & their other items and inspection of various type of Machining items & wheel & pulley assemblies of various projects for Jaypee Group as per IS: 9349, IS: 919, IS: 7718, IS: 4623, IS: 2825, IS: 7318, IS: 7215, ASME Sec II, V, VIII, IX & AWS D1.1 etc. Preparation of QAP & Check List of the various products as per drawing. Machining Inspection of Runner. Carry out Weld visual & NDT inspection such as UT & DP test. Inspection of Bought out items before receiving in stores. Preparation of WPS & PQR & also doing welder qualification as per ASME section โ€“ IX. Carry out Weld visual & NDT inspection such as DP test .Preparation of inspection reports & QA/QC documents as per ISO- 9001-2000. Preparation of documents & reports for ISO-14001 & OHSAS - 18001.
  • 6.
    Assignment Handled Inspection ofKiln Shell & Base Plates for Sun & Sardar Project. Inspection of Lime & Coal Stacker Reclaimer for Sun Project. Company Profile HARIG India Limited Harig india Ltd. is ISO 19001 , MNC Company for making Hydraulic Equipments as ESCORT , FARMTRAC, L&T JOUNDER ( Pune) SONALICA, HMT & FORD ( HOLLAND). Work Responsibilities (QC / QA) Machining Inspection of Main Shaft , Connecting Rod , Hydraulic Cylinder & Pump, Crank Shaft, Ram Arm , Piston .with Standard room inspection ( CMM ) Incoming Raw Material Inspection as per indent. During Inspection handling of Instruments as like Inside /Outside Micrometer, Vernier calipers, Bore Gauge, Height gauge etc. Permanent Address Permanent Address - C-39 , Kasev Puram DDA FLAT ,Laurence Road New- Delhi. Telephone No. : 9033291842 Mobile No. : 9727787341 Email : khanduri.sushil@rediffmail.com Postal Address : Sushil Kumar Khanduri E-23, Ayodhya Township Behind Air force Makerpura Vadodara Gujrat-390010 Personal Particulars Date of Birth : 10th Oct 1967 Nationality : Indian Gender : Male Fathers Name : Late Shri Hari Prasad khanduri Mothers Name : Smt. Sateswari Devi Religion : Hindu Marital Status : Married Language : Punjabi, Hindi, English,
  • 7.
    Highest Qualification Bachelor ofScience Field of Study : Physics, Mathโ€™s & Geology Institute/University: H.N.V.GARHWAL UNIVERSITY, UTTRANCHAL Grade : Grade B Passing year : 1987-88 DECLARATION: I hereby certify that the above information is correct and true to the best of my knowledge and belief. With Best Regards