Curricullum Vitae Fernando José Fragoso Pereira de Lima
Relevant Skills
Last 8 years working at Heathrow Airport environment – see relevant projects on following page.
• Assist lead Architect to prepare all working drawings and documents from the initial design
stage, detailing and services to final hand over to the client.
• Materials research, evaluation and selection.
• Co-ordination meetings with client, main contractor and all other technicians / sub
contractors involved.
• Site supervision.
• Building co-ordination progress inspections.
• Site inspections and reports.
• IT Proficiency – AutoCAD, Navisworks, Revit (beginners), Photoshop.
• Others (Office / Invoicing / Stock Management)
Employment History
Pascall+Watson The Warehouses, 10 Black Friars Lane, London EC4V 6EJ
Clifford Tee & Gale
( Architects & Surveyors )
5 Ecclestone Street,
London, SW1W 9LY, United Kingdom
N. S. F. Projectos ( Architects ) Queluz / Portugal
Osmond Lange Arquitectos Lisboa / Portugal
Koseff, Maserow, Van der Walt, Architects Johannesburg / Rep. of South Africa
Rand Mines ( Mining & Services ) Limited Johannesburg / Rep. of South Africa
Goldfields Mining and Development Limited Johannesburg / Rep. of South Africa
Personal Details
Date of Birth : 15.12.1954
Health : Very Good
Place of Birth : Lourenço Marques, Moçambique
Nationality : Portuguese
Passport Nr. : M024024, Portugal
Marital Status : Married, 1 son
Driver’s License : L-138 055 1 7 - Passenger ( Clean )
ID Number ( Portugal ) : 10 946 726 / Lisboa
National Insurance Nr.( UK ) : SJ 24 22 96 A
Interests : Architecture, Interior Decorating
Contacts
E-mail : fernandopereiradelima@gmail.com
Mobile : 00447835801367
Address : 24, Berkeley Avenue
Cranford - Hounslow
Middlesex
TW4 6LA
United Kingdom
Qualifications
• National Architectural Technician Certificate - Portugal
• National Architectural Technician Certificate - South Africa
• Galileu AutoCAD Certificate - Portugal
• South African Institute of Draughtsmen
• South African Institute of Architectural Technologists
• Quadratica UK General Security Awareness Training Certificate
Curricullum Vitae Fernando José Fragoso Pereira de Lima
UK Professional Experience
2015 /
Project Heathrow T2 Stage FM - F2 Design (Carillion)
Involvement WP8 - New Escalator Barrier Posts & WP13 – Automatic Doors on EV Routes
Project T3 Anti-Backtrack Doors
To stop access to Baggage Hall through passenger exit doors.
2014
Project T2A Mechanical Core Risers Risk Assessment & Duct Extract Wells
Involvement All Mechanical Chores (12 Cores, 66 levels) in compliance with HAL standards.
Additional safety steelwork and maintenance accessibility to high level dampers
and valves, as well as isolating problems such as services blocking access to
zones needing maintenance, and design of steel structures such as high rise
platforms and special access ladders.
2013
Project T2A FOH Stairs
Involvement Design and detailing of light fitting fixtures to FOH stairs.
Project WS29 – IDL Illuminated Glass Tread Stair
Involvement Construction detail design of first IDL illuminated tread staircase at Heathrow
Project WS15 – Core C1 & L4
Involvement New Duct Penetration Supporting Structures: Design and detailing of three new
duct penetration structures at cores L1 & C4.
2010 / 2013
Project T2A, VPM & T1PB Design Integrator for Vertical Circulation
Involvement Installation of Schindler Escalators (19), into inherited KONE sized openings,
minimizing impact to installation program & Stairs (22), responsible for external
cladding to escalators (11) and stairs (11), floor, wall and bulkhead interfaces,
balustrades, lighting, and solving all problems inherited from badly designed and
installed steel structures, with the required constant surveying, design, detailing,
site supervision and accompaniment.
Design and installation of additional support structure for VPM escalators (7).
2010
Project Post T5 Baggage Transfers System
It comprises a tunnel and associated shafts, chambers and main baggage hall
that will connect Terminal 5 and Terminal 3 baggage systems.
Involvement External envelope composite cladding wall system design and detailing
Project ITO (Inter Terminal Operations) Accommodation
Involvement Office, communication room, welfare and toilets - all working drawing
2009
Project Post T5 Baggage Transfers System
Involvement Office, communication room, welfare and toilets - all working drawing
Project EDF Substation 293 (provides all power for the complex), LV, HV and
transformer rooms - all working drawings
Project WIB Shaft and T5C Chamber - 3 levels of fan rooms, sub-stations, backshunt
chambers - all working drawings
Project Automatic Tray Return System - Identify and eventually replace existing X-ray
machines in all passenger and staff security ingress search areas, for new
generation automated tray system
Involvement Survey and redesign of security areas and feasibility layouts
2007 / 2008
Project Terminal 1 Displacements Project - Airside remodeling the existing space left
vacant by BA after their move to the new Terminal 5, to accommodate the
different airlines moving to this space
Involvement Office refurbishment for Lufthansa, Croatian Airlines & Menzies, at T1 Balcony
Blanket Store for United Airlines, Alpha 5 Office Accommodation, Baggage Store
for BMI

Resume_Fernando_2016

  • 1.
    Curricullum Vitae FernandoJosé Fragoso Pereira de Lima Relevant Skills Last 8 years working at Heathrow Airport environment – see relevant projects on following page. • Assist lead Architect to prepare all working drawings and documents from the initial design stage, detailing and services to final hand over to the client. • Materials research, evaluation and selection. • Co-ordination meetings with client, main contractor and all other technicians / sub contractors involved. • Site supervision. • Building co-ordination progress inspections. • Site inspections and reports. • IT Proficiency – AutoCAD, Navisworks, Revit (beginners), Photoshop. • Others (Office / Invoicing / Stock Management) Employment History Pascall+Watson The Warehouses, 10 Black Friars Lane, London EC4V 6EJ Clifford Tee & Gale ( Architects & Surveyors ) 5 Ecclestone Street, London, SW1W 9LY, United Kingdom N. S. F. Projectos ( Architects ) Queluz / Portugal Osmond Lange Arquitectos Lisboa / Portugal Koseff, Maserow, Van der Walt, Architects Johannesburg / Rep. of South Africa Rand Mines ( Mining & Services ) Limited Johannesburg / Rep. of South Africa Goldfields Mining and Development Limited Johannesburg / Rep. of South Africa Personal Details Date of Birth : 15.12.1954 Health : Very Good Place of Birth : Lourenço Marques, Moçambique Nationality : Portuguese Passport Nr. : M024024, Portugal Marital Status : Married, 1 son Driver’s License : L-138 055 1 7 - Passenger ( Clean ) ID Number ( Portugal ) : 10 946 726 / Lisboa National Insurance Nr.( UK ) : SJ 24 22 96 A Interests : Architecture, Interior Decorating Contacts E-mail : fernandopereiradelima@gmail.com Mobile : 00447835801367 Address : 24, Berkeley Avenue Cranford - Hounslow Middlesex TW4 6LA United Kingdom Qualifications • National Architectural Technician Certificate - Portugal • National Architectural Technician Certificate - South Africa • Galileu AutoCAD Certificate - Portugal • South African Institute of Draughtsmen • South African Institute of Architectural Technologists • Quadratica UK General Security Awareness Training Certificate
  • 2.
    Curricullum Vitae FernandoJosé Fragoso Pereira de Lima UK Professional Experience 2015 / Project Heathrow T2 Stage FM - F2 Design (Carillion) Involvement WP8 - New Escalator Barrier Posts & WP13 – Automatic Doors on EV Routes Project T3 Anti-Backtrack Doors To stop access to Baggage Hall through passenger exit doors. 2014 Project T2A Mechanical Core Risers Risk Assessment & Duct Extract Wells Involvement All Mechanical Chores (12 Cores, 66 levels) in compliance with HAL standards. Additional safety steelwork and maintenance accessibility to high level dampers and valves, as well as isolating problems such as services blocking access to zones needing maintenance, and design of steel structures such as high rise platforms and special access ladders. 2013 Project T2A FOH Stairs Involvement Design and detailing of light fitting fixtures to FOH stairs. Project WS29 – IDL Illuminated Glass Tread Stair Involvement Construction detail design of first IDL illuminated tread staircase at Heathrow Project WS15 – Core C1 & L4 Involvement New Duct Penetration Supporting Structures: Design and detailing of three new duct penetration structures at cores L1 & C4. 2010 / 2013 Project T2A, VPM & T1PB Design Integrator for Vertical Circulation Involvement Installation of Schindler Escalators (19), into inherited KONE sized openings, minimizing impact to installation program & Stairs (22), responsible for external cladding to escalators (11) and stairs (11), floor, wall and bulkhead interfaces, balustrades, lighting, and solving all problems inherited from badly designed and installed steel structures, with the required constant surveying, design, detailing, site supervision and accompaniment. Design and installation of additional support structure for VPM escalators (7). 2010 Project Post T5 Baggage Transfers System It comprises a tunnel and associated shafts, chambers and main baggage hall that will connect Terminal 5 and Terminal 3 baggage systems. Involvement External envelope composite cladding wall system design and detailing Project ITO (Inter Terminal Operations) Accommodation Involvement Office, communication room, welfare and toilets - all working drawing 2009 Project Post T5 Baggage Transfers System Involvement Office, communication room, welfare and toilets - all working drawing Project EDF Substation 293 (provides all power for the complex), LV, HV and transformer rooms - all working drawings Project WIB Shaft and T5C Chamber - 3 levels of fan rooms, sub-stations, backshunt chambers - all working drawings Project Automatic Tray Return System - Identify and eventually replace existing X-ray machines in all passenger and staff security ingress search areas, for new generation automated tray system Involvement Survey and redesign of security areas and feasibility layouts 2007 / 2008 Project Terminal 1 Displacements Project - Airside remodeling the existing space left vacant by BA after their move to the new Terminal 5, to accommodate the different airlines moving to this space Involvement Office refurbishment for Lufthansa, Croatian Airlines & Menzies, at T1 Balcony Blanket Store for United Airlines, Alpha 5 Office Accommodation, Baggage Store for BMI