SlideShare a Scribd company logo
Resume
Dharmendra Kumar singh
UTTAR PRADESH GORKHPUR (273212)
Email:Mob.kalu24031993@gmail.com
No. : +91-9131173257,
Personal Information: -
Father’s Name : Kuver jeet singh
Date of Birth : 15/01/1996
Height : 162 cm
Nationality : Indian
Marital status : Unmarried
Languages Known : Hindi, and English, Bangali, Marathi
Designation : Land Surveyor
Objective: To work most confidently and indecently with high accuracy from preliminarysurvey and lay
out stage up to project commissioning
Applied for the Job: Land Surveyor
Experience: 7.6 Years in surveying,
Educational Qualification: -
Name of
exam
Board/Institute School/College Year of
passing
Percentage
(%)
10th
UP. BOARD Ramparva Inter College. 2010 49.55
12th
UP. BOARD Bholoram Mascara Inter College
Sahajanwa (Gorakhapur)
2012 60.65
CIVIL ENG
DIPLOMA
Delhi Board
Global Institute Of Management
And Engineering Delhi
2016
65
Responsibilities:-
Execution of All Survey Activities, Joint Inspection And Approval From Client &
Consultant Required Time To Time In The Tune of Project.
Fixing of Grid Pillar Marking, Benchmark Shifting , Traversed Calculation , Roadsurvey,
Site Leveling Rfi ,
Instruments Handling:-
1) Total Station 1 Sec Least Count, Make: - Ts-06, Ts-06 Plus, Ts 09 Plus, Topcon Es, 101, Sokia Cs 101.
Topcon Robotic
Auto Cad
Duration: 25/01/2015 to 27/05/2017
Company: Dilip Builddown Ltd
Project-1: NH12A Mandla To Chilpi Road Project
Project-2: NH17 Kalamth To Zarap
Work Performed:
o All Survey activities such as Topographical survey, taking Ogl, Layut, Levels Of All Layers Such As
Sub Grade, Gsb , Dlc, Pqc.
o TBM Fly , Traversing, Ngl, Ogl
o Responsible for the Execution, Planning, Supervision and Organization of Road Survey worklike earth
work, Sub Base, Aggregate Base Course and Asphaltic layers.
o Layout of Building, Bridges, Structures, Side Drain and others.
o Dealing with Consultant and Maintaining Survey Record.
o Familiar with latest Surveying Equipments.
o To Control Horizontal and Vertical Alignment of Roads and road Curves during the
construction.
o Taking and plotting Road X- Section and Toe points.
o Using Total Station for close Travers of Road and collected all necessary information about X,Y and Z
Coordinates.
o Carried out joint Measurement Survey for adjustment of Utilities and Relocation such as buriedpipes,
cables and ground pole.
Duration: 30/05/2017 to 07/06/2019
Company: Rajpath Infracon Pvt Ltd
Project-3: NH166 E Karad-Vita Project (CH 0.000 TO CH 94-500)
Duration: 10/06/2019 to 20/08/2020
Company: VRC Construction Ptd Ltd
Project-4; Rajasthan /Gujarat Boarder of NH -754K as a Part of Amritsar - Jamnagar Economic Corridor (EC) in
Rajasthan on EPC under Bharatmala Pariyojnna (Phase -1) (AJ/DRGB-Package2)
Duration: 10/08/2020 to 07/08/2021
Project-4 NH- 166 NAGPUR TO HAYDRABAD ROB BRIGE
Company: GHAI CONSTRUCTION LTD
Duration: 10/08/2021
Company: GAWAR CONSTRUTION LTD
RAJAULI TO BAKHTIYARPUR 0+000 TO 91+000
Work Performed: All Survey Activities Such As Topographical Survey, Taking OGL, LAYOUT, Levels of all Layers
Such As SUBGRADE, GSB, DLC, PQC.
 TBM FLY, TRVERSING, NGL, OGL
 Responsible for the execution, Planning, Supervision and Organization of Road Survey worklike
earth work, Sub Base, Aggregate Base Course and Asphaltic layers.
 Layout of Building, Bridges, Structures, Side Drain and others.
 Dealing with Consultant and Maintaining Survey Record.
 Familiar with latest Surveying Equipments.
 To Control Horizontal and Vertical Alignment of Roads and road Curves during the
construction.
 Taking and plotting Road X- Section and Toe points.
 Using Total Station for close Travers of Road and collected all necessary information about X,Y
and Z Coordinates.
 Carried out joint Measurement Survey for adjustment of Utilities and Relocation such as buried
pipes, cables and ground pole.
 Taking data of encroachment building in R. O. W. for Record.
 Setting out Bench Marks for elevation and established their reference points on site.
 Prepare all Geometric calculation of Vertical Curves, Horizontal Curves and Super Elevation
according to given Design Stander and Drawing.
Permanent Address:-
Name: DHARMEDNRA KUMAR SINGH C/O: KUVER JEET SINGH
Vill: SHIDABAD
P.O: BASHIYAKHOR
P.S: KHANJNI Dist: GORAKHPUR
State: Uttar Pradesh Pin No: 273212
I hereby declare that the information given above is true to the best of my knowledge and belief.
Place:,
Date: (Dharmendra Kumar singh)

More Related Content

Similar to Resume Dharmendra.pdf

Qaisar cv
Qaisar cvQaisar cv
SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16Santanu Datta
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
Ali Raza Mughal
 
Asstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder SinghAsstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder SinghBHUPINDER SINGH
 
Seh waqas Curriculam Vitae 1
Seh waqas Curriculam Vitae 1Seh waqas Curriculam Vitae 1
Seh waqas Curriculam Vitae 1waqas ahmad
 
CV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDFCV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDFShajeer A.S
 

Similar to Resume Dharmendra.pdf (20)

Vishu resume new
Vishu resume newVishu resume new
Vishu resume new
 
Vishu resume new (1)
Vishu resume new (1)Vishu resume new (1)
Vishu resume new (1)
 
gandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Managergandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Manager
 
Resume dharmendra
Resume dharmendraResume dharmendra
Resume dharmendra
 
RESUME New
RESUME NewRESUME New
RESUME New
 
Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016
 
Lawrance-Resume
Lawrance-ResumeLawrance-Resume
Lawrance-Resume
 
shafaqat cv 1
shafaqat cv 1shafaqat cv 1
shafaqat cv 1
 
Qaisar cv
Qaisar cvQaisar cv
Qaisar cv
 
SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16SANTANU DATTA CV Update'16
SANTANU DATTA CV Update'16
 
Arun C.V (Civil) (1)
Arun C.V (Civil) (1)Arun C.V (Civil) (1)
Arun C.V (Civil) (1)
 
Arun C.V (Civil) (1)
Arun C.V (Civil) (1)Arun C.V (Civil) (1)
Arun C.V (Civil) (1)
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
Zia Ullah Khan 2 new
Zia Ullah Khan 2 newZia Ullah Khan 2 new
Zia Ullah Khan 2 new
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
 
Asstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder SinghAsstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder Singh
 
Seh waqas Curriculam Vitae 1
Seh waqas Curriculam Vitae 1Seh waqas Curriculam Vitae 1
Seh waqas Curriculam Vitae 1
 
UPDATED RESUME
UPDATED RESUMEUPDATED RESUME
UPDATED RESUME
 
CV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDFCV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDF
 

Recently uploaded

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 

Recently uploaded (20)

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 

Resume Dharmendra.pdf

  • 1. Resume Dharmendra Kumar singh UTTAR PRADESH GORKHPUR (273212) Email:Mob.kalu24031993@gmail.com No. : +91-9131173257, Personal Information: - Father’s Name : Kuver jeet singh Date of Birth : 15/01/1996 Height : 162 cm Nationality : Indian Marital status : Unmarried Languages Known : Hindi, and English, Bangali, Marathi Designation : Land Surveyor Objective: To work most confidently and indecently with high accuracy from preliminarysurvey and lay out stage up to project commissioning Applied for the Job: Land Surveyor Experience: 7.6 Years in surveying, Educational Qualification: - Name of exam Board/Institute School/College Year of passing Percentage (%) 10th UP. BOARD Ramparva Inter College. 2010 49.55 12th UP. BOARD Bholoram Mascara Inter College Sahajanwa (Gorakhapur) 2012 60.65 CIVIL ENG DIPLOMA Delhi Board Global Institute Of Management And Engineering Delhi 2016 65 Responsibilities:- Execution of All Survey Activities, Joint Inspection And Approval From Client & Consultant Required Time To Time In The Tune of Project. Fixing of Grid Pillar Marking, Benchmark Shifting , Traversed Calculation , Roadsurvey, Site Leveling Rfi ,
  • 2. Instruments Handling:- 1) Total Station 1 Sec Least Count, Make: - Ts-06, Ts-06 Plus, Ts 09 Plus, Topcon Es, 101, Sokia Cs 101. Topcon Robotic Auto Cad Duration: 25/01/2015 to 27/05/2017 Company: Dilip Builddown Ltd Project-1: NH12A Mandla To Chilpi Road Project Project-2: NH17 Kalamth To Zarap Work Performed: o All Survey activities such as Topographical survey, taking Ogl, Layut, Levels Of All Layers Such As Sub Grade, Gsb , Dlc, Pqc. o TBM Fly , Traversing, Ngl, Ogl o Responsible for the Execution, Planning, Supervision and Organization of Road Survey worklike earth work, Sub Base, Aggregate Base Course and Asphaltic layers. o Layout of Building, Bridges, Structures, Side Drain and others. o Dealing with Consultant and Maintaining Survey Record. o Familiar with latest Surveying Equipments. o To Control Horizontal and Vertical Alignment of Roads and road Curves during the construction. o Taking and plotting Road X- Section and Toe points. o Using Total Station for close Travers of Road and collected all necessary information about X,Y and Z Coordinates. o Carried out joint Measurement Survey for adjustment of Utilities and Relocation such as buriedpipes, cables and ground pole. Duration: 30/05/2017 to 07/06/2019 Company: Rajpath Infracon Pvt Ltd Project-3: NH166 E Karad-Vita Project (CH 0.000 TO CH 94-500) Duration: 10/06/2019 to 20/08/2020 Company: VRC Construction Ptd Ltd Project-4; Rajasthan /Gujarat Boarder of NH -754K as a Part of Amritsar - Jamnagar Economic Corridor (EC) in Rajasthan on EPC under Bharatmala Pariyojnna (Phase -1) (AJ/DRGB-Package2) Duration: 10/08/2020 to 07/08/2021 Project-4 NH- 166 NAGPUR TO HAYDRABAD ROB BRIGE Company: GHAI CONSTRUCTION LTD Duration: 10/08/2021 Company: GAWAR CONSTRUTION LTD RAJAULI TO BAKHTIYARPUR 0+000 TO 91+000
  • 3. Work Performed: All Survey Activities Such As Topographical Survey, Taking OGL, LAYOUT, Levels of all Layers Such As SUBGRADE, GSB, DLC, PQC.  TBM FLY, TRVERSING, NGL, OGL  Responsible for the execution, Planning, Supervision and Organization of Road Survey worklike earth work, Sub Base, Aggregate Base Course and Asphaltic layers.  Layout of Building, Bridges, Structures, Side Drain and others.  Dealing with Consultant and Maintaining Survey Record.  Familiar with latest Surveying Equipments.  To Control Horizontal and Vertical Alignment of Roads and road Curves during the construction.  Taking and plotting Road X- Section and Toe points.  Using Total Station for close Travers of Road and collected all necessary information about X,Y and Z Coordinates.  Carried out joint Measurement Survey for adjustment of Utilities and Relocation such as buried pipes, cables and ground pole.  Taking data of encroachment building in R. O. W. for Record.  Setting out Bench Marks for elevation and established their reference points on site.  Prepare all Geometric calculation of Vertical Curves, Horizontal Curves and Super Elevation according to given Design Stander and Drawing. Permanent Address:- Name: DHARMEDNRA KUMAR SINGH C/O: KUVER JEET SINGH Vill: SHIDABAD P.O: BASHIYAKHOR P.S: KHANJNI Dist: GORAKHPUR State: Uttar Pradesh Pin No: 273212 I hereby declare that the information given above is true to the best of my knowledge and belief. Place:, Date: (Dharmendra Kumar singh)