Responsbility Chart
- 1. Project
Director
Deputy Project
Director
Contract
Manager
HSE
Manager
Admin &
Finance
Manager
Controls
Manager
Interface
Manager
Quality
Manager
Design
Manager
Technical
Manager
Procurement
Manager
Material
Manager
Site
Manager
1.1.1 Piping ☐ ▲ ▲ ◇ ◇ ▲ ▲
1.1.2 Process ☐ ◇ ▲ ▲ ▲ ◇ ◇
1.1.3 Vessels & Mechanicals ☐ ▲ ◎ ◇ ◇ ◎ ▲ ▲
1.1.4 Cross Section Area ☐ ▲ ◎ ◇ ◇ ◇ ▲ ▲
1.1.5 Instrumentation & Control Systems ☐ ▲ ▲ ▲ ◇ ◇ ◇ ◎ ▲ ▲
1.1.6 Electrical ☐ ▲ ◇ ◇ ▲
1.1.7 Fire Fighting / HVAC / Noise ☐ ▲ ◇ ◇ ◇ ▲
1.2.1 Purchase Main Electrical Equipments ◇ ◇ ◇ ◇ ▲ ▲ ◇ ◇
1.2.2 Purchase Remaining E & I Materials ☐ ▲ ◇ ◇ ◇
1.2.3 Purchase Piping Bulk Materials ☐ ◇ ◇ ◇
1.2.4 Purchase Instruments ☐ ◇ ◇ ▲ ◇ ▲ ◇ ◇
1.2.5 Purchase Mechanical Equipments ☐ ◇ ◇ ▲ ◇ ◇
1.3.1 Civil Work Open Storage Area ☐ ▲ ◇ ◎ ◇ ◇ ◇
1.3.2 Foundation Concrete Structures ☐ ◇ ▲ ◇ ◇
1.3.3 Remaining Buildings (Civil / Steel Works) ☐ ◇ ◇ ◇
1.3.4 Civil Work Covered Storage Area ☐ ◇ ◇ ◇
1.3.5 Covered Storage Building (All Steelwork) ☐ ◇ ◇ ◇
1.3.6 Electrical / Instrumentation ◇ ◇ ◇ ▲ ◇ ▲ ◇
1.3.7 Equipment Erection ◇ ◇ ◇ ▲ ◇ ▲ ◇
1.3.8 Conveying Piping Erection ☐ ◇ ◇ ▲ ◇
1.4.1 Precommissioning ◇ ◇ ◎ ◇ ◇ ▲ ☐ ▲ ◇ ◇
◎: Accountable
Associates
ActivityTask
◇: Responsible ▲: Consult ☐: Inform