RESOLVING COMPLEX DELAY CLAIMS
Jeremy Winter and Peter Johnson
A Report on the Meeting of the Society of Construction Law
on 6th June 2000 at the National Liberal Club, Whitehall Place, London
Report by Samuel Townend
It was standing room only in the Lloyd George Room at the National Liberal Club on the
evening of 6th June 2000 as the members of the Society of Construction Law gathered to
listen to the address given by Mr Jeremy Winter and Mr Peter Johnson.
The Speakers and topic were presented by Mr Richard Bayfield, Chairman of the proceedings
and recently appointed Vice Chairman of the Society. He referred back to previous talks on
the area, 'Extensions of Time under JCT Contracts' given by Mr Martin Barnes on 3rd
February 1987, and 'Concurrent Delays' given by Mr Ian Wishart on 4th June 1996, and to
the continuing difficulties of analysis in the area. He introduced Mr Jeremy Winter as a
Partner in Baker & McKenzie, Manager of the Construction and Engineering Group,
experienced in litigation and arbitration. Also Mr Peter Johnson of Linacre Associates as a
distinguished Chartered Civil Engineer also experienced in arbitration.
The topic was introduced by Mr Winter in terms of an analysis of techniques that may be
used in relation to delay and entitlements to time and to money.
TIME
Status Quo on site
Mr Winter's view is that most standard forms of construction contract do not adequately deal
with how to determine appropriate Extensions of Time ("EoTs"). Further, most contractors'
programmes do not have the necessary links, are not resource-driven, and on the whole are
not prepared to reflect what will actually happen on site, but are designed to win the job for
the Contractor. Once the job begins the programmes are not properly updated with progress
and typically an inadequate record is kept of potential dispute areas. This has led to
consequent difficulties in proving the causes of delay and the consequent costs.
Status Quo in Court
There is still no definitive judicial ruling on the method by which to assess delay and a
general lack of certainty about some basic principles. This is coupled with a general mistrust
of critical path modelling. EoTs are not determined by Judges scientifically but on what the
Judge feels is the right amount of time. The uncertainty was illustrated by two recent court
decisions on delay issues.
Recent Court Decisions
In Henry Boot Construction (UK) Ltd v Malmaison Hotel (Manchester) Ltd, [1999] All ER
118, there was a prior agreement between the lawyers that where there were two causes of
delay, one of which was the Employer's responsibility (e.g. poor weather conditions), the
other of which was the Contractor's responsibility (e.g. Contractor had provided no labour),
the Contractor was still entitled to an extension of time. The judge did not seem to have
applied that agreement fully, because he still considered the Contractor's performance to be
relevant in determining its entitlement to an extension. The parties and the Judge also seem to
have assumed that there could be no EoT unless the delaying event was on the critical path.
This was something that had not been, but should be tested by the courts.
In Ascon Contracting Ltd v Alfred McAlpine Construction Isle of Man Ltd , (1999) 66 Con
LR 119, a Sub-Contractor and Contractor blamed each other for the late completion of works.
The Judge said that a Sub-Contractor cannot claim acceleration costs, EoT and prolongation
costs for the full period of the EoT entitlement. Mr Winter considered that the Judge was, of
course, right that a contractor could not claim prolongation costs for a period of delay that he
had overcome by acceleration, but questioned whether he was right in relation to EoTs. He
stressed that EoTs should be considered in terms of contemporaneous entitlement rather than
retrospective need. The Contractor had argued that he could apply the float in the Contract as
he wished; the Court did not agree and did not regard float as a 'tradeable commodity' (at
paragraph 92). The Judge gave an example of a Contract in which there was 6 weeks float; 6
Sub-Contractors then caused one week delay sequentially and the float is eaten up (at
paragraph 93). In these circumstances the Judge considered that the Contractor has suffered
no loss. Mr Winter questioned this conclusion, because if there had been no delay, the
Contractor would have been able to complete six weeks earlier, and would not have incurred
six weeks extra site costs. He did however acknowledge that the authorities supported the
Judge's decision (Glenlion Construction v The Guinness Trust (1988) 39 BLR 89).
In the context of these cases Mr Winter urged all members to anticipate and draft around
difficulties with respect to time before they arise, and tackle float and concurrency expressly
in their contracts. This has been attempted in the standard forms of Australia. Mr Winter
advised avoiding reliance on sometimes confused legal principles and instead to rely on a
good analysis of the facts.
Methods of Analysis
Peter Johnson looked at various methods of analysing the progress of a Contractor and of
delaying events and their causes:
(1) The most basic method is the comparison of an As Planned Bar Chart with an As
Built Bar Chart. The obvious difficulty with this method is that it does not show the causes
of the delay and therefore who is responsible.
(2) Critical Path methods:
i) As Planned Projected. In which one inserts dates as the project goes on, such
as late provision of information by the employer or additional works. The problem
with this method is that it takes no account of Contractor progress or delay.
(ii) As Built Collapsed Network. This is the opposite of (i). It takes the As Built
programme and deducts the assessed effects of Employer delays - it is then assumed
that any remaining delay is the responsibility of the Contractor. Unfortunately it takes
no account of the realignment of Contractor's resources from what has become non-
critical to what has become critical because of what has happened previously.
(3) Window analysis. This takes small windows of the As Built programme. The
problem with this method is that is a subjective and incomplete analysis.
(4) Time Impact analysis. This shows the effects of each individual delay and the
contractor's actual progress. The difference between the two networks, immediately before
and immediately after each event is demonstrably solely caused by the delaying event. This
analysis takes account of:
· Original planned method and resources;
· Progress and events so far; and
· Direct cause and effect of single events as they unfold.
This is a proven method. In the United States it has been a specified method of analysis since
the 1960s.
It involves Network Analysis. By this analysis the work is broken down into specific items;
usually a single trade and preferably less than 14 days duration. The resources, costs and
values are assigned to that activity. Each update tracks and records actual progress on all
activities. These are then joined together by logic. For example, if Y task cannot begin until
after X task, they are linked. The computer processes these links. At the end there are bars
which represent the different tasks over time. Lines are shown after each bar where there is
projected float. Bars are red where there is no float - where the item is on the critical path.
As the job goes on the network is updated. It is able to show the change in float and in the
critical path.
Each cause of delay is considered separately, and added into the project networks whether the
delay is caused by the Contractor or Employer. If the impact is over a month or over separate
delaying events the computer can produce a series of subnets which show the precise build up
over time. One can also combine the impact of both Contractor and Employer delays and
observe what the delay is before and after the Employer's delay event.
MONEY
Mr Winter then considered entitlement to money - prolongation costs. It is important in
every case to be able to demonstrate exactly what the causes are. These are best proven on a
time basis and for that reason much the same tools are used as described above. By
presenting the claim in detail in terms of time and loss, the claimant avoids the difficulties of
concurrency (for which the courts seem to prefer the dominant cause test- see the section in
Keating on Building Contracts 6th ed. at 309) and of global claims and the principles set
down in Crosby (J.) v Portland Urban District Council (1967) 5 BLR 121 and the succeeding
line of cases. The appropriate method to use is a sequential analysis of delay. Such analysis
is beneficial to a Contractor because in many cases where there are multiple causes of delay,
that delay leading to prolongation, the Contractor may need only to prove entitlement in
relation to some claims in order to be able to recover all its prolongation costs.
Mr Johnson then described how best to present a case for prolongation costs. His view is that
a Claimant should look at how the different costs were incurred (head costs, geographical
costs etc.) and at the site structure as it was actually used. An 'envelope' of time-related
overhead costs should be examined and the effect of delays on that 'envelope'. Any analysis
on this basis requires critical path software. In Mr Johnson's experience on such a close
analysis there are seldom in fact concurrent causes of delay. Causes which appear to be
concurrent usually arise sequentially but appear to impact at the same time. This method
allows the tracking of actual prolongation and cost.
Overall Conclusions
Mr Winter hoped that by adopting such methods it should enable parties at the earliest
possible time to reach an understanding as to the causes of delay, minimise the scope for
disagreement and maximise the scope for settlement. It does necessitate a detailed and
proper programme as its basis.
Following the presentation of the topic Mr Bayfield announced the setting up of a Working
Group of members of the Society to draft a Code or Recommendation of delay methodology
to be publicised in the Society's newsletter. Mr Winter and Mr Johnson agreed to join the
Working Group and invited others to join. Mr Bayfield also opened the floor for discussion
and questions.
A lively debate ensued. This included Mr Martin Barnes commenting on how the NEC
contract attempts to shrink the problems by making who owns the float a matter of agreement
for the parties. He took the view that although there was no absolutely correct method in
every case his preferred form was the As Built Collapsed method of analysis (see 2(ii)
above). Anyone presenting a case using this method only needs to know what actually
happened: there is no need for the Contractor to plan properly. Mr Johnson answered this by
saying that to use such method required a great deal of skill after the event. He referred to
Dan Quackenbush's article "How to Analyze and attack Collapsed As Built Schedule
Analysis" Defence Research Institute Inc. Construction Law Seminar, March 7-8, 1996 in
Chicago, USA.
Peter Shaw, Partner of Taylor Joynson Garrett, gave the vote of thanks and endorsed and
joined the Working Group.
SAMUEL TOWNEND
Information about the working group can be found on the Society's website at
www.scl.org.uk

More Related Content

What's hot

Master thesis defence presentation
Master thesis defence presentationMaster thesis defence presentation
Master thesis defence presentationYv Gao (高煜)
 
2016 Top Ohio Construction Law Developments and What to Watch for in 2017
2016 Top Ohio Construction Law Developments and What to Watch for in 20172016 Top Ohio Construction Law Developments and What to Watch for in 2017
2016 Top Ohio Construction Law Developments and What to Watch for in 2017Kegler Brown Hill + Ritter
 
Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872Karthik Madhavan
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentationelliotfus
 
Construction for Accountants
Construction for AccountantsConstruction for Accountants
Construction for AccountantsRedchip
 
CONSTRUCTION AND ENGINEERING LAW: THE INTERPRETATION AND APPLICATION OF DEMAN...
CONSTRUCTION AND ENGINEERING LAW: THE INTERPRETATION AND APPLICATION OF DEMAN...CONSTRUCTION AND ENGINEERING LAW: THE INTERPRETATION AND APPLICATION OF DEMAN...
CONSTRUCTION AND ENGINEERING LAW: THE INTERPRETATION AND APPLICATION OF DEMAN...Werksmans Attorneys
 
Successful Strategies For Resolving Disputes (Jenny Cooper and Brendan Cash, ...
Successful Strategies For Resolving Disputes (Jenny Cooper and Brendan Cash, ...Successful Strategies For Resolving Disputes (Jenny Cooper and Brendan Cash, ...
Successful Strategies For Resolving Disputes (Jenny Cooper and Brendan Cash, ...nzde
 
Adjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsAdjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsFrancis Ho
 
Measures to Reduce Dispute in Projects
Measures to Reduce Dispute in Projects   Measures to Reduce Dispute in Projects
Measures to Reduce Dispute in Projects Nilendra Kumar
 
Bpe Presentation On Changes To The Construction Act 2010 V7 1 Final Read Only
Bpe Presentation On Changes To The Construction Act 2010 V7 1 Final Read OnlyBpe Presentation On Changes To The Construction Act 2010 V7 1 Final Read Only
Bpe Presentation On Changes To The Construction Act 2010 V7 1 Final Read OnlyJonClose
 
Dispute resolution technique
Dispute resolution techniqueDispute resolution technique
Dispute resolution techniqueSaad Ullah
 
Project Controls Expo, 18th Nov 2014 - "CONSTRUCTION ACCELERATION— A GLOBAL T...
Project Controls Expo, 18th Nov 2014 - "CONSTRUCTION ACCELERATION— A GLOBAL T...Project Controls Expo, 18th Nov 2014 - "CONSTRUCTION ACCELERATION— A GLOBAL T...
Project Controls Expo, 18th Nov 2014 - "CONSTRUCTION ACCELERATION— A GLOBAL T...Project Controls Expo
 

What's hot (16)

Construction disputes
Construction disputesConstruction disputes
Construction disputes
 
Master thesis defence presentation
Master thesis defence presentationMaster thesis defence presentation
Master thesis defence presentation
 
2016 Top Ohio Construction Law Developments and What to Watch for in 2017
2016 Top Ohio Construction Law Developments and What to Watch for in 20172016 Top Ohio Construction Law Developments and What to Watch for in 2017
2016 Top Ohio Construction Law Developments and What to Watch for in 2017
 
Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872Cases in Delays - Indian Contract Act, 1872
Cases in Delays - Indian Contract Act, 1872
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
Hanscomb Intercontinental - UK Force majeure
Hanscomb Intercontinental - UK Force majeureHanscomb Intercontinental - UK Force majeure
Hanscomb Intercontinental - UK Force majeure
 
Construction for Accountants
Construction for AccountantsConstruction for Accountants
Construction for Accountants
 
CONSTRUCTION AND ENGINEERING LAW: THE INTERPRETATION AND APPLICATION OF DEMAN...
CONSTRUCTION AND ENGINEERING LAW: THE INTERPRETATION AND APPLICATION OF DEMAN...CONSTRUCTION AND ENGINEERING LAW: THE INTERPRETATION AND APPLICATION OF DEMAN...
CONSTRUCTION AND ENGINEERING LAW: THE INTERPRETATION AND APPLICATION OF DEMAN...
 
Successful Strategies For Resolving Disputes (Jenny Cooper and Brendan Cash, ...
Successful Strategies For Resolving Disputes (Jenny Cooper and Brendan Cash, ...Successful Strategies For Resolving Disputes (Jenny Cooper and Brendan Cash, ...
Successful Strategies For Resolving Disputes (Jenny Cooper and Brendan Cash, ...
 
Jbcc - out with the old
Jbcc - out with the oldJbcc - out with the old
Jbcc - out with the old
 
Adjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsAdjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and Tactics
 
Measures to Reduce Dispute in Projects
Measures to Reduce Dispute in Projects   Measures to Reduce Dispute in Projects
Measures to Reduce Dispute in Projects
 
Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]
 
Bpe Presentation On Changes To The Construction Act 2010 V7 1 Final Read Only
Bpe Presentation On Changes To The Construction Act 2010 V7 1 Final Read OnlyBpe Presentation On Changes To The Construction Act 2010 V7 1 Final Read Only
Bpe Presentation On Changes To The Construction Act 2010 V7 1 Final Read Only
 
Dispute resolution technique
Dispute resolution techniqueDispute resolution technique
Dispute resolution technique
 
Project Controls Expo, 18th Nov 2014 - "CONSTRUCTION ACCELERATION— A GLOBAL T...
Project Controls Expo, 18th Nov 2014 - "CONSTRUCTION ACCELERATION— A GLOBAL T...Project Controls Expo, 18th Nov 2014 - "CONSTRUCTION ACCELERATION— A GLOBAL T...
Project Controls Expo, 18th Nov 2014 - "CONSTRUCTION ACCELERATION— A GLOBAL T...
 

Viewers also liked

The Enlightenment: Week 9 - Lecture 1
The Enlightenment: Week 9 - Lecture 1The Enlightenment: Week 9 - Lecture 1
The Enlightenment: Week 9 - Lecture 1Geoffrey Krawczyk
 
A Contemporary Approach, 1945-Now
A Contemporary Approach, 1945-NowA Contemporary Approach, 1945-Now
A Contemporary Approach, 1945-NowGeoffrey Krawczyk
 
The Rise of Modernism, Part II: A New Way of Seeing
The Rise of Modernism, Part II: A New Way of SeeingThe Rise of Modernism, Part II: A New Way of Seeing
The Rise of Modernism, Part II: A New Way of SeeingGeoffrey Krawczyk
 
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons..."Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...Abhishek Shah
 
Quantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesQuantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesMichael Pink
 
Modelo OSI , protocolos que intervienen y componentes
Modelo OSI , protocolos que intervienen y componentesModelo OSI , protocolos que intervienen y componentes
Modelo OSI , protocolos que intervienen y componentesSamir Abau
 
Managing Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsManaging Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsAGC of California
 
Arbitration Of Construction Disputes
Arbitration Of Construction DisputesArbitration Of Construction Disputes
Arbitration Of Construction Disputeslouchang
 

Viewers also liked (20)

Joseph Keeran
Joseph KeeranJoseph Keeran
Joseph Keeran
 
The Enlightenment: Week 9 - Lecture 1
The Enlightenment: Week 9 - Lecture 1The Enlightenment: Week 9 - Lecture 1
The Enlightenment: Week 9 - Lecture 1
 
Losas concreto presforzado
Losas concreto presforzadoLosas concreto presforzado
Losas concreto presforzado
 
Ancient Cultures
Ancient CulturesAncient Cultures
Ancient Cultures
 
Importancia de la comunicacion
Importancia de la comunicacionImportancia de la comunicacion
Importancia de la comunicacion
 
Midterm Review
Midterm ReviewMidterm Review
Midterm Review
 
Mid-Term Review
Mid-Term ReviewMid-Term Review
Mid-Term Review
 
Final review
Final reviewFinal review
Final review
 
A Contemporary Approach, 1945-Now
A Contemporary Approach, 1945-NowA Contemporary Approach, 1945-Now
A Contemporary Approach, 1945-Now
 
Culture As Nature: Pop Art
Culture As Nature: Pop ArtCulture As Nature: Pop Art
Culture As Nature: Pop Art
 
Final Exam Review
Final Exam ReviewFinal Exam Review
Final Exam Review
 
The Renaissance in Italy
The Renaissance in ItalyThe Renaissance in Italy
The Renaissance in Italy
 
The Rise of Modernism, Part II: A New Way of Seeing
The Rise of Modernism, Part II: A New Way of SeeingThe Rise of Modernism, Part II: A New Way of Seeing
The Rise of Modernism, Part II: A New Way of Seeing
 
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons..."Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
 
Earthworks and Landart
Earthworks and LandartEarthworks and Landart
Earthworks and Landart
 
Quantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficienciesQuantify Construction Damages related to Delay, disruption, and inefficiencies
Quantify Construction Damages related to Delay, disruption, and inefficiencies
 
The Beat Generation
The Beat GenerationThe Beat Generation
The Beat Generation
 
Modelo OSI , protocolos que intervienen y componentes
Modelo OSI , protocolos que intervienen y componentesModelo OSI , protocolos que intervienen y componentes
Modelo OSI , protocolos que intervienen y componentes
 
Managing Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsManaging Cash Flows On Construction Projects
Managing Cash Flows On Construction Projects
 
Arbitration Of Construction Disputes
Arbitration Of Construction DisputesArbitration Of Construction Disputes
Arbitration Of Construction Disputes
 

Similar to Resolving Complex Delay Claims

Assessing Loss And Expenses Claim By Prolongation Cost
Assessing Loss And Expenses Claim By Prolongation CostAssessing Loss And Expenses Claim By Prolongation Cost
Assessing Loss And Expenses Claim By Prolongation CostJessica Navarro
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 CompleteJohn Ashton
 
2 claims under new fidic
2 claims under new fidic2 claims under new fidic
2 claims under new fidicAhmetArslan47
 
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014 Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014 Pedro N
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation Lin Hui
 
Literature review on_ extension of time
Literature review on_ extension of timeLiterature review on_ extension of time
Literature review on_ extension of timeJoseph Sangpang
 
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitrators
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitratorsJ.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitrators
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitratorsJ.S. Daniel
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
Systech insights edition-Mark Woodward Smith
Systech insights edition-Mark Woodward Smith Systech insights edition-Mark Woodward Smith
Systech insights edition-Mark Woodward Smith mark woodward-smith
 
Public matters newsletter, June 2014
Public matters newsletter, June 2014Public matters newsletter, June 2014
Public matters newsletter, June 2014Browne Jacobson LLP
 
2015 09 10 Peter Boase LLM Dissertation.Pdf
2015 09 10 Peter Boase LLM Dissertation.Pdf2015 09 10 Peter Boase LLM Dissertation.Pdf
2015 09 10 Peter Boase LLM Dissertation.PdfLeonard Goudy
 
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATION
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATIONSAVING TIME AND COSTS IN COMMERCIAL ARBITRATION
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATIONOluwaseyi Bamigboye
 
Saving Time and Costs in Commercial Arbitration
Saving Time and Costs in Commercial ArbitrationSaving Time and Costs in Commercial Arbitration
Saving Time and Costs in Commercial ArbitrationOluwaseyi Bamigboye
 
CSCM Causes of project delay
CSCM Causes of project delayCSCM Causes of project delay
CSCM Causes of project delayEst
 

Similar to Resolving Complex Delay Claims (20)

Concurrent Delay in Construction
Concurrent Delay in ConstructionConcurrent Delay in Construction
Concurrent Delay in Construction
 
Essentials of EOT Claims
Essentials of EOT ClaimsEssentials of EOT Claims
Essentials of EOT Claims
 
Assessing Loss And Expenses Claim By Prolongation Cost
Assessing Loss And Expenses Claim By Prolongation CostAssessing Loss And Expenses Claim By Prolongation Cost
Assessing Loss And Expenses Claim By Prolongation Cost
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
 
2 claims under new fidic
2 claims under new fidic2 claims under new fidic
2 claims under new fidic
 
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014 Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation
 
Literature review on_ extension of time
Literature review on_ extension of timeLiterature review on_ extension of time
Literature review on_ extension of time
 
ICLR_2016_Part_3_Skaik_FINAL
ICLR_2016_Part_3_Skaik_FINALICLR_2016_Part_3_Skaik_FINAL
ICLR_2016_Part_3_Skaik_FINAL
 
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitrators
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitratorsJ.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitrators
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitrators
 
February 2019 newsletter
February 2019 newsletterFebruary 2019 newsletter
February 2019 newsletter
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
A PROPOSED ROADMAP TO OPTIMISE THE
A PROPOSED ROADMAP TO OPTIMISE THEA PROPOSED ROADMAP TO OPTIMISE THE
A PROPOSED ROADMAP TO OPTIMISE THE
 
Systech insights edition-Mark Woodward Smith
Systech insights edition-Mark Woodward Smith Systech insights edition-Mark Woodward Smith
Systech insights edition-Mark Woodward Smith
 
2016_13_brooking_prize_skaik
2016_13_brooking_prize_skaik2016_13_brooking_prize_skaik
2016_13_brooking_prize_skaik
 
Public matters newsletter, June 2014
Public matters newsletter, June 2014Public matters newsletter, June 2014
Public matters newsletter, June 2014
 
2015 09 10 Peter Boase LLM Dissertation.Pdf
2015 09 10 Peter Boase LLM Dissertation.Pdf2015 09 10 Peter Boase LLM Dissertation.Pdf
2015 09 10 Peter Boase LLM Dissertation.Pdf
 
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATION
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATIONSAVING TIME AND COSTS IN COMMERCIAL ARBITRATION
SAVING TIME AND COSTS IN COMMERCIAL ARBITRATION
 
Saving Time and Costs in Commercial Arbitration
Saving Time and Costs in Commercial ArbitrationSaving Time and Costs in Commercial Arbitration
Saving Time and Costs in Commercial Arbitration
 
CSCM Causes of project delay
CSCM Causes of project delayCSCM Causes of project delay
CSCM Causes of project delay
 

Recently uploaded

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Recently uploaded (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

Resolving Complex Delay Claims

  • 1. RESOLVING COMPLEX DELAY CLAIMS Jeremy Winter and Peter Johnson A Report on the Meeting of the Society of Construction Law on 6th June 2000 at the National Liberal Club, Whitehall Place, London Report by Samuel Townend It was standing room only in the Lloyd George Room at the National Liberal Club on the evening of 6th June 2000 as the members of the Society of Construction Law gathered to listen to the address given by Mr Jeremy Winter and Mr Peter Johnson. The Speakers and topic were presented by Mr Richard Bayfield, Chairman of the proceedings and recently appointed Vice Chairman of the Society. He referred back to previous talks on the area, 'Extensions of Time under JCT Contracts' given by Mr Martin Barnes on 3rd February 1987, and 'Concurrent Delays' given by Mr Ian Wishart on 4th June 1996, and to the continuing difficulties of analysis in the area. He introduced Mr Jeremy Winter as a Partner in Baker & McKenzie, Manager of the Construction and Engineering Group, experienced in litigation and arbitration. Also Mr Peter Johnson of Linacre Associates as a distinguished Chartered Civil Engineer also experienced in arbitration. The topic was introduced by Mr Winter in terms of an analysis of techniques that may be used in relation to delay and entitlements to time and to money. TIME Status Quo on site Mr Winter's view is that most standard forms of construction contract do not adequately deal with how to determine appropriate Extensions of Time ("EoTs"). Further, most contractors' programmes do not have the necessary links, are not resource-driven, and on the whole are not prepared to reflect what will actually happen on site, but are designed to win the job for the Contractor. Once the job begins the programmes are not properly updated with progress and typically an inadequate record is kept of potential dispute areas. This has led to consequent difficulties in proving the causes of delay and the consequent costs. Status Quo in Court There is still no definitive judicial ruling on the method by which to assess delay and a general lack of certainty about some basic principles. This is coupled with a general mistrust of critical path modelling. EoTs are not determined by Judges scientifically but on what the Judge feels is the right amount of time. The uncertainty was illustrated by two recent court decisions on delay issues. Recent Court Decisions In Henry Boot Construction (UK) Ltd v Malmaison Hotel (Manchester) Ltd, [1999] All ER 118, there was a prior agreement between the lawyers that where there were two causes of
  • 2. delay, one of which was the Employer's responsibility (e.g. poor weather conditions), the other of which was the Contractor's responsibility (e.g. Contractor had provided no labour), the Contractor was still entitled to an extension of time. The judge did not seem to have applied that agreement fully, because he still considered the Contractor's performance to be relevant in determining its entitlement to an extension. The parties and the Judge also seem to have assumed that there could be no EoT unless the delaying event was on the critical path. This was something that had not been, but should be tested by the courts. In Ascon Contracting Ltd v Alfred McAlpine Construction Isle of Man Ltd , (1999) 66 Con LR 119, a Sub-Contractor and Contractor blamed each other for the late completion of works. The Judge said that a Sub-Contractor cannot claim acceleration costs, EoT and prolongation costs for the full period of the EoT entitlement. Mr Winter considered that the Judge was, of course, right that a contractor could not claim prolongation costs for a period of delay that he had overcome by acceleration, but questioned whether he was right in relation to EoTs. He stressed that EoTs should be considered in terms of contemporaneous entitlement rather than retrospective need. The Contractor had argued that he could apply the float in the Contract as he wished; the Court did not agree and did not regard float as a 'tradeable commodity' (at paragraph 92). The Judge gave an example of a Contract in which there was 6 weeks float; 6 Sub-Contractors then caused one week delay sequentially and the float is eaten up (at paragraph 93). In these circumstances the Judge considered that the Contractor has suffered no loss. Mr Winter questioned this conclusion, because if there had been no delay, the Contractor would have been able to complete six weeks earlier, and would not have incurred six weeks extra site costs. He did however acknowledge that the authorities supported the Judge's decision (Glenlion Construction v The Guinness Trust (1988) 39 BLR 89). In the context of these cases Mr Winter urged all members to anticipate and draft around difficulties with respect to time before they arise, and tackle float and concurrency expressly in their contracts. This has been attempted in the standard forms of Australia. Mr Winter advised avoiding reliance on sometimes confused legal principles and instead to rely on a good analysis of the facts. Methods of Analysis Peter Johnson looked at various methods of analysing the progress of a Contractor and of delaying events and their causes: (1) The most basic method is the comparison of an As Planned Bar Chart with an As Built Bar Chart. The obvious difficulty with this method is that it does not show the causes of the delay and therefore who is responsible. (2) Critical Path methods: i) As Planned Projected. In which one inserts dates as the project goes on, such as late provision of information by the employer or additional works. The problem with this method is that it takes no account of Contractor progress or delay. (ii) As Built Collapsed Network. This is the opposite of (i). It takes the As Built programme and deducts the assessed effects of Employer delays - it is then assumed that any remaining delay is the responsibility of the Contractor. Unfortunately it takes no account of the realignment of Contractor's resources from what has become non- critical to what has become critical because of what has happened previously.
  • 3. (3) Window analysis. This takes small windows of the As Built programme. The problem with this method is that is a subjective and incomplete analysis. (4) Time Impact analysis. This shows the effects of each individual delay and the contractor's actual progress. The difference between the two networks, immediately before and immediately after each event is demonstrably solely caused by the delaying event. This analysis takes account of: · Original planned method and resources; · Progress and events so far; and · Direct cause and effect of single events as they unfold. This is a proven method. In the United States it has been a specified method of analysis since the 1960s. It involves Network Analysis. By this analysis the work is broken down into specific items; usually a single trade and preferably less than 14 days duration. The resources, costs and values are assigned to that activity. Each update tracks and records actual progress on all activities. These are then joined together by logic. For example, if Y task cannot begin until after X task, they are linked. The computer processes these links. At the end there are bars which represent the different tasks over time. Lines are shown after each bar where there is projected float. Bars are red where there is no float - where the item is on the critical path. As the job goes on the network is updated. It is able to show the change in float and in the critical path. Each cause of delay is considered separately, and added into the project networks whether the delay is caused by the Contractor or Employer. If the impact is over a month or over separate delaying events the computer can produce a series of subnets which show the precise build up over time. One can also combine the impact of both Contractor and Employer delays and observe what the delay is before and after the Employer's delay event. MONEY Mr Winter then considered entitlement to money - prolongation costs. It is important in every case to be able to demonstrate exactly what the causes are. These are best proven on a time basis and for that reason much the same tools are used as described above. By presenting the claim in detail in terms of time and loss, the claimant avoids the difficulties of concurrency (for which the courts seem to prefer the dominant cause test- see the section in Keating on Building Contracts 6th ed. at 309) and of global claims and the principles set down in Crosby (J.) v Portland Urban District Council (1967) 5 BLR 121 and the succeeding line of cases. The appropriate method to use is a sequential analysis of delay. Such analysis is beneficial to a Contractor because in many cases where there are multiple causes of delay, that delay leading to prolongation, the Contractor may need only to prove entitlement in relation to some claims in order to be able to recover all its prolongation costs. Mr Johnson then described how best to present a case for prolongation costs. His view is that a Claimant should look at how the different costs were incurred (head costs, geographical costs etc.) and at the site structure as it was actually used. An 'envelope' of time-related
  • 4. overhead costs should be examined and the effect of delays on that 'envelope'. Any analysis on this basis requires critical path software. In Mr Johnson's experience on such a close analysis there are seldom in fact concurrent causes of delay. Causes which appear to be concurrent usually arise sequentially but appear to impact at the same time. This method allows the tracking of actual prolongation and cost. Overall Conclusions Mr Winter hoped that by adopting such methods it should enable parties at the earliest possible time to reach an understanding as to the causes of delay, minimise the scope for disagreement and maximise the scope for settlement. It does necessitate a detailed and proper programme as its basis. Following the presentation of the topic Mr Bayfield announced the setting up of a Working Group of members of the Society to draft a Code or Recommendation of delay methodology to be publicised in the Society's newsletter. Mr Winter and Mr Johnson agreed to join the Working Group and invited others to join. Mr Bayfield also opened the floor for discussion and questions. A lively debate ensued. This included Mr Martin Barnes commenting on how the NEC contract attempts to shrink the problems by making who owns the float a matter of agreement for the parties. He took the view that although there was no absolutely correct method in every case his preferred form was the As Built Collapsed method of analysis (see 2(ii) above). Anyone presenting a case using this method only needs to know what actually happened: there is no need for the Contractor to plan properly. Mr Johnson answered this by saying that to use such method required a great deal of skill after the event. He referred to Dan Quackenbush's article "How to Analyze and attack Collapsed As Built Schedule Analysis" Defence Research Institute Inc. Construction Law Seminar, March 7-8, 1996 in Chicago, USA. Peter Shaw, Partner of Taylor Joynson Garrett, gave the vote of thanks and endorsed and joined the Working Group. SAMUEL TOWNEND Information about the working group can be found on the Society's website at www.scl.org.uk