McDonalds Refurb
EXAMPLE
Our Projects
“The Way We Do It!”
1RANDALLDESIGNS
CONTENTS
STAIR SURVEY 1
PROJECT SKETCH SHEET 1
DESIGN SPEC 1
BALUSTRADE SPECIFICATION 1
PRICING SHEET 1
QUOTATION 1
PC SETUP GUIDE 1
GENERAL ARRANGMENT SHEET 1 1
GENERAL ARRANGMENT SHEET 2 1
FABRICATION DRAWING POST 1
FABRICATION DRAWING HANDRAIL 1
FABRICATION DRAWING CHANNEL PLAN 1
FABRICATION DRAWING CHANNEL CUT 1
MANUFACTURING DRAWING - GLASS 1
MARKING PLAN 1
FAB REGISTER 1
GLASS REGISTER 1
GLASS REGISTER 1
COMPONENT AND BOLT LIST 1
PROJECT CHECK LIST 1
TIME SHEET 1
2RANDALLDESIGNS
REQUIRED INFORMATION / DIMENSIONS:
(F). Pitch (o/all nose to nose of all treads) = ____
(C). Pitch (Over One tread) = ____
(A). Rise = ____ & Qty. of rise = ____
(B). Going = ____ & Qty. of going = ____
(E). Angle = ____
(H). Cut back / overhang of step = ____
(G). Depth of stair if precast from nose to back edge = ____
(D). Waist (Depth of stair from inner riser) = ____
(I). FFL to FFL / Landing to Landing = ____
(M). Well size / depth = ____
(P). Tread width = ____
(O). Tread width = ____
Landing sizes:
(J). = ____ (K). = ____
(L). = ____ (N). =____
(R). Start of stair to nearest wall = ____
(Q). Start of stair to nearest wall = ____
Tread build up & Finish – See Diagram
(Generally 15mm Allowed = carpet, tiles, stone)
(Generally 20mm Allowed = wood)
Main contractor/builder to confirm in writing
Headroom clearance check (min. 2000mm) = ____
Photos ☐
Videos ☐
STAIR SURVEY
RD #:
PROJECT TITLE:
3RANDALLDESIGNS
ALL SKETCHES ARE PROPERTY OF RANDALL DESIGNS.
THEY MUST NOT BE COPIED, REDESIGNED OR
DISTRIBUTED WITHOUT WRITTEN PERMISSION. PLEASE DO NOT SCALE: NTS
PROJECT SKETCH SHEET
RD #:
SKETCH TITLE:
PROJECT TITLE:
4RANDALLDESIGNS
Site
Access =
Material, restricted lengths =
Materials, weight restrictions =
Use
Domestic =
Commercial =
Public =
Children =
Marine =
Exterior =
Interior =
Floor Build Up
Finish =
Thickness =
By Others =
Life Span
PPC - (10 years)
Galvanised - (25 Years)
EPDM - (50 Years)
PPC + Zinc Coating - (10-15 Years)
Architect DRG’S ☐
Structural Engineers DRG’S ☐
Client DRG’S ☐
Other ☐
DESIGN SPEC
RD #:
PROJECT TITLE:
5RANDALLDESIGNS
☒ DETAILS NOTES / DESCRIPTION TBC
?
☐ POST SHAPE Click here to enter text. Round / square / profile
☐ POST SIZE / Ø Click here to enter text.
☐ POST MATERIAL Click here to enter text.
☐ POST FINISH Click here to enter text.
☐ POST COLOUR Click here to enter text.
☐ HANDRAIL SHAPE Click here to enter text.
☐ HANDRAIL SIZE / Ø Click here to enter text.
☐ HANDRAIL MATERIAL Click here to enter text.
☐ HANDRAIL FINISH Click here to enter text.
☐ HANDRAIL JOINTS Click here to enter text.
☐ HANDRAIL COLOUR Click here to enter text.
☐ POST FIX @ BASE / TYPE Click here to enter text. Please enter exact order reference code
☐ COVER PLATES Click here to enter text. Please enter exact order reference code
☐ GLASS RETAINER TYPE Click here to enter text. Please enter exact order reference code
☐ TOP MOUNT TYPE Click here to enter text.(Bought in or weld on site) Please enter exact order ref
☐ GLASS TYPE Click here to enter text.
☐ GLASS FINISH Click here to enter text.
☐ GLASS COLOUR Click here to enter text.
☐ GLASS THICKNESS Click here to enter text.
☐ TEMPLATE ANY GLASS Click here to enter text.
☐ PRIVACY SCREENS Click here to enter text.
☐ PRIVACY HEIGHT Click here to enter text.
☐ BALUSTRADE HEIGHT Click here to enter text.
☐ LOADING REQUIRED Click here to enter text.
☐ WALL MOUNT H’RAIL Click here to enter text.
☐ WALL H’RAIL MATERIAL Click here to enter text.
☐ WALL H’RAIL FIX TYPE Click here to enter text.
☐ GATE / DESIGN Click here to enter text.
☐ LOCKS Click here to enter text. Please enter exact order reference code
☐ HINGES Click here to enter text. Please enter exact order reference code
☐ SITE ACCESS Click here to enter text.
☐ PART SIZE RESTRICTED,
LOGISTICS/ACCESS
Click here to enter text.
☐ USE OF AREA PUBLIC ETC. Click here to enter text.
☐ S.ENG/CALCUALTIONS Click here to enter text.
☐ SPECIAL REQUIREMENTS Click here to enter text.
☐ ADDITIONAL STEELS: Click here to enter text.
☐ OTHER: Click here to enter text.
BALUSTRADE SPECIFICATION
RD #:
PROJECT TITLE:
6RANDALLDESIGNS
Meeting = * Structural Engineer = £______
London = **
☐ JOB / DESCRIPTION OF WORKS Duration MINUTES
REQ’D
TALLY UP
MINUTES
☐ TENDER STAGE: CAD MODEL & TENDER GA 180mins
☐ SURVEY RUN THROUGH 30 mins
☐ SPECIFICATION SHEET SEND OVER & SKETCHES 60 mins
☐ FOLDER SETUP & JOB PC FILES 30 mins
☐ 3D CAD MODEL: ENVIROMENT 3HRS
☐ 3D CAD MODEL: ASSEMBLY TBA
☐ GA DRAWING (REV.1 INITIAL ISSUE) TBA
☐ CHECK OVER BY RD CLIENT AND REV. INTERNALLY 60 mins
☐ GA DRAWING REVISON A (comments by client) 90 mins
☐ GA DRAWING REVISION B (Revise to site check) TBA
☐ GA’S AS BUILT ISSUE REQUIRED? 30mins each
☐ SLP – SITE LOCATION PLAN DRAWING 60mins Ea.
☐ GLASS PANEL DRAWING (QTY =____ X 15min ea.) 30 mins ea.
☐ GLASS PANEL CALL OFF / SCHEDULE 60 mins
☐ FABRICATION DRAWINGS (QTY =____X 15min ea.) 30 mins. ea.
☐ FABRICATION DRG. REVISION 10 mins.
☐ FAB - LASER DRAWINGS 30 mins ea.
☐ FABRICATION EMAIL 10 mins
☐ DET – DETAIL DRAWING + REVISION 120 mins
☐ MATERIALS CUT LIST / CALL OFF 60 mins
☐ MARKING PLAN / SETTING OUT (complex design?) 120 mins
☐ BOLT LIST / COMPONENTS CALL OFF 60 mins
☐ STRUCTURAL ENGINEER CALCULATIONS n/a – TBA
☐ STRUCTURAL ENGINEER OVER SEE 60mins
☐ VISUAL IMAGES/REDERS 15 min ea.
☐ SITE SURVEY (Includes travel expenses) ** TBA
☐ SITE MEETING (Includes travel expenses) * TBA
☐ ADMIN CHARGE 60 mins
☐ ADDITIONAL CHARGES 120 mins
PRICING SHEET
RD #:
PROJECT TITLE:
7RANDALLDESIGNS
Date :20.05.16
Job description of drawing works Included Note
Tender stage: cad model & tender (DET or minor works drawing) N/A -
SOLIDWORKS 3D CAD Model / 3D Model Assembly YES 1 No. Assembly
GA Drawing (GA) (REV.1 = Initial issue Includes ‘internal check’ min
or revision)
YES 1 No. GA
GA Drawing revision x2 minor (REV. A = 1st
. / REV.B = 2nd
) YES A/B on each GA
Detail Drawing (DET) (Small detail to provide separate detail of a ce
rtain item)
N/A -
Glass panel call off sizes and/or glass drawings (GL) (Templates by o
thers)
YES GL Drawings + DXF’s
Fabrication drawings (FAB) YES FAB Drg’s each part
Marking Plan / Setting out (MP) YES Note GL/FAB position
Bolt List for fixings & Component call off YES -
Structural engineer calculations (By others as standard) NO -
Visual 3D images (Included on GA as standard where appropriate) N/A -
SITE SURVEY (Includes travel expenses) YES 1 Day basic allowed
Site meeting or client office/base (Includes travel expenses) YES With survey
Admin YES -
Quotation #: QRD100 – 150
Title and/or name of project: McDonald (Woking) –Outside London/M25
Quote drawings ref: Emails 20.05.16 based on previous drawing works at Camberwell – by Detailed Drawing.
Description of required design/layout:
Visit site to meet yourself and carry out detailed survey of existing McDonalds restaurant stair area, consisting of two flights
with connecting landing areas. New Balustrade glazing top fixed channels continuous to both sides of stair with a top glass mounted continuo
us handrail, all regulations to be based on a public use of stair. Exact finishes to be discussed on site during initial meeting before commencing
survey. Scale 3D model will be created along with GA, Marking plan, FAB’s & Glass drawings.
Summary of works:
 All to include FAB piece parts, GL’s for individual glass panels and component list.
 All modelled on Solidworks (Latest) 3D CAD Software – unless otherwise discussed prior to quote.
 GA drawing, will be based on a front, plan, side, 3D isometric & any relevant detail views (Where applicable)
 All drawings supplied on Randall Designs drawing templates, unless agreed otherwise.
 All drawings will be sent to yourselves for an initial ‘internal’ check before being sent to your client.
 All revisions are based on minor changes, major changes i.e.’ full design change’ will be charged on an agreed cost.
 All Drawings to be checked by yourselves and/or your appointed structural engineer if we are not supplying calculations.
Required GA issue date: W/C 6th
June 2016
(See cover email for FAB/GL’s)
Customer name and address: TT Steel Contracts – Joe Smith
Overall Timescale: Start W/C 30th
May 2016
Quotation price: £?
Email: joe.smith@ttsteel.co.uk
Please note we are not VAT registered
Terms & Conditions: All quotation prices are fixed and will not differ, unless we otherwise agree an extra
over original quote via written communications. Any further works over original quotation will be
charged accordingly and based on the current hourly rate. All quotes are based on client supplied
information/description/sketches/current revision at time of quote. Quotation valid for 30 days from
date of above. For full T & C’s, please visit our website www.randall-designs .co.uk, thank you.
QUOTATION
We trust you find the quote satisfactory and look forward to your business, any queries please don’t hesitate to contact.
If you would like to proceed with the quotation, please send an email to the above address to confirm that
you would like to proceed stating the quotation reference number. Once received we will be in contact shortly to arrange an initial design meeting.
Many thanks,
Adam Randall
Office meeting Location and/or site survey address:
 Site address: Outside of London – Close to M25 (Site 1)
 Office address: Initial design meeting on site at time of survey.
8RANDALLDESIGNS
Upon starting to model the new project the following needs to be setup on the
workstations.
 Setup up the project folder using the template already completed
1. To do this simply right click on template & click copy
2. Then paste in clear space
3. Once this is complete the folder name should be as below
 Setup a new page in One Note using the template already completed (Project Template)
1. Right click on the template page & click copy
2. Find new destination i.e. STS Contracts section
3. Right click and paste new page
4. Once this is complete please rename with project RD REF.
PC SETUP GUIDE
9RANDALLDESIGNS
GENERAL ARRANGMENT SHEET 1
10RANDALLDESIGNS
GENERAL ARRANGMENT SHEET 2
11RANDALLDESIGNS
FABRICATION DRAWING POST
12RANDALLDESIGNS
FABRICATION DRAWING HANDRAIL
13RANDALLDESIGNS
FABRICATION DRAWING CHANNEL PLAN
14RANDALLDESIGNS
FABRICATION DRAWING CHANNEL CUT
15RANDALLDESIGNS
MANUFACTURING DRAWING - GLASS
16RANDALLDESIGNS
MARKING PLAN
17RANDALLDESIGNS
Drg. No CHK APR AMD PDF DWG
ISSUE
(date)
REV
ISSUE
(Date)
MP
FAB01
FAB02
FAB03
FAB04
FAB05
FAB06
FAB07
FAB08
FAB09
FAB10
FAB11
FAB12
FAB13
FAB14
FAB15
FAB16
FAB17
FAB18
FAB19
FAB20
Project title:
Title
#RD
SHEET BY (INITIALS) =AOR/AJM DATE SHEET STARTED = ../../2016
FAB DRAWING REGISTER
FAB REGISTER
GLASS REGISTER
18RANDALLDESIGNS
Drg. No GA REF #
TOUGHENED
ONLY
TOUGHENED +
LAMINATED
THICKNESS FINISH HEIGHT WIDTH QTY CHK APR AME PDF DWG ISU REV ISU MP
GL01
GL02
GL03
GL04
GL05
GL06
GL07
GL08
GL09
GL10
GL11
GL12
GL13
GL14
GL15
GL16
GL17
GL18
GL19
GL20
GL21
GL22
GL23
#RD
Project title:
SHEET BY (INITIALS) =AOR/AJM DATE SHEET STARTED = ../../2016
GLASS DRAWING REGISTERGLASS REGISTER
19RANDALLDESIGNS
#
DESCRIPTION / PURPOSE SIZE LENGTH MATERIAL FINISH
QTY
PER
UNIT
X
QTY OF
STAIRS
UNITS
+ 10
%
TOTAL
QTY:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
27
28
29
30
COMPONENT AND BOLT LIST
RD #:
PROJECT TITLE:
ALL QUANTITIES ABOVE HAVE 10 % EXTRA FIXINGS INCLUDED, UNLESS N/A IS IN THE + 10% COLUMN
20RANDALLDESIGNS
SYNC = Simplicity cloud software
JOB / DESCRIPTION OF WORKS DATE
COMPLETE
FORM
CODE
QUOTATION / COST TO BE AGREED BY CLIENT (P.O)
TIMESHEET – START
PC MASTER FOLDER, SYNCPLICTY FOLDER LINK AND RING BINDER PROJECT FILE
SETUP
TENDER STAGE: CAD MODEL & TENDER GA
SITE SURVEY (TRAVEL EXPENSES / MILEAGE SHEET)
SITE MEETING (INCLUDES TRAVEL EXPENSES)
SURVEY RUN THROUGH
SPECIFICATION SHEET SEND OVER & SKETCHES
STRUCTURAL ENGINEER CALCULATIONS - EMAIL & SYNC
VISUAL IMAGES - EMAIL & SYNC
DET – DETAIL DRAWING
3D CAD MODEL: ENVIROMENT
3D CAD MODEL: ASSEMBLY
PART & COMPONENT LIST
DRAWING REGISTER SETUP
GA - DRAWING REV.1 CHECK BY RD’S CLIENT (INTERNALLY)
GA - DRAWING REVISION 1 (INTERNALLY)
GA - REV.1 EMAIL & SYNC FOLDER + DRG. REGISTER UPDATE
GA - DRAWING REVISON A (COMMENTS BY CLIENT)
GA - REV.A EMAIL & SYNC FOLDER + DRG. REGISTER UPDATE
GA - DRAWING REVISION B (REVISE TO SITE CHECK)
GA - REV.B EMAIL & SYNC FOLDER + DRG. REGISTER UPDATE
GL - GLASS PANEL DRAWINGS + GLASS REGISTER
GL - GLASS PANEL CALL OFF SCHEDULE
GL - GLASS PANELS EMAIL & SYNC / BOX FOLDER
FAB - FABRICATION DRAWINGS + FAB REGISTER
FAB - LASER DRAWINGS (DXF + PDF + EMAIL & SYNC)
FAB - FABRICATION EMAIL
FAB - DRAWINGS EMAIL & SYNC
F&C - FIXINGS & COMPONENTS CALL OFF SHEET
MTL - MATERIALS CUT LIST / CALL OFF - EMAIL & SYNC
MP - MARKING PLAN / SETTING OUT - EMAIL & SYNC
EXTRA’S SHEET - EMAIL & SYNC
INVOICE RAISE (HIGHLIGHT EXTRA’S / COSTS OVER ORIGINAL QUOTE - EMAIL &
SYNC
PROJECT CHECK LIST
RD #:
PROJECT TITLE:
21RANDALLDESIGNS
INTIALS DESCRIPTION OF WORK/DRG # DATE:
START
TIME:
FINISH
TIME:
HOURS:
TOTAL
TALLY:
EXTRA
AM Environment 3/5/16 08.00 11.00 3 3 0
TOTAL HOURS WORKED:
QUOTE REF #:
INV REF #:
TIME SHEET
RD #:
PROJECT TITLE:
Extra’s = See extra’s Sheet.
If Extra’s are required, ensure everything is broken down in email

More Related Content

Similar to Randall Designs - Project Example (20)

Design Engineer .
Design Engineer .Design Engineer .
Design Engineer .
 
KHAJA Azmeel Resume
KHAJA Azmeel ResumeKHAJA Azmeel Resume
KHAJA Azmeel Resume
 
Derek Pattison CV1
Derek Pattison CV1Derek Pattison CV1
Derek Pattison CV1
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
Advenser CAD services
Advenser CAD servicesAdvenser CAD services
Advenser CAD services
 
Cad drafter
Cad drafterCad drafter
Cad drafter
 
Ici & itd pj1
Ici & itd pj1Ici & itd pj1
Ici & itd pj1
 
CV_Vijaya Kumar
CV_Vijaya KumarCV_Vijaya Kumar
CV_Vijaya Kumar
 
AHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_original
 
C.v_Ahmed Sobhy
C.v_Ahmed SobhyC.v_Ahmed Sobhy
C.v_Ahmed Sobhy
 
irshad siddiqui, auto cad, diplpma, 10 years
 irshad siddiqui, auto cad, diplpma, 10 years irshad siddiqui, auto cad, diplpma, 10 years
irshad siddiqui, auto cad, diplpma, 10 years
 
Introduction of nr bim consultant
Introduction of nr bim consultantIntroduction of nr bim consultant
Introduction of nr bim consultant
 
Introduction OF NR BIM CONSULTANT
Introduction OF NR BIM CONSULTANTIntroduction OF NR BIM CONSULTANT
Introduction OF NR BIM CONSULTANT
 
Introduction OF NR BIM CONSULTANT
Introduction OF NR BIM CONSULTANTIntroduction OF NR BIM CONSULTANT
Introduction OF NR BIM CONSULTANT
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
Resume - Sdong
Resume - SdongResume - Sdong
Resume - Sdong
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
Madhu_LPD.doc
Madhu_LPD.docMadhu_LPD.doc
Madhu_LPD.doc
 
DFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapDFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST Cap
 

Randall Designs - Project Example

  • 2. 1RANDALLDESIGNS CONTENTS STAIR SURVEY 1 PROJECT SKETCH SHEET 1 DESIGN SPEC 1 BALUSTRADE SPECIFICATION 1 PRICING SHEET 1 QUOTATION 1 PC SETUP GUIDE 1 GENERAL ARRANGMENT SHEET 1 1 GENERAL ARRANGMENT SHEET 2 1 FABRICATION DRAWING POST 1 FABRICATION DRAWING HANDRAIL 1 FABRICATION DRAWING CHANNEL PLAN 1 FABRICATION DRAWING CHANNEL CUT 1 MANUFACTURING DRAWING - GLASS 1 MARKING PLAN 1 FAB REGISTER 1 GLASS REGISTER 1 GLASS REGISTER 1 COMPONENT AND BOLT LIST 1 PROJECT CHECK LIST 1 TIME SHEET 1
  • 3. 2RANDALLDESIGNS REQUIRED INFORMATION / DIMENSIONS: (F). Pitch (o/all nose to nose of all treads) = ____ (C). Pitch (Over One tread) = ____ (A). Rise = ____ & Qty. of rise = ____ (B). Going = ____ & Qty. of going = ____ (E). Angle = ____ (H). Cut back / overhang of step = ____ (G). Depth of stair if precast from nose to back edge = ____ (D). Waist (Depth of stair from inner riser) = ____ (I). FFL to FFL / Landing to Landing = ____ (M). Well size / depth = ____ (P). Tread width = ____ (O). Tread width = ____ Landing sizes: (J). = ____ (K). = ____ (L). = ____ (N). =____ (R). Start of stair to nearest wall = ____ (Q). Start of stair to nearest wall = ____ Tread build up & Finish – See Diagram (Generally 15mm Allowed = carpet, tiles, stone) (Generally 20mm Allowed = wood) Main contractor/builder to confirm in writing Headroom clearance check (min. 2000mm) = ____ Photos ☐ Videos ☐ STAIR SURVEY RD #: PROJECT TITLE:
  • 4. 3RANDALLDESIGNS ALL SKETCHES ARE PROPERTY OF RANDALL DESIGNS. THEY MUST NOT BE COPIED, REDESIGNED OR DISTRIBUTED WITHOUT WRITTEN PERMISSION. PLEASE DO NOT SCALE: NTS PROJECT SKETCH SHEET RD #: SKETCH TITLE: PROJECT TITLE:
  • 5. 4RANDALLDESIGNS Site Access = Material, restricted lengths = Materials, weight restrictions = Use Domestic = Commercial = Public = Children = Marine = Exterior = Interior = Floor Build Up Finish = Thickness = By Others = Life Span PPC - (10 years) Galvanised - (25 Years) EPDM - (50 Years) PPC + Zinc Coating - (10-15 Years) Architect DRG’S ☐ Structural Engineers DRG’S ☐ Client DRG’S ☐ Other ☐ DESIGN SPEC RD #: PROJECT TITLE:
  • 6. 5RANDALLDESIGNS ☒ DETAILS NOTES / DESCRIPTION TBC ? ☐ POST SHAPE Click here to enter text. Round / square / profile ☐ POST SIZE / Ø Click here to enter text. ☐ POST MATERIAL Click here to enter text. ☐ POST FINISH Click here to enter text. ☐ POST COLOUR Click here to enter text. ☐ HANDRAIL SHAPE Click here to enter text. ☐ HANDRAIL SIZE / Ø Click here to enter text. ☐ HANDRAIL MATERIAL Click here to enter text. ☐ HANDRAIL FINISH Click here to enter text. ☐ HANDRAIL JOINTS Click here to enter text. ☐ HANDRAIL COLOUR Click here to enter text. ☐ POST FIX @ BASE / TYPE Click here to enter text. Please enter exact order reference code ☐ COVER PLATES Click here to enter text. Please enter exact order reference code ☐ GLASS RETAINER TYPE Click here to enter text. Please enter exact order reference code ☐ TOP MOUNT TYPE Click here to enter text.(Bought in or weld on site) Please enter exact order ref ☐ GLASS TYPE Click here to enter text. ☐ GLASS FINISH Click here to enter text. ☐ GLASS COLOUR Click here to enter text. ☐ GLASS THICKNESS Click here to enter text. ☐ TEMPLATE ANY GLASS Click here to enter text. ☐ PRIVACY SCREENS Click here to enter text. ☐ PRIVACY HEIGHT Click here to enter text. ☐ BALUSTRADE HEIGHT Click here to enter text. ☐ LOADING REQUIRED Click here to enter text. ☐ WALL MOUNT H’RAIL Click here to enter text. ☐ WALL H’RAIL MATERIAL Click here to enter text. ☐ WALL H’RAIL FIX TYPE Click here to enter text. ☐ GATE / DESIGN Click here to enter text. ☐ LOCKS Click here to enter text. Please enter exact order reference code ☐ HINGES Click here to enter text. Please enter exact order reference code ☐ SITE ACCESS Click here to enter text. ☐ PART SIZE RESTRICTED, LOGISTICS/ACCESS Click here to enter text. ☐ USE OF AREA PUBLIC ETC. Click here to enter text. ☐ S.ENG/CALCUALTIONS Click here to enter text. ☐ SPECIAL REQUIREMENTS Click here to enter text. ☐ ADDITIONAL STEELS: Click here to enter text. ☐ OTHER: Click here to enter text. BALUSTRADE SPECIFICATION RD #: PROJECT TITLE:
  • 7. 6RANDALLDESIGNS Meeting = * Structural Engineer = £______ London = ** ☐ JOB / DESCRIPTION OF WORKS Duration MINUTES REQ’D TALLY UP MINUTES ☐ TENDER STAGE: CAD MODEL & TENDER GA 180mins ☐ SURVEY RUN THROUGH 30 mins ☐ SPECIFICATION SHEET SEND OVER & SKETCHES 60 mins ☐ FOLDER SETUP & JOB PC FILES 30 mins ☐ 3D CAD MODEL: ENVIROMENT 3HRS ☐ 3D CAD MODEL: ASSEMBLY TBA ☐ GA DRAWING (REV.1 INITIAL ISSUE) TBA ☐ CHECK OVER BY RD CLIENT AND REV. INTERNALLY 60 mins ☐ GA DRAWING REVISON A (comments by client) 90 mins ☐ GA DRAWING REVISION B (Revise to site check) TBA ☐ GA’S AS BUILT ISSUE REQUIRED? 30mins each ☐ SLP – SITE LOCATION PLAN DRAWING 60mins Ea. ☐ GLASS PANEL DRAWING (QTY =____ X 15min ea.) 30 mins ea. ☐ GLASS PANEL CALL OFF / SCHEDULE 60 mins ☐ FABRICATION DRAWINGS (QTY =____X 15min ea.) 30 mins. ea. ☐ FABRICATION DRG. REVISION 10 mins. ☐ FAB - LASER DRAWINGS 30 mins ea. ☐ FABRICATION EMAIL 10 mins ☐ DET – DETAIL DRAWING + REVISION 120 mins ☐ MATERIALS CUT LIST / CALL OFF 60 mins ☐ MARKING PLAN / SETTING OUT (complex design?) 120 mins ☐ BOLT LIST / COMPONENTS CALL OFF 60 mins ☐ STRUCTURAL ENGINEER CALCULATIONS n/a – TBA ☐ STRUCTURAL ENGINEER OVER SEE 60mins ☐ VISUAL IMAGES/REDERS 15 min ea. ☐ SITE SURVEY (Includes travel expenses) ** TBA ☐ SITE MEETING (Includes travel expenses) * TBA ☐ ADMIN CHARGE 60 mins ☐ ADDITIONAL CHARGES 120 mins PRICING SHEET RD #: PROJECT TITLE:
  • 8. 7RANDALLDESIGNS Date :20.05.16 Job description of drawing works Included Note Tender stage: cad model & tender (DET or minor works drawing) N/A - SOLIDWORKS 3D CAD Model / 3D Model Assembly YES 1 No. Assembly GA Drawing (GA) (REV.1 = Initial issue Includes ‘internal check’ min or revision) YES 1 No. GA GA Drawing revision x2 minor (REV. A = 1st . / REV.B = 2nd ) YES A/B on each GA Detail Drawing (DET) (Small detail to provide separate detail of a ce rtain item) N/A - Glass panel call off sizes and/or glass drawings (GL) (Templates by o thers) YES GL Drawings + DXF’s Fabrication drawings (FAB) YES FAB Drg’s each part Marking Plan / Setting out (MP) YES Note GL/FAB position Bolt List for fixings & Component call off YES - Structural engineer calculations (By others as standard) NO - Visual 3D images (Included on GA as standard where appropriate) N/A - SITE SURVEY (Includes travel expenses) YES 1 Day basic allowed Site meeting or client office/base (Includes travel expenses) YES With survey Admin YES - Quotation #: QRD100 – 150 Title and/or name of project: McDonald (Woking) –Outside London/M25 Quote drawings ref: Emails 20.05.16 based on previous drawing works at Camberwell – by Detailed Drawing. Description of required design/layout: Visit site to meet yourself and carry out detailed survey of existing McDonalds restaurant stair area, consisting of two flights with connecting landing areas. New Balustrade glazing top fixed channels continuous to both sides of stair with a top glass mounted continuo us handrail, all regulations to be based on a public use of stair. Exact finishes to be discussed on site during initial meeting before commencing survey. Scale 3D model will be created along with GA, Marking plan, FAB’s & Glass drawings. Summary of works:  All to include FAB piece parts, GL’s for individual glass panels and component list.  All modelled on Solidworks (Latest) 3D CAD Software – unless otherwise discussed prior to quote.  GA drawing, will be based on a front, plan, side, 3D isometric & any relevant detail views (Where applicable)  All drawings supplied on Randall Designs drawing templates, unless agreed otherwise.  All drawings will be sent to yourselves for an initial ‘internal’ check before being sent to your client.  All revisions are based on minor changes, major changes i.e.’ full design change’ will be charged on an agreed cost.  All Drawings to be checked by yourselves and/or your appointed structural engineer if we are not supplying calculations. Required GA issue date: W/C 6th June 2016 (See cover email for FAB/GL’s) Customer name and address: TT Steel Contracts – Joe Smith Overall Timescale: Start W/C 30th May 2016 Quotation price: £? Email: joe.smith@ttsteel.co.uk Please note we are not VAT registered Terms & Conditions: All quotation prices are fixed and will not differ, unless we otherwise agree an extra over original quote via written communications. Any further works over original quotation will be charged accordingly and based on the current hourly rate. All quotes are based on client supplied information/description/sketches/current revision at time of quote. Quotation valid for 30 days from date of above. For full T & C’s, please visit our website www.randall-designs .co.uk, thank you. QUOTATION We trust you find the quote satisfactory and look forward to your business, any queries please don’t hesitate to contact. If you would like to proceed with the quotation, please send an email to the above address to confirm that you would like to proceed stating the quotation reference number. Once received we will be in contact shortly to arrange an initial design meeting. Many thanks, Adam Randall Office meeting Location and/or site survey address:  Site address: Outside of London – Close to M25 (Site 1)  Office address: Initial design meeting on site at time of survey.
  • 9. 8RANDALLDESIGNS Upon starting to model the new project the following needs to be setup on the workstations.  Setup up the project folder using the template already completed 1. To do this simply right click on template & click copy 2. Then paste in clear space 3. Once this is complete the folder name should be as below  Setup a new page in One Note using the template already completed (Project Template) 1. Right click on the template page & click copy 2. Find new destination i.e. STS Contracts section 3. Right click and paste new page 4. Once this is complete please rename with project RD REF. PC SETUP GUIDE
  • 18. 17RANDALLDESIGNS Drg. No CHK APR AMD PDF DWG ISSUE (date) REV ISSUE (Date) MP FAB01 FAB02 FAB03 FAB04 FAB05 FAB06 FAB07 FAB08 FAB09 FAB10 FAB11 FAB12 FAB13 FAB14 FAB15 FAB16 FAB17 FAB18 FAB19 FAB20 Project title: Title #RD SHEET BY (INITIALS) =AOR/AJM DATE SHEET STARTED = ../../2016 FAB DRAWING REGISTER FAB REGISTER GLASS REGISTER
  • 19. 18RANDALLDESIGNS Drg. No GA REF # TOUGHENED ONLY TOUGHENED + LAMINATED THICKNESS FINISH HEIGHT WIDTH QTY CHK APR AME PDF DWG ISU REV ISU MP GL01 GL02 GL03 GL04 GL05 GL06 GL07 GL08 GL09 GL10 GL11 GL12 GL13 GL14 GL15 GL16 GL17 GL18 GL19 GL20 GL21 GL22 GL23 #RD Project title: SHEET BY (INITIALS) =AOR/AJM DATE SHEET STARTED = ../../2016 GLASS DRAWING REGISTERGLASS REGISTER
  • 20. 19RANDALLDESIGNS # DESCRIPTION / PURPOSE SIZE LENGTH MATERIAL FINISH QTY PER UNIT X QTY OF STAIRS UNITS + 10 % TOTAL QTY: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 27 28 29 30 COMPONENT AND BOLT LIST RD #: PROJECT TITLE: ALL QUANTITIES ABOVE HAVE 10 % EXTRA FIXINGS INCLUDED, UNLESS N/A IS IN THE + 10% COLUMN
  • 21. 20RANDALLDESIGNS SYNC = Simplicity cloud software JOB / DESCRIPTION OF WORKS DATE COMPLETE FORM CODE QUOTATION / COST TO BE AGREED BY CLIENT (P.O) TIMESHEET – START PC MASTER FOLDER, SYNCPLICTY FOLDER LINK AND RING BINDER PROJECT FILE SETUP TENDER STAGE: CAD MODEL & TENDER GA SITE SURVEY (TRAVEL EXPENSES / MILEAGE SHEET) SITE MEETING (INCLUDES TRAVEL EXPENSES) SURVEY RUN THROUGH SPECIFICATION SHEET SEND OVER & SKETCHES STRUCTURAL ENGINEER CALCULATIONS - EMAIL & SYNC VISUAL IMAGES - EMAIL & SYNC DET – DETAIL DRAWING 3D CAD MODEL: ENVIROMENT 3D CAD MODEL: ASSEMBLY PART & COMPONENT LIST DRAWING REGISTER SETUP GA - DRAWING REV.1 CHECK BY RD’S CLIENT (INTERNALLY) GA - DRAWING REVISION 1 (INTERNALLY) GA - REV.1 EMAIL & SYNC FOLDER + DRG. REGISTER UPDATE GA - DRAWING REVISON A (COMMENTS BY CLIENT) GA - REV.A EMAIL & SYNC FOLDER + DRG. REGISTER UPDATE GA - DRAWING REVISION B (REVISE TO SITE CHECK) GA - REV.B EMAIL & SYNC FOLDER + DRG. REGISTER UPDATE GL - GLASS PANEL DRAWINGS + GLASS REGISTER GL - GLASS PANEL CALL OFF SCHEDULE GL - GLASS PANELS EMAIL & SYNC / BOX FOLDER FAB - FABRICATION DRAWINGS + FAB REGISTER FAB - LASER DRAWINGS (DXF + PDF + EMAIL & SYNC) FAB - FABRICATION EMAIL FAB - DRAWINGS EMAIL & SYNC F&C - FIXINGS & COMPONENTS CALL OFF SHEET MTL - MATERIALS CUT LIST / CALL OFF - EMAIL & SYNC MP - MARKING PLAN / SETTING OUT - EMAIL & SYNC EXTRA’S SHEET - EMAIL & SYNC INVOICE RAISE (HIGHLIGHT EXTRA’S / COSTS OVER ORIGINAL QUOTE - EMAIL & SYNC PROJECT CHECK LIST RD #: PROJECT TITLE:
  • 22. 21RANDALLDESIGNS INTIALS DESCRIPTION OF WORK/DRG # DATE: START TIME: FINISH TIME: HOURS: TOTAL TALLY: EXTRA AM Environment 3/5/16 08.00 11.00 3 3 0 TOTAL HOURS WORKED: QUOTE REF #: INV REF #: TIME SHEET RD #: PROJECT TITLE: Extra’s = See extra’s Sheet. If Extra’s are required, ensure everything is broken down in email