1. Diesel Traction - 1912
The diesel engine was invented in the year 1893, by a young
German Engineer, called Rudolf Diesel. But it was only nineteen
years later, that the first Diesel locomotive came into existence.
Since then, diesel traction has grown from strength to strength. Over 89,000 Diesel
locomotives have been built in the world so far, the General Motors, USA alone
contributing to as many as 56,000 Locomotives.
2. Electric Traction - 1881
After many decades of satisfactory performance, the steam
engines were to give way to more modern locomotives. The year
1881 saw the birth of the first electric Railway run by a German
Engineer Werner Van Siemens using both the rails to carry the
current. Finding this a little too dangerous, Siemens soon adopted
the overhead electric wires. Electric locomotives today ran on Rail
roads in many countries.
3. PURPOSE OF RAILWAY ELECTRIFICATION
• The contact lines permit almost unlimited power at the disposal of the electrically
driven vehicle.
• Permits heavier trains to achieve higher speeds.
• Electric Multiple Units provide fast commuter services with quick reversal at with
main line trains
• Electric Multiple Units offer least interference to the latter due to the EMU’s high
acceleration rates.
• Economy in operation and maintenance
• Saving in consumption of scarce diesel oil and increased through put of traffic.
• The capital cost for provision of fixed installation required for electric traction is
found adequately remunerative for routes having high levels of traffic.
4. Period Route Kms. Electrified
Prior to Independence (1925-1947) 388
I Five Year Plan (1951-56) 141
II Five Year Plan (1956-61) 216
III Five Year Plan (1961-66) 1678
Annual Plan (1966-69 814
IV Five Year Plan (1969-74) 953
V Five Year Plan (1974-78) 533
Inter Plan (1978-80) 195
VI Five Year Plan (1980-85) 1522
VII Five Year Plan (1985-90) 2812
Annual Plan (1990-92) 1557
VIII Five Year Plan (1992-97) 2708
IX Five Year Plan (1997-2002) 2484
X Five Year Plan (2002-07) 1810
XI Five Year Plan First Year (2007-08) * 502
XI Five Year Plan Second Year (2008-09) 797
XI Five Year Plan Third Year (2009-10) 1117
Total as on 31.03.2010 20059
5. ELECTRIFICATION
• INDIAN RAILWAYS TOTAL TRACK = 63327 RKM
• ELECTRIFIED upto 31.3.2009 = 18942 RKM
• % ELECTRIFIED = 29.85%
• COST OF ELECTRIFICATION
The approximate average cost of electrification is as under :
PER RKM DOUBLE LINE
For 25 KV AC TRACTION 1 crore 75 lakh
For 2X25 KV AC TRACTION 94 lakh
6. DETAILS OF ELECTRIFICATION
• Total RKM energized on 1500 V DC = BG 258
• Total RKM energized on 25 KV AC = BG 18942
• Total RKM energized on 2X25 KV AC = BG 627
• Electrification work in progress (Dec 09) = 1000 RKM
• Target for Rly. Electrification during year 2009-10 = 1000 RKM
• Passenger Train KM Hauled by Electric Traction = 49%
• BG Freight GoodsTrain KM Hauled by Electric Traction = 63%
7.
8. ONGOING PROJECT
• Notification of Award No & Date
IFB No, RVNL/CPM/MAS/VLDE-MPA-DG/OT-4 dated 24/01/2012
• Description of Item/Work
Execution of Doubling of track between Villupuram and Dindigul, for the contract
Package-1-“Construction of Roadbed, bridges, supply of ballast, Installation of
track (excluding supply of rails & PSC sleepers), Electrical (Railway Electrification
and General Electrification), outdoor signalling and telecommunication works for
Doubling of track between Valadi and Manaparai in Tiruchchirappalli and Madurai
Divisions of Southern Railway, TamilNadu, India.”
-58km stretch-
9. • Contract No & Date
LOANo.RVNL/CPMMAS/VLDE-MPA-DG/OT-4/Package 1 dated 22.10.2012
• Contractor's Name
M/s L&T Construction Infrastructure
Mount Poonamallee Road
PB No. 979
Chennai - 600 089
• Total Tender Cost (for Engg./Elect./S&T)
Rs.157,53,91,274
10. Double track
• A double-track railway usually involves running one track in each direction,
compared to a single-track railway where trains in both directions share
the same track.
• Double-track railways, especially older ones, may use each track exclusively
in one direction. This arrangement simplifies the signalling systems,
especially where the signalling is mechanical.
• Where the signals and points or rail switches are power-operated, it can be
worthwhile to signal each line in both directions, so that the double line
becomes a pair of single lines. This allows trains to use one track where the
other track is out of service due to track maintenance work, or a train
failure, or for a fast train to overtake a slow train.
12. PRINCIPAL PARTS OF CONSTRUCTION
• Over Head equipment (OHE)
A system of conductors / equipments carrying traction power from traction
sub station to electric locomotive.
As a standard practice, an independent mast is used to support the OHE for
each track to obtain mechanical independence.
• Independent Mast
Steel masts are of Four types i.e., BFB (Broad Flanged Beam), RSJ (Rolled
Steel Joist) and fabricated rectangular sectional mast of K and B type.
Portals are also used to serve multiple track section where space between
two tracks to locate an independent mast is not adequate.
13. PRINCIPAL PARTS OF CONSTRUCTION
• concrete foundation
Traction Mast / Portals are embedded in the concrete foundation. There are
different type of foundations which are used according to soil pressure and
location. The five standard types of foundations mostly used are :
(a) Side Bearing (b) Side gravity (c) New Pure gravity (d)Wet
Black cotton soil (e) Dry Black Cotton soil
• Traction Sub Station (TSS)
Every TSS has 2 nos. traction transformer out of which one is working at a
time and the second transformer is stand by. The capacity of each traction
transformer is sufficient to feed its own feed zone and half of the adjoining
feed zone.
• Signalling and Telecommunication (S&T)
16. RAILWAY ELECTRIFICATION WORKS
• Main works
1 Provision of most economic reliable electric contact system to continuously
supply power to the moving electric rolling stock.
2. Power Supply Arrangements.
3. Provision of switches to regulate the flow of power along with the electric
protective gear.
4. Monitoring and remote control of power supply.
5. Immunization of signalling and the trackside telecommunication circuits
against electromagnetic and electrostatic induction effects of 25 KV, 50 HZ,
single phase traction power supply.
6. Modernization of signalling and telecommunication.
7. Provision of maintenance and operation facilities for electric traction.
17. RAILWAY ELECTRIFICATION WORKS
• Discipline wise Division of Works
a) Electrical
b) Signal and Telecommunications
c) Civil Engineering
18. Coordination of Works
• Railway Electrification, being a multi-disciplinary project work, needs
close coordination amongst electrical, signalling &
telecommunications and civil engineering disciplines. It further needs
coordination with outside agencies such as Power Supply Authorities,
the Department of Telecommunications, the Revenue officials as well
as with the Open Line organization or whose section the work is to be
taken up. Accordingly the organization for Railway electrification
coordinates works of all the disciplines and the agencies from
inception to completion including support services to the open line in
early stages of electric traction over the section.
24. SAFETY IN ELETRIFICATION OF RAILWAYS
• SAFETY PRECAUTIONS ON ELECTRIFIED SECTIONS
• Crane Working
• Track-Circuited Rails
• Care in Handling Pipes
• Street Measuring Tapes not to be used
• Traction Structure Foundation
The top of foundation block of track structures shall be kept clear of all
materials and kept dry.
While excavating, the foundations not be exposed and there should be no
risk of sinking of the foundations.
25. COST ESTIMATION
• At the planning level strategic decisions are developed that determine
the likely benefits and costs of a project, before further resources are
utilized for more in-depth investigation. At the project level actual
location specific studies are conducted to determine the overall costs
of the project.
• CPM estimation methodology is used at the planning level
26. CPM estimation methodology components
1. The right of way the track is built upon (ROW)
2. The design and construction of the railway (Design & Build)
3. Raw materials and finished goods required (Materials)
4. Train control and communications systems (C&S)
5. Catenary/grid components for electrified service (if applicable) (Electric
Infrastructure)
27. Components influenced by factors
• Construction (adding to existing, building new, or upgrading existing
railways)
• Service (passenger, freight, or mixed use)
• Speed (maximum intended speed: 79, 110, 125, 150, or 220mph)
• Motive power (electric or non-electric)
• Trackage (single, double, or other)
• Terrain (plains, hills, or mountains)
• Land Use (urban, suburban, or rural)
29. CPM ADJUSTMENT FACTORS
• The five CPM component cost categories have been designated as
“Design & Build”, “ROW”, “Materials”, “C&S”, and “Electric
Infrastructure”. Each cost is based on a finished project, proposed
project, or study cost. Since most of the cost sources pertained to a
particular project.
• To achieve this, the US Army Corps of Engineers “Civil Works
Construction Cost Index System (CWCCIS)” was applied. The index is
used to “…escalate or inflate various project cost features to current
or future price levels…” along with adjusting for the influence of a
project on construction costs.
30. CPM ADJUSTMENT FACTORS
Base Cost without influence = (2 – State Adjustment Factor) x (State
Influenced Cost)
31. SCENARIO CPM Methodology
• Scenario CPM = (Design & Build base cost x TE x LU x SP x TR x UP x AD)+ (ROW base cost
x TE x LU x SP x TR)
+ (Materials base cost x TR)
+ (C&S base cost x TR)
+ (Electric Infrastructure base cost x TR)
• Where:
• TE = Terrain multiplier
• LU = Land Use multiplier
• SP = Speed multiplier
• TR = Track multiplier
• UP = Upgrade multiplier
• AD = Additional multiplier
32. References
Indian Railway Year Book 2002-2003
U.S. Army Corps of Engineers, 2000
Transportation Research Board, 2000
• White, Thomas. 2000. Developing The Pacific Northwest Rail Corridor Incremental Plan. [Online]
• 2000. [Cited: September 29, 2011.]
• http://www.halcyon.com/tawhite/Trans/PNWRC%20INCREMENTAL%20PLAN.htm.
• Whitford, R. K. 1981. Railroad Electrification. An Alternative for Petroleum Savings.
Transportation
• Research Record. 1981, 802.
• a planning methodology for railway construction
• cost estimation in north america
• Jeffrey Tyler Von Brown