Product
Year 2020
Q1 Q2 Q3 Q4
January February March April May June July August September October November December
Project 1
Analysis
Development
Text Here
Project 2
Analysis
Development
Text Here
Project 3
Analysis
Development
Text Here
Quarterly Based Multiple Project Timeline
Launch
Launch
Launch
Launch
Launch
Launch
Launch
Launch
Launch
Phase 1 Phase 2 Phase 3 Phase 4
Phase 1 Phase 2 Phase 3 Phase 4
Phase 1 Phase 2 Phase 3 Phase 4
Phase 1 Phase 2 Phase 3 Phase 4
Phase 1 Phase 2 Phase 3 Phase 4
Phase 1 Phase 2 Phase 3 Phase 4
Phase 1 Phase 2 Phase 3 Phase 4
Phase 1 Phase 2 Phase 3 Phase 4
Phase 1 Phase 2 Phase 3 Phase 4
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Instructions to Edit This Slide
This slide has been made in PowerPoint using basic PowerPoint
shapes, and all graphics are 100% editable in PowerPoint.
You can change color, size and orientation of any element to your liking,
and add/edit any piece of text anywhere.
Resize any Shape and Edit Color
2.
1. 3.
Use your Own Icons in any Slide
2.
1. 3.
Select from Thousands of Editable Icons on Every Topic
These icons are available at the Icons section on www.slideteam.net
Edit any Shape

More Related Content

What's hot

Project Phases Showing Phase Content And Documents With Analysis And Design R...
Project Phases Showing Phase Content And Documents With Analysis And Design R...Project Phases Showing Phase Content And Documents With Analysis And Design R...
Project Phases Showing Phase Content And Documents With Analysis And Design R...SlideTeam
 
Project Timeline Powerpoint Slides
Project Timeline Powerpoint SlidesProject Timeline Powerpoint Slides
Project Timeline Powerpoint SlidesSlideTeam
 
Project Management Timeline Gantt Chart
Project Management Timeline Gantt ChartProject Management Timeline Gantt Chart
Project Management Timeline Gantt ChartSlideTeam
 
People Process Technology Icons For Workflow
People Process Technology Icons For WorkflowPeople Process Technology Icons For Workflow
People Process Technology Icons For WorkflowSlideTeam
 
Board Meeting Agenda Ppt Presentation Presentation Examples
Board Meeting Agenda Ppt Presentation Presentation ExamplesBoard Meeting Agenda Ppt Presentation Presentation Examples
Board Meeting Agenda Ppt Presentation Presentation ExamplesSlideTeam
 
Project Status KPI Dashboard Showing Project Timeline And Budget
Project Status KPI Dashboard Showing Project Timeline And BudgetProject Status KPI Dashboard Showing Project Timeline And Budget
Project Status KPI Dashboard Showing Project Timeline And BudgetSlideTeam
 
Project Management Status Indicators Powerpoint Slide Deck
Project Management Status Indicators Powerpoint Slide DeckProject Management Status Indicators Powerpoint Slide Deck
Project Management Status Indicators Powerpoint Slide DeckSlideTeam
 
Current State Vs Future State Info Graphics
Current State Vs Future State Info GraphicsCurrent State Vs Future State Info Graphics
Current State Vs Future State Info GraphicsSlideTeam
 
Digital Transformation Overview Ppt Slide
Digital Transformation Overview Ppt SlideDigital Transformation Overview Ppt Slide
Digital Transformation Overview Ppt SlideSlideTeam
 
Transformation Journey 5 Stages
Transformation Journey 5 StagesTransformation Journey 5 Stages
Transformation Journey 5 StagesSlideTeam
 
Project Health Card Status Report Powerpoint Slide
Project Health Card Status Report Powerpoint SlideProject Health Card Status Report Powerpoint Slide
Project Health Card Status Report Powerpoint SlideSlideTeam
 
3 Year Transformation Map Product Roadmap Phases Timeline
3 Year Transformation Map Product Roadmap Phases Timeline3 Year Transformation Map Product Roadmap Phases Timeline
3 Year Transformation Map Product Roadmap Phases TimelineSlideTeam
 
Social Media Progress Dashboard
Social Media Progress DashboardSocial Media Progress Dashboard
Social Media Progress DashboardSlideTeam
 
Project Status Report Timeline Of Product Status
Project Status Report Timeline Of Product StatusProject Status Report Timeline Of Product Status
Project Status Report Timeline Of Product StatusSlideTeam
 
Project Management Metrics Dashboard Including Budget
Project Management Metrics Dashboard Including BudgetProject Management Metrics Dashboard Including Budget
Project Management Metrics Dashboard Including BudgetSlideTeam
 
Digital Business Transformation Powerpoint Templates
Digital Business Transformation Powerpoint TemplatesDigital Business Transformation Powerpoint Templates
Digital Business Transformation Powerpoint TemplatesSlideTeam
 
Agenda Ppt Examples
Agenda Ppt ExamplesAgenda Ppt Examples
Agenda Ppt ExamplesSlideTeam
 
Key Business Accomplishments Ppt Images
Key Business Accomplishments Ppt ImagesKey Business Accomplishments Ppt Images
Key Business Accomplishments Ppt ImagesSlideTeam
 
Project Status Kpi Dashboard Showing Delivery Roadmap And Resource Allocation
Project Status Kpi Dashboard Showing Delivery Roadmap And Resource AllocationProject Status Kpi Dashboard Showing Delivery Roadmap And Resource Allocation
Project Status Kpi Dashboard Showing Delivery Roadmap And Resource AllocationSlideTeam
 
5 Year Transformation Map Template Ppt Product Roadmap Template
5 Year Transformation Map Template Ppt Product Roadmap Template5 Year Transformation Map Template Ppt Product Roadmap Template
5 Year Transformation Map Template Ppt Product Roadmap TemplateSlideTeam
 

What's hot (20)

Project Phases Showing Phase Content And Documents With Analysis And Design R...
Project Phases Showing Phase Content And Documents With Analysis And Design R...Project Phases Showing Phase Content And Documents With Analysis And Design R...
Project Phases Showing Phase Content And Documents With Analysis And Design R...
 
Project Timeline Powerpoint Slides
Project Timeline Powerpoint SlidesProject Timeline Powerpoint Slides
Project Timeline Powerpoint Slides
 
Project Management Timeline Gantt Chart
Project Management Timeline Gantt ChartProject Management Timeline Gantt Chart
Project Management Timeline Gantt Chart
 
People Process Technology Icons For Workflow
People Process Technology Icons For WorkflowPeople Process Technology Icons For Workflow
People Process Technology Icons For Workflow
 
Board Meeting Agenda Ppt Presentation Presentation Examples
Board Meeting Agenda Ppt Presentation Presentation ExamplesBoard Meeting Agenda Ppt Presentation Presentation Examples
Board Meeting Agenda Ppt Presentation Presentation Examples
 
Project Status KPI Dashboard Showing Project Timeline And Budget
Project Status KPI Dashboard Showing Project Timeline And BudgetProject Status KPI Dashboard Showing Project Timeline And Budget
Project Status KPI Dashboard Showing Project Timeline And Budget
 
Project Management Status Indicators Powerpoint Slide Deck
Project Management Status Indicators Powerpoint Slide DeckProject Management Status Indicators Powerpoint Slide Deck
Project Management Status Indicators Powerpoint Slide Deck
 
Current State Vs Future State Info Graphics
Current State Vs Future State Info GraphicsCurrent State Vs Future State Info Graphics
Current State Vs Future State Info Graphics
 
Digital Transformation Overview Ppt Slide
Digital Transformation Overview Ppt SlideDigital Transformation Overview Ppt Slide
Digital Transformation Overview Ppt Slide
 
Transformation Journey 5 Stages
Transformation Journey 5 StagesTransformation Journey 5 Stages
Transformation Journey 5 Stages
 
Project Health Card Status Report Powerpoint Slide
Project Health Card Status Report Powerpoint SlideProject Health Card Status Report Powerpoint Slide
Project Health Card Status Report Powerpoint Slide
 
3 Year Transformation Map Product Roadmap Phases Timeline
3 Year Transformation Map Product Roadmap Phases Timeline3 Year Transformation Map Product Roadmap Phases Timeline
3 Year Transformation Map Product Roadmap Phases Timeline
 
Social Media Progress Dashboard
Social Media Progress DashboardSocial Media Progress Dashboard
Social Media Progress Dashboard
 
Project Status Report Timeline Of Product Status
Project Status Report Timeline Of Product StatusProject Status Report Timeline Of Product Status
Project Status Report Timeline Of Product Status
 
Project Management Metrics Dashboard Including Budget
Project Management Metrics Dashboard Including BudgetProject Management Metrics Dashboard Including Budget
Project Management Metrics Dashboard Including Budget
 
Digital Business Transformation Powerpoint Templates
Digital Business Transformation Powerpoint TemplatesDigital Business Transformation Powerpoint Templates
Digital Business Transformation Powerpoint Templates
 
Agenda Ppt Examples
Agenda Ppt ExamplesAgenda Ppt Examples
Agenda Ppt Examples
 
Key Business Accomplishments Ppt Images
Key Business Accomplishments Ppt ImagesKey Business Accomplishments Ppt Images
Key Business Accomplishments Ppt Images
 
Project Status Kpi Dashboard Showing Delivery Roadmap And Resource Allocation
Project Status Kpi Dashboard Showing Delivery Roadmap And Resource AllocationProject Status Kpi Dashboard Showing Delivery Roadmap And Resource Allocation
Project Status Kpi Dashboard Showing Delivery Roadmap And Resource Allocation
 
5 Year Transformation Map Template Ppt Product Roadmap Template
5 Year Transformation Map Template Ppt Product Roadmap Template5 Year Transformation Map Template Ppt Product Roadmap Template
5 Year Transformation Map Template Ppt Product Roadmap Template
 

Similar to Quarterly Based Multiple Project Timeline

Project Deliverables Timeline Showing Goals And Project Status
Project Deliverables Timeline Showing Goals And Project StatusProject Deliverables Timeline Showing Goals And Project Status
Project Deliverables Timeline Showing Goals And Project StatusSlideTeam
 
Project Timeline Powerpoint Templates
Project Timeline Powerpoint TemplatesProject Timeline Powerpoint Templates
Project Timeline Powerpoint TemplatesSlideTeam
 
Software Project Development Process
Software Project Development ProcessSoftware Project Development Process
Software Project Development ProcessSlideTeam
 
5 Work Streams With Project Status Report
5 Work Streams With Project Status Report5 Work Streams With Project Status Report
5 Work Streams With Project Status ReportSlideTeam
 
Quarterly Agile Scrum Roadmap
Quarterly Agile Scrum RoadmapQuarterly Agile Scrum Roadmap
Quarterly Agile Scrum RoadmapSlideTeam
 
Six Months Technology Security Service Quality Operations Timeline
Six Months Technology Security Service Quality Operations TimelineSix Months Technology Security Service Quality Operations Timeline
Six Months Technology Security Service Quality Operations TimelineSlideTeam
 
Project Timeline Ppt Slides
Project Timeline Ppt SlidesProject Timeline Ppt Slides
Project Timeline Ppt SlidesSlideTeam
 
Product Development Roadmap Timeline Dev Milestones Product Releases 4 Quarters
Product Development Roadmap Timeline Dev Milestones Product Releases 4 QuartersProduct Development Roadmap Timeline Dev Milestones Product Releases 4 Quarters
Product Development Roadmap Timeline Dev Milestones Product Releases 4 QuartersSlideTeam
 
Cross Functional Org Chart With Functional Manager
Cross Functional Org Chart With Functional ManagerCross Functional Org Chart With Functional Manager
Cross Functional Org Chart With Functional ManagerSlideTeam
 
Process Implementation Checklist
Process Implementation ChecklistProcess Implementation Checklist
Process Implementation ChecklistSlideTeam
 
Roduct Delivery Timeline With Continuous Improvement
Roduct Delivery Timeline With Continuous ImprovementRoduct Delivery Timeline With Continuous Improvement
Roduct Delivery Timeline With Continuous ImprovementSlideTeam
 
Weekly Project Status Updates
Weekly Project Status UpdatesWeekly Project Status Updates
Weekly Project Status UpdatesSlideTeam
 
Agile Development Showing Product Owner With Iteration Plan And Planning Meeting
Agile Development Showing Product Owner With Iteration Plan And Planning MeetingAgile Development Showing Product Owner With Iteration Plan And Planning Meeting
Agile Development Showing Product Owner With Iteration Plan And Planning MeetingSlideTeam
 
Roles And Responsibilities Presentation Powerpoint Templates
Roles And Responsibilities Presentation Powerpoint TemplatesRoles And Responsibilities Presentation Powerpoint Templates
Roles And Responsibilities Presentation Powerpoint TemplatesSlideTeam
 
Agile Portfolio Management Framework With Demand Management
Agile Portfolio Management Framework With Demand ManagementAgile Portfolio Management Framework With Demand Management
Agile Portfolio Management Framework With Demand ManagementSlideTeam
 
animated-it-services-project-proposal.pptx
animated-it-services-project-proposal.pptxanimated-it-services-project-proposal.pptx
animated-it-services-project-proposal.pptxMariaNiaFeruelo1
 
Project Progress Update Report With Variance Analysis
Project Progress Update Report With Variance AnalysisProject Progress Update Report With Variance Analysis
Project Progress Update Report With Variance AnalysisSlideTeam
 
Project Scope And Deliverables Example Of Ppt
Project Scope And Deliverables Example Of PptProject Scope And Deliverables Example Of Ppt
Project Scope And Deliverables Example Of PptSlideTeam
 
Implementation Process Flow
Implementation Process FlowImplementation Process Flow
Implementation Process FlowSlideTeam
 
Agile Business Transformation Roadmap
Agile Business Transformation RoadmapAgile Business Transformation Roadmap
Agile Business Transformation RoadmapSlideTeam
 

Similar to Quarterly Based Multiple Project Timeline (20)

Project Deliverables Timeline Showing Goals And Project Status
Project Deliverables Timeline Showing Goals And Project StatusProject Deliverables Timeline Showing Goals And Project Status
Project Deliverables Timeline Showing Goals And Project Status
 
Project Timeline Powerpoint Templates
Project Timeline Powerpoint TemplatesProject Timeline Powerpoint Templates
Project Timeline Powerpoint Templates
 
Software Project Development Process
Software Project Development ProcessSoftware Project Development Process
Software Project Development Process
 
5 Work Streams With Project Status Report
5 Work Streams With Project Status Report5 Work Streams With Project Status Report
5 Work Streams With Project Status Report
 
Quarterly Agile Scrum Roadmap
Quarterly Agile Scrum RoadmapQuarterly Agile Scrum Roadmap
Quarterly Agile Scrum Roadmap
 
Six Months Technology Security Service Quality Operations Timeline
Six Months Technology Security Service Quality Operations TimelineSix Months Technology Security Service Quality Operations Timeline
Six Months Technology Security Service Quality Operations Timeline
 
Project Timeline Ppt Slides
Project Timeline Ppt SlidesProject Timeline Ppt Slides
Project Timeline Ppt Slides
 
Product Development Roadmap Timeline Dev Milestones Product Releases 4 Quarters
Product Development Roadmap Timeline Dev Milestones Product Releases 4 QuartersProduct Development Roadmap Timeline Dev Milestones Product Releases 4 Quarters
Product Development Roadmap Timeline Dev Milestones Product Releases 4 Quarters
 
Cross Functional Org Chart With Functional Manager
Cross Functional Org Chart With Functional ManagerCross Functional Org Chart With Functional Manager
Cross Functional Org Chart With Functional Manager
 
Process Implementation Checklist
Process Implementation ChecklistProcess Implementation Checklist
Process Implementation Checklist
 
Roduct Delivery Timeline With Continuous Improvement
Roduct Delivery Timeline With Continuous ImprovementRoduct Delivery Timeline With Continuous Improvement
Roduct Delivery Timeline With Continuous Improvement
 
Weekly Project Status Updates
Weekly Project Status UpdatesWeekly Project Status Updates
Weekly Project Status Updates
 
Agile Development Showing Product Owner With Iteration Plan And Planning Meeting
Agile Development Showing Product Owner With Iteration Plan And Planning MeetingAgile Development Showing Product Owner With Iteration Plan And Planning Meeting
Agile Development Showing Product Owner With Iteration Plan And Planning Meeting
 
Roles And Responsibilities Presentation Powerpoint Templates
Roles And Responsibilities Presentation Powerpoint TemplatesRoles And Responsibilities Presentation Powerpoint Templates
Roles And Responsibilities Presentation Powerpoint Templates
 
Agile Portfolio Management Framework With Demand Management
Agile Portfolio Management Framework With Demand ManagementAgile Portfolio Management Framework With Demand Management
Agile Portfolio Management Framework With Demand Management
 
animated-it-services-project-proposal.pptx
animated-it-services-project-proposal.pptxanimated-it-services-project-proposal.pptx
animated-it-services-project-proposal.pptx
 
Project Progress Update Report With Variance Analysis
Project Progress Update Report With Variance AnalysisProject Progress Update Report With Variance Analysis
Project Progress Update Report With Variance Analysis
 
Project Scope And Deliverables Example Of Ppt
Project Scope And Deliverables Example Of PptProject Scope And Deliverables Example Of Ppt
Project Scope And Deliverables Example Of Ppt
 
Implementation Process Flow
Implementation Process FlowImplementation Process Flow
Implementation Process Flow
 
Agile Business Transformation Roadmap
Agile Business Transformation RoadmapAgile Business Transformation Roadmap
Agile Business Transformation Roadmap
 

More from SlideTeam

Customer Support And Services Guide Powerpoint Presentation Slides
Customer Support And Services Guide Powerpoint Presentation SlidesCustomer Support And Services Guide Powerpoint Presentation Slides
Customer Support And Services Guide Powerpoint Presentation SlidesSlideTeam
 
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...SlideTeam
 
Strategic Staff Engagement Action Plan Powerpoint Presentation Slides
Strategic Staff Engagement Action Plan Powerpoint Presentation SlidesStrategic Staff Engagement Action Plan Powerpoint Presentation Slides
Strategic Staff Engagement Action Plan Powerpoint Presentation SlidesSlideTeam
 
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt Cd
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt CdTraditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt Cd
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt CdSlideTeam
 
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...SlideTeam
 
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...SlideTeam
 
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...SlideTeam
 
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt Cd
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt CdGuide For Effective Event Marketing Powerpoint Presentation Slides Mkt Cd
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt CdSlideTeam
 
Managing Business Customers Technology Powerpoint Presentation Slides
Managing Business Customers Technology Powerpoint Presentation SlidesManaging Business Customers Technology Powerpoint Presentation Slides
Managing Business Customers Technology Powerpoint Presentation SlidesSlideTeam
 
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...SlideTeam
 
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...SlideTeam
 
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...SlideTeam
 
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...Communication Channels And Strategies For Shareholder Engagement Powerpoint P...
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...SlideTeam
 
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...SlideTeam
 
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...SlideTeam
 
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...SlideTeam
 
ChatGPT IT Powerpoint Presentation Slides
ChatGPT IT Powerpoint Presentation SlidesChatGPT IT Powerpoint Presentation Slides
ChatGPT IT Powerpoint Presentation SlidesSlideTeam
 
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt Cd
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt CdMethods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt Cd
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt CdSlideTeam
 
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...SlideTeam
 
Global Shift Towards Flexible Working Powerpoint Presentation Slides
Global Shift Towards Flexible Working Powerpoint Presentation SlidesGlobal Shift Towards Flexible Working Powerpoint Presentation Slides
Global Shift Towards Flexible Working Powerpoint Presentation SlidesSlideTeam
 

More from SlideTeam (20)

Customer Support And Services Guide Powerpoint Presentation Slides
Customer Support And Services Guide Powerpoint Presentation SlidesCustomer Support And Services Guide Powerpoint Presentation Slides
Customer Support And Services Guide Powerpoint Presentation Slides
 
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...
Word Of Mouth WOM Marketing Strategies To Build Brand Awareness Powerpoint Pr...
 
Strategic Staff Engagement Action Plan Powerpoint Presentation Slides
Strategic Staff Engagement Action Plan Powerpoint Presentation SlidesStrategic Staff Engagement Action Plan Powerpoint Presentation Slides
Strategic Staff Engagement Action Plan Powerpoint Presentation Slides
 
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt Cd
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt CdTraditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt Cd
Traditional Marketing Channel Analysis Powerpoint Presentation Slides Mkt Cd
 
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...
Integrating Asset Tracking System To Enhance Operational Effectiveness Comple...
 
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...
Designing And Implementing Brand Leadership Strategy Powerpoint Presentation ...
 
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...
How Amazon Generates Revenues Across Globe Powerpoint Presentation Slides Str...
 
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt Cd
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt CdGuide For Effective Event Marketing Powerpoint Presentation Slides Mkt Cd
Guide For Effective Event Marketing Powerpoint Presentation Slides Mkt Cd
 
Managing Business Customers Technology Powerpoint Presentation Slides
Managing Business Customers Technology Powerpoint Presentation SlidesManaging Business Customers Technology Powerpoint Presentation Slides
Managing Business Customers Technology Powerpoint Presentation Slides
 
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...
Unearthing Apples Billion Dollar Branding Secret Powerpoint Presentation Slid...
 
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...
Developing Flexible Working Practices To Improve Employee Engagement Powerpoi...
 
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...
Product Corporate And Umbrella Branding Powerpoint Presentation Slides Brandi...
 
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...Communication Channels And Strategies For Shareholder Engagement Powerpoint P...
Communication Channels And Strategies For Shareholder Engagement Powerpoint P...
 
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...
Responsible Tech Playbook To Leverage Business Ethics Powerpoint Presentation...
 
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...
Generating Leads Through Targeted Digital Marketing Campaign Powerpoint Prese...
 
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...
Boosting Profits With New And Effective Sales Strategic Plan Powerpoint Prese...
 
ChatGPT IT Powerpoint Presentation Slides
ChatGPT IT Powerpoint Presentation SlidesChatGPT IT Powerpoint Presentation Slides
ChatGPT IT Powerpoint Presentation Slides
 
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt Cd
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt CdMethods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt Cd
Methods To Implement Traditional Marketing Powerpoint Presentation Slides Mkt Cd
 
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...
Comprehensive Guide To Sports Marketing Strategy Powerpoint Presentation Slid...
 
Global Shift Towards Flexible Working Powerpoint Presentation Slides
Global Shift Towards Flexible Working Powerpoint Presentation SlidesGlobal Shift Towards Flexible Working Powerpoint Presentation Slides
Global Shift Towards Flexible Working Powerpoint Presentation Slides
 

Recently uploaded

Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesDragon Dream Bar
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small businessBen Wann
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback AnalysisSafe PaaS
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content MarketingChuck Aikens
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanasabutalha2013
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Björn Rohles
 
New Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9loNew Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9logalbokkahewagenitash
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfSam H
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseirhcs
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111zoyaansari11365
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdfDerekIwanaka1
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdftjcomstrang
 
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyTransforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyPMaps Assessments
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementBojamma2
 
IPTV Subscription in Ireland: Elevating Your Entertainment Experience
IPTV Subscription in Ireland: Elevating Your Entertainment ExperienceIPTV Subscription in Ireland: Elevating Your Entertainment Experience
IPTV Subscription in Ireland: Elevating Your Entertainment ExperienceDragon Dream Bar
 
Strategy Analysis and Selecting ( Space Matrix)
Strategy Analysis and Selecting ( Space Matrix)Strategy Analysis and Selecting ( Space Matrix)
Strategy Analysis and Selecting ( Space Matrix)RidaKhan334971
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134LR1709MUSIC
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckHajeJanKamps
 

Recently uploaded (20)

Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and Employees
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
New Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9loNew Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9lo
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings release
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyTransforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
IPTV Subscription in Ireland: Elevating Your Entertainment Experience
IPTV Subscription in Ireland: Elevating Your Entertainment ExperienceIPTV Subscription in Ireland: Elevating Your Entertainment Experience
IPTV Subscription in Ireland: Elevating Your Entertainment Experience
 
Strategy Analysis and Selecting ( Space Matrix)
Strategy Analysis and Selecting ( Space Matrix)Strategy Analysis and Selecting ( Space Matrix)
Strategy Analysis and Selecting ( Space Matrix)
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 

Quarterly Based Multiple Project Timeline

  • 1. Product Year 2020 Q1 Q2 Q3 Q4 January February March April May June July August September October November December Project 1 Analysis Development Text Here Project 2 Analysis Development Text Here Project 3 Analysis Development Text Here Quarterly Based Multiple Project Timeline Launch Launch Launch Launch Launch Launch Launch Launch Launch Phase 1 Phase 2 Phase 3 Phase 4 Phase 1 Phase 2 Phase 3 Phase 4 Phase 1 Phase 2 Phase 3 Phase 4 Phase 1 Phase 2 Phase 3 Phase 4 Phase 1 Phase 2 Phase 3 Phase 4 Phase 1 Phase 2 Phase 3 Phase 4 Phase 1 Phase 2 Phase 3 Phase 4 Phase 1 Phase 2 Phase 3 Phase 4 Phase 1 Phase 2 Phase 3 Phase 4 This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 2. Instructions to Edit This Slide This slide has been made in PowerPoint using basic PowerPoint shapes, and all graphics are 100% editable in PowerPoint. You can change color, size and orientation of any element to your liking, and add/edit any piece of text anywhere. Resize any Shape and Edit Color 2. 1. 3. Use your Own Icons in any Slide 2. 1. 3. Select from Thousands of Editable Icons on Every Topic These icons are available at the Icons section on www.slideteam.net Edit any Shape