National and Local Service Delivery Survey for
Lesotho
Draft Report Presentation
Melody Niwamanya
FEI CONSULTING & EFICON CONSULTING
2nd July 2015
Contents
1. Introduction
2. Methodology
3. Key Survey findings
4. Institutional Constraints
5. Challenges and Recommendations
6. Best practices and lessons learnt
INTRODUCTION
Introduction
1. The DDP is a four year programme (2012-2016)
2. Main partners ( GoL, UNDP, UNCDF, EU)
3. Main purpose is to: promote decentralized service
delivery for social economic growth through the
development of transparent funding mechanisms and by
improving the accountability of local authorities.
4. Main Components of the DDP
a) Improving development funding through local authorities
b)Promoting decentralization and accountability systems at the
local level
c) Enhancing capacities of line ministries and local authorities to
decentralize functions
Introduction
Objectives of the Baseline Survey:
• To assess the accessibility and quality of service delivery
• To ascertain the level of satisfaction with services (in terms
of accessibility, quality, timeliness etc.)
• To identify the institutional capacity needs to support
decentralized service delivery;
• To identify challenges faced by community members in
demanding and accessing services;
• To examine the existing oversight mechanisms for quality
assurance in service delivery and accountability; and
• To document best practices and provide recommendations
for improving service delivery.
Service Areas
1. Education
2. Health
3. Agriculture
4. Energy
5. Water & sanitation
6. Roads
7. Civil registry
8. Forestry/lands
9. Social protection and
child protection
6 districts
Botha- Bothe
Maseru
Mafeteng
Mohale’s Hoek
Quthing
Thaba Tseka
Key Service Ministries
Public Works and Transport, Roads Directorate
Social Development
Forestry
Energy, Department of Energy
Health
Water, Department of Water Affairs, Water Commission
Development Planning
Education
Agriculture & Food Security
Civil Service Registry , Ministry of Home Affairs
METHODOLOGY
Approach and Methodology
Our Approach &Methodology:
• Qualitative and Quantitative methods
• Four stages of our approach (Inception, Data collection, Data
analysis and Reporting)
Inception Stage:
• Inception meetings with partners
• Review of critical documents
• Writing the survey questionnaires
• Sample size selection
• Training of research teams
• Review of the Inception report by the partners
• Presentation of the inception report
• Approval of inception report and commencement
Approach and Methodology
Sample size and Scope
• Six districts (selected based on poverty levels &
distribution between Low and high lands)
• 1,116 House holds surveys in the six districts
• 12 Focus Group Discussions
• Sectors covered: Health, Education, Water & Sanitation,
Agriculture, Energy, Roads, Civil registry, Forestry and Land
reclamation, Social protection, Child protection.
Data collection
• Household interviews
• Key informant interviews (KIIs)
• Focus group discussions, 2 per district, over 120 discussants
• Review of various reports
Data analysis
• Data cleaning
• Data entry using Epidata
• Data analysis using SPSS version 17
Report writing and presentation
KEY SURVEY FINDINGS
Findings- Education
Integrated Early Childhood Care and Development (IECCD)
• 63% of households had children between age of 3 and 5
years
• 59% of these households, had the children attending IECCD
• 47% in Urban and 73% in the rural areas
Main reasons for not sending children to IECCD
 Not reasonable to at that age (28%)
 No facilities for IECCD (227%)
 Poor Care (26%)
 No money to facilitate children to attend IECCD (17%)
Education
Quality of IECCD schools
 Less than 1% of the national budget is spent on IECCD
Education
Free Primary
Education
 About 20% of National
budget
 59% had children of
School Primary going age
 48 minutes to reach
school
 42 mins (Urban) and 51
(Rural)
 85% walked to school
Types of schools attended
Education
• Quality of FPE
Education
Satisfaction with various
aspects:
Satisfied:
 Quality of teachers (64%)
 Quality of education (57%)
 Taking care of children (51%)
Un satisfied:
 school feeding (45%)
 quality of infrastructure (33%)
 distance to school (31.6%)
Quality of Education
Education
Factors limiting access to education services
 Inadequate service infrastructure (IECCD mainly)
 Some parents cannot afford the IECCD 40 Maloti monthly facilitation
for teachers
 Shortage of food supply at the IECCDs and primary schools
 Inadequate portions or poor food quality in FPE schools
 Hidden costs that hinder FPE continuity
 Long distances to schools ( 48 Minutes)
Health
Un satisfied
clients
 Waiting time (31%
urban and 49%
rural)
 distance to health
facilities (18% urban
and 46% rural)
 Emergency services
(19% urban and 39%
rural)
Those that Accessed Public health services in last
12 months
Health
Satisfaction with services
(good or very good)
• 84% Urban
• 81% Rural
• All HIV AIDS counselling
services (90% and
above) ,
• TB treatment and
support services (92%),
• Child immunisation
services (90%)
Waiting time
• 50% waited between 1-4
hours) for services
• 29% waited for 5 to 12
hours for services
Perception on Quality of services
Health
Factors limiting access
 Low health workers staff levels
 Poor supervision
 Long distances to health facilities (64 minutes)
 Lack of Confidentiality in handling client information
 Shortage of Medicines and supplies
 Expired Medicines
 Inadequate facilities and equipment
 Inadequate emergency and ambulance services
Water and Sanitation
• The most important natural resource in Lesotho!
• 77% have access to water sources (NDP 2012)
• 83% had access to water in the Rural areas (Survey)
• 88 % had access to water in the Urban areas (Survey)
• About 52% in the rural and 35% in Urban areas rated the
water as being safe
• about 20% in the rural and 35% in the urban rated the water
as being Unsafe
• About 16% in rural and 81% in urban paid money for the
water they used
Water and Sanitation
Main source of water
Water and Sanitation
Main type of sanitation facility Rural Urban Overall
Sewerage system 0.42 12.88 7.55 %
Septic tank 5.94 42.93 27.09 %
VIP Latrine 74.95 20.99 44.09 %
Others type of latrines 18.88 23.21 21.27 %
Types of Sanitation facilities used
Water and Sanitation
Picture: Different types of Latrines
VIP Latrine Ordinary Latrine
Water and Sanitation
Factors limiting access to water and Sanitation services
• Contaminated or un-safe water
• Long Distances to water sources, takes over an hour on
average
• Irregular Water supply especially in Urban areas
• Slow response to repair broken pipes and taps
• Increasing water costs by WASCO
• Poor community response to protection of water sources
• Poorly planned and built toilets
• Lack of pit latrine emptying facilities and resources
Agriculture
• 0ver 70% depends directly on Agricultural
• Services provided included:
• About 45% of the surveyed households were engaged in
agricultural
Main services accessed:
 injections for pets;
 subsidies on seeds/fertilizers;
 food and nutrition training;
 training in good farming practices (demonstration farms);
 training on soil conservation and land management.
Agriculture
Satisfaction with Agricultural services- Rural areas
Subsidy on
inputs
Food and
nutrition
sensitisation
Good
Farming
practices
training
Crop and
Livestock
Marketing
Livestock
programme
support
Management
of animal
theft
Satisfied 33 36 41 12 24 55
Neutral 13 26 18 40 30 6
Not satisfied 54 38 41 48 46 39
0
10
20
30
40
50
60
%percentage
Aspects of Agricultural services
Agriculture
Subsidy on inputs
Food and nutrition
sensitisation
Good Farming
practices training
Crop and Livestock
Marketing
Livestock
programme
support
Management of
animal theft
Satisfied 14 14 18 3 8 19
Neutral 19 22 26 23 25 14
Not satisfied 67 64 56 74 66 67
0
10
20
30
40
50
60
70
80
%percentage
Aspects of Agricultural services
Satisfaction with Agricultural services- Urban Areas
Agriculture
Factors Limiting access to services
• Poor quality Seeds
• Due to hunger, some communities eat seeds meant for
planting
• Late arrival of tractors (after the planting season)
• Lack of irrigation facilities
• Illegal importation of cattle from South Africa
Civil Registry
Rural (%) Urban (%) Overall (%)
75
83 80
25
17 20
% percent
Accessed services in Civil registry
Yes No
Access to Civil registry services
Civil Registry
Rural (%) Urban (%)
Services
1day
2-5day
2weeks
1
month
>1
month
1day
2-5day
2weeks
1
month
More
than1
month
Birth certificate 44.4 32.8 3.9 8.7 10.3 23.3 40.0 18.7 11.8 6.1
Death certificate 66.2 28.1 4.3 0.7 0.7 53.2 29.5 13.7 3.2 0.5
Marriage
certificate
60.6 29.4 7.3 1.8 0.9 82.8 7.7 7.7 1.0 1.0
National ID 47.9 36.4 4.9 1.0 9.8 40.0 38.2 11.7 8.0 2.1
Passport 15.9 17.8 3.8 40.6 21.9 16.8 13.7 5.0 45.7 18.8
AVERAGE 47 28.9 4.8
4
10.5
6
8.72 43.2 25.8 11.4 13.9
4
5.7
Time taken to access the different services
Civil Registry
Rural (%) Urban (%)
Services
Veryunsatisfied
Unsatisfied
Neutral/Un
decided
Satisfied
VerySatisfied
Veryunsatisfied
Unsatisfied
Neutral/Un
decided
Satisfied
VerySatisfied
Birth certificate 15.9 17.8 3.8 40.6 21.9 16.8 13.7 5.0 45.7 18.8
Death certificate 8.7 7.7 34.1 36.1 13.5 5.8 8.9 24.9 33.8 26.7
Marriage certificate 6.7 6.2 48.2 33.2 5.7 5.9 1.3 13.9 32.5 46.4
National ID 16.1 5.5 11.9 43.4 23.2 10.2 10.2 8.1 45.6 26.0
Passport 17.4 17.0 25.4 32.6 7.6 26.2 16.9 8.3 34.8 13.8
Civil Registry
• Awareness of Grievance handling
Civil Registry
Factors limiting access
• Long queues
• Limited staff
• Lack of adequate information
• Frequent breakdown of equipment
• Poor customer care
Social Protection
• House hold’s Access to various services
Social protection
Satisfied clients %
Child Grants Programme
Free Primary Education
Public Assistance
OVC Bursary
Old Age Pension
Agricultural inputs
Public Works
School Feeding
68.2
50.8
55.6
41.6
66.8
51.5
24.4
14.7
53.6
83.7
48.9
61
75.5
24
55.9
42.8
% of satisfied clients with services
Urban Rural
Social Protection
Old age pension
Child protection services/Child Grants Programme
OVC Bursary
Public Assistance (poor Families-destitute)
69.6
15.4
9.1
7.2
69.2
10.1
14.9
11.2
Satisfaction with regularity of payment %
Urban Rural
Satisfaction with regularity of payment
Awareness of grievance handling mechanisms
Factors limiting access
 A high age limit for Old age pension (70 years)
Social Protection
Factors limiting utilisation
 Long distances to collect the payments
 Lack of awareness about these programmes;
 Lack of clarity on selection criteria for some programmes;
 Orphaned children lack the support to register and access
funds
 Poor records management
Child protection
0
10
20
30
40
50
60
70
80
90
100
Prevention and
response to child
sexual, physical,
emotional abuse
Prevention and
response to neglect,
exploitation, and
child labour.
Prevention and
response to
Property grabbing.
Life skills training
for children and
youth
Average
Yes (%) 9.7 7.5 9.5 16.7 10.9
No (%) 90.3 92.5 90.5 83.3 89.2
%Access
Child protection services accessed
Whether a member of a household accessed services
Child Protection
Prevention and response
to child sexual, physical,
emotional abuse
Prevention and response
to neglect, exploitation,
and child labor.
Prevention and response
to Property grabbing.
Life skills training for
children and youth
76
70 66.6
37.4
78.2 82.4 80.8
86.4%
P
e
r
c
e
n
t
% Satisfied with child protection services
Rural Urban
Child Protection
Factors Limiting Access
• Corruption in the handling of cases
• Lack of Information on Justice dispensation process
• Lack of Witness protection services
Energy
Main Source of Lighting
Main source of heating
• Satisfaction with Electricity Services
Factors limiting accessibility
• Bio mass fuel sources are dwindling
• Limited affordable alternatives
Road Infrastructure
• Main means of transportation
1.8 0.4
45.9
9.9
42
19
0.2
40.8
1.4
38.6
11.7
0.3
43
5
40
Rural Urban Overall
• Main type of Road used
Quality of Roads
• Satisfaction with various aspects of roads
0 5 10 15 20 25 30
Quality of roads constructed
Road maintenance
Care and action taken during winter
Responsiveness to complaints on roads
24
14
12
24
29
11
12
14
% of satisfied clients
Urban Rural
Factors limiting access to roads
• Timeliness of road maintenance or road restoration after
damage;
“After roads are reported damaged; 69% of respondents
estimated that it takes more than
6 months to repair a road.”
• Water logging;
• Very Narrow roads
• Rocky and mountainous terrain hard to construct roads
• Flying rocks
Forestry and Land reclamation
Awareness of services
Tree planting-
Water conservation
Proper range management
Control of soil erosion
Water harvesting infrastructures
49.7
54.7
46.7
52.3
56.6
10.2
25.3
15.3
14.6
21.8
40.1
20
37.9
33.1
21.6
Percent (%)
Yes Neutral No
• Satisfaction with service aspects
Tree planting-
Water conservation
Proper range management
Control of soil erosion
Water harvesting infrastructures
5.9
3.6
12
1.6
4.5
0.7
0.6
2
3.3
2.1
% Percentage
Service Aspects
Urban Rural
• Limited awareness of government programmes
• Increased Deforestation
• Tree planting campaigns are loosing momentum
INSTITUTIONAL CONSTRAINTS
General findings
• Planning Framework and capacity are still weak in particular sector
and district planning processes are disjointed making it difficult to
support service delivery in local governments appropriately
• Areas of disharmony between sector based legislation and policies
with decentralisation framework; many of sector based legislation pre-
date the LG Act or the Decentralisation Policy for example, under
forestry, water, roads, forestry
• Roles between CG and LGs have not been very clear or understood and
LGs do not often have the capacity to execute their roles affecting
programme supervision. Ministries continue to undertake most of
programme supervision
• The distinction between roles of chiefs and local politicians provided in
the Decentralisation Policy, is yet to be fully acknowledged. Conflicts
between Chiefs and local politicians (councillors) were cited widely as a
hindrance to services delivery.
General Findings Continue ..
• Management of local government budgets affects service
delivery; budgets of LGs are scattered across
deconcentrated units; transfer of funds is often slow and
unpredictable. LGs find it difficult to finance recurrent
operations involving maintenance and supervision.
• Continued delay to form technical structures under LGs is a
major limitation to the execution and supervision of service
delivery operations
• Capacity of coordinating institutions is key: concerns that
role of MLGC in the facilitating the relations with LGs was
not properly played
Water
The water supply function is assigned to LGs
• Need harmonisation of laws between LG Act and Water Act to
minimise risk in the management of water resources;
• Improve coordination of actors in relation to the access and
management of water resources; waste disposal, land mgt, etc.
• Capacity, both at the Water Commission / Water Affairs Dept. to
supervise the development and management of water sources within
communities is limited.
• Capacity of LGs for the management of integrated water catchment
areas – these are degrading rapidly as they are poorly protected
• Easier sources of water are drying up, due to Climate change effects,
making the unit cost for service delivery high.
• Contributions from local populations do not always come readily (due
to affordability or cooperation issues) under the water committees so
maintenance and operations of systems, e.g. provision electricity of fuel
for pumps, is often impacted.
Civil Registration
Civil Registration is not decentralized but at NICR
• Budget resources are inadequate to expand services to
community level
• Delays in service are also caused by the significant backlog
in registration ( - only 33% captured; temporary issue)
• Chiefs are not remunerated for the verification services
they render and may not be always available. This is a risks
to the integrity of the system as users may resort to giving
inducements to Chiefs to obtain a service.
• Limitations on bandwidth and the reliability of the
network negatively effects the operations and is a source
of frustration for clients.
Roads
Roads Directorate is for management of all roads; LGs are
development and maintenance of access roads
• Capacity of Roads Directorate (RD) for technical support
and enforcement of standards and quality assurance is not
enough to cover the entire country
• Districts / LGs budgets are often small and not adequate
for maintenance of community roads and are often delayed
and are un-predictable.
• Although contractors are being trained, they often have
limited resources (financial, technical staff, and equipment)
and inadequate implementation experience and capacity.
Forestry
LGs has a role to control and protect natural resources. Main role is
with Ministry of Forestry, Range and Soil Conservation
• Conflict in different policies confuse local leaders; for example,
under range management, differing charges are prescribed for
grazing outside designated ranges by the Ministry of Forestry
and by the Ministry for Local Governments
• Reducing sector budgets have limited staff recruitment leading
to the major HR gaps at the Ministry and in districts for key
positions such as Forest Rangers and Grazing Control
Supervisors.
• Local councils are not playing their role of supervision and
protection effectively; there is rampant vandalism of forestry
resources and other program interventions
Agriculture
Ministry of Agriculture is central. Agriculture Functions to LGs are broad.
• Wide spread capacity gaps limiting ability to monitor farmers and
farmer programmes; districts do not have staff of their own
• Information flow from districts to the national level however has
remained a major challenge; for example reporting on the breakout of
epidemics / disease.
• Commitment to agriculture programs by farmers is not always assured;
cases of the diversion of inputs (seeds) / medication are cited
• Major weakness in the extension and monitoring services; as a result,
production does not always meet expected yields because farmers do
not often put enough effort into looking after their gardens.
• Subsidies have created a dependence syndrome; inputs provided by
Government are often taken for granted, leading to the inefficient
utilisation of resources by farmers.
Energy
Energy function is not decentralized - assigned to Energy Ministry
• Limited funding makes it difficult to extend the national grid to
communities. Only 35% of households are connected.
• Lesotho is a net importer of electricity. High dependency on
external sources (South Africa) is a risk in the pricing of electricity
and limits the opportunities to reduce the costs of electricity as
the FGDs wanted.
• Private companies often have limited capital for investments
and are unable to significantly participate in the distribution /
supply of energy.
• Poor standards control is affecting reliability of the energy
services; uncontrolled energy related products are found
everywhere on the market affecting the services
Social Protection
SP is lead by MSD and other central Govt units. Role for LGs is not
clear. Policy assigns a coordination functions to Districts
• Getting local communities to participate in social protection
programs is a challenge as their role is not backed by legislation.
• There are many players in the area of social protection services
including government agencies / ministries, NGOs, and need to
strengthen coordination mechanisms
• Limited staff capacity at MSD; MSD faces major human resource
gaps as a number of positions remain vacant
• Coordination at LG; oversight and management committees for
the programs at district level include elected members, chiefs
and politicians (councillors). Neither of these committees nor
their processes is backed by law or policy but is only a creation of
MSD
• No administrative structures at LGs for social protection
Education
LGs has role primary and secondary education – but not devolved
yet; LGs provide location and participate in governance of schools
• Resources are insufficient to maintain / expand school
infrastructure as demand grows.
• Some teachers above 60 years are still kept and some are un-
trainable. Retiring them from the system requires a lot of funds
(retirement packages) which are not available.
• Members of schools boards are volunteers with tenure of 3
years. It is difficult to obtain the required commitment of
members without some form of compensation.
• Capacity for supervision / inspection of schools is low. As a
result, rural schools in particular tend to start the academic term
late due to high absenteeism and find it difficult to complete the
curriculum on time
KEY CHALLENGES /
RECOMMENDATIONS
General Challenges
These challenges has largely been identified before
• Participation of LGs in the planning, management and supervision is
very limited. This is affected by delay to implement technical and
administrative structures among others.
• LGs have no structures and therefore capacities to carry out their full
mandate. At the same time, central sector are often stretched because
they have to fill in gaps left by the absence of LGs
• There is a need for policy consistency on cost sharing across all
services so that users are well aware about their obligations.
• There will be need for better regulation of LG programs to minimise the
effect of dependency
• Infrastructure maintenance roles and responsibilities must be clarified
and resources assigned to them as the Decentralisation Policy is
implemented.
• Roles and mechanisms for information sharing and dissemination
need to be clarified as the new Decentralisation Policy is implemented.
Key Recommendations
• Expedite the implementation of the Decentralisation Policy so
that LGs can begin to participate more effectively in service
delivery
• Issue guidelines to all sector institutions on streamlining their
legal and policy frameworks to embrace decentralisation.
• Formulate and implement a change management and capacity
building plan to prepare LGs and central government sector
institutions for their roles under the new dispensation based on
the decentralisation policy.
• As provided in the 2012 Decentralisation Diagnostic Study,
formulate and implement a plan to reorient the MoLGCP and
MoF so that their coordination roles under the Decentralisation
Policy are effectively played.
• Re-establish the previously closed Community Councils or set-up
satellite centres to bring services closer to people
THANK YOU - Q&A

More Related Content

What's hot

Global Fund Round 9 Phase 2 HIV Project Rivers and Bayelsa States Update Report
Global Fund Round 9 Phase 2 HIV Project Rivers and Bayelsa States Update ReportGlobal Fund Round 9 Phase 2 HIV Project Rivers and Bayelsa States Update Report
Global Fund Round 9 Phase 2 HIV Project Rivers and Bayelsa States Update Report
John Bako
 
PCC Eastern European Economic Migrants JSNA and CCC Migrant Populations JSNA ...
PCC Eastern European Economic Migrants JSNA and CCC Migrant Populations JSNA ...PCC Eastern European Economic Migrants JSNA and CCC Migrant Populations JSNA ...
PCC Eastern European Economic Migrants JSNA and CCC Migrant Populations JSNA ...
CambridgeshireInsight
 
HIV and mobility in Australia: Roadmap for Action
HIV and mobility in Australia: Roadmap for ActionHIV and mobility in Australia: Roadmap for Action
HIV and mobility in Australia: Roadmap for Action
Australian Federation of AIDS Organisations
 
Annual Results and Impact Evaluation Workshop for RBF - Day Six - Cameroon PB...
Annual Results and Impact Evaluation Workshop for RBF - Day Six - Cameroon PB...Annual Results and Impact Evaluation Workshop for RBF - Day Six - Cameroon PB...
Annual Results and Impact Evaluation Workshop for RBF - Day Six - Cameroon PB...
RBFHealth
 
Modeling the Effectiveness of the Lead Farmer Approach in Agricultural Extens...
Modeling the Effectiveness of the Lead Farmer Approach in Agricultural Extens...Modeling the Effectiveness of the Lead Farmer Approach in Agricultural Extens...
Modeling the Effectiveness of the Lead Farmer Approach in Agricultural Extens...
IFPRIMaSSP
 
Practical Entry Points for Improving Governance for Rural Sanitation and Hygi...
Practical Entry Points for Improving Governance for Rural Sanitation and Hygi...Practical Entry Points for Improving Governance for Rural Sanitation and Hygi...
Practical Entry Points for Improving Governance for Rural Sanitation and Hygi...
International WaterCentre
 
Effects of Extension Services on Technology Adoption and Productivity among F...
Effects of Extension Services on Technology Adoption and Productivity among F...Effects of Extension Services on Technology Adoption and Productivity among F...
Effects of Extension Services on Technology Adoption and Productivity among F...
essp2
 
Commonwealth council on aging best practice awards 2006-2016_dars
Commonwealth council on aging best practice awards 2006-2016_darsCommonwealth council on aging best practice awards 2006-2016_dars
Commonwealth council on aging best practice awards 2006-2016_dars
rexnayee
 
Medicare Ineligible PLHIV: Lessons from the ATRAS Study
Medicare Ineligible PLHIV: Lessons from the ATRAS StudyMedicare Ineligible PLHIV: Lessons from the ATRAS Study
Medicare Ineligible PLHIV: Lessons from the ATRAS Study
Australian Federation of AIDS Organisations
 
Sabar Shouchagar of Nadia District
Sabar Shouchagar of Nadia District Sabar Shouchagar of Nadia District
Sabar Shouchagar of Nadia District
NITI Aayog
 
Introduction to elm presented at National Sensitization workshop for Industre...
Introduction to elm presented at National Sensitization workshop for Industre...Introduction to elm presented at National Sensitization workshop for Industre...
Introduction to elm presented at National Sensitization workshop for Industre...
K Madan Gopal
 
George Olago - Health ICT Health Care Strategy Plan
George Olago -  Health ICT Health Care Strategy PlanGeorge Olago -  Health ICT Health Care Strategy Plan
George Olago - Health ICT Health Care Strategy PlanOtieno Olago
 
Sector planning-strategies-and-their-implementation-water for all
Sector planning-strategies-and-their-implementation-water for allSector planning-strategies-and-their-implementation-water for all
Sector planning-strategies-and-their-implementation-water for all
Aicha Chorak Franky
 
David stacey jsna workshop
David stacey   jsna workshopDavid stacey   jsna workshop
David stacey jsna workshopKind of Digital
 
Complex needs in older adults_Riverside
Complex needs in older adults_RiversideComplex needs in older adults_Riverside
Complex needs in older adults_Riverside
rexnayee
 
Lesotho Decentralization experience by Lebohang Mothae, CHALe
Lesotho Decentralization experience by Lebohang Mothae, CHALeLesotho Decentralization experience by Lebohang Mothae, CHALe
Lesotho Decentralization experience by Lebohang Mothae, CHALeachapkenya
 

What's hot (20)

Global Fund Round 9 Phase 2 HIV Project Rivers and Bayelsa States Update Report
Global Fund Round 9 Phase 2 HIV Project Rivers and Bayelsa States Update ReportGlobal Fund Round 9 Phase 2 HIV Project Rivers and Bayelsa States Update Report
Global Fund Round 9 Phase 2 HIV Project Rivers and Bayelsa States Update Report
 
PCC Eastern European Economic Migrants JSNA and CCC Migrant Populations JSNA ...
PCC Eastern European Economic Migrants JSNA and CCC Migrant Populations JSNA ...PCC Eastern European Economic Migrants JSNA and CCC Migrant Populations JSNA ...
PCC Eastern European Economic Migrants JSNA and CCC Migrant Populations JSNA ...
 
HIV and mobility in Australia: Roadmap for Action
HIV and mobility in Australia: Roadmap for ActionHIV and mobility in Australia: Roadmap for Action
HIV and mobility in Australia: Roadmap for Action
 
Annual Results and Impact Evaluation Workshop for RBF - Day Six - Cameroon PB...
Annual Results and Impact Evaluation Workshop for RBF - Day Six - Cameroon PB...Annual Results and Impact Evaluation Workshop for RBF - Day Six - Cameroon PB...
Annual Results and Impact Evaluation Workshop for RBF - Day Six - Cameroon PB...
 
Modeling the Effectiveness of the Lead Farmer Approach in Agricultural Extens...
Modeling the Effectiveness of the Lead Farmer Approach in Agricultural Extens...Modeling the Effectiveness of the Lead Farmer Approach in Agricultural Extens...
Modeling the Effectiveness of the Lead Farmer Approach in Agricultural Extens...
 
Practical Entry Points for Improving Governance for Rural Sanitation and Hygi...
Practical Entry Points for Improving Governance for Rural Sanitation and Hygi...Practical Entry Points for Improving Governance for Rural Sanitation and Hygi...
Practical Entry Points for Improving Governance for Rural Sanitation and Hygi...
 
Final summary presentation 6th conference day 3 take home
Final summary presentation 6th conference day 3 take homeFinal summary presentation 6th conference day 3 take home
Final summary presentation 6th conference day 3 take home
 
Effects of Extension Services on Technology Adoption and Productivity among F...
Effects of Extension Services on Technology Adoption and Productivity among F...Effects of Extension Services on Technology Adoption and Productivity among F...
Effects of Extension Services on Technology Adoption and Productivity among F...
 
Commonwealth council on aging best practice awards 2006-2016_dars
Commonwealth council on aging best practice awards 2006-2016_darsCommonwealth council on aging best practice awards 2006-2016_dars
Commonwealth council on aging best practice awards 2006-2016_dars
 
Team 7
Team 7Team 7
Team 7
 
FNHMA2011
FNHMA2011FNHMA2011
FNHMA2011
 
Medicare Ineligible PLHIV: Lessons from the ATRAS Study
Medicare Ineligible PLHIV: Lessons from the ATRAS StudyMedicare Ineligible PLHIV: Lessons from the ATRAS Study
Medicare Ineligible PLHIV: Lessons from the ATRAS Study
 
Sabar Shouchagar of Nadia District
Sabar Shouchagar of Nadia District Sabar Shouchagar of Nadia District
Sabar Shouchagar of Nadia District
 
Introduction to elm presented at National Sensitization workshop for Industre...
Introduction to elm presented at National Sensitization workshop for Industre...Introduction to elm presented at National Sensitization workshop for Industre...
Introduction to elm presented at National Sensitization workshop for Industre...
 
George Olago - Health ICT Health Care Strategy Plan
George Olago -  Health ICT Health Care Strategy PlanGeorge Olago -  Health ICT Health Care Strategy Plan
George Olago - Health ICT Health Care Strategy Plan
 
Sector planning-strategies-and-their-implementation-water for all
Sector planning-strategies-and-their-implementation-water for allSector planning-strategies-and-their-implementation-water for all
Sector planning-strategies-and-their-implementation-water for all
 
Building capacities of PWDs organisations to enhance access to sexual reprodu...
Building capacities of PWDs organisations to enhance access to sexual reprodu...Building capacities of PWDs organisations to enhance access to sexual reprodu...
Building capacities of PWDs organisations to enhance access to sexual reprodu...
 
David stacey jsna workshop
David stacey   jsna workshopDavid stacey   jsna workshop
David stacey jsna workshop
 
Complex needs in older adults_Riverside
Complex needs in older adults_RiversideComplex needs in older adults_Riverside
Complex needs in older adults_Riverside
 
Lesotho Decentralization experience by Lebohang Mothae, CHALe
Lesotho Decentralization experience by Lebohang Mothae, CHALeLesotho Decentralization experience by Lebohang Mothae, CHALe
Lesotho Decentralization experience by Lebohang Mothae, CHALe
 

Similar to Quality of Service Delivery Survey Presentation - Melody Niwamanya

Be Well Survey Data HP PLE -Akm
Be Well Survey Data HP PLE -AkmBe Well Survey Data HP PLE -Akm
Be Well Survey Data HP PLE -AkmAKM Alamgir, PhD
 
Dissemination of community scoore card to districts
Dissemination of community scoore card to districtsDissemination of community scoore card to districts
Dissemination of community scoore card to districtsCissy Namuzimbi
 
The path to integration: health and social care – Elaine Bayliss
The path to integration: health and social care – Elaine BaylissThe path to integration: health and social care – Elaine Bayliss
The path to integration: health and social care – Elaine Bayliss
NHS Improving Quality
 
Fluorosis management in a district review and monitoring system from nalgonda
Fluorosis management in a district   review and monitoring system from nalgondaFluorosis management in a district   review and monitoring system from nalgonda
Fluorosis management in a district review and monitoring system from nalgonda
Fluoride Knowledge and Action Network
 
The role of local government and community structures in community led total ...
The role of local government and community structures in community led total ...The role of local government and community structures in community led total ...
The role of local government and community structures in community led total ...IRC
 
The reality of an integrated digital care record
The reality of an integrated digital care recordThe reality of an integrated digital care record
The reality of an integrated digital care record
Health and Care Innovation Expo
 
Vietnam 19 may-ed
Vietnam 19 may-edVietnam 19 may-ed
Vietnam 19 may-ed
UNU-WIDER
 
Client Services Unit Update 2018
Client Services Unit Update 2018Client Services Unit Update 2018
Client Services Unit Update 2018
Office of HIV Planning
 
Community Convergent Committee - kanyakumari - An introduction
Community Convergent Committee - kanyakumari - An introductionCommunity Convergent Committee - kanyakumari - An introduction
Community Convergent Committee - kanyakumari - An introduction
Shiju Nesamony
 
Community Scorecard_Sara Gullo_10.16.13
Community Scorecard_Sara Gullo_10.16.13Community Scorecard_Sara Gullo_10.16.13
Community Scorecard_Sara Gullo_10.16.13CORE Group
 
M-governance project - NRBuzz presentation by A.Salim, A.Orwa & H. Moraa
M-governance project - NRBuzz presentation by A.Salim, A.Orwa & H. MoraaM-governance project - NRBuzz presentation by A.Salim, A.Orwa & H. Moraa
M-governance project - NRBuzz presentation by A.Salim, A.Orwa & H. MoraaiHub Research
 
How to Conduct a Community Assessment for Water Projects
How to Conduct a Community Assessment for Water ProjectsHow to Conduct a Community Assessment for Water Projects
How to Conduct a Community Assessment for Water Projects
Rotary International
 
Community-Centered Health Systems Strengthening -- Namburete
Community-Centered Health Systems Strengthening -- NambureteCommunity-Centered Health Systems Strengthening -- Namburete
Community-Centered Health Systems Strengthening -- Namburete
CORE Group
 
D1.4: Anil Vyas: Sustainable Access to Clean Drinking Water to 300,000 Urban ...
D1.4: Anil Vyas: Sustainable Access to Clean Drinking Water to 300,000 Urban ...D1.4: Anil Vyas: Sustainable Access to Clean Drinking Water to 300,000 Urban ...
D1.4: Anil Vyas: Sustainable Access to Clean Drinking Water to 300,000 Urban ...Debbie_at_IDS
 
Transitioning from reach every district to reach every community
Transitioning from reach every district to reach every communityTransitioning from reach every district to reach every community
Transitioning from reach every district to reach every community
JSI
 
Mapping nutrition change in Odisha
Mapping nutrition change in OdishaMapping nutrition change in Odisha
Mapping nutrition change in Odisha
Transform Nutrition
 
SIBS : rural water supply monitoring in Timor Leste
SIBS : rural water supply monitoring in Timor LesteSIBS : rural water supply monitoring in Timor Leste
SIBS : rural water supply monitoring in Timor Leste
IRC
 
The Governance and Economics of Water Security for Sustainable Development in...
The Governance and Economics of Water Security for Sustainable Development in...The Governance and Economics of Water Security for Sustainable Development in...
The Governance and Economics of Water Security for Sustainable Development in...
OECDregions
 

Similar to Quality of Service Delivery Survey Presentation - Melody Niwamanya (20)

Be Well Survey Data HP PLE -Akm
Be Well Survey Data HP PLE -AkmBe Well Survey Data HP PLE -Akm
Be Well Survey Data HP PLE -Akm
 
DTURevolutionist2013
DTURevolutionist2013DTURevolutionist2013
DTURevolutionist2013
 
SAKSHAM
SAKSHAMSAKSHAM
SAKSHAM
 
Dissemination of community scoore card to districts
Dissemination of community scoore card to districtsDissemination of community scoore card to districts
Dissemination of community scoore card to districts
 
The path to integration: health and social care – Elaine Bayliss
The path to integration: health and social care – Elaine BaylissThe path to integration: health and social care – Elaine Bayliss
The path to integration: health and social care – Elaine Bayliss
 
Fluorosis management in a district review and monitoring system from nalgonda
Fluorosis management in a district   review and monitoring system from nalgondaFluorosis management in a district   review and monitoring system from nalgonda
Fluorosis management in a district review and monitoring system from nalgonda
 
The role of local government and community structures in community led total ...
The role of local government and community structures in community led total ...The role of local government and community structures in community led total ...
The role of local government and community structures in community led total ...
 
The reality of an integrated digital care record
The reality of an integrated digital care recordThe reality of an integrated digital care record
The reality of an integrated digital care record
 
Vietnam 19 may-ed
Vietnam 19 may-edVietnam 19 may-ed
Vietnam 19 may-ed
 
Client Services Unit Update 2018
Client Services Unit Update 2018Client Services Unit Update 2018
Client Services Unit Update 2018
 
Community Convergent Committee - kanyakumari - An introduction
Community Convergent Committee - kanyakumari - An introductionCommunity Convergent Committee - kanyakumari - An introduction
Community Convergent Committee - kanyakumari - An introduction
 
Community Scorecard_Sara Gullo_10.16.13
Community Scorecard_Sara Gullo_10.16.13Community Scorecard_Sara Gullo_10.16.13
Community Scorecard_Sara Gullo_10.16.13
 
M-governance project - NRBuzz presentation by A.Salim, A.Orwa & H. Moraa
M-governance project - NRBuzz presentation by A.Salim, A.Orwa & H. MoraaM-governance project - NRBuzz presentation by A.Salim, A.Orwa & H. Moraa
M-governance project - NRBuzz presentation by A.Salim, A.Orwa & H. Moraa
 
How to Conduct a Community Assessment for Water Projects
How to Conduct a Community Assessment for Water ProjectsHow to Conduct a Community Assessment for Water Projects
How to Conduct a Community Assessment for Water Projects
 
Community-Centered Health Systems Strengthening -- Namburete
Community-Centered Health Systems Strengthening -- NambureteCommunity-Centered Health Systems Strengthening -- Namburete
Community-Centered Health Systems Strengthening -- Namburete
 
D1.4: Anil Vyas: Sustainable Access to Clean Drinking Water to 300,000 Urban ...
D1.4: Anil Vyas: Sustainable Access to Clean Drinking Water to 300,000 Urban ...D1.4: Anil Vyas: Sustainable Access to Clean Drinking Water to 300,000 Urban ...
D1.4: Anil Vyas: Sustainable Access to Clean Drinking Water to 300,000 Urban ...
 
Transitioning from reach every district to reach every community
Transitioning from reach every district to reach every communityTransitioning from reach every district to reach every community
Transitioning from reach every district to reach every community
 
Mapping nutrition change in Odisha
Mapping nutrition change in OdishaMapping nutrition change in Odisha
Mapping nutrition change in Odisha
 
SIBS : rural water supply monitoring in Timor Leste
SIBS : rural water supply monitoring in Timor LesteSIBS : rural water supply monitoring in Timor Leste
SIBS : rural water supply monitoring in Timor Leste
 
The Governance and Economics of Water Security for Sustainable Development in...
The Governance and Economics of Water Security for Sustainable Development in...The Governance and Economics of Water Security for Sustainable Development in...
The Governance and Economics of Water Security for Sustainable Development in...
 

Quality of Service Delivery Survey Presentation - Melody Niwamanya

  • 1. National and Local Service Delivery Survey for Lesotho Draft Report Presentation Melody Niwamanya FEI CONSULTING & EFICON CONSULTING 2nd July 2015
  • 2. Contents 1. Introduction 2. Methodology 3. Key Survey findings 4. Institutional Constraints 5. Challenges and Recommendations 6. Best practices and lessons learnt
  • 4. Introduction 1. The DDP is a four year programme (2012-2016) 2. Main partners ( GoL, UNDP, UNCDF, EU) 3. Main purpose is to: promote decentralized service delivery for social economic growth through the development of transparent funding mechanisms and by improving the accountability of local authorities. 4. Main Components of the DDP a) Improving development funding through local authorities b)Promoting decentralization and accountability systems at the local level c) Enhancing capacities of line ministries and local authorities to decentralize functions
  • 5. Introduction Objectives of the Baseline Survey: • To assess the accessibility and quality of service delivery • To ascertain the level of satisfaction with services (in terms of accessibility, quality, timeliness etc.) • To identify the institutional capacity needs to support decentralized service delivery; • To identify challenges faced by community members in demanding and accessing services; • To examine the existing oversight mechanisms for quality assurance in service delivery and accountability; and • To document best practices and provide recommendations for improving service delivery.
  • 6. Service Areas 1. Education 2. Health 3. Agriculture 4. Energy 5. Water & sanitation 6. Roads 7. Civil registry 8. Forestry/lands 9. Social protection and child protection 6 districts Botha- Bothe Maseru Mafeteng Mohale’s Hoek Quthing Thaba Tseka Key Service Ministries Public Works and Transport, Roads Directorate Social Development Forestry Energy, Department of Energy Health Water, Department of Water Affairs, Water Commission Development Planning Education Agriculture & Food Security Civil Service Registry , Ministry of Home Affairs
  • 8. Approach and Methodology Our Approach &Methodology: • Qualitative and Quantitative methods • Four stages of our approach (Inception, Data collection, Data analysis and Reporting) Inception Stage: • Inception meetings with partners • Review of critical documents • Writing the survey questionnaires • Sample size selection • Training of research teams • Review of the Inception report by the partners • Presentation of the inception report • Approval of inception report and commencement
  • 9. Approach and Methodology Sample size and Scope • Six districts (selected based on poverty levels & distribution between Low and high lands) • 1,116 House holds surveys in the six districts • 12 Focus Group Discussions • Sectors covered: Health, Education, Water & Sanitation, Agriculture, Energy, Roads, Civil registry, Forestry and Land reclamation, Social protection, Child protection.
  • 10. Data collection • Household interviews • Key informant interviews (KIIs) • Focus group discussions, 2 per district, over 120 discussants • Review of various reports Data analysis • Data cleaning • Data entry using Epidata • Data analysis using SPSS version 17 Report writing and presentation
  • 12. Findings- Education Integrated Early Childhood Care and Development (IECCD) • 63% of households had children between age of 3 and 5 years • 59% of these households, had the children attending IECCD • 47% in Urban and 73% in the rural areas Main reasons for not sending children to IECCD  Not reasonable to at that age (28%)  No facilities for IECCD (227%)  Poor Care (26%)  No money to facilitate children to attend IECCD (17%)
  • 13. Education Quality of IECCD schools  Less than 1% of the national budget is spent on IECCD
  • 14. Education Free Primary Education  About 20% of National budget  59% had children of School Primary going age  48 minutes to reach school  42 mins (Urban) and 51 (Rural)  85% walked to school Types of schools attended
  • 16. Education Satisfaction with various aspects: Satisfied:  Quality of teachers (64%)  Quality of education (57%)  Taking care of children (51%) Un satisfied:  school feeding (45%)  quality of infrastructure (33%)  distance to school (31.6%) Quality of Education
  • 17. Education Factors limiting access to education services  Inadequate service infrastructure (IECCD mainly)  Some parents cannot afford the IECCD 40 Maloti monthly facilitation for teachers  Shortage of food supply at the IECCDs and primary schools  Inadequate portions or poor food quality in FPE schools  Hidden costs that hinder FPE continuity  Long distances to schools ( 48 Minutes)
  • 18. Health Un satisfied clients  Waiting time (31% urban and 49% rural)  distance to health facilities (18% urban and 46% rural)  Emergency services (19% urban and 39% rural) Those that Accessed Public health services in last 12 months
  • 19. Health Satisfaction with services (good or very good) • 84% Urban • 81% Rural • All HIV AIDS counselling services (90% and above) , • TB treatment and support services (92%), • Child immunisation services (90%) Waiting time • 50% waited between 1-4 hours) for services • 29% waited for 5 to 12 hours for services Perception on Quality of services
  • 20. Health Factors limiting access  Low health workers staff levels  Poor supervision  Long distances to health facilities (64 minutes)  Lack of Confidentiality in handling client information  Shortage of Medicines and supplies  Expired Medicines  Inadequate facilities and equipment  Inadequate emergency and ambulance services
  • 21. Water and Sanitation • The most important natural resource in Lesotho! • 77% have access to water sources (NDP 2012) • 83% had access to water in the Rural areas (Survey) • 88 % had access to water in the Urban areas (Survey) • About 52% in the rural and 35% in Urban areas rated the water as being safe • about 20% in the rural and 35% in the urban rated the water as being Unsafe • About 16% in rural and 81% in urban paid money for the water they used
  • 22. Water and Sanitation Main source of water
  • 23. Water and Sanitation Main type of sanitation facility Rural Urban Overall Sewerage system 0.42 12.88 7.55 % Septic tank 5.94 42.93 27.09 % VIP Latrine 74.95 20.99 44.09 % Others type of latrines 18.88 23.21 21.27 % Types of Sanitation facilities used
  • 24. Water and Sanitation Picture: Different types of Latrines VIP Latrine Ordinary Latrine
  • 25. Water and Sanitation Factors limiting access to water and Sanitation services • Contaminated or un-safe water • Long Distances to water sources, takes over an hour on average • Irregular Water supply especially in Urban areas • Slow response to repair broken pipes and taps • Increasing water costs by WASCO • Poor community response to protection of water sources • Poorly planned and built toilets • Lack of pit latrine emptying facilities and resources
  • 26. Agriculture • 0ver 70% depends directly on Agricultural • Services provided included: • About 45% of the surveyed households were engaged in agricultural Main services accessed:  injections for pets;  subsidies on seeds/fertilizers;  food and nutrition training;  training in good farming practices (demonstration farms);  training on soil conservation and land management.
  • 27. Agriculture Satisfaction with Agricultural services- Rural areas Subsidy on inputs Food and nutrition sensitisation Good Farming practices training Crop and Livestock Marketing Livestock programme support Management of animal theft Satisfied 33 36 41 12 24 55 Neutral 13 26 18 40 30 6 Not satisfied 54 38 41 48 46 39 0 10 20 30 40 50 60 %percentage Aspects of Agricultural services
  • 28. Agriculture Subsidy on inputs Food and nutrition sensitisation Good Farming practices training Crop and Livestock Marketing Livestock programme support Management of animal theft Satisfied 14 14 18 3 8 19 Neutral 19 22 26 23 25 14 Not satisfied 67 64 56 74 66 67 0 10 20 30 40 50 60 70 80 %percentage Aspects of Agricultural services Satisfaction with Agricultural services- Urban Areas
  • 29. Agriculture Factors Limiting access to services • Poor quality Seeds • Due to hunger, some communities eat seeds meant for planting • Late arrival of tractors (after the planting season) • Lack of irrigation facilities • Illegal importation of cattle from South Africa
  • 30. Civil Registry Rural (%) Urban (%) Overall (%) 75 83 80 25 17 20 % percent Accessed services in Civil registry Yes No Access to Civil registry services
  • 31. Civil Registry Rural (%) Urban (%) Services 1day 2-5day 2weeks 1 month >1 month 1day 2-5day 2weeks 1 month More than1 month Birth certificate 44.4 32.8 3.9 8.7 10.3 23.3 40.0 18.7 11.8 6.1 Death certificate 66.2 28.1 4.3 0.7 0.7 53.2 29.5 13.7 3.2 0.5 Marriage certificate 60.6 29.4 7.3 1.8 0.9 82.8 7.7 7.7 1.0 1.0 National ID 47.9 36.4 4.9 1.0 9.8 40.0 38.2 11.7 8.0 2.1 Passport 15.9 17.8 3.8 40.6 21.9 16.8 13.7 5.0 45.7 18.8 AVERAGE 47 28.9 4.8 4 10.5 6 8.72 43.2 25.8 11.4 13.9 4 5.7 Time taken to access the different services
  • 32. Civil Registry Rural (%) Urban (%) Services Veryunsatisfied Unsatisfied Neutral/Un decided Satisfied VerySatisfied Veryunsatisfied Unsatisfied Neutral/Un decided Satisfied VerySatisfied Birth certificate 15.9 17.8 3.8 40.6 21.9 16.8 13.7 5.0 45.7 18.8 Death certificate 8.7 7.7 34.1 36.1 13.5 5.8 8.9 24.9 33.8 26.7 Marriage certificate 6.7 6.2 48.2 33.2 5.7 5.9 1.3 13.9 32.5 46.4 National ID 16.1 5.5 11.9 43.4 23.2 10.2 10.2 8.1 45.6 26.0 Passport 17.4 17.0 25.4 32.6 7.6 26.2 16.9 8.3 34.8 13.8
  • 33. Civil Registry • Awareness of Grievance handling
  • 34. Civil Registry Factors limiting access • Long queues • Limited staff • Lack of adequate information • Frequent breakdown of equipment • Poor customer care
  • 35. Social Protection • House hold’s Access to various services
  • 36. Social protection Satisfied clients % Child Grants Programme Free Primary Education Public Assistance OVC Bursary Old Age Pension Agricultural inputs Public Works School Feeding 68.2 50.8 55.6 41.6 66.8 51.5 24.4 14.7 53.6 83.7 48.9 61 75.5 24 55.9 42.8 % of satisfied clients with services Urban Rural
  • 37. Social Protection Old age pension Child protection services/Child Grants Programme OVC Bursary Public Assistance (poor Families-destitute) 69.6 15.4 9.1 7.2 69.2 10.1 14.9 11.2 Satisfaction with regularity of payment % Urban Rural Satisfaction with regularity of payment
  • 38. Awareness of grievance handling mechanisms
  • 39. Factors limiting access  A high age limit for Old age pension (70 years)
  • 40. Social Protection Factors limiting utilisation  Long distances to collect the payments  Lack of awareness about these programmes;  Lack of clarity on selection criteria for some programmes;  Orphaned children lack the support to register and access funds  Poor records management
  • 41. Child protection 0 10 20 30 40 50 60 70 80 90 100 Prevention and response to child sexual, physical, emotional abuse Prevention and response to neglect, exploitation, and child labour. Prevention and response to Property grabbing. Life skills training for children and youth Average Yes (%) 9.7 7.5 9.5 16.7 10.9 No (%) 90.3 92.5 90.5 83.3 89.2 %Access Child protection services accessed Whether a member of a household accessed services
  • 42. Child Protection Prevention and response to child sexual, physical, emotional abuse Prevention and response to neglect, exploitation, and child labor. Prevention and response to Property grabbing. Life skills training for children and youth 76 70 66.6 37.4 78.2 82.4 80.8 86.4% P e r c e n t % Satisfied with child protection services Rural Urban
  • 43. Child Protection Factors Limiting Access • Corruption in the handling of cases • Lack of Information on Justice dispensation process • Lack of Witness protection services
  • 45. Main source of heating
  • 46. • Satisfaction with Electricity Services
  • 47. Factors limiting accessibility • Bio mass fuel sources are dwindling • Limited affordable alternatives
  • 48. Road Infrastructure • Main means of transportation 1.8 0.4 45.9 9.9 42 19 0.2 40.8 1.4 38.6 11.7 0.3 43 5 40 Rural Urban Overall
  • 49. • Main type of Road used
  • 51. • Satisfaction with various aspects of roads 0 5 10 15 20 25 30 Quality of roads constructed Road maintenance Care and action taken during winter Responsiveness to complaints on roads 24 14 12 24 29 11 12 14 % of satisfied clients Urban Rural
  • 52. Factors limiting access to roads • Timeliness of road maintenance or road restoration after damage; “After roads are reported damaged; 69% of respondents estimated that it takes more than 6 months to repair a road.” • Water logging; • Very Narrow roads • Rocky and mountainous terrain hard to construct roads • Flying rocks
  • 53. Forestry and Land reclamation Awareness of services Tree planting- Water conservation Proper range management Control of soil erosion Water harvesting infrastructures 49.7 54.7 46.7 52.3 56.6 10.2 25.3 15.3 14.6 21.8 40.1 20 37.9 33.1 21.6 Percent (%) Yes Neutral No
  • 54. • Satisfaction with service aspects Tree planting- Water conservation Proper range management Control of soil erosion Water harvesting infrastructures 5.9 3.6 12 1.6 4.5 0.7 0.6 2 3.3 2.1 % Percentage Service Aspects Urban Rural
  • 55. • Limited awareness of government programmes • Increased Deforestation • Tree planting campaigns are loosing momentum
  • 57. General findings • Planning Framework and capacity are still weak in particular sector and district planning processes are disjointed making it difficult to support service delivery in local governments appropriately • Areas of disharmony between sector based legislation and policies with decentralisation framework; many of sector based legislation pre- date the LG Act or the Decentralisation Policy for example, under forestry, water, roads, forestry • Roles between CG and LGs have not been very clear or understood and LGs do not often have the capacity to execute their roles affecting programme supervision. Ministries continue to undertake most of programme supervision • The distinction between roles of chiefs and local politicians provided in the Decentralisation Policy, is yet to be fully acknowledged. Conflicts between Chiefs and local politicians (councillors) were cited widely as a hindrance to services delivery.
  • 58. General Findings Continue .. • Management of local government budgets affects service delivery; budgets of LGs are scattered across deconcentrated units; transfer of funds is often slow and unpredictable. LGs find it difficult to finance recurrent operations involving maintenance and supervision. • Continued delay to form technical structures under LGs is a major limitation to the execution and supervision of service delivery operations • Capacity of coordinating institutions is key: concerns that role of MLGC in the facilitating the relations with LGs was not properly played
  • 59. Water The water supply function is assigned to LGs • Need harmonisation of laws between LG Act and Water Act to minimise risk in the management of water resources; • Improve coordination of actors in relation to the access and management of water resources; waste disposal, land mgt, etc. • Capacity, both at the Water Commission / Water Affairs Dept. to supervise the development and management of water sources within communities is limited. • Capacity of LGs for the management of integrated water catchment areas – these are degrading rapidly as they are poorly protected • Easier sources of water are drying up, due to Climate change effects, making the unit cost for service delivery high. • Contributions from local populations do not always come readily (due to affordability or cooperation issues) under the water committees so maintenance and operations of systems, e.g. provision electricity of fuel for pumps, is often impacted.
  • 60. Civil Registration Civil Registration is not decentralized but at NICR • Budget resources are inadequate to expand services to community level • Delays in service are also caused by the significant backlog in registration ( - only 33% captured; temporary issue) • Chiefs are not remunerated for the verification services they render and may not be always available. This is a risks to the integrity of the system as users may resort to giving inducements to Chiefs to obtain a service. • Limitations on bandwidth and the reliability of the network negatively effects the operations and is a source of frustration for clients.
  • 61. Roads Roads Directorate is for management of all roads; LGs are development and maintenance of access roads • Capacity of Roads Directorate (RD) for technical support and enforcement of standards and quality assurance is not enough to cover the entire country • Districts / LGs budgets are often small and not adequate for maintenance of community roads and are often delayed and are un-predictable. • Although contractors are being trained, they often have limited resources (financial, technical staff, and equipment) and inadequate implementation experience and capacity.
  • 62. Forestry LGs has a role to control and protect natural resources. Main role is with Ministry of Forestry, Range and Soil Conservation • Conflict in different policies confuse local leaders; for example, under range management, differing charges are prescribed for grazing outside designated ranges by the Ministry of Forestry and by the Ministry for Local Governments • Reducing sector budgets have limited staff recruitment leading to the major HR gaps at the Ministry and in districts for key positions such as Forest Rangers and Grazing Control Supervisors. • Local councils are not playing their role of supervision and protection effectively; there is rampant vandalism of forestry resources and other program interventions
  • 63. Agriculture Ministry of Agriculture is central. Agriculture Functions to LGs are broad. • Wide spread capacity gaps limiting ability to monitor farmers and farmer programmes; districts do not have staff of their own • Information flow from districts to the national level however has remained a major challenge; for example reporting on the breakout of epidemics / disease. • Commitment to agriculture programs by farmers is not always assured; cases of the diversion of inputs (seeds) / medication are cited • Major weakness in the extension and monitoring services; as a result, production does not always meet expected yields because farmers do not often put enough effort into looking after their gardens. • Subsidies have created a dependence syndrome; inputs provided by Government are often taken for granted, leading to the inefficient utilisation of resources by farmers.
  • 64. Energy Energy function is not decentralized - assigned to Energy Ministry • Limited funding makes it difficult to extend the national grid to communities. Only 35% of households are connected. • Lesotho is a net importer of electricity. High dependency on external sources (South Africa) is a risk in the pricing of electricity and limits the opportunities to reduce the costs of electricity as the FGDs wanted. • Private companies often have limited capital for investments and are unable to significantly participate in the distribution / supply of energy. • Poor standards control is affecting reliability of the energy services; uncontrolled energy related products are found everywhere on the market affecting the services
  • 65. Social Protection SP is lead by MSD and other central Govt units. Role for LGs is not clear. Policy assigns a coordination functions to Districts • Getting local communities to participate in social protection programs is a challenge as their role is not backed by legislation. • There are many players in the area of social protection services including government agencies / ministries, NGOs, and need to strengthen coordination mechanisms • Limited staff capacity at MSD; MSD faces major human resource gaps as a number of positions remain vacant • Coordination at LG; oversight and management committees for the programs at district level include elected members, chiefs and politicians (councillors). Neither of these committees nor their processes is backed by law or policy but is only a creation of MSD • No administrative structures at LGs for social protection
  • 66. Education LGs has role primary and secondary education – but not devolved yet; LGs provide location and participate in governance of schools • Resources are insufficient to maintain / expand school infrastructure as demand grows. • Some teachers above 60 years are still kept and some are un- trainable. Retiring them from the system requires a lot of funds (retirement packages) which are not available. • Members of schools boards are volunteers with tenure of 3 years. It is difficult to obtain the required commitment of members without some form of compensation. • Capacity for supervision / inspection of schools is low. As a result, rural schools in particular tend to start the academic term late due to high absenteeism and find it difficult to complete the curriculum on time
  • 68. General Challenges These challenges has largely been identified before • Participation of LGs in the planning, management and supervision is very limited. This is affected by delay to implement technical and administrative structures among others. • LGs have no structures and therefore capacities to carry out their full mandate. At the same time, central sector are often stretched because they have to fill in gaps left by the absence of LGs • There is a need for policy consistency on cost sharing across all services so that users are well aware about their obligations. • There will be need for better regulation of LG programs to minimise the effect of dependency • Infrastructure maintenance roles and responsibilities must be clarified and resources assigned to them as the Decentralisation Policy is implemented. • Roles and mechanisms for information sharing and dissemination need to be clarified as the new Decentralisation Policy is implemented.
  • 69. Key Recommendations • Expedite the implementation of the Decentralisation Policy so that LGs can begin to participate more effectively in service delivery • Issue guidelines to all sector institutions on streamlining their legal and policy frameworks to embrace decentralisation. • Formulate and implement a change management and capacity building plan to prepare LGs and central government sector institutions for their roles under the new dispensation based on the decentralisation policy. • As provided in the 2012 Decentralisation Diagnostic Study, formulate and implement a plan to reorient the MoLGCP and MoF so that their coordination roles under the Decentralisation Policy are effectively played. • Re-establish the previously closed Community Councils or set-up satellite centres to bring services closer to people
  • 70. THANK YOU - Q&A