The quality inspection report summarizes measurement results for a part inspected on March 14, 2019. Key measurements included a best fit alignment analysis, cross sections, linear and radial dimension checks, and 3D comparison to a reference model. Some measurements such as linear dimension 2 were out of tolerance. Custom views and group measurements for flatness and parallelism were also reported. In summary, the report presents quantitative inspection results for part dimensions and alignments.
This was the first training manual instrumental and developed by Colin Koh in 2001 to provide basic energy audit knowledge for manufacturing customers in Singapore.
This was the first training manual instrumental and developed by Colin Koh in 2001 to provide basic energy audit knowledge for manufacturing customers in Singapore.
STUDY OF MONTHLY SUPPLIER EVALUATION SCORECARD PARAMETERS OF INDIAN CAR MANUF...IAEME Publication
Growing automobile industry, make in India initiatives from government of India
and increasing challenges of competitiveness has made supplier selection and
periodic evaluation process more complex. In this paper, focus is given on periodic
supplier evaluation scorecard parameters. The perceptions of experts from Indian car
manufacturing industry are studied to understand their views on these parameters.
Also studied the impact of variables like respondent’s age, qualification, experience,
department, designation, geographical location (region) and type of organization
(OEM/Supplier) on these parameters. This study will be helpful to car manufacturing
industry in India to understand the perceptions within industry about monthly supplier
evaluation scorecard parameters. This in turn will help in improving monthly supplier
evaluation scorecard systems and supplier performance
The 3-course bundle we are offering is the best money can buy. Professionally created in mind to provide you with expert subject knowledge about your chosen field. With this course bundle, your CV will shine through as it provides you with skills highly valued by employers.
See More: https://bit.ly/2WC8q6Z
The Report issued by supervising inspectorate(SGS-CSTC Standards Technical Services CO. Ltd) confirm that:
Company name: Guangzhou Zhilitong Electromechanical Co.,Ltd
Showroom: Http://zhilitong.en.made-in-china.com
Address: 1/F, 2nd Building, 287 Longxi Road, Liwan District, Guangzhou, Guangdong, China
Product: Testing Equipment
has been on site audited for the following scope of activity
1. General Information
2. Production Capacity & Quality Control
3. Photos
General Comments:
Guangzhou Zhilitong Electromechanical Co., Ltd is a manufacturer with 19 employees; it was established in 1991, located in 1/F, 2nd Building, 287 Longxi Road, Liwan District, Guangzhou, Guangdong, China; The workshops occupy an area of more than 600 square
meters, and the main product is testing equipment, the company has its own brand
Sign for and on behalf of
SGS-CSTC Standards Technical Services Co,Ltd
Basics of Economic & Environmental Issues in Materials Selection - EdukiteEduKite
The life cycle of a product chiefly depends on the choice of material’s implications which obviously influences many characteristics of economic and environmental performance. This Basics of Economic & Environmental Issues in Materials Selection helps you evaluate those implications by solving problems related to life cycle environmental evaluation.
See More: https://bit.ly/2yyRyzB
Tests and Requirements: Like Ham and Eggs, Sugar and Spice, Lucy and DesiTechWell
The practice of agile software development requires a clear understanding of business needs. Misunderstanding requirements causes waste, slipped schedules, and mistrust within the organization. Developers implement their perceived interpretation of requirements; testers test against their perceptions. Disagreement can arise about implementation defects, when the cause is really a disagreement about the requirement. Ken Pugh shows how acceptance tests decrease requirements misunderstandings by both developers and testers. A testable requirement provides a single source that serves as the analysis document, acceptance criteria, regression test suite, and progress tracker for any given feature. Explore the creation, evaluation, and use of testable requirements by the business and developers. Join Ken to examine how to transform requirements into stories, small units of work that have business value, small implementation effort, and easy-to-understand acceptance tests. Learn how testers and requirement elicitors can work together to create acceptance tests prior to implementation.
Slides for my "Monitoring in Azure" talk at Zühlke Group DevOpsDays 2019 #DevOps #Azure #Monitoring
Demo repository: https://github.com/tknerr/zdod19-azure-monitoring-demo
ISO 14001 Context of the Organization Elements Team Web Africa
Understanding the Organization and its context
Understanding the needs and expectations of interested parties
Determining the scope of the EMS
Environmental Management System
CASE STUDY: Regeneracja przepustnic i wykonanie uszczelnieńDominika Rytwińska
Zakres prac:
1. Wstępne oględziny celem kwalifikacji do całkowitego demontażu przepustnic
2. Demontaż zespołu napędowego
3. Pomiar geometrii
4. Analiza składu stali
5. Czyszczenie i ocena uszkodzeń
6. Regeneracja dysku przepustnicy
7. Wykonanie uszczelek
8. Montaż uszczelnień w przepustnicach
9. Wykonanie testów szczelności
10. Pakowanie i transport do klienta
STUDY OF MONTHLY SUPPLIER EVALUATION SCORECARD PARAMETERS OF INDIAN CAR MANUF...IAEME Publication
Growing automobile industry, make in India initiatives from government of India
and increasing challenges of competitiveness has made supplier selection and
periodic evaluation process more complex. In this paper, focus is given on periodic
supplier evaluation scorecard parameters. The perceptions of experts from Indian car
manufacturing industry are studied to understand their views on these parameters.
Also studied the impact of variables like respondent’s age, qualification, experience,
department, designation, geographical location (region) and type of organization
(OEM/Supplier) on these parameters. This study will be helpful to car manufacturing
industry in India to understand the perceptions within industry about monthly supplier
evaluation scorecard parameters. This in turn will help in improving monthly supplier
evaluation scorecard systems and supplier performance
The 3-course bundle we are offering is the best money can buy. Professionally created in mind to provide you with expert subject knowledge about your chosen field. With this course bundle, your CV will shine through as it provides you with skills highly valued by employers.
See More: https://bit.ly/2WC8q6Z
The Report issued by supervising inspectorate(SGS-CSTC Standards Technical Services CO. Ltd) confirm that:
Company name: Guangzhou Zhilitong Electromechanical Co.,Ltd
Showroom: Http://zhilitong.en.made-in-china.com
Address: 1/F, 2nd Building, 287 Longxi Road, Liwan District, Guangzhou, Guangdong, China
Product: Testing Equipment
has been on site audited for the following scope of activity
1. General Information
2. Production Capacity & Quality Control
3. Photos
General Comments:
Guangzhou Zhilitong Electromechanical Co., Ltd is a manufacturer with 19 employees; it was established in 1991, located in 1/F, 2nd Building, 287 Longxi Road, Liwan District, Guangzhou, Guangdong, China; The workshops occupy an area of more than 600 square
meters, and the main product is testing equipment, the company has its own brand
Sign for and on behalf of
SGS-CSTC Standards Technical Services Co,Ltd
Basics of Economic & Environmental Issues in Materials Selection - EdukiteEduKite
The life cycle of a product chiefly depends on the choice of material’s implications which obviously influences many characteristics of economic and environmental performance. This Basics of Economic & Environmental Issues in Materials Selection helps you evaluate those implications by solving problems related to life cycle environmental evaluation.
See More: https://bit.ly/2yyRyzB
Tests and Requirements: Like Ham and Eggs, Sugar and Spice, Lucy and DesiTechWell
The practice of agile software development requires a clear understanding of business needs. Misunderstanding requirements causes waste, slipped schedules, and mistrust within the organization. Developers implement their perceived interpretation of requirements; testers test against their perceptions. Disagreement can arise about implementation defects, when the cause is really a disagreement about the requirement. Ken Pugh shows how acceptance tests decrease requirements misunderstandings by both developers and testers. A testable requirement provides a single source that serves as the analysis document, acceptance criteria, regression test suite, and progress tracker for any given feature. Explore the creation, evaluation, and use of testable requirements by the business and developers. Join Ken to examine how to transform requirements into stories, small units of work that have business value, small implementation effort, and easy-to-understand acceptance tests. Learn how testers and requirement elicitors can work together to create acceptance tests prior to implementation.
Slides for my "Monitoring in Azure" talk at Zühlke Group DevOpsDays 2019 #DevOps #Azure #Monitoring
Demo repository: https://github.com/tknerr/zdod19-azure-monitoring-demo
ISO 14001 Context of the Organization Elements Team Web Africa
Understanding the Organization and its context
Understanding the needs and expectations of interested parties
Determining the scope of the EMS
Environmental Management System
CASE STUDY: Regeneracja przepustnic i wykonanie uszczelnieńDominika Rytwińska
Zakres prac:
1. Wstępne oględziny celem kwalifikacji do całkowitego demontażu przepustnic
2. Demontaż zespołu napędowego
3. Pomiar geometrii
4. Analiza składu stali
5. Czyszczenie i ocena uszkodzeń
6. Regeneracja dysku przepustnicy
7. Wykonanie uszczelek
8. Montaż uszczelnień w przepustnicach
9. Wykonanie testów szczelności
10. Pakowanie i transport do klienta
CASE STUDY: Regeneracja przepustnic i wykonanie uszczelnieńDominika Rytwińska
Zakres prac:
1. Wstępne oględziny celem kwalifikacji do całkowitego demontażu przepustnic
2. Demontaż zespołu napędowego
3. Pomiar geometrii
4. Analiza składu stali
5. Czyszczenie i ocena uszkodzeń
6. Regeneracja dysku przepustnicy
7. Wykonanie uszczelek
8. Montaż uszczelnień w przepustnicach
9. Wykonanie testów szczelności
10. Pakowanie i transport do klienta
Case study: uszczelnienia i regeneracja przepustnic
Branża: przemysł stoczniowy
Zakres prac:
1. Wstępne oględziny celem kwalifikacji do całkowitego demontażu przepustnic
2. Demontaż zespołu napędowego
3. Pomiar geometrii
4. Analiza składu stali
5. Czyszczenie i ocena uszkodzeń
6. Regeneracja dysku przepustnicy
7. Wykonanie uszczelek
8. Montaż uszczelnień w przepustnicach
9. Wykonanie testów szczelności
10. Pakowanie i transport do klienta
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
What Is Recruitment Processing Outsourcing (RPO) Services?Impeccable HR
Impeccable HR provides a wide range of RPO services for your bulk hiring needs within a stipulated period. They meticulously build RPO solutions to improve your recruitment process. RPO services are great for budget-conscious recruiters who want high-quality personnel.
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingLancer Service
Discover why your Porsche 911 headlights might flicker out unexpectedly. From aging bulbs to electrical gremlins and moisture mishaps, we're delving into the reasons behind the blackout. Stay tuned to illuminate the road ahead and ensure your lights shine bright for safer journeys.
How To Fix The Key Not Detected Issue In Mercedes CarsIntegrity Motorcar
Experiencing a "Key Not Detected" problem in your Mercedes? Don’t take it for granted. Go through this presentation to find out the exact nature of the issue you are dealing with. Have your vehicle checked by a certified professional if necessary.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Your VW's camshaft position sensor is crucial for engine performance. Signs of failure include engine misfires, difficulty starting, stalling at low speeds, reduced fuel efficiency, and the check engine light. Prompt inspection and replacement can prevent further damage and keep your VW running smoothly.
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
2. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Reference Data - HEALED_BODY_1
3. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Measured Data - Akim_3.Leios
4. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Best Fit Alignment1
Min. -0,2579
Max. 0,2579
Avg. -0,0062
RMS 0,0985
Std. Dev. 0,0983
Var. 0,0097
+Avg. 0,0827
-Avg. -0,0749
5. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Cross Section1
6. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Name Result Name Reference Value Tolerance Actual Value Deviation
Linear Dim.2 Result Data - 1 5,6 ±0,1 5,3407 -0,2593
7. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Cross Section2
8. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Name Result Name Reference Value Tolerance Actual Value Deviation
Radial Dim.2 Result Data - 1 1 -0,5 ~ 0 1,2946 0,2946
Radial Dim.3 Result Data - 1 1 -0,5 ~ 0 1,1567 0,1567
9. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : 3D Compare1
Min. -0,4903
Max. 0,4904
Avg. -0,0025
RMS 0,1115
Std. Dev. 0,1115
Var. 0,0124
+Avg. 0,0929
-Avg. -0,079
In Tol.(%) 66,8998
Out Tol.(%) 33,1002
Over Tol.(%) 16,5885
Under Tol.(%) 16,5116
10. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Name Min. Max. Avg. RMS Std. Dev. Var. +Avg. -Avg.
3D Compare1 -0,4903 0,4904 -0,0025 0,1115 0,1115 0,0124 0,0929 -0,079
11. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Group1
12. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Name Result Name Tolerance Deviation Reference Value Actual Value
Linear Dim.1 Result Data - 1 ±0,2 -0,0231 6,85 6,8269
Linear Dim.3 Result Data - 1 ±0,075 0,0272 8,175 8,2022
Linear Dim.4 Result Data - 1 ±0,1 0,3317 113,79 114,1217
Radial Dim.1 Result Data - 1 ±0,075 -0,0238 6,175 6,1512
Name Result Name Tolerance Actual Value Bonus Tolerance
Parallelism1 Result Data - 1 0,3 0,0901 0
Parallelism2 Result Data - 1 0,3 0,1539 0
Parallelism3 Result Data - 1 0,4 0,3524 0
Parallelism4 Result Data - 1 0,4 0,6182 0
Parallelism5 Result Data - 1 0,4 0,2622 0
Parallelism6 Result Data - 1 0,4 0,4663 0
Parallelism7 Result Data - 1 0,2 2,2124 0
Parallelism8 Result Data - 1 0,4 0,022 0
Parallelism9 Result Data - 1 0,4 0,5663 0
Parallelism10 Result Data - 1 0,4 0,1114 0
Parallelism11 Result Data - 1 0,4 0,4419 0
Parallelism12 Result Data - 1 0,4 0,1297 0
Parallelism13 Result Data - 1 0,4 0,7574 0
Parallelism14 Result Data - 1 0,4 0,4945 0
Parallelism15 Result Data - 1 0,4 0,3814 0
Position1 Result Data - 1 0,3 4,1148 0
Position2 Result Data - 1 0,3 1,4627 0
Position3 Result Data - 1 0,3 1,5015 0
Position4 Result Data - 1 0,5 3,6135 0
Position5 Result Data - 1 0,5 4,0088 0
Position6 Result Data - 1 0,4 1,8587 0
Position7 Result Data - 1 0,4 1,8679 0
13. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View1
14. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View2
15. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View3
16. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View5
17. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View6
18. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View7
19. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View8
20. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View9
21. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View10
22. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View11
23. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View12
24. Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Date Mar 14, 2019
Unit mm
Department [Department]
Inspector [Inspector]
Product Name [Product Name]
Part Name [Part Name]
Result Data - 1 : Custom View13