Sivarani. S.M
#206, Stag Saptagiri Apartment, Email: sivimis@gmail.com
I’st ‘A’ Main S.T.Bed Layout, Mobile : 9741341725
Koramangala 4th
Block,
Bangalore 560034
To associate myself with a progressive and professional organization that provides a challenging and
rewarding career ensuring a high level of job satisfaction.
• 5.5+ years of experience in Software Testing Methodologies in Healthcare Domain.
• Proficient in Performing Functional, Regression, User Acceptance, Integration, System,
and Performance Testing.
• Around 1 years of experience in Test Automation using QTP 9.2
• Expertise in manual/functional Testing and has strong knowledge in all phases of SDLC
• Excellent knowledge and working experience in test planning, test execution and test results
analysis
• Proficient in all stages of test life cycle from test planning to defect tracking and managing
defect lifecycle.
• Experience in designing test plans and test cases, verifying and validating windows based
server and web based applications and effective Quality Assurance implementation
• Good experience in replication of problems and generation of bug report using Spira Team,
Bug tracking Tool (Test Director), Bugzilla.
• Developing and maintaining test scripts, analyzing bugs and interacting with development
team members in fixing the defects
• Exposure in Multi Language testing like Arabic and Thai
• Excellent communication and presentation skills, self starter, quick learner, team player
Educational Details
Course & Duration Institution Board/University Percentage of Marks
B.E
(2003 – 2007)
Odaiyppa College of Engineering
and Technology, Theni
ANNA
University 73%
H.S.C – 2003 T.K.S.M. Hr Sec School, Theni Higher Secondary 82%
S.S.L.C – 2001 A.M.H.N.U.M School, Andipatti Matriculation 78%
1. Organization : ABK Software Solution, Bangalore.
Designation : Quality Analyst.
Duration : Dec 2015 to Till Date 2016
2. Organization : HEALTHFORE Pvt Ltd (Religare group), Bangalore
Designation : Sr.Software Test Engineer
Duration : August 2011 to October 2013
Objective
Profile Summary
Professional Experience
3. Organization : iSOFT India Pvt Ltd, Bangalore
Designation : Quality Engineer
Duration : February 2009 to March 2011
4. Organization : Ramco Systems Pvt Ltd, Chennai
Designation : Trainee
Duration : February 2008 to August 2008
Operating systems : MS-Dos, Windows
Languages : JAVA 2.0, HTML, VB
Database : Oracle 9i & 10g, SQL Server
Technologies : J2EE
Testing Tools : QTP, Win runner, Load runner
Bug Tracking Tool : Test Director, Spira Team, Whiziblesem
1. ABK Software Solution:
Client : IMC - Jeddah, Saudi.
Worked for : Past 7 month - Till Date.
Tools used : Bugzilla – Test management and Defect tracking
Modules Handled: Speciality Modules
 Doctor Workbench (DWB)
 Admit Discharge Transfer (ADT)
 Nursing
 Emergency (ER)
 Pharmacy
 Laboratory (LAB)
 Blood Bank (BB)
 Radiology (RD)
Responsibilities:
• Preparation, review and execution of Test case documents
• Perform testing, defect raising and defect tracking
• Automation of test script by using QTP
• Monitoring of defect tracking activity till closure
• Periodic status updates to Client, Onsite coordinator
• Communicating and coordinating with development team for the defect fixes
• Performed Build deployment in testing environment.
Technical Skills
Projects
Project: HIMMA
2. Healthfore Product Description(Group of Religare technologies):
Client : EIH - Dubai, ABMH - India, As-Salam-Egypt
Worked for : 2 years.
Tools used : Whiziblesem – Test management and Defect tracking
Modules Handled: PAS (Patient Administration System)
 Patient Registration (PR)
 Inpatient Management (IP)
 Outpatient Management (OP)
 Accidents and Emergency (AE)
 Appointment Scheduling (OA)
 Billing (BL)
Speciality Modules
 Laboratory (LAB)
 Blood Bank (BB)
 Radiology (RD)
Doctor Screen - Practitioner Workbench(PWB)
Responsibilities:
• Preparation, review and execution of Test case documents
• Perform testing, defect raising and defect tracking
• Automation of test script by using QTP
• Monitoring of defect tracking activity till closure
• Periodic status updates to Client, Onsite coordinator
• Communicating and coordinating with development team for the defect fixes
• Performed Build deployment in testing environment.
3. iSOFT Product Description:
eHIS (Enterprise Healthcare Information System) is a state of the art healthcare management
system built on n-tier technology targeting hospitals, clinics and primary healthcare centres. It
provides the entire Healthcare Entrepreneur Resource Planning product functionality, right from a
Patient Registration to Discharge, having the patient in the hospital as the focal point; the product
excels as a paperless and film less enterprise wide solution. This product has several modules, which
are extremely doctor friendly, the core of which are System Manager, Master Patient index, Inpatient,
Outpatient, A&E, Appointments, Clinician Access, Order Entry, Pharmacy and Inventory. The various
components are fully integrated to automate functions ranging patient administration to clinician
services.
Project: EIH- Emirates International Hospital
Client : Siriraj Hospital - Bangkok, Thailand, LIMPOPO - SA, MEDICITI – India
Worked for : 2 years.
Tools used : SpiraTeam – Test management and Defect tracking, QTP 9.2
Modules Handled: PAS (Patient Administration System)
 Master Patient Index (MPI)
 Inpatient Management (IP)
 Outpatient Management (OP)
 Duplicate Registration Check (DR)
 Appointment Scheduling (OA)
Speciality Modules
 Oral Health (OH)
 Maternity Consultation (MC)
 Radiology (RD)
Clinician Access (CA)
Responsibilities:
• Preparation, review and execution of Test case documents
• Perform beta testing, defect raising and defect tracking
• Automation of test script by using QTP
• Monitoring of defect tracking activity till closure
• Periodic status updates to Client, Onsite coordinator and PM
• Communicating and coordinating with development team for the defect fixes
Project: EHIS 5.x - Enterprise Healthcare Information System
Client : MOH-Malaysia; MOD –Oman
Worked for : 6 Months.
Tools used : SpiraTeam – Test management and Defect tracking
Modules Handled : PAS (Patient Administration System)
 Master Patient Index (MPI)
 Inpatient Management (IP)
 Outpatient Management (OP)
 Appointment Scheduling (OA)
Responsibilities:
• Perform functional testing, defect raising and defect tracking
• Monitoring of defect tracking activity till closure
Project: EHIS 10.x - Enterprise Healthcare Information System
• Ad-hoc and exploratory testing
• Mentored the new joiners in the team
• Review and modification of test cases for this module
• Perform sanity testing and regression testing
• Defect logging and tracking in the bug tracking tool
4. Ramco Product Description:
Project: Manufacturing Solution, Interface
Client : Ramco Cements, Sagar cements
Tools used : Screen launch, Test Director
Responsibilities:
• Deploying the application Patches.
• Performed Screen launch testing and Scenario Testing by using an Internal tool and report
the status.
• Performed Load testing, Object count and source safe.
• Release of Project and Version.
• Coordinating with team members and update the status to team lead.
Personal Details
Date of Birth : 1st
July, 1986.
Sex : Female
Marital Status : Married
Languages Known : Tamil, English
Nationality : Indian
• Ad-hoc and exploratory testing
• Mentored the new joiners in the team
• Review and modification of test cases for this module
• Perform sanity testing and regression testing
• Defect logging and tracking in the bug tracking tool
4. Ramco Product Description:
Project: Manufacturing Solution, Interface
Client : Ramco Cements, Sagar cements
Tools used : Screen launch, Test Director
Responsibilities:
• Deploying the application Patches.
• Performed Screen launch testing and Scenario Testing by using an Internal tool and report
the status.
• Performed Load testing, Object count and source safe.
• Release of Project and Version.
• Coordinating with team members and update the status to team lead.
Personal Details
Date of Birth : 1st
July, 1986.
Sex : Female
Marital Status : Married
Languages Known : Tamil, English
Nationality : Indian

Quality Analyst_5+ years exp

  • 1.
    Sivarani. S.M #206, StagSaptagiri Apartment, Email: sivimis@gmail.com I’st ‘A’ Main S.T.Bed Layout, Mobile : 9741341725 Koramangala 4th Block, Bangalore 560034 To associate myself with a progressive and professional organization that provides a challenging and rewarding career ensuring a high level of job satisfaction. • 5.5+ years of experience in Software Testing Methodologies in Healthcare Domain. • Proficient in Performing Functional, Regression, User Acceptance, Integration, System, and Performance Testing. • Around 1 years of experience in Test Automation using QTP 9.2 • Expertise in manual/functional Testing and has strong knowledge in all phases of SDLC • Excellent knowledge and working experience in test planning, test execution and test results analysis • Proficient in all stages of test life cycle from test planning to defect tracking and managing defect lifecycle. • Experience in designing test plans and test cases, verifying and validating windows based server and web based applications and effective Quality Assurance implementation • Good experience in replication of problems and generation of bug report using Spira Team, Bug tracking Tool (Test Director), Bugzilla. • Developing and maintaining test scripts, analyzing bugs and interacting with development team members in fixing the defects • Exposure in Multi Language testing like Arabic and Thai • Excellent communication and presentation skills, self starter, quick learner, team player Educational Details Course & Duration Institution Board/University Percentage of Marks B.E (2003 – 2007) Odaiyppa College of Engineering and Technology, Theni ANNA University 73% H.S.C – 2003 T.K.S.M. Hr Sec School, Theni Higher Secondary 82% S.S.L.C – 2001 A.M.H.N.U.M School, Andipatti Matriculation 78% 1. Organization : ABK Software Solution, Bangalore. Designation : Quality Analyst. Duration : Dec 2015 to Till Date 2016 2. Organization : HEALTHFORE Pvt Ltd (Religare group), Bangalore Designation : Sr.Software Test Engineer Duration : August 2011 to October 2013 Objective Profile Summary Professional Experience
  • 2.
    3. Organization :iSOFT India Pvt Ltd, Bangalore Designation : Quality Engineer Duration : February 2009 to March 2011 4. Organization : Ramco Systems Pvt Ltd, Chennai Designation : Trainee Duration : February 2008 to August 2008 Operating systems : MS-Dos, Windows Languages : JAVA 2.0, HTML, VB Database : Oracle 9i & 10g, SQL Server Technologies : J2EE Testing Tools : QTP, Win runner, Load runner Bug Tracking Tool : Test Director, Spira Team, Whiziblesem 1. ABK Software Solution: Client : IMC - Jeddah, Saudi. Worked for : Past 7 month - Till Date. Tools used : Bugzilla – Test management and Defect tracking Modules Handled: Speciality Modules  Doctor Workbench (DWB)  Admit Discharge Transfer (ADT)  Nursing  Emergency (ER)  Pharmacy  Laboratory (LAB)  Blood Bank (BB)  Radiology (RD) Responsibilities: • Preparation, review and execution of Test case documents • Perform testing, defect raising and defect tracking • Automation of test script by using QTP • Monitoring of defect tracking activity till closure • Periodic status updates to Client, Onsite coordinator • Communicating and coordinating with development team for the defect fixes • Performed Build deployment in testing environment. Technical Skills Projects Project: HIMMA
  • 3.
    2. Healthfore ProductDescription(Group of Religare technologies): Client : EIH - Dubai, ABMH - India, As-Salam-Egypt Worked for : 2 years. Tools used : Whiziblesem – Test management and Defect tracking Modules Handled: PAS (Patient Administration System)  Patient Registration (PR)  Inpatient Management (IP)  Outpatient Management (OP)  Accidents and Emergency (AE)  Appointment Scheduling (OA)  Billing (BL) Speciality Modules  Laboratory (LAB)  Blood Bank (BB)  Radiology (RD) Doctor Screen - Practitioner Workbench(PWB) Responsibilities: • Preparation, review and execution of Test case documents • Perform testing, defect raising and defect tracking • Automation of test script by using QTP • Monitoring of defect tracking activity till closure • Periodic status updates to Client, Onsite coordinator • Communicating and coordinating with development team for the defect fixes • Performed Build deployment in testing environment. 3. iSOFT Product Description: eHIS (Enterprise Healthcare Information System) is a state of the art healthcare management system built on n-tier technology targeting hospitals, clinics and primary healthcare centres. It provides the entire Healthcare Entrepreneur Resource Planning product functionality, right from a Patient Registration to Discharge, having the patient in the hospital as the focal point; the product excels as a paperless and film less enterprise wide solution. This product has several modules, which are extremely doctor friendly, the core of which are System Manager, Master Patient index, Inpatient, Outpatient, A&E, Appointments, Clinician Access, Order Entry, Pharmacy and Inventory. The various components are fully integrated to automate functions ranging patient administration to clinician services. Project: EIH- Emirates International Hospital
  • 4.
    Client : SirirajHospital - Bangkok, Thailand, LIMPOPO - SA, MEDICITI – India Worked for : 2 years. Tools used : SpiraTeam – Test management and Defect tracking, QTP 9.2 Modules Handled: PAS (Patient Administration System)  Master Patient Index (MPI)  Inpatient Management (IP)  Outpatient Management (OP)  Duplicate Registration Check (DR)  Appointment Scheduling (OA) Speciality Modules  Oral Health (OH)  Maternity Consultation (MC)  Radiology (RD) Clinician Access (CA) Responsibilities: • Preparation, review and execution of Test case documents • Perform beta testing, defect raising and defect tracking • Automation of test script by using QTP • Monitoring of defect tracking activity till closure • Periodic status updates to Client, Onsite coordinator and PM • Communicating and coordinating with development team for the defect fixes Project: EHIS 5.x - Enterprise Healthcare Information System Client : MOH-Malaysia; MOD –Oman Worked for : 6 Months. Tools used : SpiraTeam – Test management and Defect tracking Modules Handled : PAS (Patient Administration System)  Master Patient Index (MPI)  Inpatient Management (IP)  Outpatient Management (OP)  Appointment Scheduling (OA) Responsibilities: • Perform functional testing, defect raising and defect tracking • Monitoring of defect tracking activity till closure Project: EHIS 10.x - Enterprise Healthcare Information System
  • 5.
    • Ad-hoc andexploratory testing • Mentored the new joiners in the team • Review and modification of test cases for this module • Perform sanity testing and regression testing • Defect logging and tracking in the bug tracking tool 4. Ramco Product Description: Project: Manufacturing Solution, Interface Client : Ramco Cements, Sagar cements Tools used : Screen launch, Test Director Responsibilities: • Deploying the application Patches. • Performed Screen launch testing and Scenario Testing by using an Internal tool and report the status. • Performed Load testing, Object count and source safe. • Release of Project and Version. • Coordinating with team members and update the status to team lead. Personal Details Date of Birth : 1st July, 1986. Sex : Female Marital Status : Married Languages Known : Tamil, English Nationality : Indian
  • 6.
    • Ad-hoc andexploratory testing • Mentored the new joiners in the team • Review and modification of test cases for this module • Perform sanity testing and regression testing • Defect logging and tracking in the bug tracking tool 4. Ramco Product Description: Project: Manufacturing Solution, Interface Client : Ramco Cements, Sagar cements Tools used : Screen launch, Test Director Responsibilities: • Deploying the application Patches. • Performed Screen launch testing and Scenario Testing by using an Internal tool and report the status. • Performed Load testing, Object count and source safe. • Release of Project and Version. • Coordinating with team members and update the status to team lead. Personal Details Date of Birth : 1st July, 1986. Sex : Female Marital Status : Married Languages Known : Tamil, English Nationality : Indian