1. Public Facilities Manual Project
NVBIA/NAIOP
Phase 2 Update
Don Lacquement, Project Manager
Danielle Badra, Outreach Coordinator
Land Development Services
November 21, 2019
2. Today’s Presentation
•Background
•Phase 2 Objectives
•Actions to Date
•Outreach
•Phase 2 Highlights
•Projected Schedule
•Easy Ways to Be Involved
•Contact Information
2
3. Background
December 4, 2018
BOS approved “Phase 1”
revisions to achieve
flexibility & clarity in the
land development
review process.
3
4. Phase 2
Objectives
• Resolve Complex Phase 1
Issues/Vet
• Bring PFM into Alignment
with Codes
• Remove Replication
• Incorporate LTIs
• Add New and Updated
Guidelines
4
5. Actions to Date
• Developed a Phase 2
PFM Website.
• Completed: Spring P2
Package - July 16, 2019.
• In Progress: Winter P2
Package.
5
6. Outreach to County Staff
6
PFM
Project
Team
Steering
Committee
Technical
Advisory
Committee
DPC
OCA
BOS Land
Use
Aides
PC Land
Use
Process
Review
8. Outreach to
Land Development Industry
8
PFM
Project
Website
Stakeholder
Committee
zMOD
Land Use
Attorneys
ESI
NVBIA
NAIOP
ESRC
Industry
Reps
9. Engineering Standards Review Committee
9
• Paul Johnson (NVBIA)
• Kevin Nelson (VDOT)
• Mark Liberati (Virginia
Association of Surveyors)
• Keith Sinclair (ESI)
• Theodore Britt (VSPE)
• James Clark (Heavy
Construction Contractors
Association)
• Howard Guba (Citizen-at-
Large)
• Michael Kitchen (NAIOP)
• Asad Rouhi (NVSWCD)
• Bryan Layman (Associated
Builders and Contractors)
• Kevin Pullen (League of
Women Voters)
• Dr. Robert Norwood
(Citizen-at-Large)
• Paul Norsi (Citizen-at-Large)
• Ned Poffenberger (Fairfax
County Federation of
Citizens Associations)
• Robert Scheller (WACEL)
• Bruce Titus (Fairfax Bar
Association)
• Saundra O’Connell (DPD)
• Don Lacquement (LDS)
• Chad Crawford (DPWES)
10. Phase 2 HighlightsStreetLights
• Align PFM with
Regulations of VDOT,
Chapter 118.
• Incorporate Urban
Design Guidelines in
CRAs, CRDs & Mixed-
Use Areas.
• Legislative Amendment
to Decommission Solar
Facilities.
GeneralInformation
Modernize Street
Lights to Light
Emitting Diode
(LED) Fixtures.
StormDrainage
Provide Alternative
Pipe Material for
Storm Sewer.
Require Dam Breach
Inundation Zone
Maps with As-Builts.
• Minor Chapter 6
Updates In-Progress.
10
11. Phase 2 HighlightsStreets
• Point to relevant
VDOT Standards
& Specifications
to Facilitate
Design & Review
of Streets.
• Clarify VDOT’s
Shared-Use Path.
Trails&Recreation
• Update Trails
Information to
Reflect the
Countywide
Trails Plan.
SanitarySewer
• Elevate Manhole
Covers to Prevent
Inflow.
• Remove Outdated
Provisions such as
Concrete Pipe.
• Verify Pipe Types, DIP
Liners, & Easement
Width Requirements
for Deep Sewers.
11
12. Phase 2 HighlightsTreeConservation
• Clarify Critical
Root Zone
Requirement.
• Update RPA
Planting Density
Specifications
(Potential P2
Item).
Geotechnical
• Set Residential
Basement
Elevation Above
Groundwater
Table.
• Incorporate
Standards for the
Use of Lime
Stabilization.
Geotechnical
• Add Exploration
Requirements for
Deep
Foundations.
12
14. Easy Ways to Be Involved
Check out the PFM Project website.
Review the chapter edits - routinely.
Use the online feedback form or email.
Attend the public hearings.
14
15. Questions?
For more information:
PFM Project Phase 2 Website
https://www.fairfaxcounty.gov/landdevelopment/p
ublic-facilities-manual-flexibility-project
Contact: