SlideShare a Scribd company logo
Proposal for the establishment of two Internet Cafeteria.
The Dominica Association of Local Community Authority, in order to
continue, after the end of the ARIAL Project on December 31st 2013.
Would like to establish Internet Cafeteria in two areas in Dominica as a
pilot project to start with every intention to expand into all seven
satellite districts in the near future.
The two first areas to be established will be the Northern and the
Western Districts.
On the North the cafeteria will be based in the Village of Vieille Case
and will be supervised by DALCA and the Village Council and will cover
the villages of Vieille Case, Penville, Thibaud, Bense and Paix Bouche.
It will be opened Seven days a week from Monday to Sunday, from 9am
to 9pm, in order to accommodate the five Villages.
The target will be College and School children, and also the youth of
those areas.
On the West, the Cafeteria will be established in the Village of Mahaut,
and will include the villages of Mahaut, Campbell, Jimmit, Tareau
Warner and Layou and will be supervised by DALCA and the Village
Council.
The aim of the project is to generate income of approximately EC
$4,400.00 on a weekly basis in each area.
In order to implement the project DALCA is seeking from, ARIEL
according to the funds remaining for the duration of the Project
Which comes to an end on the 31st of December 9, 2013.
DALCA is seeking funding for eight desk top computers (four per area)
eight Computer desks, (four per area) two Printers (one per area) two
Transformers,(one per area) and two surge protectors (one per area).
The Dominica Association of Local Authorities will continue the
expansion of the projects as soon as the two areas are up and running
effectively, from profits generated from the two projects, In the
following districts the Northeast, East, Southeast, Southwest, and South
Districts as phase two of the program.
The project will also serve the purpose of training Local Councilors and
Villagers in educational programs and computer literacy, and will also
include an Adult Education Program, for the upliftment of the
communities.
Hence the reason why DALCA is asking VNG International that if the
balance of the Budget that comes to a close in December 2013 can
meet the cost of the equipment needed for that project.
8 Desktop computers @ EC$2800.00 each = $ 22400.00
8 computer desks @ EC$ 850.00 each = $ 6800.00
2 transformers @ EC$ 500.00 each = $ 1000.00
2 surge protector @ EC$ 175.00 each = $ 350.00
2 HP printers @ EC $ 500.00 each = $ 1000.00
Total cost to purchase Equipments = $ 31550.00
Cost of equipments for project = $ 31,550.00
Projected weekly income from project
= $ 4400.00 weekly X 4 weeks = $17600.00 X 12 months = EC $
211,200.00.
Income Expenditure table
Cost of purchase of equipments for start of project EC $ 31550.00
Payment of staff for daily operation of business
2 staff @ $ 1000.00 Per. Fortnight X 2 EC $ 2000.00
Rental of office space in two areas @ $500.00 monthly EC $ 1000.00
Electricity two areas @$150.00 Monthly EC $ 300.00
Payment to services from Lime internet. $ 90.00 Monthly EC $ 180.00
Mileage assistance for chairman to supervise two areas EC $ 600.00
Stationary for use at cafeterias EC $ 1000.00
Total monthly expense EC $ 5080.00
TOTAL Monthly Income from Project = $ 17,600.00
Total Monthly Expenditure = $ 5080.00
Net profit on a monthly Basis = $ 12520.00
Proposal for the establishment of two Internet Cafeteria

More Related Content

Viewers also liked

docker
dockerdocker
docker
Cesar Maciel
 
Κειμενογράφος: Αντιγραφή-Επικόλληση
Κειμενογράφος: Αντιγραφή-ΕπικόλλησηΚειμενογράφος: Αντιγραφή-Επικόλληση
Κειμενογράφος: Αντιγραφή-Επικόλληση
Penelope Markellou
 
Critical Analysis of Starbucks
Critical Analysis of StarbucksCritical Analysis of Starbucks
Critical Analysis of Starbucks
8902714972
 
Update EU Cookie-Rechtlinie, Petra Eul-Löh, HEC Consulting
Update EU Cookie-Rechtlinie, Petra Eul-Löh, HEC ConsultingUpdate EU Cookie-Rechtlinie, Petra Eul-Löh, HEC Consulting
Update EU Cookie-Rechtlinie, Petra Eul-Löh, HEC Consulting
luna-park GmbH
 
Cafeteria Research Project Report
Cafeteria Research Project ReportCafeteria Research Project Report
Cafeteria Research Project Report
Elizabeth Madison, MA, Registered Dietitian
 
Research proposal & thesis format ver 4 april 2011
Research proposal & thesis format   ver 4 april 2011Research proposal & thesis format   ver 4 april 2011
Research proposal & thesis format ver 4 april 2011
Adam Khaleel
 
Business Proposal for Soft Line Cafe to operate at Al Yamamah University
Business Proposal for Soft Line Cafe to operate at Al Yamamah UniversityBusiness Proposal for Soft Line Cafe to operate at Al Yamamah University
Business Proposal for Soft Line Cafe to operate at Al Yamamah University
Naja Faysal
 
Project Proposal Guidelines
Project Proposal GuidelinesProject Proposal Guidelines
Project Proposal Guidelines
Prof. Erwin Globio
 
Gulayan Sa Paaralan 2010
Gulayan Sa Paaralan 2010Gulayan Sa Paaralan 2010
Gulayan Sa Paaralan 2010
Cuenca Nhs Pugo
 
Enterprise PHP (Zend UK Business Conference)
Enterprise PHP (Zend UK Business Conference)Enterprise PHP (Zend UK Business Conference)
Enterprise PHP (Zend UK Business Conference)
Ivo Jansch
 
Project Proposal Sample: RFID on Warehouse Management System
Project Proposal Sample: RFID on Warehouse Management SystemProject Proposal Sample: RFID on Warehouse Management System
Project Proposal Sample: RFID on Warehouse Management System
Cheri Amour Calicdan
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project report
Hagi Sahib
 
Project proposal on income generating 1
Project proposal on income generating 1Project proposal on income generating 1
Project proposal on income generating 1
berhanu taye
 
Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014
Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014
Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014
Department of Education - Quary - 1 IS
 

Viewers also liked (14)

docker
dockerdocker
docker
 
Κειμενογράφος: Αντιγραφή-Επικόλληση
Κειμενογράφος: Αντιγραφή-ΕπικόλλησηΚειμενογράφος: Αντιγραφή-Επικόλληση
Κειμενογράφος: Αντιγραφή-Επικόλληση
 
Critical Analysis of Starbucks
Critical Analysis of StarbucksCritical Analysis of Starbucks
Critical Analysis of Starbucks
 
Update EU Cookie-Rechtlinie, Petra Eul-Löh, HEC Consulting
Update EU Cookie-Rechtlinie, Petra Eul-Löh, HEC ConsultingUpdate EU Cookie-Rechtlinie, Petra Eul-Löh, HEC Consulting
Update EU Cookie-Rechtlinie, Petra Eul-Löh, HEC Consulting
 
Cafeteria Research Project Report
Cafeteria Research Project ReportCafeteria Research Project Report
Cafeteria Research Project Report
 
Research proposal & thesis format ver 4 april 2011
Research proposal & thesis format   ver 4 april 2011Research proposal & thesis format   ver 4 april 2011
Research proposal & thesis format ver 4 april 2011
 
Business Proposal for Soft Line Cafe to operate at Al Yamamah University
Business Proposal for Soft Line Cafe to operate at Al Yamamah UniversityBusiness Proposal for Soft Line Cafe to operate at Al Yamamah University
Business Proposal for Soft Line Cafe to operate at Al Yamamah University
 
Project Proposal Guidelines
Project Proposal GuidelinesProject Proposal Guidelines
Project Proposal Guidelines
 
Gulayan Sa Paaralan 2010
Gulayan Sa Paaralan 2010Gulayan Sa Paaralan 2010
Gulayan Sa Paaralan 2010
 
Enterprise PHP (Zend UK Business Conference)
Enterprise PHP (Zend UK Business Conference)Enterprise PHP (Zend UK Business Conference)
Enterprise PHP (Zend UK Business Conference)
 
Project Proposal Sample: RFID on Warehouse Management System
Project Proposal Sample: RFID on Warehouse Management SystemProject Proposal Sample: RFID on Warehouse Management System
Project Proposal Sample: RFID on Warehouse Management System
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project report
 
Project proposal on income generating 1
Project proposal on income generating 1Project proposal on income generating 1
Project proposal on income generating 1
 
Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014
Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014
Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014
 

Similar to Proposal for the establishment of two Internet Cafeteria

Mahabir Pun Connecting Nepal with Wireless Connection
Mahabir Pun Connecting Nepal with Wireless ConnectionMahabir Pun Connecting Nepal with Wireless Connection
Mahabir Pun Connecting Nepal with Wireless Connection
Sparrow SMS
 
Nepal Disaster and Innovation by Mahabir Pun tokyo2015
Nepal Disaster and Innovation by Mahabir Pun  tokyo2015Nepal Disaster and Innovation by Mahabir Pun  tokyo2015
Nepal Disaster and Innovation by Mahabir Pun tokyo2015
Izumi Aizu
 
E-Rate
E-RateE-Rate
E-Rate
Kari Widener
 
Power point for week 2
Power point for week 2Power point for week 2
Power point for week 2
Kari Widener
 
eWATER
eWATEReWATER
Présentation Bootcamp 1 OR.pptx
Présentation Bootcamp 1 OR.pptxPrésentation Bootcamp 1 OR.pptx
Présentation Bootcamp 1 OR.pptx
walidlaqrafi
 
First Light: An MD&I project by Fjord London and Ensemble pour la Difference
First Light: An MD&I project by Fjord London and Ensemble pour la DifferenceFirst Light: An MD&I project by Fjord London and Ensemble pour la Difference
First Light: An MD&I project by Fjord London and Ensemble pour la Difference
Internet Society
 
Arusha | Jun-14 | Changing Rural Economies through Small Scale Electrification
Arusha | Jun-14 | Changing Rural Economies through Small Scale ElectrificationArusha | Jun-14 | Changing Rural Economies through Small Scale Electrification
Arusha | Jun-14 | Changing Rural Economies through Small Scale Electrification
Smart Villages
 
EXHIBITION (3)
EXHIBITION (3)EXHIBITION (3)
EXHIBITION (3)
Khanya Kalashe
 
Uniaro 2.4KW Solar Off-Grid Project interim Report
Uniaro 2.4KW Solar Off-Grid Project interim ReportUniaro 2.4KW Solar Off-Grid Project interim Report
Uniaro 2.4KW Solar Off-Grid Project interim Report
Ogbemudia Godfrey
 
Civic cohort30
Civic cohort30Civic cohort30
Webinar 2 | Apr-16 | Learning from Failure in Social Entrepreurship
Webinar 2 | Apr-16 | Learning from Failure in Social EntrepreurshipWebinar 2 | Apr-16 | Learning from Failure in Social Entrepreurship
Webinar 2 | Apr-16 | Learning from Failure in Social Entrepreurship
Smart Villages
 
2016 R3 Michele Bernier
2016 R3 Michele Bernier2016 R3 Michele Bernier
2016 R3 Michele Bernier
MassRecycle .
 
Terrat | Aug-15 | Introduction of solar system in Longido district.
Terrat | Aug-15 | Introduction of solar system in Longido district.Terrat | Aug-15 | Introduction of solar system in Longido district.
Terrat | Aug-15 | Introduction of solar system in Longido district.
Smart Villages
 
Inner City News
Inner City NewsInner City News
Inner City News
Alan Bennett
 
Windsor Computer Environmental Program
Windsor Computer Environmental ProgramWindsor Computer Environmental Program
Windsor Computer Environmental Program
Jacqueline Christmas
 
9 14 rev green only
9 14 rev green only9 14 rev green only
9 14 rev green only
Michael Baker
 
ACCIONA Magazine 73: COP25 Special Edition
ACCIONA Magazine 73: COP25 Special EditionACCIONA Magazine 73: COP25 Special Edition
ACCIONA Magazine 73: COP25 Special Edition
acciona
 
009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future
djhutch
 
ANGELIQUE INTERNATIONAL LIMITED- EDITORIAL PUBLISHED IN ELECTRICAL & POWER MA...
ANGELIQUE INTERNATIONAL LIMITED- EDITORIAL PUBLISHED IN ELECTRICAL & POWER MA...ANGELIQUE INTERNATIONAL LIMITED- EDITORIAL PUBLISHED IN ELECTRICAL & POWER MA...
ANGELIQUE INTERNATIONAL LIMITED- EDITORIAL PUBLISHED IN ELECTRICAL & POWER MA...
Angelique International Limited
 

Similar to Proposal for the establishment of two Internet Cafeteria (20)

Mahabir Pun Connecting Nepal with Wireless Connection
Mahabir Pun Connecting Nepal with Wireless ConnectionMahabir Pun Connecting Nepal with Wireless Connection
Mahabir Pun Connecting Nepal with Wireless Connection
 
Nepal Disaster and Innovation by Mahabir Pun tokyo2015
Nepal Disaster and Innovation by Mahabir Pun  tokyo2015Nepal Disaster and Innovation by Mahabir Pun  tokyo2015
Nepal Disaster and Innovation by Mahabir Pun tokyo2015
 
E-Rate
E-RateE-Rate
E-Rate
 
Power point for week 2
Power point for week 2Power point for week 2
Power point for week 2
 
eWATER
eWATEReWATER
eWATER
 
Présentation Bootcamp 1 OR.pptx
Présentation Bootcamp 1 OR.pptxPrésentation Bootcamp 1 OR.pptx
Présentation Bootcamp 1 OR.pptx
 
First Light: An MD&I project by Fjord London and Ensemble pour la Difference
First Light: An MD&I project by Fjord London and Ensemble pour la DifferenceFirst Light: An MD&I project by Fjord London and Ensemble pour la Difference
First Light: An MD&I project by Fjord London and Ensemble pour la Difference
 
Arusha | Jun-14 | Changing Rural Economies through Small Scale Electrification
Arusha | Jun-14 | Changing Rural Economies through Small Scale ElectrificationArusha | Jun-14 | Changing Rural Economies through Small Scale Electrification
Arusha | Jun-14 | Changing Rural Economies through Small Scale Electrification
 
EXHIBITION (3)
EXHIBITION (3)EXHIBITION (3)
EXHIBITION (3)
 
Uniaro 2.4KW Solar Off-Grid Project interim Report
Uniaro 2.4KW Solar Off-Grid Project interim ReportUniaro 2.4KW Solar Off-Grid Project interim Report
Uniaro 2.4KW Solar Off-Grid Project interim Report
 
Civic cohort30
Civic cohort30Civic cohort30
Civic cohort30
 
Webinar 2 | Apr-16 | Learning from Failure in Social Entrepreurship
Webinar 2 | Apr-16 | Learning from Failure in Social EntrepreurshipWebinar 2 | Apr-16 | Learning from Failure in Social Entrepreurship
Webinar 2 | Apr-16 | Learning from Failure in Social Entrepreurship
 
2016 R3 Michele Bernier
2016 R3 Michele Bernier2016 R3 Michele Bernier
2016 R3 Michele Bernier
 
Terrat | Aug-15 | Introduction of solar system in Longido district.
Terrat | Aug-15 | Introduction of solar system in Longido district.Terrat | Aug-15 | Introduction of solar system in Longido district.
Terrat | Aug-15 | Introduction of solar system in Longido district.
 
Inner City News
Inner City NewsInner City News
Inner City News
 
Windsor Computer Environmental Program
Windsor Computer Environmental ProgramWindsor Computer Environmental Program
Windsor Computer Environmental Program
 
9 14 rev green only
9 14 rev green only9 14 rev green only
9 14 rev green only
 
ACCIONA Magazine 73: COP25 Special Edition
ACCIONA Magazine 73: COP25 Special EditionACCIONA Magazine 73: COP25 Special Edition
ACCIONA Magazine 73: COP25 Special Edition
 
009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future
 
ANGELIQUE INTERNATIONAL LIMITED- EDITORIAL PUBLISHED IN ELECTRICAL & POWER MA...
ANGELIQUE INTERNATIONAL LIMITED- EDITORIAL PUBLISHED IN ELECTRICAL & POWER MA...ANGELIQUE INTERNATIONAL LIMITED- EDITORIAL PUBLISHED IN ELECTRICAL & POWER MA...
ANGELIQUE INTERNATIONAL LIMITED- EDITORIAL PUBLISHED IN ELECTRICAL & POWER MA...
 

Proposal for the establishment of two Internet Cafeteria

  • 1. Proposal for the establishment of two Internet Cafeteria. The Dominica Association of Local Community Authority, in order to continue, after the end of the ARIAL Project on December 31st 2013. Would like to establish Internet Cafeteria in two areas in Dominica as a pilot project to start with every intention to expand into all seven satellite districts in the near future. The two first areas to be established will be the Northern and the Western Districts. On the North the cafeteria will be based in the Village of Vieille Case and will be supervised by DALCA and the Village Council and will cover the villages of Vieille Case, Penville, Thibaud, Bense and Paix Bouche. It will be opened Seven days a week from Monday to Sunday, from 9am to 9pm, in order to accommodate the five Villages. The target will be College and School children, and also the youth of those areas. On the West, the Cafeteria will be established in the Village of Mahaut, and will include the villages of Mahaut, Campbell, Jimmit, Tareau Warner and Layou and will be supervised by DALCA and the Village Council. The aim of the project is to generate income of approximately EC $4,400.00 on a weekly basis in each area. In order to implement the project DALCA is seeking from, ARIEL according to the funds remaining for the duration of the Project Which comes to an end on the 31st of December 9, 2013.
  • 2. DALCA is seeking funding for eight desk top computers (four per area) eight Computer desks, (four per area) two Printers (one per area) two Transformers,(one per area) and two surge protectors (one per area). The Dominica Association of Local Authorities will continue the expansion of the projects as soon as the two areas are up and running effectively, from profits generated from the two projects, In the following districts the Northeast, East, Southeast, Southwest, and South Districts as phase two of the program. The project will also serve the purpose of training Local Councilors and Villagers in educational programs and computer literacy, and will also include an Adult Education Program, for the upliftment of the communities. Hence the reason why DALCA is asking VNG International that if the balance of the Budget that comes to a close in December 2013 can meet the cost of the equipment needed for that project. 8 Desktop computers @ EC$2800.00 each = $ 22400.00 8 computer desks @ EC$ 850.00 each = $ 6800.00 2 transformers @ EC$ 500.00 each = $ 1000.00 2 surge protector @ EC$ 175.00 each = $ 350.00 2 HP printers @ EC $ 500.00 each = $ 1000.00 Total cost to purchase Equipments = $ 31550.00 Cost of equipments for project = $ 31,550.00
  • 3. Projected weekly income from project = $ 4400.00 weekly X 4 weeks = $17600.00 X 12 months = EC $ 211,200.00. Income Expenditure table Cost of purchase of equipments for start of project EC $ 31550.00 Payment of staff for daily operation of business 2 staff @ $ 1000.00 Per. Fortnight X 2 EC $ 2000.00 Rental of office space in two areas @ $500.00 monthly EC $ 1000.00 Electricity two areas @$150.00 Monthly EC $ 300.00 Payment to services from Lime internet. $ 90.00 Monthly EC $ 180.00 Mileage assistance for chairman to supervise two areas EC $ 600.00 Stationary for use at cafeterias EC $ 1000.00 Total monthly expense EC $ 5080.00 TOTAL Monthly Income from Project = $ 17,600.00 Total Monthly Expenditure = $ 5080.00 Net profit on a monthly Basis = $ 12520.00