IEEE- Project Title 2012-2013

                                                      DOTNET



Cloud Computing
       1. A Secure Erasure Code-Based Cloud Storage System with Secure Data Forwarding.
       2. HASBE: A Hierarchical Attribute-Based Solution for Flexible and Scalable Access
          Control in Cloud Computing
       3. Enabling Secure and Efficient Ranked Keyword Search over Outsourced Cloud Data
Grid Computing
       1. Meeting Soft Deadlines in Scientific Workflows Using Resubmission Impact
       2. Detecting and resolving Firewall Policy Anomalies
       3. The Boomerang Protocol: Tying Data to Geographic Locations in Mobile
          Disconnected Networks
Image processing
       1. A Discriminative Model of Motion and Cross Ratio for View-Invariant Action
          Recognition
       2. Scene-Oriented Hierarchical Classification of Blurry and Noisy Image
Networking
       1. Distributed Resource Allocation Based on Queue Balancing in Multihop Cognitive
          Radio Networks
Network Security
       1. Double Guard: Detecting Intrusions in Multitier Web Applications
       2. Resilient Authenticated Execution of Critical Applications in Untrusted Environments
       3. Automatic Reconfiguration for Large-Scale Reliable Storage Systems
       4. Data-Provenance Verification For Secure Hosts
Data Mining
       1. Saturn: Range Queries, Load Balancing and Fault Tolerance in DHT Data Systems.
       2. Segmentation and Sampling of Moving Object Trajectories Based on
          Representativeness
Mobile Computing
       1. Enhancing Privacy and Accuracy in Probe Vehicle-Based Traffic Monitoring via Virtual
          Trip Lines
       2. Approximation Algorithms for Data Broadcast in Wireless Networks
       3. Directed by Directionality: Benefiting from the Gain Pattern of Active RFID Badges
Software Engineering
       1. QoS Assurance for Dynamic Reconfiguration of Component-Based Software Systems.
       2. Stake Rare: Using Social Networks and Collaborative Filtering for Large-Scale
          Requirements Elicitation




   33,Meenakshi Sundaram Building, Sivaji st, (Near Tnagar Bus Terminus),TNagar Chennai-17, Ph: 044-42070551/ Mobile:
             9790877889/ www.sunbeamsoft.com / sunbeamsoft@gmail.com www.sybiantechnologies.com/
                                              projects@sybiantechnologies.com
IEEE- Project Title 2012-2013

                                                        JAVA

Cloud Computing
       1. Optimization of Resource Provisioning Cost in Cloud Computing
       2. Performance Analysis of Cloud Computing Centers Using Queuing Systems.
       3. Autonomic Placement of Mixed Batch and Transactional Workloads 0.
       4. Cashing in on the Cache in the Cloud
Grid Computing
       1. An Online Data Access Prediction and Optimization Approach for Distributed
          Systems Image Processing
       2. Cost-Driven Scheduling of Grid Workflows Using Partial Critical Paths
Image Processing
       1. Improving Various Reversible Data Hiding Schemes Via Optimal Codes for Binary
          Covers
       2. Game-Theoretic Pricing for Video Streaming in Mobile Networks
Networking
       1. Insights on Media Streaming Progress Using BitTorrent-Like Protocols for On-
          Demand Streaming
Network Security
       1. ES-MPICH2: A Message Passing Interface with Enhanced Security.
       2. JS-Reduce: Defending Your Data from Sequential Background Knowledge Attacks
       3. Incentive Compatible Privacy-Preserving Distributed Classification
Data Mining
       1. A Look-Ahead Approach to Secure Multiparty Protocols.
       2. Efficient and Progressive Algorithms for Distributed Skyline Queries over Uncertain
          Data
       3. Protecting Location Privacy against Location-Dependent Attacks in Mobile Services
Software Engineering
       1. PerLa:A Language and Middleware Architecture for Data Management and
          Integration in Pervasive Information Systems
       2. Comparing Semi-Automated Clustering Methods for Persona Development
Mobile Computing
       1. Energy-Efficient Cooperative Video Distribution with Statistical QoS Provisions over
          Wireless Networks
       2. Efficient Virtual Backbone Construction with Routing Cost Constraint in Wireless
          Networks Using Directional Antennas
       3. Design of Efficient Multicast Protocol for IEEE 802.11n WLANs and Cross-Layer
          Optimization for Scalable Video Streaming
       4. Mobile Data Offloading through Opportunistic Communications and Social
          Participation



   33,Meenakshi Sundaram Building, Sivaji st, (Near Tnagar Bus Terminus),TNagar Chennai-17, Ph: 044-42070551/ Mobile:
             9790877889/ www.sunbeamsoft.com / sunbeamsoft@gmail.com www.sybiantechnologies.com/
                                              projects@sybiantechnologies.com

Projecttitles 2013

  • 1.
    IEEE- Project Title2012-2013 DOTNET Cloud Computing 1. A Secure Erasure Code-Based Cloud Storage System with Secure Data Forwarding. 2. HASBE: A Hierarchical Attribute-Based Solution for Flexible and Scalable Access Control in Cloud Computing 3. Enabling Secure and Efficient Ranked Keyword Search over Outsourced Cloud Data Grid Computing 1. Meeting Soft Deadlines in Scientific Workflows Using Resubmission Impact 2. Detecting and resolving Firewall Policy Anomalies 3. The Boomerang Protocol: Tying Data to Geographic Locations in Mobile Disconnected Networks Image processing 1. A Discriminative Model of Motion and Cross Ratio for View-Invariant Action Recognition 2. Scene-Oriented Hierarchical Classification of Blurry and Noisy Image Networking 1. Distributed Resource Allocation Based on Queue Balancing in Multihop Cognitive Radio Networks Network Security 1. Double Guard: Detecting Intrusions in Multitier Web Applications 2. Resilient Authenticated Execution of Critical Applications in Untrusted Environments 3. Automatic Reconfiguration for Large-Scale Reliable Storage Systems 4. Data-Provenance Verification For Secure Hosts Data Mining 1. Saturn: Range Queries, Load Balancing and Fault Tolerance in DHT Data Systems. 2. Segmentation and Sampling of Moving Object Trajectories Based on Representativeness Mobile Computing 1. Enhancing Privacy and Accuracy in Probe Vehicle-Based Traffic Monitoring via Virtual Trip Lines 2. Approximation Algorithms for Data Broadcast in Wireless Networks 3. Directed by Directionality: Benefiting from the Gain Pattern of Active RFID Badges Software Engineering 1. QoS Assurance for Dynamic Reconfiguration of Component-Based Software Systems. 2. Stake Rare: Using Social Networks and Collaborative Filtering for Large-Scale Requirements Elicitation 33,Meenakshi Sundaram Building, Sivaji st, (Near Tnagar Bus Terminus),TNagar Chennai-17, Ph: 044-42070551/ Mobile: 9790877889/ www.sunbeamsoft.com / sunbeamsoft@gmail.com www.sybiantechnologies.com/ projects@sybiantechnologies.com
  • 2.
    IEEE- Project Title2012-2013 JAVA Cloud Computing 1. Optimization of Resource Provisioning Cost in Cloud Computing 2. Performance Analysis of Cloud Computing Centers Using Queuing Systems. 3. Autonomic Placement of Mixed Batch and Transactional Workloads 0. 4. Cashing in on the Cache in the Cloud Grid Computing 1. An Online Data Access Prediction and Optimization Approach for Distributed Systems Image Processing 2. Cost-Driven Scheduling of Grid Workflows Using Partial Critical Paths Image Processing 1. Improving Various Reversible Data Hiding Schemes Via Optimal Codes for Binary Covers 2. Game-Theoretic Pricing for Video Streaming in Mobile Networks Networking 1. Insights on Media Streaming Progress Using BitTorrent-Like Protocols for On- Demand Streaming Network Security 1. ES-MPICH2: A Message Passing Interface with Enhanced Security. 2. JS-Reduce: Defending Your Data from Sequential Background Knowledge Attacks 3. Incentive Compatible Privacy-Preserving Distributed Classification Data Mining 1. A Look-Ahead Approach to Secure Multiparty Protocols. 2. Efficient and Progressive Algorithms for Distributed Skyline Queries over Uncertain Data 3. Protecting Location Privacy against Location-Dependent Attacks in Mobile Services Software Engineering 1. PerLa:A Language and Middleware Architecture for Data Management and Integration in Pervasive Information Systems 2. Comparing Semi-Automated Clustering Methods for Persona Development Mobile Computing 1. Energy-Efficient Cooperative Video Distribution with Statistical QoS Provisions over Wireless Networks 2. Efficient Virtual Backbone Construction with Routing Cost Constraint in Wireless Networks Using Directional Antennas 3. Design of Efficient Multicast Protocol for IEEE 802.11n WLANs and Cross-Layer Optimization for Scalable Video Streaming 4. Mobile Data Offloading through Opportunistic Communications and Social Participation 33,Meenakshi Sundaram Building, Sivaji st, (Near Tnagar Bus Terminus),TNagar Chennai-17, Ph: 044-42070551/ Mobile: 9790877889/ www.sunbeamsoft.com / sunbeamsoft@gmail.com www.sybiantechnologies.com/ projects@sybiantechnologies.com