The document discusses several nitrogen plant projects completed by the company between 2012-2014. It provides details about nitrogen plants supplied to various clients in industries like chemicals, electronics, cement, batteries, and oil & gas. Key details provided for each project include client name and location, plant capacity and technology, date of completion, and end use of nitrogen at the client's site.
Subject for Post: Operation & Maintenance in Charge (Mechanical)
I Muhammad Haris S/o Muhammad Asif request you kindly to take my C.V under consideration for the job I am applying for, as mentioned above. As my all particulars are explained in my C.V. I am looking for the reputable organization to provide me chance of working in challenging environment.
Currently I am working at Pak Oasis Industries Pvt. Ltd. as a Plant In charge. I am expert in following subjects that I have experience in my Ten year professional experience of engineering: Operation and Maintenance and industrial Control.
I will remain thankful to whole administration kindly provide me chance to work in your organization/company.
Regards:
M. Haris Asif
Experienced Process Design Engineer with a demonstrated history of working in the mechanical or industrial engineering industry. Strong engineering professional skilled in design, Contracts & tendering, Bid management, negotiations,Operations Management, Process Engineering, Power Plants, and Engineering.
Subject for Post: Operation & Maintenance in Charge (Mechanical)
I Muhammad Haris S/o Muhammad Asif request you kindly to take my C.V under consideration for the job I am applying for, as mentioned above. As my all particulars are explained in my C.V. I am looking for the reputable organization to provide me chance of working in challenging environment.
Currently I am working at Pak Oasis Industries Pvt. Ltd. as a Plant In charge. I am expert in following subjects that I have experience in my Ten year professional experience of engineering: Operation and Maintenance and industrial Control.
I will remain thankful to whole administration kindly provide me chance to work in your organization/company.
Regards:
M. Haris Asif
Experienced Process Design Engineer with a demonstrated history of working in the mechanical or industrial engineering industry. Strong engineering professional skilled in design, Contracts & tendering, Bid management, negotiations,Operations Management, Process Engineering, Power Plants, and Engineering.
Esteem is a leading supplier and contractor for Fired Heaters (Heaters, Cracking Furnaces, Reformers, Waste Heat recovery Units, Process Furnaces) and related equipment to the Hydrocarbon and Chemical industries spanning Oil & Gas, Petrochemical, Refining, Fertilizer and related sectors.
Design, supply and construction of Fired Heaters (from Turnkey projects to revamps) designed to API 560 or other international standards form the core of our business. We have capabilities to provide furnaces based on our own design or the design supplied by clients/ consultants.
Esteem is a leading supplier and contractor for Fired Heaters (Heaters, Cracking Furnaces, Reformers, Waste Heat recovery Units, Process Furnaces) and related equipment to the Hydrocarbon and Chemical industries spanning Oil & Gas, Petrochemical, Refining, Fertilizer and related sectors.
Design, supply and construction of Fired Heaters (from Turnkey projects to revamps) designed to API 560 or other international standards form the core of our business. We have capabilities to provide furnaces based on our own design or the design supplied by clients/ consultants.
JDs of Piping Engineer
1. Review of Bid documents, scope of work & client specification to kick off the project.
2 Designing of complete Skid mounted modular packages for complete EPCC Job as per Project Specifications and applicable codes and standards
3 Review of vendor documents to make sure compliance of Client Specifications and applicable codes & standards e.g. data /cut sheets of manual valves/instruments etc.
4. Preparation of package data sheets, reflecting all technical & vendor data for Client submission.
5. Leading and assigning piping tasks to team of design engineers & draftsmen.
6. Dealing with vendors to transmit technical requirements and closing of vendor’s TQ(s) specially piping material including valves, rupture discs, strainers, isolation kits etc.
7. Coordination with Client for approval for vendor data
8. 3D Modeling of the skids as per PID, project specifications, applicable codes (B31.3, API & ASME) and good industrial practices(PIPs).
9. Design Calculation for skid mounted modular packages and incorporation of changes in 3-D Model (if any) based on process requirements.
10. Issuing complete MTO(s) and MR(s) for entire modular packages.
11. Follow Up with Engineering Team for all Engineering Deliverables as per Project Specifications.
12. Follow up with engineering and fabrication team to meet the project schedule.
13. Piping Layout Drawings, Top View Equipment Layouts & Piping General Arrangement Drawings.
14. Making sure issuance of Piping Fabrication Drawings (Isometrics) with respect to correct rating, schedule and material.
15. Stress analysis based on project specifications and ASME B31.3.
16. Modify and revise designs to correct operating deficiencies or to reduce production problems.
17. Modification drawings of revamp project(s)
18. As building of Modular Packages.
19 Pre Commissioning Activities at Nigeria Site. Mechanically Hand Over of Skid Packages to Commissioning Team.
1. Projects
9 TPD Nitrogen Plant at M/S Indorama asiapet Limited,Lobpuri,Thiland
December 2014
In INDORAMA ASIAPET LIMITED, our company have supplied a 9 TPD Nitrogen Plant of
PSA techonology.
• Follow up with Production and Installation department for day to day program/follow up the
targets of projects and resource and generating productivity reports
• Mainly Responsible for Project execution which includes Erection/Installation and
commissioning as per P & I .
• Receiving the material at site, checking the specification and quantity of material received as
per requirements, and preparing material forecast to keep the work flow.
• Supervision of installation work at site including everything from erection mechanical piping as
per layout plan to installation of electrical cables and instruments and Co-ordination with the
associates/vendor for timely completion of job, giving training to the associates about the
operations.
• Supervision of erectioning of pipe lines of plant and from plant to client process.
• Also responsible for electrical cable termination from field to Main control panel and checking
all the mechanical and electrical interlock weather working as per design.
• Executing the project and handover to client.
• Training the client about the operation.
9 TPD Nitrogen Plant at CRAIN INDIA, Rajesthan
April 2014
In CrainIndiawe have given9 TPD NitrogenPlantof Membrane Techonologyanditisa containerplant
whichcan be move fromdifferentplacestoplaces.Clientisusingnitrogenintheirdiferentprocesslike
Drilling,Purgingandworkcompletionof oil wellsetc.
• FollowupwithProductionandInstallationdepartmentfordayto dayprogram/follow upthe targets
of projectsandresource andgeneratingproductivityreports
• MainlyResponsible forProjectexecutionwhichincludesErection/Installationandcommissioningas
perP & I .
• Receivingthe material atsite,checkingthe specificationandquantityof material receivedasper
requirements,andpreparingmaterial forecasttokeepthe workflow.
• Supervisionof installationworkatsite includingeverythingfromerectionmechanical pipingasper
layoutplanto installationof electricalcablesandinstrumentsandCo-ordinationwiththe
associates/vendorfortimelycompletionof job,givingtrainingtothe associatesaboutthe operations.
• Supervisionof erectioningof pipe linesof plantandfromplantto clientprocess.
• Alsoresponsibleforelectrical cableterminationfromfieldtoMaincontrol panel andcheckingall the
2. mechanical andelectrical interlockweatherworkingasperdesign.
• Executingthe projectandhandovertoclient.
• Trainingthe clientaboutthe operation.
3 TPD Nitrogen Plant at OCL CEMENT, West Bengal.
In OCL CEMENT, W.B. our company have suppled 3 TPD Nitrogen Plant which they are using
for inerting and blankiting of their different process
2 x 3 TPD Nitrogen Plant at ITC Limited, West Bengal
January2014
In ITC Limited, W.B. our company have suppled 2 x 3 TPD Nitrogen Plant which they are using
for food packeging.
2 x 6 Nm3/Hr Oxygen Plant at AMARA RAJA BATTERIES LIMITED
August2014
In AMARA RAJA BATTERIES our company have supplied 2 x 6 Nm3/Hr Oxygen Plant of
PSA Process where they will be using in Auto. ARC Welding Process in manufacturing Batteries
2 x 1.5 TPD Nitrogen Plant at BOSCH INDIA LTD, Jaipur
November2012
In BOSCH INDIA, Jaipur our company have supplied a 2 x 1.5 TPD Nitrogen Plant of PSA
techonology.
Nitrogen Plant is used here for Heat Treatment Process. Our client will be using nitrogen in their
furnaces for inerting furnace and other stages of treatment.
2.9 TPD Nitrogen Plant at Diamond Power Infrastructure Limited, Voaroda
August2013
In Diamond Power, Varododra our company have supplied Nitrogen Plant of PSA Technology.
Client is using for curing process of Cables.
4.5 TPD Nitrogen Plant at Dorf Ketal and Chemicals Limited,
In Dorf Ketal our company have supplied Nitrogen Plant of PSA Techonology.
The client will be using for chemical blanketing of chemicals.
3. 2.5 TPD Nitrogen De-Oxo Plant at Global Copper Limited, Varododra
September 2012
In Global Copper our company have supplied ultra high pure Nitrogen Plant of PSA Technology.
The client here use nitrogen for heat treatment processsuch as annelling.
7.5 TPD Nitrogen Plant at Samsung Electronics India Pvt. Ltd.
January2014
In Samsung India our company have supplied Nitrogen Plant of PSA Technology. The Client
will be using nitrogen for their different process.