The document outlines the organization of a gas turbine project team for the 2011/2012 year. The project is contracted by National Resources Canada to design a 10 MW power generator using supercritical carbon dioxide. The team is divided into six groups: Aerodynamics, Heat Transfer, Performance, Structures, Balance of Plant, and Integration. Project members are listed under each group lead along with their roles.