CLIENT
Rio Tinto Iron Ore
PROJECT
Nammuldi Incremental
Tonnes Phase 2
LOCATION
Pilbara, Western Australia
CONTRACT AWARD VALUE
$140 million
START DATE
August 2015
COMPLETION DATE
October 2017
PFS-M18 Current
NAMMULDI INCREMENTAL
TONNES PHASE 2
	
  PROJECT SUMMARY
NRW has been awarded a contract from Rio Tinto for contract mining
and ore haulage, which is located within the West Pilbara region of
Western Australia, situated approximately 60 km north-west of Tom
Price. Having completed a significant amount of civil related projects
for Rio Tinto this contract represents a significant step forward in
building a relationship with a key, long term client, across both of
NRW’s civil and mining divisions respectively.
The scope of the Nammuldi Incremental Tonnes – Phase 2 Project is
to develop the Marra Mamba iron ore deposits to produce 10Mtpa
Saleable Ore Product.
The scope of the contract is for the development of the Greenfield site
including:
• Construction of mine haul roads, ore stockpiles, waste dumps
and other mine infrastructure
• Production mining (including drill & blast)
• Haulage of high grade ore from mine area to the existing
Nammuldi Plant site (12km’s)
• Supply, installation and operation of two 5 Mtpa crushing plants
The NRW fleet that is being utilised on the project includes two 250T
excavators, one 190T excavator, five 992 loaders, fourteen 140T
dumptrucks, three 90T dumptrucks, four 200T roadtrains, seven D10
dozers, two 16 graders, one 14 grader and five watertrucks.
The contract term runs for 24 months and is anticipated to have a peak
of 140 personnel on site, including local indigenous.

More Related Content

Similar to Project - Nammuldi Mining and Ore Haulage

Cypress Development Corp. - November 2014
Cypress Development Corp. - November 2014Cypress Development Corp. - November 2014
Cypress Development Corp. - November 2014
Company Spotlight
 
Cypress Development Corp. - Corporate Presentation
Cypress Development Corp. - Corporate PresentationCypress Development Corp. - Corporate Presentation
Cypress Development Corp. - Corporate Presentation
Company Spotlight
 
Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013
FirstQuantum
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
FirstQuantum
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013FirstQuantum
 
Oz Metals 20150808
Oz Metals 20150808Oz Metals 20150808
Oz Metals 20150808
J-François Bertincourt
 
Cypress Development Corp - Corporate Presentation
Cypress Development Corp - Corporate PresentationCypress Development Corp - Corporate Presentation
Cypress Development Corp - Corporate Presentation
Company Spotlight
 
Corporate Presentation - September 2013
Corporate Presentation - September 2013Corporate Presentation - September 2013
Corporate Presentation - September 2013FirstQuantum
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015John Wood
 
Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013
RepublicGold
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012
FirstQuantum
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - final
FirstQuantum
 
Symposium Investor Roadshow November 2015 - WPG Resources
Symposium Investor Roadshow November 2015 - WPG ResourcesSymposium Investor Roadshow November 2015 - WPG Resources
Symposium Investor Roadshow November 2015 - WPG Resources
Symposium
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
MPH Ventures Corporate Presentation
MPH Ventures Corporate PresentationMPH Ventures Corporate Presentation
MPH Ventures Corporate PresentationCompany Spotlight
 
First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014FirstQuantum
 
Nubian presentation June 2020
Nubian presentation June 2020 Nubian presentation June 2020
Nubian presentation June 2020
Rodney Ireland
 
Refractory grade graphite: Seeking Chinese supply diversification
Refractory grade graphite: Seeking Chinese supply diversificationRefractory grade graphite: Seeking Chinese supply diversification
Refractory grade graphite: Seeking Chinese supply diversification
Simon Moores
 

Similar to Project - Nammuldi Mining and Ore Haulage (20)

Cypress Development Corp. - November 2014
Cypress Development Corp. - November 2014Cypress Development Corp. - November 2014
Cypress Development Corp. - November 2014
 
Cypress Development Corp. - Corporate Presentation
Cypress Development Corp. - Corporate PresentationCypress Development Corp. - Corporate Presentation
Cypress Development Corp. - Corporate Presentation
 
Tasiast_copy
Tasiast_copyTasiast_copy
Tasiast_copy
 
Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013
 
Oz Metals 20150808
Oz Metals 20150808Oz Metals 20150808
Oz Metals 20150808
 
Cypress Development Corp - Corporate Presentation
Cypress Development Corp - Corporate PresentationCypress Development Corp - Corporate Presentation
Cypress Development Corp - Corporate Presentation
 
Corporate Presentation - September 2013
Corporate Presentation - September 2013Corporate Presentation - September 2013
Corporate Presentation - September 2013
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015
 
Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - final
 
Symposium Investor Roadshow November 2015 - WPG Resources
Symposium Investor Roadshow November 2015 - WPG ResourcesSymposium Investor Roadshow November 2015 - WPG Resources
Symposium Investor Roadshow November 2015 - WPG Resources
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
MPH Ventures Corporate Presentation
MPH Ventures Corporate PresentationMPH Ventures Corporate Presentation
MPH Ventures Corporate Presentation
 
First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014
 
Mph ventures march_2012
Mph ventures march_2012Mph ventures march_2012
Mph ventures march_2012
 
Nubian presentation June 2020
Nubian presentation June 2020 Nubian presentation June 2020
Nubian presentation June 2020
 
Refractory grade graphite: Seeking Chinese supply diversification
Refractory grade graphite: Seeking Chinese supply diversificationRefractory grade graphite: Seeking Chinese supply diversification
Refractory grade graphite: Seeking Chinese supply diversification
 

Project - Nammuldi Mining and Ore Haulage

  • 1.     CLIENT Rio Tinto Iron Ore PROJECT Nammuldi Incremental Tonnes Phase 2 LOCATION Pilbara, Western Australia CONTRACT AWARD VALUE $140 million START DATE August 2015 COMPLETION DATE October 2017 PFS-M18 Current NAMMULDI INCREMENTAL TONNES PHASE 2  PROJECT SUMMARY NRW has been awarded a contract from Rio Tinto for contract mining and ore haulage, which is located within the West Pilbara region of Western Australia, situated approximately 60 km north-west of Tom Price. Having completed a significant amount of civil related projects for Rio Tinto this contract represents a significant step forward in building a relationship with a key, long term client, across both of NRW’s civil and mining divisions respectively. The scope of the Nammuldi Incremental Tonnes – Phase 2 Project is to develop the Marra Mamba iron ore deposits to produce 10Mtpa Saleable Ore Product. The scope of the contract is for the development of the Greenfield site including: • Construction of mine haul roads, ore stockpiles, waste dumps and other mine infrastructure • Production mining (including drill & blast) • Haulage of high grade ore from mine area to the existing Nammuldi Plant site (12km’s) • Supply, installation and operation of two 5 Mtpa crushing plants The NRW fleet that is being utilised on the project includes two 250T excavators, one 190T excavator, five 992 loaders, fourteen 140T dumptrucks, three 90T dumptrucks, four 200T roadtrains, seven D10 dozers, two 16 graders, one 14 grader and five watertrucks. The contract term runs for 24 months and is anticipated to have a peak of 140 personnel on site, including local indigenous.