project management 1304 - - نسخة.pptx
1. Project manager report
Prepared by :
Hussein.I.Al-Fitouri
Student Number : 1568
Under supervision :E.MOHAMED MAHFOUZ
BENGHAZI UNIVERSITY
FACULTY OF ENGINEERING
PETROLEUM ENGINNERING DEPARTMENT
2. Project overview statement (POS)
•Project name : Establishment of a feed factory.
•Project manager :Hussein.I.Al-Fitouri
3. Problemopportunity:
•The reason for the huge demand for poultry
feed is due to the large number of poultry
farms , which are more widespread in rural
area.
4. Project goal :
•The poultry feed production project
aims to provide high-quality feed for
all workers in the field of poultry
farming.
5. Project objectives
•Establishing a factory for animal feed cubes.
•Search for an alternative source of nutrition during the
drought period.
•Helps provide a number of job opportunities for young
people.
•Supporting ordinary farmers with limited resources.
•Providing cheap feed.
6. Success criteria :
•Providing balanced and healthy feed.
•Improving production performance.
•Providing a high-tech industrial environment To
produce feed efficiently and with high quality.
•Good marketing for the project.
7. Assumption/risks/obstacles
•Potential environmental risks that may affect the
operation of the factory.
•Financial risks associated with the project. These risks
may include increases in raw material costs or labor
costs,
•Low demand for produced feed, and inability to meet
financial expectations.
8. Preparin
g feed
factory
Prepare the
location
Preparing a
map of the
building
Building
construction
process
Build the
building
Finishing the
building
Sanitation
Electricity
connection
Water
connection
flagstones
Add
decoration
Gypsum
board
Building
paint
Furnishing
the rooms
control room
rest rooms
bathroom
Factory
equipment
Grinders and
mixers
Silos for
storing grain
Air condition
And cooling
fan
Feed shaping
machines
Control
boards
finish
Work breakdown structure(WBS)