PROJECT BUSINESS
CASE STUDY
1. THE CHALLENGE
2. SOLUTION
3. CABLES SUPPLIED
4. VALUE ADDITION
The Challenge
• Power cables to draw power from their captive power plants.
• Power cables to transmit power from the internal substation to individual machines.
• Cables to cater to the control applications in different machines, conveyor belts and chlorine
plant.
• Instrumentation cables to establish efficient communication between control panels and
systems units.
The Lapp
Solution
• High current carrying cables for heavy duty power transmission.
• Flexible cables for stressful operations
• Wide rage of application centric cables.
• UNITRONIC cables to maintain seamless data communication between the machines and the
control panels.
Cables Supplied
• Time irrespective customer support
• Cable longevity ensured
Value Addition
Sample image
THANK YOU FOR YOUR ATTENTION
Know more at www.thelappstore.com

Project Business

  • 1.
  • 2.
    1. THE CHALLENGE 2.SOLUTION 3. CABLES SUPPLIED 4. VALUE ADDITION
  • 4.
    The Challenge • Powercables to draw power from their captive power plants. • Power cables to transmit power from the internal substation to individual machines. • Cables to cater to the control applications in different machines, conveyor belts and chlorine plant. • Instrumentation cables to establish efficient communication between control panels and systems units.
  • 5.
    The Lapp Solution • Highcurrent carrying cables for heavy duty power transmission. • Flexible cables for stressful operations • Wide rage of application centric cables. • UNITRONIC cables to maintain seamless data communication between the machines and the control panels.
  • 6.
  • 7.
    • Time irrespectivecustomer support • Cable longevity ensured Value Addition Sample image
  • 8.
    THANK YOU FORYOUR ATTENTION Know more at www.thelappstore.com