SOLAR
CASE STUDY
1. THE CHALLENGE
2. SOLUTION
3. CABLES SUPPLIED
4. VALUE ADDITION
The Challenge
• TUV certified string cables to interconnect solar modules and then connecting to the junction boxes.
• Transmitting DC power without losing much power during transmission.
• Flame retardant as well as oxidation resistant cables
• Cables also needed to be UV resistant and joint free.
The Lapp
Solution
• Tough and versatile string cables with unmatched quality
• Acid and alkaline resistant in order to protect the cable from accidental mishaps
• Joint free cable construction
Cables Supplied
• Cable quality par Excellence
• Customer satisfaction guaranteed
• Voice of customer
Value Addition
Sample image
THANK YOU FOR YOUR ATTENTION
Know more at www.thelappstore.com

Solar

  • 1.
  • 2.
    1. THE CHALLENGE 2.SOLUTION 3. CABLES SUPPLIED 4. VALUE ADDITION
  • 4.
    The Challenge • TUVcertified string cables to interconnect solar modules and then connecting to the junction boxes. • Transmitting DC power without losing much power during transmission. • Flame retardant as well as oxidation resistant cables • Cables also needed to be UV resistant and joint free.
  • 5.
    The Lapp Solution • Toughand versatile string cables with unmatched quality • Acid and alkaline resistant in order to protect the cable from accidental mishaps • Joint free cable construction
  • 6.
  • 7.
    • Cable qualitypar Excellence • Customer satisfaction guaranteed • Voice of customer Value Addition Sample image
  • 8.
    THANK YOU FORYOUR ATTENTION Know more at www.thelappstore.com