The production schedule for March 1st, 2016 includes 5 shots to be filmed at a studio from 9:35 AM to 10:25 AM, with equipment setup from 9:10 AM to 9:30 AM and equipment wrapup from 10:25 AM to 10:45 AM. Shot 1 is scheduled from 9:35 AM to 9:45 AM, Shot 2 from 9:45 AM to 9:55 AM, Shot 3 from 9:55 AM to 10:05 AM, Shot 4 from 10:05 AM to 10:15 AM, and Shot 5 from 10:15 AM to 10:25 AM.