Scene:1
Shoot Date/Time:Afternoon Location: Knights End Road
Characters: Georgia Props/Costume: Skateboard, skinny jeans,
checkered Vans (shoes)
Set Design: N/A Equipment: Video camera, tripod
Cast: Georgia Crew: Zoe
Scene:2
Shoot Date/Time:Evening Location: Skate shed
Characters: Kai Props/Costume: Guitar
Set Design: Rehearsal Equipment: Video camera, tripod
Cast: Kai Crew: Zoe and Georgia
Scene:3
Shoot Date/Time:Afternoon Location: Peterborough underpass
Characters: Austin, Kai and Harry Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:4
Shoot Date/Time:Afternoon Location: Car park
Characters: Austin Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin Crew: Zoe and Georgia
Scene:2
Shoot Date/Time:Evening Location: Skate shed
Characters: Austin Props/Costume: Casual clothing,
microphone
Set Design: Rehearsal Equipment: Video camera, tripod
Cast: Austin Crew: Zoe and Georgia
Scene:5 (window view)
Shoot Date/Time:Afternoon Location: Forest Road
Characters: N/A Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera
Cast: N/A Crew: Zoe and Georgia
Scene:6
Shoot Date/Time:Afternoon Location: Forest
Characters: Austin and Kai Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin and Kai Crew: Zoe and Georgia
Scene:7
Shoot Date/Time:Afternoon Location: Field
Characters: Kai Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera
Cast: Austin and Kai Crew: N/A
Scene:8 (hanging out)
Shoot Date/Time:Evening Location: Skate shed
Characters: Kai, Austin and Harry Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera
Cast: Austin and Kai Crew: Zoe and Georgia
Scene:9
Shoot Date/Time:Daytime Location: Skate park/bowl
Characters: Harry Props/Costume: Casual clothing,
skateboard
Set Design: N/A Equipment: Video camera
Cast: Harry Crew: Zoe and Georgia
Scene:10
Shoot Date/Time:Evening (sunset) Location: Skate bowl
Characters: Zoe, Harry, Austin, Kai Props/Costume: Casual clothing,
skateboard, fake cigarette/vape pen
Set Design: N/A Equipment: Video camera
Cast: Zoe, Harry, Austin, Kai Crew: Georgia
Scene:11
Shoot Date/Time:Daytime Location: Beach
Characters: Austin, Kai and Harry Props/Costume: Casual clothing, football
Set Design: N/A Equipment: Video camera
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:2
Shoot Date/Time:Evening Location: Skate shed
Characters: Austin, Kai and Harry Props/Costume: Casual clothing,
microphone, guitar
Set Design: Rehearsal Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:12
Shoot Date/Time:27th October, Night Location: Gig - The O2 Academy, Islington
Characters: N/A Props/Costume: N/A
Set Design: Gig Equipment: Video camera, tripod
Cast: N/A Crew: Georgia
Scene:8 (hanging out)
Shoot Date/Time:Evening Location: Skate shed
Characters: Kai, Austin and Harry Props/Costume: Casual clothing, pizza
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:13
Shoot Date/Time:Daytime Location: Beach
Characters: Austin, Kai and Harry Props/Costume: Casual clothing, beer
bottles
Set Design: N/A Equipment: Video camera
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:14
Shoot Date/Time:Daytime Location: Jack’s house
Characters: N/A Props/Costume: Vinyl player and record
Set Design: N/A Equipment: Video camera and tripod
Cast: N/A Crew: Zoe
Scene:2
Shoot Date/Time:Evening Location: Skate shed
Characters: Kai Props/Costume: Casual clothing, guitar
Set Design: Rehearsal Equipment: Video camera, tripod
Cast: Kai Crew: Zoe and Georgia
Scene:12
Shoot Date/Time:27th October, Night Location: Gig - The O2 Academy, Islington
Characters: N/A Props/Costume: N/A
Set Design: Gig Equipment: Video camera, tripod
Cast: N/A Crew: Georgia
Scene:15
Shoot Date/Time:Night Location: Peterborough Bridge
Characters: Austin Props/Costume: Casual clothing
Set Design: Coloured Lights Equipment: Video camera, tripod
Cast: Austin Crew: Zoe and Georgia
Scene:16
Shoot Date/Time:28th October - Day Location: Brick Lane / Shoreditch
Characters: Kai Props/Costume: Casual clothing
Set Design: Graffiti wall / busy street Equipment: Video camera, tripod
Cast: Kai Crew: Georgia
Scene:17
Shoot Date/Time:Day Location: Zoe’s Car
Characters: N/A Props/Costume: CD with “Mixtape 2003”
written on it, CD player
Set Design: N/A Equipment: Video camera
Cast: N/A Crew: Zoe and Georgia
Scene:18
Shoot Date/Time:Evening Location: Beach
Characters: Zoe and Georgia Props/Costume: Skinny jeans rolled up
Set Design: N/A Equipment: Video camera, tripod
Cast: Zoe and Georgia Crew: Zoe and Georgia
Scene:19
Shoot Date/Time:Day Location: Shopping centre - photo booth
Characters: Austin, Kai and Harry Props/Costume: Casual clothing, photos of
the band from the photo booth
Set Design: Photo booth Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:20
Shoot Date/Time:Day Location: River - rope swing
Characters: Austin, Kai Props/Costume: Casual clothing, rope
swing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai Crew: Zoe and Georgia
Scene:4
Shoot Date/Time:Afternoon Location: Car park
Characters: Austin, Harry Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Harry Crew: Zoe and Georgia
Scene:21
Shoot Date/Time:Afternoon Location: Skate Park/Bowl
Characters: Austin, Kai and Harry Props/Costume: Casual clothing,
skateboard
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:22
Shoot Date/Time:Day Location: Car park
Characters: Austin, Kai and Harry Props/Costume: Casual clothing, shopping
trolley
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:23
Shoot Date/Time:Afternoon Location: Record shop - Shoreditch
Characters: Kai Props/Costume: Casual clothing, records
Set Design: Vinyl records Equipment: Video camera, tripod
Cast: Kai Crew: Georgia
Scene:24
Shoot Date/Time:Afternoon Location: Brick Wall
Characters: Austin Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin Crew: Zoe and Georgia
Scene:21
Shoot Date/Time:Afternoon Location: Skate Park/Bowl
Characters: Austin, Kai and Harry Props/Costume: Casual clothing,
skateboard
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:2
Shoot Date/Time:Evening Location: Skate shed
Characters: Kai Props/Costume: Guitar
Set Design: Rehearsal Equipment: Video camera, tripod
Cast: Kai Crew: Zoe and Georgia
Scene:22
Shoot Date/Time:Afternoon Location: Skate Park
Characters: Harry Props/Costume: Skateboard
Set Design: N/A Equipment: Video camera, tripod
Cast: Harry Crew: Zoe and Georgia
Scene:23
Shoot Date/Time:Afternoon Location: Car
Characters: Austin, Kai Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai Crew: Zoe and Georgia
Scene:24
Shoot Date/Time:Evening Location: Forest / Field
Characters: Austin, Kai and Harry Props/Costume: Guitar
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:13
Shoot Date/Time:Daytime Location: Beach
Characters: Austin, Kai and Harry Props/Costume: Casual clothing, beer
bottles
Set Design: N/A Equipment: Video camera
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:25
Shoot Date/Time:Daytime Location: Beach
Characters: Austin, Kai and Harry Props/Costume: Casual clothing, Beach
ball
Set Design: N/A Equipment: Video camera, Tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:26
Shoot Date/Time:Afternoon Location: Car
Characters: Austin, Kai Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai Crew: Zoe and Georgia
Scene:27
Shoot Date/Time:Day Location: Peterborough
Characters: Austin, Kai and Harry Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:28
Shoot Date/Time:Afternoon Location: Peterborough
Characters: Austin, Kai and Harry Props/Costume: Casual clothing, free
hugs sign
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:29
Shoot Date/Time:Evening Location: Beach
Characters: Austin, Kai and Harry Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:8 (hanging out)
Shoot Date/Time:Evening Location: Skate shed
Characters: Kai, Austin and Harry Props/Costume: Casual clothing, beer
bottle
Set Design: N/A Equipment: Video camera
Cast: Austin and Kai Crew: Zoe and Georgia
Scene:18
Shoot Date/Time:Evening Location: Beach
Characters: Zoe and Georgia Props/Costume: Skinny jeans rolled up
Set Design: N/A Equipment: Video camera, tripod
Cast: Zoe and Georgia Crew: Zoe and Georgia
Scene:30
Shoot Date/Time:Afternoon Location: Forest
Characters: Harry Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Harry Crew: Zoe and Georgia
Scene:2
Shoot Date/Time:Evening Location: Skate shed
Characters: Kai Props/Costume: Guitar
Set Design: Rehearsal Equipment: Video camera, tripod
Cast: Kai Crew: Zoe and Georgia
Scene:31
Shoot Date/Time:Evening Location: Peterborough
Characters: Austin, Kai Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai Crew: Zoe and Georgia
Scene:15
Shoot Date/Time:Night Location: Peterborough Bridge
Characters: Austin Props/Costume: Casual clothing
Set Design: Coloured Lights Equipment: Video camera, tripod
Cast: Austin Crew: Zoe and Georgia
Scene:32
Shoot Date/Time:Night Location: Skate shed
Characters: Harry Props/Costume: Casual clothing,
Keyboard
Set Design: Gig - Lights Equipment: Video camera, tripod
Cast: Harry Crew: Zoe and Georgia
Scene:33
Shoot Date/Time:Afternoon Location: Skate Bowl
Characters: Harry, Kai and Austin Props/Costume: Casual clothing,
skateboard
Set Design: N/A Equipment: Video camera, tripod
Cast: Harry, Kai and Austin Crew: Zoe and Georgia
Scene:3
Shoot Date/Time:Afternoon Location: Peterborough underpass
Characters: Austin, Kai and Harry Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:11
Shoot Date/Time:Daytime Location: Beach
Characters: Austin, Kai and Harry Props/Costume: Casual clothing, football
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:34
Shoot Date/Time:Evening Location: Skate shed
Characters: Kai, Austin and Harry Props/Costume: Casual clothing, guitar,
microphone, keyboard
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:8 (hanging out)
Shoot Date/Time:Evening Location: Skate shed
Characters: Kai, Austin and Harry Props/Costume: Casual clothing, pizza,
beer bottles
Set Design: N/A Equipment: Video camera
Cast: Austin and Kai Crew: Zoe and Georgia
Scene:35
Shoot Date/Time:Afternoon Location: Forest
Characters: Austin, Kai and Harry Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:5 (window view)
Shoot Date/Time:Afternoon Location: Forest Road
Characters: N/A Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera
Cast: N/A Crew: Zoe and Georgia
Scene:36
Shoot Date/Time:Daytime Location: Beach - sea
Characters: Austin, Kai and Harry Props/Costume: Casual clothing, rolled up
jeans
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia
Scene:37
Shoot Date/Time:Daytime Location: Skate Park
Characters: Harry Props/Costume: Casual clothing,
Skateboard
Set Design: N/A Equipment: Video camera, tripod
Cast: Harry Crew: Zoe and Georgia
Scene:38
Shoot Date/Time:Evening - sunset Location: Beach
Characters: Austin, Kai and Harry Props/Costume: Casual clothing
Set Design: N/A Equipment: Video camera, tripod
Cast: Austin, Kai and Harry Crew: Zoe and Georgia

Production schedule

  • 1.
    Scene:1 Shoot Date/Time:Afternoon Location:Knights End Road Characters: Georgia Props/Costume: Skateboard, skinny jeans, checkered Vans (shoes) Set Design: N/A Equipment: Video camera, tripod Cast: Georgia Crew: Zoe Scene:2 Shoot Date/Time:Evening Location: Skate shed Characters: Kai Props/Costume: Guitar Set Design: Rehearsal Equipment: Video camera, tripod Cast: Kai Crew: Zoe and Georgia Scene:3 Shoot Date/Time:Afternoon Location: Peterborough underpass Characters: Austin, Kai and Harry Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:4 Shoot Date/Time:Afternoon Location: Car park Characters: Austin Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin Crew: Zoe and Georgia
  • 2.
    Scene:2 Shoot Date/Time:Evening Location:Skate shed Characters: Austin Props/Costume: Casual clothing, microphone Set Design: Rehearsal Equipment: Video camera, tripod Cast: Austin Crew: Zoe and Georgia Scene:5 (window view) Shoot Date/Time:Afternoon Location: Forest Road Characters: N/A Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera Cast: N/A Crew: Zoe and Georgia Scene:6 Shoot Date/Time:Afternoon Location: Forest Characters: Austin and Kai Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin and Kai Crew: Zoe and Georgia Scene:7 Shoot Date/Time:Afternoon Location: Field Characters: Kai Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera Cast: Austin and Kai Crew: N/A
  • 3.
    Scene:8 (hanging out) ShootDate/Time:Evening Location: Skate shed Characters: Kai, Austin and Harry Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera Cast: Austin and Kai Crew: Zoe and Georgia Scene:9 Shoot Date/Time:Daytime Location: Skate park/bowl Characters: Harry Props/Costume: Casual clothing, skateboard Set Design: N/A Equipment: Video camera Cast: Harry Crew: Zoe and Georgia Scene:10 Shoot Date/Time:Evening (sunset) Location: Skate bowl Characters: Zoe, Harry, Austin, Kai Props/Costume: Casual clothing, skateboard, fake cigarette/vape pen Set Design: N/A Equipment: Video camera Cast: Zoe, Harry, Austin, Kai Crew: Georgia Scene:11 Shoot Date/Time:Daytime Location: Beach Characters: Austin, Kai and Harry Props/Costume: Casual clothing, football Set Design: N/A Equipment: Video camera Cast: Austin, Kai and Harry Crew: Zoe and Georgia
  • 4.
    Scene:2 Shoot Date/Time:Evening Location:Skate shed Characters: Austin, Kai and Harry Props/Costume: Casual clothing, microphone, guitar Set Design: Rehearsal Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:12 Shoot Date/Time:27th October, Night Location: Gig - The O2 Academy, Islington Characters: N/A Props/Costume: N/A Set Design: Gig Equipment: Video camera, tripod Cast: N/A Crew: Georgia Scene:8 (hanging out) Shoot Date/Time:Evening Location: Skate shed Characters: Kai, Austin and Harry Props/Costume: Casual clothing, pizza Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:13 Shoot Date/Time:Daytime Location: Beach Characters: Austin, Kai and Harry Props/Costume: Casual clothing, beer bottles Set Design: N/A Equipment: Video camera Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:14
  • 5.
    Shoot Date/Time:Daytime Location:Jack’s house Characters: N/A Props/Costume: Vinyl player and record Set Design: N/A Equipment: Video camera and tripod Cast: N/A Crew: Zoe Scene:2 Shoot Date/Time:Evening Location: Skate shed Characters: Kai Props/Costume: Casual clothing, guitar Set Design: Rehearsal Equipment: Video camera, tripod Cast: Kai Crew: Zoe and Georgia Scene:12 Shoot Date/Time:27th October, Night Location: Gig - The O2 Academy, Islington Characters: N/A Props/Costume: N/A Set Design: Gig Equipment: Video camera, tripod Cast: N/A Crew: Georgia Scene:15 Shoot Date/Time:Night Location: Peterborough Bridge Characters: Austin Props/Costume: Casual clothing Set Design: Coloured Lights Equipment: Video camera, tripod Cast: Austin Crew: Zoe and Georgia Scene:16
  • 6.
    Shoot Date/Time:28th October- Day Location: Brick Lane / Shoreditch Characters: Kai Props/Costume: Casual clothing Set Design: Graffiti wall / busy street Equipment: Video camera, tripod Cast: Kai Crew: Georgia Scene:17 Shoot Date/Time:Day Location: Zoe’s Car Characters: N/A Props/Costume: CD with “Mixtape 2003” written on it, CD player Set Design: N/A Equipment: Video camera Cast: N/A Crew: Zoe and Georgia Scene:18 Shoot Date/Time:Evening Location: Beach Characters: Zoe and Georgia Props/Costume: Skinny jeans rolled up Set Design: N/A Equipment: Video camera, tripod Cast: Zoe and Georgia Crew: Zoe and Georgia Scene:19 Shoot Date/Time:Day Location: Shopping centre - photo booth Characters: Austin, Kai and Harry Props/Costume: Casual clothing, photos of the band from the photo booth Set Design: Photo booth Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:20 Shoot Date/Time:Day Location: River - rope swing
  • 7.
    Characters: Austin, KaiProps/Costume: Casual clothing, rope swing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai Crew: Zoe and Georgia Scene:4 Shoot Date/Time:Afternoon Location: Car park Characters: Austin, Harry Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Harry Crew: Zoe and Georgia Scene:21 Shoot Date/Time:Afternoon Location: Skate Park/Bowl Characters: Austin, Kai and Harry Props/Costume: Casual clothing, skateboard Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:22 Shoot Date/Time:Day Location: Car park Characters: Austin, Kai and Harry Props/Costume: Casual clothing, shopping trolley Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:23 Shoot Date/Time:Afternoon Location: Record shop - Shoreditch Characters: Kai Props/Costume: Casual clothing, records
  • 8.
    Set Design: Vinylrecords Equipment: Video camera, tripod Cast: Kai Crew: Georgia Scene:24 Shoot Date/Time:Afternoon Location: Brick Wall Characters: Austin Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin Crew: Zoe and Georgia Scene:21 Shoot Date/Time:Afternoon Location: Skate Park/Bowl Characters: Austin, Kai and Harry Props/Costume: Casual clothing, skateboard Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:2 Shoot Date/Time:Evening Location: Skate shed Characters: Kai Props/Costume: Guitar Set Design: Rehearsal Equipment: Video camera, tripod Cast: Kai Crew: Zoe and Georgia Scene:22 Shoot Date/Time:Afternoon Location: Skate Park Characters: Harry Props/Costume: Skateboard
  • 9.
    Set Design: N/AEquipment: Video camera, tripod Cast: Harry Crew: Zoe and Georgia Scene:23 Shoot Date/Time:Afternoon Location: Car Characters: Austin, Kai Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai Crew: Zoe and Georgia Scene:24 Shoot Date/Time:Evening Location: Forest / Field Characters: Austin, Kai and Harry Props/Costume: Guitar Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:13 Shoot Date/Time:Daytime Location: Beach Characters: Austin, Kai and Harry Props/Costume: Casual clothing, beer bottles Set Design: N/A Equipment: Video camera Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:25 Shoot Date/Time:Daytime Location: Beach Characters: Austin, Kai and Harry Props/Costume: Casual clothing, Beach ball
  • 10.
    Set Design: N/AEquipment: Video camera, Tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:26 Shoot Date/Time:Afternoon Location: Car Characters: Austin, Kai Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai Crew: Zoe and Georgia Scene:27 Shoot Date/Time:Day Location: Peterborough Characters: Austin, Kai and Harry Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:28 Shoot Date/Time:Afternoon Location: Peterborough Characters: Austin, Kai and Harry Props/Costume: Casual clothing, free hugs sign Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:29 Shoot Date/Time:Evening Location: Beach
  • 11.
    Characters: Austin, Kaiand Harry Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:8 (hanging out) Shoot Date/Time:Evening Location: Skate shed Characters: Kai, Austin and Harry Props/Costume: Casual clothing, beer bottle Set Design: N/A Equipment: Video camera Cast: Austin and Kai Crew: Zoe and Georgia Scene:18 Shoot Date/Time:Evening Location: Beach Characters: Zoe and Georgia Props/Costume: Skinny jeans rolled up Set Design: N/A Equipment: Video camera, tripod Cast: Zoe and Georgia Crew: Zoe and Georgia Scene:30 Shoot Date/Time:Afternoon Location: Forest Characters: Harry Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Harry Crew: Zoe and Georgia Scene:2 Shoot Date/Time:Evening Location: Skate shed
  • 12.
    Characters: Kai Props/Costume:Guitar Set Design: Rehearsal Equipment: Video camera, tripod Cast: Kai Crew: Zoe and Georgia Scene:31 Shoot Date/Time:Evening Location: Peterborough Characters: Austin, Kai Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai Crew: Zoe and Georgia Scene:15 Shoot Date/Time:Night Location: Peterborough Bridge Characters: Austin Props/Costume: Casual clothing Set Design: Coloured Lights Equipment: Video camera, tripod Cast: Austin Crew: Zoe and Georgia Scene:32 Shoot Date/Time:Night Location: Skate shed Characters: Harry Props/Costume: Casual clothing, Keyboard Set Design: Gig - Lights Equipment: Video camera, tripod Cast: Harry Crew: Zoe and Georgia Scene:33 Shoot Date/Time:Afternoon Location: Skate Bowl
  • 13.
    Characters: Harry, Kaiand Austin Props/Costume: Casual clothing, skateboard Set Design: N/A Equipment: Video camera, tripod Cast: Harry, Kai and Austin Crew: Zoe and Georgia Scene:3 Shoot Date/Time:Afternoon Location: Peterborough underpass Characters: Austin, Kai and Harry Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:11 Shoot Date/Time:Daytime Location: Beach Characters: Austin, Kai and Harry Props/Costume: Casual clothing, football Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:34 Shoot Date/Time:Evening Location: Skate shed Characters: Kai, Austin and Harry Props/Costume: Casual clothing, guitar, microphone, keyboard Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:8 (hanging out) Shoot Date/Time:Evening Location: Skate shed
  • 14.
    Characters: Kai, Austinand Harry Props/Costume: Casual clothing, pizza, beer bottles Set Design: N/A Equipment: Video camera Cast: Austin and Kai Crew: Zoe and Georgia Scene:35 Shoot Date/Time:Afternoon Location: Forest Characters: Austin, Kai and Harry Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:5 (window view) Shoot Date/Time:Afternoon Location: Forest Road Characters: N/A Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera Cast: N/A Crew: Zoe and Georgia Scene:36 Shoot Date/Time:Daytime Location: Beach - sea Characters: Austin, Kai and Harry Props/Costume: Casual clothing, rolled up jeans Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia Scene:37 Shoot Date/Time:Daytime Location: Skate Park
  • 15.
    Characters: Harry Props/Costume:Casual clothing, Skateboard Set Design: N/A Equipment: Video camera, tripod Cast: Harry Crew: Zoe and Georgia Scene:38 Shoot Date/Time:Evening - sunset Location: Beach Characters: Austin, Kai and Harry Props/Costume: Casual clothing Set Design: N/A Equipment: Video camera, tripod Cast: Austin, Kai and Harry Crew: Zoe and Georgia