The document provides details on two problems involving heat exchanger design and optimization. Problem 11 involves designing a condenser to condense 2000 kg/hr of vapor at 132°C using cooling water. The optimal solutions are a cooling water flow rate of 2284.58 kg/hr and an exit temperature of 106.54°C. Problem 17 requires determining the optimal exit temperature and optimal tube length but no other details are provided.