A Collaboration
                    Network
                    for EWG-DSS

                    Fatima Dargam
                    Rita Ribeiro
                    Pascale Zaraté




                                         EWG-DSS
                                         Social-Academic
                                         Network


Seminar, November 17, 2009            Uni-Graz, Dep. Statistics & Operations Research
The current project is a joint-development

                              involving ALL the Group Members

                                      and the Coordination Board:

                      Pascale Zaraté                Fatima Dargam                   Rita Ribeiro
                      IRIT / INPT - ENSIACET - GI   SimTech Simulation Technology   UNINOVA - CA3
                      (France)                      ILTC (Austria / Brazil)         (Portugal)




Seminar, November 17, 2009                                 Uni-Graz, Dep. Statistics & Operations Research
Social Networks

                                  • Represent different real-life
                                  communities


                                  • Play an important role in
                                  determining:
                                      • the way problems are
                                      solved;

                                      • the way organizations are
                                      run;

                                      • degree to which individuals
                                      succeed in achieving their
                                      goals.
Seminar, November 17, 2009          Uni-Graz, Dep. Statistics & Operations Research
Social Networks Analysis


                 • The attributes of individuals (actors) are less
                 important than their relationships with other actors
                 within the network.


                 • Focus     How the connection structure affects the
                 individuals.


                 • EWG-DSS     Weighted Collaboration / Affiliation
                 Network (authors connected by co-authoring)




Seminar, November 17, 2009                   Uni-Graz, Dep. Statistics & Operations Research
104 Members                           (as of June 2009)
                      EWG-DSS members:
                      Ana Respício; Antonio Rodrigues; M.Eugênia Captivo; Tei Barnhart; Alexandre Gachet;
                      Antonio Martinez; Albert Angehrn; Alessio Ishizaka; Ana Maria Rosa Borges; Arijit
                      Bhattacharya; Barbo Back; Bertrand Mareschal; Boris Delibasic ; C. Makropoulos;
                      Jacques Calmet; Carlos Antunes; Carlos Bana e Costa; Christer Carlsson; Asis Kr.
                      Chattopadhyay; Caludia Loebbecke; Csaba Csaki; Dobrila Petrovic; Dorien De Tombe;
                      Dirk Kenis; Andreas Edelmayer ; Eduardo Natividade Jesus; Fatima Dargam; Fréféric
                      Adam; Christophe Fagot; Franck Tetard; Frits Claassen; Frieder Stolzenburg; Peter
                      Gelleri; Gilles Coppin; Inès Saad; Ilya Ashikhmin; Kwakkel Jan; J. Jassbi;Tawfik
                      Jelassi; Jeremy Forth ; Jorge Souza; Joao Lourenco; Johannes Leitner; Jean Pierre
                      Brans; Jochen Pfalzgraf; Jorge Pinho de Sousa; Jose Vincente Segura; Li Ching Ma;
                      Lourdes Canos; Ladislav Lukas; Marija Najika; Marko Bohannec; Philip Powel; Michael
                      Bruhn Barfod; Miklos Biros; Mikael Mihalevich; Jose Maria Moreno Jimenez; Maria
                      Theiner; Natalio Krasnogor; Nikolaos F. Matsatsinis; Olaf Herden; Paul Hasenohr;
                      Paulo Leonco; Peter Keenan; Philippe Lenca; Pierre Kunsch; Suzanne Pinson; Jean
                      Charles Pomerol; Paulo Ramos; Rita Ribeiro; Caroline Rieder; Rudolf Vetschera;
                      Camille Rosenthal Sabroux; Susanne Stadler ; Frantisek Sudzina; Maria Theiner;
                      Thomas Soboll; Alexis Tsoukias; W. Walker; Yi Yang; Pascale Zaraté; ...


           • many of us … working on Decision Making since 1989


           • Some of the applied DSS developed by the group members:
           Planning Distance Education & Distance Learning; Medical learning Environment;
           Process Modelling Design; Aerospace Knowledge Bases; Validation Requirements;
           Social Simulation; Marketing & Production; Forecasting; Scheduling Systems; etc...




Seminar, November 17, 2009                              Uni-Graz, Dep. Statistics & Operations Research
Main Topics of Research within the Group:

                  • Collaborative Decision Making (CDM)
                       • GDSS: Group-DM; NDSS: Negotiation-DM;
                       • Distributed Models of Decision Making
                       • Applications in Collaborative Decision Making & Analysis
                       • Models for Decision Analysis (DA) in Group Decision Making
                       - Evaluation of the Collaboration Levels for DM & DA
                       - Facilitation of Group Coordination and Group Communication

                  • Knowledge Management & Context supporting Decision Making
                      • Knowledge Management as a Collaboration Model
                       - Knowledge-intensive Collaborative Models
                       - Context-based Decision Systems

                  • Network & Web-based Systems
                      • Network-based Collaborative Decision Making
                       • New Methodologies and Technology for GDSS

                  • Aggregation & Fuzzy Algorithms for Decision Making
                  • Knowledge-Based (Intelligent) Decision Systems
                  • Applied Decision Support Systems (including MIS)

Seminar, November 17, 2009                         Uni-Graz, Dep. Statistics & Operations Research
Motivation:
                                                      Importance and relevance of
                                                    analysing and representing the
                                                         various relationships that
                                                      academically link the current
                                                         104 members of the DSS
                                                            EURO Working Group
                                                                        EWG-DSS.




       Main Objectives:
       Evaluate the group’s collaboration dynamics since its foundation (1989).

       As a by-product, we aim to encourage new research and promote further
       collaboration among the academic members of the group in common
       projects and joint-publications

Seminar, November 17, 2009                      Uni-Graz, Dep. Statistics & Operations Research
The EWG-DSS Social-Academic Network
                        (the group in focus)

    Nodes: authors; publications; projects; research areas
    Nodes
    Ties / Relations: collaborations; joint-projects; Journal-editions; ...

   • Distances among the
   members of the group.

   • Major and minor areas
   of research concentration
   & interaction in the group.

   • New tendencies & working areas.

   • New opportunities for cooperation.


Seminar, November 17, 2009                     Uni-Graz, Dep. Statistics & Operations Research
Methodology

                       Weighted Graphs Methods

                       Software Frameworks:

                       NWB Network Workbench

                       PAJEK Network


Seminar, November 17, 2009           Uni-Graz, Dep. Statistics & Operations Research
Download Source Code
                             NWB repository: http://nwb.slis.indiana.edu/svn/nwb




Seminar, November 17, 2009         Uni-Graz, Dep. Statistics & Operations Research
Pajek (Spider in Slovene)
                         Program for Large Network Analysis



              Pajek is a Windows Program
              for networks analysis & visualization

              Authors:
              Vladimir Batagelj; Andrej Mrvar &
              Matjaž Zaveršnik.


              Available for non-commercial use:
              http://pajek.imfm.si/doku.php


Seminar, November 17, 2009                   Uni-Graz, Dep. Statistics & Operations Research
Initial Implementation Phases

                  Acquisition & Extraction Processes:
                      Organizing the input data in matrix format:
                       authors x papers, papers x topics
                      Creating the network input files with
                      nodes and labels
                  Transformation Process:
                      Using Jaccard Similarity Measure to
                      obtain output files to be analyzed
                      graphically and statistically by
                      Pajek and NWB.
Seminar, November 17, 2009              Uni-Graz, Dep. Statistics & Operations Research
Implementing the Network

                   The EWG-DSS Network V.1.0 :

                       Input from 70 EWG-DSS members;
                       Period of 19 years [1989 – 2008];
                       1350 Publications;
                       34 extracted Topics of Research Areas




Seminar, November 17, 2009             Uni-Graz, Dep. Statistics & Operations Research
70 Authors / Members of the EWG-DSS:
                             Ai         Author Name            Ai         Author Name            Ai        Author Name
                             A1        Arijit Bhattacharya     A25         Fréféric Adam         A49        Pascale Zaraté

                             A2         Adla Abdelkader        A26      Frieder Stolzenburg      A50         Peter Gelleri

                             A3        Albert A. Angehrn       A27         Frits Claassen        A51         Peter Keenan

                             A4         Alessio Ishizaka       A28         Ilya Ashikhmin        A52         Philip Powel

                             A5         Alexis Tsoukias        A29           Inès Saad           A53        Philippe Lenca

                             A6          Ana Respício          A30            J.Jassbi           A54        Pierre Kunsch

                             A7    Antonio Jimenez Martinez    A31        Jacques Calmet         A55          Rita Ribeiro

                             A8     Asis Kr. Chattopadhyay     A32     Jean Charles Pomerol      A56       Rudolf Vetschera

                             A9       Bertrand Mareschal       A33       Jean Pierre Brans       A57        Sanja Petrovic

                             A10         Bojan Srdjevic        A34     João Carlos Lourenço      A58       Suzanne Pinson

                             A11        Boris Delibasic        A35        Jochen Pfalzgraf       A59        Tawfik Jelassi

                             A12      Caludia Loebbecke        A36       Johannes Leitner        A60     Thanasis Spyridakos

                             A13   Camille Rosenthal Sabroux   A37     Jorge Freire de Sousa     A61            Yi Yang

                             A14        Carlos Antunes         A38     Jorge Pinho de Sousa      A62        Thomas Soboll

                             A15      Carlos Bana e Costa      A39   Jose Maria Moreno Jimenez   A63       BAZZANA Flavio

                             A16       Christer Carlsson       A40        Ladislav Lukas         A64         Guilan Kong

                             A17         Csaba Csaki           A41          Li Ching Ma          A65     Jason Papathanasiou

                             A18           Dirk Kenis          A42       Luís Cândido Dias       A66       Mikael Mihalevich

                             A19        Dobrila Petrovic       A43       Marko Bohannec          A67       Taghezout Noria

                             A20       Dorien De Tombe         A44     Michael Bruhn Barfod      A68     Warren Elliott Walker

                             A21   Eduardo Manuel Natividade   A45          Miklos Biros         A69   José Vicente segura Heras
                                            Jesus

                             A22        Fatima Dargam          A46       Natalio Krasnogor       A70      Antonio Rodrigues

                             A23         Franck Tetard         A47      Nguyen Dinh Pham

                             A24       Frantisek Sudzina       A48          Olaf Herden



Seminar, November 17, 2009                                           Uni-Graz, Dep. Statistics & Operations Research
34 Topics of Research extracted from the 1350 Publications:

                             #    Research Topic                 #    Research Topic
                             1    Business Models                18   Knowledge Management
                             2    Collaboration Dynamics         19   Multi-Agent Systems
                                  Cooperative Decision Support
                             3                                   20   Multiple Criteria Decision Aiding
                                  Systems
                                                                      Management Learning and
                             4    Decision Analysis              21
                                                                      Decision Making
                             5    Decision Aiding Process        22   Network
                             6    Data Mining                    23   Operations research
                             7    Decision Support Systems       24   Preference analysis
                             8    Evaluation                     25   Performance Evaluation
                             9    E-Business                     26   Preference Modelling
                                                                      Production Planning and
                             10   Entreprise resource Planning   27
                                                                      Scheduling
                             11   Expert Systems                 28   Supply Chain Management
                             12   Economic Theory                29   Sustainable Development
                             13   Fuzzy Sets                     30   Social Networks
                                  Group Decision and
                             14                                  31   Simulation Systems
                                  Negotiation
                                                                      Systems Software Evaluation and
                             15   Information Retrieval          32
                                                                      Selection
                             16   Information Systems            33   Virtual Communities
                                  Information and
                             17   Telecommunication              34   Context
                                  Technology


Seminar, November 17, 2009                                       Uni-Graz, Dep. Statistics & Operations Research
Implementing the Network
                                         Authors                    Publications
                                                            P1      P2        ....          Pm
                                           A1              APij
                                           A2
                                           ....
                                           ...
                                           ...
                                           An


                             Boolean Matrix R(A,P) relating authors and their publications.


                                         Papers                           Topics
                                                             T1      T2              ....        Tm
                                           P1               PTij
                                           P2
                                           ....
                                           ...
                                           ...
                                           Pn

                               Boolean Matrix S(P,T) relating publications and their topics.


Seminar, November 17, 2009                                   Uni-Graz, Dep. Statistics & Operations Research
Implementing the Network




Seminar, November 17, 2009        Uni-Graz, Dep. Statistics & Operations Research
Implementing the Network




Seminar, November 17, 2009        Uni-Graz, Dep. Statistics & Operations Research
Implementing the Network




Seminar, November 17, 2009        Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations
                       Visualization of the Author_AP network, graphically represented in PAJEK.
                                              Ai = Authors; for i = {1,…, 70}




Seminar, November 17, 2009                             Uni-Graz, Dep. Statistics & Operations Research
Seminar, November 17, 2009   Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations



Visualization of the
Author_AP.net,
related by the collaboration
in publications.

Network graphically
represented in NWB, via the
Kamada Kawai algorithm.




Seminar, November 17, 2009               Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations


NWB Radial Graph
Visualization of the Publ_AP
network, showing the
collaboration among the
authors, via their joint-
publications.


Pj = Publications
     of the authors
for j = {1,…, 1350}




Seminar, November 17, 2009               Uni-Graz, Dep. Statistics & Operations Research
Seminar, November 17, 2009   Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations
                      Visualization of the Publ_AP network, graphically represented in PAJEK.




Seminar, November 17, 2009                            Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations
                  Visualization of the Publ_AP represented in PAJEK, with separate components




Seminar, November 17, 2009                           Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations
                                  Visualization of the Topics_AT represented in PAJEK,
                 showing the connections among the 34 topics with relation to the authors’ areas of research.




Seminar, November 17, 2009                                   Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations
                   Visualization of the Publ_PT represented in PAJEK, with separate components,
                   showing the relationships among the publications and topics of research




   1350
Publications


 34 Topics




Seminar, November 17, 2009                            Uni-Graz, Dep. Statistics & Operations Research
Seminar, November 17, 2009   Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations
                                 NWB Radial Graph Visualization of the Authors_AT network,
                 showing the collaboration among the authors, with relation to their common research topics.




Seminar, November 17, 2009                                   Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations




Seminar, November 17, 2009             Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations




Seminar, November 17, 2009             Uni-Graz, Dep. Statistics & Operations Research
Network Visualizations




Seminar, November 17, 2009             Uni-Graz, Dep. Statistics & Operations Research
Social-Academic Network EWG-DSS
                                Concluding Remarks




  The collaboration relationships show:

  1.    How the members relate to each other in terms of topics of research;

  2.    What are the most relevant topics of research within in the group;

  3.    The relevant statistical data concerning our publications




Seminar, November 17, 2009                  Uni-Graz, Dep. Statistics & Operations Research
Social-Academic Network EWG-DSS
                                Concluding Remarks




      The collaboration relationships also show:


       •     How many external collaborators (co-authors not in EWG-DSS)
             exist and indirectly participate in the EWG-DSS




Seminar, November 17, 2009                 Uni-Graz, Dep. Statistics & Operations Research
Social-Academic Network - EWG-DSS
                               Concluding Remarks


           In further versions of the Network, we aim at:
   • Analyze the network with more accurate results, including
    missing input data

   • Encourage the isolated nodes of absent connections
     to become, at a first stage, nodes of
     “weak connections” within the net;

   • Reduce/eliminate the isolated nodes;

   • Bring the external collaborators to
     the EWG-DSS Network



Seminar, November 17, 2009                  Uni-Graz, Dep. Statistics & Operations Research
Social-Academic Network - EWG-DSS
                               Concluding Remarks


                             powerful tool
                                   to
               identify the EWG-DSS group interaction
                                   &
                                   to
                 provide a useful feedback for further
                    collaboration in joint-research




Seminar, November 17, 2009             Uni-Graz, Dep. Statistics & Operations Research
Social-Academic Network - EWG-DSS
                               Concluding Remarks



      As coordinators, we also encourage other EURO
      WGs to follow this example and try to identify the
      cooperation of their groups.

                •Participation
                •Research production in joint-work.




Seminar, November 17, 2009             Uni-Graz, Dep. Statistics & Operations Research
EWG-DSS IRIT List-Server




Seminar, November 17, 2009               Uni-Graz, Dep. Statistics & Operations Research
http://ewgdss.wordpress.com/




Seminar, November 17, 2009               Uni-Graz, Dep. Statistics & Operations Research
51 Members…

              Join in!



Seminar, November 17, 2009   Uni-Graz, Dep. Statistics & Operations Research
Participate!




Seminar, November 17, 2009   Uni-Graz, Dep. Statistics & Operations Research
Thanks
                         for your attention!




Seminar, November 17, 2009         Uni-Graz, Dep. Statistics & Operations Research

Presentation-Social Academic Network EWG-DSS

  • 1.
    A Collaboration Network for EWG-DSS Fatima Dargam Rita Ribeiro Pascale Zaraté EWG-DSS Social-Academic Network Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 2.
    The current projectis a joint-development involving ALL the Group Members and the Coordination Board: Pascale Zaraté Fatima Dargam Rita Ribeiro IRIT / INPT - ENSIACET - GI SimTech Simulation Technology UNINOVA - CA3 (France) ILTC (Austria / Brazil) (Portugal) Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 3.
    Social Networks • Represent different real-life communities • Play an important role in determining: • the way problems are solved; • the way organizations are run; • degree to which individuals succeed in achieving their goals. Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 4.
    Social Networks Analysis • The attributes of individuals (actors) are less important than their relationships with other actors within the network. • Focus How the connection structure affects the individuals. • EWG-DSS Weighted Collaboration / Affiliation Network (authors connected by co-authoring) Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 5.
    104 Members (as of June 2009) EWG-DSS members: Ana Respício; Antonio Rodrigues; M.Eugênia Captivo; Tei Barnhart; Alexandre Gachet; Antonio Martinez; Albert Angehrn; Alessio Ishizaka; Ana Maria Rosa Borges; Arijit Bhattacharya; Barbo Back; Bertrand Mareschal; Boris Delibasic ; C. Makropoulos; Jacques Calmet; Carlos Antunes; Carlos Bana e Costa; Christer Carlsson; Asis Kr. Chattopadhyay; Caludia Loebbecke; Csaba Csaki; Dobrila Petrovic; Dorien De Tombe; Dirk Kenis; Andreas Edelmayer ; Eduardo Natividade Jesus; Fatima Dargam; Fréféric Adam; Christophe Fagot; Franck Tetard; Frits Claassen; Frieder Stolzenburg; Peter Gelleri; Gilles Coppin; Inès Saad; Ilya Ashikhmin; Kwakkel Jan; J. Jassbi;Tawfik Jelassi; Jeremy Forth ; Jorge Souza; Joao Lourenco; Johannes Leitner; Jean Pierre Brans; Jochen Pfalzgraf; Jorge Pinho de Sousa; Jose Vincente Segura; Li Ching Ma; Lourdes Canos; Ladislav Lukas; Marija Najika; Marko Bohannec; Philip Powel; Michael Bruhn Barfod; Miklos Biros; Mikael Mihalevich; Jose Maria Moreno Jimenez; Maria Theiner; Natalio Krasnogor; Nikolaos F. Matsatsinis; Olaf Herden; Paul Hasenohr; Paulo Leonco; Peter Keenan; Philippe Lenca; Pierre Kunsch; Suzanne Pinson; Jean Charles Pomerol; Paulo Ramos; Rita Ribeiro; Caroline Rieder; Rudolf Vetschera; Camille Rosenthal Sabroux; Susanne Stadler ; Frantisek Sudzina; Maria Theiner; Thomas Soboll; Alexis Tsoukias; W. Walker; Yi Yang; Pascale Zaraté; ... • many of us … working on Decision Making since 1989 • Some of the applied DSS developed by the group members: Planning Distance Education & Distance Learning; Medical learning Environment; Process Modelling Design; Aerospace Knowledge Bases; Validation Requirements; Social Simulation; Marketing & Production; Forecasting; Scheduling Systems; etc... Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 6.
    Main Topics ofResearch within the Group: • Collaborative Decision Making (CDM) • GDSS: Group-DM; NDSS: Negotiation-DM; • Distributed Models of Decision Making • Applications in Collaborative Decision Making & Analysis • Models for Decision Analysis (DA) in Group Decision Making - Evaluation of the Collaboration Levels for DM & DA - Facilitation of Group Coordination and Group Communication • Knowledge Management & Context supporting Decision Making • Knowledge Management as a Collaboration Model - Knowledge-intensive Collaborative Models - Context-based Decision Systems • Network & Web-based Systems • Network-based Collaborative Decision Making • New Methodologies and Technology for GDSS • Aggregation & Fuzzy Algorithms for Decision Making • Knowledge-Based (Intelligent) Decision Systems • Applied Decision Support Systems (including MIS) Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 7.
    Motivation: Importance and relevance of analysing and representing the various relationships that academically link the current 104 members of the DSS EURO Working Group EWG-DSS. Main Objectives: Evaluate the group’s collaboration dynamics since its foundation (1989). As a by-product, we aim to encourage new research and promote further collaboration among the academic members of the group in common projects and joint-publications Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 8.
    The EWG-DSS Social-AcademicNetwork (the group in focus) Nodes: authors; publications; projects; research areas Nodes Ties / Relations: collaborations; joint-projects; Journal-editions; ... • Distances among the members of the group. • Major and minor areas of research concentration & interaction in the group. • New tendencies & working areas. • New opportunities for cooperation. Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 9.
    Methodology Weighted Graphs Methods Software Frameworks: NWB Network Workbench PAJEK Network Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 10.
    Download Source Code NWB repository: http://nwb.slis.indiana.edu/svn/nwb Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 11.
    Pajek (Spider inSlovene) Program for Large Network Analysis Pajek is a Windows Program for networks analysis & visualization Authors: Vladimir Batagelj; Andrej Mrvar & Matjaž Zaveršnik. Available for non-commercial use: http://pajek.imfm.si/doku.php Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 12.
    Initial Implementation Phases Acquisition & Extraction Processes: Organizing the input data in matrix format: authors x papers, papers x topics Creating the network input files with nodes and labels Transformation Process: Using Jaccard Similarity Measure to obtain output files to be analyzed graphically and statistically by Pajek and NWB. Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 13.
    Implementing the Network The EWG-DSS Network V.1.0 : Input from 70 EWG-DSS members; Period of 19 years [1989 – 2008]; 1350 Publications; 34 extracted Topics of Research Areas Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 14.
    70 Authors /Members of the EWG-DSS: Ai Author Name Ai Author Name Ai Author Name A1 Arijit Bhattacharya A25 Fréféric Adam A49 Pascale Zaraté A2 Adla Abdelkader A26 Frieder Stolzenburg A50 Peter Gelleri A3 Albert A. Angehrn A27 Frits Claassen A51 Peter Keenan A4 Alessio Ishizaka A28 Ilya Ashikhmin A52 Philip Powel A5 Alexis Tsoukias A29 Inès Saad A53 Philippe Lenca A6 Ana Respício A30 J.Jassbi A54 Pierre Kunsch A7 Antonio Jimenez Martinez A31 Jacques Calmet A55 Rita Ribeiro A8 Asis Kr. Chattopadhyay A32 Jean Charles Pomerol A56 Rudolf Vetschera A9 Bertrand Mareschal A33 Jean Pierre Brans A57 Sanja Petrovic A10 Bojan Srdjevic A34 João Carlos Lourenço A58 Suzanne Pinson A11 Boris Delibasic A35 Jochen Pfalzgraf A59 Tawfik Jelassi A12 Caludia Loebbecke A36 Johannes Leitner A60 Thanasis Spyridakos A13 Camille Rosenthal Sabroux A37 Jorge Freire de Sousa A61 Yi Yang A14 Carlos Antunes A38 Jorge Pinho de Sousa A62 Thomas Soboll A15 Carlos Bana e Costa A39 Jose Maria Moreno Jimenez A63 BAZZANA Flavio A16 Christer Carlsson A40 Ladislav Lukas A64 Guilan Kong A17 Csaba Csaki A41 Li Ching Ma A65 Jason Papathanasiou A18 Dirk Kenis A42 Luís Cândido Dias A66 Mikael Mihalevich A19 Dobrila Petrovic A43 Marko Bohannec A67 Taghezout Noria A20 Dorien De Tombe A44 Michael Bruhn Barfod A68 Warren Elliott Walker A21 Eduardo Manuel Natividade A45 Miklos Biros A69 José Vicente segura Heras Jesus A22 Fatima Dargam A46 Natalio Krasnogor A70 Antonio Rodrigues A23 Franck Tetard A47 Nguyen Dinh Pham A24 Frantisek Sudzina A48 Olaf Herden Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 15.
    34 Topics ofResearch extracted from the 1350 Publications: # Research Topic # Research Topic 1 Business Models 18 Knowledge Management 2 Collaboration Dynamics 19 Multi-Agent Systems Cooperative Decision Support 3 20 Multiple Criteria Decision Aiding Systems Management Learning and 4 Decision Analysis 21 Decision Making 5 Decision Aiding Process 22 Network 6 Data Mining 23 Operations research 7 Decision Support Systems 24 Preference analysis 8 Evaluation 25 Performance Evaluation 9 E-Business 26 Preference Modelling Production Planning and 10 Entreprise resource Planning 27 Scheduling 11 Expert Systems 28 Supply Chain Management 12 Economic Theory 29 Sustainable Development 13 Fuzzy Sets 30 Social Networks Group Decision and 14 31 Simulation Systems Negotiation Systems Software Evaluation and 15 Information Retrieval 32 Selection 16 Information Systems 33 Virtual Communities Information and 17 Telecommunication 34 Context Technology Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 16.
    Implementing the Network Authors Publications P1 P2 .... Pm A1 APij A2 .... ... ... An Boolean Matrix R(A,P) relating authors and their publications. Papers Topics T1 T2 .... Tm P1 PTij P2 .... ... ... Pn Boolean Matrix S(P,T) relating publications and their topics. Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 17.
    Implementing the Network Seminar,November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 18.
    Implementing the Network Seminar,November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 19.
    Implementing the Network Seminar,November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 20.
    Network Visualizations Visualization of the Author_AP network, graphically represented in PAJEK. Ai = Authors; for i = {1,…, 70} Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 21.
    Seminar, November 17,2009 Uni-Graz, Dep. Statistics & Operations Research
  • 22.
    Network Visualizations Visualization ofthe Author_AP.net, related by the collaboration in publications. Network graphically represented in NWB, via the Kamada Kawai algorithm. Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 23.
    Network Visualizations NWB RadialGraph Visualization of the Publ_AP network, showing the collaboration among the authors, via their joint- publications. Pj = Publications of the authors for j = {1,…, 1350} Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 24.
    Seminar, November 17,2009 Uni-Graz, Dep. Statistics & Operations Research
  • 25.
    Network Visualizations Visualization of the Publ_AP network, graphically represented in PAJEK. Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 26.
    Network Visualizations Visualization of the Publ_AP represented in PAJEK, with separate components Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 27.
    Network Visualizations Visualization of the Topics_AT represented in PAJEK, showing the connections among the 34 topics with relation to the authors’ areas of research. Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 28.
    Network Visualizations Visualization of the Publ_PT represented in PAJEK, with separate components, showing the relationships among the publications and topics of research 1350 Publications 34 Topics Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 29.
    Seminar, November 17,2009 Uni-Graz, Dep. Statistics & Operations Research
  • 30.
    Network Visualizations NWB Radial Graph Visualization of the Authors_AT network, showing the collaboration among the authors, with relation to their common research topics. Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 31.
    Network Visualizations Seminar, November17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 32.
    Network Visualizations Seminar, November17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 33.
    Network Visualizations Seminar, November17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 34.
    Social-Academic Network EWG-DSS Concluding Remarks The collaboration relationships show: 1. How the members relate to each other in terms of topics of research; 2. What are the most relevant topics of research within in the group; 3. The relevant statistical data concerning our publications Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 35.
    Social-Academic Network EWG-DSS Concluding Remarks The collaboration relationships also show: • How many external collaborators (co-authors not in EWG-DSS) exist and indirectly participate in the EWG-DSS Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 36.
    Social-Academic Network -EWG-DSS Concluding Remarks In further versions of the Network, we aim at: • Analyze the network with more accurate results, including missing input data • Encourage the isolated nodes of absent connections to become, at a first stage, nodes of “weak connections” within the net; • Reduce/eliminate the isolated nodes; • Bring the external collaborators to the EWG-DSS Network Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 37.
    Social-Academic Network -EWG-DSS Concluding Remarks powerful tool to identify the EWG-DSS group interaction & to provide a useful feedback for further collaboration in joint-research Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 38.
    Social-Academic Network -EWG-DSS Concluding Remarks As coordinators, we also encourage other EURO WGs to follow this example and try to identify the cooperation of their groups. •Participation •Research production in joint-work. Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 39.
    EWG-DSS IRIT List-Server Seminar,November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 40.
    http://ewgdss.wordpress.com/ Seminar, November 17,2009 Uni-Graz, Dep. Statistics & Operations Research
  • 41.
    51 Members… Join in! Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research
  • 42.
    Participate! Seminar, November 17,2009 Uni-Graz, Dep. Statistics & Operations Research
  • 43.
    Thanks for your attention! Seminar, November 17, 2009 Uni-Graz, Dep. Statistics & Operations Research