The Board of Education has offered this slide presentation for the public during their consideration of how to address the declining enrollment in the three Sechelt elementary schools.
A District Perspective on the Use of Assessment Technologybobsd46
*Many slides are copyright NWEA. Some were edited from their original design. Why did School District No. 46 (Sunshine Coast) choose the NWEA assessment tools? How are the results of the assessments used to support instruction and learning in our grades 2 - 10 classes?
This powerpoint presentation was delivered at three public meetings during the month of March 2008. This working document is part of School District #46 (Sunshine Coast) consultation process for the development of the 2008-09 Budget.
Proposed policy measures for fire prevention and mitigationCIFOR-ICRAF
This presentation by Bambang Hero Sahajo of the Faculty of Forestry of the Bogor Agricultural University shows the rationale and recommendations for policy measures for fire prevention and mitigation.
A District Perspective on the Use of Assessment Technologybobsd46
*Many slides are copyright NWEA. Some were edited from their original design. Why did School District No. 46 (Sunshine Coast) choose the NWEA assessment tools? How are the results of the assessments used to support instruction and learning in our grades 2 - 10 classes?
This powerpoint presentation was delivered at three public meetings during the month of March 2008. This working document is part of School District #46 (Sunshine Coast) consultation process for the development of the 2008-09 Budget.
Proposed policy measures for fire prevention and mitigationCIFOR-ICRAF
This presentation by Bambang Hero Sahajo of the Faculty of Forestry of the Bogor Agricultural University shows the rationale and recommendations for policy measures for fire prevention and mitigation.
Learn about the next steps leading to a decision by the Sunshine Coast School District regarding possible school closures.
This presentation was delivered at the December 1, 2009 Public Meeting at Chatelech Secondary School.
The next meeting regarding this topic will also be at Chatelech on Tuesday, December 8.
The Wellesley 2025 stakeholders and planners proactive plan for campus renewal provides a working model for the presentation in which we identify goals and objectives and share initiatives, solutions, analysis ,and economic factors that affect construction Market forecasting, and project cost multipliers for master planning projects.
Atmosphere Ocean And Environmental Change - EdukiteEduKite
The Atmosphere Ocean And Environmental Change explores the physical processes that control Earth’s atmosphere, ocean, and climate. With this course you will be able to analyze how energy is responsible for atmospheric motion, describe the mechanisms that cause the Earth and atmosphere to interact, balancing heat in the system, predict direction of movement when an object is affected by the Coriolis Effect, compare how temperature and salinity influence movement of water, and more.
See More: https://bit.ly/2E5bk94
Cornell Cooperative Extension Dutchess County and the Dutchess County Environmental Management Council (EMC) held their annual CAC & EMC Roundtable on Tuesday, March 31st from 6pm-8pm online via Zoom. At this meeting, Dutchess County Conservation Advisory Council (CAC) and Conservation Board (CB) members were invited to attend and share the work they have completed and the challenges they faced in 2021, as well as their plans for 2022.
This is the presentation about the building project made by the Community Advisory Council to the Cherry Valley-Springfield Board of Education on 1/18/07. Further information is available at http://www.cvscs.org.
Reston Community Center Aquatic Facility RenovationsFairfax County
Renovating the Reston Community Center aquatic facility included demolition of the existing pool, deck, and mechanical, electrical and plumbing (MEP) components. A new lap pool, warm water pool, and zero-entry pools were installed with new tiled decks. New MEP work included piping, heating, and controls and filtration for the new pools and the existing spa.
Accotink Tributary at Oakford Drive Stream RestorationFairfax County
The Accotink Tributary at Oakford Drive Stream Restoration project included restoration of approximately 1,538 linear feet of stream using natural channel design for restoration, enhancing and stabilizing the degraded stream channel, bed and bank to stabilize, enhance and provide water quality benefits, aesthetics, and prevent further erosion.
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
Learn about the next steps leading to a decision by the Sunshine Coast School District regarding possible school closures.
This presentation was delivered at the December 1, 2009 Public Meeting at Chatelech Secondary School.
The next meeting regarding this topic will also be at Chatelech on Tuesday, December 8.
The Wellesley 2025 stakeholders and planners proactive plan for campus renewal provides a working model for the presentation in which we identify goals and objectives and share initiatives, solutions, analysis ,and economic factors that affect construction Market forecasting, and project cost multipliers for master planning projects.
Atmosphere Ocean And Environmental Change - EdukiteEduKite
The Atmosphere Ocean And Environmental Change explores the physical processes that control Earth’s atmosphere, ocean, and climate. With this course you will be able to analyze how energy is responsible for atmospheric motion, describe the mechanisms that cause the Earth and atmosphere to interact, balancing heat in the system, predict direction of movement when an object is affected by the Coriolis Effect, compare how temperature and salinity influence movement of water, and more.
See More: https://bit.ly/2E5bk94
Cornell Cooperative Extension Dutchess County and the Dutchess County Environmental Management Council (EMC) held their annual CAC & EMC Roundtable on Tuesday, March 31st from 6pm-8pm online via Zoom. At this meeting, Dutchess County Conservation Advisory Council (CAC) and Conservation Board (CB) members were invited to attend and share the work they have completed and the challenges they faced in 2021, as well as their plans for 2022.
This is the presentation about the building project made by the Community Advisory Council to the Cherry Valley-Springfield Board of Education on 1/18/07. Further information is available at http://www.cvscs.org.
Reston Community Center Aquatic Facility RenovationsFairfax County
Renovating the Reston Community Center aquatic facility included demolition of the existing pool, deck, and mechanical, electrical and plumbing (MEP) components. A new lap pool, warm water pool, and zero-entry pools were installed with new tiled decks. New MEP work included piping, heating, and controls and filtration for the new pools and the existing spa.
Accotink Tributary at Oakford Drive Stream RestorationFairfax County
The Accotink Tributary at Oakford Drive Stream Restoration project included restoration of approximately 1,538 linear feet of stream using natural channel design for restoration, enhancing and stabilizing the degraded stream channel, bed and bank to stabilize, enhance and provide water quality benefits, aesthetics, and prevent further erosion.
Similar to Presentation For December 8 09 Meeting (20)
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
Introduction to AI for Nonprofits with Tapp NetworkTechSoup
Dive into the world of AI! Experts Jon Hill and Tareq Monaur will guide you through AI's role in enhancing nonprofit websites and basic marketing strategies, making it easy to understand and apply.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
Macroeconomics- Movie Location
This will be used as part of your Personal Professional Portfolio once graded.
Objective:
Prepare a presentation or a paper using research, basic comparative analysis, data organization and application of economic information. You will make an informed assessment of an economic climate outside of the United States to accomplish an entertainment industry objective.
1. School District No. 46 (Sunshine Coast) A COMMUNITY ENGAGED IN THE PURSUIT OF LIFELONG LEARNING AND EDUCATIONAL EXCELLENCE ENGAGING THE COMMUNITY/POSSIBLE SCHOOL CLOSURES December 8, 2009
2. School District No. 46 (Sunshine Coast)GOVERNANCE POLICY 2.8 SCHOOL CLOSURES The Board of School Trustees of School District No. 46 (Sunshine Coast) believes in the educational value of neighbourhood schools. The Board needs to give continuing attention to: 2.8.1 Educational program effectiveness. 2.8.2 Factors involving student safety and building modernization needs. 2.8.3 Financial limitations of the school district. 2.8.4 Operational deficiencies. 2.8.5 Demographic changes within School District No. 46. 2.8.6 The integrity of each student’s educational program. When school closure or consolidation is contemplated, the Board shall ensure that adequate advance notice and opportunities for community consultation are provided.
29. MAJOR MAINTENANCE PROJECTS SECHELT ELEMENTARY Mechanical Complete up grade to mechanical system $850,000 Electrical Upgraded lighting from T-12 to T-8 $45,500 Intrusion Alarms and fire alarm changed $15,000 Total Electrical: $60,000 Flooring Upgrades and repairs estimated at $25,000 Bathrooms Remodel bathrooms $50,000 Grounds Recondition upper field. $45,000 TOTAL: $1,030,000
30. Maintenance Projects KINNIKINNICK ELEMENTARY Mechanical Complete upgrade to roof top units $450,000 Electrical Upgrade lighting from T-12 to T-8 $25,000 New intrusion and fire alarms $20,000 New PA and intercom System $7,500 Total Electrical: $52,500 Flooring Repair and replacement of floor coverings lifting due to moisture estimated at $150,000 Bathrooms Remodel bathrooms $15,000 Grounds Field drainage and re-contouring estimated at: $160,000 TOTAL: $827,500
31. MAINTENANCE PROJECTS DAVIS BAY ELEMENTARY Mechanical Re and Re Furnace, Gym air handler and hook up DDC $450,000 Electrical Upgrade lighting from T-12 to T-8 $45,000 New intrusion and fire alarms and fire alarms $25,000 Total Electrical: $70,000 Flooring Repairs and replacement: $35,000 Bathrooms Remodel bathrooms $25,000 Total: $580,000
32. Seismic Upgrade Schedule (under review) Sechelt: Seismic Upgrade Scheduled in Capital Plan for 2012/13 Upgrade resistance to seismic loading $2,935,520 Davis Bay: Seismic Upgrade – Scheduled in Capital Plan for 2014/15 Upgrade resistance to seismic loading $624,640 West Sechelt: Seismic Upgrade – Scheduled in Capital Plan for 2014/15 Upgrade resistance to seismic loading $520,380