BIM AND INFORMATION EXCHANGE:
COBie for curtain walls subcontractors
Irene Zezza
Why should be required COBie to a curtainwall subcontractor?
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
1/12
C
O
B
i
e
Construction
Operation
Buildings
information
exchange
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
2/12
What is COBie?
Facility
Floor
Space
Zones
Type
Component
Systems
Job
Resource
Spare
Instruction
Impacts
Contacts
Documents
Issues
Coordinates
Attributes
Connections
Design
Build
Common
COBie
Building information Modelling
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
3/12
Model
Management
COBie
BIM
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
4/12
PAS 1192-2:2013
PAS 1192-3:2013
BS1192-4:2014
COBie
Construction Operations
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
5/12
BUILDING
PROCESS
Pre-Design: Architect
Design: Architect
MEP engineers
Structural engineers
Construction: Contractor
Architect
MEP engineers
COBie
Information
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
6/12
proprietary
format
standard
format
structured
data
unstructured
data
VS VS
COBie
exchange
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
7/12
PRODUCT DEFINITION
Briefing and design
PRODUCT MANUFACTURE
Construction
PRODUCT USE
Operation and maintenance
THE PROCESS
CUSTOMER DEMANDS
Capital Real-estate Building materials Personnel Know-how
SUPPLY
COBie BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
8/12
COBie
and
FM
COBie
and
IFC
COBie
and
Data Drop
COBie
and
Responsibility
Matrix
COBie
and
Classifications
- structured model
- reduce cost
- reduce time
- structured information
- MVD
- Data Drop 1
- Data Drop 2
- Data Drop 3
- Data Drop 4
- Data Drop n
- Team responsibility
- Deliverable requirements
- Spreadsheet schema
- Type assets
- Component Assets
- Property sets
- Uniclass
- Omniclass
Why COBie for curtain wall subcontractor?
Design
Build
Operate
Space, System &
Equipment Layout
Product Data, As-Built
Layout, Tag & Seral N.,
Warranties & Spares
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
9/12
Design Build
Operate
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
10/12
Why COBie for curtain wall subcontractor?
TYPE
COMPONENT
ASSEMBLY
JOB
RESOURCE
DOCUMENT
manufacturers, warranties, replacementCost, expectedLife, nominalDimensions, performance
type name, space, serialNumber, installationDate, warrantyStartDate, barcode, ID
assemblyType, sheetName, parentName, childName
description, duration, frequency, priors, resource
description
file reference
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
11/12
Why COBie for curtain wall subcontractor?
BIM CAFM
HANDOVER
BIM+CAFM
2D
3D
CDE
COBie
work
manage
ment
planned
mainten
ance
integrate
document
integrate
model
2D
3D
CDE
integrate
document
COBie
integrate
model
work
manage
ment
planned
mainten
ance
operation
&
maintena
nce
FM
lifecycle
manage
ment
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
12/12
Conclusions
COBie
Support of public
organization
BIMCoordinator
BIMExecution Plan
Project phases closely
monitored
Contracts defined
between stakeholders
Increasing role of
the FM

PRESENTATION