PMP Exam Overview




  Professional and Technical Learning
  IST HR, Growth Market Unit




                                        © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                      IBM GREATER CHINA GROUP
                      HR Learning



    Agenda
       GCG PMP Summary
       PMP Test Scope
       PMP Test Application Steps
       PMP Test Techniques / Study Tips Sharing
       PMP Re-certification Process




2       PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                           IBM GREATER CHINA GROUP
                           HR Learning


    GCG PMP Summary

     As of 2/28/2009 PMP in IBM GCG
     IBM China                  408
     IBM Hong Kong                67
     IBM Taiwan                  142
     Total                       617




3            PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                  IBM GREATER CHINA GROUP
                  HR Learning




                    PMP Test Scope




4   PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                        IBM GREATER CHINA GROUP
                             HR Learning

PMI - PMBOK

       1987 establish the standards
       1996 (1st edition) – 150 pages
       2000 (2nd edition) – 190 pages
       2004 (3rd edition) – 380 pages
       2008 (4th edition) – 413 pages
        – Published in 12/2008
        – New PMBOK test from 6/30/2009
        – Refer in book 7x24 website for softcopy & download
           –   Find the 7x24 in W3 on demand workspace (w3.ibm.com)
           –   Click books 24x7 and you need to input your internet id / password to go to the website.
           –   Find the PMBOK V4 through the left navigation bar




5              PMP Exam Overview | PMP Test | Confidential                                 © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                                                                       IBM GREATER CHINA GROUP
                                             HR Learning

      PMBOK V4                     Project Management Knowledge Areas
                                                                                           Human               Commun-                            Procure-
  Integration        Scope               Time              Cost           Quality                              ications            Risk           ment
                                                                                           Resource

                                          Define                                          Develop Human           Identify       Plan Risk             Plan
Develop Project       Collect
   Charter
                                                        Estimate Costs   Plan Quality     Resource Plan        Stakeholders
                                                                                                                                Management         Procurements
                   Requirements          Activities

Develop Project                                                            Perform          Acquire                                                   Conduct
                                        Sequence          Determine                                             Plan
 Management        Define Scope                                            Quality          Project                             Identify Risk       Procurement
     Plan                               Activities         Budget                                           Communications
                                                                          Assurance          Team                                                        s

       Direct &                                             Control         Perform         Develop                              Perform
                   Create WBS       Estimate Activity                       Quality                             Distribute    Qualitative Risk       Administer
       manage                                               Costs                           Project
                                      Resources                             Control                            Information      Analysis            Procurements
       project                                                                               Team
      execution                                                       Work breakdown structure
                                                                                                                                                        Close
                   Verify Scope                                           WBS dictionary     Manage            Manage            Perform
                                                                                                                              Quantitative Risk      Procurement
                                    Estimate Activity                                        Project         Stakeholder
  Monitor and                                                                                                                    Analysis                 s
                                       Durations                                             Team            Expectations
 control project      Control
      work            Scope
                                         Develop                                                              Report             Plan Risk
    Perform                             Schedule                                                            Performance         Responses
   Integrated
    Change
     Control                              Control
                                                                                                                               Monitor and
                                         Schedule                                                                              Control Risks
        Close
      Project or
       Phase

                                    2                     20                      8                       10                       2
                                                                                                       Monitoring &
                                Initiating              Planning              Executing                                         Closing           Total 42
                                                                                                       Controlling
                                Process                 Process                Process
                                                                                                        Process
                                                                                                                                Process           Processes


  6                     PMP Exam Overview | PMP Test | Confidential                                                                       © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                  IBM GREATER CHINA GROUP
                                HR Learning

    The Revised PMP Credential Examination will Test Knowledge in the Following Six Domains
             

                 Initiating the Project……11%
                 Tasks

                Conduct Project Selection Methods
                Define Scope
                Document Project Risks, Assumptions, and Constraints
                Identify and Perform Stakeholder Analysis
                Develop Project Charter
                Obtain Project Charter Approval

              Planning the Project……23%
               Tasks

                Define and Record Requirements, Constraints and Assumptions
                Identify Project Team and Define Roles and Responsibilities
                Create the WBS
                Develop Project Management Plan
                Develop Change Management Plan
                Identify Risks and Define Risk Strategies
                Obtain Plan Approval
                Conduct Kick-off Meeting
7                 PMP Exam Overview | PMP Test | Confidential                        © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                IBM GREATER CHINA GROUP
                            HR Learning

The Revised PMP Credential Examination will Test Knowledge in the Following Six Domains (cont.)

         Executing the Project……27%
          Tasks

           Execute Tasks Defined in Project Plan
           Ensure Common Understanding and Set Expectations
           Implement the Procurement of Project Resources
           Manage Resource Allocation
           Implement Quality Management Plan
           Implement Approved Changes
           Implement Approved Actions and Workarounds
           Improve Team Performance

         Monitoring and Controlling the Project……21%
          Tasks

           Measure Project Performance
           Verify and Manage Changes to the Project
           Ensure Project Deliverables Conform to Quality Standards
           Monitor all Risks

8             PMP Exam Overview | PMP Test | Confidential                          © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                IBM GREATER CHINA GROUP
                            HR Learning

The Revised PMP Credential Examination will Test Knowledge in the Following Six Domains (cont.)

        Closing the Project……9%
         Tasks

          Obtain Final Acceptance for the Project
          Obtain Financial, Legal, and Administrative Closure
          Release Project Resources
          Identify, Document and Communicate Lessons Learned
          Create and Distribute Final Project Report
          Archive and Retain Project Records
          Measure Customer Satisfaction

        Professional and Social Responsibility……9%
         Tasks

          Ensure Individual Integrity
          Contribute to the Project Management Knowledge Base
          Enhance Personal Professional Competence
          Promote Interaction Among Stakeholders

        Total……100%


9             PMP Exam Overview | PMP Test | Confidential                          © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


       New passing score of the PMP exam:
             HR Learning
                                                                    IBM GREATER CHINA GROUP




     PMP Test Passing Scores
       Total Questions : 200
       25 pretest questions will be randomly placed throughout the new
        examination to gather statistical information on the performance of
        these questions in order to determine whether they may be used on
        future examinations. These 25 pretest items are included in the 200-
        question examination, but will not be included in the pass/fail
        determination; candidates will be scored on 175 questions.
       Diagnostic score reports are now being given to all candidates to
        show their overall pass or fail status giving the “Proficient, Moderate
        Proficient, Below Proficient” in each domain. Originally to pass the
        PMP examination, candidates must answer a minimum of 141 of the
        175 scored questions (81%) correctly.
       Breaking news: passing rate is adjusted to 106 out of 175 (61%)
        correct (announced Dec 1, 2005).




10       PMP Exam Overview | PMP Test | Confidential                   © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                   IBM GREATER CHINA GROUP
                           HR Learning



     PMP Test Application Steps

        Can I take PMP Exam ? - Eligibility Criteria.
        What’s the Internal process of PMP Exam Application ? - Advance Approval
        What to prepare and How to Register ? – Doc, Mail, Web-base
        Where ? When ? How to take / pass the Exam ? – Refer the detail steps
        Pass ! – Congratulation !!
        Fail ? – Re-take Exam.
        How to Prepare ? – Books, Experience…
        How to Renew Certification in every 3 years ? – PMI PDC-PMPHANDBOOK
         guideline




11           PMP Exam Overview | PMP Test | Confidential              © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                       IBM GREATER CHINA GROUP
                       HR Learning

Eligibility Criteria

        Category 1
          – Baccalaureate or Global Equivalent University Degree.
          – Minimum 4500Hours Project Management Experience within 5 PM
            Process Groups in 6 Years, totally 36 months.
          – 35 Contact Hours of Project Management Education
             – IBM PMF 24 hours
             – IBM Leadership in a project team environment 24 hours
             – PMP Exam Study 16 hours




12       PMP Exam Overview | PMP Test | Confidential                      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                          IBM GREATER CHINA GROUP
                       HR Learning

Eligibility Criteria – cont.

        Category 2
          – High School Diploma Equivalent Secondary School Credential.
          – Minimum 7500Hours Project Management Experience within 5 PM
            Process Groups in 8 Years, totally 60 months.
          – 35 Contact Hours of Project Management Education
             – IBM PMF 24 hours
             – IBM Leadership in a project team environment 24 hours
             – PMP Exam Study 16 hours




13       PMP Exam Overview | PMP Test | Confidential                        © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                              IBM GREATER CHINA GROUP
                          HR Learning

Internal Process of PMP Exam Application (get advance
approval before test)
      Read website approval & claim procedure
       TW: http://w3-07.ibm.com/hr/ap/tw/yourcareer/zh-tw/ext_edu_gcg.html
       CN : http://w3-07.ibm.com/hr/ap/cn/yourcareer/zh-cn/ext_edu_gcg.html
      Download the expense claim form, fill out the test fee & get immediate
       manager’s approval
      Forward the manager’s approval mail to Joy Tang to get HR concurrence
      Keep the approval mails for future expense claim
      Submit the expense claim after passing the PMP exam & attach the
       advance approval mail, invoice copy & PMP certificate copy
      Inform Joy Tang to add you to GCG PMP community after you get PMP
       “PASS” notification




     Remarks: Get GCG CFO Lily Low and GCG HR Executive approval before expense claim based
     on 2/2009 expense control rule




14          PMP Exam Overview | PMP Test | Confidential                         © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                           IBM GREATER CHINA GROUP
                        HR Learning

What to Prepare ?
Document Preparation

        Prepare 3 project experiences with the hours allocation in 5 domains
        Gather 35 contact hours training records
        Understand how many you need to pay for PMI Member Fees and PMP test
         Fees and get the internal approval in advance


                                          PMI Member           Non-PMI Member
        PMI Member Fee                    US$129               NA
        PMP 1st Test Fee                  US$405 (RMB$2100)    US$555 (RMB$3300)
        IBM Discount                      -US$60
        (IBM01C001)
        Total                             US$474 (Non-China)   US$555 (Non-China)
                                          US$129 + RMB$2100    RMB$3300 (China)
                                          (China, no IBM
                                          discount)


15        PMP Exam Overview | PMP Test | Confidential                         © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                             IBM GREATER CHINA GROUP
                           HR Learning

PMP Application Form

        Personal background information
        Project Management Experiences
          – Project period
          – Job role
          – Industry of the project
          – Job Title
          – Project address / project contact point
          – Initiating/Planning/Executing/Monitoring & Controlling/Closing Domain
            hours (separate project hours in phases)
          – Project description
        Education Records (Course title, Institution name, Course period)

                                                    Adobe Acrobat
Remarks: Reference Application form                   Document




16           PMP Exam Overview | PMP Test | Confidential                       © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                   IBM GREATER CHINA GROUP
                                HR Learning

How to Earn the contact hours

            Contact hours earned (Category – A - F)
         –      Courses or programs offered by PMI Registered Education Providers
                (R.E.P.s)
         –      University/college academic and continuing education programs
         –      Courses or programs offered by PMI Component organizations
         –      Courses or programs offered by employer/company-sponsored programs
         –      Courses or programs offered by distance-learning companies and
                demonstration that course requirements were completed successfully,
                including an end of course assessment
         –      Courses or programs offered by training companies or consultants


     Remarks: Refer PMP Handbook in PMI website




17                PMP Exam Overview | PMP Test | Confidential                         © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                   IBM GREATER CHINA GROUP
                       HR Learning

PMP Test Eligibility Rule

       Candidates are granted a one-year eligibility window.
       Candidates have a max of three attempts to receive a passing score
        on the PMP exam within the one-year eligibility period. After the 3rd
        unsuccessful attempt, candidates will have to wait one year before
        re-applying
         – Re-exam fee:
             – Non-Member – USD 375 (RMB$2500)
             – Member – USD 275 (RMB$1250)




18       PMP Exam Overview | PMP Test | Confidential                  © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                             IBM GREATER CHINA GROUP
                             HR Learning

PMP Test Registration Process

      Web-based Registration
        – http://www.pmi.org/




19             PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                           IBM GREATER CHINA GROUP
                                HR Learning



 Dear Ying Liu,

 Your application has been reviewed. The next step in the process is to submit payment for the credential
 examination.

 You have one year from the date your application was approved to take your PMP examination. Your
 application was approved on 22 Apr 2009.

 To submit payment, please login at https://www.pmi.org/certapp/.
 Please note that PMI randomly selects a percentage of applications to participate in the audit process, as
 detailed in the credential handbook. Once payment is made toward your application, you will be notified
 whether your application has been selected to participate in this process. If selected, you will be advised
 of the process and provided with an appropriate link for more in-depth instructions. For credential
 candidates going through the audit process, the examination eligibility period will be reset to one year
 following the successful completion of the audit.

 Before you can schedule your examination, you must first pay the credential fee. Once you make
 payment, you will receive a PMI Identification Code, which you will need in order to schedule your
 examination.

 Please contact us at customercare@pmi.org if you have questions or concerns.

 Thank you,
 PMI Customer Care
20                PMP Exam Overview | PMP Test | Confidential                                 © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                                            IBM GREATER CHINA GROUP
                                  HR Learning

 Dear Chen-Ying Wu,

 Thank you for your interest in the PMP credential. Your examination scheduling details are outlined below, please review
 them thoroughly and ensure all information provided is accurate.

 Name exactly as it appears on your identification: Chen-Ying Wu         Several days later…
 PMI Identification Code: 1226003E1                                      You will receive the notification
 Exam: PMP
 Language the Examination will be Administered in: English               that you pass the PMI eligibility
 Language Aid: Simplified Chinese                                        review after you pay the test fee.
 Eligibility Expiration Date: 10 Jun 2009
                                                                         You could schedule your test and
 Computer-based Examinees:                                               pay the test fee
 If you are taking a computer-based examination, please schedule your examination by following the detailed examination
 scheduling instructions at http://www.pmi.org/PDF/CredentialExamSchedulingInstructions.pdf. Due to high-test volume, it is
 recommended that you schedule to test at least six weeks before the intended date of testing.

 Paper-based Examinees:
 If you are taking a paper-based examination you have already been successfully scheduled. Please await your confirmation
 that will be sent by e-mail from PMI 20-25 days before the event. This confirmation will contain site instructions. Please read
 the detailed examination scheduling instructions at http://www.pmi.org/PDF/CredentialExamSchedulingInstructions.pdf for
 information about how to cancel a scheduled paper-based examination and other very important information.

 PMI wishes you a successful testing experience. Please contact us at customercare@pmi.org if you have questions or
 concerns.

 Thank you,

 PMI Customer Care

21                 PMP Exam Overview | PMP Test | Confidential                                                 © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                  IBM GREATER CHINA GROUP
                       HR Learning

Random PMI Audit of Qualification

       You will be randomly selected to provide the evidence of the
        following documents before you could register the PMP test after
        registration process
         – Diploma
         – Education certificate
         – Project experience evidence


     Don’t panic !! You need to collect the documents and mail to PMI
     to let them verify before you get the eligibility letter from PMI




22       PMP Exam Overview | PMP Test | Confidential                © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                          IBM GREATER CHINA GROUP
                        HR Learning




      Are You Ready for Exam ???



                                  God Bless You !
                                  Good Luck !
                                  A-Me-To-Fu !
                                  ……..
     Schedule the PMP Test in the PMI approved location




23        PMP Exam Overview | PMP Test | Confidential        © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW



               Paper HR Learning
                     Test Register in China                             IBM GREATER CHINA GROUP




 China – Register PMP test in following center and pay the fee
     Test date : one Saturday in March, June, September and December
     Reference website to register the test : http://www.chinapmp.cn/




     Find all centers in http://www.chinapmp.cn/info/SortContent_rz.asp?sortid=344
24              PMP Exam Overview | PMP Test | Confidential                © 2007 IBM Corporation
Computer-Base Test Register                                    ANTICIPATE, ENABLE, GROW


                                                                       IBM GREATER CHINA GROUP
                        HR Learning


     Taiwan
         http://www.2test.com
         Register to Prometric (get ID: SPxxxxxxx)
         Book Exam Time Schedule & Choose Test location
           – By Web-based
           – By 008-061-1141 Phone call 講中文
           – Fax 008-061-1191
           – Exam: PMI-PMP – PROJECT MGMT PROFESSIONAL
           – Reschedule or cancel must be done before 48 hours exam day or you may
             be charged for fee
           – Choose Mandarin as 2nd language version besides English




25        PMP Exam Overview | PMP Test | Confidential                     © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                     IBM GREATER CHINA GROUP
                     HR Learning

Testing Center in Taiwan




26     PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                            IBM GREATER CHINA GROUP
                              HR Learning

Exam Confirmation Notice
     To: ChenYing Wu
     3FNo 1 Aly 1 Ln 524 Sec 5 Chunghsiao E Rd
     Taipei 00000
     TAIWAN

     Subject: Confirmation of computer-based Project Management Professional,#8885000000699262

     Your appointment for the computer-based Project Management Professional is confirmed. Please
     find the confirmation details that follow:
            Confirmation:    8885000000699262
            Program:         Project Management Institute
            Exam Code:       PMP
                  Project Management Professional
            Exam Date:       06 Feb 2009
            Exam Time:       12:30


     RESCHEDULE / CANCEL POLICY
     If you need to reschedule or cancel your exam, you must call the registration center, or visit
     www.prometric.com, no later than 48 hours before your appointment date.
     You must apply to Project Management Institute each time you wish to retest.



27              PMP Exam Overview | PMP Test | Confidential                                    © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                          IBM GREATER CHINA GROUP
                          HR Learning

Taking Exam
      Documents to bring to the testing site :
        – TW: Passport (match the photo and name)
        – CN: 身份證 (or Passport) and 準考證 (download from www.chinapmp.cn 4 days before
          the test date)
      Suggest to go to the test site before the test to survey the environment
      Arrive the test center 30-60 minutes before the test
      4 hours exam 200 multiple-choice questions
        – TW: Computer-based Exam
        – CN: Paper test ( 中英文考題 )
      The exam site will provide pencil & blank papers
      You may or may not take a simple calculator without programming
       function depending on the test environment (if it’s computer test, the
       function is built into computer)
      15-minute Computer Tutorial and followed by an optional candidate
       satisfaction survey and an exam score report (TW only)




28          PMP Exam Overview | PMP Test | Confidential                     © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                      IBM GREATER CHINA GROUP
                      HR Learning


Types of Exam Questions

       Situational questions
       Two right answers
       Extraneous information
       Out of the blue questions – never heard of the
        terms before
       Definition questions




29      PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                             IBM GREATER CHINA GROUP
                          HR Learning

Test Techniques
      Write down all formulas, numbers and acronyms before you start
      Multiple choice, one question in one page, read the question and ALL the
       answers, choose the BEST answers
      Keep notes about difficult questions and mark the questions for future review
      Sometimes we just guess one answer and go to next question if we do not know
       the contents. Don’t spend time on this kind of question.
      Use elimination, only ONE answer is best and correct
      Rank the answers by correctness or always true
      Look for highlighted qualifiers such as BEST, FIRST, EXCEPT, MOST,
       GREATEST, MAJOR, NOT, NEVER, ALWAYS
      Look for PMBOK phrases
      Ask yourself what would PMBOK say BEFORE experience
      If unsure of the answer, guess an initial answer, it is better than no answer.
       There is no penalty for wrong answers
      Use 2.5-3 hours to complete the test and spend the rest of the time to review the
       answers which marked for future review
      There is “Previous, Next, Mark, End of EXAM “ icon, final counting time is on the
       right upper corner, “Exit” icon is on right lower corner (TW only)




30          PMP Exam Overview | PMP Test | Confidential                         © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                      IBM GREATER CHINA GROUP
                      HR Learning

Test Techniques - continued
      忘掉 IB M 規定及您以前彈性經驗 , 以 P MI 觀點回答問題
      考試不是在問您的看法 , 而是在問 P MI 希望的答案
      有關專業道德倫理問題 :
      – 欺騙 , 偷竊 , 賄賂…
       侵犯公司 , 客戶 ,PMI 利益 ( 先檢舉 , 再分析評估 )
        1 . 通知 PMI
        2. 通知客戶
        3. 通知經理

      – 廠商或客戶給您好處 ( 週末湖邊渡假屋子 , 晚餐 , 車子 , … ) 禮貌拒
        絕 , 並且告訴他這不符合專業倫理
      題目開始時多半很長又較難 , 但不要緊張 , 鎮定回答問題 , 會漸入
       佳境




31      PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                         IBM GREATER CHINA GROUP
                         HR Learning



     Test Techniques - continued
         IP , P ate nt rig ht
         絕對尊重智慧財產權及專利權 , 拒絕不當使用 ,
         並且義正詞嚴告訴他這是不對的行為
         利益衝突
         誠實告知客戶或經理
         無法如期達成專案要求 , 意外事件…
            1 . 先分析評估
            2. 再與 Te am 找出可能解決之道
            3. 最後才通知客戶或經理
         題目分散在各章節 , 不可偏廢
         要求指出某一動作是在那一個 p ro c e s s 執行題目不少




32         PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                              IBM GREATER CHINA GROUP
                      HR Learning


Test Techniques - continued

       很多專有名詞定義題 :
       1 . E MV, N PV, C ritic al Path , Q u ality Au d it,
          S lac k, PE RT, Mas lo w, E V, PV, S V, C PI, S PI… 甚至問您如專有
        名詞縮寫英文的英文全名 .
       2. Tim e : C ritic al Path 計算
          H R : C o m m u n ic atio n c h an n e l 計算
          C o s t : E V, PV, S V, C V, C PI, S PI
         PE RT : PE RT 計算
         Ris k : E MV 計算
       答案中如果有沒看過的名詞 , 通常是掰出來混淆視聽的錯誤答
        案




33      PMP Exam Overview | PMP Test | Confidential              © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                     IBM GREATER CHINA GROUP
                     HR Learning

Test Techniques - continued

      Wh at- if 情境題目
       題目字數行數超多 , 答案也是三四行以上 .

       1 . 耐心看完題目 , 通常最下面三行才是重點 .
       2. 有些題目提供一大堆數字資料 , 但最後問句並未要求計算 , 只是
       憑此來評估而已 .
       3. 保持信心 , 後面還是會出現簡易的送分題




34     PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                           IBM GREATER CHINA GROUP
                         HR Learning

Study Tips
        Read PMBOK, IBM PMP Exam Prep Study Guide, RMC Prep Exam by
         Rita Mulcahy
        Read the PMBOK at least twice – Pay attention to the definitions at the
         end of each section.
        Understand that perhaps >50% of the questions are on material not in
         the PMBOK.
        Form the study group
        Practice the questions and read the books again
         1. Specialized course offered by IBM (on-line facilitated) ($635) PM53G
         2. Project Management PMI Exam Flash Cards ex: ($25)
           http://www.amazon.com/PMP-Exam-Success-Certification-Flashcards/dp/0976866021
         3. PM e-learning class PMPROJ01 (PMP Test Prep)
        Don’t expect to do it during normal IBM working hours on a regular
         basis.
        Budget several vacation days the week before the exam for intensive
         study.

     “ 您需要強烈動機 !” 以 IB Me r 的智商 , 只要投入時間一定沒問題的 ! 建議
       最多規劃 3- 6 月完成考試 ! 甚至有人只用 2- 3 月即完成整個過程 !!

35         PMP Exam Overview | PMP Test | Confidential                                       © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                 IBM GREATER CHINA GROUP
                            HR Learning



     Congratulations mail from PMI
      Dear Chen-Ying Wu,

      Congratulations on obtaining the PMP credential.

      You will receive your certificate package within eight weeks. At your earliest
      convenience, please verify that your preferred mailing address is correct by visiting our
      website at PMI.org

      Your examination score report is available at https://www.pmi.org/certapp/. Until you
      receive your certificate package, you may use this score report to validate your
      credential status. You may also access the policies and procedures necessary to
      maintain your credential in the credential handbook.

      Please contact us at customercare@pmi.org if you have questions or concerns.

      Thank you,

      PMI Customer Care

36            PMP Exam Overview | PMP Test | Confidential                           © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                            IBM GREATER CHINA GROUP
                            HR Learning


Not passed, Please Try Again

By Mail or FAX
$275 Member
(RMB$1250)
$375 Non-Member
(RMB$2500)

3~4 Weeks
for Voucher




 37           PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                           IBM GREATER CHINA GROUP
                     HR Learning




     Hard Working……



                                               Finally….




38     PMP Exam Overview | PMP Test | Confidential            © 2007 IBM Corporation
© 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                     IBM GREATER CHINA GROUP
                     HR Learning




Related Websites


        PM/COE related link in PMI :
        http://w3-03.ibm.com/transform/project/certification/pmi_info.html

        Exercise PMP study link:
        http://www.pmstudy.com
        http://www.certgear.com/products/preview/pmp_certification/index.html

        Exam reimbursement:
        http://w3-6.ibm.com/hr/ap/china/yourcareer/zh-cn/ext_edu_gcg.html
        http://w3-6.ibm.com/hr/ap/taiwan/yourcareer/zh-tw/ext_edu_gcg.html




40     PMP Exam Overview | PMP Test | Confidential                      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                   IBM GREATER CHINA GROUP
                   HR Learning




     PMP Re-certification Process




41   PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                 IBM GREATER CHINA GROUP
                        HR Learning

Why Should I get re-certification ?
     You want to keep using the PMP Title
     You want to avoid re-doing the PMP exam
         – As curriculum is changing
         – industry domains are being added

     You want to keep your skills up to date
         – Learn about new areas in PM’s
         – Network with experienced PM’s from other organizations
         – Keep abreast of current ideas in Project Management




42        PMP Exam Overview | PMP Test | Confidential               © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                         IBM GREATER CHINA GROUP
                           HR Learning

How to Renew the Certification
      Individuals must accrue 60 PDU’s (Professional Development Unit) in
       the 3 year cycle following certification.
        – PM’s who do not re-certify with PMI cannot use the title PMP
        – PM’s who do not re-certify may lose Senior status
        – You have 3 years plus maximum one year to get the 60 PDU’s

      PMI will verify the PDU requirements of the PMP upon the last year and
       send an email to the request for the PMP renewal

      PMP fill out the application for certification renewal & pay the renewal
       fees by credit card no later than 90 days after the certification deadline
        – PMI member : US$60 (Member fee US$129)
        – Non-PMI member : US$150


      PMI will mail the updated certificate with the new active certification/CCR
       cycle dates within 6-8 weeks after receiving the application



43           PMP Exam Overview | PMP Test | Confidential                    © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                IBM GREATER CHINA GROUP
                            HR Learning

Qualifying activities to get the PDU – 5 Categories
     Category 1 – Formal academic education
          –    Complete degree course in PM
          –    IBM sponsored MBA in PM

     Category 2 – Professional activities & self-directed learning
          –    Refer guide to category 2 activities in PDC_CCRHANDBOOK
          –    Maximum 15 self-directed learning PDUs could be earned per CCR cycle

     Category 3 – PMI Registered Education Providers/PMI components
          –    IBM is PMP registered education provider- search Global Campus for following:
               “PMP Professional Development Activity Program Number” – example
               1107-0000PM75

     Category 4 – Other Providers
          –    Attend PM courses from non PMI registered providers

     Category 5 – Volunteer Services to Professional or Community Organization
          –    Volunteering PM services in community (max 20 PDUs)

     More information:
          –    http://www.pmi.org/info/PDC_PDUQualifyingActivities
44            PMP Exam Overview | PMP Test | Confidential                         © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                         IBM GREATER CHINA GROUP
                      HR Learning



 Category 2
      Category 2 is complicated and has several areas which you already do as
      part of your work in IBM.

      Professional Activities
           –    Author / Co-author for textbook or article
           –    Speaker at PM event
           –    Facilitator for PM workshops, events, conferences
           –    Content developer for PM learning activity
           –    Practitioner of PM services for more than 1500 hrs per yr (max 15 PDU)
           –    A committee member of a PM organization maximum 5 PDU per year could be claimed


      Self Directed learning (max 15 PDU)
           –    Mentoring & coaching activities
           –    Producing education material
           –    Reading PM books etc.
           –    For more details see the CCR Handbook online at PMI.org.




45      PMP Exam Overview | PMP Test | Confidential                                         © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                          IBM GREATER CHINA GROUP
                          HR Learning


     Category 3 : PDU of IBM Global Campus Education                  Adobe Acrobat
                                                                        Document




46          PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                   IBM GREATER CHINA GROUP
                       HR Learning

How to Register PDU’s
     Submission can be done in online / fax / email or mail
         – http://tel.occe.ou.edu/pmi/PMI_Member/PDUlogin.php3#PMIID

     Regular submission is recommended as the rules do change.
     20 PDUs (earned in last year) can be carried forward to next cycle
     Submissions are audited so you need to have evidence




47       PMP Exam Overview | PMP Test | Confidential                   © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                                                    IBM GREATER CHINA GROUP
                        HR Learning


     Suspended Status
         - The candidates are not satisfied Continuing Certification Requirement within the
         active certification dates will be placed into suspended status
         - There is a maximum “one year” suspension period
         - Suspended certification status indicates that the individual may not use the credential
         or certification mark
         - Certificants who do not meet the overdue requirements within the suspension period
         will lose their credential designation
         - The date of a certificant’s next CCR cycle will not change after reinstatement to
         active status from suspension




48        PMP Exam Overview | PMP Test | Confidential                                  © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                    IBM GREATER CHINA GROUP
                    HR Learning




               Important Reminder to PMP !


     Do complete 60 PDU education, claim PDU to PMI
     and renew your PMP certification every 3 years




49    PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation
ANTICIPATE, ENABLE, GROW


                                                   IBM GREATER CHINA GROUP
                   HR Learning




                                   Questions ?




50   PMP Exam Overview | PMP Test | Confidential      © 2007 IBM Corporation

Pmp exam overview

  • 1.
    PMP Exam Overview Professional and Technical Learning IST HR, Growth Market Unit © 2007 IBM Corporation
  • 2.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Agenda  GCG PMP Summary  PMP Test Scope  PMP Test Application Steps  PMP Test Techniques / Study Tips Sharing  PMP Re-certification Process 2 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 3.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning GCG PMP Summary As of 2/28/2009 PMP in IBM GCG IBM China 408 IBM Hong Kong 67 IBM Taiwan 142 Total 617 3 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 4.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning PMP Test Scope 4 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 5.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning PMI - PMBOK  1987 establish the standards  1996 (1st edition) – 150 pages  2000 (2nd edition) – 190 pages  2004 (3rd edition) – 380 pages  2008 (4th edition) – 413 pages – Published in 12/2008 – New PMBOK test from 6/30/2009 – Refer in book 7x24 website for softcopy & download – Find the 7x24 in W3 on demand workspace (w3.ibm.com) – Click books 24x7 and you need to input your internet id / password to go to the website. – Find the PMBOK V4 through the left navigation bar 5 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 6.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning PMBOK V4 Project Management Knowledge Areas Human Commun- Procure- Integration Scope Time Cost Quality ications Risk ment Resource Define Develop Human Identify Plan Risk Plan Develop Project Collect Charter Estimate Costs Plan Quality Resource Plan Stakeholders Management Procurements Requirements Activities Develop Project Perform Acquire Conduct Sequence Determine Plan Management Define Scope Quality Project Identify Risk Procurement Plan Activities Budget Communications Assurance Team s Direct & Control Perform Develop Perform Create WBS Estimate Activity Quality Distribute Qualitative Risk Administer manage Costs Project Resources Control Information Analysis Procurements project Team execution Work breakdown structure Close Verify Scope WBS dictionary Manage Manage Perform Quantitative Risk Procurement Estimate Activity Project Stakeholder Monitor and Analysis s Durations Team Expectations control project Control work Scope Develop Report Plan Risk Perform Schedule Performance Responses Integrated Change Control Control Monitor and Schedule Control Risks Close Project or Phase 2 20 8 10 2 Monitoring & Initiating Planning Executing Closing Total 42 Controlling Process Process Process Process Process Processes 6 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 7.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning The Revised PMP Credential Examination will Test Knowledge in the Following Six Domains  Initiating the Project……11% Tasks  Conduct Project Selection Methods  Define Scope  Document Project Risks, Assumptions, and Constraints  Identify and Perform Stakeholder Analysis  Develop Project Charter  Obtain Project Charter Approval  Planning the Project……23% Tasks  Define and Record Requirements, Constraints and Assumptions  Identify Project Team and Define Roles and Responsibilities  Create the WBS  Develop Project Management Plan  Develop Change Management Plan  Identify Risks and Define Risk Strategies  Obtain Plan Approval  Conduct Kick-off Meeting 7 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 8.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning The Revised PMP Credential Examination will Test Knowledge in the Following Six Domains (cont.)  Executing the Project……27% Tasks  Execute Tasks Defined in Project Plan  Ensure Common Understanding and Set Expectations  Implement the Procurement of Project Resources  Manage Resource Allocation  Implement Quality Management Plan  Implement Approved Changes  Implement Approved Actions and Workarounds  Improve Team Performance  Monitoring and Controlling the Project……21% Tasks  Measure Project Performance  Verify and Manage Changes to the Project  Ensure Project Deliverables Conform to Quality Standards  Monitor all Risks 8 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 9.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning The Revised PMP Credential Examination will Test Knowledge in the Following Six Domains (cont.)  Closing the Project……9% Tasks  Obtain Final Acceptance for the Project  Obtain Financial, Legal, and Administrative Closure  Release Project Resources  Identify, Document and Communicate Lessons Learned  Create and Distribute Final Project Report  Archive and Retain Project Records  Measure Customer Satisfaction  Professional and Social Responsibility……9% Tasks  Ensure Individual Integrity  Contribute to the Project Management Knowledge Base  Enhance Personal Professional Competence  Promote Interaction Among Stakeholders  Total……100% 9 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 10.
    ANTICIPATE, ENABLE, GROW New passing score of the PMP exam: HR Learning IBM GREATER CHINA GROUP PMP Test Passing Scores  Total Questions : 200  25 pretest questions will be randomly placed throughout the new examination to gather statistical information on the performance of these questions in order to determine whether they may be used on future examinations. These 25 pretest items are included in the 200- question examination, but will not be included in the pass/fail determination; candidates will be scored on 175 questions.  Diagnostic score reports are now being given to all candidates to show their overall pass or fail status giving the “Proficient, Moderate Proficient, Below Proficient” in each domain. Originally to pass the PMP examination, candidates must answer a minimum of 141 of the 175 scored questions (81%) correctly.  Breaking news: passing rate is adjusted to 106 out of 175 (61%) correct (announced Dec 1, 2005). 10 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 11.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning PMP Test Application Steps  Can I take PMP Exam ? - Eligibility Criteria.  What’s the Internal process of PMP Exam Application ? - Advance Approval  What to prepare and How to Register ? – Doc, Mail, Web-base  Where ? When ? How to take / pass the Exam ? – Refer the detail steps  Pass ! – Congratulation !!  Fail ? – Re-take Exam.  How to Prepare ? – Books, Experience…  How to Renew Certification in every 3 years ? – PMI PDC-PMPHANDBOOK guideline 11 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 12.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Eligibility Criteria  Category 1 – Baccalaureate or Global Equivalent University Degree. – Minimum 4500Hours Project Management Experience within 5 PM Process Groups in 6 Years, totally 36 months. – 35 Contact Hours of Project Management Education – IBM PMF 24 hours – IBM Leadership in a project team environment 24 hours – PMP Exam Study 16 hours 12 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 13.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Eligibility Criteria – cont.  Category 2 – High School Diploma Equivalent Secondary School Credential. – Minimum 7500Hours Project Management Experience within 5 PM Process Groups in 8 Years, totally 60 months. – 35 Contact Hours of Project Management Education – IBM PMF 24 hours – IBM Leadership in a project team environment 24 hours – PMP Exam Study 16 hours 13 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 14.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Internal Process of PMP Exam Application (get advance approval before test)  Read website approval & claim procedure TW: http://w3-07.ibm.com/hr/ap/tw/yourcareer/zh-tw/ext_edu_gcg.html CN : http://w3-07.ibm.com/hr/ap/cn/yourcareer/zh-cn/ext_edu_gcg.html  Download the expense claim form, fill out the test fee & get immediate manager’s approval  Forward the manager’s approval mail to Joy Tang to get HR concurrence  Keep the approval mails for future expense claim  Submit the expense claim after passing the PMP exam & attach the advance approval mail, invoice copy & PMP certificate copy  Inform Joy Tang to add you to GCG PMP community after you get PMP “PASS” notification Remarks: Get GCG CFO Lily Low and GCG HR Executive approval before expense claim based on 2/2009 expense control rule 14 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 15.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning What to Prepare ? Document Preparation  Prepare 3 project experiences with the hours allocation in 5 domains  Gather 35 contact hours training records  Understand how many you need to pay for PMI Member Fees and PMP test Fees and get the internal approval in advance PMI Member Non-PMI Member PMI Member Fee US$129 NA PMP 1st Test Fee US$405 (RMB$2100) US$555 (RMB$3300) IBM Discount -US$60 (IBM01C001) Total US$474 (Non-China) US$555 (Non-China) US$129 + RMB$2100 RMB$3300 (China) (China, no IBM discount) 15 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 16.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning PMP Application Form  Personal background information  Project Management Experiences – Project period – Job role – Industry of the project – Job Title – Project address / project contact point – Initiating/Planning/Executing/Monitoring & Controlling/Closing Domain hours (separate project hours in phases) – Project description  Education Records (Course title, Institution name, Course period) Adobe Acrobat Remarks: Reference Application form Document 16 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 17.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning How to Earn the contact hours  Contact hours earned (Category – A - F) – Courses or programs offered by PMI Registered Education Providers (R.E.P.s) – University/college academic and continuing education programs – Courses or programs offered by PMI Component organizations – Courses or programs offered by employer/company-sponsored programs – Courses or programs offered by distance-learning companies and demonstration that course requirements were completed successfully, including an end of course assessment – Courses or programs offered by training companies or consultants Remarks: Refer PMP Handbook in PMI website 17 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 18.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning PMP Test Eligibility Rule  Candidates are granted a one-year eligibility window.  Candidates have a max of three attempts to receive a passing score on the PMP exam within the one-year eligibility period. After the 3rd unsuccessful attempt, candidates will have to wait one year before re-applying – Re-exam fee: – Non-Member – USD 375 (RMB$2500) – Member – USD 275 (RMB$1250) 18 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 19.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning PMP Test Registration Process  Web-based Registration – http://www.pmi.org/ 19 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 20.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Dear Ying Liu, Your application has been reviewed. The next step in the process is to submit payment for the credential examination. You have one year from the date your application was approved to take your PMP examination. Your application was approved on 22 Apr 2009. To submit payment, please login at https://www.pmi.org/certapp/. Please note that PMI randomly selects a percentage of applications to participate in the audit process, as detailed in the credential handbook. Once payment is made toward your application, you will be notified whether your application has been selected to participate in this process. If selected, you will be advised of the process and provided with an appropriate link for more in-depth instructions. For credential candidates going through the audit process, the examination eligibility period will be reset to one year following the successful completion of the audit. Before you can schedule your examination, you must first pay the credential fee. Once you make payment, you will receive a PMI Identification Code, which you will need in order to schedule your examination. Please contact us at customercare@pmi.org if you have questions or concerns. Thank you, PMI Customer Care 20 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 21.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Dear Chen-Ying Wu, Thank you for your interest in the PMP credential. Your examination scheduling details are outlined below, please review them thoroughly and ensure all information provided is accurate. Name exactly as it appears on your identification: Chen-Ying Wu Several days later… PMI Identification Code: 1226003E1 You will receive the notification Exam: PMP Language the Examination will be Administered in: English that you pass the PMI eligibility Language Aid: Simplified Chinese review after you pay the test fee. Eligibility Expiration Date: 10 Jun 2009 You could schedule your test and Computer-based Examinees: pay the test fee If you are taking a computer-based examination, please schedule your examination by following the detailed examination scheduling instructions at http://www.pmi.org/PDF/CredentialExamSchedulingInstructions.pdf. Due to high-test volume, it is recommended that you schedule to test at least six weeks before the intended date of testing. Paper-based Examinees: If you are taking a paper-based examination you have already been successfully scheduled. Please await your confirmation that will be sent by e-mail from PMI 20-25 days before the event. This confirmation will contain site instructions. Please read the detailed examination scheduling instructions at http://www.pmi.org/PDF/CredentialExamSchedulingInstructions.pdf for information about how to cancel a scheduled paper-based examination and other very important information. PMI wishes you a successful testing experience. Please contact us at customercare@pmi.org if you have questions or concerns. Thank you, PMI Customer Care 21 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 22.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Random PMI Audit of Qualification  You will be randomly selected to provide the evidence of the following documents before you could register the PMP test after registration process – Diploma – Education certificate – Project experience evidence Don’t panic !! You need to collect the documents and mail to PMI to let them verify before you get the eligibility letter from PMI 22 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 23.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Are You Ready for Exam ??? God Bless You ! Good Luck ! A-Me-To-Fu ! …….. Schedule the PMP Test in the PMI approved location 23 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 24.
    ANTICIPATE, ENABLE, GROW Paper HR Learning Test Register in China IBM GREATER CHINA GROUP China – Register PMP test in following center and pay the fee Test date : one Saturday in March, June, September and December Reference website to register the test : http://www.chinapmp.cn/ Find all centers in http://www.chinapmp.cn/info/SortContent_rz.asp?sortid=344 24 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 25.
    Computer-Base Test Register ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Taiwan  http://www.2test.com  Register to Prometric (get ID: SPxxxxxxx)  Book Exam Time Schedule & Choose Test location – By Web-based – By 008-061-1141 Phone call 講中文 – Fax 008-061-1191 – Exam: PMI-PMP – PROJECT MGMT PROFESSIONAL – Reschedule or cancel must be done before 48 hours exam day or you may be charged for fee – Choose Mandarin as 2nd language version besides English 25 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 26.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Testing Center in Taiwan 26 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 27.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Exam Confirmation Notice To: ChenYing Wu 3FNo 1 Aly 1 Ln 524 Sec 5 Chunghsiao E Rd Taipei 00000 TAIWAN Subject: Confirmation of computer-based Project Management Professional,#8885000000699262 Your appointment for the computer-based Project Management Professional is confirmed. Please find the confirmation details that follow: Confirmation: 8885000000699262 Program: Project Management Institute Exam Code: PMP Project Management Professional Exam Date: 06 Feb 2009 Exam Time: 12:30 RESCHEDULE / CANCEL POLICY If you need to reschedule or cancel your exam, you must call the registration center, or visit www.prometric.com, no later than 48 hours before your appointment date. You must apply to Project Management Institute each time you wish to retest. 27 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 28.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Taking Exam  Documents to bring to the testing site : – TW: Passport (match the photo and name) – CN: 身份證 (or Passport) and 準考證 (download from www.chinapmp.cn 4 days before the test date)  Suggest to go to the test site before the test to survey the environment  Arrive the test center 30-60 minutes before the test  4 hours exam 200 multiple-choice questions – TW: Computer-based Exam – CN: Paper test ( 中英文考題 )  The exam site will provide pencil & blank papers  You may or may not take a simple calculator without programming function depending on the test environment (if it’s computer test, the function is built into computer)  15-minute Computer Tutorial and followed by an optional candidate satisfaction survey and an exam score report (TW only) 28 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 29.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Types of Exam Questions  Situational questions  Two right answers  Extraneous information  Out of the blue questions – never heard of the terms before  Definition questions 29 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 30.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Test Techniques  Write down all formulas, numbers and acronyms before you start  Multiple choice, one question in one page, read the question and ALL the answers, choose the BEST answers  Keep notes about difficult questions and mark the questions for future review  Sometimes we just guess one answer and go to next question if we do not know the contents. Don’t spend time on this kind of question.  Use elimination, only ONE answer is best and correct  Rank the answers by correctness or always true  Look for highlighted qualifiers such as BEST, FIRST, EXCEPT, MOST, GREATEST, MAJOR, NOT, NEVER, ALWAYS  Look for PMBOK phrases  Ask yourself what would PMBOK say BEFORE experience  If unsure of the answer, guess an initial answer, it is better than no answer. There is no penalty for wrong answers  Use 2.5-3 hours to complete the test and spend the rest of the time to review the answers which marked for future review  There is “Previous, Next, Mark, End of EXAM “ icon, final counting time is on the right upper corner, “Exit” icon is on right lower corner (TW only) 30 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 31.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Test Techniques - continued  忘掉 IB M 規定及您以前彈性經驗 , 以 P MI 觀點回答問題  考試不是在問您的看法 , 而是在問 P MI 希望的答案  有關專業道德倫理問題 : – 欺騙 , 偷竊 , 賄賂… 侵犯公司 , 客戶 ,PMI 利益 ( 先檢舉 , 再分析評估 ) 1 . 通知 PMI 2. 通知客戶 3. 通知經理 – 廠商或客戶給您好處 ( 週末湖邊渡假屋子 , 晚餐 , 車子 , … ) 禮貌拒 絕 , 並且告訴他這不符合專業倫理  題目開始時多半很長又較難 , 但不要緊張 , 鎮定回答問題 , 會漸入 佳境 31 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 32.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Test Techniques - continued  IP , P ate nt rig ht 絕對尊重智慧財產權及專利權 , 拒絕不當使用 , 並且義正詞嚴告訴他這是不對的行為  利益衝突 誠實告知客戶或經理  無法如期達成專案要求 , 意外事件… 1 . 先分析評估 2. 再與 Te am 找出可能解決之道 3. 最後才通知客戶或經理  題目分散在各章節 , 不可偏廢  要求指出某一動作是在那一個 p ro c e s s 執行題目不少 32 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 33.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Test Techniques - continued  很多專有名詞定義題 : 1 . E MV, N PV, C ritic al Path , Q u ality Au d it, S lac k, PE RT, Mas lo w, E V, PV, S V, C PI, S PI… 甚至問您如專有 名詞縮寫英文的英文全名 . 2. Tim e : C ritic al Path 計算 H R : C o m m u n ic atio n c h an n e l 計算 C o s t : E V, PV, S V, C V, C PI, S PI PE RT : PE RT 計算 Ris k : E MV 計算  答案中如果有沒看過的名詞 , 通常是掰出來混淆視聽的錯誤答 案 33 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 34.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Test Techniques - continued  Wh at- if 情境題目 題目字數行數超多 , 答案也是三四行以上 . 1 . 耐心看完題目 , 通常最下面三行才是重點 . 2. 有些題目提供一大堆數字資料 , 但最後問句並未要求計算 , 只是 憑此來評估而已 . 3. 保持信心 , 後面還是會出現簡易的送分題 34 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 35.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Study Tips  Read PMBOK, IBM PMP Exam Prep Study Guide, RMC Prep Exam by Rita Mulcahy  Read the PMBOK at least twice – Pay attention to the definitions at the end of each section.  Understand that perhaps >50% of the questions are on material not in the PMBOK.  Form the study group  Practice the questions and read the books again 1. Specialized course offered by IBM (on-line facilitated) ($635) PM53G 2. Project Management PMI Exam Flash Cards ex: ($25) http://www.amazon.com/PMP-Exam-Success-Certification-Flashcards/dp/0976866021 3. PM e-learning class PMPROJ01 (PMP Test Prep)  Don’t expect to do it during normal IBM working hours on a regular basis.  Budget several vacation days the week before the exam for intensive study. “ 您需要強烈動機 !” 以 IB Me r 的智商 , 只要投入時間一定沒問題的 ! 建議 最多規劃 3- 6 月完成考試 ! 甚至有人只用 2- 3 月即完成整個過程 !! 35 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 36.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Congratulations mail from PMI Dear Chen-Ying Wu, Congratulations on obtaining the PMP credential. You will receive your certificate package within eight weeks. At your earliest convenience, please verify that your preferred mailing address is correct by visiting our website at PMI.org Your examination score report is available at https://www.pmi.org/certapp/. Until you receive your certificate package, you may use this score report to validate your credential status. You may also access the policies and procedures necessary to maintain your credential in the credential handbook. Please contact us at customercare@pmi.org if you have questions or concerns. Thank you, PMI Customer Care 36 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 37.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Not passed, Please Try Again By Mail or FAX $275 Member (RMB$1250) $375 Non-Member (RMB$2500) 3~4 Weeks for Voucher 37 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 38.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Hard Working…… Finally…. 38 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 39.
    © 2007 IBMCorporation
  • 40.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Related Websites PM/COE related link in PMI : http://w3-03.ibm.com/transform/project/certification/pmi_info.html Exercise PMP study link: http://www.pmstudy.com http://www.certgear.com/products/preview/pmp_certification/index.html Exam reimbursement: http://w3-6.ibm.com/hr/ap/china/yourcareer/zh-cn/ext_edu_gcg.html http://w3-6.ibm.com/hr/ap/taiwan/yourcareer/zh-tw/ext_edu_gcg.html 40 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 41.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning PMP Re-certification Process 41 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 42.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Why Should I get re-certification ? You want to keep using the PMP Title You want to avoid re-doing the PMP exam – As curriculum is changing – industry domains are being added You want to keep your skills up to date – Learn about new areas in PM’s – Network with experienced PM’s from other organizations – Keep abreast of current ideas in Project Management 42 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 43.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning How to Renew the Certification  Individuals must accrue 60 PDU’s (Professional Development Unit) in the 3 year cycle following certification. – PM’s who do not re-certify with PMI cannot use the title PMP – PM’s who do not re-certify may lose Senior status – You have 3 years plus maximum one year to get the 60 PDU’s  PMI will verify the PDU requirements of the PMP upon the last year and send an email to the request for the PMP renewal  PMP fill out the application for certification renewal & pay the renewal fees by credit card no later than 90 days after the certification deadline – PMI member : US$60 (Member fee US$129) – Non-PMI member : US$150  PMI will mail the updated certificate with the new active certification/CCR cycle dates within 6-8 weeks after receiving the application 43 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 44.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Qualifying activities to get the PDU – 5 Categories Category 1 – Formal academic education – Complete degree course in PM – IBM sponsored MBA in PM Category 2 – Professional activities & self-directed learning – Refer guide to category 2 activities in PDC_CCRHANDBOOK – Maximum 15 self-directed learning PDUs could be earned per CCR cycle Category 3 – PMI Registered Education Providers/PMI components – IBM is PMP registered education provider- search Global Campus for following: “PMP Professional Development Activity Program Number” – example 1107-0000PM75 Category 4 – Other Providers – Attend PM courses from non PMI registered providers Category 5 – Volunteer Services to Professional or Community Organization – Volunteering PM services in community (max 20 PDUs) More information: – http://www.pmi.org/info/PDC_PDUQualifyingActivities 44 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 45.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Category 2 Category 2 is complicated and has several areas which you already do as part of your work in IBM. Professional Activities – Author / Co-author for textbook or article – Speaker at PM event – Facilitator for PM workshops, events, conferences – Content developer for PM learning activity – Practitioner of PM services for more than 1500 hrs per yr (max 15 PDU) – A committee member of a PM organization maximum 5 PDU per year could be claimed Self Directed learning (max 15 PDU) – Mentoring & coaching activities – Producing education material – Reading PM books etc. – For more details see the CCR Handbook online at PMI.org. 45 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 46.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Category 3 : PDU of IBM Global Campus Education Adobe Acrobat Document 46 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 47.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning How to Register PDU’s Submission can be done in online / fax / email or mail – http://tel.occe.ou.edu/pmi/PMI_Member/PDUlogin.php3#PMIID Regular submission is recommended as the rules do change. 20 PDUs (earned in last year) can be carried forward to next cycle Submissions are audited so you need to have evidence 47 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 48.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Suspended Status - The candidates are not satisfied Continuing Certification Requirement within the active certification dates will be placed into suspended status - There is a maximum “one year” suspension period - Suspended certification status indicates that the individual may not use the credential or certification mark - Certificants who do not meet the overdue requirements within the suspension period will lose their credential designation - The date of a certificant’s next CCR cycle will not change after reinstatement to active status from suspension 48 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 49.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Important Reminder to PMP ! Do complete 60 PDU education, claim PDU to PMI and renew your PMP certification every 3 years 49 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation
  • 50.
    ANTICIPATE, ENABLE, GROW IBM GREATER CHINA GROUP HR Learning Questions ? 50 PMP Exam Overview | PMP Test | Confidential © 2007 IBM Corporation