Objective: Intently listen to each topic presented through power points,
conversations around the table, and at breakout points. Carefully
document all of the information and most importantly the commentary
being said.
Status: Completed
Accomplished Lessons Learned Improvements
• Handwrote pages of
information highlighting key
concepts and important
commentary.
• Participated in small group
work taking note of specific
questions being asked and
answered.
• Typed up all DST notes.
Organized in chronological
order and then by topic and
listed name of speaker.
• Sometimes not everything is
important. Even though it might
seem like it. Focus in on the
important information that is
necessary to capture.
• Zoom in on the commentary
this is extremely important for
people in the meeting to refer
back to.
• Make sure to keep all notes
very organized with clear titles.
• Have a review session on some
of the key vocabulary to look for
when going into a meeting
where certain topics are being
discussed.
• Have a lesson on how to create
an organizational chart for
taking notes.
•In the beginning this would
have been very helpful for me
especially since I write
everything down.
• Took photos of notes written
by individual groups
• Worked with Zach to created
chart of EM wshop notes.
• Always double check spelling
because if you misspell a word it
can completely change the
meaning of what you
documented.
•Create a template ahead of time
that caters to particular meeting.
Also look for digital easel boards.
To avoid large amount of group
notes
Schneider Electric 7/9/2015
On boarding Document
Accomplished Lessons Learned Improvements
• Created a detailed 28 page
documentation for interns to
follow. This consisted of steps to
help set up:
1) Accounts
2) Computer
3) voicemail
4) computer software
5) and an explanation of key
websites that Schneider uses
like Swebi and how to set up
your international directory
profile.
• gave them welcome package,
name plate, agenda.
• It is important to keep things clear
and simple for new employees to
follow when being presented with a
lot of new information.
• It is vital to take note of any technical
issues that might be a problem for
example (auto time was not working)
and fix these before you have new
interns attempt to use them.
• Keep in mind that you should focus
on completing one task in a day rather
than trying to set up various
accounts. It is too confusing .
• Create a vision with 3 different
phases for interns to follow.
You could break this up :
1) Setup computers and
voicemail and email
2) Create your international
directory profile and learn
how to use Swebi
3) Set up auto time (correctly)
and ADP
4) Set up HR link and review
key websites like Swebi
5 ) Book meetings
• Planned and Executed a
meeting with an agenda for
interns to follow . This agenda
was used to help successfully get
them set up during meeting.
• Make a timeline of what needs to be
completed each day based on
necessity. And try your best to stick
with this.
•Encourage a review session
with interns to tell you what
they found challenging each day
when getting setup.
Use their feedback to make
positive changes.
Objective: Create a simplified way for new interns to go about the on boarding process
at Schneider Electric. Make the Interns feel welcome and provide them with tools
they need to succeed.
Status: Completed
Schneider Electric 7/9/2015
Organized DST Boot Camp
and EM Workshop
Objective: Review all materials being distributed for workshops, check for spelling
errors and any details that need to be changed. Confirm list of participants with
hotel , answer any questions meeting participants have regarding logistics, Organize
activities and confirm specifics with each company hosting event. ( ex: Catering, Red
Sox game, Odyssey cruise, Carl from MTC). Keep track of expenses along the way and
upload any receipts into a box folder.
Status: Completed
Accomplished Lessons Learned Improvements
• Edited DST Boot camp agenda and
website
EM workshop:
• Confirmed hotel rooms ,Odyssey
cruise info ,MTC rooms , and catering.
• Scanned and uploaded receipts to box
and kept track of invoices.
•Always double check that all
services/ activates booked do not
need changes. EX: catering
company had to bring more
water.
•Scan every receipt as it comes in
and organize them by date.
• Make an organized list of
things that need to be done
using excel. It is easier to
keep track of things that
way rather than using
sticky notes.
• Created freedom trail packets
• Created personalized badges with SE
Colors and words
•Created welcome letters
•Did research on running trails.
•Created a chart of who was in each
group based on their nametag
•It is important to always make
extra copies of documents.
• Split up work efficiently by
day so that you are not
cramming.
Schneider Electric 7/9/2015
Working with Azure
Objective: Keep track of each accounts costs and update the Azure Table,
Book Azure meetings and create a table displaying costs owed by each
account. Also compile a list of the financial controller and cost center for
each account
Status: Completed
Accomplished Lessons Learned Improvements
•Created a tab for each account:
Updated Euros for each month,
calculated average growth, estimate
run rate, actual run rate, average
increase and total new estimate.
•Kept track of changes for each account
and updated them when necessary.
•Figured out how much each account
owed ( 18%) and calculated how much
they owed for June and July giving me
their total amount owed.
•Booked Azure meetings for each
account
• It is important to always use the most
updated version of a project.
• Make sure to keep very careful track of
your emails and any account changes that
need to be made.
• Clearly communicate what you need from
people and make sure to find out if account
contacts have changed.
• Better system of keeping track of
updates in account info.
•Make each account update a
document with their account info as
it changes throughout the year and
have them send it to you.
•Have a database type system where
you can lookup who is in charge of
what account and also an easy
method of finding the cost center
information.
•Created a table compiling a list of
financial controllers and cost centers
for accounts.
Schneider Electric 7/9/2015
Put in place Organizational tools
Objective 1 : Create an effective way for DST leaders to communicate
clearly and plan meetings in order to make progress. Purpose is to allow
them to set goals and dates to achieve these goals by and to be able to
meet ,discuss and execute their plan.
Objective 2: Identify location of each employee in Global Solutions and
document their work station in the form of an organized map.
Status: Completed
Accomplished Lessons Learned Improvements
• Organized and color coded a DST
Calendar.
• Set up a meeting with Wendy and
verified important meeting dates were
correct.
• Devised a color code system to
organize events . Created a color code
key .
• Set up a Google account and listed
all events.
• Located each employee from Global
solutions. Create d a seating chart and
document their work station number
with their name.
• Do not hesitate to ask for constructive
criticism. It can be very useful
•Double check key information before
continuing to dive further into the project
• It helps to come up with a method to your
organization for example: color coding. And
it helps to stick with this.
• When creating organizational tools focus
on making them user friendly. After all the
tool is only helpful if you make it clear.
• Find a useful template that can be
used to clearly show different events.
It will make your life easier when you
are trying to differentiate between
dates.
• For the seating chart take a survey of
peoples personal preferences for the
way it is organized. Are their any
special features you would like on it?
What would make it as clear as
possible?
Schneider Electric 7/9/2015
Organizing Asset Management Workshop
Accomplished Lessons Learned Improvements
• Spent a lot of time thoroughly
researching all events going on during
time of workshop
• Booked restaurants for each night of
workshop.
• Booked Improv comedy y show for
Thursday night. Spoke with producer
got reserved front row seats.
• re wrote and confirmed catering
order with sensational l foods
• Created a room request form and
filled it out and sent it to Carl.
• Confirmed rooms with him. Sent
room names to catering company.
• Created a participant chart with
arrival and departure date gave this to
hotel. Keep updating hotel on room
changes and created a contract to sign
with hotel . Got a good rate.
• Always get an estimate for the cost of
each event before booking anything
• It never hurts to ask! Ex: Contacted
comedy show about group events. And she
offered me front row reserved seats.
• Try to keep communication clear and keep
confusion at a minimum. Sometimes its
easier just to call the person. Keep event
coordinates updated with new or changed
information.
• Get someone's feed back on how you can
improve in the way you do things ( example:
the Agenda) I was unaware of the table of
contents feature on excel.
• More communication on
a Budget or type of venue we are
looking for. This would make it
easier to narrow down choices.
• Have a tutorial on how to use
various helpful tools in word when
making an agenda
• Have some type of organized
system with meeting participants in
order to successfully confirm their
arrival and departure times at l east a
week before the workshop.
• Clear understanding of what
specific events we wan t to book for
example do we want a concert? Or a
comedy show? If not a concert then I
will focus ALL my energy on
researching about comedy shows.
• Reformatted the table of contents in
agenda and rewrote title for each page
• Created an organized chart with
activities, contact info, even time and
cost of each activity.
Objective: Take care of the logistics for the workshop and coordinate a
seamless transition for guests from each activity/event they embark on.
Status: Not completed
Schneider Electric 7/9/2015
“Happy” Music Video
Accomplished Lessons Learned Improvements
• Researched Legal rights of “Happy”
Song. Altered the Happy song and
wrote lyrics to fit with the SE theme
• Sometimes it is important to be realistic
about what can and cannot be done in a
certain amount of time.
• From the start create a timeline to
begin with.
• Be more clear about what you
would like to have in video and who
can help achieve this vision
• Created a PowerPoint showcasing
our ideas Attended meeting with
David and presented our “Happy “
Video vision to him
• Took notes at the meeting with Ed
• It is important to have a vision and create a
timeline to stick to.
• Organization is key. Always make sure to
bring backup batteries.
• Use the resources around you.
Come up with new lyrics that are
easy to sing.
• Sang a line from verse 1 with
employees during recording session
• Shot some footage around
campus.
Objective: Produce a music video to showcase the Boston One Campus modern
technology and Schneider Electric’s happy employees.
Status: Not completed
Schneider Electric 7/9/2015
…And most Importantly……

More Related Content

Similar to PMO Internship Final Presentation8.26

Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)
Arvin Dela Cruz
 
Score Rs4 U
Score Rs4 UScore Rs4 U
Score Rs4 U
Levins
 
Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...
berhanu taye
 
Product Deck
Product DeckProduct Deck
Product Deck
JacobFrank11
 
Project management.docx communiction
Project management.docx communictionProject management.docx communiction
Project management.docx communiction
berhanu taye
 
Sunil_ Resume updated
Sunil_ Resume updatedSunil_ Resume updated
Sunil_ Resume updatedSunil Kumar
 
Sunil_ Resume updated
Sunil_ Resume updatedSunil_ Resume updated
Sunil_ Resume updatedSunil Kumar
 
IE Business School Question F - Marcus Yau
IE Business School Question F - Marcus YauIE Business School Question F - Marcus Yau
IE Business School Question F - Marcus Yau
Marcus Yau
 
Rafeek yousef ramzy update1
Rafeek yousef ramzy update1Rafeek yousef ramzy update1
Rafeek yousef ramzy update1
Rafeek RAmzy
 
UX Webinar: Always Be Testing
UX Webinar: Always Be TestingUX Webinar: Always Be Testing
UX Webinar: Always Be Testing
Charity Dynamics
 
Presentation on Report Writing.pptx
Presentation on Report Writing.pptxPresentation on Report Writing.pptx
Presentation on Report Writing.pptx
AbbaAdamu3
 
Technology for growth - West Sussex Recover & Rise S4W3
Technology for growth - West Sussex Recover & Rise S4W3Technology for growth - West Sussex Recover & Rise S4W3
Technology for growth - West Sussex Recover & Rise S4W3
Annie-Marie Page
 
Tips for delivering a successful events
Tips for delivering a successful eventsTips for delivering a successful events
Tips for delivering a successful events
Cini Mathew
 
Writing A Better Grant Application
Writing A Better Grant ApplicationWriting A Better Grant Application
Writing A Better Grant Application
Minnesota Historical Society, Legacy Grants Program
 

Similar to PMO Internship Final Presentation8.26 (20)

Ram resume FPNA
Ram resume FPNARam resume FPNA
Ram resume FPNA
 
Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)
 
Score Rs4 U
Score Rs4 UScore Rs4 U
Score Rs4 U
 
Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...
 
Product Deck
Product DeckProduct Deck
Product Deck
 
Project management.docx communiction
Project management.docx communictionProject management.docx communiction
Project management.docx communiction
 
Sunil_ Resume updated
Sunil_ Resume updatedSunil_ Resume updated
Sunil_ Resume updated
 
Sunil_ Resume updated
Sunil_ Resume updatedSunil_ Resume updated
Sunil_ Resume updated
 
Gael Resume
Gael ResumeGael Resume
Gael Resume
 
Synopsis
SynopsisSynopsis
Synopsis
 
DMF Resume 12-2016
DMF Resume 12-2016DMF Resume 12-2016
DMF Resume 12-2016
 
IE Business School Question F - Marcus Yau
IE Business School Question F - Marcus YauIE Business School Question F - Marcus Yau
IE Business School Question F - Marcus Yau
 
Rafeek yousef ramzy update1
Rafeek yousef ramzy update1Rafeek yousef ramzy update1
Rafeek yousef ramzy update1
 
Advertising 101
Advertising 101Advertising 101
Advertising 101
 
UX Webinar: Always Be Testing
UX Webinar: Always Be TestingUX Webinar: Always Be Testing
UX Webinar: Always Be Testing
 
Presentation on Report Writing.pptx
Presentation on Report Writing.pptxPresentation on Report Writing.pptx
Presentation on Report Writing.pptx
 
Resume Sangeeta
Resume SangeetaResume Sangeeta
Resume Sangeeta
 
Technology for growth - West Sussex Recover & Rise S4W3
Technology for growth - West Sussex Recover & Rise S4W3Technology for growth - West Sussex Recover & Rise S4W3
Technology for growth - West Sussex Recover & Rise S4W3
 
Tips for delivering a successful events
Tips for delivering a successful eventsTips for delivering a successful events
Tips for delivering a successful events
 
Writing A Better Grant Application
Writing A Better Grant ApplicationWriting A Better Grant Application
Writing A Better Grant Application
 

PMO Internship Final Presentation8.26

  • 1. Schneider Electric 7/9/2015 Kaitlin Cronin August 26th, 2014
  • 2. Schneider Electric 7/9/2015 Documenting DST Boot Camp and Energy Management workshop Objective: Intently listen to each topic presented through power points, conversations around the table, and at breakout points. Carefully document all of the information and most importantly the commentary being said. Status: Completed Accomplished Lessons Learned Improvements • Handwrote pages of information highlighting key concepts and important commentary. • Participated in small group work taking note of specific questions being asked and answered. • Typed up all DST notes. Organized in chronological order and then by topic and listed name of speaker. • Sometimes not everything is important. Even though it might seem like it. Focus in on the important information that is necessary to capture. • Zoom in on the commentary this is extremely important for people in the meeting to refer back to. • Make sure to keep all notes very organized with clear titles. • Have a review session on some of the key vocabulary to look for when going into a meeting where certain topics are being discussed. • Have a lesson on how to create an organizational chart for taking notes. •In the beginning this would have been very helpful for me especially since I write everything down. • Took photos of notes written by individual groups • Worked with Zach to created chart of EM wshop notes. • Always double check spelling because if you misspell a word it can completely change the meaning of what you documented. •Create a template ahead of time that caters to particular meeting. Also look for digital easel boards. To avoid large amount of group notes
  • 3. Schneider Electric 7/9/2015 On boarding Document Accomplished Lessons Learned Improvements • Created a detailed 28 page documentation for interns to follow. This consisted of steps to help set up: 1) Accounts 2) Computer 3) voicemail 4) computer software 5) and an explanation of key websites that Schneider uses like Swebi and how to set up your international directory profile. • gave them welcome package, name plate, agenda. • It is important to keep things clear and simple for new employees to follow when being presented with a lot of new information. • It is vital to take note of any technical issues that might be a problem for example (auto time was not working) and fix these before you have new interns attempt to use them. • Keep in mind that you should focus on completing one task in a day rather than trying to set up various accounts. It is too confusing . • Create a vision with 3 different phases for interns to follow. You could break this up : 1) Setup computers and voicemail and email 2) Create your international directory profile and learn how to use Swebi 3) Set up auto time (correctly) and ADP 4) Set up HR link and review key websites like Swebi 5 ) Book meetings • Planned and Executed a meeting with an agenda for interns to follow . This agenda was used to help successfully get them set up during meeting. • Make a timeline of what needs to be completed each day based on necessity. And try your best to stick with this. •Encourage a review session with interns to tell you what they found challenging each day when getting setup. Use their feedback to make positive changes. Objective: Create a simplified way for new interns to go about the on boarding process at Schneider Electric. Make the Interns feel welcome and provide them with tools they need to succeed. Status: Completed
  • 4. Schneider Electric 7/9/2015 Organized DST Boot Camp and EM Workshop Objective: Review all materials being distributed for workshops, check for spelling errors and any details that need to be changed. Confirm list of participants with hotel , answer any questions meeting participants have regarding logistics, Organize activities and confirm specifics with each company hosting event. ( ex: Catering, Red Sox game, Odyssey cruise, Carl from MTC). Keep track of expenses along the way and upload any receipts into a box folder. Status: Completed Accomplished Lessons Learned Improvements • Edited DST Boot camp agenda and website EM workshop: • Confirmed hotel rooms ,Odyssey cruise info ,MTC rooms , and catering. • Scanned and uploaded receipts to box and kept track of invoices. •Always double check that all services/ activates booked do not need changes. EX: catering company had to bring more water. •Scan every receipt as it comes in and organize them by date. • Make an organized list of things that need to be done using excel. It is easier to keep track of things that way rather than using sticky notes. • Created freedom trail packets • Created personalized badges with SE Colors and words •Created welcome letters •Did research on running trails. •Created a chart of who was in each group based on their nametag •It is important to always make extra copies of documents. • Split up work efficiently by day so that you are not cramming.
  • 5. Schneider Electric 7/9/2015 Working with Azure Objective: Keep track of each accounts costs and update the Azure Table, Book Azure meetings and create a table displaying costs owed by each account. Also compile a list of the financial controller and cost center for each account Status: Completed Accomplished Lessons Learned Improvements •Created a tab for each account: Updated Euros for each month, calculated average growth, estimate run rate, actual run rate, average increase and total new estimate. •Kept track of changes for each account and updated them when necessary. •Figured out how much each account owed ( 18%) and calculated how much they owed for June and July giving me their total amount owed. •Booked Azure meetings for each account • It is important to always use the most updated version of a project. • Make sure to keep very careful track of your emails and any account changes that need to be made. • Clearly communicate what you need from people and make sure to find out if account contacts have changed. • Better system of keeping track of updates in account info. •Make each account update a document with their account info as it changes throughout the year and have them send it to you. •Have a database type system where you can lookup who is in charge of what account and also an easy method of finding the cost center information. •Created a table compiling a list of financial controllers and cost centers for accounts.
  • 6. Schneider Electric 7/9/2015 Put in place Organizational tools Objective 1 : Create an effective way for DST leaders to communicate clearly and plan meetings in order to make progress. Purpose is to allow them to set goals and dates to achieve these goals by and to be able to meet ,discuss and execute their plan. Objective 2: Identify location of each employee in Global Solutions and document their work station in the form of an organized map. Status: Completed Accomplished Lessons Learned Improvements • Organized and color coded a DST Calendar. • Set up a meeting with Wendy and verified important meeting dates were correct. • Devised a color code system to organize events . Created a color code key . • Set up a Google account and listed all events. • Located each employee from Global solutions. Create d a seating chart and document their work station number with their name. • Do not hesitate to ask for constructive criticism. It can be very useful •Double check key information before continuing to dive further into the project • It helps to come up with a method to your organization for example: color coding. And it helps to stick with this. • When creating organizational tools focus on making them user friendly. After all the tool is only helpful if you make it clear. • Find a useful template that can be used to clearly show different events. It will make your life easier when you are trying to differentiate between dates. • For the seating chart take a survey of peoples personal preferences for the way it is organized. Are their any special features you would like on it? What would make it as clear as possible?
  • 7. Schneider Electric 7/9/2015 Organizing Asset Management Workshop Accomplished Lessons Learned Improvements • Spent a lot of time thoroughly researching all events going on during time of workshop • Booked restaurants for each night of workshop. • Booked Improv comedy y show for Thursday night. Spoke with producer got reserved front row seats. • re wrote and confirmed catering order with sensational l foods • Created a room request form and filled it out and sent it to Carl. • Confirmed rooms with him. Sent room names to catering company. • Created a participant chart with arrival and departure date gave this to hotel. Keep updating hotel on room changes and created a contract to sign with hotel . Got a good rate. • Always get an estimate for the cost of each event before booking anything • It never hurts to ask! Ex: Contacted comedy show about group events. And she offered me front row reserved seats. • Try to keep communication clear and keep confusion at a minimum. Sometimes its easier just to call the person. Keep event coordinates updated with new or changed information. • Get someone's feed back on how you can improve in the way you do things ( example: the Agenda) I was unaware of the table of contents feature on excel. • More communication on a Budget or type of venue we are looking for. This would make it easier to narrow down choices. • Have a tutorial on how to use various helpful tools in word when making an agenda • Have some type of organized system with meeting participants in order to successfully confirm their arrival and departure times at l east a week before the workshop. • Clear understanding of what specific events we wan t to book for example do we want a concert? Or a comedy show? If not a concert then I will focus ALL my energy on researching about comedy shows. • Reformatted the table of contents in agenda and rewrote title for each page • Created an organized chart with activities, contact info, even time and cost of each activity. Objective: Take care of the logistics for the workshop and coordinate a seamless transition for guests from each activity/event they embark on. Status: Not completed
  • 8. Schneider Electric 7/9/2015 “Happy” Music Video Accomplished Lessons Learned Improvements • Researched Legal rights of “Happy” Song. Altered the Happy song and wrote lyrics to fit with the SE theme • Sometimes it is important to be realistic about what can and cannot be done in a certain amount of time. • From the start create a timeline to begin with. • Be more clear about what you would like to have in video and who can help achieve this vision • Created a PowerPoint showcasing our ideas Attended meeting with David and presented our “Happy “ Video vision to him • Took notes at the meeting with Ed • It is important to have a vision and create a timeline to stick to. • Organization is key. Always make sure to bring backup batteries. • Use the resources around you. Come up with new lyrics that are easy to sing. • Sang a line from verse 1 with employees during recording session • Shot some footage around campus. Objective: Produce a music video to showcase the Boston One Campus modern technology and Schneider Electric’s happy employees. Status: Not completed
  • 9. Schneider Electric 7/9/2015 …And most Importantly……