The document outlines the operations flow and vehicle capacity of a plant warehouse. Sixteen vehicles are currently at the loading track, with one waiting after loading. Four vehicles are waiting to load or unload. The warehouse can hold up to four vehicles waiting to load/unload at the front gate and one vehicle after loading. It details the storage capacity, loading capacity per vehicle size, estimated loading times, and total loading and goods shifting capacity over 24 hours.