The document outlines the operations flow and vehicle capacity of a plant warehouse. Sixteen vehicles are currently at the loading track, with one waiting after loading. Four vehicles are waiting to load or unload. The warehouse can hold up to four vehicles waiting to load/unload at the front gate and one vehicle after loading. It details the storage capacity, loading capacity per vehicle size, estimated loading times, and total loading and goods shifting capacity over 24 hours.
3. VEHICLES STAYING CAPACITY IN WAREHOUSE
PREMISES
Vehicles Waiting Capacity For Loading/Unloading
At gate No-2 side 4 Vehicles can stay in warehouse premises for loading/unloading
purpose
At gate no-2 side 1 Vehicles can stay in warehouse premises after loading
3 Vehicles can stay in warehouse premises at loading/unloading track
4. CAPACITY
FG Storage Capacity
Plant Warehouse Approximately Storage Capacity – PhC 57,360
Loading Capacity
Loading Capacity of 6 Bay Vehicles at a Time 2
Loading Capacity of 12 Bay Vehicles at a Time 1
Total Vehicles Loading Capacity at a Time 3
Load Size PhC
6 Bay Vehicle 360
12 Bay Vehicle 720
24 Bay vehicle 1440
5. LOADING TIMING AT TRACK
WH Average Loading Time/Vehicle
6 Bay 15 Minutes
12 Bay 25 Minutes
Total Time 40 Minutes
6. LOADING CAPACITY IN 24 HRS
Total Vehicles Loading Capacity In 24 Hrs
6 Bay Vehicles loading Capacity in 24 Hrs 96 Vehicles
12 Bay Vehicles loading Capacity in 24 Hrs 58 Vehicles
Total Vehicles loading Capacity in 24 Hrs 154 Vehicles
7. CASES SHIFTING CAPACITY
Total Vehicles PhC Shifting Capacity
6 Bay Vehicles PhC Shifting Capacity in 24 Hrs 34,560 PhC
12 Bay Vehicles PhC Shifting Capacity in 24 Hrs 41,760 PhC
Total Vehicles PhC Shifting Capacity in 24 Hrs 76,320 PhC