PLANT WAREHOUSE
OPERATION FLOW
16bayVehicleatloadingtrack&1Vehicleis
waitingafterloadingforsettlement
4Vehiclesarewaitingfor
loading/unloading
1 vehicle 6 bay & 1 Vehicle 12 bay at
loading track
Warehouse Operation Flow
FG Hall
NewEmptyStorageArea
PlantArea
Empty Storage Area
Assembly Area
Forklift Movement Area
Main Samundri Road
Service Road
Gate No-1 Gate No-2
OUT IN
VEHICLES STAYING CAPACITY IN WAREHOUSE
PREMISES
Vehicles Waiting Capacity For Loading/Unloading
At gate No-2 side 4 Vehicles can stay in warehouse premises for loading/unloading
purpose
At gate no-2 side 1 Vehicles can stay in warehouse premises after loading
3 Vehicles can stay in warehouse premises at loading/unloading track
CAPACITY
FG Storage Capacity
Plant Warehouse Approximately Storage Capacity – PhC 57,360
Loading Capacity
Loading Capacity of 6 Bay Vehicles at a Time 2
Loading Capacity of 12 Bay Vehicles at a Time 1
Total Vehicles Loading Capacity at a Time 3
Load Size PhC
6 Bay Vehicle 360
12 Bay Vehicle 720
24 Bay vehicle 1440
LOADING TIMING AT TRACK
WH Average Loading Time/Vehicle
6 Bay 15 Minutes
12 Bay 25 Minutes
Total Time 40 Minutes
LOADING CAPACITY IN 24 HRS
Total Vehicles Loading Capacity In 24 Hrs
6 Bay Vehicles loading Capacity in 24 Hrs 96 Vehicles
12 Bay Vehicles loading Capacity in 24 Hrs 58 Vehicles
Total Vehicles loading Capacity in 24 Hrs 154 Vehicles
CASES SHIFTING CAPACITY
Total Vehicles PhC Shifting Capacity
6 Bay Vehicles PhC Shifting Capacity in 24 Hrs 34,560 PhC
12 Bay Vehicles PhC Shifting Capacity in 24 Hrs 41,760 PhC
Total Vehicles PhC Shifting Capacity in 24 Hrs 76,320 PhC

Plant Warehouse Operation Flow

  • 1.
  • 2.
    16bayVehicleatloadingtrack&1Vehicleis waitingafterloadingforsettlement 4Vehiclesarewaitingfor loading/unloading 1 vehicle 6bay & 1 Vehicle 12 bay at loading track Warehouse Operation Flow FG Hall NewEmptyStorageArea PlantArea Empty Storage Area Assembly Area Forklift Movement Area Main Samundri Road Service Road Gate No-1 Gate No-2 OUT IN
  • 3.
    VEHICLES STAYING CAPACITYIN WAREHOUSE PREMISES Vehicles Waiting Capacity For Loading/Unloading At gate No-2 side 4 Vehicles can stay in warehouse premises for loading/unloading purpose At gate no-2 side 1 Vehicles can stay in warehouse premises after loading 3 Vehicles can stay in warehouse premises at loading/unloading track
  • 4.
    CAPACITY FG Storage Capacity PlantWarehouse Approximately Storage Capacity – PhC 57,360 Loading Capacity Loading Capacity of 6 Bay Vehicles at a Time 2 Loading Capacity of 12 Bay Vehicles at a Time 1 Total Vehicles Loading Capacity at a Time 3 Load Size PhC 6 Bay Vehicle 360 12 Bay Vehicle 720 24 Bay vehicle 1440
  • 5.
    LOADING TIMING ATTRACK WH Average Loading Time/Vehicle 6 Bay 15 Minutes 12 Bay 25 Minutes Total Time 40 Minutes
  • 6.
    LOADING CAPACITY IN24 HRS Total Vehicles Loading Capacity In 24 Hrs 6 Bay Vehicles loading Capacity in 24 Hrs 96 Vehicles 12 Bay Vehicles loading Capacity in 24 Hrs 58 Vehicles Total Vehicles loading Capacity in 24 Hrs 154 Vehicles
  • 7.
    CASES SHIFTING CAPACITY TotalVehicles PhC Shifting Capacity 6 Bay Vehicles PhC Shifting Capacity in 24 Hrs 34,560 PhC 12 Bay Vehicles PhC Shifting Capacity in 24 Hrs 41,760 PhC Total Vehicles PhC Shifting Capacity in 24 Hrs 76,320 PhC