SlideShare a Scribd company logo
PICTURES OF LARGE
PROJECTS PERMITTED
AND
COMPLETED
Technical Experience and Abilities
Pleasant River Bridge Replacement 32’ Arch Culvert
Fig 1 Fig 2
Fig 3 Fig 4
Cherryfield Foods Inc. Mopang Stream Crossing
70 Foot Span, Cement Abutment, 36” Steel I-Beam Frame, Wood Deck, 14’
Travel Surface
Up Stream Side Down Stream Side
Some pictures showing the construction of the
Mopang Stream Crossing Cherryfield Foods Inc.
DMR E-Fishing the abutment coffer dams DMR E-fishing the stream profile to ensure
no salmon are in the area
Water was pumped from behind the
Coffer dam, always worked in the Dry
Setting the first I-Beam
Fig 1 Fig 2
Fig 3 Fig 4
Mopang Stream Bridge
Looking West Looking East
Stream Channel
20" Maple up stream of
Bridge Site Moved After
Footers were set.
Rock
Flood Level
Original Ground Elevations
Stream Flood Level
Constructed Road Elevations
1 Square = 5 Feet
1 Square = 1 Foot
MopangStreamElevations
HorizontalViewofBridgeElevations
AfterConstructionLUPCChangeDrawing#2
DanielBowker
Permitted
36" I-Beams
4' Tapered Cement Approach Pads
Both Ends
West Side Abutment pushed
back 10' from river and
Constructed 1'Taller With
Larger Abutments
East Side Abutment Pushed 2'
Closer to River 1' Taller,
Abutments set Below Stream
Bed
Permitted Not
Installed Abutment
Technical Experience and Abilities
Stream Crossings Done By Cherryfield Foods Inc.
Peaked Mt Pond Bridge Replacement Bog Stream 16’ Arch Culvert
Sam Hill Brook 16’ Arch Culvert Mopang Stream ATV Bridge
Fig 1 Fig 2
Fig 3 Fig 4

More Related Content

Viewers also liked (11)

Shivani shukla_B38_KnowledgeManagement
Shivani shukla_B38_KnowledgeManagementShivani shukla_B38_KnowledgeManagement
Shivani shukla_B38_KnowledgeManagement
 
Cuidar do corpo
Cuidar do corpoCuidar do corpo
Cuidar do corpo
 
4. Biodiversidad
4. Biodiversidad4. Biodiversidad
4. Biodiversidad
 
M.Naren_CB.BU.P2MBA 14036
M.Naren_CB.BU.P2MBA 14036M.Naren_CB.BU.P2MBA 14036
M.Naren_CB.BU.P2MBA 14036
 
Kerala school-approach paper november
Kerala school-approach paper novemberKerala school-approach paper november
Kerala school-approach paper november
 
MMNONAK 2
MMNONAK 2MMNONAK 2
MMNONAK 2
 
Resume_optics_Gupta Roy
Resume_optics_Gupta RoyResume_optics_Gupta Roy
Resume_optics_Gupta Roy
 
Entrevista Prof Alexandre Rezende - Metrópole
Entrevista Prof Alexandre Rezende - MetrópoleEntrevista Prof Alexandre Rezende - Metrópole
Entrevista Prof Alexandre Rezende - Metrópole
 
Cfd03 thermal analysis-of-automotive-lumax
Cfd03 thermal analysis-of-automotive-lumaxCfd03 thermal analysis-of-automotive-lumax
Cfd03 thermal analysis-of-automotive-lumax
 
Semiotica de la arquitectura
Semiotica de la arquitecturaSemiotica de la arquitectura
Semiotica de la arquitectura
 
GEOGRAPHY YEAR 9: THE HISTORY OF SPACE EXPLORATION
GEOGRAPHY YEAR 9: THE HISTORY OF SPACE EXPLORATIONGEOGRAPHY YEAR 9: THE HISTORY OF SPACE EXPLORATION
GEOGRAPHY YEAR 9: THE HISTORY OF SPACE EXPLORATION
 

Pictures of Large Projects Permitted and Completed

  • 1. PICTURES OF LARGE PROJECTS PERMITTED AND COMPLETED
  • 2.
  • 3.
  • 4. Technical Experience and Abilities Pleasant River Bridge Replacement 32’ Arch Culvert Fig 1 Fig 2 Fig 3 Fig 4
  • 5. Cherryfield Foods Inc. Mopang Stream Crossing 70 Foot Span, Cement Abutment, 36” Steel I-Beam Frame, Wood Deck, 14’ Travel Surface Up Stream Side Down Stream Side
  • 6. Some pictures showing the construction of the Mopang Stream Crossing Cherryfield Foods Inc. DMR E-Fishing the abutment coffer dams DMR E-fishing the stream profile to ensure no salmon are in the area Water was pumped from behind the Coffer dam, always worked in the Dry Setting the first I-Beam Fig 1 Fig 2 Fig 3 Fig 4
  • 7. Mopang Stream Bridge Looking West Looking East
  • 8. Stream Channel 20" Maple up stream of Bridge Site Moved After Footers were set. Rock Flood Level Original Ground Elevations Stream Flood Level Constructed Road Elevations 1 Square = 5 Feet 1 Square = 1 Foot MopangStreamElevations HorizontalViewofBridgeElevations AfterConstructionLUPCChangeDrawing#2 DanielBowker Permitted 36" I-Beams 4' Tapered Cement Approach Pads Both Ends West Side Abutment pushed back 10' from river and Constructed 1'Taller With Larger Abutments East Side Abutment Pushed 2' Closer to River 1' Taller, Abutments set Below Stream Bed Permitted Not Installed Abutment
  • 9. Technical Experience and Abilities Stream Crossings Done By Cherryfield Foods Inc. Peaked Mt Pond Bridge Replacement Bog Stream 16’ Arch Culvert Sam Hill Brook 16’ Arch Culvert Mopang Stream ATV Bridge Fig 1 Fig 2 Fig 3 Fig 4