VIJAY PATEL
6733 Garden Road
Maumee Ohio 43537
Phone # 419 787 8580(cell)
Email: patelv61@gmail.com
PROFESSIONAL STATEMENT
Experienced .Net professional with seven years of development experience, including strong skills in database
administration, and team leadership. He is proficient in SDLC (System Development Life Cycle) including design
using tools such as Visio, UML and Smart Draw from Wireframe. He is extremely well versed in OOP and OOD
methodologies for software development (web based and desktop applications). He has worked in an Agile
environment, most recently with Cedar Fair where he worked alongside a certified Scrum Master. Vijay has
excellent interpersonal and customer service skills.
EXPERIENCE
First Merit Bank October 2014 – Recent
328 Saginaw Road, Flint, MI
Programmer Analyst, SQl Server Developer
 Work with SSAS,SSIS, SSRS on Business Intelligent tool with SQL
server 2014
 Responsible to convert .NET web application from .NET 3.0 to 4.5
 Utilize Ajax Control Tool Kit for Design conversion project
 Worked with MVC(Model View Controller 5.0) to improve
functionality over .NET 3.0
 Worked with .NET Charting in project to implement click event to
retrieve data from SqL Database
 Utilize Spreadsheet Gear to generate Spread sheet(XLS) data
 Worked with Telerik control for Designing new web site
 Worked with SSIS to convert Database views from one database
to Tables in other Database
 Worked with LINQ to generate Database Schema and populate
Data Grid
ProMedica July 2013 –October 2014
Software Developer
1901 Indian Wood Circle, Maumee, Ohio 43537
July 2013 – October 2014
 Responsible for developing a set of standard software engineering
processes utilized by agencies.
 Develop data standards, data exchange, XML data standard or data
sharing model.
Provide technical XML services to the management and support
staff.
Handle the queries regarding XML and troubleshoot problems.
 Work with oracle and PowerShell to insert delete and update the
data
working on the different phases of the life cycle like analysis,
APPLICATIONS:
Visual Studio .NET
includes C#, VB.NET,
Crystal Report 8.0,9.0,
Visual Basic, VB and java
scripting, CSS, HTML,
XML, JAVA, JDBC, EJB,
C++, IIS, VB.NET, C#
PLATFORMS:
Window 2000, XP, win 7
and 8 Unix
DATABASES:
MS SQL Server 7.0, 2000,
2005, 2008, 2012, 2014
(SSIS, SSAS, SSRS, DTS),
Red Gate, Oracle 8i, 9i,
TOAD, Access, Fox Pro
APPLICATIONS:
ADO, ADO.NET, OLEDB,
ADODB, DAO, ASP.NET
(Maintain and admin IIS)
DEVELOPMENT TOOLS:
Visual Studio 6.0, Visual
Basic, C++, Visual
Interdev and Visual
Studio. .NET 2003 to
2013 Visual and C#. Wise
Installation package,
Install shield with J++ and
J#
DESIGN TOOLS:
VISIO, UML Graphic
manipulation with Adobe
Photoshop
designing, development and maintenance and maintained operational documentation.
 Creation of csv(flat file) file from Database and upload flat file into sql developer(oracle)
 Worked with Win and Web forms with help of Visual Studio 2012 to create software which link to SSRS
web site and also utilize Win form to create same project.
 Built WIMs, task sequences, package and collection architecture, oracle and SQL queries and report
 Implemented PowerShell remoting and script execution and perform ETL in PowerShell script.
 Configured Powershell in DDMG, In-Three, DDMAIL and DDI domains for script execution and remoting
 Worked with ICD-9 and ICD-10 codding and create script to write data in CSV file with help of PowerShell
 Worked with Service Now to retrieve the assignment and worked with documentation to justify all the
work done. Prior to Service Now Worked on FOGBUGS to perform same functionality.
 Worked with Federal mandated health care project to rewrite Oracle query and converted into XML file
to load into HP FARM
 Worked with TortoiseSVN for Version control for retrieving assignment and there after commit changes
to existing program.
 Worked with SSRS web site with backend of Oracle and sql server 2012
 Worked with Sql developer and Sql Server with DBMS activity mentioned below:
 Installation, Administration and Maintenance of SQL Server Instances.
 Setup Test, Dev, Staging and Production Environments with capacity of more than 5 terabyte size of
Database
 Create Users and assign permissions based on the level of database access the user would need.
 Maintain, Create, Delete and Alter Database security as required to prevent threat against any
situation
 Create Linked Servers to SQL Servers and other databases such as Oracle, Access etc.
 Involved in Source Data Analysis, analysis and designing mappings for data extraction also
responsible for Design and Development of SSIS Packages to load the Data from various Databases
and Files.
 Involved in ETL Process with help of SQL server Analysis services, Integration services, and
Reporting services to capture Claim, Member data and convert into XLs, PDF, CSV and in other
format
 Involved in development of Cubes, Dimension, Business critical KPIs using SQL Server Analysis
service representing aggregation in several different way by using custom grouping and hierarchy
and involved in creating MDX query in accordance to business requirement.
 Worked with SSRS subscription and data driven subscription for report automation to send report by
email or saved in window directory
 Design database Backup and Restoration Strategy. Once created the database Backups, monitor
those backups are being performed regularly. From time to time recover the databases to a specific
point of time, as per the requests. Setup High-Availability as part Disaster Recovery Strategy for the
Databases. Troubleshoot various problems that arise in a day-to-day work and fix the issues.
 To analyze long running slow queries and tune the same to optimize application and system
performance.
 Configure Hardware requirement for Database server(Win 2008 server)
 Monitoring and Performance Tuning; Physical Server Level, Database level and query tuning
 Documenting major changes to the SQL Servers.
 Apply Service Packs
AVTRON MANUFACTURING, INDEPENDENCE, OH JUNE 2011 – JULY 2013
SOFTWARE ENGINEER
 Responsible for converting C++ Applications to C#.
 Developed win Form in MFC environment.
 Worked on PLC with C++, AC drive, DC Drive and Data Acquisition
 Main purpose to built PLC (machine control computer) to read digital and analog inputs from various sensors
From ADAPT (Computer or Server control) in Aerospace industries, Steel industries.
 Created Dll for the project to interact with Window 2000, XP and latest one with window 7 on 32 and 64 bit
application on C# (.NET version 4.0)
PAGE 2
 Worked on ADO.net with Access database to connect front end of C# which bring log in information and
product registration tables.
 Utilized Install Pro to make package of WIN and MFC project.
Environment: C++, ADO.net, Access, C#, Install Pro, Agile, MVC(Practice and Pattern)
CEDAR FAIR LLP, SANDUSKY,OH JUN 08 – JUN 11
SENIOR PROGRAMMER ANALYST/SQL REPORT WRITER
 Developed web based Reporting (SSRS) site to support HR, Finance, and operation department
 Developed SQL Reports utilizing SSRS, MS Visual Studio and .NET framework 2.0
 Served as developer for the SSIS project
 Developed DTS/SSIS packages, created Link Servers, and utilized T-SQL
 Performed upgrade from SQL Server 2000 to SQL Server 2005
 Performed back-ups, restores, scheduling, and maintenance and disaster recovery planning for SQL Server
 Create Database schema with UML (Visio, Wire Frame)
 Involved in performance tuning and indexes (Cluster and Non Clustered)
 Worked on Win and Web forms with help of C# in .NET Framework 2.0
 Administered SQL Server including back up / recovery, creation of user, indexing (Cluster and Non Cluster)
for normalization
 Worked with Red Gate to perform: Link server, Source Control, Data Compare, SQL Multi Script
 Performed role as a security specialist in JD Edwards Enterprise One 8.12. ERP Project
 Provided 24/7 coverage on-site and off-side of SQL 2005 databases
 Performed security updates And patches for all user types
 Designed diagrams for all the databases
 Developed plans and managed and executed complex technical efforts
 Developed stored procedures, views, and triggers
 Performed database storage migration
 Developed documentation for all databases
Environment: SSRS, C#, Visio, SQL Server, Red Gate, UML, T-SQL, SSIS, DTS
MERILLAT INDUSTRIES, ADRIAN, MI DEC 07 – APR 08
SQL DBA/SENIOR .NET DEVELOPER/LEAD PROGRAMMER ANALYST
 Developed web applications with Visual Studio 6.0 (Visual Interdev, Visual Basic, ASP and SQL Server 2000,
2003, 2005)
 Maintained and recommended changes in existing web application utilizing Visual Basic, Visual Interdev,
SQL Server 2000, Active Reports, COM and DB2 (QMF)
 Interfaced with JDE (ERP) solution to auto creates the product and non-product order (service order) in a
web based application called Service Auto maintenance (SAM)
 Created, altered and deleted tables, views and store procedures in SQL Server 2000 and AS400 (which
eventually connects to JDE (ERP Solution)
 Created flat files from Access and SQL Server 2000 database tables as needed
 Created DTS packages, SSIS, SSRS
 Worked efficiently in and around the ADO, DAO and RDO
 Documented all transactions and weekly status reports with MS Office Suite
 Created Exe files with Visual Basic 6.0 and Active Report to generate the reports
PAGE 3
MEDICAL MUTUAL OF OHIO, CLEVELAND, OH MAY 06 – OCT 07
SENIOR DB2 AND .NET DEVELOPER/LEAD PROGRAMMER ANALYST
(WEB BASED APPLICATION)
 Worked as a DB2 developer in MMO subsidiary named Antares Solutions. The application consisted of
(a) medical coverage, (b) dental coverage with capability to edit, delete and update the information of
doctor and patient (customer) as required
 Rewrote the code for exporting the data in XLS, Microsoft Word and Crystal Report to allow the
information to save or open
 Rewrote the user control in corporate with twelve different web pages to elevate from testing stage to
development to QA environment to deploy in production
PROGRESSIVE INSURANCE, MAYFIELD VILLAGE, OH JAN 06 – APR 06
SENIOR .NET DEVELOPER/SENIOR CONSULTANT, PROGRAMMER/ANALYST
SQL AND DB2 DEVELOPER (WINDOW AND WEB BASED APPLICATION)
 Worked as a SQL developer on an insurance application module includes Auto, RV and Marine, with the
capability to edit, remove and update the information
 Migrated database with DTS package. Administered database by performing duties such as (1) database
tuning, (2) backups and recovery, (3) database design, (4) creation of entity relationship, (5) creation of
tables, view, store procedure and indexes
 Developed the Window and Web based application with help of Visual Studio.NET includes C# with Microsoft
SQL server 2000 database to incorporate with ADO.NET (creation of Store Procedure, Tables and Triggers)
and ASP.NET
 Utilized UML to create database schema
 Performed the integration and unit test to verify any errors and conclude at software usability evaluations by
perform following methods(1) user -based, (2) expert-based, (3)model-based
 Migrated Smalltalk software application from IBM mainframe to Microsoft arena for editing and retrieving of
insurance policy in reference to Customers, Vehicles with help of three tire application and taking care of
business layer(includes rules and reference used in IBM based application) data access layer, security layer,
document all the changes
 Created SQL script to run a trace and run a UNIT test for the proper retrieval of data, importing the data
from Excel(.XLS) into SQL database(DTS package)
 Performed duties as SQL DBA for entire projects. This included creation of table, store procedure synonyms,
trigger, performance tuning, backups, replication using OLAP, reporting, DTS package etc.
MARATHON ASHLAND PIPELINE LLC, FINDLAY, OH OCT 04 – AUG 05
SENIOR .NET DEVELOPER/SENIOR MS SQL SERVER 2000 DEVELOPER/
DBA SENIOR CONSULTANT (WEB AND WINDOW BASED APPLICATION
DEVELOPER WITH MIGRATING DIFFERENT SOFTWARE FROM VB 6.0 TO
VB.NET AND C#)
 Developed Window and Web based application. Named info tracking project with help of Visual Studio.NET
and its language such as VB.NET, C#, ASP.NET (IIS 5.0 and 6.0), ADO.NET (database from MSSQL 2000
and Oracle 8i with creation of table, view, store procedure, OLEDB (Allow oracle or other database to connect
to front end of C# or VB.NET)), with tools like data grid, dropdown list, List box, Command button, User
Control, Validation controls etc., Wise Installshield was applied on Window based (desktop) application. Java
and VB scripting involved in Wise Installation
 Migrated software from VB 6.0 to .NET for technical department for intranet and window application. Involved
in development of intranet web site to capture information for the engineering department to view, edit, update
and delete the information. Connect from database with store procedure, view, tables with creation of dataset,
connection string and data connection. Performed import and export data from Excel spreadsheet to MS
SQL server. Administrated IIS v 6.0 and VSS to capture or save the entire project. Involved in designing
database with help of VISIO as well as Smart Draw from Wire Frame (designing tool to create schema, web
design, and different presentation for project). Involved in web services like XML, XSL, and XSLT
 Created tables, stored procedure synonyms, triggers, views and database optimization, performance
monitoring and tuning, database maintenance, backup/recovery, data consistence check, security
administration and data cleanse. Furthermore, responsible to design and implement enterprise databases
etc. (act and perform duty as MS DBA) and also worked with cluster management
 After completion of window based application utilized packaging software like Installshield associates with
.NET tools is J# and C++ and Wise Installshield
 Developed email form to send feedback to engineering department with help of SMTP server and VB script
and eleven web pages with developing report (READ ONLY) with Crystal Report
 Developed web security to control web pages to administer the login info for end user who has the
responsibility to develop and maintain the application and database. This allows the Administer to control
the security around the software. Security was built in user control with web config file which has no chances
to get into certain databases
 Created user control to include ten web pages and debug the application for the smooth operation of the
software (includes database, compilation errors etc). Performed the integration and unit test to verify any
errors and conclude at software usability evaluations by perform following methods(1) user -based, (2)
expert-based, (3)model based
ECOLOGICAL SERVICES, TOLEDO, OH JUL 01 – JUL 05
SENIOR .NET DEVELOPER/SENIOR SQL DEVELOPER/DBA SENIOR
CONSULTANT AND TEAM LEAD/SYSTEM ADMIN/PROGRAMMER
ANALYST
 Web and window based application developer with migrating different software from VB 6.0 to VB.NET and
C# and performed duty as MS SQL DBA with 7.0/ 2000. Also acted as project administrator
 Developed web based and window based (desktop) application with Visual Studio 6.0 (Visual Basic 6.0 and
C++) and migrated the project in January 2002 into Visual Basic.NET, as well as C# forms and project with
Oracle and MS SQL Server 7.0/2000 ODBC and afterward wrote and managed multiple reports into Crystal
Report 7.0 to 9i and applied it on the internet with the help of Crystal enterprise and Seagate Info. Experience
building analysis and posting it to the internet as add on to reports generated from ORACLE, MS SQL
SERVER and ACCESS
 Involved in PowerPoint presentation as well as Visio diagram to provide meeting agenda, web page design
and other clip art to mention in slide show
 Developed web site and client server project for ecological services dealing in consulting business
 Applied Visual Interdev for testing the ODBC for Oracle and MS SQL 7.0 (Includes creation of tables, view,
Stored Procedures and Synonyms), perform Database Performance Tuning, SQL PLUS, SQL LOADER,
SQL worksheet. Administer Database (but NOT DBA) Access into window and web application, Application
of Visio for Database connectivity Diagram and Configuration of chain of command. Project Design includes
performing relational database design and conversion or transfer Or DTS package (Import and Export
Database and its files and folders) from Documented to Oracle 8i. and Utilized SQL Loader to perform Data
Transfer. Visio was designing tool to implement database structure and also web designing.
 Developed and maintained window based application and Website for www.shahinvestments.com with help
of technology like HTML. And also was involved in set up of LAN/WAN (internet connection) Network all the
computer with Servers and printers and other components. Developed full life cycle software for traveling
company to track customer tickets for Different part of country and world. And applications of Wise
Installshield for Software install and uninstall Creation of Database includes Tables, View, and Stored
Procedures, Trigger and entity Relationship diagram with Visio. Worked on relational database.
 Knowledge and 55+ months hands-on experience with VB.NET and C# associates with ADO.NET, ASP.NET
and other aspect of .NET framework Component used were Radio Button, Text Box, Drop down List Box,
Date Time Picker, Etc). Developed Full life cycle web sites applying technology like Visual Basic,
HTML/ASP/FrontPage/Access/Visual Interdev/IIS, MTS, MSSQL, ORACLE and ADO for Company's Intranet
web site with help of Crystal Reports and Crystal Enterprise version 8.5
 Developed User interface for company to capture information about their Client, Project Candidates
(Employees, Training and Payroll etc with tools like SS tab, Dropdown list, Radio Button, Text, labels, etc.
 Developed Window based apps with C# and back end or MS SQL 7.0/2000 to capture info for client By Bank
teller for Fifth third bank.
 Developed Visual frameworks and some of Communication protocol associated With FTP. Proficient in
Software Distribution (Includes Advertisement and Sales) as well as Tech Support. Developed, designed
(Includes Business process, Architect, Implementation), Debug the application for smooth operation of the
software. (Includes (Database, Compilation errors etc), coded, Documented and tested the software
(includes QA testing). Perform The integration and Unit test to verify any errors and Conclude at software
usability evaluations by perform following methods(1) User -based, (2) Expert-based, (3)Model based
 Developed and maintained web and window based application to synchronize in handheld Device like
Palm Pilot to eliminate carrying laptop application includes 8 forms connected to SQL Server 2000 and
blend with Crystal report 8.0 to 9.0 Allow the project Manager to obtain all the information regarding future
Project ,Employees, other requirement ( Experience from February 2005 till now)
 Administered Database (MS SQL7.0/2000 and ORACLE 8i) and IIS for proper operation with keep in minds
the security.
 Developed Web based application for internal client on following technology : JSK1.4.0, J2EE, JSP Web
Sphere Servlets, XML, ASP, Cold fusion, SQL, PL/SQL, SQL Server
 Designed MS SQL server and Oracle to keep in mind following aspect of Info Tracking project : (1)Creation
of tables, views, store procedure, triggers, Index,(2) backups/ recovery plans, (2) data consistence check,
security administration, and data cleanse. Furthermore, responsible to design and implement enterprise
databases.
 Designed web, database ER diagram, Presentation of project in format of PPT with Smart Draw from wire
frame , Visio or UML
 Developed Computer system specification for proposed solution to information system problem according
to SDLC for following project includes Project planning, feasibility study, Systems analysis, requirements
definition, Systems design, Implementation, Integration and testing, Acceptance, installation, deployment,
Maintenance
MERRILL LYNCH, NEW YORK, NY JUL 00 – JUL 01
ORACLE AND SQL DEVELOPER AND DBA/PROJECT LEAD AND
SENIOR CONSULTANT AND PROGRAMMER/ANALYST
(WINDOWS AND WEB BASED)
 Worked as a Team Lead as well as Sr. Developer For Merrill Lynch IBK Global Financial Project Investment
Banking for web http://www.ml.com) and window Includes Architect, designing, Implementation as well as
complete lifecycle software applying various technology like C++, Visual Basic, DCOM, COM, COM+, IIS,
MTS, Visual Interdev and Microsoft PowerPoint Macros, Java, EJB, Apache Tomcat which includes Docbank
is a web based Pitch Book Development and collaboration system for Investment Banking Division of Merrill
Lynch (Includes On line Banking with client share, stock, interest Calculation, 401k Administration). This
enables the bankers to create and manage the pitch book creation and sharing it across their global divisions.
This solution supports the entire standard document management functionalities. 0n addition, this system
also comprises of a job track system that implements a workflow for publishing services. This is a global
system that is deployed at multiple locations i.e. New York, London, India, Japan and Hong Kong. It is a
J2EE compliant solution
 Performed In-house projects in Window based application by applying Technology like Visual
Basic/Oracle/ODBC/Crystal Reports/Visual Interdev company information management application to track
details about the company's clients, employees and Employee training needs. Developed, designed, coded,
documented and tested the software (includes QA testing) Worked on Updating company's web site with
help of IIS*, as well as HTML, Front Page and MTS technology, XML Worked in OOPS and OOD environment
to enhance the performance in IT department
 Applied Visual Interdev for testing the ODBC for Oracle and MS SQL 7.0 (Includes Creation of tables, view,
Store
Procedure and Synonyms), Access into web application,
 Application of UML and Visio for Database connectivity Diagram and Configuration of chain of command and
Project Design includes relational database and convert or transfer (Import and Export Database and its files
and folders) from Documentum to Oracle 8i.
 Prepared Documentation to support the software and Mentoring junior staff in Java technology for new
project as well as in Visual Basic and Oracle ODBC (ADODB, ADO, and DAO) and Crystal Report.
 Administered database (MS SQL7.0/2000 and ORACLE 8i) and IIS for proper operations with keep in mind
the security and helpful to HELPDESK for controlling the entire USER interaction for login info with window
and all the application related to project.
 Managed the team of 15 consultants for various project within organization from Project Scope to
Maintenance includes Scope, Analysis/Software Requirements, Design, Development, Testing: (1) Unit
Testing and (2) Integration Testing, Training, Documentation, Pilot, Deployment, Post Implementation
Review
 Developed computer system specification for proposed solution to information system problem according to
SDLC for following project. Includes Project planning, feasibility study, Systems analysis, requirements
definition, Systems design, Implementation, Integration and testing, Acceptance, installation, deployment,
Maintenance, Documentation
EDUCATION
Diploma in Automobile Engineering Graduate with 3.7 grades in April 1987
R.I.Trade shop School (National Educational Center) Providence, RI
Certified Microsoft Certified Programmer Graduate with 3.7 grades in Aug 1998
Comp-U-Learn, 30600 N. Bingham Farms, Southfield, Michigan
CERTIFICATIONS
 Certified Microsoft.NET developer in associates with C#, VB.NET(MCAD, MCSD,) ASP.NET, ADO.NET and
MCAD Exam 70-305 and 70-315
 Certified in MCDBA in association with MS SQL Server 2000
 Certified with Window 2000 Server, Window NT, Window 2003 Server (MCSE)
 A+ certified with Network cert
TRAINING
 COMP-U-LEARNUS, Southfield, MI 9/1997 to 7/1998
 Certification in Concepts of computer, Introduction to Internet, Web Authoring Using
 HTML, Window 95/98/NT operating systems, Concepts of NETWORKING, Unix, C/C++ Programming,
Business Modeling, Oracle 8.0, PL/SQL, SQL, Developer 2000 (Forms4.5 & Report 2.5), Visual Basic 5.0/6.0
(Crystal Reports), MS Access, Active Server Pages (ASP)

Patel v res_(1)

  • 1.
    VIJAY PATEL 6733 GardenRoad Maumee Ohio 43537 Phone # 419 787 8580(cell) Email: patelv61@gmail.com PROFESSIONAL STATEMENT Experienced .Net professional with seven years of development experience, including strong skills in database administration, and team leadership. He is proficient in SDLC (System Development Life Cycle) including design using tools such as Visio, UML and Smart Draw from Wireframe. He is extremely well versed in OOP and OOD methodologies for software development (web based and desktop applications). He has worked in an Agile environment, most recently with Cedar Fair where he worked alongside a certified Scrum Master. Vijay has excellent interpersonal and customer service skills. EXPERIENCE First Merit Bank October 2014 – Recent 328 Saginaw Road, Flint, MI Programmer Analyst, SQl Server Developer  Work with SSAS,SSIS, SSRS on Business Intelligent tool with SQL server 2014  Responsible to convert .NET web application from .NET 3.0 to 4.5  Utilize Ajax Control Tool Kit for Design conversion project  Worked with MVC(Model View Controller 5.0) to improve functionality over .NET 3.0  Worked with .NET Charting in project to implement click event to retrieve data from SqL Database  Utilize Spreadsheet Gear to generate Spread sheet(XLS) data  Worked with Telerik control for Designing new web site  Worked with SSIS to convert Database views from one database to Tables in other Database  Worked with LINQ to generate Database Schema and populate Data Grid ProMedica July 2013 –October 2014 Software Developer 1901 Indian Wood Circle, Maumee, Ohio 43537 July 2013 – October 2014  Responsible for developing a set of standard software engineering processes utilized by agencies.  Develop data standards, data exchange, XML data standard or data sharing model. Provide technical XML services to the management and support staff. Handle the queries regarding XML and troubleshoot problems.  Work with oracle and PowerShell to insert delete and update the data working on the different phases of the life cycle like analysis, APPLICATIONS: Visual Studio .NET includes C#, VB.NET, Crystal Report 8.0,9.0, Visual Basic, VB and java scripting, CSS, HTML, XML, JAVA, JDBC, EJB, C++, IIS, VB.NET, C# PLATFORMS: Window 2000, XP, win 7 and 8 Unix DATABASES: MS SQL Server 7.0, 2000, 2005, 2008, 2012, 2014 (SSIS, SSAS, SSRS, DTS), Red Gate, Oracle 8i, 9i, TOAD, Access, Fox Pro APPLICATIONS: ADO, ADO.NET, OLEDB, ADODB, DAO, ASP.NET (Maintain and admin IIS) DEVELOPMENT TOOLS: Visual Studio 6.0, Visual Basic, C++, Visual Interdev and Visual Studio. .NET 2003 to 2013 Visual and C#. Wise Installation package, Install shield with J++ and J# DESIGN TOOLS: VISIO, UML Graphic manipulation with Adobe Photoshop
  • 2.
    designing, development andmaintenance and maintained operational documentation.  Creation of csv(flat file) file from Database and upload flat file into sql developer(oracle)  Worked with Win and Web forms with help of Visual Studio 2012 to create software which link to SSRS web site and also utilize Win form to create same project.  Built WIMs, task sequences, package and collection architecture, oracle and SQL queries and report  Implemented PowerShell remoting and script execution and perform ETL in PowerShell script.  Configured Powershell in DDMG, In-Three, DDMAIL and DDI domains for script execution and remoting  Worked with ICD-9 and ICD-10 codding and create script to write data in CSV file with help of PowerShell  Worked with Service Now to retrieve the assignment and worked with documentation to justify all the work done. Prior to Service Now Worked on FOGBUGS to perform same functionality.  Worked with Federal mandated health care project to rewrite Oracle query and converted into XML file to load into HP FARM  Worked with TortoiseSVN for Version control for retrieving assignment and there after commit changes to existing program.  Worked with SSRS web site with backend of Oracle and sql server 2012  Worked with Sql developer and Sql Server with DBMS activity mentioned below:  Installation, Administration and Maintenance of SQL Server Instances.  Setup Test, Dev, Staging and Production Environments with capacity of more than 5 terabyte size of Database  Create Users and assign permissions based on the level of database access the user would need.  Maintain, Create, Delete and Alter Database security as required to prevent threat against any situation  Create Linked Servers to SQL Servers and other databases such as Oracle, Access etc.  Involved in Source Data Analysis, analysis and designing mappings for data extraction also responsible for Design and Development of SSIS Packages to load the Data from various Databases and Files.  Involved in ETL Process with help of SQL server Analysis services, Integration services, and Reporting services to capture Claim, Member data and convert into XLs, PDF, CSV and in other format  Involved in development of Cubes, Dimension, Business critical KPIs using SQL Server Analysis service representing aggregation in several different way by using custom grouping and hierarchy and involved in creating MDX query in accordance to business requirement.  Worked with SSRS subscription and data driven subscription for report automation to send report by email or saved in window directory  Design database Backup and Restoration Strategy. Once created the database Backups, monitor those backups are being performed regularly. From time to time recover the databases to a specific point of time, as per the requests. Setup High-Availability as part Disaster Recovery Strategy for the Databases. Troubleshoot various problems that arise in a day-to-day work and fix the issues.  To analyze long running slow queries and tune the same to optimize application and system performance.  Configure Hardware requirement for Database server(Win 2008 server)  Monitoring and Performance Tuning; Physical Server Level, Database level and query tuning  Documenting major changes to the SQL Servers.  Apply Service Packs AVTRON MANUFACTURING, INDEPENDENCE, OH JUNE 2011 – JULY 2013 SOFTWARE ENGINEER  Responsible for converting C++ Applications to C#.  Developed win Form in MFC environment.  Worked on PLC with C++, AC drive, DC Drive and Data Acquisition
  • 3.
     Main purposeto built PLC (machine control computer) to read digital and analog inputs from various sensors From ADAPT (Computer or Server control) in Aerospace industries, Steel industries.  Created Dll for the project to interact with Window 2000, XP and latest one with window 7 on 32 and 64 bit application on C# (.NET version 4.0) PAGE 2  Worked on ADO.net with Access database to connect front end of C# which bring log in information and product registration tables.  Utilized Install Pro to make package of WIN and MFC project. Environment: C++, ADO.net, Access, C#, Install Pro, Agile, MVC(Practice and Pattern) CEDAR FAIR LLP, SANDUSKY,OH JUN 08 – JUN 11 SENIOR PROGRAMMER ANALYST/SQL REPORT WRITER  Developed web based Reporting (SSRS) site to support HR, Finance, and operation department  Developed SQL Reports utilizing SSRS, MS Visual Studio and .NET framework 2.0  Served as developer for the SSIS project  Developed DTS/SSIS packages, created Link Servers, and utilized T-SQL  Performed upgrade from SQL Server 2000 to SQL Server 2005  Performed back-ups, restores, scheduling, and maintenance and disaster recovery planning for SQL Server  Create Database schema with UML (Visio, Wire Frame)  Involved in performance tuning and indexes (Cluster and Non Clustered)  Worked on Win and Web forms with help of C# in .NET Framework 2.0  Administered SQL Server including back up / recovery, creation of user, indexing (Cluster and Non Cluster) for normalization  Worked with Red Gate to perform: Link server, Source Control, Data Compare, SQL Multi Script  Performed role as a security specialist in JD Edwards Enterprise One 8.12. ERP Project  Provided 24/7 coverage on-site and off-side of SQL 2005 databases  Performed security updates And patches for all user types  Designed diagrams for all the databases  Developed plans and managed and executed complex technical efforts  Developed stored procedures, views, and triggers  Performed database storage migration  Developed documentation for all databases Environment: SSRS, C#, Visio, SQL Server, Red Gate, UML, T-SQL, SSIS, DTS MERILLAT INDUSTRIES, ADRIAN, MI DEC 07 – APR 08 SQL DBA/SENIOR .NET DEVELOPER/LEAD PROGRAMMER ANALYST  Developed web applications with Visual Studio 6.0 (Visual Interdev, Visual Basic, ASP and SQL Server 2000, 2003, 2005)  Maintained and recommended changes in existing web application utilizing Visual Basic, Visual Interdev, SQL Server 2000, Active Reports, COM and DB2 (QMF)  Interfaced with JDE (ERP) solution to auto creates the product and non-product order (service order) in a web based application called Service Auto maintenance (SAM)  Created, altered and deleted tables, views and store procedures in SQL Server 2000 and AS400 (which eventually connects to JDE (ERP Solution)  Created flat files from Access and SQL Server 2000 database tables as needed  Created DTS packages, SSIS, SSRS  Worked efficiently in and around the ADO, DAO and RDO  Documented all transactions and weekly status reports with MS Office Suite  Created Exe files with Visual Basic 6.0 and Active Report to generate the reports
  • 4.
    PAGE 3 MEDICAL MUTUALOF OHIO, CLEVELAND, OH MAY 06 – OCT 07 SENIOR DB2 AND .NET DEVELOPER/LEAD PROGRAMMER ANALYST (WEB BASED APPLICATION)  Worked as a DB2 developer in MMO subsidiary named Antares Solutions. The application consisted of (a) medical coverage, (b) dental coverage with capability to edit, delete and update the information of doctor and patient (customer) as required  Rewrote the code for exporting the data in XLS, Microsoft Word and Crystal Report to allow the information to save or open  Rewrote the user control in corporate with twelve different web pages to elevate from testing stage to development to QA environment to deploy in production PROGRESSIVE INSURANCE, MAYFIELD VILLAGE, OH JAN 06 – APR 06 SENIOR .NET DEVELOPER/SENIOR CONSULTANT, PROGRAMMER/ANALYST SQL AND DB2 DEVELOPER (WINDOW AND WEB BASED APPLICATION)  Worked as a SQL developer on an insurance application module includes Auto, RV and Marine, with the capability to edit, remove and update the information  Migrated database with DTS package. Administered database by performing duties such as (1) database tuning, (2) backups and recovery, (3) database design, (4) creation of entity relationship, (5) creation of tables, view, store procedure and indexes  Developed the Window and Web based application with help of Visual Studio.NET includes C# with Microsoft SQL server 2000 database to incorporate with ADO.NET (creation of Store Procedure, Tables and Triggers) and ASP.NET  Utilized UML to create database schema  Performed the integration and unit test to verify any errors and conclude at software usability evaluations by perform following methods(1) user -based, (2) expert-based, (3)model-based  Migrated Smalltalk software application from IBM mainframe to Microsoft arena for editing and retrieving of insurance policy in reference to Customers, Vehicles with help of three tire application and taking care of business layer(includes rules and reference used in IBM based application) data access layer, security layer, document all the changes  Created SQL script to run a trace and run a UNIT test for the proper retrieval of data, importing the data from Excel(.XLS) into SQL database(DTS package)  Performed duties as SQL DBA for entire projects. This included creation of table, store procedure synonyms, trigger, performance tuning, backups, replication using OLAP, reporting, DTS package etc. MARATHON ASHLAND PIPELINE LLC, FINDLAY, OH OCT 04 – AUG 05 SENIOR .NET DEVELOPER/SENIOR MS SQL SERVER 2000 DEVELOPER/ DBA SENIOR CONSULTANT (WEB AND WINDOW BASED APPLICATION DEVELOPER WITH MIGRATING DIFFERENT SOFTWARE FROM VB 6.0 TO VB.NET AND C#)  Developed Window and Web based application. Named info tracking project with help of Visual Studio.NET and its language such as VB.NET, C#, ASP.NET (IIS 5.0 and 6.0), ADO.NET (database from MSSQL 2000 and Oracle 8i with creation of table, view, store procedure, OLEDB (Allow oracle or other database to connect to front end of C# or VB.NET)), with tools like data grid, dropdown list, List box, Command button, User Control, Validation controls etc., Wise Installshield was applied on Window based (desktop) application. Java and VB scripting involved in Wise Installation  Migrated software from VB 6.0 to .NET for technical department for intranet and window application. Involved in development of intranet web site to capture information for the engineering department to view, edit, update and delete the information. Connect from database with store procedure, view, tables with creation of dataset, connection string and data connection. Performed import and export data from Excel spreadsheet to MS SQL server. Administrated IIS v 6.0 and VSS to capture or save the entire project. Involved in designing
  • 5.
    database with helpof VISIO as well as Smart Draw from Wire Frame (designing tool to create schema, web design, and different presentation for project). Involved in web services like XML, XSL, and XSLT  Created tables, stored procedure synonyms, triggers, views and database optimization, performance monitoring and tuning, database maintenance, backup/recovery, data consistence check, security administration and data cleanse. Furthermore, responsible to design and implement enterprise databases etc. (act and perform duty as MS DBA) and also worked with cluster management  After completion of window based application utilized packaging software like Installshield associates with .NET tools is J# and C++ and Wise Installshield  Developed email form to send feedback to engineering department with help of SMTP server and VB script and eleven web pages with developing report (READ ONLY) with Crystal Report  Developed web security to control web pages to administer the login info for end user who has the responsibility to develop and maintain the application and database. This allows the Administer to control the security around the software. Security was built in user control with web config file which has no chances to get into certain databases  Created user control to include ten web pages and debug the application for the smooth operation of the software (includes database, compilation errors etc). Performed the integration and unit test to verify any errors and conclude at software usability evaluations by perform following methods(1) user -based, (2) expert-based, (3)model based ECOLOGICAL SERVICES, TOLEDO, OH JUL 01 – JUL 05 SENIOR .NET DEVELOPER/SENIOR SQL DEVELOPER/DBA SENIOR CONSULTANT AND TEAM LEAD/SYSTEM ADMIN/PROGRAMMER ANALYST  Web and window based application developer with migrating different software from VB 6.0 to VB.NET and C# and performed duty as MS SQL DBA with 7.0/ 2000. Also acted as project administrator  Developed web based and window based (desktop) application with Visual Studio 6.0 (Visual Basic 6.0 and C++) and migrated the project in January 2002 into Visual Basic.NET, as well as C# forms and project with Oracle and MS SQL Server 7.0/2000 ODBC and afterward wrote and managed multiple reports into Crystal Report 7.0 to 9i and applied it on the internet with the help of Crystal enterprise and Seagate Info. Experience building analysis and posting it to the internet as add on to reports generated from ORACLE, MS SQL SERVER and ACCESS  Involved in PowerPoint presentation as well as Visio diagram to provide meeting agenda, web page design and other clip art to mention in slide show  Developed web site and client server project for ecological services dealing in consulting business  Applied Visual Interdev for testing the ODBC for Oracle and MS SQL 7.0 (Includes creation of tables, view, Stored Procedures and Synonyms), perform Database Performance Tuning, SQL PLUS, SQL LOADER, SQL worksheet. Administer Database (but NOT DBA) Access into window and web application, Application of Visio for Database connectivity Diagram and Configuration of chain of command. Project Design includes performing relational database design and conversion or transfer Or DTS package (Import and Export Database and its files and folders) from Documented to Oracle 8i. and Utilized SQL Loader to perform Data Transfer. Visio was designing tool to implement database structure and also web designing.  Developed and maintained window based application and Website for www.shahinvestments.com with help of technology like HTML. And also was involved in set up of LAN/WAN (internet connection) Network all the computer with Servers and printers and other components. Developed full life cycle software for traveling company to track customer tickets for Different part of country and world. And applications of Wise Installshield for Software install and uninstall Creation of Database includes Tables, View, and Stored Procedures, Trigger and entity Relationship diagram with Visio. Worked on relational database.  Knowledge and 55+ months hands-on experience with VB.NET and C# associates with ADO.NET, ASP.NET and other aspect of .NET framework Component used were Radio Button, Text Box, Drop down List Box, Date Time Picker, Etc). Developed Full life cycle web sites applying technology like Visual Basic, HTML/ASP/FrontPage/Access/Visual Interdev/IIS, MTS, MSSQL, ORACLE and ADO for Company's Intranet web site with help of Crystal Reports and Crystal Enterprise version 8.5  Developed User interface for company to capture information about their Client, Project Candidates (Employees, Training and Payroll etc with tools like SS tab, Dropdown list, Radio Button, Text, labels, etc.  Developed Window based apps with C# and back end or MS SQL 7.0/2000 to capture info for client By Bank teller for Fifth third bank.
  • 6.
     Developed Visualframeworks and some of Communication protocol associated With FTP. Proficient in Software Distribution (Includes Advertisement and Sales) as well as Tech Support. Developed, designed (Includes Business process, Architect, Implementation), Debug the application for smooth operation of the software. (Includes (Database, Compilation errors etc), coded, Documented and tested the software (includes QA testing). Perform The integration and Unit test to verify any errors and Conclude at software usability evaluations by perform following methods(1) User -based, (2) Expert-based, (3)Model based  Developed and maintained web and window based application to synchronize in handheld Device like Palm Pilot to eliminate carrying laptop application includes 8 forms connected to SQL Server 2000 and blend with Crystal report 8.0 to 9.0 Allow the project Manager to obtain all the information regarding future Project ,Employees, other requirement ( Experience from February 2005 till now)  Administered Database (MS SQL7.0/2000 and ORACLE 8i) and IIS for proper operation with keep in minds the security.  Developed Web based application for internal client on following technology : JSK1.4.0, J2EE, JSP Web Sphere Servlets, XML, ASP, Cold fusion, SQL, PL/SQL, SQL Server  Designed MS SQL server and Oracle to keep in mind following aspect of Info Tracking project : (1)Creation of tables, views, store procedure, triggers, Index,(2) backups/ recovery plans, (2) data consistence check, security administration, and data cleanse. Furthermore, responsible to design and implement enterprise databases.  Designed web, database ER diagram, Presentation of project in format of PPT with Smart Draw from wire frame , Visio or UML  Developed Computer system specification for proposed solution to information system problem according to SDLC for following project includes Project planning, feasibility study, Systems analysis, requirements definition, Systems design, Implementation, Integration and testing, Acceptance, installation, deployment, Maintenance MERRILL LYNCH, NEW YORK, NY JUL 00 – JUL 01 ORACLE AND SQL DEVELOPER AND DBA/PROJECT LEAD AND SENIOR CONSULTANT AND PROGRAMMER/ANALYST (WINDOWS AND WEB BASED)  Worked as a Team Lead as well as Sr. Developer For Merrill Lynch IBK Global Financial Project Investment Banking for web http://www.ml.com) and window Includes Architect, designing, Implementation as well as complete lifecycle software applying various technology like C++, Visual Basic, DCOM, COM, COM+, IIS, MTS, Visual Interdev and Microsoft PowerPoint Macros, Java, EJB, Apache Tomcat which includes Docbank is a web based Pitch Book Development and collaboration system for Investment Banking Division of Merrill Lynch (Includes On line Banking with client share, stock, interest Calculation, 401k Administration). This enables the bankers to create and manage the pitch book creation and sharing it across their global divisions. This solution supports the entire standard document management functionalities. 0n addition, this system also comprises of a job track system that implements a workflow for publishing services. This is a global system that is deployed at multiple locations i.e. New York, London, India, Japan and Hong Kong. It is a J2EE compliant solution  Performed In-house projects in Window based application by applying Technology like Visual Basic/Oracle/ODBC/Crystal Reports/Visual Interdev company information management application to track details about the company's clients, employees and Employee training needs. Developed, designed, coded, documented and tested the software (includes QA testing) Worked on Updating company's web site with help of IIS*, as well as HTML, Front Page and MTS technology, XML Worked in OOPS and OOD environment to enhance the performance in IT department  Applied Visual Interdev for testing the ODBC for Oracle and MS SQL 7.0 (Includes Creation of tables, view, Store Procedure and Synonyms), Access into web application,  Application of UML and Visio for Database connectivity Diagram and Configuration of chain of command and Project Design includes relational database and convert or transfer (Import and Export Database and its files and folders) from Documentum to Oracle 8i.  Prepared Documentation to support the software and Mentoring junior staff in Java technology for new project as well as in Visual Basic and Oracle ODBC (ADODB, ADO, and DAO) and Crystal Report.  Administered database (MS SQL7.0/2000 and ORACLE 8i) and IIS for proper operations with keep in mind
  • 7.
    the security andhelpful to HELPDESK for controlling the entire USER interaction for login info with window and all the application related to project.  Managed the team of 15 consultants for various project within organization from Project Scope to Maintenance includes Scope, Analysis/Software Requirements, Design, Development, Testing: (1) Unit Testing and (2) Integration Testing, Training, Documentation, Pilot, Deployment, Post Implementation Review  Developed computer system specification for proposed solution to information system problem according to SDLC for following project. Includes Project planning, feasibility study, Systems analysis, requirements definition, Systems design, Implementation, Integration and testing, Acceptance, installation, deployment, Maintenance, Documentation EDUCATION Diploma in Automobile Engineering Graduate with 3.7 grades in April 1987 R.I.Trade shop School (National Educational Center) Providence, RI Certified Microsoft Certified Programmer Graduate with 3.7 grades in Aug 1998 Comp-U-Learn, 30600 N. Bingham Farms, Southfield, Michigan CERTIFICATIONS  Certified Microsoft.NET developer in associates with C#, VB.NET(MCAD, MCSD,) ASP.NET, ADO.NET and MCAD Exam 70-305 and 70-315  Certified in MCDBA in association with MS SQL Server 2000  Certified with Window 2000 Server, Window NT, Window 2003 Server (MCSE)  A+ certified with Network cert TRAINING  COMP-U-LEARNUS, Southfield, MI 9/1997 to 7/1998  Certification in Concepts of computer, Introduction to Internet, Web Authoring Using  HTML, Window 95/98/NT operating systems, Concepts of NETWORKING, Unix, C/C++ Programming, Business Modeling, Oracle 8.0, PL/SQL, SQL, Developer 2000 (Forms4.5 & Report 2.5), Visual Basic 5.0/6.0 (Crystal Reports), MS Access, Active Server Pages (ASP)