Ministry of agriculture
PASIDP Report for IFAD supervision
Mission PY6, 2013/14
Program Goal, Objectives and Components of
PASIDP
• The program goal of PASIDP is
– to improve food security,
– family nutrition and incomes of rural households.
• Its primary objective is to develop a sustainable, farmer-
owned and managed system of small-scale irrigated
agriculture.
• The objective will be realized mainly through enhanced
empowerment of farmers in the
– design,
– construction and
– operation and maintenance of the schemes,
• underpinned by improved agricultural support services
and strengthening institution at all levels including the
grassroots.
Program Goal, Objectives and Components of
PASIDP
PASIDP contains three major components, namely:
• Institutions Development
• Small-Scale Irrigation Development, and
• Agricultural Development
The Institution Development component includes:
• promote highly participatory approach to small-
scale irrigation development
• strengthen institutional capacity to ensure
effective coordination and management of
planned activities; and improve the M&E system
Program Goal, Objectives and Components of
PASIDP
The Small-scale Irrigation Development component
promotes:
• improve catchment area planning;
• support planning, design, supervision and
construction of small-scale irrigation schemes, and
• improve scheme-to-market access roads.
Agricultural Development component includes:
• strengthen agricultural support services
• improve farming practices mainly through better soil
and water conservation measures
• promote seed production, and
• promote home gardens development,
Small-Scale Irrigation Development Component
• Thus based on this, major activities of small-
scale irrigation development component for PY6
include:
– improving catchments area planning
– improving irrigation infrastructure
– improving road access to schemes and market
• Thus based on this, during the budget year
(2013/14 or 2006 E.C), that is, in the 9 months,
various types of schemes especially diversion
and spate have started and found on different
construction status.
Small-Scale Irrigation Development Component
• Schemes which are started from the project
inception up to the end of Project Year (PY) 5 or
2013/2005 E.C are 69.
• Among the started schemes,
– 24 schemes are completed up to the end of PY5,
– 45 of them are handled as an ongoing in the PY6 or
2013/14 or 2006 E.C.
Small-Scale Irrigation Development Component
• In the PY6 2013/14 or 2006 E.C,
– 18 schemes are completed among the ongoing
schemes,
– 27 schemes are in different construction stages,
above 80% on average.
• The total schemes construction completed from
the project inception up to PY6 of 3rd quarter is
amounting to 42 with the total command area
of 6,096 hectare benefiting 15,197 households
which is a total of about 75,985 people.
Small-Scale Irrigation Development Component
• As to the new target of PY6 (2013/14 or 2006 E.C)
the plan for scheme construction is 30, among
which,
– 16 are on progress of construction.
– the remaining 12 schemes in Ormia region are still on
bid and are said to be lagging behind the schedule.
• The project life target for construction of SSI
schemes is 125 with the total command area of
12,020 hectare, aim to benefit 35,430 households.
• However, on the PY6, the total schemes under
different stages of implementation or development
are about 112 (99 schemes and 13 boreholes).
• The total command area of these schemes is 12,201
hectare with 29,331 -households.
Small-Scale Irrigation Development Component
• Recently the completed scheme develop
– 6,096 hectare and
– benefiting 15,197 households which is 50% and 43%
of the project targets respectively but
• after the completion of all the schemes under
construction the total command area will raise
to about
– 12,201 hectare and the total
– beneficiaries of 29,331 households which is about
101% and 83.0% of the project life target
respectively.
PASIDP 2006 Plan and Achievement (9 Months ): SSI Development Status
Schemes Amhara Oromia SNNP Tigray Total
Remar
k
1 Schemes started up to
June 2013 (2005 E.C)
20 16 12 21 69
2 Schemes completed up
to June 2013 (2005 E.C)
9 5 1 9 24
Ongoing
Schemes
11 11 11 12 45
3 Ongoing Schemes
completed in the last 9
months of (2006 E.C)
3 1 2 12 18
4 Ongoing Schemes not
Completed till 3rd quarter
of project year 6th
8 10 9 0 27
Total schemes
completed
12 6 3 21 42
5 Target of New schemes
for 2013/14 (2006 E.C )
8 12 4 6+13=19 30+13=43 Additio
nal are
Bore holes
Status of New
Construction
a. Construction 8 - 2 6+13=19 16+13=29
b. Bid - 12 - - 12
c. Study and design - - 2 - 2
Total scheme up to
now 2013/14 (2006 E.C)
28 28 16 27+13=40 99+13=112
Agricultural Development Component
• PASIDP is designed to use small-scale irrigation as a
mechanism to reduce poverty, improve food security
and farmers’ incomes in the poor rural areas of the
program regions.
• The program is targeted mainly at the chronically
food insecure, drought prone and highly populated
areas.
• It is focused on sustainable small-scale irrigation
development and includes;
– upper catchments treatment,
– soil fertility rehabilitation and
– soil and water conservation activities as measures to
reverse the degradation of natural resources.
• It integrates Integrated Pest Management (IPM) as a
critical component of the program.
Agricultural Development Component
• The Agricultural Development component will:
– (i) strengthen agricultural support services;
– (ii) improve farming practices mainly through better
soil and water conservation measures;
– (iii) promote seed production; and
– (iv) promote development of home gardens.
PASIDP Performance up to Nine month of the project year 6th against the regions
Target
No
Activity
Description unit
Target
Achievement
Cumulative
at the end
of previous
year
This
Quarter
Up to this Quarter % achievement
Project life
Comulative
up to the
end of py5 Annual
This
quarter
up to this
quarter
From
annual
From
inception
% Quarter
performance
% 9month
performanc
e
%Perfrom
ance from
Inception
1
Agricultural plan
preparation
Nu
mbe
r
271 142 129 0 144 125 8 87 178
60.42 65.68
2
Command area
developed
Ha 12020 6195 5825 480 3543 1102 3750 7564 8666 781
213.49 72.09
3
FRG main group
established
Num
ber
362 250 112 10 124 183 56 94 277 560
75.81 76.52
4
Equipment for
FTCs
set 293 213 80 10 80 76 5 18 94 50
22.50 32.08
5
FRG Input
prurchased
and provided
Fertilizer Qt 1724 1513 211 40 772 1384 97 149 1504 244 19.27 87.21
Improved seed Kg 11063 5587 5476 5100 14564 1955 3847 6013 6006 75 41.29 54.29
Chemicals
/pestcide,herbici
de/
Kg/
Lit
660 516 144 25 90 333 47 66 381 188
73.33 57.73
6
On farm
demonstration
conducted
dem
ons.
2763 1851 912 117 3324 3104 373 603 679 319
18.14 24.57
7
Home garden
establishment
Num
ber
220 141 79 0 48 106 40 49 155
102.08 70.45
8
Improved stoves
purchased and
provided
num
ber
3146 1878 1268 368 468 748 362 390 998 98
83.33 31.72
9
Seed production
demonstration
conducted
dem
ons.
305 183 122 10 252 301 235 244 545 2350
96.83 178.69
10
Community
nursery
Num
ber
66 17 49 23 66 29 28 38 67 122
57.58 101.52
PASIDP Performance up to Nine month of project year 6th against the appraisal
Target
No
Activity
Description unit
Target
Achievement
Cumulative
at the end
of previous
year
This
Quarter
Up to this Quarter %ge achievement
Project life
Comulative
up to the
end of py5 Annual
This
quarter
up to this
quarter
From
annual
From
inception
%quarter
performan
ce
% 9
month
acieveme
nt
%
achiveme
nt from
inception
1
Agricultural
plan preparation
Number 225 199 26 0 144 125 8 87 178
60.42 79.11
2
Command area
developed
Ha 12020 6195 5825 480 3543 1102 3750 7564 8666 781
213.49 72.09
3
FRG main
group
established
Number 450 372 52 10 124 183 56 94 277 560
75.81 61.56
4
Equipment for
FTCs
set 225 213 80 10 80 76 5 18 94 50
22.50 41.78
5
FRG Input
prurchased
and provided
Fertilizer Qt 1724 1513 211 40 772 1384 97 149 1504 244 19.27 87.21
Improved seed Kg 11063 5587 5476 5100 14564 1955 3847 6013 6006 75 41.29 54.29
Chemicals
/pestcide,herbici
de/
Kg/Lit 660 516 144 25 90 333 47 66 381 188
73.33 57.73
6
On farm
demonstration
conducted
demons. 600 548 52 117 570 76 373 558 634 319
97.89 105.67
7
Home garden
establishment
Number 220 141 79 0 48 106 40 49 155
102.08 70.45
8
Improved stoves
purchased and
provided
number 3146 1878 1268 368 468 748 362 390 998 98
83.33 31.72
9
Seed production
demonstration
conducted
demons. 305 183 122 10 252 301 235 244 545 2350
96.83 178.69
10
Community
nursery
Number 66 17 49 23 66 29 28 38 67 122
57.58 101.52
Institution Development Component
• The objective of Institutional Development Component is to
establish the institutional framework necessary to support
– sustainable system of small-scale irrigation development in
which indigenous knowledge highly considered and
empowering of communities to participate in all phases of the
project.
• The staff at woreda, regional and federal government levels
will be trained and sensitized to adopt a more participatory
approach in their work.
• Special attention will be paid to training WUAs in efficient
water use and effective maintenance procedures.
• Women will be given training to empower them to
participate more confidently and effectively in decision
making in the WUAs and in other kebele organizations.
Institution Development Component
Thus based on this perspective
• Performance Review of the 2012/13 and Annual Work
Plan and Budget of the Program for the year 2013/14 was
conducted from 29 July – 2 August 2013 and on 21 – 22
September 2013 at Adama.
• 2013/14 (EFY 2006) 6 month Performance of the Program
Reviewed from 1 -5 February 2014 at Bahir Dar.
Institution Development Component
As to the trainings, various types of trainings have been
conducted at federal level such as:
• training for 25 participants with the theme Training of Trainers
on “Gender Mainstreaming” from 16th – 20th September
2013 at Adama.
• training for 43 participants with the theme “Irrigation Design
and Study” from 14th of October – 1st November 2013 at
Bahir Dar University.
• training for 25 participants with the theme “Irrigation
Agronomy” from 14th of October – 1st November 2013 at
Melkasa Agricultural research Center.
• training for 8 participants with the theme “Financial
Management and Procurement” from 14th October – 1st
November and 8 participants on “Advanced Project
Management, Monitoring and Evaluation ” was conducted
from 19th of November –to 6th December 2013 at IDEA
International Institute Nairobi, Kenya.
2006 Four Regions 9 Month Performance Report Summery
N
o
Planned
Activities
Un
it
Target Achievement Achievement in %
Proj.
life
Cumula
tiveupto
endof
previous
year
Ann
ual
Thi
s
quarter
upto
this
quarter
Cumula
tiveupto
endof
previous
year
This
quarter
This
year (up
to this
quarter)
From
inception
this
quarter
upto
thisquarter
from
projectlife
1 Staff
Training
No
2 WUAs
Established &
strengthened
No 405 225 90 48 115 152 24 51 187 50 44 46
3 Regional
Water Bureau
No 312 260 52 60 673 781 37 93 874 62 14 28
0
4 Regional
Agricultural
Bureau
No 140 100 20 23
7
1228 486 235 637 1123 99 52 80
2
5 Woreda
staff
No 522 388 126 99
8
2820 5150 1710 2597 7788 171 92 14
92
6 DA
Training
No 1050 696 236 11
79
2954 4073 5521 6399 10462 468 217 99
6
7 Communit
y sensitization
No 4652
8
25896 1031
6
0 11295 32912 9263 1027
2
43184 #DIV/
0!
91 93
8 WUA
training
No 4594
4
25548 1019
8
61
68
14878 17842 2476 5039 22816 40 34 50
9 FHHs-
managed home
gardens
development
training
No 2025
0
16740 2340 28
90
5200 2770 1950 1950 4720 67 38 23
1
0
FRG
Training
conducted to
farmer
No 2274
0
13740 4500 12
76
4864 10836 2960 4383 15219 232 90 67
Financial Flow From PY1-PY6
Budget Year Loan Grant
Exchange Rate
difference Total Income
2008/09 9,747 10,127 2,435 22,309
2009/10 6,531 6,531 2,079 15,140
2010/11 41,672 27,732 1,318 70,723
2011/12 22,313 34,201 1,174 57,689
2012/13 56,326 54,888 811 112,025
2013/14 52,303 47,440 0 99,742
Total 188,891 180,919 7,817,356,50 377,628
Financial Flow From PY1-PY6
IFAD Fund
Expected
for project
Life
Desberced
as of
March
30,2014
%
accomplish
ed Settlement
Settlment
%
Loan 20000 12089 60 10653 89.0
Grant 20000 11900 60 10544 89.0
TOTAL 40000 23989 60 21197 89.0
Thank you

More Related Content

Viewers also liked

CONTRIBUTION OF INTERNTAIONAL DONORS TO CHINA’S OCEAN AND COASTAL MANAGEMENT...
CONTRIBUTION OF INTERNTAIONAL DONORS  TO CHINA’S OCEAN AND COASTAL MANAGEMENT...CONTRIBUTION OF INTERNTAIONAL DONORS  TO CHINA’S OCEAN AND COASTAL MANAGEMENT...
CONTRIBUTION OF INTERNTAIONAL DONORS TO CHINA’S OCEAN AND COASTAL MANAGEMENT...Iwl Pcu
 
Rainwater Harvesting - CTA Technical Centre
Rainwater Harvesting - CTA Technical Centre  Rainwater Harvesting - CTA Technical Centre
Rainwater Harvesting - CTA Technical Centre D7Z
 
Measuring discharge at a tradtitional small scale irrigation scheme; A person...
Measuring discharge at a tradtitional small scale irrigation scheme; A person...Measuring discharge at a tradtitional small scale irrigation scheme; A person...
Measuring discharge at a tradtitional small scale irrigation scheme; A person...Joy Pengel
 
ILRI-BMZ Project on Improving the Livelihoods of Poor Livestock-keepers in Af...
ILRI-BMZ Project on Improving the Livelihoods of Poor Livestock-keepers in Af...ILRI-BMZ Project on Improving the Livelihoods of Poor Livestock-keepers in Af...
ILRI-BMZ Project on Improving the Livelihoods of Poor Livestock-keepers in Af...ILRI
 
Fs volume iv (eia) environment comments
Fs volume iv (eia) environment commentsFs volume iv (eia) environment comments
Fs volume iv (eia) environment commentszubeditufail
 
LIVES research framework
LIVES research frameworkLIVES research framework
LIVES research frameworkILRI
 
Hailu Tefera/Assefa Tofu: Poverty alleviation and environmental restoration u...
Hailu Tefera/Assefa Tofu: Poverty alleviation and environmental restoration u...Hailu Tefera/Assefa Tofu: Poverty alleviation and environmental restoration u...
Hailu Tefera/Assefa Tofu: Poverty alleviation and environmental restoration u...AfricaAdapt
 
Furi and Bashargo (1)
Furi and Bashargo (1)Furi and Bashargo (1)
Furi and Bashargo (1)Temesgen Furi
 
The Africa RISING project in Ethiopia
The Africa RISING project in EthiopiaThe Africa RISING project in Ethiopia
The Africa RISING project in EthiopiaILRI
 
Knowledge and Innovation for Impact
Knowledge and Innovation for ImpactKnowledge and Innovation for Impact
Knowledge and Innovation for ImpactCIFOR-ICRAF
 
CSA Symposium 2016 -Shawn Miller Day 1 Session 3
CSA Symposium 2016 -Shawn Miller  Day 1 Session 3CSA Symposium 2016 -Shawn Miller  Day 1 Session 3
CSA Symposium 2016 -Shawn Miller Day 1 Session 3ACDI/VOCA
 
Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...iosrjce
 
Africa; Agricultural Water Management Technologies for Small Scale Farmers i...
Africa;  Agricultural Water Management Technologies for Small Scale Farmers i...Africa;  Agricultural Water Management Technologies for Small Scale Farmers i...
Africa; Agricultural Water Management Technologies for Small Scale Farmers i...D7Z
 

Viewers also liked (20)

irrigation design
irrigation designirrigation design
irrigation design
 
MOHAMED ELHAMAWY
MOHAMED ELHAMAWYMOHAMED ELHAMAWY
MOHAMED ELHAMAWY
 
CONTRIBUTION OF INTERNTAIONAL DONORS TO CHINA’S OCEAN AND COASTAL MANAGEMENT...
CONTRIBUTION OF INTERNTAIONAL DONORS  TO CHINA’S OCEAN AND COASTAL MANAGEMENT...CONTRIBUTION OF INTERNTAIONAL DONORS  TO CHINA’S OCEAN AND COASTAL MANAGEMENT...
CONTRIBUTION OF INTERNTAIONAL DONORS TO CHINA’S OCEAN AND COASTAL MANAGEMENT...
 
Realistic assessment of irrigation potential in the Lake Tana Basin, Ethiopia
Realistic assessment of irrigation potential in the Lake Tana Basin, EthiopiaRealistic assessment of irrigation potential in the Lake Tana Basin, Ethiopia
Realistic assessment of irrigation potential in the Lake Tana Basin, Ethiopia
 
Rainwater Harvesting - CTA Technical Centre
Rainwater Harvesting - CTA Technical Centre  Rainwater Harvesting - CTA Technical Centre
Rainwater Harvesting - CTA Technical Centre
 
Measuring discharge at a tradtitional small scale irrigation scheme; A person...
Measuring discharge at a tradtitional small scale irrigation scheme; A person...Measuring discharge at a tradtitional small scale irrigation scheme; A person...
Measuring discharge at a tradtitional small scale irrigation scheme; A person...
 
ILRI-BMZ Project on Improving the Livelihoods of Poor Livestock-keepers in Af...
ILRI-BMZ Project on Improving the Livelihoods of Poor Livestock-keepers in Af...ILRI-BMZ Project on Improving the Livelihoods of Poor Livestock-keepers in Af...
ILRI-BMZ Project on Improving the Livelihoods of Poor Livestock-keepers in Af...
 
Fs volume iv (eia) environment comments
Fs volume iv (eia) environment commentsFs volume iv (eia) environment comments
Fs volume iv (eia) environment comments
 
LIVES research framework
LIVES research frameworkLIVES research framework
LIVES research framework
 
Hailu Tefera/Assefa Tofu: Poverty alleviation and environmental restoration u...
Hailu Tefera/Assefa Tofu: Poverty alleviation and environmental restoration u...Hailu Tefera/Assefa Tofu: Poverty alleviation and environmental restoration u...
Hailu Tefera/Assefa Tofu: Poverty alleviation and environmental restoration u...
 
Furi and Bashargo (1)
Furi and Bashargo (1)Furi and Bashargo (1)
Furi and Bashargo (1)
 
The Africa RISING project in Ethiopia
The Africa RISING project in EthiopiaThe Africa RISING project in Ethiopia
The Africa RISING project in Ethiopia
 
Uma 7466
Uma 7466Uma 7466
Uma 7466
 
Knowledge and Innovation for Impact
Knowledge and Innovation for ImpactKnowledge and Innovation for Impact
Knowledge and Innovation for Impact
 
CSA Symposium 2016 -Shawn Miller Day 1 Session 3
CSA Symposium 2016 -Shawn Miller  Day 1 Session 3CSA Symposium 2016 -Shawn Miller  Day 1 Session 3
CSA Symposium 2016 -Shawn Miller Day 1 Session 3
 
Ci small scale farmers' coffee project
Ci small scale farmers' coffee projectCi small scale farmers' coffee project
Ci small scale farmers' coffee project
 
The impact of selected small-scale irrigation schemes on household income and...
The impact of selected small-scale irrigation schemes on household income and...The impact of selected small-scale irrigation schemes on household income and...
The impact of selected small-scale irrigation schemes on household income and...
 
Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...
 
IFPRI-Indicators for Assessing Performance of Extension Agencies: A Global Re...
IFPRI-Indicators for Assessing Performance of Extension Agencies: A Global Re...IFPRI-Indicators for Assessing Performance of Extension Agencies: A Global Re...
IFPRI-Indicators for Assessing Performance of Extension Agencies: A Global Re...
 
Africa; Agricultural Water Management Technologies for Small Scale Farmers i...
Africa;  Agricultural Water Management Technologies for Small Scale Farmers i...Africa;  Agricultural Water Management Technologies for Small Scale Farmers i...
Africa; Agricultural Water Management Technologies for Small Scale Farmers i...
 

Similar to Participatory small scale irrigation development program (PASIDP) project year 6, 9 month performance review workshop Adama, Ethiopia

Ifad cambodia overview of the portfolio jan2017
Ifad cambodia overview of the portfolio jan2017Ifad cambodia overview of the portfolio jan2017
Ifad cambodia overview of the portfolio jan2017Benoît THIERRY
 
My Portfolio in Plan International
My Portfolio in Plan InternationalMy Portfolio in Plan International
My Portfolio in Plan InternationalMaksudur Rahman
 
Uganda - Addressing agricultural resilience in long term climate planning ins...
Uganda - Addressing agricultural resilience in long term climate planning ins...Uganda - Addressing agricultural resilience in long term climate planning ins...
Uganda - Addressing agricultural resilience in long term climate planning ins...UNDP Climate
 
13. COSOP 2013-18 Implemenation Progress
13. COSOP 2013-18 Implemenation Progress13. COSOP 2013-18 Implemenation Progress
13. COSOP 2013-18 Implemenation Progressifadseahub
 
Planning commission and five year plan
Planning commission and five year planPlanning commission and five year plan
Planning commission and five year planRagjni Govindaraju
 
19aex112-schemesinhorticulturecrops-210726073121 (1).pptx
19aex112-schemesinhorticulturecrops-210726073121 (1).pptx19aex112-schemesinhorticulturecrops-210726073121 (1).pptx
19aex112-schemesinhorticulturecrops-210726073121 (1).pptxSamuVall
 
renforcement de la résilience des petits agriculteurs par les techniques de l...
renforcement de la résilience des petits agriculteurs par les techniques de l...renforcement de la résilience des petits agriculteurs par les techniques de l...
renforcement de la résilience des petits agriculteurs par les techniques de l...ArmandTanougong1
 
Snrmpep presentation to mission april 2016
Snrmpep presentation to mission april 2016Snrmpep presentation to mission april 2016
Snrmpep presentation to mission april 2016ifadseahub
 
Schemes in Horticulture crops
Schemes in Horticulture cropsSchemes in Horticulture crops
Schemes in Horticulture cropsAVKaaviya
 
Poverty alleviation programmes irdp, pmgsy, capart
Poverty alleviation programmes  irdp,  pmgsy, capartPoverty alleviation programmes  irdp,  pmgsy, capart
Poverty alleviation programmes irdp, pmgsy, capartKavi Priya J
 
National development and sectoral plans WP2_GWP Ghana case study_maxwell boat...
National development and sectoral plans WP2_GWP Ghana case study_maxwell boat...National development and sectoral plans WP2_GWP Ghana case study_maxwell boat...
National development and sectoral plans WP2_GWP Ghana case study_maxwell boat...Global Water Partnership
 
Common Guidelines for Watershed Development Projects-2008 (NRAA)
Common Guidelines  for Watershed Development Projects-2008 (NRAA)Common Guidelines  for Watershed Development Projects-2008 (NRAA)
Common Guidelines for Watershed Development Projects-2008 (NRAA)Dr. Ramdas Samarth
 
15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendations15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendationsifadseahub
 
Bokamoso ba rona-agri-briefing-presentation
Bokamoso ba rona-agri-briefing-presentationBokamoso ba rona-agri-briefing-presentation
Bokamoso ba rona-agri-briefing-presentationMokaraneMorganMotsep
 
Agricultural Transformation Agenda in GTP II
 Agricultural Transformation Agenda in GTP II Agricultural Transformation Agenda in GTP II
Agricultural Transformation Agenda in GTP IIILRI
 
Twelfth five year plan review
Twelfth five year plan reviewTwelfth five year plan review
Twelfth five year plan reviewSushant Karnik
 

Similar to Participatory small scale irrigation development program (PASIDP) project year 6, 9 month performance review workshop Adama, Ethiopia (20)

Ifad cambodia overview of the portfolio jan2017
Ifad cambodia overview of the portfolio jan2017Ifad cambodia overview of the portfolio jan2017
Ifad cambodia overview of the portfolio jan2017
 
EXT PPT.pptx
EXT PPT.pptxEXT PPT.pptx
EXT PPT.pptx
 
My Portfolio in Plan International
My Portfolio in Plan InternationalMy Portfolio in Plan International
My Portfolio in Plan International
 
pcfreaks
pcfreakspcfreaks
pcfreaks
 
Uganda - Addressing agricultural resilience in long term climate planning ins...
Uganda - Addressing agricultural resilience in long term climate planning ins...Uganda - Addressing agricultural resilience in long term climate planning ins...
Uganda - Addressing agricultural resilience in long term climate planning ins...
 
13. COSOP 2013-18 Implemenation Progress
13. COSOP 2013-18 Implemenation Progress13. COSOP 2013-18 Implemenation Progress
13. COSOP 2013-18 Implemenation Progress
 
Planning commission and five year plan
Planning commission and five year planPlanning commission and five year plan
Planning commission and five year plan
 
19aex112-schemesinhorticulturecrops-210726073121 (1).pptx
19aex112-schemesinhorticulturecrops-210726073121 (1).pptx19aex112-schemesinhorticulturecrops-210726073121 (1).pptx
19aex112-schemesinhorticulturecrops-210726073121 (1).pptx
 
renforcement de la résilience des petits agriculteurs par les techniques de l...
renforcement de la résilience des petits agriculteurs par les techniques de l...renforcement de la résilience des petits agriculteurs par les techniques de l...
renforcement de la résilience des petits agriculteurs par les techniques de l...
 
Snrmpep presentation to mission april 2016
Snrmpep presentation to mission april 2016Snrmpep presentation to mission april 2016
Snrmpep presentation to mission april 2016
 
Schemes in Horticulture crops
Schemes in Horticulture cropsSchemes in Horticulture crops
Schemes in Horticulture crops
 
Poverty alleviation programmes irdp, pmgsy, capart
Poverty alleviation programmes  irdp,  pmgsy, capartPoverty alleviation programmes  irdp,  pmgsy, capart
Poverty alleviation programmes irdp, pmgsy, capart
 
National development and sectoral plans WP2_GWP Ghana case study_maxwell boat...
National development and sectoral plans WP2_GWP Ghana case study_maxwell boat...National development and sectoral plans WP2_GWP Ghana case study_maxwell boat...
National development and sectoral plans WP2_GWP Ghana case study_maxwell boat...
 
Common Guidelines for Watershed Development Projects-2008 (NRAA)
Common Guidelines  for Watershed Development Projects-2008 (NRAA)Common Guidelines  for Watershed Development Projects-2008 (NRAA)
Common Guidelines for Watershed Development Projects-2008 (NRAA)
 
15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendations15. COSOP 2013-18 Recommendations
15. COSOP 2013-18 Recommendations
 
Monitoring caadp implementation in africa
Monitoring caadp implementation in africaMonitoring caadp implementation in africa
Monitoring caadp implementation in africa
 
Bokamoso ba rona-agri-briefing-presentation
Bokamoso ba rona-agri-briefing-presentationBokamoso ba rona-agri-briefing-presentation
Bokamoso ba rona-agri-briefing-presentation
 
MordernTheorists
MordernTheoristsMordernTheorists
MordernTheorists
 
Agricultural Transformation Agenda in GTP II
 Agricultural Transformation Agenda in GTP II Agricultural Transformation Agenda in GTP II
Agricultural Transformation Agenda in GTP II
 
Twelfth five year plan review
Twelfth five year plan reviewTwelfth five year plan review
Twelfth five year plan review
 

Recently uploaded

The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarHarsh Kumar
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppmiss dipika
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Roomdivyansh0kumar0
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxhiddenlevers
 
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...yordanosyohannes2
 
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Roomdivyansh0kumar0
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证rjrjkk
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHenry Tapper
 
Unveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net WorthUnveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net WorthShaheen Kumar
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130Suhani Kapoor
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantagesjayjaymabutot13
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyTyöeläkeyhtiö Elo
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证jdkhjh
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managmentfactical
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfMichael Silva
 

Recently uploaded (20)

The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh Kumar
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsApp
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
 
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
 
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview document
 
Unveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net WorthUnveiling the Top Chartered Accountants in India and Their Staggering Net Worth
Unveiling the Top Chartered Accountants in India and Their Staggering Net Worth
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantages
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managment
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdf
 

Participatory small scale irrigation development program (PASIDP) project year 6, 9 month performance review workshop Adama, Ethiopia

  • 1. Ministry of agriculture PASIDP Report for IFAD supervision Mission PY6, 2013/14
  • 2. Program Goal, Objectives and Components of PASIDP • The program goal of PASIDP is – to improve food security, – family nutrition and incomes of rural households. • Its primary objective is to develop a sustainable, farmer- owned and managed system of small-scale irrigated agriculture. • The objective will be realized mainly through enhanced empowerment of farmers in the – design, – construction and – operation and maintenance of the schemes, • underpinned by improved agricultural support services and strengthening institution at all levels including the grassroots.
  • 3. Program Goal, Objectives and Components of PASIDP PASIDP contains three major components, namely: • Institutions Development • Small-Scale Irrigation Development, and • Agricultural Development The Institution Development component includes: • promote highly participatory approach to small- scale irrigation development • strengthen institutional capacity to ensure effective coordination and management of planned activities; and improve the M&E system
  • 4. Program Goal, Objectives and Components of PASIDP The Small-scale Irrigation Development component promotes: • improve catchment area planning; • support planning, design, supervision and construction of small-scale irrigation schemes, and • improve scheme-to-market access roads. Agricultural Development component includes: • strengthen agricultural support services • improve farming practices mainly through better soil and water conservation measures • promote seed production, and • promote home gardens development,
  • 5. Small-Scale Irrigation Development Component • Thus based on this, major activities of small- scale irrigation development component for PY6 include: – improving catchments area planning – improving irrigation infrastructure – improving road access to schemes and market • Thus based on this, during the budget year (2013/14 or 2006 E.C), that is, in the 9 months, various types of schemes especially diversion and spate have started and found on different construction status.
  • 6. Small-Scale Irrigation Development Component • Schemes which are started from the project inception up to the end of Project Year (PY) 5 or 2013/2005 E.C are 69. • Among the started schemes, – 24 schemes are completed up to the end of PY5, – 45 of them are handled as an ongoing in the PY6 or 2013/14 or 2006 E.C.
  • 7. Small-Scale Irrigation Development Component • In the PY6 2013/14 or 2006 E.C, – 18 schemes are completed among the ongoing schemes, – 27 schemes are in different construction stages, above 80% on average. • The total schemes construction completed from the project inception up to PY6 of 3rd quarter is amounting to 42 with the total command area of 6,096 hectare benefiting 15,197 households which is a total of about 75,985 people.
  • 8. Small-Scale Irrigation Development Component • As to the new target of PY6 (2013/14 or 2006 E.C) the plan for scheme construction is 30, among which, – 16 are on progress of construction. – the remaining 12 schemes in Ormia region are still on bid and are said to be lagging behind the schedule. • The project life target for construction of SSI schemes is 125 with the total command area of 12,020 hectare, aim to benefit 35,430 households. • However, on the PY6, the total schemes under different stages of implementation or development are about 112 (99 schemes and 13 boreholes). • The total command area of these schemes is 12,201 hectare with 29,331 -households.
  • 9. Small-Scale Irrigation Development Component • Recently the completed scheme develop – 6,096 hectare and – benefiting 15,197 households which is 50% and 43% of the project targets respectively but • after the completion of all the schemes under construction the total command area will raise to about – 12,201 hectare and the total – beneficiaries of 29,331 households which is about 101% and 83.0% of the project life target respectively.
  • 10. PASIDP 2006 Plan and Achievement (9 Months ): SSI Development Status Schemes Amhara Oromia SNNP Tigray Total Remar k 1 Schemes started up to June 2013 (2005 E.C) 20 16 12 21 69 2 Schemes completed up to June 2013 (2005 E.C) 9 5 1 9 24 Ongoing Schemes 11 11 11 12 45 3 Ongoing Schemes completed in the last 9 months of (2006 E.C) 3 1 2 12 18 4 Ongoing Schemes not Completed till 3rd quarter of project year 6th 8 10 9 0 27 Total schemes completed 12 6 3 21 42 5 Target of New schemes for 2013/14 (2006 E.C ) 8 12 4 6+13=19 30+13=43 Additio nal are Bore holes Status of New Construction a. Construction 8 - 2 6+13=19 16+13=29 b. Bid - 12 - - 12 c. Study and design - - 2 - 2 Total scheme up to now 2013/14 (2006 E.C) 28 28 16 27+13=40 99+13=112
  • 11. Agricultural Development Component • PASIDP is designed to use small-scale irrigation as a mechanism to reduce poverty, improve food security and farmers’ incomes in the poor rural areas of the program regions. • The program is targeted mainly at the chronically food insecure, drought prone and highly populated areas. • It is focused on sustainable small-scale irrigation development and includes; – upper catchments treatment, – soil fertility rehabilitation and – soil and water conservation activities as measures to reverse the degradation of natural resources. • It integrates Integrated Pest Management (IPM) as a critical component of the program.
  • 12. Agricultural Development Component • The Agricultural Development component will: – (i) strengthen agricultural support services; – (ii) improve farming practices mainly through better soil and water conservation measures; – (iii) promote seed production; and – (iv) promote development of home gardens.
  • 13. PASIDP Performance up to Nine month of the project year 6th against the regions Target No Activity Description unit Target Achievement Cumulative at the end of previous year This Quarter Up to this Quarter % achievement Project life Comulative up to the end of py5 Annual This quarter up to this quarter From annual From inception % Quarter performance % 9month performanc e %Perfrom ance from Inception 1 Agricultural plan preparation Nu mbe r 271 142 129 0 144 125 8 87 178 60.42 65.68 2 Command area developed Ha 12020 6195 5825 480 3543 1102 3750 7564 8666 781 213.49 72.09 3 FRG main group established Num ber 362 250 112 10 124 183 56 94 277 560 75.81 76.52 4 Equipment for FTCs set 293 213 80 10 80 76 5 18 94 50 22.50 32.08 5 FRG Input prurchased and provided Fertilizer Qt 1724 1513 211 40 772 1384 97 149 1504 244 19.27 87.21 Improved seed Kg 11063 5587 5476 5100 14564 1955 3847 6013 6006 75 41.29 54.29 Chemicals /pestcide,herbici de/ Kg/ Lit 660 516 144 25 90 333 47 66 381 188 73.33 57.73 6 On farm demonstration conducted dem ons. 2763 1851 912 117 3324 3104 373 603 679 319 18.14 24.57 7 Home garden establishment Num ber 220 141 79 0 48 106 40 49 155 102.08 70.45 8 Improved stoves purchased and provided num ber 3146 1878 1268 368 468 748 362 390 998 98 83.33 31.72 9 Seed production demonstration conducted dem ons. 305 183 122 10 252 301 235 244 545 2350 96.83 178.69 10 Community nursery Num ber 66 17 49 23 66 29 28 38 67 122 57.58 101.52
  • 14. PASIDP Performance up to Nine month of project year 6th against the appraisal Target No Activity Description unit Target Achievement Cumulative at the end of previous year This Quarter Up to this Quarter %ge achievement Project life Comulative up to the end of py5 Annual This quarter up to this quarter From annual From inception %quarter performan ce % 9 month acieveme nt % achiveme nt from inception 1 Agricultural plan preparation Number 225 199 26 0 144 125 8 87 178 60.42 79.11 2 Command area developed Ha 12020 6195 5825 480 3543 1102 3750 7564 8666 781 213.49 72.09 3 FRG main group established Number 450 372 52 10 124 183 56 94 277 560 75.81 61.56 4 Equipment for FTCs set 225 213 80 10 80 76 5 18 94 50 22.50 41.78 5 FRG Input prurchased and provided Fertilizer Qt 1724 1513 211 40 772 1384 97 149 1504 244 19.27 87.21 Improved seed Kg 11063 5587 5476 5100 14564 1955 3847 6013 6006 75 41.29 54.29 Chemicals /pestcide,herbici de/ Kg/Lit 660 516 144 25 90 333 47 66 381 188 73.33 57.73 6 On farm demonstration conducted demons. 600 548 52 117 570 76 373 558 634 319 97.89 105.67 7 Home garden establishment Number 220 141 79 0 48 106 40 49 155 102.08 70.45 8 Improved stoves purchased and provided number 3146 1878 1268 368 468 748 362 390 998 98 83.33 31.72 9 Seed production demonstration conducted demons. 305 183 122 10 252 301 235 244 545 2350 96.83 178.69 10 Community nursery Number 66 17 49 23 66 29 28 38 67 122 57.58 101.52
  • 15. Institution Development Component • The objective of Institutional Development Component is to establish the institutional framework necessary to support – sustainable system of small-scale irrigation development in which indigenous knowledge highly considered and empowering of communities to participate in all phases of the project. • The staff at woreda, regional and federal government levels will be trained and sensitized to adopt a more participatory approach in their work. • Special attention will be paid to training WUAs in efficient water use and effective maintenance procedures. • Women will be given training to empower them to participate more confidently and effectively in decision making in the WUAs and in other kebele organizations.
  • 16. Institution Development Component Thus based on this perspective • Performance Review of the 2012/13 and Annual Work Plan and Budget of the Program for the year 2013/14 was conducted from 29 July – 2 August 2013 and on 21 – 22 September 2013 at Adama. • 2013/14 (EFY 2006) 6 month Performance of the Program Reviewed from 1 -5 February 2014 at Bahir Dar.
  • 17. Institution Development Component As to the trainings, various types of trainings have been conducted at federal level such as: • training for 25 participants with the theme Training of Trainers on “Gender Mainstreaming” from 16th – 20th September 2013 at Adama. • training for 43 participants with the theme “Irrigation Design and Study” from 14th of October – 1st November 2013 at Bahir Dar University. • training for 25 participants with the theme “Irrigation Agronomy” from 14th of October – 1st November 2013 at Melkasa Agricultural research Center. • training for 8 participants with the theme “Financial Management and Procurement” from 14th October – 1st November and 8 participants on “Advanced Project Management, Monitoring and Evaluation ” was conducted from 19th of November –to 6th December 2013 at IDEA International Institute Nairobi, Kenya.
  • 18. 2006 Four Regions 9 Month Performance Report Summery N o Planned Activities Un it Target Achievement Achievement in % Proj. life Cumula tiveupto endof previous year Ann ual Thi s quarter upto this quarter Cumula tiveupto endof previous year This quarter This year (up to this quarter) From inception this quarter upto thisquarter from projectlife 1 Staff Training No 2 WUAs Established & strengthened No 405 225 90 48 115 152 24 51 187 50 44 46 3 Regional Water Bureau No 312 260 52 60 673 781 37 93 874 62 14 28 0 4 Regional Agricultural Bureau No 140 100 20 23 7 1228 486 235 637 1123 99 52 80 2 5 Woreda staff No 522 388 126 99 8 2820 5150 1710 2597 7788 171 92 14 92 6 DA Training No 1050 696 236 11 79 2954 4073 5521 6399 10462 468 217 99 6 7 Communit y sensitization No 4652 8 25896 1031 6 0 11295 32912 9263 1027 2 43184 #DIV/ 0! 91 93 8 WUA training No 4594 4 25548 1019 8 61 68 14878 17842 2476 5039 22816 40 34 50 9 FHHs- managed home gardens development training No 2025 0 16740 2340 28 90 5200 2770 1950 1950 4720 67 38 23 1 0 FRG Training conducted to farmer No 2274 0 13740 4500 12 76 4864 10836 2960 4383 15219 232 90 67
  • 19. Financial Flow From PY1-PY6 Budget Year Loan Grant Exchange Rate difference Total Income 2008/09 9,747 10,127 2,435 22,309 2009/10 6,531 6,531 2,079 15,140 2010/11 41,672 27,732 1,318 70,723 2011/12 22,313 34,201 1,174 57,689 2012/13 56,326 54,888 811 112,025 2013/14 52,303 47,440 0 99,742 Total 188,891 180,919 7,817,356,50 377,628
  • 20. Financial Flow From PY1-PY6 IFAD Fund Expected for project Life Desberced as of March 30,2014 % accomplish ed Settlement Settlment % Loan 20000 12089 60 10653 89.0 Grant 20000 11900 60 10544 89.0 TOTAL 40000 23989 60 21197 89.0