Omar Rashid – Senior System Analyst
Al-Khobar Saudi Arabia
Mobile: +966-559058983
Email: oraashid@gmail.com
Professional Summary:
I am a qualified IT professional with a high level of experience in developing and
implementing the IT needs of a business. I am adept at performing support and
analysis across a large range of development and project activities, including
designing, coding, testing and implementing client/server and desktop
applications, and performing diagnosis and troubleshooting functions based on
Agile methodology with the tools like PowerBuilder, Vb.net, SSRS,ASP.net .
I possess strong organisational skills, analytical thoughts and I thrive in an
ambitious team environment. I am seeking a role where I can use my skills to
help with business growth and development.
Professional Experience:
• Saudi Global Ports – Dammam Saudi Arabia :- July 2015 to present
As a System Analyst
• Monu-Tech Information Systems –Khobar - Saudi Arabia Oct-2008 -
2014 :- System Analyst and Senior Programmer
• King Abdul Aziz City of Science and Technology (KACST) Riyadh Saudi
Arabia 23 September 1997 – October 2008:- Programmer
• Rizwi Software Consultancy Mumbai India April-97 to Sep-97 Programmer
• TISCO (Tata Iron and Steel Company). June 1994 to January 1995 Project
Trainee.
Professional Qualification:
• Master of Computer Application (MCA) 1995, From LNMI Patna Magadh
University Bodh Gaya India
• Bachelor of Commerce University Of Calcutta India
Certification & Training:
• SAP 4.6c ABAP/4 training integr8 Hyderabad India
• Fast track to Dynamic web page design using PowerSite
• Fast track to Java by Sybase
• Oracle Sql Plus.
Technical Skills
ERP : Monu-tech ERP, SAP ABAP
Languages : C#,PowerBuilder 9, 11, VB2012, ASP.net2012, ABAP/4, HTML,
XML, Java- script
1
RDBMS : MSSQL 2012, 2005, Sybase 11, Oracle 9i, Open-SQL. DB2i on iSeries for I V7R1
Tools : SSRS 2012, Info-maker 9, Crystal Report 9, TOAD DATAPOINT
Office : MS word 2007, excel, PowerPoint, Outlook 2007
Platform : Window 2007, XP, SAP NetWeaver 7
Saudi Global Ports Dammam July 2015 till present
Developing and managing various reports of the company from several DB2 Libraries
(database). Like CTCS (CONTAINER TERMINAL CONTROL SYSTEM), SPACE (Yard Planning) AND
SHIPS (Vessel Planning). Also creating views from all these Libraries and views composition of
above mentioned Libraries files (tables).
TOS Application (COSMOS) maintenance like creating users, groups and granting access
according to their rules in the TOS.
Major Reports Developed:
Export Status summary report: This report indicate which liner, how many manifested, and
how many received and how many cleared. This report is based on Bill of lading. This report is
very much useful for tracking the container status.
Hourly Moves per Crane: This report is how many containers are planned for discharge and
load by which crane. How much is executed every hours when vessel is on berth and how much
total discharged and loaded.
Terminal Departure Report: This report is subscribed to concerned official and liner when
vessel left the berth. This is for total discharged and loaded, how many restowed,
transshipment, all the details like OOG, Hazardous, and tonnage etc.
Last 24 hours report: How many containers loaded or discharged in last 24 hours. And how
many remaining per vessel voyage.
Productivity Report: How many containers stripped and stuffed-back daily shift wise.
Port Authority Reports : This include many reports like PA Daily Terminal Arabic Reports, This
report covers wide range of summary reports, Import Container, export containers in yard, How
many containers waiting for Delivery, waiting for Inspection, waiting for stripping and stuffed
back, Reefer containers, Riyadh containers.
Daily Railway report: This reports is also for Port Authority, It include total rail containers in the
yard, how many loaded on rail in last 24 hours, and other details of container and loading and
discharge.
GST, HST TCT Reports: These reports were very challenging and by grace of God, it is achieved
very nicely. Gate Service Time (GST) it is duration between A-check and P-check of truck
carrying containers.
2
Hauler Service Time (HST): This is CHE (execution Approval by Equipment) time minus P-check
(physical checking time of containers) on the truck.
Truck Completion Time (TCT): This is duration of truck’s time between P-Check and Gate out
Time.
These GST, HST, TCT reports are daily weekly and monthly. Daily reports are detail reports but
weekly and Monthly reports are summary.
There are many reports for export and import container processing. These are mentioned
below.
Daily Import Status, Awaiting Booking, Awaiting shifting from Yard to Inspection Yard, Awaiting
Seal Cutting, Awaiting Stripping, Awaiting Clearance, Awaiting Stuffing, Awaiting Delivery,
Awaiting Loading.
Vessel wise Inspection Nominated and non-Nominated containers Vessel wise dwell days
between discharge, Inspection, Clearance and Delivery and loading.
Vessel Activity Crane Logs, Long Dwell Days for awaiting Clearance. These and many others
report developed and modified by me.
All the above reports are developed using SSRS, Microsoft Visual Studio 2010. And as well
Report-Builder 3.0. Query analysis is done using Toad and backend Database is Db2i on iSeries.
Monu-Tech Information System, Alkhobar Saudi Arabia
October 15-2008 - June 2015
 System Analyst and senior Programmer
Presently, I am working for Monu-tech Information system. This company provides ERP System
for managing of your businesses in retail industry, trading, logistics, manufacturing industry,
and service segments. There are several Modules and sub Modules. Mainly this has Finance,
HR, Payrolls, Production, and Maintenance, Sales, Purchase and Project managements. As well
we have Hotel management modules.
I have worked and enhanced most of the above modules as per the customers need. In all the
modules emailing system, saving reports as PDF file and excel is enhanced by me.
The applications are developed using PowerBuilder 9.3 and back end is MSSQL 2005 and now
2008.
My Responsibilities Include:
• Determine the strategic capabilities of the firm.
• Plan, design and assign the work to developer.
• As per the customer needs and situation arises, any overall enhancement in the system.
• Adding new module and its design and development
• IF any bugs, then solve through myself or with the support of other programmers.
• Testing the application with support of others to ensure the application ready.
• Generate an effective plan tom achieve the set target.
• Recognize the client requirements to ensure maximum customer satisfaction.
• Evaluate the performance of the team.
3
• Assist in planning & implementing of major modifications like deletions & additions to
support regional infrastructure.
I want to mention that some module is totally designed and developed by me. These are
mentioned below
1. Heavy Equipment Rental system
2. Invoice management
3. Task management
4. Restaurant management
5. Housekeeping Of Hotel management
6. Hotel Sales Management
In some module I played substantial role these are below
1. General Ledger
2. Account Payable
3. Purchase Order
4. Order Entry and Billing
5. Human resources
6. Payroll
7. Maintenance Management
King Abdul Aziz City of Science and Technology (KACST)
Since Sep 1997-OCT 14 2008
This is an independent scientific organization administratively reporting to the Prime Minister.
KACST is both the Saudi Arabian national science agency and its national laboratories. The
science agency function involves science and technology policy making, data collection, funding
of external research, and services such as the patent office.
There is Computer Center which looks all the information technology needs of the KACST. I was
the software developer among the various developer works in Computer center. I used to
develop various applications for various department of KACST. Those applications developed,
modified and maintained by me are mentioned below.
1. Atomic System: -
This application is for Atomic Energy Research Institute in the KACST. This application is used
for complete information about radioactive elements used in the KSA, for example issuing the
license to organization which uses radioactive elements, giving certificates to the related
employees working in that field, keeping information import/export of radioactive elements
from outside countries and information details from police department for that radioactive or
isotopes and related employees. All these information’s are stored though this application.
Some portion of above was developed on web using ASP.net 2.
2. Current Awareness Emailing system for library:-
As KACST is a scientific and technological Institute of Saudi Arabia. In this there is big
library for scientific and technological books as well there are lots of magazines
4
subscribed for researcher and for technological persons for their interest of subjects.
Those persons who are members of library and wants to see articles related with their
interest of fields use to choose magazines through software made for that. All articles
heading related with those magazines which he/she subscribed are sent through email.
Note: - Now the part of same Current awareness system has been developed in VB.net.
Articles of the magazines are sent by email using crystal report and exported to PDF and
sent as file.
Employee attendance system (Follow-Up application): - This application is of Follow-up
department of KACST. This application is very much having business logic. This is a menu
driven application with complex reports.
2 Multilingual Dictionary for scientific Arabic terms BASM: -This application is very useful
for Arabic technical and scientific professionals. This application is like computer based
Arabic scientific dictionary.
3 Scientific Instruments Information System (SIIS):- This application is developed to
maintain information of Scientific Instruments used in the KACST. This application is
used by Measurement and Instruments center of KACST.
4 National Bibliographic Database (English) NBDE (DB10):- This is designed to provide online
information retrieval services that can help to accelerate the pace of research activities in
the Kingdom. This system represent national inventory of Saudi scientific and technical
literature generated in the Kingdom. This application was developed earlier. I redesigned
and developed this again.
5 Library Application system:- In this system there are several modules
a. Circulation Module
b. Books Module.
Note:-All the above application is developed and maintained and Modified
by me. Apart from these above, I also maintained and developed some other
application for KACST. Like …
8 Personal application.
9 Operation and Maintenance application.
10 Warehouse application.
Personality and organization system: - This is application was planned and designed by
one NGO. I was member of the team of designing database of that system. And honestly
I enjoyed in designing that system. Because there was lot of interesting information I got
in designing that system.
5
Rizvi Software Consultancy: - 04-06-97 to Sept. 97:- This is software Consultancy Company
where I worked for few months as a programmer.
I was team member of South African company project. In that system there were
several modules. I worked in trading modules. This application was developed in
PowerBuilder 4.0 and backend was Oracle 7. That was the First Project where I learned
PowerBuilder and developed application in that.
Project Trainee: - In Master of Computer application MCA course which is postgraduate course
of three years. The last semester is of project training. I did that project from India one of the
most renowned companies TISCO (Tata Iron and Steel Company).
My project was to develop SlabCatser Metallurgical Information System. This project was real-
time information of steel grade on the basis of chemistry and abnormalities in casting.
Front-End:- Oracle form2.3 and RPT, Back-End: - Oracle 6.0 under UNIX environment.
I got certificate on this project from scientific division of TATA Steel. And got 3rd position in last
semester on the basis of project
Personal Profile:
Father’s Name : Abdul Fattah (late)
Date of Birth : 5th
January 1970
Nationality : Indian
Marital Status : Married
Passport No : J5367960
Languages:-
Urdu English Hindi Arabic
(mother
tongue)
Fluent (spoken and
written)
Fluent (spoken and
written)
Little bit
Overall Personality:
Success oriented, outgoing with a positive attitude, strong sense of responsibility
and self-motivation. Good written oral and inter personal communication skills,
team player with proven leadership qualities, creative, flexible and effective
work habits. I am open to learning and can transform myself as an asset for any
organization.
Iqama: - Transferable InshaAllah
Place: - ALKhober Dammam
6
Rizvi Software Consultancy: - 04-06-97 to Sept. 97:- This is software Consultancy Company
where I worked for few months as a programmer.
I was team member of South African company project. In that system there were
several modules. I worked in trading modules. This application was developed in
PowerBuilder 4.0 and backend was Oracle 7. That was the First Project where I learned
PowerBuilder and developed application in that.
Project Trainee: - In Master of Computer application MCA course which is postgraduate course
of three years. The last semester is of project training. I did that project from India one of the
most renowned companies TISCO (Tata Iron and Steel Company).
My project was to develop SlabCatser Metallurgical Information System. This project was real-
time information of steel grade on the basis of chemistry and abnormalities in casting.
Front-End:- Oracle form2.3 and RPT, Back-End: - Oracle 6.0 under UNIX environment.
I got certificate on this project from scientific division of TATA Steel. And got 3rd position in last
semester on the basis of project
Personal Profile:
Father’s Name : Abdul Fattah (late)
Date of Birth : 5th
January 1970
Nationality : Indian
Marital Status : Married
Passport No : J5367960
Languages:-
Urdu English Hindi Arabic
(mother
tongue)
Fluent (spoken and
written)
Fluent (spoken and
written)
Little bit
Overall Personality:
Success oriented, outgoing with a positive attitude, strong sense of responsibility
and self-motivation. Good written oral and inter personal communication skills,
team player with proven leadership qualities, creative, flexible and effective
work habits. I am open to learning and can transform myself as an asset for any
organization.
Iqama: - Transferable InshaAllah
Place: - ALKhober Dammam
6

orashid_2016_New

  • 1.
    Omar Rashid –Senior System Analyst Al-Khobar Saudi Arabia Mobile: +966-559058983 Email: oraashid@gmail.com Professional Summary: I am a qualified IT professional with a high level of experience in developing and implementing the IT needs of a business. I am adept at performing support and analysis across a large range of development and project activities, including designing, coding, testing and implementing client/server and desktop applications, and performing diagnosis and troubleshooting functions based on Agile methodology with the tools like PowerBuilder, Vb.net, SSRS,ASP.net . I possess strong organisational skills, analytical thoughts and I thrive in an ambitious team environment. I am seeking a role where I can use my skills to help with business growth and development. Professional Experience: • Saudi Global Ports – Dammam Saudi Arabia :- July 2015 to present As a System Analyst • Monu-Tech Information Systems –Khobar - Saudi Arabia Oct-2008 - 2014 :- System Analyst and Senior Programmer • King Abdul Aziz City of Science and Technology (KACST) Riyadh Saudi Arabia 23 September 1997 – October 2008:- Programmer • Rizwi Software Consultancy Mumbai India April-97 to Sep-97 Programmer • TISCO (Tata Iron and Steel Company). June 1994 to January 1995 Project Trainee. Professional Qualification: • Master of Computer Application (MCA) 1995, From LNMI Patna Magadh University Bodh Gaya India • Bachelor of Commerce University Of Calcutta India Certification & Training: • SAP 4.6c ABAP/4 training integr8 Hyderabad India • Fast track to Dynamic web page design using PowerSite • Fast track to Java by Sybase • Oracle Sql Plus. Technical Skills ERP : Monu-tech ERP, SAP ABAP Languages : C#,PowerBuilder 9, 11, VB2012, ASP.net2012, ABAP/4, HTML, XML, Java- script 1
  • 2.
    RDBMS : MSSQL2012, 2005, Sybase 11, Oracle 9i, Open-SQL. DB2i on iSeries for I V7R1 Tools : SSRS 2012, Info-maker 9, Crystal Report 9, TOAD DATAPOINT Office : MS word 2007, excel, PowerPoint, Outlook 2007 Platform : Window 2007, XP, SAP NetWeaver 7 Saudi Global Ports Dammam July 2015 till present Developing and managing various reports of the company from several DB2 Libraries (database). Like CTCS (CONTAINER TERMINAL CONTROL SYSTEM), SPACE (Yard Planning) AND SHIPS (Vessel Planning). Also creating views from all these Libraries and views composition of above mentioned Libraries files (tables). TOS Application (COSMOS) maintenance like creating users, groups and granting access according to their rules in the TOS. Major Reports Developed: Export Status summary report: This report indicate which liner, how many manifested, and how many received and how many cleared. This report is based on Bill of lading. This report is very much useful for tracking the container status. Hourly Moves per Crane: This report is how many containers are planned for discharge and load by which crane. How much is executed every hours when vessel is on berth and how much total discharged and loaded. Terminal Departure Report: This report is subscribed to concerned official and liner when vessel left the berth. This is for total discharged and loaded, how many restowed, transshipment, all the details like OOG, Hazardous, and tonnage etc. Last 24 hours report: How many containers loaded or discharged in last 24 hours. And how many remaining per vessel voyage. Productivity Report: How many containers stripped and stuffed-back daily shift wise. Port Authority Reports : This include many reports like PA Daily Terminal Arabic Reports, This report covers wide range of summary reports, Import Container, export containers in yard, How many containers waiting for Delivery, waiting for Inspection, waiting for stripping and stuffed back, Reefer containers, Riyadh containers. Daily Railway report: This reports is also for Port Authority, It include total rail containers in the yard, how many loaded on rail in last 24 hours, and other details of container and loading and discharge. GST, HST TCT Reports: These reports were very challenging and by grace of God, it is achieved very nicely. Gate Service Time (GST) it is duration between A-check and P-check of truck carrying containers. 2
  • 3.
    Hauler Service Time(HST): This is CHE (execution Approval by Equipment) time minus P-check (physical checking time of containers) on the truck. Truck Completion Time (TCT): This is duration of truck’s time between P-Check and Gate out Time. These GST, HST, TCT reports are daily weekly and monthly. Daily reports are detail reports but weekly and Monthly reports are summary. There are many reports for export and import container processing. These are mentioned below. Daily Import Status, Awaiting Booking, Awaiting shifting from Yard to Inspection Yard, Awaiting Seal Cutting, Awaiting Stripping, Awaiting Clearance, Awaiting Stuffing, Awaiting Delivery, Awaiting Loading. Vessel wise Inspection Nominated and non-Nominated containers Vessel wise dwell days between discharge, Inspection, Clearance and Delivery and loading. Vessel Activity Crane Logs, Long Dwell Days for awaiting Clearance. These and many others report developed and modified by me. All the above reports are developed using SSRS, Microsoft Visual Studio 2010. And as well Report-Builder 3.0. Query analysis is done using Toad and backend Database is Db2i on iSeries. Monu-Tech Information System, Alkhobar Saudi Arabia October 15-2008 - June 2015  System Analyst and senior Programmer Presently, I am working for Monu-tech Information system. This company provides ERP System for managing of your businesses in retail industry, trading, logistics, manufacturing industry, and service segments. There are several Modules and sub Modules. Mainly this has Finance, HR, Payrolls, Production, and Maintenance, Sales, Purchase and Project managements. As well we have Hotel management modules. I have worked and enhanced most of the above modules as per the customers need. In all the modules emailing system, saving reports as PDF file and excel is enhanced by me. The applications are developed using PowerBuilder 9.3 and back end is MSSQL 2005 and now 2008. My Responsibilities Include: • Determine the strategic capabilities of the firm. • Plan, design and assign the work to developer. • As per the customer needs and situation arises, any overall enhancement in the system. • Adding new module and its design and development • IF any bugs, then solve through myself or with the support of other programmers. • Testing the application with support of others to ensure the application ready. • Generate an effective plan tom achieve the set target. • Recognize the client requirements to ensure maximum customer satisfaction. • Evaluate the performance of the team. 3
  • 4.
    • Assist inplanning & implementing of major modifications like deletions & additions to support regional infrastructure. I want to mention that some module is totally designed and developed by me. These are mentioned below 1. Heavy Equipment Rental system 2. Invoice management 3. Task management 4. Restaurant management 5. Housekeeping Of Hotel management 6. Hotel Sales Management In some module I played substantial role these are below 1. General Ledger 2. Account Payable 3. Purchase Order 4. Order Entry and Billing 5. Human resources 6. Payroll 7. Maintenance Management King Abdul Aziz City of Science and Technology (KACST) Since Sep 1997-OCT 14 2008 This is an independent scientific organization administratively reporting to the Prime Minister. KACST is both the Saudi Arabian national science agency and its national laboratories. The science agency function involves science and technology policy making, data collection, funding of external research, and services such as the patent office. There is Computer Center which looks all the information technology needs of the KACST. I was the software developer among the various developer works in Computer center. I used to develop various applications for various department of KACST. Those applications developed, modified and maintained by me are mentioned below. 1. Atomic System: - This application is for Atomic Energy Research Institute in the KACST. This application is used for complete information about radioactive elements used in the KSA, for example issuing the license to organization which uses radioactive elements, giving certificates to the related employees working in that field, keeping information import/export of radioactive elements from outside countries and information details from police department for that radioactive or isotopes and related employees. All these information’s are stored though this application. Some portion of above was developed on web using ASP.net 2. 2. Current Awareness Emailing system for library:- As KACST is a scientific and technological Institute of Saudi Arabia. In this there is big library for scientific and technological books as well there are lots of magazines 4
  • 5.
    subscribed for researcherand for technological persons for their interest of subjects. Those persons who are members of library and wants to see articles related with their interest of fields use to choose magazines through software made for that. All articles heading related with those magazines which he/she subscribed are sent through email. Note: - Now the part of same Current awareness system has been developed in VB.net. Articles of the magazines are sent by email using crystal report and exported to PDF and sent as file. Employee attendance system (Follow-Up application): - This application is of Follow-up department of KACST. This application is very much having business logic. This is a menu driven application with complex reports. 2 Multilingual Dictionary for scientific Arabic terms BASM: -This application is very useful for Arabic technical and scientific professionals. This application is like computer based Arabic scientific dictionary. 3 Scientific Instruments Information System (SIIS):- This application is developed to maintain information of Scientific Instruments used in the KACST. This application is used by Measurement and Instruments center of KACST. 4 National Bibliographic Database (English) NBDE (DB10):- This is designed to provide online information retrieval services that can help to accelerate the pace of research activities in the Kingdom. This system represent national inventory of Saudi scientific and technical literature generated in the Kingdom. This application was developed earlier. I redesigned and developed this again. 5 Library Application system:- In this system there are several modules a. Circulation Module b. Books Module. Note:-All the above application is developed and maintained and Modified by me. Apart from these above, I also maintained and developed some other application for KACST. Like … 8 Personal application. 9 Operation and Maintenance application. 10 Warehouse application. Personality and organization system: - This is application was planned and designed by one NGO. I was member of the team of designing database of that system. And honestly I enjoyed in designing that system. Because there was lot of interesting information I got in designing that system. 5
  • 6.
    Rizvi Software Consultancy:- 04-06-97 to Sept. 97:- This is software Consultancy Company where I worked for few months as a programmer. I was team member of South African company project. In that system there were several modules. I worked in trading modules. This application was developed in PowerBuilder 4.0 and backend was Oracle 7. That was the First Project where I learned PowerBuilder and developed application in that. Project Trainee: - In Master of Computer application MCA course which is postgraduate course of three years. The last semester is of project training. I did that project from India one of the most renowned companies TISCO (Tata Iron and Steel Company). My project was to develop SlabCatser Metallurgical Information System. This project was real- time information of steel grade on the basis of chemistry and abnormalities in casting. Front-End:- Oracle form2.3 and RPT, Back-End: - Oracle 6.0 under UNIX environment. I got certificate on this project from scientific division of TATA Steel. And got 3rd position in last semester on the basis of project Personal Profile: Father’s Name : Abdul Fattah (late) Date of Birth : 5th January 1970 Nationality : Indian Marital Status : Married Passport No : J5367960 Languages:- Urdu English Hindi Arabic (mother tongue) Fluent (spoken and written) Fluent (spoken and written) Little bit Overall Personality: Success oriented, outgoing with a positive attitude, strong sense of responsibility and self-motivation. Good written oral and inter personal communication skills, team player with proven leadership qualities, creative, flexible and effective work habits. I am open to learning and can transform myself as an asset for any organization. Iqama: - Transferable InshaAllah Place: - ALKhober Dammam 6
  • 7.
    Rizvi Software Consultancy:- 04-06-97 to Sept. 97:- This is software Consultancy Company where I worked for few months as a programmer. I was team member of South African company project. In that system there were several modules. I worked in trading modules. This application was developed in PowerBuilder 4.0 and backend was Oracle 7. That was the First Project where I learned PowerBuilder and developed application in that. Project Trainee: - In Master of Computer application MCA course which is postgraduate course of three years. The last semester is of project training. I did that project from India one of the most renowned companies TISCO (Tata Iron and Steel Company). My project was to develop SlabCatser Metallurgical Information System. This project was real- time information of steel grade on the basis of chemistry and abnormalities in casting. Front-End:- Oracle form2.3 and RPT, Back-End: - Oracle 6.0 under UNIX environment. I got certificate on this project from scientific division of TATA Steel. And got 3rd position in last semester on the basis of project Personal Profile: Father’s Name : Abdul Fattah (late) Date of Birth : 5th January 1970 Nationality : Indian Marital Status : Married Passport No : J5367960 Languages:- Urdu English Hindi Arabic (mother tongue) Fluent (spoken and written) Fluent (spoken and written) Little bit Overall Personality: Success oriented, outgoing with a positive attitude, strong sense of responsibility and self-motivation. Good written oral and inter personal communication skills, team player with proven leadership qualities, creative, flexible and effective work habits. I am open to learning and can transform myself as an asset for any organization. Iqama: - Transferable InshaAllah Place: - ALKhober Dammam 6